Missouri Department of Transportation

For immediate assistance, please contact us at 1-888-ASK-MODOT ( 1-888-275-6636 ). For more information about MoDOT, please visit our home page.

Report Date: Saturday, March 28, 2026 4:41:32 AM

Use the dropdown boxes below to filter the results.

Traffic Impact

BACK TO TOP

Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 29 traffic impacts to report.

Road closed due to traffic impact 16 Road(s) closed due to traffic impact
Expect delays due to traffic impact 4 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 2 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 7 Closure(s) due to planned event(s)
Expect delays due to planned event 0 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to planned event RT N S - ADAIR County - CLOSED
PLANNED
Road closure begins .003 mile(s) after CRD YARROW TRL S, and ends .002 mile(s) after CRD LINDERVILLE TRL S.
Reported 4/4/2026 12:00:00 PM.
Closure estimated to last 7 hour(s).
Road closed due to planned event RT N N - ADAIR County - CLOSED
PLANNED
Road closure begins .002 mile(s) before CRD LINDERVILLE TRL S, and ends .003 mile(s) before CRD YARROW TRL S.
Reported 4/4/2026 12:00:00 PM.
Closure estimated to last 7 hour(s).
Road closed due to traffic impact CST GENE FIELD RD E - BUCHANAN County - CLOSED
BRIDGE CLOSED
Road closure begins .013 mile(s) after CST WOODBINE RD S, and ends .017 mile(s) after CST WOODLAND DR S.
Reported 11/10/2025 1:38:00 PM.
Road closed until further notice.
Road closed due to traffic impact CST GENE FIELD RD W - BUCHANAN County - CLOSED
BRIDGE CLOSED
Road closure begins .017 mile(s) before CST WOODLAND DR S, and ends .013 mile(s) before CST QUAIL DR S.
Reported 11/10/2025 1:38:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT PP W - CHARITON County - CLOSED
BRIDGE DAMAGE
Road closure begins .054 mile(s) after CRD SALT LICK AVE S, and ends .116 mile(s) after CRD SALT LICK AVE S.
Reported 6/17/2025 5:31:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT PP E - CHARITON County - CLOSED
BRIDGE DAMAGE
Road closure begins .116 mile(s) before CRD SALT LICK AVE S, and ends .054 mile(s) before CRD SALT LICK AVE S.
Reported 6/17/2025 5:31:00 PM.
Road closed until further notice.
Road closed due to planned event MO 81 N - CLARK County - CLOSED
PLANNED
Road closure begins .006 mile(s) before CRD 270 SPUR S, and ends .002 mile(s) before CRD 387 E.
Reported 3/28/2026 11:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to planned event MO 81 S - CLARK County - CLOSED
PLANNED
Road closure begins .002 mile(s) after CRD 387 E, and ends .006 mile(s) after CRD 270 SPUR S.
Reported 3/28/2026 11:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to traffic impact RT B W - DENT County - CLOSED
BRIDGE CLOSED
Road closure begins .112 mile(s) before CRD 5450 S, and ends .016 mile(s) before CRD 5450 S.
Reported 3/6/2026 11:24:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT B E - DENT County - CLOSED
BRIDGE CLOSED
Road closure begins .016 mile(s) after CRD 5450 S, and ends .112 mile(s) after CRD 5450 S.
Reported 3/6/2026 11:24:00 AM.
Road closed until further notice.
Road closed due to traffic impact CRD 206 E - DUNKLIN County - CLOSED
BRIDGE DAMAGE
Road closure begins MO 53 S, and ends .276 mile(s) after MO 53 S.
Reported 8/25/2025 2:48:00 PM.
Road closed until further notice.
