Report Date: Thursday, November 12, 2026 7:09:56 AM

Use the dropdown boxes below to filter the results.

Traffic Impact

BACK TO TOP

Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 28 traffic impacts to report.

Road closed due to traffic impact 10 Road(s) closed due to traffic impact
Expect delays due to traffic impact 9 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 6 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 3 Closure(s) due to planned event(s)
Expect delays due to planned event 0 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to traffic impact IS 35 S - CLAY County - CLOSED
VEHICLE CRASH
Road closure begins .206 mile(s) before US 69 S, and ends RP WINN RD TO IS35S S.
Reported 11/12/2026 6:48:00 AM.
Closure estimated to last 1 hour(s).
Road closed due to traffic impact CRD 206 W - DUNKLIN County - CLOSED
BRIDGE DAMAGE
Road closure begins .276 mile(s) before MO 53 S, and ends MO 53 S.
Reported 8/25/2025 2:48:00 PM.
Road closed until further notice.
Road closed due to traffic impact CRD 206 E - DUNKLIN County - CLOSED
BRIDGE DAMAGE
Road closure begins MO 53 S, and ends .276 mile(s) after MO 53 S.
Reported 8/25/2025 2:48:00 PM.
Road closed until further notice.
Road closed due to planned event RA IS44E ST CLAIR E - FRANKLIN County - CLOSED
PLANNED
Road closure begins IS 44 E, and ends IS 44 E.
Reported 4/2/2026 11:57:00 AM.
Road closed until further notice.
Expect delays due to traffic impact IS 435 N - JACKSON County - EXPECT DELAYS
VEHICLE CRASH
Incident begins .042 mile(s) before CST HAWTHORNE RD E, and ends .023 mile(s) after RR UNKNOWN STUB S.
Reported 11/12/2026 6:56:00 AM.
Traffic impact estimated to last 1 hour(s).
Expect delays due to traffic impact CRD 201 N - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .007 mile(s) before RT OO E, and ends RT OO E.
Reported 3/22/2026 12:32:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact CRD 201 S - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins RT OO E, and ends .007 mile(s) after RT OO E.
Reported 3/22/2026 12:32:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT OO E - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .019 mile(s) before CRD 201 S, and ends .019 mile(s) after CRD 201 S.
Reported 3/22/2026 12:02:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT OO W - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .019 mile(s) before CRD 201 S, and ends .019 mile(s) after CRD 201 S.
Reported 3/22/2026 12:02:00 PM.
Traffic will be implacted until further notice.
Road closed due to planned event MO 11 S - LINN County - CLOSED
PLANNED
Road closure begins .011 mile(s) after RT M S, and ends .01 mile(s) after CST W CLARK ST E.
Reported 12/5/2026 4:30:00 PM.
Closure estimated to last 2 hour(s).
Road closed due to planned event MO 11 N - LINN County - CLOSED
PLANNED
Road closure begins .01 mile(s) before CST E CLARK ST E, and ends .011 mile(s) before RT M S.
Reported 12/5/2026 4:30:00 PM.
Closure estimated to last 2 hour(s).
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Expect delays due to traffic impact IS 70 E - ST. LOUIS County - EXPECT DELAYS
VEHICLE CRASH
Incident begins .387 mile(s) before RP IS70E TO JENNINGS STATION RD E, and ends .037 mile(s) before CST JENNINGS STATION RD S.
Reported 11/12/2026 6:37:00 AM.
Traffic impact estimated to last 1 hour(s).
Expect delays due to traffic impact RT P S - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .013 mile(s) before CRD HEEGE RD E, and ends .011 mile(s) after CRD HEEGE RD E.
Reported 11/12/2026 6:59:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT P N - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .011 mile(s) before CRD HEEGE RD E, and ends .013 mile(s) after CRD HEEGE RD E.
Reported 11/12/2026 6:59:00 AM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RV 70 E - ST. LOUIS CITY County - CLOSED
UTILITY DAMAGE
Road closure begins IS 70 E, and ends .126 mile(s) before CST UNION BLVD S.
Reported 6/26/2026 5:02:00 PM.
Road closed until further notice.
Road closed due to traffic impact CST BROADWAY S - ST. LOUIS CITY County - CLOSED
UTILITY DAMAGE
Road closure begins CST BROADWAY S, and ends .001 mile(s) after RT D E.
Reported 6/14/2026 5:39:00 PM.
Road closed until further notice.
Road closed due to traffic impact RP BROADWAY TO IS44E E - ST. LOUIS CITY County - CLOSED
UTILITY DAMAGE
Road closure begins CST BROADWAY N, and ends IS 44 E.
Reported 6/14/2026 5:42:00 PM.
Road closed until further notice.
Possible delays due to traffic impact RT D W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .002 mile(s) before CST PENDLETON AVE S, and ends .006 mile(s) after CST PENDLETON AVE S.
Reported 11/11/2026 10:27:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D E - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .005 mile(s) before CST NEWSTEAD AVE S, and ends .002 mile(s) after CST NEWSTEAD AVE S.
Reported 11/11/2026 10:38:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D E - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .006 mile(s) before CST PENDLETON AVE S, and ends .002 mile(s) after CST PENDLETON AVE S.
Reported 11/11/2026 10:27:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .013 mile(s) before CST TAYLOR AVE S, and ends .019 mile(s) after CST TAYLOR AVE S.
Reported 11/11/2026 10:35:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D E - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .019 mile(s) before CST TAYLOR AVE S, and ends .013 mile(s) after CST TAYLOR AVE S.
Reported 11/11/2026 10:35:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIGNAL ISSUE
Incident begins .002 mile(s) before CST NEWSTEAD AVE S, and ends .005 mile(s) after CST NEWSTEAD AVE S.
Reported 11/11/2026 10:38:00 AM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT H S - ST. LOUIS CITY County - CLOSED
UTILITY DAMAGE
Road closure begins .01 mile(s) before CST CHAIN OF ROCKS BRG E, and ends .01 mile(s) after CST CHAIN OF ROCKS BRG E.
Reported 10/27/2026 9:41:00 AM.
Road closed until further notice.
Road closed due to traffic impact RP IS44W TO BROADWAY S - ST. LOUIS CITY County - CLOSED
UTILITY DAMAGE
Road closure begins IS 44 W, and ends .049 mile(s) before CST BROADWAY S.
Reported 6/26/2026 4:46:00 PM.
Road closed until further notice.
Expect delays due to traffic impact RP IS70E TO TUCKER BLVD S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .016 mile(s) before CST CASS AVE E, and ends .001 mile(s) before CST CASS AVE E.
Reported 9/2/2026 9:36:00 PM.
Traffic will be implacted until further notice.

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 171 closure(s) due to work zone(s) to report.

Road closed due to work zone 171 Road(s) closed due to work zone
Road closed due to workzone CST BENTON BLVD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before RP BENTON BLVD TO IS70W W.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST BENTON BLVD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after RP BENTON BLVD TO IS70W W and ends at .008 mile(s) before CST TRUMAN RD E.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 7 S - PULASKI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT P E and ends at .002 mile(s) before RT P E.
Work is scheduled from 13-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 7 N - PULASKI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after RT P E and ends at RT P E.
Work is scheduled from 13-JUL-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD CEDAR DR W - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at RT CC E and ends at .026 mile(s) before CRD LAKE SHORE DR S.
Work is scheduled from 08-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD CEDAR DR E - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .026 mile(s) after CRD LAKE SHORE DR S and ends at RT CC E.
Work is scheduled from 08-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E W - VERNON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .967 mile(s) before CRD 2625 S and ends at .027 mile(s) before CRD 2625 S.
Work is scheduled from 01-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E E - VERNON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .027 mile(s) after CRD 2625 S and ends at .967 mile(s) after CRD 2625 S.
Work is scheduled from 01-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone WS IS70E MAYVIEW E - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 E and ends at .116 mile(s) after IS 70 E.
Work is scheduled from 28-JUL-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US50E TO MO291 E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 50 E and ends at .001 mile(s) before MO 291 N.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST CLEVELAND AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .009 mile(s) after CST E 26TH ST E and ends at .007 mile(s) before CST E 25TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US54W TO RTW W - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 63 S and ends at RT W E.
Work is scheduled from 23-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CLEVELAND AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after CST E 25TH ST E and ends at .009 mile(s) before CST E 26TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MAIN ST S - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at RT CC E and ends at .013 mile(s) before CRD TRACKER RD E.
Work is scheduled from 05-OCT-2026 to 31-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO RTHH E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 E and ends at RT M S.
Work is scheduled from 09-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO US169S S - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 S and ends at US 169 S.
Work is scheduled from 27-MAY-2026 to 31-JUL-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST SE HAMBLEN RD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after MO 291 N and ends at .003 mile(s) before OR 50 E.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS29S TO MO283 S - CLAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 29 S and ends at CST N OAK TRFY S.
Work is scheduled from 20-JUL-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD JOHNSON DR N - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after OR 70 E and ends at .001 mile(s) before RP US40W TO JOHNSON DR W.
Work is scheduled from 16-SEP-2026 to 12-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD JOHNSON DR S - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RP US40W TO JOHNSON DR W and ends at .003 mile(s) before OR 70 E.
Work is scheduled from 16-SEP-2026 to 12-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y E - STE. GENEVIEVE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at CRD JERSEY LN E and ends at US 61 S.
Work is scheduled from 28-SEP-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - STE. GENEVIEVE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 61 S and ends at CRD JERSEY LN E.
Work is scheduled from 28-SEP-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MYRTLE AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CST NORTON AVE S and ends at .004 mile(s) before OR 70 E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MYRTLE AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after OR 70 E and ends at .004 mile(s) before CST NORTON AVE S.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD COLD SPRING AVE N - BENTON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before PVT SNOWCAP LP E and ends at MO 7 S.
Work is scheduled from 28-SEP-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD COLD SPRING AVE S - BENTON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 7 S and ends at .001 mile(s) after PVT SNOWCAP LP E.
Work is scheduled from 28-SEP-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N N - STE. GENEVIEVE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .016 mile(s) before CRD COFFELT RD E and ends at .164 mile(s) after CRD COFFELT RD E.
Work is scheduled from 03-AUG-2026 to 21-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 61 S - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) before PVT ACHILLEA LN S and ends at .006 mile(s) after CRD 506 S.
Work is scheduled from 14-OCT-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT N S - STE. GENEVIEVE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .164 mile(s) before CRD COFFELT RD E and ends at .016 mile(s) after CRD COFFELT RD E.
Work is scheduled from 03-AUG-2026 to 21-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 61 N - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) before CRD 506 S and ends at .006 mile(s) before PVT UNKNOWN E.
Work is scheduled from 14-OCT-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD TREE FARM RD E - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .269 mile(s) before CRD BUECHELE RD S and ends at .005 mile(s) before CRD PINNACLE LAKE RD S.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHEROKEE ST TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST CHEROKEE ST E and ends at IS 55 S.
Work is scheduled from 17-JAN-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTHH TO IS70E E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT HH S and ends at .01 mile(s) before IS 70 E.
Work is scheduled from 07-AUG-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD TREE FARM RD W - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .005 mile(s) after CRD PINNACLE LAKE RD S and ends at .269 mile(s) after CRD BUECHELE RD S.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W S - MORGAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT AA S and ends at .064 mile(s) after PVT ICR RD E.
Work is scheduled from 21-SEP-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TREE FARM RD W - MONTGOMERY County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .723 mile(s) before OR 70 E and ends at .029 mile(s) before OR 70 E.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TREE FARM RD E - MONTGOMERY County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at .029 mile(s) after OR 70 W and ends at .723 mile(s) after OR 70 W.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTHN TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT H S and ends at IS 44 W.
Work is scheduled from 20-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W N - MORGAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .064 mile(s) before PVT ICR RD E and ends at .001 mile(s) before RT AA S.
Work is scheduled from 21-SEP-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT MM W - BUTLER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) before CRD 355 S and ends at CRD 373 S.
Work is scheduled from 17-AUG-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT MM E - BUTLER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CRD 373 S and ends at .001 mile(s) after CRD 355 S.
Work is scheduled from 17-AUG-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B N - HOLT County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at US 59 S and ends at .008 mile(s) after CRD 285 E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B S - HOLT County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .008 mile(s) before CRD 285 E and ends at US 59 S.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTW TO US54W W - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT W E and ends at US 63 S.
Work is scheduled from 02-NOV-2026 to 07-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO13S TO IS44E E - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 13 S and ends at IS 44 E.
Work is scheduled from 19-OCT-2026 to 31-DEC-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 S - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .032 mile(s) after CRD PECAN RD E and ends at .022 mile(s) before CRD NUTMEG RD E.
Work is scheduled from 10-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 N - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .022 mile(s) after CRD NUTMEG RD E and ends at .032 mile(s) before CRD PECAN RD E.
Work is scheduled from 10-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 350 E - JACKSON County - ALL LANES CLOSED
260417-C01 J4P3093 - Various bridge rehab
BRIDGE MAINTENANCE
Road closure begins at CST 55TH ST E and ends at .001 mile(s) before IS 435 N.
Work is scheduled from 01-OCT-2026 to 24-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RA IS70E ODESSA TRK PK E - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 E.
Work is scheduled from 18-SEP-2026 to 01-SEP-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO MYRTLE AVE E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 70 E and ends at .003 mile(s) before CST MYRTLE AVE S.
Work is scheduled from 20-MAR-2025 to 20-MAR-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD NITROGEN AVE N - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .012 mile(s) after CRD 115TH LN E and ends at .013 mile(s) before RT AE E.
Work is scheduled from 24-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD NITROGEN AVE S - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after RT AE E and ends at .012 mile(s) before CRD 115TH LN E.
Work is scheduled from 24-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70W TO MO131 W - LAFAYETTE County - ALL LANES CLOSED
PAVEMENT MARKING
Road closure begins at .006 mile(s) after IS 70 W and ends at MO 131 S.
Work is scheduled from 11-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT NN E - PERRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at PVT PEACEFUL VALLEY DR E and ends at .003 mile(s) after CRD 840 S.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT VV E - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT N S and ends at .024 mile(s) before RT AH S.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT VV W - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) after RT AH S and ends at RT N S.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT NN W - PERRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) before CRD 840 S and ends at PVT PEACEFUL VALLEY DR E.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 163 S - BOONE County - ALL LANES CLOSED
Project 4 I-70 onnector to Rocheport
BRIDGE RECONSTRUCTION
Road closure begins at CST PROVIDENCE RD S and ends at .003 mile(s) before RP MO163 TO IS70E E.
Work is scheduled from 29-MAY-2026 to 15-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 163 N - BOONE County - ALL LANES CLOSED
Project 4 I-70 onnector to Rocheport
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP IS70E TO MO163 E and ends at CST PROVIDENCE RD S.
Work is scheduled from 29-MAY-2026 to 15-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67N TO RTDW W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 N and ends at RT D W.
Work is scheduled from 05-MAY-2025 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone WS IS70E MAYVIEW E - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .133 mile(s) before IS 70 E and ends at IS 70 E.
Work is scheduled from 28-JUL-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST DAVIS BLVD N - JASPER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .031 mile(s) after RT FF E and ends at .014 mile(s) before CST 27TH ST E.
Work is scheduled from 30-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST DAVIS BLVD S - JASPER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .014 mile(s) after CST 27TH ST E and ends at .031 mile(s) before RT FF E.
Work is scheduled from 30-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT AF N - WRIGHT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .012 mile(s) before CRD CRISPTOWN RD E and ends at .04 mile(s) after CRD MINGS DR E.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT AF S - WRIGHT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .04 mile(s) before CRD MINGS DR E and ends at .012 mile(s) after CRD CRISPTOWN RD E.
Work is scheduled from 06-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 291 S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CST SE 7TH TER E and ends at .005 mile(s) before CST SE HAMBLEN RD S.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHOUTEAU TRFY TO IS35S S - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .002 mile(s) after CST CHOUTEAU TRFY S and ends at .011 mile(s) before IS 35 S.
Work is scheduled from 09-NOV-2026 to 20-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS49N TO RED BRIDGE RD N - JACKSON County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at IS 49 N and ends at .014 mile(s) before OR 49 N.
Work is scheduled from 04-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST SE HAMBLEN RD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after OR 50 E and ends at .001 mile(s) before MO 291 N.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTHS TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT H S and ends at .075 mile(s) before IS 44 W.
Work is scheduled from 20-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U E - BUCHANAN County - ALL LANES CLOSED
RAILROAD MAINTENANCE
Road closure begins at .014 mile(s) after CST ERIE ST S and ends at .013 mile(s) before CST STOCKYARDS EXPY S.
Work is scheduled from 11-NOV-2026 to 12-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U W - BUCHANAN County - ALL LANES CLOSED
RAILROAD MAINTENANCE
Road closure begins at .013 mile(s) after CST STOCKYARDS EXPY S and ends at .014 mile(s) before CST ERIE ST S.
Work is scheduled from 11-NOV-2026 to 12-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS55S TO RTZ W - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 55 S and ends at RT Z E.
Work is scheduled from 13-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO MERSINGTON AVE E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 70 E and ends at CST E 27TH ST E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K N - LAWRENCE County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .06 mile(s) after PVT 2157P E and ends at .019 mile(s) after CRD 2155 E.
Work is scheduled from 09-SEP-2026 to 09-SEP-2030.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT OO E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) before CRD 379 S and ends at .003 mile(s) before CRD 365 S.
Work is scheduled from 26-OCT-2026 to 10-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT OO W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CRD 365 S and ends at .008 mile(s) after CRD 379 S.
Work is scheduled from 26-OCT-2026 to 10-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF E - PLATTE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .015 mile(s) after CST RIVER RD E and ends at .012 mile(s) before CST RIVER RD E.
Work is scheduled from 17-JUN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U W - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .302 mile(s) after CRD DUSTIN RD S and ends at .59 mile(s) after CRD DUSTIN RD S.
Work is scheduled from 29-OCT-2026 to 17-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U E - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .59 mile(s) before CRD DUSTIN RD S and ends at .302 mile(s) before CRD DUSTIN RD S.
Work is scheduled from 29-OCT-2026 to 17-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF W - PLATTE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .012 mile(s) after CST MILL ST E and ends at .015 mile(s) before CST RIVER RD E.
Work is scheduled from 17-JUN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST RANDOLPH ST E - ADAIR County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at BU 63 S and ends at CST ELY ST S.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST RANDOLPH ST W - ADAIR County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at CST ELY ST S and ends at BU 63 S.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT O W - GRUNDY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .002 mile(s) before CRD NE 48TH AVE S and ends at .005 mile(s) before CRD NE 37TH AVE S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Y N - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .01 mile(s) after CRD NE-1000 E and ends at .01 mile(s) before CRD NE 1100 RD E.
Work is scheduled from 10-AUG-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y S - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .01 mile(s) after CRD NE 1100 RD E and ends at .01 mile(s) before CRD NE-1000 E.
Work is scheduled from 10-AUG-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT O E - GRUNDY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .005 mile(s) after CRD NE 37TH AVE S and ends at .002 mile(s) after CRD NE 48TH AVE S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST NW COOKINGHAM DR W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP IS435S TO NW COOKINGHAM DR E and ends at .004 mile(s) before RP NW COOKINGHAM DR TO IS435N N.
Work is scheduled from 16-MAR-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K S - LAWRENCE County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .019 mile(s) before CRD 2155 E and ends at .06 mile(s) before PVT 2157P E.
Work is scheduled from 09-SEP-2026 to 09-SEP-2030.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST NW COOKINGHAM DR E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after RP NW COOKINGHAM DR TO IS435N N and ends at .003 mile(s) before RP IS435S TO NW COOKINGHAM DR E.
Work is scheduled from 16-MAR-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTC TO IS35N N - DAVIESS County - ALL LANES CLOSED
SHOULDER WORK
Road closure begins at RT C E and ends at IS 35 N.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT VV S - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .117 mile(s) before RR BNSF RAILWAY MARCELINE SUB E and ends at .13 mile(s) before CRD BISON ST E.
Work is scheduled from 15-OCT-2026 to 30-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT VV N - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .13 mile(s) after CRD BISON ST E and ends at .117 mile(s) after RR BNSF RAILWAY MARCELINE SUB E.
Work is scheduled from 15-OCT-2026 to 30-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone PED OAKLEY OVERPASS N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before RP VAN BRUNT BLVD TO IS70E E and ends at .008 mile(s) after RP IS70W TO VAN BRUNT BLVD S.
Work is scheduled from 03-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone PED OAKLEY OVERPASS S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) before RP IS70W TO VAN BRUNT BLVD S and ends at .02 mile(s) after RP VAN BRUNT BLVD TO IS70E E.
Work is scheduled from 03-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N W - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .596 mile(s) after CRD SHADY RD S and ends at .457 mile(s) before RT B S.
Work is scheduled from 23-JUL-2026 to 30-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N E - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .457 mile(s) after RT B S and ends at .596 mile(s) before CRD SHADY RD S.
Work is scheduled from 23-JUL-2026 to 30-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K S - LAWRENCE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .064 mile(s) before CRD 2155 E and ends at .011 mile(s) before PVT 2157P E.
Work is scheduled from 23-SEP-2026 to 23-SEP-2030.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT K N - LAWRENCE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .011 mile(s) after PVT 2157P E and ends at .064 mile(s) after CRD 2155 E.
Work is scheduled from 23-SEP-2026 to 23-SEP-2030.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 47 N - LINCOLN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .004 mile(s) after PVT FARM LN E and ends at .001 mile(s) before CRD FRED NORTON RD S.
Work is scheduled from 05-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 47 S - LINCOLN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) after CRD FRED NORTON RD S and ends at .001 mile(s) after CRD BOHEMIAN CHURCH RD S.
Work is scheduled from 05-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT J S - BOONE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CRD OLD ROCHEPORT RD E and ends at .003 mile(s) before RT O S.
Work is scheduled from 06-AUG-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CST CLARK ST S and ends at CRD 222 E.
Work is scheduled from 24-AUG-2026 to 01-SEP-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 291 N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST SE HAMBLEN RD S and ends at .003 mile(s) before CST SE HAMBLEN RD S.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J N - BOONE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT O S and ends at .003 mile(s) before CRD OLD ROCHEPORT RD E.
Work is scheduled from 06-AUG-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CRD 222 E and ends at .004 mile(s) before CST CLARK ST S.
Work is scheduled from 24-AUG-2026 to 01-SEP-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 291 S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST SE HAMBLEN RD S and ends at .009 mile(s) after CST SE HAMBLEN RD S.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO163 TO IS70W W - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 163 S and ends at IS 70 W.
Work is scheduled from 30-JUL-2026 to 26-OCT-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT CC E - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .002 mile(s) after CST MAIN ST S and ends at .002 mile(s) before CST ROSEWOOD LN S.
Work is scheduled from 15-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT CC W - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .002 mile(s) after CST ROSEWOOD LN S and ends at .002 mile(s) before CST MAIN ST S.
Work is scheduled from 15-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT O N - HICKORY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) before CRD 310 E and ends at RT H E.
Work is scheduled from 08-SEP-2026 to 09-MAR-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone PVT OVERPASS S - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .024 mile(s) before CST TRUMAN RD E and ends at .019 mile(s) after CST TRUMAN RD E.
Work is scheduled from 11-APR-2025 to 31-DEC-2032.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO13S TO MO82 W - ST. CLAIR County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .076 mile(s) after MO 13 S and ends at MO 82 E.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT W S - RIPLEY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) before CRD W-2 E and ends at .001 mile(s) before RT AA E.
