Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 4 traffic impacts in the NE district to report.

Road closed due to traffic impact 2 Road(s) closed due to traffic impact
Expect delays due to traffic impact 0 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 0 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 2 Closure(s) due to planned event(s)
Expect delays due to planned event 0 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to planned event RT P S - RALLS County - CLOSED
PLANNED
Road closure begins MO 19 S, and ends .002 mile(s) before CST W MASON ST E.
Reported 10/31/2026 4:30:00 PM.
Closure estimated to last 4 hour(s).
Road closed due to planned event RT P N - RALLS County - CLOSED
PLANNED
Road closure begins .002 mile(s) after CST W MASON ST E, and ends MO 19 S.
Reported 10/31/2026 4:30:00 PM.
Closure estimated to last 4 hour(s).

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 10 closure(s) due to work zone(s) in the NE district to report.

Road closed due to work zone 10 Road(s) closed due to work zone
Road closed due to workzone RT W N - PIKE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .413 mile(s) after RT H E and ends at .568 mile(s) after RT H E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W S - PIKE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .568 mile(s) before RT H E and ends at .413 mile(s) before RT H E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 47 S - LINCOLN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) after CRD FRED NORTON RD S and ends at .001 mile(s) after CRD BOHEMIAN CHURCH RD S.
Work is scheduled from 05-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 47 N - LINCOLN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .004 mile(s) after PVT FARM LN E and ends at .001 mile(s) before CRD FRED NORTON RD S.
Work is scheduled from 05-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD TREE FARM RD E - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .269 mile(s) before CRD BUECHELE RD S and ends at .005 mile(s) before CRD PINNACLE LAKE RD S.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD TREE FARM RD W - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .005 mile(s) after CRD PINNACLE LAKE RD S and ends at .269 mile(s) after CRD BUECHELE RD S.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TREE FARM RD E - MONTGOMERY County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at .029 mile(s) after OR 70 W and ends at .723 mile(s) after OR 70 W.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TREE FARM RD W - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .723 mile(s) before OR 70 E and ends at .029 mile(s) before OR 70 E.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT VV S - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .117 mile(s) before RR BNSF RAILWAY MARCELINE SUB E and ends at .13 mile(s) before CRD BISON ST E.
Work is scheduled from 15-OCT-2026 to 30-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT VV N - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .13 mile(s) after CRD BISON ST E and ends at .117 mile(s) after RR BNSF RAILWAY MARCELINE SUB E.
Work is scheduled from 15-OCT-2026 to 30-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 38 work zones where you can expect delays, or, where delays are not expected, but possible, in the NE district to report.