Road closed due to traffic impact CRD 206 W - DUNKLIN County - CLOSED
BRIDGE DAMAGE
Road closure begins .276 mile(s) before MO 53 S, and ends MO 53 S.
Reported 8/25/2025 2:48:00 PM.
Road closed until further notice.
Possible delays due to traffic impact RT D N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins .001 mile(s) after RP RTD TO IS44E E, and ends RT WW E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins RT WW E, and ends .001 mile(s) before RP RTD TO IS44E E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact CRD 201 S - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins RT OO E, and ends .007 mile(s) after RT OO E.
Reported 3/22/2026 12:32:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact CRD 201 N - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .007 mile(s) before RT OO E, and ends RT OO E.
Reported 3/22/2026 12:32:00 PM.
Traffic will be implacted until further notice.
Road closed due to planned event RT J S - JOHNSON County - CLOSED
PLANNED
Road closure begins .001 mile(s) before CST BRIDGE ST E, and ends BU 50 E.
Reported 5/2/2026 6:00:00 AM.
Closure estimated to last 24 hour(s).
Expect delays due to traffic impact RT OO E - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .019 mile(s) before CRD 201 S, and ends .018 mile(s) after CRD 201 S.
Reported 3/22/2026 12:02:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT OO W - JOHNSON County - EXPECT DELAYS
OTHER
Incident begins .018 mile(s) before CRD 201 S, and ends .019 mile(s) after CRD 201 S.
Reported 3/22/2026 12:02:00 PM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to planned event MO 79 S - MARION County - CLOSED
PLANNED
Road closure begins CST CHURCH ST E, and ends .255 mile(s) after RR HANNIBAL SIDING S.
Reported 7/4/2026 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to planned event MO 79 N - RALLS County - CLOSED
PLANNED
Road closure begins .255 mile(s) before RR HANNIBAL SIDING S, and ends CST CHURCH ST E.
Reported 7/4/2026 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to traffic impact RT AA S - SCOTT County - CLOSED
BRIDGE DAMAGE
Road closure begins .004 mile(s) after OR 60 E, and ends .004 mile(s) before CST LYNUAL ST E.
Reported 8/14/2025 3:39:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT AA N - SCOTT County - CLOSED
BRIDGE DAMAGE
Road closure begins .004 mile(s) after CST LYNUAL ST E, and ends .004 mile(s) before OR 60 E.
Reported 8/14/2025 3:39:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT T S - SULLIVAN County - CLOSED
BRIDGE CLOSED
Road closure begins .461 mile(s) after CRD EMBER RD S, and ends .906 mile(s) after CRD EMBER RD S.
Reported 8/25/2025 11:24:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT T N - SULLIVAN County - CLOSED
BRIDGE CLOSED
Road closure begins .906 mile(s) before CRD EMBER RD S, and ends .461 mile(s) before CRD EMBER RD S.
Reported 8/25/2025 11:24:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT Y W - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .23 mile(s) before CRD BLACK HORSE RD S, and ends .013 mile(s) before CRD ST LUKE RD E.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT Y E - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .013 mile(s) after CRD ST LUKE RD E, and ends .23 mile(s) after CRD BLACK HORSE RD S.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 194 closure(s) due to work zone(s) to report.