Work is scheduled from 09-NOV-2026 to 08-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W N - RIPLEY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT AA E and ends at .005 mile(s) after CRD W-2 E.
Work is scheduled from 09-NOV-2026 to 08-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST GRANT AVE S - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CST NORTON RD E and ends at .002 mile(s) before CST EVERGREEN ST E.
Work is scheduled from 08-JUN-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST GRANT AVE N - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CST EVERGREEN ST E and ends at .001 mile(s) before CST NORTON RD E.
Work is scheduled from 08-JUN-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US169N TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 169 N and ends at .014 mile(s) before MO 9 N.
Work is scheduled from 27-MAY-2026 to 31-JUL-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NATIONAL AVE N - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST EVERGREEN ST E and ends at .003 mile(s) before CST NORTON ST E.
Work is scheduled from 05-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NATIONAL AVE S - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST NORTON ST E and ends at CST EVERGREEN ST E.
Work is scheduled from 05-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C N - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .478 mile(s) after CRD 454 E and ends at .004 mile(s) before CRD 432 E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C S - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CRD 432 E and ends at .478 mile(s) before CRD 454 E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N S - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .059 mile(s) after CRD FARLEY HAMPTON RD E and ends at .021 mile(s) before CRD NW TIFFANY PARK RD E.
Work is scheduled from 28-OCT-2026 to 08-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTZ TO IS55S S - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at RT Z E and ends at IS 55 S.
Work is scheduled from 13-OCT-2026 to 05-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT CC E - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .03 mile(s) after CRD HERNDON ST E and ends at .011 mile(s) before CST MAIN ST S.
Work is scheduled from 10-AUG-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO RTCC W - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at US 67 S and ends at .004 mile(s) before RT CC S.
Work is scheduled from 30-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RED BRIDGE RD TO IS49N N - JACKSON County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at OR 49 N and ends at .028 mile(s) before RP IS49N TO IS470E E.
Work is scheduled from 03-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS70W TO RTD W - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 W and ends at RT Z S.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U N - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .005 mile(s) before US 36 W and ends at .042 mile(s) after CRD 253 S.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U S - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .042 mile(s) before CRD 253 S and ends at .005 mile(s) after US 24 W.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTDW TO US67S S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D W and ends at US 67 S.
Work is scheduled from 05-MAY-2025 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT CC W - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .011 mile(s) after CST MAIN ST S and ends at .03 mile(s) before CRD HERNDON ST E.
Work is scheduled from 10-AUG-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H S - PLATTE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .212 mile(s) after CRD TAULBEE RD E and ends at .385 mile(s) after CRD TAULBEE RD E.
Work is scheduled from 04-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H N - PLATTE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .385 mile(s) before CRD TAULBEE RD E and ends at .212 mile(s) before CRD TAULBEE RD E.
Work is scheduled from 04-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT O S - HICKORY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT H E and ends at .002 mile(s) after CRD 310 E.
Work is scheduled from 08-SEP-2026 to 09-MAR-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO US40E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 70 E and ends at US 40 E.
Work is scheduled from 13-JUL-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO RTDE E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 S and ends at RT D E.
Work is scheduled from 05-MAY-2025 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 70 E - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .352 mile(s) before CRD OLD US 40 E and ends at .008 mile(s) before PVT EMERALD LAKE RD S.
Work is scheduled from 07-APR-2026 to 25-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 70 W - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .008 mile(s) after PVT EMERALD LAKE RD S and ends at .352 mile(s) after CRD OLD US 40 E.
Work is scheduled from 07-APR-2026 to 25-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .729 mile(s) after RT N S and ends at .023 mile(s) before CRD RUNNING HORSE RD S.
Work is scheduled from 05-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D W - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .023 mile(s) after CRD RUNNING HORSE RD S and ends at .729 mile(s) before RT N S.
Work is scheduled from 05-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 97 S - BARRY County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .115 mile(s) before US 60 W and ends at .008 mile(s) before US 60 W.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 97 N - BARRY County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .013 mile(s) after US 60 W and ends at .116 mile(s) after US 60 W.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS435N TO US71N N - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 435 N and ends at .001 mile(s) before US 71 N.
Work is scheduled from 26-MAY-2026 to 03-DEC-2026.
Work will start daily at 09:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 E - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .163 mile(s) after CST I-70 DR SE W and ends at .06 mile(s) before CST HILLSDALE RD S.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 W - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .06 mile(s) after CST HILLSDALE RD S and ends at .163 mile(s) before CST I-70 DR SE E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO291S TO US50W W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 291 S and ends at .006 mile(s) before US 50 W.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD 116TH TRL W - SALINE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .519 mile(s) before CRD KENTUCKY AVE S and ends at US 65 N.
Work is scheduled from 03-SEP-2026 to 20-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone US 61 N - STE. GENEVIEVE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .102 mile(s) before RT Y E and ends at .001 mile(s) after CRD CLEMENT RD E.
Work is scheduled from 25-SEP-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD 116TH TRL E - SALINE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 65 N and ends at .519 mile(s) after CRD KENTUCKY AVE S.
Work is scheduled from 03-SEP-2026 to 20-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT EE N - RAY County - ALL LANES CLOSED
CONCRETE OVERLAY
Road closure begins at MO 210 E and ends at .009 mile(s) before CRD FRANKLIN RD S.
Work is scheduled from 09-NOV-2026 to 23-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT EE S - RAY County - ALL LANES CLOSED
CONCRETE OVERLAY
Road closure begins at .009 mile(s) after CRD FRANKLIN RD S and ends at MO 210 E.
Work is scheduled from 09-NOV-2026 to 23-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 N - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .607 mile(s) after CRD NUTMEG RD E and ends at .628 mile(s) before CRD PECAN RD E.
Work is scheduled from 08-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 S - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .628 mile(s) after CRD PECAN RD E and ends at .607 mile(s) before CRD NUTMEG RD E.
Work is scheduled from 08-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDE TO US67N N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D E and ends at US 67 N.
Work is scheduled from 05-MAY-2025 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST INDIANA AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after CST E 18TH ST E and ends at .006 mile(s) before CST TRUMAN RD E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST INDIANA AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before CST E 18TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST IVY W - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 94 W and ends at CST OLD MO 94 E.
Work is scheduled from 18-JUL-2022 to 01-AUG-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W W - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .002 mile(s) after CST MARION PARK DR S and ends at .002 mile(s) before CST PARKWOOD AVE S.
Work is scheduled from 23-OCT-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS64W TO IS70E E - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 64 W and ends at .01 mile(s) before RP IS64E TO IS70E E.
Work is scheduled from 20-OCT-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO291N TO US50E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 291 N and ends at .004 mile(s) before US 50 E.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .001 mile(s) after CST PARKWOOD AVE S and ends at .002 mile(s) before CST MARION PARK DR S.
Work is scheduled from 23-OCT-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CIVIC CENTER DR W - ST. CHARLES County - ALL LANES CLOSED
SHOULDER WORK
Road closure begins at .008 mile(s) after CST CEDAR CIR DR S and ends at .006 mile(s) before OR 64 E.
Work is scheduled from 09-NOV-2026 to 27-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST CIVIC CENTER DR E - ST. CHARLES County - ALL LANES CLOSED
SHOULDER WORK
Road closure begins at .006 mile(s) after OR 64 E and ends at .008 mile(s) before CST CEDAR CIR DR S.
Work is scheduled from 09-NOV-2026 to 27-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST MAIN ST N - CHRISTIAN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .013 mile(s) after CRD TRACKER RD E and ends at RT CC E.
Work is scheduled from 05-OCT-2026 to 31-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W N - PIKE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .413 mile(s) after RT H E and ends at .568 mile(s) after RT H E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT W S - PIKE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .568 mile(s) before RT H E and ends at .413 mile(s) before RT H E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP LOU HOLLAND DR TO US169N N - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at CST RICHARDS RD S and ends at US 169 N.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT EE W - CEDAR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) before CRD 50 E and ends at .006 mile(s) after CRD SW 1501 S.
Work is scheduled from 20-JUL-2026 to 12-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT EE E - VERNON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) before CRD SW 1501 S and ends at .011 mile(s) after CRD 50 E.
Work is scheduled from 20-JUL-2026 to 12-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 61 S - STE. GENEVIEVE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before CRD CLEMENT RD E and ends at .102 mile(s) after RT Y E.
Work is scheduled from 25-SEP-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 504 work zones where you can expect delays, or, where delays are not expected, but possible, to report.

Expected delay(s) due to work zone 262 Expected delay(s) due to work zone
Possible delay(s) due to work zone 242 Possible delay(s) due to work zone
Expect delays due to workzone MO 291 N - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after CST COURTNEY RD S and ends at .003 mile(s) after CST COBBLER RD E.
Work is scheduled from 22-DEC-2025 to 03-MAY-2027.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST N 22ND ST S - CHRISTIAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC E and ends at .034 mile(s) after RT CC E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST N 22ND ST N - CHRISTIAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .034 mile(s) before RT CC E and ends at RT CC E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after RP IS70E TO US67N N and ends at .009 mile(s) after RP NATURAL BRIDGE RD TO IS70W W.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - POLK County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after CRD 30TH RD S and ends at .176 mile(s) after CST MILL ST E.
Work is scheduled from 01-JUN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - BATES County - POSSIBLE DELAYS
MOWING
Work zone begins at .077 mile(s) after MO 52 E and ends at .017 mile(s) after RT B E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .198 mile(s) after MO 131 S and ends at .028 mile(s) before RR MEXICO SUB E.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST CEMENT CITY RD E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .235 mile(s) before MO 291 S and ends at MO 291 S.
Work is scheduled from 12-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .045 mile(s) after RR MEXICO SUB E and ends at .045 mile(s) before RP IS70W TO MO131 W.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .019 mile(s) before CST HOSTETTER ST S and ends at .342 mile(s) before RT H S.
Work is scheduled from 08-JUN-2026 to 15-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .339 mile(s) after RT H S and ends at .019 mile(s) after CST HOSTETTER ST S.
Work is scheduled from 08-JUN-2026 to 15-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .17 mile(s) after CO MO58 TO MO7 E and ends at .061 mile(s) before CRD RAFFURTY RD S.
Work is scheduled from 16-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .061 mile(s) after CRD RAFFURTY RD S and ends at .17 mile(s) before CO MO58 TO MO7 E.
Work is scheduled from 16-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 18 E - HENRY County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .02 mile(s) before CST MCLANE ST S and ends at CST KENTON PL S.
Work is scheduled from 10-NOV-2026 to 30-NOV-2026.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST MCCLEARY RD S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .01 mile(s) before US 69 S and ends at .08 mile(s) after CST PATSY LN E.
Work is scheduled from 09-NOV-2026 to 27-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 35 N - CLINTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after RP MO116 TO IS35N N and ends at .096 mile(s) before CRD NE 272ND ST E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 S - CLINTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .093 mile(s) after CRD NE 272ND ST E and ends at .005 mile(s) after RP IS35S TO MO116 S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D S - CARROLL County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) after CST DIETRICH ST E and ends at MO 10 E.
Work is scheduled from 29-OCT-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT D N - CARROLL County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 10 E and ends at .006 mile(s) before CST DIETRICH ST E.
Work is scheduled from 29-OCT-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS470W TO IS49N N - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at IS 470 W and ends at IS 49 N.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB E - PHELPS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before CST OAK S and ends at .016 mile(s) before CST CEDAR S.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT BB W - PHELPS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) after CST CEDAR S and ends at .024 mile(s) after CST OAK S.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 S - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .284 mile(s) after CRD COLD SPRING AVE S and ends at .061 mile(s) before CST JACKSON ST S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 N - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) after CST JACKSON ST S and ends at .284 mile(s) before CRD COLD SPRING AVE S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 7 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .134 mile(s) after CST SW EAGLES RIDGE DR E and ends at .016 mile(s) after CST SOUTHGATE DR E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 18 W - HENRY County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST KENTON PL S and ends at .02 mile(s) after CST MCLANE ST S.
Work is scheduled from 10-NOV-2026 to 30-NOV-2026.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 123 S - GREENE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .015 mile(s) after CST COLLEGE ST E and ends at .008 mile(s) before CST MONROE ST E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 123 N - GREENE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .008 mile(s) after CST MONROE ST E and ends at .015 mile(s) before CST COLLEGE ST E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - MADISON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .249 mile(s) before RT A E and ends at .378 mile(s) after RT C E.
Work is scheduled from 18-MAY-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 N - MADISON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .379 mile(s) before RT C E and ends at .248 mile(s) after RT A E.
Work is scheduled from 18-MAY-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .038 mile(s) after CRD SHETLAND RD S and ends at .006 mile(s) before CRD TEAL DR S.
Work is scheduled from 23-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .006 mile(s) after CRD TEAL DR S and ends at .038 mile(s) before CRD SHETLAND RD S.
Work is scheduled from 23-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 69 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .04 mile(s) after CO US69 TO MO1S N and ends at .019 mile(s) after CST N HIGHLAND AVE S.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .023 mile(s) before MO 37 S and ends at .087 mile(s) before RP MO37 TO IS44W W.
Work is scheduled from 09-NOV-2026 to 11-DEC-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .074 mile(s) after RP IS44E TO MO37 S and ends at .023 mile(s) after MO 37 S.
Work is scheduled from 09-NOV-2026 to 11-DEC-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. CHARLES County - POSSIBLE DELAYS
260116-F08
NEW PAVEMENT CONSTRUCTION
Work zone begins at .139 mile(s) after CST LEWIS & CLARK BLVD N and ends at .685 mile(s) before CO US67S TO US67N N.
Work is scheduled from 07-JUL-2026 to 01-AUG-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at MO 141 S and ends at .005 mile(s) after CST BAXTER RD S.
Work is scheduled from 19-JUN-2026 to 31-DEC-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 E - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at .046 mile(s) after MO 79 S and ends at IS 72 E.
Work is scheduled from 06-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 36 W - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at IS 72 W and ends at .048 mile(s) before MO 79 S.
Work is scheduled from 06-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 W - JOHNSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .226 mile(s) after CRD 501 S and ends at .01 mile(s) after RT M S.
Work is scheduled from 13-APR-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 E - JOHNSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before RT M S and ends at .083 mile(s) before CRD 501 N.
Work is scheduled from 13-APR-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .943 mile(s) before RP IS49S TO CRD EARP RD W and ends at .482 mile(s) before RP IS49S TO CRD EARP RD W.
Work is scheduled from 23-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 N - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .487 mile(s) after RP CRD EARP RD TO IS49N N and ends at .948 mile(s) after RP CRD EARP RD TO IS49N N.
Work is scheduled from 23-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 S - ST. CHARLES County - POSSIBLE DELAYS
260116-F08
NEW PAVEMENT CONSTRUCTION
Work zone begins at .17 mile(s) before PVT MACHENS CLUB DR S and ends at .153 mile(s) before CST LEWIS & CLARK BLVD S.
Work is scheduled from 07-JUL-2026 to 01-AUG-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CRD OLD HIGHWAY 40 E - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .012 mile(s) after CST FIRST ST S and ends at .013 mile(s) before OR 70 E.
Work is scheduled from 28-JUL-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CRD OLD HIGHWAY 40 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .013 mile(s) after OR 70 E and ends at .012 mile(s) before CST FIRST ST S.
Work is scheduled from 28-JUL-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST NW PRYOR RD N - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .035 mile(s) before RP PRYOR RD TO IS470E E and ends at .003 mile(s) before RP MO350E TO IS470W W.
Work is scheduled from 02-NOV-2026 to 14-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .027 mile(s) before OR 60 E and ends at .053 mile(s) after MO 37 S.
Work is scheduled from 15-SEP-2026 to 11-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST NW PRYOR RD S - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after RP MO350E TO IS470W W and ends at .036 mile(s) after RP PRYOR RD TO IS470E E.
Work is scheduled from 02-NOV-2026 to 14-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 W - BARRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .053 mile(s) before MO 37 S and ends at .027 mile(s) after OR 60 E.
Work is scheduled from 15-SEP-2026 to 11-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST 39TH ST E - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .042 mile(s) after CST WHITNEY RD S and ends at .005 mile(s) after RP 39TH ST TO MO291N N.
Work is scheduled from 27-OCT-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST 39TH ST W - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before RP 39TH ST TO MO291N N and ends at .042 mile(s) before CST WHITNEY RD S.
Work is scheduled from 27-OCT-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .118 mile(s) before RT BA S and ends at .01 mile(s) before CST OLD EATHERTON RD S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .027 mile(s) before PVT MANLEY QUARRY RD E and ends at .003 mile(s) after RP IS55S TO RTAE E.
Work is scheduled from 10-NOV-2026 to 04-DEC-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before RR COLT S and ends at .451 mile(s) after RP US54W TO IS70E E.
Work is scheduled from 13-OCT-2024 to 31-DEC-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .457 mile(s) before RP IS70W TO US54W E and ends at .021 mile(s) after RR COLT S.
Work is scheduled from 13-OCT-2024 to 31-DEC-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP DORSETT RD TO US67N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .038 mile(s) before US 67 N and ends at US 67 N.
Work is scheduled from 28-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST LEES SUMMIT RD S - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .022 mile(s) after CST 41ST ST E and ends at .035 mile(s) after RP IS70E TO LEES SUMMIT RD E.
Work is scheduled from 11-OCT-2026 to 02-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT U E - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .055 mile(s) before RR UP S and ends at US 59 S.
Work is scheduled from 23-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT U W - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 59 S and ends at .055 mile(s) after RR UP S.
Work is scheduled from 23-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RP IS44E TO MO13S S and ends at .002 mile(s) before US 65 S.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after US 65 S and ends at .044 mile(s) before RP MO13N TO IS44W W.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 435 N - CLAY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before RP IS435N TO NW COOKINGHAM DR W and ends at .069 mile(s) before RP NW COOKINGHAM DR TO IS435N N.
Work is scheduled from 17-AUG-2026 to 27-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. FRANCOIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CRD WEBSTER ST E and ends at .001 mile(s) before RT O E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at 1.257 mile(s) before RP IS49N TO RTB E and ends at .113 mile(s) after RR NEVADA SUB S.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - HENRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .233 mile(s) before CRD NW-1401 S and ends at .174 mile(s) after CO MO7N TO MO7S S.
Work is scheduled from 26-OCT-2026 to 30-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .097 mile(s) before RR NEVADA SUB S and ends at 1.262 mile(s) after RP RTN TO IS49S S.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .035 mile(s) before RP MONSANTO ACCESS DR W TO US67S S and ends at .001 mile(s) before CST SUNSWEPT DR E.
Work is scheduled from 05-OCT-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT K E - CAPE GIRARDEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at PVT MICHAEL DR S and ends at .003 mile(s) before CST SIEMERS DR S.
Work is scheduled from 11-MAY-2026 to 01-NOV-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT K W - CAPE GIRARDEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .003 mile(s) after CST SIEMERS DR S and ends at PVT MICHAEL DR S.
Work is scheduled from 11-MAY-2026 to 01-NOV-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 70 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .171 mile(s) after RT WW S and ends at 1.434 mile(s) before RP IS70W TO RTD W.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
MEDIAN OR SHOULDER
Work zone begins at .004 mile(s) before RT W N and ends at .031 mile(s) before RP IS70W TO RTF W.
Work is scheduled from 23-OCT-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone MO 84 W - PEMISCOT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .804 mile(s) before OR 55 S and ends at .21 mile(s) before OR 55 S.
Work is scheduled from 10-AUG-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 84 E - PEMISCOT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .21 mile(s) after OR 55 S and ends at .804 mile(s) after OR 55 S.
Work is scheduled from 10-AUG-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 94 W - ST. CHARLES County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before RP MO94 TO MO370W W and ends at .001 mile(s) before CST 3RD ST S.
Work is scheduled from 19-MAY-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 94 E - ST. CHARLES County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after CST 3RD ST S and ends at .001 mile(s) after RP MO94 TO MO370W W.
Work is scheduled from 19-MAY-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) before RP IS255S TO US67 S and ends at .005 mile(s) before CST STARLING AIRPORT RD S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after CST STARLING AIRPORT RD S and ends at .008 mile(s) after RP IS255S TO US67 S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .038 mile(s) before RP RTB TO US63S S and ends at .05 mile(s) after RP RTB TO US63N N.
Work is scheduled from 09-NOV-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at RP MO47 TO IS70E E and ends at .025 mile(s) after RP IS70E TO WILDCAT DR S.
Work is scheduled from 05-DEC-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone RT B S - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .05 mile(s) before RP RTB TO US63N N and ends at .038 mile(s) after RP US63S TO RTB S.
Work is scheduled from 09-NOV-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 W - STODDARD County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .249 mile(s) before RP US60W TO RTWW W and ends at .068 mile(s) before RT TT S.
Work is scheduled from 12-NOV-2026 to 18-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO1 TO IS35S S - CLAY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 1 S and ends at .082 mile(s) before IS 35 S.
Work is scheduled from 14-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 50 E - OSAGE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .03 mile(s) before RT CC S and ends at .03 mile(s) after RT CC S.
Work is scheduled from 15-JUN-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .086 mile(s) after RP IS55N TO CST MCNUTT ST N and ends at .061 mile(s) before RT Z E.
Work is scheduled from 09-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 50 W - OSAGE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .03 mile(s) before RT CC S and ends at .03 mile(s) after RT CC S.
Work is scheduled from 15-JUN-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 24 W - MONROE County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .021 mile(s) after RT W E and ends at .004 mile(s) before CRD 486 E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 E - MONROE County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .004 mile(s) after CRD 486 E and ends at .021 mile(s) before RT W E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 87 N - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before RR SEDALIA SUB E and ends at .018 mile(s) after RT AA S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 57 S - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.964 mile(s) before CRD 202 E and ends at .062 mile(s) before CRD 202 E.
Work is scheduled from 02-NOV-2026 to 28-FEB-2027.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after MO 141 S and ends at .036 mile(s) after CST HENRY AVE S.
Work is scheduled from 19-OCT-2026 to 31-DEC-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 116 E - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before CRD SE 248TH ST E and ends at .001 mile(s) before RP MO116 TO IS35N N.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 87 S - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .018 mile(s) before RT AA S and ends at .001 mile(s) after RR SEDALIA SUB E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK E - PHELPS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .691 mile(s) after CRD 3630 S and ends at RT ZZ E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK W - CRAWFORD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT ZZ E and ends at .691 mile(s) before CRD 3630 S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 116 W - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after RP IS35N TO MO116 N and ends at .001 mile(s) after CRD SE 248TH ST E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 57 N - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) after CRD 202 E and ends at 1.963 mile(s) after CRD 202 E.
Work is scheduled from 02-NOV-2026 to 28-FEB-2027.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 15 N - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST YALE ST E and ends at .119 mile(s) before CST PARIS RD S.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT D W - ST. LOUIS CITY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .007 mile(s) after CST HODIAMONT AVE S and ends at .015 mile(s) before CST IONA AVE S.
Work is scheduled from 09-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 13 S - POLK County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .179 mile(s) before CST MILL ST E and ends at .012 mile(s) before CRD 30TH RD S.
Work is scheduled from 01-JUN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 15 S - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .119 mile(s) after CST PARIS RD S and ends at .005 mile(s) after CST YALE ST E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 30 E - JEFFERSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .099 mile(s) before CO MO30 TO RTNN N and ends at .014 mile(s) after RT PP E.