Expected delay(s) due to work zone 17 Expected delay(s) due to work zone
Possible delay(s) due to work zone 21 Possible delay(s) due to work zone
Possible delays due to workzone RT P E - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .029 mile(s) after MO 6 E and ends at .242 mile(s) before US 63 S.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P W - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .242 mile(s) after US 63 S and ends at .029 mile(s) before MO 6 E.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P E - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .145 mile(s) after OR 63 S and ends at .014 mile(s) before CRD EAST CENTER WAY E.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P W - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .014 mile(s) after CRD EAST CENTER WAY E and ends at .145 mile(s) before OR 63 S.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H S - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST BOUNDARY ST S and ends at MO 11 S.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H N - ADAIR County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 11 S and ends at CST BOUNDARY ST S.
Work is scheduled from 29-SEP-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H N - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .045 mile(s) after CRD 114 E and ends at MO 151 S.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H S - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 151 S and ends at .045 mile(s) before CRD 114 E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 15 S - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST W ELM ST E and ends at CST W BEECH ST E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 15 N - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST E BEECH ST E and ends at CST W ELM ST E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 W - MONROE County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .021 mile(s) after RT W E and ends at .004 mile(s) before CRD 486 E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 E - MONROE County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .004 mile(s) after CRD 486 E and ends at .021 mile(s) before RT W E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT O S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST OAKLAND AVE S and ends at .001 mile(s) before CST FRONT ST E.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST FRONT ST E and ends at CST OAKLAND AVE S.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 149 N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST SECOND ST E and ends at .001 mile(s) before CST TENTH ST E.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 149 S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST TENTH ST E and ends at CST SECOND ST E.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DAVIS RD N - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) after RT KK E and ends at CRD DAVIS RD E.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DAVIS RD S - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD DAVIS RD E and ends at .004 mile(s) before RT KK E.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 61 S - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .093 mile(s) before CST ESTATES DR E and ends at CST NORTH LINCOLN DR S.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 61 N - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST NORTH LINCOLN DR S and ends at .093 mile(s) after CST ESTATES DR E.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST DUGAN LN E - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at OR 61 S and ends at .285 mile(s) after OR 61 S.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST DUGAN LN W - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .285 mile(s) before OR 61 S and ends at OR 61 S.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone E OR 61 N - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .026 mile(s) after CST BLUFFVIEW DR S and ends at .027 mile(s) after OR 61 S.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone E OR 61 S - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .027 mile(s) before OR 61 S and ends at .026 mile(s) before CST BLUFFVIEW DR S.
Work is scheduled from 14-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .187 mile(s) before RP IS70W TO MO47 W and ends at .017 mile(s) after RP IS70W TO W WARRENTON BLVD W.
Work is scheduled from 24-OCT-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at RP MO47 TO IS70E E and ends at .025 mile(s) after RP IS70E TO WILDCAT DR S.
Work is scheduled from 05-DEC-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .051 mile(s) before RP WILDCAT DR TO IS70W W and ends at .043 mile(s) before RP IS70W TO MO47 W.
Work is scheduled from 05-DEC-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .038 mile(s) before RP W WARRENTON BLVD TO IS70E E and ends at .144 mile(s) after RP MO47 TO IS70E E.
Work is scheduled from 24-OCT-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) before RA IS70E WRIGHT CITY E and ends at .123 mile(s) after RP RTF TO IS70E E.
Work is scheduled from 04-MAY-2026 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone US 136 W - SCHUYLER County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .04 mile(s) after PVT PRIVATE DR S and ends at .011 mile(s) before MO 5 S.
Work is scheduled from 03-AUG-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 63 N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .018 mile(s) before CST PATTERSON ST E and ends at .003 mile(s) after MO 6 E.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 63 S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before MO 6 E and ends at .018 mile(s) after CST PATTERSON ST E.
Work is scheduled from 17-AUG-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .124 mile(s) before RP IS70W TO RTF W and ends at .252 mile(s) after RA IS70W WRIGHT CITY W.
Work is scheduled from 04-MAY-2026 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
MEDIAN OR SHOULDER
Work zone begins at .031 mile(s) after RP RTF TO IS70E E and ends at .007 mile(s) after RT W N.
Work is scheduled from 23-OCT-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone MO 15 N - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST YALE ST E and ends at .119 mile(s) before CST PARIS RD S.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 15 S - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .119 mile(s) after CST PARIS RD S and ends at .005 mile(s) after CST YALE ST E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone BU 54 E - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before MO 22 E and ends at .002 mile(s) before RT J E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone BU 54 W - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after RT J E and ends at .001 mile(s) after MO 22 E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 19 work zone(s) in the NE district planned for a future date.