Work is scheduled from 08-SEP-2026 to 20-NOV-2026.
Work will start daily at 05:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 30 W - JEFFERSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .017 mile(s) before RT PP E and ends at .219 mile(s) after RT B S.
Work is scheduled from 08-SEP-2026 to 20-NOV-2026.
Work will start daily at 05:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.166 mile(s) before RP IS70W TO RTHS S and ends at .143 mile(s) after RP MO7 TO IS70W W.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP RTCC TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC S and ends at .028 mile(s) before US 67 N.
Work is scheduled from 16-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .139 mile(s) before RP IS70E TO MO7 S and ends at 1.166 mile(s) after RP RTFS TO IS70E E.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 49 S - CASS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .023 mile(s) after RT A E and ends at .034 mile(s) before MO 18 E.
Work is scheduled from 26-OCT-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 49 N - BATES County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .033 mile(s) after MO 18 E and ends at .024 mile(s) before RT B E.
Work is scheduled from 26-OCT-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 N - ST. LOUIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) before CRD MEHL AVE S and ends at US 50 E.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at .002 mile(s) after CRD MEHL AVE S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .053 mile(s) before RP IS70E TO RTW S S and ends at CST WENTZVILLE PKWY E.
Work is scheduled from 12-SEP-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
News Release
Expect delays due to workzone MO 20 E - SALINE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .36 mile(s) after CRD HEMLOCK AVE S and ends at BU 65 S.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 20 W - SALINE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at BU 65 S and ends at .36 mile(s) before CRD HEMLOCK AVE S.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .175 mile(s) before RP IS70W TO RTE W and ends at .144 mile(s) after RP MO7 TO IS70W W.
Work is scheduled from 22-JUN-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 70 E - JACKSON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .14 mile(s) before RP IS70E TO MO7 S and ends at .196 mile(s) after RP RTH TO IS70E E.
Work is scheduled from 22-JUN-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US67N TO IS55N N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 N and ends at IS 55 N.
Work is scheduled from 22-JAN-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS70E TO MO7 S - JACKSON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at MO 7 S.
Work is scheduled from 20-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB S - CASS County - EXPECT DELAYS
PAVEMENT STRIPING
Work zone begins at CRD 163RD ST E and ends at MO 58 E.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB N - CASS County - EXPECT DELAYS
PAVEMENT STRIPING
Work zone begins at MO 58 E and ends at CRD 163RD ST E.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT W E - CALLAWAY County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before CST CEDAR CITY DR E and ends at .009 mile(s) after US 63 S.
Work is scheduled from 11-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W W - CALLAWAY County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) before US 63 S and ends at .001 mile(s) after CST CEDAR CITY DR E.
Work is scheduled from 11-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .548 mile(s) after RP MO141N TO IS44W W and ends at .728 mile(s) after RP MO141N TO IS44W W.
Work is scheduled from 15-OCT-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 S - ST. CLAIR County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) after BU 13 S and ends at .229 mile(s) before RP MO13S TO US54 W.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST W COLER ST W - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST N JEFFERSON ST S and ends at .002 mile(s) before CST N VALLEY ST S.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - BATES County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 52 E and ends at .398 mile(s) before CRD GREEN ST E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST W COLER ST E - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST N VALLEY ST S and ends at CST N JEFFERSON ST S.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D E - BATES County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .022 mile(s) after RT BB S and ends at .19 mile(s) before CRD SW-450 E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at .013 mile(s) before RP IS49S TO RTH W and ends at .046 mile(s) after CRD CEDAR RD E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 N - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) before RP RTW TO US71N N and ends at .001 mile(s) before CST HICKMAN MILLS DR W.
Work is scheduled from 27-MAY-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 266 E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .356 mile(s) after CRD 59 S and ends at .114 mile(s) after CRD 65 S.
Work is scheduled from 09-NOV-2026 to 26-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .071 mile(s) after RP CHOUTEAU TRFY TO IS35S S and ends at .055 mile(s) after MO 1 S.
Work is scheduled from 02-NOV-2026 to 20-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .046 mile(s) after RP IS29S TO IS35N N and ends at .062 mile(s) after MO 1 S.
Work is scheduled from 02-NOV-2026 to 20-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 266 W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .114 mile(s) before CRD 65 S and ends at .356 mile(s) before CRD 59 S.
Work is scheduled from 09-NOV-2026 to 26-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 32 E - DENT County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .102 mile(s) before CST MISSOURI AVE S and ends at .02 mile(s) before CST CARTY ST S.
Work is scheduled from 14-OCT-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 32 W - DENT County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .02 mile(s) after CST CARTY ST S and ends at .102 mile(s) after CST MISSOURI AVE S.
Work is scheduled from 14-OCT-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 N - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .834 mile(s) after CRD INDIAN LINE RD E and ends at .767 mile(s) before RP IS49N TO RTD E.
Work is scheduled from 17-JUN-2026 to 30-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 63 N - HOWELL County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .509 mile(s) after CO US60W TO US60E E and ends at .277 mile(s) after WS US60W WILLOW SPRINGS W.
Work is scheduled from 18-AUG-2026 to 16-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS435S TO MO350E E - JACKSON County - POSSIBLE DELAYS
260417-C01 J4P3093 - Various bridge rehab
BRIDGE MAINTENANCE
Work zone begins at IS 435 S and ends at MO 350 E.
Work is scheduled from 01-OCT-2026 to 24-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT MM S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .083 mile(s) after RP RTMM TO MO360E E and ends at .006 mile(s) before US 60 W.
Work is scheduled from 17-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .006 mile(s) after US 60 W and ends at .083 mile(s) before RP RTMM TO MO360E E.
Work is scheduled from 17-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) before RP US54W TO MO94E E and ends at .008 mile(s) after RP RTW TO US54W W.
Work is scheduled from 01-JUN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 74 E - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) before MO 177 S and ends at .235 mile(s) after RR RIVER SUB S.
Work is scheduled from 02-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 74 W - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) before RR RIVER SUB S and ends at .005 mile(s) after MO 177 S.
Work is scheduled from 02-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at PVT COPPERGATE SQUARE DR E and ends at .031 mile(s) before RP IS255N TO MO231 N.
Work is scheduled from 24-AUG-2026 to 03-MAY-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 291 N - CLAY County - EXPECT DELAYS
Route 291 Deck replacement
BRIDGE RECONSTRUCTION
Work zone begins at .015 mile(s) before RR TRENTON SUB S and ends at RR TRENTON SUB S.
Work is scheduled from 20-JUL-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .012 mile(s) before CST EIGHTH ST E and ends at .017 mile(s) after CST BRANDON WALLACE WAY E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .017 mile(s) before CST BRANDON WALLACE WAY E and ends at .012 mile(s) after CST EAST 6TH ST E.
Work is scheduled from 06-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .013 mile(s) before CRD ARLEE AVE E and ends at .041 mile(s) after CRD HOFFMEISTER AVE E.
Work is scheduled from 16-MAR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 114 W - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .091 mile(s) before RT BB S and ends at .1 mile(s) after RT BB S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 63 N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .04 mile(s) after CST JANEWAY E and ends at .016 mile(s) after CST SCOTT ST E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 63 S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .016 mile(s) before CST SCOTT ST E and ends at .04 mile(s) before CST JANEWAY E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST OAKLAND AVE S and ends at CST CORRIGAN ST E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST FRONT ST E and ends at CST OAKLAND AVE S.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .041 mile(s) before CRD HOFFMEISTER AVE E and ends at .013 mile(s) after CRD ARLEE AVE E.
Work is scheduled from 16-MAR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 114 E - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .1 mile(s) before RT BB S and ends at .091 mile(s) after RT BB S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST TOWER ST S and ends at .003 mile(s) before LP 49 S.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after LP 49 S and ends at .001 mile(s) after CST TOWER ST S.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 8 E and ends at .749 mile(s) after CRD CAPE RD E.
Work is scheduled from 26-OCT-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .749 mile(s) before CRD CAPE RD E and ends at MO 8 E.
Work is scheduled from 26-OCT-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST 82ND BLVD S and ends at .001 mile(s) after IS 170 W.
Work is scheduled from 21-MAY-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 270 E - ST. LOUIS County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .176 mile(s) before RP IS270E TO RIVERVIEW DR E and ends at .02 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS70W TO IS435N N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .087 mile(s) after IS 70 W and ends at .21 mile(s) after IS 70 W.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US40 TO IS435N N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .148 mile(s) before RP IS70W TO IS435N N and ends at RP IS70W TO IS435N N.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 350 W - JACKSON County - EXPECT DELAYS
260417-C01 J4P3093 - Various bridge rehab
BRIDGE MAINTENANCE
Work zone begins at .232 mile(s) after RP 63RD ST E TO MO350W W and ends at CST DR MARTIN LUTHER KING JR BLVD E.
Work is scheduled from 27-OCT-2026 to 24-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 57 S - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.964 mile(s) before CRD 202 E and ends at .062 mile(s) before CRD 202 E.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 57 N - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) after CRD 202 E and ends at 1.963 mile(s) after CRD 202 E.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 W - JASPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at LP 49 S and ends at .001 mile(s) before CST S ST LOUIS AVE S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 E - JASPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) after CST S ST LOUIS AVE S and ends at LP 49 S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70W TO RTJ W - BOONE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 70 W and ends at RT O S.
Work is scheduled from 01-JUN-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
250919-C03, JKU0226
INTERSECTION IMPROVEMENTS
Work zone begins at .005 mile(s) after CST STERLING AVE S and ends at .003 mile(s) before CST HAWTHORNE AVE S.
Work is scheduled from 16-FEB-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST YALE AVE S and ends at .003 mile(s) before IS 55 S.
Work is scheduled from 25-AUG-2025 to 30-APR-2027.
Work will start daily at 05:00 AM and end by 09:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
Project 4 I-70 onnector to Rocheport
NEW PAVEMENT CONSTRUCTION
Work zone begins at .052 mile(s) after RR COLT S and ends at .205 mile(s) before BK KATY TRAIL E.
Work is scheduled from 20-APR-2026 to 31-DEC-2029.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .027 mile(s) before CST SIGNAL HILL DR E and ends at .007 mile(s) before RP IS70W TO N HANLEY RD N.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 100 W - ST. LOUIS CITY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .003 mile(s) after IS 55 S and ends at .002 mile(s) before CST YALE AVE S.
Work is scheduled from 25-AUG-2025 to 30-APR-2027.
Work will start daily at 05:00 AM and end by 09:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
Project 4 I-70 onnector to Rocheport
NEW PAVEMENT CONSTRUCTION
Work zone begins at .203 mile(s) after BK KATY TRAIL E and ends at .049 mile(s) before RR COLT S.
Work is scheduled from 20-APR-2026 to 31-DEC-2029.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 97 N - BARRY County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .003 mile(s) after CRD 2025 E and ends at .016 mile(s) before US 60 E.
Work is scheduled from 17-SEP-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - COOPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .787 mile(s) before RR RIVER SUB E and ends at .233 mile(s) before BK KATY TRAIL E.
Work is scheduled from 09-MAR-2026 to 31-DEC-2027.
Work will start daily at 06:00 AM and end by 11:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 97 S - BARRY County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .017 mile(s) after US 60 E and ends at .003 mile(s) before CRD 2025 E.
Work is scheduled from 17-SEP-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .187 mile(s) before RP IS70W TO MO47 W and ends at .017 mile(s) after RP IS70W TO W WARRENTON BLVD W.
Work is scheduled from 24-OCT-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - COOPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .25 mile(s) after BK KATY TRAIL E and ends at .786 mile(s) after RR RIVER SUB E.
Work is scheduled from 09-MAR-2026 to 31-DEC-2027.
Work will start daily at 06:00 AM and end by 11:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT AB W - STODDARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before CRD 535 S and ends at MO 25 S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AB E - STODDARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 25 S and ends at .001 mile(s) after CRD 535 S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - ST. LOUIS CITY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) after CST GRAND BLVD S and ends at CST KINGSHIGHWAY BLVD S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .413 mile(s) before MO 43 S and ends at .021 mile(s) after BU 60 E.
Work is scheduled from 28-SEP-2026 to 11-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 13 S - LAFAYETTE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .227 mile(s) after CRD JENNINGS RD E and ends at .045 mile(s) before CRD SUMMER AZURE LN E.
Work is scheduled from 12-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55N TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at IS 55 N and ends at US 67 N.
Work is scheduled from 26-JAN-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT RA S - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST SE TODD GEORGE PKWY S and ends at .011 mile(s) after CST SE 12TH ST E.
Work is scheduled from 01-SEP-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT RA N - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) before CST SE 12TH ST E and ends at CST SE TODD GEORGE PKWY S.
Work is scheduled from 01-SEP-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT C E - HENRY County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at MO 7 S and ends at .016 mile(s) after RT E S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .111 mile(s) after RT M E and ends at .093 mile(s) before CST MCNUTT ST S.
Work is scheduled from 29-MAY-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST OLYMPIC BLVD S and ends at .011 mile(s) before CST WOODLAND SPRINGS CT S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C W - BENTON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .016 mile(s) before RT E S and ends at MO 7 S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 9 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .082 mile(s) before CST 26TH AVE E and ends at .084 mile(s) after CST W 10TH AVE E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 92 E - PLATTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .03 mile(s) before CST MARSHALL ST E and ends at CST PRAIRIE VIEW RD S.
Work is scheduled from 19-OCT-2026 to 25-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 9 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .084 mile(s) before CST E 10TH AVE E and ends at .01 mile(s) before CST N OAK TRFY N.
Work is scheduled from 09-NOV-2026 to 23-NOV-2026.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before CST GOLDEN BEAR DR E and ends at .021 mile(s) before CST OLYMPIC BLVD S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 60 W - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) after PVT NEOSHO DR E and ends at .003 mile(s) before CST SOUTH ST E.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 60 E - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after CST SOUTH ST E and ends at .006 mile(s) before PVT NEOSHO DR E.
Work is scheduled from 13-APR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 59 N - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .022 mile(s) after CST ELIZABETH ST E and ends at CST OHIO ST E.
Work is scheduled from 23-MAR-2026 to 30-SEP-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) before BU 60 E and ends at .413 mile(s) after MO 43 S.
Work is scheduled from 28-SEP-2026 to 11-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .301 mile(s) after CST MISSOURI BOTTOM RD E and ends at .01 mile(s) after CST NATURAL BRIDGE RD E.
Work is scheduled from 11-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .041 mile(s) before CST ST JOSEPH ST E and ends at .003 mile(s) before CST SCENIC DR S.
Work is scheduled from 01-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CST SCENIC DR S and ends at .041 mile(s) after CST ST JOSEPH ST E.
Work is scheduled from 01-JUL-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .751 mile(s) after RP RTD TO IS49S S and ends at .843 mile(s) before CRD INDIAN LINE RD E.
Work is scheduled from 17-JUN-2026 to 02-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 N - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .83 mile(s) after CRD INDIAN LINE RD E and ends at .763 mile(s) before RP IS49N TO RTD E.
Work is scheduled from 17-JUN-2026 to 02-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .031 mile(s) after RP IS255N TO MO231 N and ends at PVT COPPERGATE SQUARE DR E.
Work is scheduled from 24-AUG-2026 to 03-MAY-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC W - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .053 mile(s) after PVT COMMERCIAL RD S and ends at .015 mile(s) before CRD HERNDON ST E.
Work is scheduled from 09-APR-2026 to 31-AUG-2027.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC E - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) after CRD HERNDON ST E and ends at .053 mile(s) before PVT COMMERCIAL RD S.
Work is scheduled from 09-APR-2026 to 31-AUG-2027.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 S - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) before OR 44 E and ends at .01 mile(s) before RT OO E.
Work is scheduled from 18-AUG-2026 to 01-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 N - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .01 mile(s) after RT OO E and ends at .001 mile(s) after OR 44 E.
Work is scheduled from 18-AUG-2026 to 01-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT YY E - CRAWFORD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .004 mile(s) after CRD BURLEY RIDGE RD S and ends at .001 mile(s) before RT M S.
Work is scheduled from 09-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT YY W - CRAWFORD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .001 mile(s) after RT M S and ends at .004 mile(s) before CRD BURLEY RIDGE RD S.
Work is scheduled from 09-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST NW BARRY RD W - CLAY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .037 mile(s) before RP BARRY RD TO US169N N and ends at .03 mile(s) before RP BARRY RD W TO US169S S.
Work is scheduled from 27-AUG-2022 to 01-AUG-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after CO MO100W TO MO100E E and ends at .013 mile(s) after CRD MASON LN S.
Work is scheduled from 04-MAY-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST W 32ND ST W - JASPER County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at MO 43 S and ends at .012 mile(s) after MO 43 S.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - JACKSON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .033 mile(s) after CST SHAW PKWY E and ends at .017 mile(s) before CST NW 6TH ST S.
Work is scheduled from 11-NOV-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST W 32ND ST E - NEWTON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .013 mile(s) before MO 43 S and ends at MO 43 S.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.447 mile(s) before RP IS44E TO MO141N N and ends at .485 mile(s) before RP IS44E TO MO141N N.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST FLORLAND DR E and ends at .016 mile(s) before CST SOUTHWELL LN S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before MO 413 S and ends at .015 mile(s) after RT M E.
Work is scheduled from 18-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .013 mile(s) before RT M E and ends at .051 mile(s) after MO 413 N.
Work is scheduled from 18-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO370W TO MO94 W - ST. CHARLES County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 370 W and ends at MO 94 E.
Work is scheduled from 29-JUL-2026 to 31-DEC-2026.
Work will start daily at 05:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 64 E - ST. LOUIS CITY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .047 mile(s) before CST MARKET ST E and ends at .026 mile(s) after CST MARKET ST E.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 32 E - CEDAR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before MO 39 S and ends at .006 mile(s) before RT J S.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 32 W - CEDAR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) after RT J S and ends at .001 mile(s) after MO 39 S.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .043 mile(s) after CRD THORNLEIGH RD S and ends at .263 mile(s) after CO US65N TO US65S W.
Work is scheduled from 31-AUG-2026 to 28-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .262 mile(s) before CO US65N TO US65S W and ends at .042 mile(s) before CRD THORNLEIGH RD S.
Work is scheduled from 31-AUG-2026 to 28-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before IS 170 W and ends at .001 mile(s) before CST OLIVE BLVD E.
Work is scheduled from 21-MAY-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 30 E and ends at .001 mile(s) before CRD PICKLES FORD RD S.
Work is scheduled from 27-APR-2026 to 01-DEC-2026.
Work will start daily at 06:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 S - CLAY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .029 mile(s) before US 69 S and ends at .03 mile(s) after CST W 3RD ST E.
Work is scheduled from 09-MAR-2026 to 31-JUL-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H N - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .045 mile(s) after CRD 114 E and ends at MO 151 S.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - SALINE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .014 mile(s) after OR 70 E and ends at .025 mile(s) before CRD 110TH RD E.
Work is scheduled from 27-JUL-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - SALINE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .025 mile(s) after CRD 110TH RD E and ends at .015 mile(s) before OR 70 E.
Work is scheduled from 27-JUL-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB S - CLINTON County - EXPECT DELAYS
CORE DRILLING
Work zone begins at LP 35 S and ends at OR 35 S.
Work is scheduled from 03-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 S - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .012 mile(s) after CRD MAGNOLIA AVE S and ends at .637 mile(s) before CRD ARROW ROCK RD E.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 N - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .637 mile(s) after CRD ARROW ROCK RD E and ends at .012 mile(s) before CRD MAGNOLIA AVE S.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .175 mile(s) before RP IS70W TO RTE W and ends at .018 mile(s) after RP IS70W TO RTHS S.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will start daily at 06:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .27 mile(s) after US 63C S and ends at .06 mile(s) after CO CST CONLEY RD TO US63C N.
Work is scheduled from 20-FEB-2026 to 01-JAN-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .016 mile(s) before RP RTFS TO IS70E E and ends at .196 mile(s) after RP RTH TO IS70E E.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will start daily at 06:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP N - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .369 mile(s) after CRD TUNEY RD E and ends at .792 mile(s) after CRD TUNEY RD E.
Work is scheduled from 27-APR-2026 to 01-DEC-2026.
Work will start daily at 06:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 240 E - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .416 mile(s) before RR RIVER SUB E and ends at .211 mile(s) before RR KCS INDUSTRIAL SPUR E.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at .032 mile(s) before RP RTKS TO IS64E E.
Work is scheduled from 10-SEP-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone MO 240 W - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .211 mile(s) after RR KCS INDUSTRIAL SPUR E and ends at .416 mile(s) after RR RIVER SUB E.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 S - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .174 mile(s) before RT F E and ends at .322 mile(s) before CST KINGRIDGE RD S.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 N - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .322 mile(s) after CST KINGRIDGE RD S and ends at .174 mile(s) after RT F E.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 N - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CST W 3RD ST E and ends at .026 mile(s) before RP IS29S TO US169N N.
Work is scheduled from 09-MAR-2026 to 31-JUL-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST LEES SUMMIT RD N - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .035 mile(s) before RP LEES SUMMIT RD TO IS70E E and ends at .022 mile(s) before CST 41ST ST E.
Work is scheduled from 11-OCT-2026 to 02-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS35N TO MO1 N - CLAY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at IS 35 N and ends at MO 1 S.
Work is scheduled from 13-OCT-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .08 mile(s) before CST GOLDEN BEAR DR E and ends at US 63C S.
Work is scheduled from 03-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at US 63C S and ends at .08 mile(s) before CST CLARK LN E.
Work is scheduled from 03-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 435 S - JACKSON County - EXPECT DELAYS
260918-C03 JKU0512
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) before US 40 E and ends at .009 mile(s) after CST STADIUM DR E.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 11:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 149 N - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST SECOND ST E and ends at CST TENTH ST E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 149 S - ADAIR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST TENTH ST E and ends at CST SECOND ST E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 6 W - GRUNDY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) before CRD 24TH ST S and ends at .003 mile(s) before CRD JORDAN AVE E.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - BARRY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .016 mile(s) after CRD 1040 S and ends at .014 mile(s) before CRD 1020 S.
Work is scheduled from 15-JUL-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - BARRY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .014 mile(s) after CRD 1020 S and ends at .016 mile(s) before CRD 1040 S.
Work is scheduled from 15-JUL-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 69 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .263 mile(s) before CRD CAMERON RD S and ends at .067 mile(s) after MO 10 W.
Work is scheduled from 09-NOV-2026 to 27-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 46 E - WORTH County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .437 mile(s) after RT Y S and ends at .563 mile(s) before CRD RIMROCK TRL S.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .045 mile(s) after RT K S and ends at .006 mile(s) before RP US61S TO US40W W.
Work is scheduled from 10-SEP-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone US 50 E - MONITEAU County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .015 mile(s) before CST HIGHLAND AVE S and ends at .038 mile(s) after RT K S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - MONITEAU County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .038 mile(s) before RT K S and ends at .015 mile(s) after CST HIGHLAND RD S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - FRANKLIN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .1 mile(s) after IS 44 E and ends at .065 mile(s) before RP IS44E TO RTO E.
Work is scheduled from 05-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 136 E - MERCER County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) before RT C S and ends at .006 mile(s) after MO 5 S.
Work is scheduled from 03-AUG-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at CST WENTZVILLE PKWY E and ends at .097 mile(s) after RP RTW S TO IS70W W.
Work is scheduled from 12-SEP-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
News Release
Possible delays due to workzone US 136 W - PUTNAM County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) before MO 5 S and ends at .009 mile(s) after RT C S.
Work is scheduled from 03-AUG-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 S - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST HICKMAN MILLS DR E and ends at RP US71S TO RTW E.
Work is scheduled from 27-MAY-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 N - BENTON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .216 mile(s) after CST MAIN ST E and ends at .627 mile(s) after CRD COLD SPRING AVE S.
Work is scheduled from 06-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 S - BENTON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .627 mile(s) before CRD COLD SPRING AVE S and ends at .216 mile(s) before CST MAIN ST E.
Work is scheduled from 06-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP RTHH TO IS29N N - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at RT HH E and ends at IS 29 N.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .002 mile(s) before RT TT E and ends at .015 mile(s) before RR NEVADA SUB S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 S - HARRISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.058 mile(s) after RP US136 TO IS35S S and ends at .027 mile(s) before MO 13 S.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 S - PETTIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .009 mile(s) after CST PLAZA AVE E and ends at .093 mile(s) before CO US65S TO US65N E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 213 S - LAFAYETTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .016 mile(s) after CRD NEALE RD E and ends at .023 mile(s) before MO 20 E.
Work is scheduled from 12-NOV-2026 to 24-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - PETTIS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST S WARREN AVE S and ends at .001 mile(s) before CST S STATE FAIR BLVD N.
Work is scheduled from 02-NOV-2026 to 16-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT T S - LAFAYETTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CST LIPPER ST S and ends at .012 mile(s) before OR 70 E.
Work is scheduled from 20-OCT-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .031 mile(s) after RR NEVADA SUB S and ends at .002 mile(s) after RT TT E.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - LAFAYETTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .012 mile(s) after OR 70 E and ends at .005 mile(s) after CST LIPPER ST S.
Work is scheduled from 20-OCT-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD COUNTY RD CC E - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 67 N and ends at .05 mile(s) after RT CC S.
Work is scheduled from 16-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST BRECKENRIDGE INDUSTRIAL CT S and ends at CST MELVIN AVE S.
Work is scheduled from 28-OCT-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .018 mile(s) after CST TAPAWINGO E and ends at .355 mile(s) before CST NW VALLEY VIEW RD E.
Work is scheduled from 19-OCT-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT CC E - CHRISTIAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .043 mile(s) before CRD N 25TH ST S and ends at RT J E.
Work is scheduled from 05-OCT-2026 to 15-DEC-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - HOLT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .53 mile(s) after CRD BEAGLE RD S and ends at .935 mile(s) after CRD BEAGLE RD S.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT CC W - CHRISTIAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .008 mile(s) before RT J E and ends at .043 mile(s) after CRD N 25TH ST S.
Work is scheduled from 05-OCT-2026 to 15-DEC-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT KK W - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT BB S and ends at CRD 220 E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 15 S - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST W ELM ST E and ends at CST W BEECH ST E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .124 mile(s) before RP IS70W TO RTF W and ends at .252 mile(s) after RA IS70W WRIGHT CITY W.
Work is scheduled from 04-MAY-2026 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .051 mile(s) before RP WILDCAT DR TO IS70W W and ends at .043 mile(s) before RP IS70W TO MO47 W.
Work is scheduled from 05-DEC-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone MO 15 N - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST E BEECH ST E and ends at CST W ELM ST E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H S - SHELBY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 151 S and ends at .045 mile(s) before CRD 114 E.
Work is scheduled from 10-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST DUNN RD E and ends at .001 mile(s) before CST CHAIN OF ROCKS BRG E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST CHAIN OF ROCKS BRG E and ends at .001 mile(s) after CST DUNN RD E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after RP DORSETT RD TO US67N N and ends at .008 mile(s) before CST ADIE RD S.
Work is scheduled from 28-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .579 mile(s) after RP MO273 TO IS29N N and ends at .026 mile(s) before CRD NORTH AMERICAN AVE E.
Work is scheduled from 30-OCT-2026 to 30-DEC-2026.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - PLATTE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .025 mile(s) after WS IS29S PLATTE CITY S and ends at .813 mile(s) after CRD NORTH AMERICAN AVE E.
Work is scheduled from 30-OCT-2026 to 30-DEC-2026.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK E - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at CRD 220 E and ends at RT BB S.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB N - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT B E and ends at .008 mile(s) before RT KK E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K S - GRUNDY County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .082 mile(s) after RT E E and ends at US 65 S.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .061 mile(s) before CO CST CONLEY RD TO US63C N and ends at .245 mile(s) before US 63C S.
Work is scheduled from 20-FEB-2026 to 01-JAN-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K N - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at US 65 S and ends at .082 mile(s) before RT E E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB S - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .008 mile(s) after RT KK E and ends at RT B E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 66 E - JASPER County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .001 mile(s) after RT P E and ends at LP 49 S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2028.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 W - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST MCKINLEY AVE S and ends at CST WINFIELD AVE S.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 35 S - HARRISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .621 mile(s) before RP IS35S TO RTAA S and ends at .561 mile(s) after RP RTAA TO IS35S S.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 S - NODAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .254 mile(s) before CRD 340 ST E and ends at .062 mile(s) after CRD 355 ST E.
Work is scheduled from 06-NOV-2026 to 18-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT FF W - JASPER County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .009 mile(s) before CST VIRGINIA AVE S and ends at MO 43 S.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 43 N - NEWTON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .001 mile(s) before RT FF E and ends at .006 mile(s) after CST 31ST ST E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT W - CAMDEN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at PVT LAKEVIEW RESORT BLVD S and ends at RT F S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT E - CAMDEN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at RT F S and ends at PVT LAKEVIEW RESORT BLVD S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 1 N - CLAY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .014 mile(s) before CST NE 43RD ST E and ends at .012 mile(s) after RP IS35S TO MO1 S.
Work is scheduled from 14-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 1 S - CLAY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .012 mile(s) before RP MO1 TO IS35S S and ends at .014 mile(s) after CST NE 43RD ST E.
Work is scheduled from 14-SEP-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 34 E - BOLLINGER County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .001 mile(s) after CRD 302 S and ends at MO 72 E.
Work is scheduled from 30-SEP-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST ELMGROVE AVE E and ends at .032 mile(s) before CST QUEEN ANN DR E.
Work is scheduled from 19-OCT-2026 to 20-NOV-2026.
Work will start daily at 06:30 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone N OR 64 W - ST. CHARLES County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .062 mile(s) before CST BARATHAVEN BLVD E and ends at .04 mile(s) after CST ACADEMY PL S.
Work is scheduled from 30-SEP-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 20 E - LAFAYETTE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .072 mile(s) after RT W S and ends at .088 mile(s) before RT EE S.
Work is scheduled from 13-JUL-2026 to 23-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 20 W - SALINE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .088 mile(s) after RT EE S and ends at .072 mile(s) before RT W S.
Work is scheduled from 13-JUL-2026 to 23-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT A W - CARTER County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST CLEVELAND AVE E and ends at .003 mile(s) before CST LONG AVE E.
Work is scheduled from 03-AUG-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - JASPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .292 mile(s) after RP MO37 TO IS44E E and ends at .09 mile(s) after RT Z S.
Work is scheduled from 06-APR-2026 to 01-JAN-2027.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 60 W - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .213 mile(s) after RT O S and ends at .663 mile(s) after RT NN S.
Work is scheduled from 07-JUL-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT A E - CARTER County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CST WALNUT ST E and ends at CST CLEVELAND AVE E.
Work is scheduled from 03-AUG-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .655 mile(s) after PVT HONOR CAMP LN S and ends at .103 mile(s) before RT NN S.
Work is scheduled from 07-JUL-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 W - LAWRENCE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .091 mile(s) before RT O S and ends at .314 mile(s) before RP IS44W TO MO37 N.
Work is scheduled from 06-APR-2026 to 01-JAN-2027.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 82 W - ST. CLAIR County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .01 mile(s) after RP MO13N TO MO82 E and ends at .001 mile(s) before RP MO82 TO MO13S S.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 82 E - ST. CLAIR County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after RP MO82 TO MO13S S and ends at .01 mile(s) before RP MO13N TO MO82 E.
Work is scheduled from 09-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 60 E - STODDARD County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before MO 114 E and ends at US 62 E.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 60 W - NEW MADRID County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) after US 62 E and ends at .001 mile(s) after MO 114 E.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - POLK County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CO WOR13 TO MO13 E and ends at .003 mile(s) before CRD 565TH RD E.
Work is scheduled from 26-MAY-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 34 W - CAPE GIRARDEAU County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at MO 72 E and ends at .001 mile(s) before CRD 302 S.
Work is scheduled from 30-SEP-2026 to 01-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .045 mile(s) after RT A E and ends at .001 mile(s) before CST WENTZVILLE PKWY E.
Work is scheduled from 17-SEP-2025 to 30-NOV-2026.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .058 mile(s) before US 40 E and ends at .021 mile(s) before IS 670 W.
Work is scheduled from 03-MAR-2025 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .109 mile(s) before IS 670 E and ends at .045 mile(s) after US 40 E.
Work is scheduled from 03-MAR-2025 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 136 E - PUTNAM County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .011 mile(s) after MO 5 S and ends at .04 mile(s) before PVT PRIVATE DR S.
Work is scheduled from 03-AUG-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 136 W - SCHUYLER County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .04 mile(s) after PVT PRIVATE DR S and ends at .011 mile(s) before MO 5 S.
Work is scheduled from 03-AUG-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 37 S - JASPER County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .052 mile(s) before PVT SARCOXIE HIGHS SCHOOL STADIUM S and ends at .014 mile(s) before CST FRANKLIN ST E.
Work is scheduled from 01-NOV-2026 to 29-NOV-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 37 N - JASPER County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .014 mile(s) after CST FRANKLIN ST E and ends at .052 mile(s) after PVT SARCOXIE HIGHS SCHOOL STADIUM S.
Work is scheduled from 01-NOV-2026 to 29-NOV-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTJ TO IS70W W - BOONE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT J S and ends at IS 70 W.
Work is scheduled from 01-JUN-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 59 N - BUCHANAN County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before MO 752 E and ends at .031 mile(s) after CST KENTUCKY ST E.
Work is scheduled from 30-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 370 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CST N 5TH ST S and ends at .068 mile(s) after MO 141 S.
Work is scheduled from 02-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CRD KINSWOOD LN W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 231 S and ends at .061 mile(s) after MO 231 S.
Work is scheduled from 16-OCT-2026 to 03-MAY-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .755 mile(s) after RP RTD TO IS49S S and ends at .847 mile(s) before CRD INDIAN LINE RD E.
Work is scheduled from 17-JUN-2026 to 30-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 267 N - ST. LOUIS County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at US 50 E and ends at CST ALABAMA AVE E.
Work is scheduled from 10-SEP-2025 to 01-NOV-2027.
Work will start daily at 05:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 267 S - ST. LOUIS County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at CST ALABAMA AVE E and ends at US 50 E.
Work is scheduled from 10-SEP-2025 to 01-NOV-2027.
Work will start daily at 05:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS55N TO US61 N - JEFFERSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at IS 55 N and ends at US 61 S.
Work is scheduled from 19-OCT-2026 to 31-MAR-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A E - MILLER County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 17 S and ends at MO 42 E.
Work is scheduled from 19-OCT-2026 to 13-NOV-2026.
Work will start daily at 08:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A W - MILLER County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 42 E and ends at MO 17 S.
Work is scheduled from 19-OCT-2026 to 13-NOV-2026.
Work will start daily at 08:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 N - DAVIESS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .014 mile(s) before RP IS35N TO RTC N and ends at .918 mile(s) after RP RTC TO IS35N N.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 S - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) after BU 65 S and ends at .047 mile(s) after CRD 100TH RD E.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 370 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) before RP MO141 TO MO370W W and ends at .001 mile(s) after CST N 5TH ST S.
Work is scheduled from 02-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 124 E - HOWARD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .001 mile(s) after MO 240 E and ends at .007 mile(s) before US 63 S.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 37 N - BARRY County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .026 mile(s) before US 60 E and ends at .03 mile(s) after US 60 E.
Work is scheduled from 25-SEP-2026 to 11-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 N - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .047 mile(s) before CRD 100TH RD E and ends at .012 mile(s) before BU 65 S.
Work is scheduled from 02-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 124 W - BOONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .007 mile(s) after US 63 S and ends at .001 mile(s) before MO 240 E.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 39 S - LAWRENCE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST HASTINGS S and ends at .015 mile(s) after CST NORTH ST E.
Work is scheduled from 01-NOV-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP US50E TO MO291 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after US 50 E and ends at .001 mile(s) before MO 291 N.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 265 S - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .055 mile(s) before RT M E and ends at .014 mile(s) after RT AA S.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 39 N - LAWRENCE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .015 mile(s) before CST NORTH ST E and ends at .002 mile(s) after CST HASTINGS S.
Work is scheduled from 01-NOV-2026 to 01-DEC-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 265 N - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .014 mile(s) before RT AA S and ends at .055 mile(s) after RT M E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - LAFAYETTE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .645 mile(s) before OR 24 E and ends at .113 mile(s) before OR 24 E.
Work is scheduled from 26-OCT-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US50W TO MO291 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after US 50 W and ends at .002 mile(s) before MO 291 S.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST WENTZVILLE PKWY E and ends at .044 mile(s) before RT A E.
Work is scheduled from 17-SEP-2025 to 30-NOV-2026.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone US 65 S - LAFAYETTE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .299 mile(s) before CRD 280TH LN E and ends at .414 mile(s) before CST SPEYER LN S.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 N - SALINE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .414 mile(s) after CST SPEYER LN S and ends at .299 mile(s) after CRD 280TH LN E.
Work is scheduled from 01-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - STODDARD County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .408 mile(s) before CRD 227A S and ends at .376 mile(s) before CRD 227A S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - SHANNON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .006 mile(s) before RT DD S and ends at .037 mile(s) before RT P S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Y N - CLAY County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at MO 10 E and ends at .053 mile(s) after CRD PINE RD S.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .102 mile(s) before RP US63N TO RTB N and ends at .087 mile(s) after RP RTB TO US63N N.
Work is scheduled from 09-NOV-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y S - RAY County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .053 mile(s) before CRD PINE RD S and ends at MO 10 E.
Work is scheduled from 02-NOV-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - STODDARD County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .376 mile(s) after CRD 227A S and ends at .408 mile(s) after CRD 227A S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .042 mile(s) before RR SAINT LOUIS DISTRICT E and ends at .104 mile(s) after CST JAMES S MCDONNELL BLVD S.
Work is scheduled from 09-NOV-2026 to 23-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 13 S - HENRY County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .018 mile(s) after MO 18 E and ends at .007 mile(s) before MO 52 W.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will start daily at 10:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .012 mile(s) after CST ST DENIS ST E and ends at .029 mile(s) after CST ST CHARLES ST S.
Work is scheduled from 09-NOV-2026 to 23-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 21 N - WASHINGTON County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at .075 mile(s) after MO 8 E and ends at .001 mile(s) before CRD BRITTON RD E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .106 mile(s) before RP US63S TO RTB S and ends at .124 mile(s) after RP RTB TO US63S S.
Work is scheduled from 09-NOV-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 39 N - CEDAR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .015 mile(s) after CST SOUTH ST S and ends at .01 mile(s) before CST ENGLEWOOD DR E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 21 S - JEFFERSON County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at .001 mile(s) after CRD BRITTON RD E and ends at .075 mile(s) before MO 8 E.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 E - WASHINGTON County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at .008 mile(s) after MO 21 S and ends at .052 mile(s) before CRD GERMANIA RD S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 W - WASHINGTON County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at .052 mile(s) after CRD GERMANIA RD S and ends at .008 mile(s) before MO 21 S.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST INDEPENDENCE AVE W - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .025 mile(s) before CST THE PASEO N and ends at .027 mile(s) after CST CAMPBELL ST S.
Work is scheduled from 09-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST INDEPENDENCE AVE E - JACKSON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .027 mile(s) before CST CAMPBELL ST S and ends at .025 mile(s) after CST THE PASEO N.
Work is scheduled from 09-NOV-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 100 E - FRANKLIN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST HICKORY ST S and ends at CST MILLER ST S.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 100 W - FRANKLIN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST MILLER ST S and ends at .001 mile(s) after CST HICKORY ST S.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 N - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .844 mile(s) before RP IS49N TO RTK E and ends at .054 mile(s) before LP 49 N.
Work is scheduled from 23-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - VERNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .01 mile(s) before LP 49 N and ends at .838 mile(s) after RP RTK TO IS49S S.
Work is scheduled from 23-JUN-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 47 S - WASHINGTON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .153 mile(s) before CRD RODERICK RD S and ends at .119 mile(s) before CRD CADET RD S.
Work is scheduled from 19-OCT-2026 to 30-JUL-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 47 N - WASHINGTON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .119 mile(s) after CRD CADET RD S and ends at .153 mile(s) after CRD RODERICK RD S.
Work is scheduled from 19-OCT-2026 to 30-JUL-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .175 mile(s) before RP IS70W TO RTE W and ends at .365 mile(s) after RP RTO TO IS70W W.
Work is scheduled from 29-JUN-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 70 E - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .335 mile(s) before RP IS70E TO RTM E and ends at .196 mile(s) after RP RTH TO IS70E E.
Work is scheduled from 29-JUN-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 W - JASPER County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at LP 49 S and ends at .001 mile(s) before RT P E.
Work is scheduled from 16-MAR-2026 to 01-DEC-2028.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 110 E - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at .066 mile(s) before MO 79 S and ends at IS 72 E.
Work is scheduled from 06-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 33 N - CLAY County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .026 mile(s) after CST JEFFERSON ST S and ends at .014 mile(s) before CRD NE 172ND ST E.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 43 S - JASPER County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .001 mile(s) before RT FF E and ends at .012 mile(s) after RT FF E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 110 W - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at IS 72 W and ends at .063 mile(s) after MO 79 S.
Work is scheduled from 06-NOV-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .028 mile(s) before RP US67S TO IS55N N and ends at RP IS55S TO US67S S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .116 mile(s) after CRD S BUCK CREEK RD E and ends at .039 mile(s) before US 61 S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - PLATTE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .084 mile(s) after CST N AMBASSADOR DR S and ends at .174 mile(s) after OR 29 S.
Work is scheduled from 06-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 33 S - CLAY County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .014 mile(s) after CRD NE 172ND ST E and ends at .026 mile(s) before CST JEFFERSON ST S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - BARTON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .016 mile(s) before RT A S and ends at .002 mile(s) after CRD SE 50TH LN S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .047 mile(s) after RP IS55N TO MO141S S and ends at .033 mile(s) before RP MERAMEC BOTTOM RD TO IS55N N.
Work is scheduled from 24-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 E - BARTON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) before CRD SE 50TH LN S and ends at .016 mile(s) after RT A S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D E - PLATTE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .058 mile(s) before RP RTDE TO IS29S S and ends at .084 mile(s) before CST N AMBASSADOR DR S.
Work is scheduled from 06-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Z W - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after CST DANIEL DUNKLIN COMMERCIAL BLVD S and ends at .034 mile(s) before CST PEVELY INDUSTRIAL DR S.
Work is scheduled from 27-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Z E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .034 mile(s) after CST PEVELY INDUSTRIAL DR S and ends at .003 mile(s) before CST DANIEL DUNKLIN COMMERCIAL BLVD S.
Work is scheduled from 27-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 37 S - BARRY County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .03 mile(s) before US 60 E and ends at .026 mile(s) after US 60 E.
Work is scheduled from 25-SEP-2026 to 11-DEC-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .058 mile(s) after RT Z E and ends at .1 mile(s) after CST MCNUTT ST N.
Work is scheduled from 28-FEB-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .01 mile(s) before RP US67N TO RTCC E and ends at US 67 S.
Work is scheduled from 05-OCT-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 67 S and ends at .01 mile(s) after RP US67N TO RTCC E.
Work is scheduled from 05-OCT-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) before RA IS70E WRIGHT CITY E and ends at .123 mile(s) after RP RTF TO IS70E E.
Work is scheduled from 04-MAY-2026 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
MEDIAN OR SHOULDER
Work zone begins at .031 mile(s) after RP RTF TO IS70E E and ends at .007 mile(s) after RT W N.
Work is scheduled from 23-OCT-2025 to 30-NOV-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone US 160 E - RIPLEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) before MO 142 E and ends at .002 mile(s) after RT JJ S.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 W - RIPLEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) before RT JJ S and ends at .002 mile(s) after MO 142 E.
Work is scheduled from 05-OCT-2026 to 30-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT D E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at BU 65 S and ends at .002 mile(s) before CST SUNSHINE ST E.
Work is scheduled from 02-NOV-2026 to 30-JUN-2028.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT D W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST SUNSHINE ST E and ends at BU 65 S.
Work is scheduled from 02-NOV-2026 to 30-JUN-2028.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after RP IS55S TO MERAMEC BOTTOM RD W and ends at .083 mile(s) before RP MO141N TO IS55S S.
Work is scheduled from 24-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 W - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST TUCKER ST S and ends at .001 mile(s) before CST PERKINS ST S.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST PERKINS ST S and ends at .002 mile(s) after CST TUCKER ST S.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U S - GRUNDY County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT F E and ends at MO 190 E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U N - LIVINGSTON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 190 E and ends at RT F E.
Work is scheduled from 02-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 49 S - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST MINNESOTA AVE E and ends at .004 mile(s) after CST CHERRY ST E.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 49 N - VERNON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) before CST CHERRY ST E and ends at .001 mile(s) before CST MINNESOTA AVE E.
Work is scheduled from 01-OCT-2026 to 02-DEC-2026.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST 7TH ST E and ends at .003 mile(s) before CST W 9TH ST E.
Work is scheduled from 02-NOV-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at .019 mile(s) after RP IS29N TO RTHH N and ends at .013 mile(s) before RP IS29N TO MO273 N.
Work is scheduled from 09-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .07 mile(s) before RP US54W TO US63N N and ends at .002 mile(s) before RP US54W TO MO94E E.
Work is scheduled from 22-SEP-2026 to 30-APR-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 N - NODAWAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .209 mile(s) before RT CC E and ends at .279 mile(s) after CRD ECHO RD S.
Work is scheduled from 26-MAR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .008 mile(s) after RP RTW TO US54W W and ends at .018 mile(s) after RP US63S TO MAIN ST S.
Work is scheduled from 22-SEP-2026 to 30-APR-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) before US 61 S and ends at .047 mile(s) after US 67 N.
Work is scheduled from 09-NOV-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .038 mile(s) before RP W WARRENTON BLVD TO IS70E E and ends at .144 mile(s) after RP MO47 TO IS70E E.
Work is scheduled from 24-OCT-2025 to 30-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone CST BOB F GRIFFIN RD N - DEKALB County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .034 mile(s) before US 36 E and ends at .003 mile(s) before US 36 E.
Work is scheduled from 04-AUG-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) before CST LARKIN LN S and ends at .001 mile(s) after CST N SPOEDE RD S.
Work is scheduled from 12-NOV-2026 to 18-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD FELTON AVE E and ends at CRD RIPA AVE E.
Work is scheduled from 11-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 54 E - CALLAWAY County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .128 mile(s) after RR JEFFERSON CITY SUB E and ends at .003 mile(s) before RP RTW TO US63N N.