Future work zone(s) 19 Future work zone(s)
Future work zone RT B W - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after CRD BETHEL CHR RD S and ends at .002 mile(s) before RT ZZ S.
Work is scheduled from 27-OCT-2026 to 27-OCT-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after CRD CASE RD S and ends at .014 mile(s) before CRD HARVEY RD S.
Work is scheduled from 28-OCT-2026 to 28-OCT-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .014 mile(s) after CRD HARVEY RD S and ends at .01 mile(s) before CRD CASE RD S.
Work is scheduled from 28-OCT-2026 to 28-OCT-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .011 mile(s) after CRD DEER HOLLOW RD E and ends at .009 mile(s) before CRD MEXICO RD S.
Work is scheduled from 29-OCT-2026 to 29-OCT-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after CRD MEXICO RD S and ends at .011 mile(s) before CRD DEER HOLLOW RD E.
Work is scheduled from 29-OCT-2026 to 29-OCT-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .012 mile(s) after CRD SAILOR RD E and ends at .019 mile(s) before CRD BETHEL CHR RD S.
Work is scheduled from 30-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .019 mile(s) after CRD BETHEL CHR RD S and ends at .012 mile(s) before CRD SAILOR RD E.
Work is scheduled from 30-OCT-2026 to 30-OCT-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after CRD BETHEL CHR RD S and ends at .006 mile(s) before CRD SAILOR RD E.
Work is scheduled from 30-OCT-2026 to 30-OCT-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - MONTGOMERY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) after CRD SAILOR RD E and ends at .002 mile(s) before CRD BETHEL CHR RD S.
Work is scheduled from 30-OCT-2026 to 30-OCT-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - MONTGOMERY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .015 mile(s) after RT ZZ S and ends at .002 mile(s) before RR SAINT LOUIS DISTRICT E.
Work is scheduled from 26-OCT-2026 to 26-OCT-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - MONTGOMERY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after RR SAINT LOUIS DISTRICT E and ends at .015 mile(s) before RT ZZ S.
Work is scheduled from 26-OCT-2026 to 26-OCT-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ E - RANDOLPH County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .001 mile(s) after RT C S and ends at US 24 E.
Work is scheduled from 26-OCT-2026 to 26-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ W - RANDOLPH County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at US 24 E and ends at .001 mile(s) before RT C S.
Work is scheduled from 26-OCT-2026 to 26-OCT-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone N OR 70 E - WARREN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .03 mile(s) after CST N STRINGTOWN RD S and ends at .031 mile(s) before CST COTTON RD S.
Work is scheduled from 26-OCT-2026 to 11-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone N OR 70 W - WARREN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .031 mile(s) after CST COTTON RD S and ends at .03 mile(s) before CST N STRINGTOWN RD S.
Work is scheduled from 26-OCT-2026 to 11-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 70 E - MONTGOMERY County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .096 mile(s) after RT N S and ends at .057 mile(s) before RP W WARRENTON BLVD TO IS70E E.
Work is scheduled from 26-OCT-2026 to 30-OCT-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 63 N - ADAIR County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .013 mile(s) after CRD DOGWOOD LN S and ends at .03 mile(s) before BU 63 S.
Work is scheduled from 02-NOV-2026 to 06-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - SHELBY County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .159 mile(s) before RP US36E TO MO15 S and ends at .398 mile(s) after BU 36 E.
Work is scheduled from 26-OCT-2026 to 28-OCT-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - SHELBY County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .316 mile(s) before CRD 462 E and ends at .143 mile(s) after RP MO15 TO US36W W.
Work is scheduled from 26-OCT-2026 to 28-OCT-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 10-25-2026 at 03:10 AM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
47
MO 79 (Lincoln) TO MO 61 (Lincoln) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 10-25-2026 at 03:10 AM
Missouri Route
79
RT H (Pike) TO St. Charles County Line Road reported clear CLEAR 10-25-2026 at 03:10 AM
RP IS70E TO MO19
RP IS70E TO MO19 E Road reported clear CLEAR 10-25-2026 at 03:10 AM
RP IS70E TO MO47
RP IS70E TO MO47 E Road reported clear CLEAR 10-25-2026 at 03:10 AM
RP MO19 TO IS70E
RP MO19 TO IS70E E Road reported clear CLEAR 10-25-2026 at 03:10 AM
RP MO47 TO IS70E
RP MO47 TO IS70E E Road reported clear CLEAR 10-25-2026 at 03:10 AM
BACK TO TOP
Version Information: 27835 b223ab5185e084ae98dfbe5b55c884a33114657e 2026-10-20 20:35:42Z