Work is scheduled from 11-NOV-2026 to 17-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST COUNTRY RIDGE DR E and ends at CST RIVER VALLEY DR S.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST RIVER VALLEY DR S and ends at CST COUNTRY RIDGE DR E.
Work is scheduled from 02-NOV-2026 to 30-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 E - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .065 mile(s) before CST ENCHANTED PKWY S and ends at .014 mile(s) before CRD WEIDMAN RD S.
Work is scheduled from 04-MAY-2026 to 30-JUN-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .116 mile(s) before MO 115 S and ends at .048 mile(s) after MO 115 N.
Work is scheduled from 29-OCT-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - BATES County - POSSIBLE DELAYS
MOWING
Work zone begins at .02 mile(s) after RT A E and ends at .077 mile(s) before MO 52 E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 72 E - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at .059 mile(s) before RP MO79 TO IS72E E and ends at US 36 E.
Work is scheduled from 12-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 72 W - MARION County - POSSIBLE DELAYS
BRIDGE FLUSHING
Work zone begins at US 36 W and ends at .033 mile(s) after RP IS72W TO MO79 N.
Work is scheduled from 12-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT PP N - BATES County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD SW 10508 E and ends at RT A E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D N - CASS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .021 mile(s) before CRD 227 TER E and ends at .013 mile(s) after CRD 223RD ST E.
Work is scheduled from 09-NOV-2026 to 15-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D S - CASS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .013 mile(s) before CRD 223RD ST E and ends at .021 mile(s) after CRD 227 TER E.
Work is scheduled from 09-NOV-2026 to 15-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 136 E - MERCER County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .175 mile(s) before CST N STEWARD ST S and ends at .036 mile(s) before CST N STEWARD ST S.
Work is scheduled from 04-MAY-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 136 W - MERCER County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .036 mile(s) after CST N STEWARD ST S and ends at .175 mile(s) after CST N STEWARD ST S.
Work is scheduled from 04-MAY-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone BU 54 E - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before MO 22 E and ends at .002 mile(s) before RT J E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone BU 54 W - AUDRAIN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after RT J E and ends at .001 mile(s) after MO 22 E.
Work is scheduled from 12-OCT-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST HENRY AVE S and ends at CST BAXTER RD S.
Work is scheduled from 30-SEP-2026 to 31-DEC-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 39 S - CEDAR County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 32 E and ends at .002 mile(s) before CST WELLS ST E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 39 N - CEDAR County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST WELLS ST E and ends at MO 32 E.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 E - ST. CLAIR County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .155 mile(s) after CRD SE 850 E and ends at .013 mile(s) before CRD SE 601 S.
Work is scheduled from 12-NOV-2026 to 26-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - ST. CLAIR County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .013 mile(s) after CRD SE 601 S and ends at .155 mile(s) before CRD SE 850 E.
Work is scheduled from 12-NOV-2026 to 26-NOV-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - JACKSON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .141 mile(s) before RP IS70E TO MO7 S and ends at .199 mile(s) after CRD LEFHOLZ RD S.
Work is scheduled from 17-JUL-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .218 mile(s) after CST DAVIS RD S and ends at .007 mile(s) before CST LITTLE BLUE PKWY S.
Work is scheduled from 23-OCT-2026 to 13-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
250919-C03, JKU0226
INTERSECTION IMPROVEMENTS
Work zone begins at .003 mile(s) after CST HAWTHORNE AVE S and ends at .005 mile(s) before CST STERLING AVE S.
Work is scheduled from 16-FEB-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) after CRD TEL-HAVEN CT E and ends at .209 mile(s) after PVT PRIVATE S.
Work is scheduled from 26-OCT-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST SE HAMBLEN RD N - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST SE OLDHAM PKWY E and ends at .001 mile(s) after OR 50 E.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST SE HAMBLEN RD S - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before OR 50 E and ends at .001 mile(s) before CST SE OLDHAM PKWY E.
Work is scheduled from 22-SEP-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .015 mile(s) before RT J S and ends at .035 mile(s) before RP US54W TO IS70E E.
Work is scheduled from 07-AUG-2026 to 04-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after CST INDIANA AVE S and ends at .009 mile(s) before RP IS70E TO MERSINGTON AVE E.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .076 mile(s) after RT B S and ends at .015 mile(s) before CRD SAMPSON RD E.
Work is scheduled from 08-NOV-2026 to 28-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .209 mile(s) before PVT PRIVATE S and ends at .005 mile(s) before CRD TEL-HAVEN CT E.
Work is scheduled from 26-OCT-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - STONE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .019 mile(s) after RT U E and ends at .014 mile(s) after CRD GOOCH RD E.
Work is scheduled from 02-NOV-2026 to 16-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) after RP IS55N TO US67S N and ends at .238 mile(s) after RR RIVER SUB S.
Work is scheduled from 01-APR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .269 mile(s) before RR RIVER SUB S and ends at .04 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 01-APR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .032 mile(s) before RP IS70E TO RTJ E and ends at .595 mile(s) before RT Z S.
Work is scheduled from 17-NOV-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - COOPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .594 mile(s) after RT Z S and ends at .097 mile(s) after RP RTJ TO IS70W W.
Work is scheduled from 17-NOV-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 39 S - CEDAR County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .01 mile(s) after CST ENGLEWOOD DR E and ends at .015 mile(s) before CST SOUTH ST S.
Work is scheduled from 17-AUG-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 7 N - HENRY County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at MO 18 E and ends at .096 mile(s) before RP MO7N TO LUTHERAN DR N.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will start daily at 10:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 169 S - BUCHANAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .037 mile(s) before CST ROCHESTER RD S and ends at .185 mile(s) after CST NORTH VILLAGE DR E.
Work is scheduled from 08-NOV-2026 to 20-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 7 S - HENRY County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .111 mile(s) after RP RTB TO MO7S S and ends at MO 18 E.
Work is scheduled from 10-NOV-2026 to 12-NOV-2026.
Work will start daily at 10:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - DENT County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .018 mile(s) before CST CENTER ST E and ends at .015 mile(s) before MO 32 E.
Work is scheduled from 14-OCT-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 N - DENT County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .015 mile(s) after MO 68 E and ends at .018 mile(s) after CST CENTER ST E.
Work is scheduled from 14-OCT-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 N - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .081 mile(s) before CO EOR49 TO WOR49 S and ends at .003 mile(s) after RP RED BRIDGE RD TO IS49N N.
Work is scheduled from 25-OCT-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Possible delays due to workzone IS 170 E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .038 mile(s) after RP IS170E TO MO115N N and ends at .135 mile(s) after PED PED OVER IS170 E.
Work is scheduled from 23-SEP-2026 to 30-APR-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 W - LAFAYETTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.319 mile(s) before RP IS70W TO RTHS S and ends at .763 mile(s) before RP IS70W TO RTHS S.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 70 E - JACKSON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .764 mile(s) after RP RTFS TO IS70E E and ends at 1.316 mile(s) after RP RTFS TO IS70E E.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .24 mile(s) before CRD POPPY DR E and ends at .215 mile(s) after CRD POPPY DR E.
Work is scheduled from 28-SEP-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 E - DEKALB County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .013 mile(s) after MO 110 W and ends at .062 mile(s) after CST BOB F GRIFFIN RD S.
Work is scheduled from 04-AUG-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 36 W - DEKALB County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .018 mile(s) after CO US36W TO US36E S and ends at .044 mile(s) after CST BOB F GRIFFIN RD S.
Work is scheduled from 04-AUG-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST BOB F GRIFFIN RD S - DEKALB County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .032 mile(s) before US 36 W and ends at .002 mile(s) before US 36 W.
Work is scheduled from 04-AUG-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W W - CASS County - EXPECT DELAYS
PAVEMENT STRIPING
Work zone begins at RT A E and ends at RT D S.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RP IS55S TO US67S S and ends at .185 mile(s) before CRD BUCK CREEK RD W E.
Work is scheduled from 23-JUN-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD WAGON TRAIL RD N - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .07 mile(s) before US 63 S and ends at .064 mile(s) after US 63 N.
Work is scheduled from 04-NOV-2026 to 22-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 170 W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .137 mile(s) before PED PED OVER IS170 E and ends at .034 mile(s) before RP MO115N TO IS170W W.
Work is scheduled from 23-SEP-2026 to 30-APR-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT W E - CASS County - EXPECT DELAYS
PAVEMENT STRIPING
Work zone begins at RT D S and ends at RT A E.
Work is scheduled from 12-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC E - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CRD N 25TH ST S and ends at .008 mile(s) before RP RTJ E TO US65N N.
Work is scheduled from 20-JUL-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC W - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .012 mile(s) before US 65 N and ends at .002 mile(s) before CRD N 25TH ST S.
Work is scheduled from 20-JUL-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD WAGON TRAIL RD S - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .064 mile(s) before US 63 N and ends at .07 mile(s) after US 63 S.
Work is scheduled from 04-NOV-2026 to 22-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT FF E - JASPER County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .003 mile(s) after CST DAVIS BLVD S and ends at .004 mile(s) before CST DOUGHBOY DR S.
Work is scheduled from 13-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF W - JASPER County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .004 mile(s) after PVT RICHARD WALTER CIR E and ends at .013 mile(s) before RR HEAVENER SUB S.
Work is scheduled from 13-JUL-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .271 mile(s) before RP IS70W TO RTD W and ends at .623 mile(s) after RP RTD TO IS70W W.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP RTCC TO US 67S S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC S and ends at .08 mile(s) before US 67 S.
Work is scheduled from 16-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US67N TO RTCC E - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) after US 67 N and ends at RT CC S.
Work is scheduled from 16-OCT-2026 to 13-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before CRD MASON LN S and ends at .012 mile(s) after CRD BARRETT STATION RD S.
Work is scheduled from 04-MAY-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 35 S - DAVIESS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .969 mile(s) before RP IS35S TO RTC S and ends at .008 mile(s) before RT C E.
Work is scheduled from 10-NOV-2026 to 13-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS255S TO MO231 S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .156 mile(s) before MO 231 S and ends at MO 231 S.
Work is scheduled from 16-OCT-2026 to 03-MAY-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .178 mile(s) before CRD WAGON TRAIL RD S and ends at .13 mile(s) after CRD WAGON TRAIL RD S.
Work is scheduled from 04-NOV-2026 to 22-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .427 mile(s) before RP IS70E TO RTD E and ends at .3 mile(s) after RP RTD TO IS70E E.
Work is scheduled from 04-MAY-2026 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .131 mile(s) before CRD WAGON TRAIL RD S and ends at .177 mile(s) after CRD WAGON TRAIL RD S.
Work is scheduled from 04-NOV-2026 to 22-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 7 N - JACKSON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after US 40 W and ends at .002 mile(s) before CST SHAW PKWY E.
Work is scheduled from 06-APR-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 7 S - JACKSON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST SHAW PKWY E and ends at .001 mile(s) before US 40 W.
Work is scheduled from 06-APR-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .133 mile(s) after RP LILAC AVE TO IS270E E and ends at .024 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) before RP IS270W TO RIVERVIEW DR N W and ends at .062 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 N - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .3 mile(s) after BU 61 N and ends at .157 mile(s) after RP US61 TO IS55N N.
Work is scheduled from 27-SEP-2026 to 13-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 49 N - WAYNE County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .167 mile(s) after CST THIRD ST S and ends at .033 mile(s) before MO 72 E.
Work is scheduled from 28-AUG-2026 to 23-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 49 S - IRON County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .033 mile(s) after MO 72 E and ends at .167 mile(s) before CST THIRD ST S.
Work is scheduled from 28-AUG-2026 to 23-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 33 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .187 mile(s) before CRD NE 184TH ST E and ends at .12 mile(s) after CRD DIANA DR E.
Work is scheduled from 09-NOV-2026 to 12-NOV-2026.
Work will start daily at 07:00 AM and end by 07:22 PM.
Work will be conducted Monday through Friday.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 143 work zone(s) planned for a future date.

Future work zone(s) 143 Future work zone(s)
Future work zone RT M W - IRON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .002 mile(s) before CST LONGWOOD DR S and ends at CST BOULDER DR S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - IRON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CST BOULDER DR S and ends at .002 mile(s) after CST LONGWOOD DR S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO IS670W W - JACKSON County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .007 mile(s) after IS 35 N and ends at IS 670 W.
Work is scheduled from 30-NOV-2026 to 01-DEC-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AD S - LACLEDE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at 1.76 mile(s) after CRD VINTAGE DR S and ends at 1.407 mile(s) before CRD AUDRAIN RD E.
Work is scheduled from 07-DEC-2026 to 10-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST BROADWAY AVE N - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST EVERGREEN ST E and ends at CST NORTON RD E.
Work is scheduled from 16-NOV-2026 to 04-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST BROADWAY AVE S - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST NORTON RD E and ends at .001 mile(s) before CST EVERGREEN ST E.
Work is scheduled from 16-NOV-2026 to 04-JAN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) before CST FAIRLIND DR E and ends at .004 mile(s) before MO 30 E.
Work is scheduled from 17-NOV-2026 to 17-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after MO 30 E and ends at .02 mile(s) after CST FAIRLIND DR E.
Work is scheduled from 17-NOV-2026 to 17-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 E - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after RT JJ S and ends at .003 mile(s) before CRD 402 E.
Work is scheduled from 19-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 W - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD 402 E and ends at .003 mile(s) before RT JJ S.
Work is scheduled from 19-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT TT W - GREENE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .07 mile(s) after CRD 63 S and ends at .254 mile(s) after CRD 61 S.
Work is scheduled from 30-NOV-2026 to 30-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 65 S - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .059 mile(s) after OR 65 S and ends at .317 mile(s) after OR 65 S.
Work is scheduled from 16-NOV-2026 to 18-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS55S TO IS270E E - ST. LOUIS County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .094 mile(s) after RP US50E TO IS270E E and ends at .009 mile(s) after CRD VON TALGE RD S.
Work is scheduled from 30-NOV-2026 to 04-DEC-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT Y E - POLK County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .062 mile(s) after CRD 163RD RD S and ends at .194 mile(s) before CRD 480TH RD E.
Work is scheduled from 01-DEC-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D E - BATES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after RP RTD TO IS49S S and ends at .007 mile(s) before LP 49 S.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D W - BATES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after LP 49 S and ends at .007 mile(s) before RP RTD TO IS49S S.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP RTD TO IS49S S - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT D E and ends at .002 mile(s) before IS 49 S.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 62 E - NEW MADRID County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .029 mile(s) after LP 55 S and ends at .1 mile(s) after OR 55 S.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 62 W - NEW MADRID County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .1 mile(s) before OR 55 S and ends at .029 mile(s) before LP 55 S.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 126 E - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .235 mile(s) before RT O S and ends at .146 mile(s) before RT J S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 126 W - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .146 mile(s) after RT J S and ends at .235 mile(s) after RT O S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) after CST PINEGATE DR S and ends at .003 mile(s) before CST HAVERSHAM PL S.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS435N TO IS70W W - JACKSON County - ALL LANES CLOSED
260918-C03 JKU0512
BRIDGE MAINTENANCE
Work zone begins at IS 435 N and ends at .008 mile(s) before IS 435 N.
Work is scheduled from 14-DEC-2026 to 17-DEC-2026.
Work will start daily at 11:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS49N TO RTD E - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 49 N and ends at RT D E.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS55N TO US50E E - ST. LOUIS County - NO DELAYS
ROADSIDE WORK
Work zone begins at .061 mile(s) after RP IS255N TO US50E E and ends at RP IS270W TO US50W W.
Work is scheduled from 13-NOV-2026 to 30-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 153 S - DUNKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) after RT M S and ends at .01 mile(s) before RT HH E.
Work is scheduled from 17-NOV-2026 to 17-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 153 N - DUNKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after RT HH E and ends at .007 mile(s) before RT M S.
Work is scheduled from 17-NOV-2026 to 17-NOV-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RA IS70W CONCORDIA W - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 W and ends at .12 mile(s) before IS 70 W.
Work is scheduled from 30-NOV-2026 to 03-DEC-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB S - KNOX County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) after CRD QUAIL RUN RD E and ends at .01 mile(s) before CRD 122 E.
Work is scheduled from 07-DEC-2026 to 11-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB N - SHELBY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .01 mile(s) after CRD 122 E and ends at .016 mile(s) before CRD QUAIL RUN RD E.
Work is scheduled from 07-DEC-2026 to 11-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 29 N - BUCHANAN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST PICKETT RD E and ends at .054 mile(s) after RP IS29N TO US36W W.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 100 W - FRANKLIN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CST FIFTH ST E and ends at .002 mile(s) after MO 47 S.
Work is scheduled from 20-NOV-2026 to 25-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted all week, including weekends.
Future work zone IS 44 E - ST. LOUIS County - NO DELAYS
BRIDGE INSPECTION
Work zone begins at .035 mile(s) before OR 44 E and ends at .016 mile(s) after CRD LEWIS RD S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 180 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .068 mile(s) before CRD CARSON RD S and ends at .022 mile(s) after CRD CARSON RD S.
Work is scheduled from 16-NOV-2026 to 31-DEC-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 180 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CRD WHEATON AVE S and ends at .004 mile(s) after CST NORTH & SOUTH RD S.
Work is scheduled from 17-NOV-2026 to 31-DEC-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB N - SHELBY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) after CRD 122 E and ends at .011 mile(s) before CRD QUAIL RUN RD E.
Work is scheduled from 30-NOV-2026 to 04-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB S - KNOX County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after CRD QUAIL RUN RD E and ends at .008 mile(s) before CRD 122 E.
Work is scheduled from 30-NOV-2026 to 04-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST GIST RD W - ST. LOUIS County - NO DELAYS
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) after CST GALLATIN LN E and ends at .04 mile(s) after IS 270 W.
Work is scheduled from 17-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .411 mile(s) after RP CEDAR RD TO IS49N N and ends at .987 mile(s) after RP CEDAR RD TO IS49N N.
Work is scheduled from 16-NOV-2026 to 12-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US36E TO IS29N N - BUCHANAN County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at US 36 E and ends at IS 29 N.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 36 W - BUCHANAN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .27 mile(s) before RP US36W TO CRAIG PKWY W and ends at .089 mile(s) after RP CRAIG PKWY TO US36W W.
Work is scheduled from 17-NOV-2026 to 18-NOV-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 32 W - POLK County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .105 mile(s) before CST E 1ST ST E and ends at .025 mile(s) before CST N CHESTNUT ST S.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 32 E - POLK County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .025 mile(s) after CST N CHESTNUT ST S and ends at .105 mile(s) after CST E 1ST ST E.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
PAVEMENT STRIPING
Work zone begins at .324 mile(s) before RP IS270W TO RIVERVIEW DR N W and ends at .003 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 14-NOV-2026 to 16-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST E 104TH ST E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .02 mile(s) before RP E 104TH ST TO IS435N N and ends at .01 mile(s) after RP E 104TH ST TO IS435N N.
Work is scheduled from 13-NOV-2026 to 13-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .03 mile(s) after RP US50W TO MO291 W and ends at .043 mile(s) before MO 291 S.
Work is scheduled from 13-NOV-2026 to 28-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT A E - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .386 mile(s) after CRD 249 S and ends at .067 mile(s) before RT CC S.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A W - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .067 mile(s) after RT CC S and ends at .386 mile(s) before CRD 249 S.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .029 mile(s) after MO 291 N and ends at .028 mile(s) before RP MO291N TO US50E E.
Work is scheduled from 13-NOV-2026 to 28-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT YY E - NEW MADRID County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .249 mile(s) after CRD 355 E and ends at .008 mile(s) after CRD 209 S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY W - PEMISCOT County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .008 mile(s) before CRD 209 S and ends at .249 mile(s) before CRD 355 E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 52 E - MILLER County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .007 mile(s) after MO 17 S and ends at .28 mile(s) before MO 17 S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .171 mile(s) before RP IS49S TO RTD W and ends at .203 mile(s) after RP RTD TO IS49S S.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 49 N - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .205 mile(s) before RP IS49N TO RTD E and ends at .183 mile(s) after RP RTD TO IS49N N.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT H W - BENTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .864 mile(s) before US 65 N and ends at .018 mile(s) before US 65 N.
Work is scheduled from 17-NOV-2026 to 17-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - JACKSON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) before RT KK S and ends at .006 mile(s) after RT VV E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - CASS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) before RT VV E and ends at .003 mile(s) after RT KK S.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .087 mile(s) after CRD NW 6TH RD E and ends at .04 mile(s) before CRD W CENTRAL RD E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .04 mile(s) after CRD W CENTRAL RD E and ends at .087 mile(s) before CRD NW 6TH RD E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.099 mile(s) before CST NUTMEG RD E and ends at .936 mile(s) before CST NUTMEG RD E.
Work is scheduled from 16-NOV-2026 to 12-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP CRAIG PKWY TO US36W W - BUCHANAN County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at CRD CRAIG PKWY S and ends at US 36 W.
Work is scheduled from 17-NOV-2026 to 18-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLINTON County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .001 mile(s) after RT H E and ends at .028 mile(s) before RP IS35N TO US69 N.
Work is scheduled from 16-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .206 mile(s) before RP IS44W TO RTT W and ends at .966 mile(s) after RP RTT TO IS44W W.
Work is scheduled from 22-NOV-2026 to 11-DEC-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .926 mile(s) before RP IS44E TO RTN E and ends at .246 mile(s) after RP RTN TO IS44E E.
Work is scheduled from 22-NOV-2026 to 11-DEC-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 42 W - MARIES County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .005 mile(s) before CRD 335 S and ends at .005 mile(s) after CRD 336 S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 N - JACKSON County - EXPECT DELAYS
260918-C03 JKU0512
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before CST STADIUM DR E and ends at .01 mile(s) after US 40 E.
Work is scheduled from 22-NOV-2026 to 03-DEC-2026.
Work will start daily at 11:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .972 mile(s) before RP IS44E TO MO141N N and ends at .742 mile(s) before RP IS44E TO MO141N N.
Work is scheduled from 17-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ N - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at 1.673 mile(s) after RT C E and ends at 2.235 mile(s) before CRD NE 1030 E.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ S - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at 2.235 mile(s) after CRD NE 1030 E and ends at 1.673 mile(s) before RT C E.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT T N - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .152 mile(s) before CRD SE 30TH RD E and ends at .176 mile(s) after CRD SE 30TH RD E.
Work is scheduled from 18-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K W - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .015 mile(s) after CRD NW 140TH LN S and ends at .024 mile(s) before CRD NW 145TH LN S.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K E - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .024 mile(s) after CRD NW 145TH LN S and ends at .015 mile(s) before CRD NW 140TH LN S.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .352 mile(s) after RT M S and ends at .456 mile(s) before CRD NW 751 S.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .456 mile(s) after CRD NW 751 S and ends at .352 mile(s) before RT M S.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - BENTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .038 mile(s) after CRD DURAN CREEK RD S and ends at .146 mile(s) before CRD ALLEN RD E.
Work is scheduled from 18-NOV-2026 to 18-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 123 N - HICKORY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .016 mile(s) after CRD 290 E and ends at .022 mile(s) before CRD 266 E.
Work is scheduled from 17-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 123 S - HICKORY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .022 mile(s) after CRD 266 E and ends at .016 mile(s) before CRD 290 E.
Work is scheduled from 17-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLINTON County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .019 mile(s) after RP IS35S TO US69 S and ends at .027 mile(s) after RT H E.
Work is scheduled from 16-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO21 TO IS270E E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at MO 21 S and ends at IS 270 E.
Work is scheduled from 03-DEC-2026 to 03-DEC-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .052 mile(s) before CST FAIRLIND DR E and ends at .034 mile(s) before MO 30 E.
Work is scheduled from 18-NOV-2026 to 18-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS435S TO IS70E E - JACKSON County - ALL LANES CLOSED
260918-C03 JKU0512
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after US 40 E and ends at .002 mile(s) before RP IS70E TO BLUE RIDGE CUTOFF E.
Work is scheduled from 07-DEC-2026 to 10-DEC-2026.
Work will start daily at 11:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP RTD TO IS49N N - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT D E and ends at .006 mile(s) before IS 49 N.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT T S - BARTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .176 mile(s) before CRD SE 30TH RD E and ends at .152 mile(s) after CRD SE 30TH RD E.
Work is scheduled from 18-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 45 N - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .028 mile(s) after CST MACADOW ST S and ends at .091 mile(s) after CRD IATAN RD E.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 45 S - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .092 mile(s) before CRD IATAN RD E and ends at .039 mile(s) before CST MACADOW ST S.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B N - PLATTE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .158 mile(s) after CRD BUENA VISTA RD EAST E and ends at .044 mile(s) after CST PERRY ST E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after RT BB S and ends at .003 mile(s) after CRD SE-251 S.
Work is scheduled from 01-DEC-2026 to 25-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT Z W - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before CRD SE-251 S and ends at .002 mile(s) before RT BB S.
Work is scheduled from 01-DEC-2026 to 25-FEB-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD VINCENT AVE E and ends at CRD ETTA AVE E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD WALLER AVE E and ends at CRD HORN AVE E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 185 N - WASHINGTON County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 8 E and ends at .09 mile(s) before RT K S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 185 S - FRANKLIN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .09 mile(s) after RT K S and ends at .009 mile(s) after CO MO8 TO MO185 N.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST SAPPINGTON RD S and ends at CST BIG BEND BLVD E.
Work is scheduled from 17-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .013 mile(s) after CST BIG BEND BLVD E and ends at .004 mile(s) after CST SAPPINGTON RD S.
Work is scheduled from 17-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS49S TO RTD W - BATES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .011 mile(s) after IS 49 S and ends at RT D E.
Work is scheduled from 01-MAY-2027 to 01-JUN-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT V S - GREENE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .114 mile(s) before CRD 33 S and ends at .432 mile(s) after CRD 33 S.
Work is scheduled from 01-DEC-2026 to 01-DEC-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT V N - GREENE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .432 mile(s) before CRD 33 S and ends at .114 mile(s) after CRD 33 S.
Work is scheduled from 01-DEC-2026 to 01-DEC-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST S WOODS MILL RD S - ST. LOUIS County - NO DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after RP NORTH FORTY DR TO IS64W W and ends at .003 mile(s) after IS 64 E.
Work is scheduled from 16-NOV-2026 to 16-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 66 E - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .019 mile(s) before MO 43 S and ends at .019 mile(s) after MO 43 S.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 66 W - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .019 mile(s) before MO 43 S and ends at .019 mile(s) after MO 43 S.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - BUCHANAN County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .151 mile(s) before RP US36E TO MO759S S and ends at .021 mile(s) before RP MO759S TO US36E E.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - PLATTE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) after CST PERRIN ST E and ends at .226 mile(s) before CRD BUENA VISTA RD EAST E.
Work is scheduled from 23-NOV-2026 to 25-NOV-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM S - GREENE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .008 mile(s) before CST HAILE ST E and ends at .003 mile(s) after CRD 160 E.
Work is scheduled from 16-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT MM N - GREENE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) before CRD 160 E and ends at .008 mile(s) after CST HAILE ST E.
Work is scheduled from 16-NOV-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS29N TO US36W W - BUCHANAN County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at IS 29 N and ends at US 36 W.
Work is scheduled from 16-NOV-2026 to 17-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 670 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .144 mile(s) before CST GENESSEE ST S and ends at .008 mile(s) after RP IS670E TO IS35S S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 670 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .026 mile(s) after RP IS35N TO IS670W W and ends at .145 mile(s) after CST GENESSEE ST S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 62 E - MISSISSIPPI County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) before CRD 304 E and ends at .003 mile(s) before CRD 206 E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 62 W - MISSISSIPPI County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD 206 E and ends at .005 mile(s) after CRD 304 E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .728 mile(s) after CRD 547 S and ends at .064 mile(s) after RT E E.
Work is scheduled from 13-NOV-2026 to 19-NOV-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 29 S - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .067 mile(s) after RP IS29S TO FRONT ST E E and ends at .011 mile(s) after IS 35 S.
Work is scheduled from 13-NOV-2026 to 15-NOV-2026.
Work will start daily at 08:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone IS 29 N - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .034 mile(s) before IS 35 N and ends at .076 mile(s) before RP FRONT ST W TO IS29N N.
Work is scheduled from 13-NOV-2026 to 15-NOV-2026.
Work will start daily at 08:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone IS 170 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .054 mile(s) before CST S BRENTWOOD BLVD S and ends at .016 mile(s) after CST S BRENTWOOD BLVD S.
Work is scheduled from 01-DEC-2026 to 01-DEC-2026.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 19 S and ends at CRD SIG BASS RD E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .008 mile(s) before CST MAIN ST E and ends at .002 mile(s) after CST VIOLA GILL LN S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .072 mile(s) after CRD NW 225 S and ends at .606 mile(s) before CRD NW 400 E.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - ST. CLAIR County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .606 mile(s) after CRD NW 400 E and ends at .072 mile(s) before CRD NW 225 S.
Work is scheduled from 16-NOV-2026 to 03-DEC-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD SIG BASS RD E and ends at MO 19 S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 2 E - CASS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .081 mile(s) before CST MAIN ST S and ends at .006 mile(s) before CRD GROH RD S.
Work is scheduled from 14-DEC-2026 to 18-DEC-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 57 N - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) after CRD 202 E and ends at 1.963 mile(s) after CRD 202 E.
Work is scheduled from 01-MAR-2027 to 31-OCT-2027.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone IS 57 S - MISSISSIPPI County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.964 mile(s) before CRD 202 E and ends at .062 mile(s) before CRD 202 E.
Work is scheduled from 01-MAR-2027 to 31-OCT-2027.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone MO 171 S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .137 mile(s) before OR 171 S and ends at .136 mile(s) after OR 171 S.
Work is scheduled from 16-NOV-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - STONE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .273 mile(s) before CRD CRUMPLEY DR S and ends at .021 mile(s) before RT K S.
Work is scheduled from 08-DEC-2026 to 09-DEC-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - BUCHANAN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .1 mile(s) before CRD 130 SE S and ends at .158 mile(s) after MO 31 N.
Work is scheduled from 18-NOV-2026 to 19-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT AB E - PULASKI County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 133 S and ends at .001 mile(s) before CRD SPRING RD S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB W - PULASKI County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .001 mile(s) after CRD SPRING RD S and ends at MO 133 S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 17 S - PULASKI County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) before OR 44 E and ends at .124 mile(s) after OR 44 E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 17 N - PULASKI County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .124 mile(s) before OR 44 E and ends at .002 mile(s) after OR 44 E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - HICKORY County - ALL LANES CLOSED
SHOULDER WORK
Work zone begins at .002 mile(s) after US 54 E and ends at .001 mile(s) before CRD 91 S.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - HICKORY County - ALL LANES CLOSED
SHOULDER WORK
Work zone begins at .001 mile(s) after CRD 91 S and ends at .002 mile(s) before US 54 E.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - BUCHANAN County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at RR ST JOSEPH SUB S and ends at .157 mile(s) after RP IS229S TO US36W W.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) before PVT OLD POLO RUN E and ends at .023 mile(s) after CST HUNTLEIGH DR W.
Work is scheduled from 17-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - STONE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RT K S and ends at .273 mile(s) after CRD CRUMPLEY DR S.
Work is scheduled from 08-DEC-2026 to 09-DEC-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O E - LACLEDE County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .583 mile(s) before CRD USHER DR S and ends at .003 mile(s) before CRD USHER DR S.
Work is scheduled from 08-DEC-2026 to 09-DEC-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST CLAYTON RD W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) before IS 64 E and ends at .017 mile(s) after IS 64 E.
Work is scheduled from 07-DEC-2026 to 21-DEC-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - PEMISCOT County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .707 mile(s) after CRD 547 S and ends at .029 mile(s) before RT E E.
Work is scheduled from 23-NOV-2026 to 27-NOV-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS County - NO DELAYS
BRIDGE INSPECTION
Work zone begins at .01 mile(s) before CRD LEWIS RD S and ends at .031 mile(s) after OR 44 E.
Work is scheduled from 16-NOV-2026 to 19-NOV-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 64 E - ST. LOUIS County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .145 mile(s) after US 61 S and ends at .002 mile(s) after CST SOUTH FORTY DR E.
Work is scheduled from 24-NOV-2026 to 24-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 S - TANEY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .029 mile(s) after MO 165 S and ends at .165 mile(s) before COE STATE PARK DR E.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 N - TANEY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .165 mile(s) after COE STATE PARK DR E and ends at .029 mile(s) before MO 165 S.
Work is scheduled from 16-NOV-2026 to 20-NOV-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 171 N - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .139 mile(s) before OR 171 S and ends at .136 mile(s) after OR 171 S.
Work is scheduled from 16-NOV-2026 to 04-DEC-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD CARRIAGE LN W - CLAY County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT A S and ends at .032 mile(s) after RT A S.
Work is scheduled from 16-NOV-2026 to 16-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD CARRIAGE LN E - CLAY County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .032 mile(s) before RT A S and ends at RT A S.
Work is scheduled from 16-NOV-2026 to 16-NOV-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
155
IS 55 (Pemiscot) TO Tennessee Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
170
RT D / Page Avenue (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
170
IS 270 (St. Louis) TO RT D / Page Avenue (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
229
IS 29 North Jct (Andrew) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
255
IS 55 (St. Louis) TO Illinois Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
270
IS 70 (St. Louis) TO Illinois Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
270
IS 44 (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
270
IS 55 (St. Louis) TO IS 44 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
270
IS 64 (St. Louis) TO IS 70 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
29
IS 229 SOUTH JCT (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
RT W (Holt) TO MO 118 (Holt) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
MO 118 (Holt) TO Andrew County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
Andrew County Line TO US 169 North Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
MO 45 (PLATTE) TO IS 35 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
MEXICO CITY AVE (PLATTE) TO MO 45 Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
BUCHANAN COUNTY LINE TO MEXICO CITY AVE (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
US 136 (Atchison) TO RT W (Holt) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
Iowa Line TO US 136 (Atchison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
29
US 169 North Jct (Buchanan) TO IS 229 South Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
US 69 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
US 69 South Jct (Daviess) TO US 69 (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
IS 670 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
RT DD (Daviess) TO US 69 South Jct (Daviess) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
CLINTON COUNTY LINE TO MO 152 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
MO 152 (CLAY) TO IS 29 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
Iowa Line TO RT A / Z (Harrison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
RT A / Z (Harrison) TO RT H / AA (Harrison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
RT H / AA (Harrison) TO RT DD (Daviess) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
35
IS 70 E JCT (JACKSON) TO IS 670 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
IS 70 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
108TH STREET (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
IS 29 SOUTH JCT (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
PLATTE COUNTY LINE TO 108TH STREET (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
IS 470 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
KANSAS LINE TO IS 29 NORTH JCT (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
435
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
St. Louis City Line TO IS 70 (St. Louis City) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
44
MO 266 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
RT J / Y (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
Crawford County Line TO Franklin County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
Laclede County Line TO Phelps County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
MO 37 (Jasper) TO MO 174 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
Phelps County Line TO US 63 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
MO 38 (Webster) TO RT J / Y (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
US 63 (Phelps) TO Crawford County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
MO 174 (Lawrence) TO MO 266 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
44
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
44
Oklahoma Line TO MO 37 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
MO 125 (Greene) TO MO 38 (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
44
MO 5 (Laclede) TO Pulaski County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
470
WOODS CHAPEL RD (JACKSON) TO 39TH STREET (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
470
IS 435 (JACKSON) TO WOODS CHAPEL RD (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
RT H / K (JASPER) TO IS 44 EAST JCT (JASPER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
IS 44 WEST JCT (JASPER) TO RT B (MCDONALD) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
RT B (VERNON) TO US 160 (BARTON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
US 160 (BARTON) TO RT H / K (JASPER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
RT A / B (CASS) TO RT A / B (BATES) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
RT B (MCDONALD) TO ARKANSAS LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
NORTH CASS PKWY (CASS) TO RT A / B (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
IS 435 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
JACKSON COUNTY LINE TO NORTH CASS PKWY (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
49
RT A / B (BATES) TO RT B (VERNON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
MO 80 (New Madrid) TO US 61 / US 62 South Jct (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
MO 32 (Ste. Genevieve) TO RT N (Ste. Genevieve) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
RT KK (Cape Girardeau) TO US 61 / MO 34 (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
US 61 / MO 34 (Cape Girardeau) TO MO 77 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
RT A (Pemiscot) TO RT U (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
ST. LOUIS CITY LINE TO RT M (JEFFERSON) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
55
RT M (JEFFERSON) TO RT TT (JEFFERSON) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
55
RT TT (JEFFERSON) TO MO 32 (STE. GENEVIEVE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
MO 77 (Scott) TO IS 57 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
IS 57 (Scott) TO MO 80 (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
RT N (Ste. Genevieve) TO RT KK (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
RT U (Pemiscot) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
US 61 / US 62 South Jct (New Madrid) TO RT A (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
55
IS 44 TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
57
Illinois Line TO IS 55 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
635
IS 29 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
64
IS 70 (St. Charles) TO St. Louis County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
64
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
64
St. Louis City Line TO Illinois Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
670
KANSAS LINE TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
RT F (Jackson) TO MO 13 (Lafayette) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
St. Louis City Line TO Illinois Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
Callaway County Line TO US 54 (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
RT Z (Boone) TO Callaway County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
MO 740 (Boone) TO RT Z (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
RT W / T (St. Charles) TO St. Louis County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
70
MO 179 (Cooper) TO MO 740 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
Cooper County Line TO MO 135 (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
MO 13 (Lafayette) TO RT Y (Saline) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Interstate Route
70
US 65 (Saline) TO MO J (Saline) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
RT Y (Saline) TO US 65 (Saline) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
IS 435 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
IS 470 (JACKSON) TO RT F (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
KANSAS LINE TO IS 670 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
US 54 (Callaway) TO RT D / YY (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
MO J (Saline) TO Saline County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
MO 135 (Cooper) TO MO 179 (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
70
RT D / YY (Callaway) TO MO 19 (Montgomery) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
US 59 North Jct (Atchison) TO RT M (Atchison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
MO 5 West Jct (Putnam) TO Schuyler County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
Mercer County Line TO US 65 West Jct (Mercer) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
MO 139 West Jct (Putnam) TO MO 5 West Jct (Putnam) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
Nebraska Line TO US 59 North Jct (Atchison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
US 169 East Jct (Gentry) TO RT D (Harrison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
US 65 East Jct (Mercer) TO MO 139 West Jct (Putnam) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
US 71 South Jct (Nodaway) TO RT P South Jct (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
RT P South Jct (Nodaway) TO US 169 East Jct (Gentry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
RT D (Harrison) TO IS 35 (Harrison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
RT M (Atchison) TO US 71 North Jct (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
IS 35 (Harrison) TO Mercer County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
159
IS 29 (Holt) TO Nebraska Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
US 65 (Taney) TO MO 76 East Jct (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 14 (Christian) TO MO 13 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
US 60 East Jct (Greene) TO MO 14 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
US 63 North Jct (Howell) TO RT M (Oregon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 43 (Barton) TO IS 49 (Barton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 126 (Barton) TO MO 39 North Jct (Dade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
Kansas Line TO MO 43 (Barton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
Butler County Line TO US 67 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
RT F / V (Greene) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 21 South Jct (Ripley) TO Butler County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 13 (Stone) TO US 65 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
RT V (Ozark) TO US 63 South Jct (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
IS 49 (Barton) TO MO 126 (Barton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 5 West Jct (Ozark) TO RT V (Ozark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
RT M (Oregon) TO MO 19 South Jct (Oregon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
160
MO 39 North Jct (Dade) TO RT F / V (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
166
Kansas Line TO IS 44 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
IS 29 North Jct (Buchanan) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
IS 29 South Jct (Buchanan) TO RT V V (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
RT O (Gentry) TO US 136 East Jct (Gentry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
MO 152 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
MO 92 (CLAY) TO MO 152 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
Iowa Line TO RT O (Gentry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
RT VV (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
US 136 West Jct (Gentry) TO RT M (Gentry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
RT M (Gentry) TO MO 31 (DeKalb) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
RT E (Andrew) TO IS 29 North Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
MO 31 (DeKalb) TO RT E (Andrew) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
169
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
MO 291 (JACKSON) TO LAFAYETTE COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
MO 13 (Lafayette) TO US 65 (Lafayette) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
Lafayette County Line TO MO 13 (Lafayette) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
MO 11 (Chariton) TO MO 5 West Jct (Chariton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
US 65 (Carroll) TO MO 11 (Chariton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
IS 435 (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
24
MO 5 West Jct (Chariton) TO Randolph County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
US 65 (Livingston) TO RT W (Linn) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
Kansas Line TO RT AC (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
MO 33 East Jct (DeKalb) TO RT J (Caldwell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
RT W (Linn) TO MO 11 (Linn) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
MO 11 (Linn) TO Macon County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
MO 31 (DeKalb) TO MO 33 East Jct (DeKalb) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
RT J (Caldwell) TO RT A (Caldwell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
RT A (Caldwell) TO US 65 (Livingston) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
36
RT AC (Buchanan) TO MO 31 (DeKalb) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
40
IS 70 WEST JCT (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
40
SP 240 (Howard) TO IS 70 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
40
Howard County Line TO SP 240 (Howard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
40
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
40
MO 7 (JACKSON) TO IS 70 EAST JCT (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
412
MO 25 (Dunklin) TO RT C (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
412
Arkansas Line TO MO 25 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
412
RT C (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
IS 470 (Jackson) TO RT F (Jackson) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
RT TT (Pettis) TO MO 135 West Jct (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
RT D / T (Cole) TO US 54 (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
RT N (OSAGE) TO MO 19 WEST JCT (GASCONADE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
MO 13 (Johnson) TO MO 127 (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
MILITIA DRIVE (Cole) TO Cole County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
Osage County Line TO RT N (Osage) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
Gasconade County Line TO IS 44 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
50
RT F (Jackson) TO MO 13 (Johnson) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
MO 135 West Jct (Pettis) TO RT E (Moniteau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
MO 19 WEST JCT (GASCONADE) TO FRANKLIN COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
Moniteau County Line TO RT D / T (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
RT E (Moniteau) TO Moniteau County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
RT MM (Pettis) TO RT TT (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
MO 127 (Pettis) TO RT MM (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
50
US 54 (Cole) TO MILITIA DRIVE (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 5 (Camden) TO Grand Glaize Bridge Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 43 (Vernon) TO RT AA (Vernon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 13 (St. Clair) TO MO 83 (Hickory) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
RT J (Callaway) TO IS 70 (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 17 (Cole) TO RT CC (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
Kansas Line TO MO 43 (Vernon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 52 (Miller) TO MO 17 (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
US 65 (Hickory) TO MO 73 (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 39 (Cedar) TO MO 13 (St. Clair) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
Grand Glaize Bridge TO MO 52 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 73 (Camden) TO MO 5 (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
IS 70 (Callaway) TO Audrain County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
US 63 North Jct (Callaway) TO RT J (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
RT AA (Vernon) TO MO 39 (Cedar) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
RT CC (Cole) TO US 63 North Jct (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
MO 83 (Hickory) TO US 65 (Hickory) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
IS 29 Exit 53 (Andrew) TO Karnes Rd (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
IS 29 Exit 75 (Holt) TO IS 29 Exit 67 (Holt) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
Pendelton St (Buchanan) TO IS 229 North Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
Iowa Line TO US 136 North Jct (Atchison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
US 136 South Jct (Atchison) TO IS 29 Exit 92 (Holt) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
59
MO 752 (Buchanan) TO Kansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
RT P (Greene) TO MO 360 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 59 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
US 67 South Jct (Butler) TO RT DD (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 17 East Jct (Howell) TO RT J (Carter) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 21 North Jct (Carter) TO Butler County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
IS 57 (Mississippi) TO Illinois Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 59 South Jct (Newton) TO MO 59 North Jct (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 360 (Greene) TO US 65 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
Oklahoma Line TO MO 59 South Jct (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
Butler County Line TO US 67 South Jct (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
US 63 South Jct (Howell) TO MO 17 East Jct (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
RT J (Carter) TO MO 21 North Jct (Carter) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
US 65 (Greene) TO RT FF (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 37 (Barry) TO BU 60 East Jct (Lawrence) Aurora Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
BU 60 East Jct (Lawrence) Aurora TO RT P (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 95 (Wright) TO MO 181 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
RT FF (Webster) TO MO 5 East Jct (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 114 (Stoddard) TO IS 55 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 5 East Jct (Wright) TO MO 95 (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
RT M (Newton) TO MO 37 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
RT DD (Butler) TO MO 114 (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
60
MO 181 (Texas) TO US 63 South Jct (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
US 60 (NEW MADRID) TO MO 80 (NEW MADRID) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
ST. CHARLES COUNTY LINE TO IS 70 (ST. CHARLES) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
US 67 (JEFFERSON) TO STE. GENEVIEVE COUNTY LINE Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
61
Ste. Genevieve County Line TO MO 32 (St. Genevieve) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
RT Y (CAPE GIRARDEAU) TO IS 55 EXIT 99 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
IS 55 EXIT 87 (SCOTT) TO MO 77 SOUTH JCT (SCOTT) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
RT M (PERRY) TO MO 51 (PERRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
IS 55 Exit 44 (New Madrid) TO IS 55 Exit 32 (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 77 South Jct (Scott) TO US 60 (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
IS 55 Exit 99 (Cape Girardeau) TO IS 55 Exit 93 (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 80 (NEW MADRID) TO IS 55 EXIT 49(NEW MADRID) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
IS 55 Exit 8 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
RT A (PERRY) TO RT Y (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 51 (PERRY) TO RT A (PERRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
61
MO 32 (ST. GENEVIEVE) TO RT M (PERRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
62
US 61 (SCOTT) TO RT B (MISSISSIPPI) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
62
RT W (New Madrid) TO US 61 (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
62
RT B (MISSISSIPPI) TO IS 57 (MISSISSIPPI) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
62
MO 53 (Dunklin) TO RT W (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 160 North Jct (Texas) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
RT B (Boone) TO RT H (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
MO 32 (Texas) TO US 60 North Jct (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
RT P (Osage) TO MO 42 (Maries) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
MO 42 (Maries) TO Phelps County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
MO 22 (Boone) TO RT B (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
IS 44 (Phelps) TO MO 32 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
Phelps County Line TO IS 44 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
RT H (Boone) TO US 54 (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 60 South Jct (Texas) TO US 160 North Jct (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63
US 50 East Jct (Osage) TO RT P (Osage) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
63C
US 63 (Boone) TO US 63 (Boone) Columbia Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT AC (Benton) TO RT AA (Benton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 176 South Jct (Taney) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 125 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
IS 44 (Greene) TO US 60 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
US 60 (Greene) TO RT EE (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 32 (Dallas) TO MO 125 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT EE (Christian) TO MO 176 South Jct (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
CRD Wildwood Rd S TO RT H (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
Livingston County Line TO US 36 (Livingston) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
US 36 (Livingston) TO RT U (Carroll) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 6 (Grundy) TO Livingston County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT YY (Saline) TO CRD Wildwood Rd S Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
Saline County Line TO RT YY (Saline) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT C (Grundy) TO MO 6 (Grundy) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
Iowa Line TO US 136 North Jct (Mercer) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT D (Dallas) TO MO 32 (Dallas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT H (Pettis) TO CRD KA LINE DR E (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
US 136 North Jct (Mercer) TO RT C (Grundy) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
CRD KA LINE DR E (Pettis) TO MO 52 North Jct (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT U (Carroll) TO US 24 (Carroll) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
RT AA (Benton) TO RT D (Dallas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 52 South Jct (Benton) TO RT AC (Benton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
US 24 (Carroll) TO Saline County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
65
MO 52 North Jct (Pettis) TO MO 52 South Jct (Benton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
IS 270 (St. Louis) TO Dorsett Rd / Midland Blvd (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
Prospect Ave (St. Louis) TO MO 267 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
RT M (Jefferson) TO US 61 South Jct (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
MO 267 (St. Louis) TO RT M (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
MO 32 North Jct (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
RT V (Jefferson) TO MO 32 North Jct (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
Dorsett Rd / Midland Blvd (St. Louis) TO Swan Dr (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
MO 72 (Madison) TO RT EE (Wayne) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
Illinois Line TO IS 270 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
US 61 South Jct (Jefferson) TO RT V (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
United States Route
67
MO 172 (Wayne) TO US 60 North Jct (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
RT M (Butler) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
US 60 South Jct (Butler) TO RT M (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
67
RT EE (Wayne) TO MO 172 (Wayne) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
PLATTE COUNTY LINE TO IS 635 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
IS 35 SOUTH JCT (CLAY) TO PLATTE COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
MO 6 South Jct (Daviess) TO IS 35 South Jct (Daviess) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
IS 635 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
IS 35 South Jct (Daviess) TO LP 35 (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
MO 92 (CLAY) TO IS 35 NORTH JCT (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
69
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
RT B (Andrew) TO IS 29 (Andrew) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
Is 49 (McDonald) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
Iowa Line TO RT FF (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
US 136 East Jct (Nodaway) TO RT B (Andrew) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
RT FF (Nodaway) TO US 136 East Jct (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
United States Route
71
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
1
MO 152 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
1
IS 35 (CLAY) TO MO 210 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
10
RT M (RAY) TO CARROLL COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
10
CARROLL COUNTY LINE TO US 65 (CARROLL) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
10
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
10
CLAY COUNTY LINE TO RT M (RAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
100
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
100
St. Louis County Line TO Big Bend Blvd (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
100
Frene Creek Rd (Gasconade) TO MO 19 South Jct (Gasconade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
100
MO 19 North Jct (Gasconade) TO Franklin County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
103
US 60 (Carter) TO Skyline Dr (Carter) Van Buren Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
105
US 62 (Mississippi) TO MO 80 (Mississippi) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
109
RT CC (St. Louis) TO RT W (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
110
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
112
RT F (Barry) TO MO 76 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
114
US 60 (Stoddard) TO US 61 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
114
MO 25 (Stoddard) TO Airport Rd (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
115
IS 70 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
116
MO 13 NORTH JCT (CALDWELL) TO RT A (CALDWELL) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
116
US 69 (Clinton) TO MO 13 South Jct (Caldwell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
116
US 169 (Clinton) TO MO 33 East Jct (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
116
MO 33 East Jct (Clinton) TO US 69 (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
12
IS 435 (JACKSON) TO SPRING ST. (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
123
RT BB (Greene) TO US 160 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
124
RT B (Boone) TO MO 22 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
125
RT C (Greene) TO RT OO West Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
125
RT OO West Jct (Greene) TO US 60 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
125
US 65 (Greene) TO RT E (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
125
US 60 (Greene) TO MO 14 West Jct (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
125
MO 14 East Jct (Christian) TO RT T (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 82 (St. Clair) TO US 54 (St. Clair) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
St. Clair County Line TO MO 82 (St. Clair) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
US 50 EAST JCT (JOHNSON) TO MO 2 (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 224 West Jct (Lafayette) TO IS 70 (Lafayette) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
IS 70 (Lafayette) TO US 50 West Jct (Johnson) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
Ray County Line TO MO 224 West Jct (Lafayette) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
US 160 Reed Spring Jct (Stone) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
US 54 (St. Clair) TO MO 32 (Polk) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 7 South Jct (Henry) TO St. Clair County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 6 West Jct (Daviess) TO US 36 (Caldwell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 2 (Johnson) TO MO 7 North Jct (Henry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
US 36 (Caldwell) TO Ray County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
MO 32 (Polk) TO RT BB (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
13
RT BB (Greene) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
131
MO 224 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
131
LAFAYETTE COUNTY LINE TO US 50 (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
131
US 50 (JOHNSON) TO MO 58 (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
133
Maries County Line TO MO 17 (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
133
MO 7 (Pulaski) TO IS 44 (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
135
MO 52 (Morgan) TO MO 5 (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
14
RT BB (Douglas) TO RT FF (Douglas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
14
MO 125 (Christian) TO RT BB (Douglas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
14
RT P (Christian) TO US 65 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
14
US 65 (Christian) TO MO 125 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
141
MO 364 (ST. LOUIS) TO MO 30 (ST. LOUIS) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
141
MO 30 (ST. LOUIS) TO US 67 (JEFFERSON) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
141
MO 370 (St. Louis) TO MO 364 (St. Louis Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
142
RT V (RIPLEY) TO MO 21 WEST JCT (RIPLEY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
142
US 63 (OREGON) TO RT V (RIPLEY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
142
MO 158 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
142
MO 21 East Jct (Ripley) TO RT E (Ripley) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
148
US 136 (Nodaway) TO Iowa Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
150
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
150
KANSAS LINE TO MO 291 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
152
IS 435 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
152
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
158
US 67 (Butler) TO MO 142 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
163
IS 70 (Boone) TO RT K (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
164
RT NN (Pemiscot) TO US 61 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
164
RT D (Pemiscot) TO RT DD (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
164
US 412 West Jct (Dunklin) TO RT NN (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
RT K (Miller) TO IS 44 (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
MO 52 West Jct (Miller) TO RT K (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
MO 32 (Texas) TO US 63 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
RT AW (Texas) TO MO 32 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
US 54 (Cole) TO Miller County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
US 63 (Howell) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
17
Miller County Line TO MO 52 West Jct (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
171
MO 96 (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
171
MO 249 (Jasper) TO MO 96 W Jct (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
171
Kansas Line TO MO 96 West Jct (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
171
MO 43 (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
173
MO 265 (Stone) TO MO 248 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
174
RT P (Greene) TO US 60 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
174
MO 39 (Lawrence) TO RT P (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
175
IS 49 (Newton) TO MO 86 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
177
US 61 (Cape Girardeau) TO RT J (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
177
RT J (Cape Girardeau) TO Lexington Ave (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
179
Industrial Dr (Cole) TO US 54 (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
18
Montgomery St (Henry) TO MO 13 (Henry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
180
IS 270 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
185
RT H (Franklin) TO SP 185 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
US 160 South Jct (Oregon) TO RT E (Oregon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
Crawford County Line TO IS 44 (Crawford) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
MO 106 (Shannon) TO US 60 East Jct (Shannon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
MO 8 East Jct (Crawford) TO Dent County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
MO 100 North Jct (Gasconade) TO MO 28 East Jct (Gasconade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
IS 44 (Crawford) TO MO 8 West Jct (Crawford) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
MO 28 West Jct (Gasconade) TO Crawford County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
19
Dent County Line TO RT B (Dent) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
2
KANSAS STATE LINE TO I-49 Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
2
RT ZZ (JOHNSON) TO HENRY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
2
JOHNSON COUNTY LINE TO MO 52 (HENRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
2
CASS COUNTY LINE TO RT ZZ (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
2
I-49 TO JOHNSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
Washington County Line TO MO 8 (Washington) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
MO 8 (Washington) TO MO 32 North Jct (Washington) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
RT M / MM (Jefferson) TO Washington County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
21
MO 30 (St. Louis) TO RT M / MM (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
21
US 60 South Jct (Carter) TO US 160 North Jct (Ripley) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
US 160 South Jct (Ripley) TO RT FF (Ripley) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
MO 32 North Jct (Washington) TO MO 72 South Jct (Reynolds) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
21
MO 72 South Jct (Reynolds) TO US 60 North Jct (Carter) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
210
IS 29 (CLAY) TO MO 291 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
210
MO 291 (JACKSON) TO RAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
210
CLAY COUNTY LINE TO MO 10 (RAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
22
US 63 (Boone) TO MO 15 (Audrain) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
221
US 67 (St. Francois) TO RT B (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
224
HIGHLAND AVE WEST JCT (LAFAYETTE) TO US 24 (LAFAYETTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
23
LAFAYETTE COUNTY LINE TO US 50 Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
23
US 50 TO MO 2 (HENRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
23
US 24 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
231
St. Louis City Line TO US 61 / 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
240
US 65 (SALINE) TO MO 5 W JCT (HOWARD) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
240
MO 5 East Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
242
RT MM (Camden) TO US 54 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
248
MO 265 West Jct (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
248
MO 465 (Taney) TO US 65 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
248
MO 76 (Barry) TO MO 39 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
249
MO 171 (Jasper) TO IS 44 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
US 62 South Jct (Dunklin) TO MO 53 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
MO 91 (Stoddard) TO RT M (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
MO 77 (Cape Girardeau) TO MO 91 (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
RT M (Stoddard) TO RT D (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
MO 53 (Dunklin) TO US 412 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
US 61 (Cape Girardeau) TO MO 77 (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
25
RT D (Stoddard) TO US 62 North Jct (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
265
MO 413 (Stone) TO MO 248 West Jct (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
265
MO 76 (Stone) TO US 65 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
266
RT T (Greene) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
267
St. Louis City Line TO US 50 / 61 / 67 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
28
IS 44 (Pulaski) TO RT MM (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
28
US 63 East Jct (Maries) TO RT EE (Maries) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
28
RT EE (GASCONADE) TO US 50 (GASCONADE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
28
RT EE (MARIES) TO RT EE (GASCONADE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
CLAY COUNTY LINE TO 39ST STREET (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
IS 35 (CLAY) TO LEONARD ST. Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
LEONARD ST. TO JACKSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
IS 470 SOUTH JCT (JACKSON) TO US 50 EAST JCT (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
IS 435 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
US 50 WEST JCT (JACKSON) TO MO 150 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
JACKSON COUNTY LINE TO IS 49 (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
291
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
30
Jefferson County Line TO RT W / MM (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
30
IS 44 (Franklin) TO Jefferson County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
30
RT W / MM (Jefferson) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
32
MO 72 West Jct (Dent) TO MO 72 East Jct (Dent) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 245 (Cedar) TO MO 13 (Polk) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 5 South Jct (Laclede) TO RT N (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
US 65 (Dallas) TO RT A / OO Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
IS 55 (STE. GENEVIEVE) TO FOURTH ST. (STE. GENEVIEVE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 72 East Jct (Dent) TO MO 49 East Jct (Iron) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
RT N (St. Francois) TO US 67 North Jct (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 49 East Jct (Iron) TO MO 21 South Jct (Iron) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
US 63 (Texas) TO MO 72 West Jct (Dent) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
US 67 South Jct (St. Francois) TO IS 55 (Ste. Genevieve) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
RT A / OO (Laclede) TO MO 5 North Jct (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
RT CC (Cedar) TO MO 245 (Cedar) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 13 (Polk) TO RT P (Polk) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
RT P (Polk) TO US 65 (Dallas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
MO 17 (Texas) TO US 63 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
32
US 54 (Cedar) TO RT CC (Cedar) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
33
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
33
CLINTON COUNTY LINE TO US 69 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
33
MO 6 (DeKalb) TO US 36 (DeKalb) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
34
MO 21 (REYNOLDS) TO RT KK (WAYNE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
34
US 67 (WAYNE) TO RT Y (BOLLINGER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
34
RT KK (WAYNE) TO US 67 (WAYNE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
34
RT Y (BOLLINGER) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
340
MO 100 (St. Louis) TO Ferguson Ave (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
350
IS 435 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
360
IS 44 (GREENE) TO US 60 (GREENE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
364
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
364
RT N (ST. CHARLES) TO MO 94 (ST. CHARLES) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
364
MO 94 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
366
IS 44 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
367
US 67 (St. Louis) TO IS 70 (St. Louis City) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
37
US 60 (Barry) TO RT W (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
37
IS 44 (Jasper) TO US 60 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
37
RT W (Barry) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
370
IS 70 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
370
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
376
MO 265 (Taney) TO MO 76 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
38
RT J (Webster) TO RT P (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
MO 32 East Jct (Cedar) TO RT Y (Dade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
US 160 South Jct (Dade) TO MO 96 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
IS 44 (Lawrence) TO US 60 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
US 60 (Lawrence) TO MO 248 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
MO 248 (Barry) TO MO 86 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
MO 96 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
39
RT Y (Dade) TO US 160 North Jct (Dade) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
41
US 24 (CARROLL) TO SALINE COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
41
SALINE COUNTY LINE TO MO 240 WEST JCT (SALINE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
413
MO 13 (Greene) TO US 60 East Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
413
US 60 West Jct (Christian) TO MO 265 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
42
RT A (Miller) TO US 63 (Maries) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
42
RT C West Jct (Miller) TO RT A (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
42
US 54 (Camden) TO RT C West Jct (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
Newton County Line TO IS 44 East Jct (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
US 160 (Barton) TO MO 96 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
RT V (BARTON) TO US 160 (BARTON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
RT C (Newton) TO US 60 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
US 54 (VERNON) TO RT V (BARTON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
IS 44 West Jct (Newton) TO RT C (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
MO 171 (Jasper) TO Murphy Blvd (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
43
MO 96 (Jasper) TO MO 171 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
45
IS 435 (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
45
BUCHANAN COUNTY LINE TO SPUR 45 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
45
US 59 (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
45
SPUR 45 (PLATTE) TO IS 435 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
46
US 136 East Jct (Nodaway) TO RT W (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
46
MO 113 (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
46
RT W (Nodaway) TO US 169 (Worth) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
MO 79 (Lincoln) TO MO 61 (Lincoln) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
RT E (Washington) TO St. Francois County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
Franklin County Line TO US 50 West Jct (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
47
US 50 East Jct (Franklin) TO MO 30 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
Iowa Line TO US 136 East Jct (Putnam) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT J (Laclede) TO MO 38 (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 50 East Jct (Moniteau) TO MO 52 North Jct (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
Laclede County Line TO IS 44 (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 52 North Jct (Morgan) TO RT O (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT J (Cooper) TO US 50 West Jct (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 38 (Wright) TO US 60 East Jct (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT V (Chariton) TO MO 240 South Jct (Howard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 160 West Jct (Ozark) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT M (Sullivan) TO MO 6 North Jct (Sullivan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 36 East Jct (Linn) TO RT E (Chariton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 136 West Jct (Putnam) TO RT M (Sullivan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
Linn County Line TO US 36 West Jct (Linn) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 6 North Jct (Sullivan) TO Linn County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 24 East Jct (Chariton) TO RT V (Chariton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 240 South Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT E (Chariton) TO US 24 West Jct (Chariton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 95 North Jct (Ozark) TO US 160 East Jct (Ozark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
IS 44 (Laclede Co.) TO RT J (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
MO 14 (Douglas) TO MO 95 North Jct (Ozark) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 60 West Jct (Wright) TO MO 14 (Douglas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
Howard County Line TO IS 70 (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
US 54 (Camden) TO Laclede County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
5
RT O (Morgan) TO US 54 (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
51
RT KK (PERRY) TO MO 72 (BOLLINGER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
51
MO 34 (BOLLINGER) TO RT C (BOLLINGER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
51
ILLINOIS LINE TO RT KK (PERRY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
51
RT C (Bollinger) TO US 60 (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
51
MO 72 (BOLLINGER) TO MO 34 (BOLLINGER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
RT B (Pettis) TO US 65 North Jct (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
RT AA (Morgan) TO US 54 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
US 65 South Jct (Benton) TO RT FF (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
MO 7 North Jct (Henry) TO RT B (Pettis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
MO 5 East Jct (Morgan) TO RT AA (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
NW 2501 (Bates) TO LP 49 (Bates) Butler Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
52
RT FF (Morgan) TO MO 5 West Jct (Morgan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
53
BU 67 (Butler) TO Dunklin County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
53
Dunklin County Line TO MO 25 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
571
MO 96 (Jasper) TO IS 49 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
58
RT D (CASS) TO DEAN AVENUE (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
58
CASS COUNTY LINE TO RT AA (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
58
MO 291 SOUTH JCT (CASS) TO JOHNSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
58
PRAIRIE RD (CASS) TO MO 291 N JCT (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
58
RT AA (JOHNSON) TO US 50 (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
59
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
59
LP 49 South Jct (Newton) TO MO 76 South Jct (McDonald) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
59
IS 44 (Jasper) TO US 60 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
MO 13 East Jct (Daviess) TO RT P/WW (Grundy) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
RT W (Sullivan) TO MO 5 South Jct (Sullivan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
MO 5 North Jct (Sullivan) TO RT D (Sullivan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
RT P/WW (Grundy) TO US 65 (Grundy) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
RT D (Sullivan) TO US 63 North Jct (Adair) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
US 65 (Grundy) TO RT W (Sullivan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
IS 35 (Daviess) TO MO 13East Jct (Daviess) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
MO 31 North Jct (DeKalb) TO IS 35 (Daviess) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
US 169 (Buchanan) TO MO 31 North Jct (DeKalb) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
64
RT KK (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
66
LP 49 (Rangeline Rd) (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
66
MO 249 (Jasper) TO I-44 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
66
Kansas Line TO LP 49 (Jasper) Joplin Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
68
US 63 (Maries) TO Phelps County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
68
Maries County Line TO IS 44 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
RT B (Cass) TO MO 13 North Jct (Henry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
MO 13 North Jct (Henry) TO RT PP (Henry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
RT PP (Henry) TO US 65 North Jct (Benton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
RT NN (Camden) TO MO 5 North Jct (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
IS 70 (Jackson) TO MO 150 South Jct (Jackson) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
US 65 South Jct (Benton) TO RT NN (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
IS 49 South Jct (Cass) TO RT B (Cass) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
7
MO 150 South Jct (Jackson) TO IS 49 North Jct (Cass) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
RT F (MADISON) TO MO 51 (BOLLINGER) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
Madison County Line TO US 67 (Madison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
MO 51 (BOLLINGER) TO MO 34 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
MO 32 East Jct (Dent) TO MO 21 West Jct (Reynolds) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
MO 34 (CAPE GIRARDEAU) TO US 61 WEST JCT (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
MO 21 East Jct (Iron) TO Madison County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
Dent County Line TO MO 32 West Jct (Dent) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
US 63 (Phelps) TO Dent County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
72
US 67 (Madison) TO RT F (Madison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
73
US 54 (Camden) TO US 65 (Dallas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
74
MO 25 (Cape Giradeau) TO IS 55 South Jct (Cape Giradeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
74
IS 55 North Jct (Cape Giradeau) TO US 61 (Cape Girardeau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
74
US 61 East Jct (Cape Girardeau) TO Illinois Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
740
IS 70 (Boone) TO US 63 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
744
Springfield /Branson Airport (Greene) TO IS 44 East Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
752
US 59 (Buchanan) TO IS 229 (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
759
4th St (Buchanan) TO Stockyards Expy (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
MO 173 (Stone) TO MO 13 North Jct (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
RT MM (Barry) TO MO 86 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
US 65 S JCT(Taney) TO US 160 West Jct (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
MO 13 South Jct (Stone) TO US 65 N JCT (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
US 160 East Jct (Taney) TO MO 125 West Jct (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
76
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
763
US 63 (Boone) TO MO 740 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
765
US 65 NORTH JCT (PETTIS) TO US 65 SOUTH JCT (PETTIS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
77
MO 25 (Cape Girardeau) TO US 61 West Jct (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
77
US 61 East Jct (Scott) TO RT D (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
78
IS 435 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
79
St. Charles County Line TO IS 70 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
79
RT H (Pike) TO St. Charles County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
MO 21 (Washington) TO St. Francois County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
MO 68 (Phelps) TO MO 19 East Jct (Crawford) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
IS 44 (Phelps) TO MO 68 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
Washington County Line TO MO 21 (Washington) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
8
MO 19 East Jct (Crawford) TO Washington County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
80
US 61 (New Madrid) TO CRD 523 (Mississippi) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
82
US 54 (Cedar) TO RT H (Cedar) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
83
RT B (Polk) TO MO 13 (Polk) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
84
US 412 East Jct (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
84
IS 55 (Pemiscot) TO IS 155 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
84
Arkansas Line TO US 412 West Jct (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
MO 39 (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
US 60 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
RT F (Barry) TO MO 39 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
IS 44 (Newton) TO RT C (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
MO 13 East Jct (Stone) TO US 65 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
86
RT NN (Newton) TO US 60 South Jct (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
87
US 40 / MO 5 (Cooper) TO IS 70 (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
87
RT O (Moniteau) TO RT A (Moniteau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
87
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
87
RT J (Cooper) TO RT O (Moniteau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
87
RT A (Moniteau) TO US 54 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
9
IS 635 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
9
PLATTE COUNTY LINE TO JACKSON COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
9
JACKSON COUNTY LINE TO IS 70 Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
9
BARRY RD (PLATTE) TO IS 635 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
90
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
91
MO 51 (Bollinger) TO MO 25 (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
92
KANSAS LINE TO CLAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
92
PLATTE COUNTY LINE TO US 169 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
92
US 169 (CLAY) TO US 69 (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
94
RT J (St. Charles) TO US 67 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
94
US 54 / US 63 (Callaway) TO RT D (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
94
IS 70 (St. Charles) TO RT J (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
94
RT T (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Missouri Route
95
RT W (Wright) TO RT ZZ (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
96
MO 171 East Jct (Jasper) TO River St (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
96
MO 43 (Jasper) TO MO 171 East Jct (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
96
MO 171 West Jct (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
96
River St (Jasper) TO RT U (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
96
RT U (Jasper) TO IS 44 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Missouri Route
99
US 60 (Shannon) TO Obanion St (Shannon) Birch Tree Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
MO 92 (CLAY) TO LIBERTY CITY LIMITS (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
MO 100 (Franklin) TO MO 47 (Frankiin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
A
US 61 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
A
US 69 (Clinton) TO West St (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
RT PP (Bates) TO IS 49 (Bates) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
A
MO 38 (Webster) TO Outer Road 60 (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
BU 60 (Wright) TO RT U (Wright) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
A
US 169 (Buchanan) TO RT O (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
US 60 (Butler) TO RT B ( Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
IS 29 (PLATTE) TO US 69 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
Sanders Valley Rd (Christian) TO US 160 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
RT H (Greene) TO US 65 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
US 62 (Scott) TO NOR 60 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AA
RT HH (Jasper) TO RT V V (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AB
MO 25/77 (Cape Girardeau) TO RT K (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AB
MO 141 (St. Louis) TO IS 270 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
AB
US 160 (Greene) TO MO 266 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AC
US 67 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
AC
MO 6 (Buchanan) TO US 36 (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AC
MO 163 (Boone) TO US 63 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AC
Pickett Rd (Buchanan) TO US 169 (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
AF
Spring Bluff Rd (Franklin) TO IS 44 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
AT
US 50 (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
AW
RT TT (Pulaski) TO MO 17 (Texas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
BU 60 (Butler) TO RT AA (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
US 61 (PERRY) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
Brown Station Rd North Jct (Boone) TO LP 70 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
MO 124 (Boone) TO Brown Station Rd North Jct (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
B
MO 266 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
US 54 (Cole) TO RT W / M (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
B
RT W / M (Cole) TO MO 133 (Osage) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
BB
US 63 (Phelps) TO MO 8 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
BB
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
BB
RT A (Franklin) TO US 50 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
BB
US 54 (Vernon) TO RT F (Vernon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
BB
BU 65 (Taney) TO Gobblers Knob Rd (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
RT CC East Jct (Moniteau) TO RT HH (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
RT O (Callaway) TO RT AD (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
IS 49 (CASS) TO RT YY (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
RT HH (Cole) TO US 54 (Cole) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
RT AB (Webster) TO US 60 (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
MO 133 (Pulaski) TO MO 28 (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
MO 52 (Morgan) TO RT CC East Jct (Moniteau) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
C
MO 51 (Bollinger) TO MO 91 (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
CC
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
CC
RT AD (Howell) TO US 63 (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
CC
MO 109 (St. Louis) TO Kehrs Mill Rd (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
CC
RT M (Webster) TO IS 44 (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
MO 59 (Newton) TO Benton Ave (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
BU 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
CRD D-2 (Carter) TO BU 60 (Carter) Van Buren) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
JACKSON COUNTY LINE TO RT Y (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
RT Y (CASS) TO MO 2 (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
CLAY COUNTY LINE TO RT KK (RAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
IS 270 (St. Louis) TO IS 170 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
D
IS 170 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
D
Rouggly Rd (St. Francois) TO RT W (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
120TH ST. (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
RT NN (Polk) TO MO 32 (Polk) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
D
RT U (Pemiscot) TO MO 164 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
D
MO 171 (Jasper) TO RT O (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
DD
MO 13 (JOHNSON) TO MO 23 (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
DD
MO 38 (Webster) TO Osage Rd (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
DD
MO 164 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
DD
US 40 / 61 (St. Charles) TO Diehr Rd (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
DD
MO 13 (Stone) TO CRD DD-25 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
E
MO 124 (Boone) TO IS 70 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
E
MO 84 (Dunklin) TO MO 25 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
E
MO 21 (Washington) TO MO 8 (Washington) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
E
RT N (Jefferson) TO St. Francois County Line Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
EE
Colony Church Rd (St. Francois) TO RT D (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
EE
SOR IS 70 (St. Louis) TO MO 180 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
EE
IS 55 (New Madrid) TO CRD 403 (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
EE
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
EE
RT AB (Greene) TO US 160 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
IS 70 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
LP 44 (Franklin) TO RT O (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
F
RT J (Callaway) TO Jefferson St (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
Westview Ln (Washington) TO MO 8 (Washington) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
US 65 (Taney) TO US 160 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
MO 112 (Barry) TO MO 86 (Barry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
F
MO 5 (Camden) TO RT TT (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
FF
CRD 190 / Kodiak Rd (Jasper) TO MO 59 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
FF
MO 43 (Jasper) TO CRD 190 / Kodiak Rd (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
FF
RT W (Jefferson) TO RT F (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
FF
US 60 (Greene) TO Weaver Rd (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
MO 17 (Pulaski) TO Ft. Leonard Wood (Pulaski) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
MO 215 (Polk) TO IS 44 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
IS 44 (Lawrence) TO BU 60 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
RT W (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
LP 49 (Bates) TO Main St (Bates) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
H
RT FF WEST JCT (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
HH
MO 171 (Jasper) TO MO 571 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
HH
US 61 (Scott) TO IS 55 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
HH
Reynolds County Line TO MO 34 (Wayne) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
HH
MO 86 (Newton) TO US 60 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
J
US 65 (Christian) TO RT NN (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
J
RT WW (CALLAWAY) TO RT F (CALLAWAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
J
MO 58 (CASS) TO IS 49 (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
J
US 50 (JOHNSON) TO WHITEMAN AFB (JOHNSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
J
RT MM (Dunklin) TO BU 25 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
JJ
Well St (Jasper) TO RT P (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
RT KK (Boone) TO MO 163 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
IS 229 (Andrew) TO US 59 (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
IS 49 (Vernon) TO CRD 1800 (Vernon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
CRD 317 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
MO 25 (CAPE GIRARDEAU) TO CRD 317 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
RT ZZ (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
MO 30 (Franklin) TO MO 185 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
K
MO 43 (Newton) TO Irwin Dr (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
RT N (SCOTT) TO RT AB (SCOTT) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
CRD 6470 (Howell) TO US 63 (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
K
IS 70 (St. Charles) TO US 40 / 61 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
K
MO 14 (CHRISTIAN) TO RT M (STONE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
KK
Beginning of Route (Camden) TO US 54 (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
KK
MO 185 North Jct (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
KK
MO 8 (Phelps) TO CRD 3610 (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
M
RT U (Stone) TO MO 14 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
M
RT A (Scott) TO US 61 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
M
US 60 (Greene) TO RT FF (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
M
MO 21 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
M
MO 79 (St. Charles) TO RT P (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
MM
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
MM
IS 44 (Greene) TO MO 413 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
MM
RT TT (Camden) TO MO 242 (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
N
IS 270 (St. Louis) TO MO 115 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
N
RT F (Franklin) TO Meramec River (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
N
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
N
IS 44 (Greene) TO CRD 168 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
N
MO 21 (Jefferson) TO RT E / Miller St (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
N
MO 32 (St. Francois) TO RT NN (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
N
RT NN (St. Francois) TO MO 21 (Iron) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
N
MISSISSIPPI RIVER (SCOTT) TO MAIN ST. (SCOTT) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
NN
RT O (Franklin) TO Rock Church Rd (Franklin) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
NN
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
NN
MO 164 (Dunklin) TO Arkansas Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
NN
US 412 (Dunklin) TO MO 164 (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
NN
MO 86 (Newton) TO RT P (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
RT C (Callaway) TO RT CC (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
MO 32 (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
MO 72 (Phelps) TO Lions Club Dr (Phelps) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
RT AK (Franklin) TO RT F (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
O
US 67 (ST. FRANCOIS) TO RT D (ST. GENEIVE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
MO 84 (Dunklin) TO RT V V (Dunklin) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
O
MO 5 (Morgan) TO End of Route Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
OO
MO 125 East Jct (Greene) TO MO 38 (Webster) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
OO
Vintage Lane (Stone) TO MO 13 (Stone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
OO
MO 32 (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
OO
MO 744 (Greene) TO MO 125 West Jct (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
P
RT JJ (Jasper) TO MO 66 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
P
MO 8 (St. Francois) TO MO 8 (St. Francois) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
P
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
P
US 61 (St. Charles) TO RT M (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
P
MO 366 (St. Louis) TO MO 30 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
PP
US 60 (Butler) TO BU 60 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
PP
Byrnes Mill Rd (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
T
RT N (St. Charles) TO RT TT ( St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
T
IS 70 (St. Charles) TO RT N (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
T
Ossenfort Rd (St. Louis) TO MO 100 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
T
RT D (Wayne) TO US 60 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
T
IS 55 (Perry) TO MO 51 (Perry) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
T
Allan Rd (Taney) TO MO 76 (Taney) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
TT
US 61 (Jefferson) TO RT AA (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
TT
RT F (Camden) TO RT MM (Camden) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
TT
LP 49 (Jasper) TO Duquesne Rd (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
TT
Beginning of Route (Boone) TO MO 740 (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
U
US 61 (New Madrid) TO RT WW (New Madrid) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
U
West Florissant Ave (St. Louis) TO Woodrow Ave (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
U
IS 55 (Pemiscot) TO MO 84 (Pemiscot) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
U
Oklahoma Line TO MO 43 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
U
CRD 54 SW (Buchanan) TO US 59 (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
V
IS 44 (Phelps) TO CRD 2060 (Phelps) Rolla Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
V
RT E (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
V
Munn Ave (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
V
US 40 (JACKSON) TO MO 350 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
W
RT Y South Jct (Morgan) TO BU 54 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
W
MO 109 (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
W
MO 14 (Christian) TO Jackson Spring Rd (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
W
MO 177 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
W
KANSAS LINE TO IS 435 (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
W
Logan Rd (Vernon) Nevada TO US 54 (Vernon) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
WW
Callaway County Line TO RT J (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
WW
US 63 (Boone) TO Callaway County Line Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
WW
BU 60 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
RT BB (Scott) TO US 61 (Scott) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
MO 25 (Stoddard) TO Pedestrian Factory Overpass (Stoddard) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
MO 58 (CASS) TO RT YY (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
MO 127 (PETTIS) TO US 65 (PETTIS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
MO 52 (Miller) TO CRD ISBON Rd (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Y
CRD 3670 (Howell) TO US 60 (Howell) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
YY
US 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
YY
US 169 (Buchanan) TO RT AC (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
YY
Kansas Line TO MO 171 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
YY
RT Y (CASS) TO RT C (CASS) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Z
IS 70 (St. Charles) TO RT D (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
Z
RT A (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Rural Route
Z
BU 54 (Callaway) TO Chandler Dr (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Z
Main St (Jasper) Carl Junction TO MO 171 (Jasper) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Z
Lincoln Dr (Madison) TO CRD 234 (Madison) Fredericktown Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
Z
IS 29 (PLATTE) TO MCPHERSON AVE (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Rural Route
ZZ
RT KK (Crawford) TO MO 19 (Crawford) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
29
US 59 South Jct (Andrew) TO US 169 North Jct (Buchanan) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
29
BU 71 (Andrew) TO LP 29 North Jct (Andrew) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
35
US 69 (Clinton) TO IS 35 (Clinton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
44
IS 44 (Franklin) TO IS 44 (St. Louis) Road reported clear CLEAR 11-12-2026 at 06:11 AM
Loop
Interstate Route
44
IS 44 West Jct (Greene) TO IS 44 East Jct (Greene) Springfield Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
44
MO 39 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
49
IS 49 North Jct (Vernon) TO IS 49 South Jct (Vernon) Nevada Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
49
IS 49 North Jct (Bates) TO IS 49 South Jct (Bates) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
49
IS 44 (Newton) TO IS 49 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
49
MO 86 (Newton) TO BU 60 (Newton) Neosho Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
49
MO 171 (Jasper) TO IS 44 (Newton) Joplin Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
70
MO 763 East Jct (Boone) TO IS 70 East Jct (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Loop
Interstate Route
70
IS 70 West Jct (Boone) TO MO 763 West Jct (Boone) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
10
MO 10 (RAY) TO MO 10 (RAY) RICHMOND Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
13
MO 20 (LAFAYETTE) TO MO 13 (LAFAYETTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
25
MO 25 North Jct (Dunklin) TO MO 25 South Jct (New Madrid) Malden Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
39
MO 174 (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
5
MO 14 (Douglas) Ava TO MO 5 (Douglas) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
50
MO 179 (Cole) TO US 50 (Cole) Missouri Blvd Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
54
MO 52 (Miller) TO MO 87 South Jct (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
54
MO 87 North Jct (Miller) TO US 54 (Miller) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
54
US 54 South Jct (Callaway) TO 4TH St. (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
54
13TH St. (Callaway) TO US 54 North Jct (Callaway) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 (Barry) TO US 60 (Barry) Monett Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 (Stoddard) TO MO 25 (Stoddard) Dexter Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 West Jct (Texas) TO US 63 (Texas) Cabool Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 West Jct (Texas) TO BU 63 (Texas) Willow Springs Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
Oklahoma Line TO MO 43 (Newton) Seneca Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 (Lawrence) TO US 60 (Lawrence) Aurora Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
MO 5 (Wright) TO US 60 (Wright) Mansfield Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 (Newton) TO MO 86 East Jct (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 West Jct (Butler) TO US 60 East Jct (Butler) Poplar Bluff Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 West Jct (Greene) TO RT B (Webster) Rogersville Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 (Wright) TO US 60 (Texas) Mountain Grove Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
MO 86 West Jct (Newton) TO US 60 (Newton) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
60
US 60 West Jct (Carter) TO RT D (Carter) Van Buren Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
61
IS 55 EXIT 89 (SCOTT) TO US 61 (SCOTT) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
63
US 63 North Jct (Texas) TO BU 60 (Texas) Willow Springs Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
63
US 63 North Jct (Howell) TO US 63 South Jct (Howell) West Plains Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
65
US 65 (Greene) TO US 60 (Greene) Springfield Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
65
MO 14 (Christian) TO US 65 (Christian) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
67
BU 60 (Bulter) TO US 67 (Butler) Poplar Bluff Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
67
MO 8 (St. Francois) TO Main St (St. Francois) Park Hills Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
67
MO 72 (Madison) TO US 67 (Madison) Fredericktown Road reported clear CLEAR 11-11-2026 at 10:11 PM
Business Route
71
US 71 (Andrew) TO LP 29 (Andrew) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Spur
169
US 169 (CLAY) TO RT DD (CLAY) Road reported clear CLEAR 11-11-2026 at 10:11 PM
Spur
44
IS 44 (Phelps) St. Robert TO Ft. Leonard Wood Road reported clear CLEAR 11-11-2026 at 10:11 PM
Spur
45
MO 92 (PLATTE) TO MO 45 (PLATTE) Road reported clear CLEAR 11-11-2026 at 10:11 PM
CST BAGNELL DAM BLVD
Valley Rd (Miller) TO US 54 (Miller) Lake Ozark Road reported clear CLEAR 11-11-2026 at 10:11 PM
CST CHOUTEAU TRFY
MO 210 (CLAY) TO FRONT ST (JACKSON) Road reported clear CLEAR 11-11-2026 at 10:11 PM
CST S 5TH ST
MO 94 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP 11TH ST TO IS70E
RP 11TH ST TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP ADELAIDE AVE TO IS70E
RP ADELAIDE AVE TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP AIRFLIGHT DR TO IS70E
RP AIRFLIGHT DR TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP AIRFLIGHT DR TO IS70E
RP AIRFLIGHT DR TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP BIRCHER BLVD TO IS70E
RP BIRCHER BLVD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP BRYAN RD TO IS70E
RP BRYAN RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP CARRIE AVE TO IS70E
RP CARRIE AVE TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP CAVE SPRINGS RD N TO IS70E
RP CAVE SPRINGS RD N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP CYPRESS RD TO IS70E
RP CYPRESS RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP DAVID HOEKEL PKWY TO IS70E
RP DAVID HOEKEL PKWY TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP FAIRGROUNDS RD TO IS70E
RP FAIRGROUNDS RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP GOODFELLOW BLVD TO IS70E
RP GOODFELLOW BLVD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP GRAND AVE TO IS70E
RP GRAND AVE TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS170E TO IS70E
RP IS170E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS170W TO IS70E
RP IS170W TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS270E TO IS70E
RP IS270E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS270W TO IS70E
RP IS270W TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS470E TO IS70E
RP IS470E TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS470W TO IS70E
RP IS470W TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS64E TO IS70E
RP IS64E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS64W TO IS70E
RP IS64W TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO ADELAIDE AVE
RP IS70E TO ADELAIDE AVE E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO BERMUDA RD
RP IS70E TO BERMUDA RD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO BIRCHER BLVD
RP IS70E TO BIRCHER BLVD W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO BIRCHER BLVD
RP IS70E TO BIRCHER BLVD E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO BRYAN RD
RP IS70E TO BRYAN RD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO CARRIE AVE
RP IS70E TO CARRIE AVE E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO CAVE SPRINGS RD N
RP IS70E TO CAVE SPRINGS RD N N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO CYPRESS RD
RP IS70E TO CYPRESS RD N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO DAVID HOEKEL PKWY
RP IS70E TO DAVID HOEKEL PKWY E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO FAIRGROUNDS RD
RP IS70E TO FAIRGROUNDS RD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO GOODFELLOW BLVD
RP IS70E TO GOODFELLOW BLVD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO GOODFELLOW BLVD
RP IS70E TO GOODFELLOW BLVD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO GRAND AVE
RP IS70E TO GRAND AVE E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO IS170E
RP IS70E TO IS170E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO IS270W
RP IS70E TO IS270W W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO IS35S
RP IS70E TO IS35S S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO IS435S
RP IS70E TO IS435S S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO IS470E
RP IS70E TO IS470E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO IS470W
RP IS70E TO IS470W W Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO IS64E
RP IS70E TO IS64E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO JENNINGS STATION RD
RP IS70E TO JENNINGS STATION RD E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO LAKE ST LOUIS BLVD
RP IS70E TO LAKE ST LOUIS BLVD E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO LP70
RP IS70E TO LP70E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO LP70W
RP IS70E TO LP70W W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MID RIVERS MALL DR S
RP IS70E TO MID RIVERS MALL DR S S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO115
RP IS70E TO MO115 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO13
RP IS70E TO MO 13 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO131
RP IS70E TO MO131 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO141N
RP IS70E TO MO141N N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO141S
RP IS70E TO MO141S S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO163
RP IS70E TO MO163 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO180W
RP IS70E TO MO180W W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO180W
RP IS70E TO MO180W W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO19
RP IS70E TO MO19 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO23
RP IS70E TO MO23 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO47
RP IS70E TO MO47 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO7
RP IS70E TO MO7 S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO740E
RP IS70E TO MO740E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO740W
RP IS70E TO MO740W W Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO763N
RP IS70E TO MO763N N Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO763S
RP IS70E TO MO763S S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO79
RP IS70E TO MO79 S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO87
RP IS70E TO MO87 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO MO94E
RP IS70E TO MO94E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO MO94W
RP IS70E TO MO94W W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO NO HANLEY RD
RP IS70E TO NO HANLEY RD E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO OR70E
RP IS70E TO OR70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO PEAR TREE DR
RP IS70E TO PEAR TREE DR E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RIVERVIEW BLVD
RP IS70E TO RIVERVIEW BLVD E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTA
RP IS70E TO RTA W Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTFN
RP IS70E TO RTFN N Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO RTFS
RP IS70E TO RTFS S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO RTK
RP IS70E TO RTK S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTNN
RP IS70E TO RTNN N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTNS
RP IS70E TO RTNS S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTU
RP IS70E TO RTU E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTW S
RP IS70E TO RTT E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO RTZ
RP IS70E TO RTZ S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO ST LOUIS AVE
RP IS70E TO ST LOUIS AVE E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO TUCKER BLVD
RP IS70E TO TUCKER BLVD S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO US40
RP IS70E TO US40 W Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US40
RP IS70E TO US40 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US40E
RP IS70E TO US40E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US40E
RP IS70E TO US40E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US40W
RP IS70E TO US40W W Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US54E
RP IS70E TO US54W W Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US61N
RP IS70E TO US61N N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO US63C
RP IS70E TO US63C S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US65N
RP IS70E TO US65N N Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US65S
RP IS70E TO US65S S Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP IS70E TO US67N
RP IS70E TO US67N N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO US67S
RP IS70E TO US67S S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO VETERANS MEMORIAL PKWY
RP IS70E TO VETERANS MEMORIAL PKWY E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO WENTZVILLE PKWY
RP IS70E TO WENTZVILLE PKWY E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO WEST FLORISSANT AVE
RP IS70E TO WEST FLORISSANT AVE S Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP IS70E TO ZUMBEHL RD N
RP IS70E TO ZUMBEHL RD N N Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP JENNINGS STATION RD TO IS70E
RP JENNINGS STATION RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP KINGSHIGHWAY BLVD N TO IS70E
RP KINGSHIGHWAY BLVD N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP KINGSHIGHWAY BLVD S TO IS70E
RP KINGSHIGHWAY BLVD S TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP LAKE ST LOUIS BLVD TO IS70E
RP LAKE ST LOUIS BLVD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP LAMBERT INTL BLVD TO IS70E
RP LAMBERT INTL BLVD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP LP70 TO IS70E
RP LP70 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP LP70E TO IS70E
RP LP70E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP LP70W TO IS70E
RP LP70W TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MID RIVERS MALL DR N TO IS70E
RP MID RIVERS MALL DR N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO115 TO IS70E
RP MO115 TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO115N TO IS70E
RP MO115N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO13 TO IS70E
RP MO13 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO141N TO IS70E
RP MO141N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO141S TO IS70E
RP MO141S TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO163 TO IS70E
RP MO163 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO180 TO IS70E
RP 180 TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO19 TO IS70E
RP MO19 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO23 TO IS70E
RP MO23 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO370W TO IS70E
RP MO370W TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO47 TO IS70E
RP MO47 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO5 TO IS70E
RP MO5 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO7 TO IS70E
RP MO7 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO740E TO IS70E
RP MO470E TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO740W TO IS70E
RP MO470W TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO763N TO IS70E
RP MO763N TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO763S TO IS70E
RP MO763S TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO79 TO IS70E
RP MO79 TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO79 TO IS70E
RP MO79 TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO87 TO IS70E
RP MO87 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP MO94E TO IS70E
RP MO94E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP MO94W TO IS70E
RP MO94W TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP N HANLEY RD TO IS70E
RP N HANLEY RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP NATURAL BRIDGE RD TO IS70E
RP NATURAL BRIDGE RD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP OR70E TO IS70E
RP OR70E TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP OR70E TO IS70E
RP OR70E TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTA TO IS70E
RP RTA TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTFN TO IS70E
RP RTFN TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP RTFS TO IS70E
RP RTFS TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP RTNN TO IS70E
RP RTNN TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTNS TO IS70E
RP RTNS TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTNS TO IS70E
RP RTNS TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTU TO IS70E
RP RTU TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTW N TO IS70E
RP RTT TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP RTZ TO IS70E
RP RTZ TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP SANTA MONICA AVE TO IS70E
RP SANTA MONICA AVE TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP SOR70 TO IS70E
RP SOR70 TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP T R HUGHES BLVD S TO IS70E
RP T R Hughes BLVD TO IS 70 (St. Charles) Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP TUCKER BLVD TO IS70E
RP TUCKER BLVD TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP US40 TO IS70E
RP US40 TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US40E TO IS70E
RP US40E TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US40W TO IS70E
RP US40W TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US54W TO IS70E
RP US54E TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US63C TO IS70E
RP US63C TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US65N TO IS70E
RP US65N TO IS70E E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US65S TO IS70E
RP US65S TO IS70 E Road reported clear CLEAR 11-11-2026 at 10:11 PM
RP US67N TO IS70E
RP US67N TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP US67S TO IS70E
RP US67S TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP WENTZVILLE PKWY TO IS70E
RP WENTZVILLE PKWY TO IS70 E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP WEST FLORISSANT AVE TO IS70E
RP WEST FLORISSANT AVE TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
RP ZUMBEHL RD S TO IS70E
RP ZUMBEHL RD S TO IS70E E Road reported clear CLEAR 11-12-2026 at 06:11 AM
CO IS55 TO US61
IS 55 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 11-12-2026 at 06:11 AM
WS IS70E FORISTELL
WS IS70E FORISTELL E TO WS IS70E FORISTELL E Road reported clear CLEAR 11-12-2026 at 06:11 AM