Road closed due to work zone 194 Road(s) closed due to work zone
Road closed due to workzone CRD RIVERSIDE TERRACE SE S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 169 S and ends at .004 mile(s) before CRD FIKE SE E.
Work is scheduled from 09-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E E - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .505 mile(s) after CRD KEYSTONE AVE S and ends at 1.122 mile(s) after CRD KEYSTONE AVE S.
Work is scheduled from 23-MAR-2026 to 14-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E W - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at 1.122 mile(s) before CRD KEYSTONE AVE S and ends at .505 mile(s) before CRD KEYSTONE AVE S.
Work is scheduled from 23-MAR-2026 to 14-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST BENTON BLVD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before RP BENTON BLVD TO IS70W W.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST BENTON BLVD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after RP BENTON BLVD TO IS70W W and ends at .008 mile(s) before CST TRUMAN RD E.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 7 S - CASS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .17 mile(s) after CO MO58 TO MO7 E and ends at .061 mile(s) before CRD RAFFURTY RD S.
Work is scheduled from 16-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 7 N - CASS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .061 mile(s) after CRD RAFFURTY RD S and ends at .17 mile(s) before CO MO58 TO MO7 E.
Work is scheduled from 16-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 137 N - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) after CRD 3780 E and ends at .005 mile(s) after CRD FREEDOM RD E.
Work is scheduled from 23-MAR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 137 S - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) before CRD FREEDOM RD E and ends at .011 mile(s) before CRD 3780 E.
Work is scheduled from 23-MAR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 S - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CRD PINE RD E and ends at .003 mile(s) before CRD PECAN RD E.
Work is scheduled from 09-MAR-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 43 N - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CRD PECAN RD E and ends at .002 mile(s) before CRD PINE RD E.
Work is scheduled from 09-MAR-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E W - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT Y E and ends at .001 mile(s) before RT Y E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E E - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT Y E and ends at RT Y E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CLEVELAND AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .009 mile(s) after CST E 26TH ST E and ends at .007 mile(s) before CST E 25TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K S - LIVINGSTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .274 mile(s) before US 65 S and ends at .181 mile(s) before US 65 S.
Work is scheduled from 19-JAN-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K N - LIVINGSTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .181 mile(s) after US 65 S and ends at .274 mile(s) after US 65 S.
Work is scheduled from 19-JAN-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CLEVELAND AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after CST E 25TH ST E and ends at .009 mile(s) before CST E 26TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTD TO IS29N N - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) after RT D W and ends at IS 29 N.
Work is scheduled from 03-FEB-2026 to 15-MAY-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD RIVERSIDE TER S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at CST EASTON RD E and ends at US 169 S.
Work is scheduled from 09-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT M N - PLATTE County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .052 mile(s) after CRD E DYE STORE RD E and ends at .581 mile(s) after CRD NICKOLS RD E.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST MYRTLE AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CST NORTON AVE S and ends at .017 mile(s) after OR 70 E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MYRTLE AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .017 mile(s) before OR 70 E and ends at .004 mile(s) before CST NORTON AVE S.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MERSINGTON AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .041 mile(s) before CST E 27TH ST E and ends at CST E 27TH ST E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST MERSINGTON AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST E 27TH ST E and ends at .041 mile(s) after CST E 27TH ST E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 160 E - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after US 63 N and ends at .001 mile(s) before RT BB S.
Work is scheduled from 11-NOV-2024 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone US 160 W - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT BB S and ends at .002 mile(s) before US 63 N.
Work is scheduled from 11-NOV-2024 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone CST LISTER AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .055 mile(s) before IS 70 E and ends at .052 mile(s) after IS 70 W.
Work is scheduled from 03-NOV-2025 to 30-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST LISTER AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .052 mile(s) before IS 70 W and ends at .055 mile(s) after IS 70 E.
Work is scheduled from 03-NOV-2025 to 30-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 11 N - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .497 mile(s) before CRD NEVADA RD S and ends at .327 mile(s) before CRD NEVADA RD S.
Work is scheduled from 05-JAN-2026 to 15-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 158 W - BUTLER County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .534 mile(s) after MO 142 E and ends at .004 mile(s) before CRD 341 S.
Work is scheduled from 02-FEB-2026 to 10-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 158 E - BUTLER County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .004 mile(s) after CRD 341 S and ends at .534 mile(s) before MO 142 E.
Work is scheduled from 02-FEB-2026 to 10-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT O W - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .492 mile(s) before CRD BLUE GRASS AVE S and ends at .073 mile(s) before CRD BLUE GRASS AVE S.
Work is scheduled from 01-DEC-2025 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT O E - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .073 mile(s) after CRD BLUE GRASS AVE S and ends at .492 mile(s) after CRD BLUE GRASS AVE S.
Work is scheduled from 01-DEC-2025 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 11 S - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .327 mile(s) after CRD NEVADA RD S and ends at .497 mile(s) after CRD NEVADA RD S.
Work is scheduled from 05-JAN-2026 to 15-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHEROKEE ST TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST CHEROKEE ST E and ends at IS 55 S.
Work is scheduled from 17-JAN-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST HOLMES ST N - JACKSON County - ALL LANES CLOSED
250620-C04 JKU0024 Holmes Brdige Reconstruction
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) before CST TRUMAN RD E and ends at CST E 14TH ST E.
Work is scheduled from 22-AUG-2025 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 169 N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .006 mile(s) after CST W 5TH ST W and ends at .057 mile(s) after MO 9 S.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTHN TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT H S and ends at IS 44 W.
Work is scheduled from 20-MAR-2026 to 31-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD NW JONES MEYER RD W - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .007 mile(s) after CRD HILLSBORO RD S and ends at MO 45 S.
Work is scheduled from 09-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD NW JONES MEYER RD E - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 45 S and ends at .007 mile(s) before CRD HILLSBORO RD S.
Work is scheduled from 09-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H N - ST. CLAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .388 mile(s) after CRD NW 500 E and ends at .059 mile(s) before CRD NW 650 E.
Work is scheduled from 09-MAR-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z N - ST. CHARLES County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) after RP RTZ TO IS70E E and ends at .003 mile(s) before CST S CHURCH ST S.
Work is scheduled from 09-MAR-2026 to 24-APR-2026.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Project Site
Road closed due to workzone RT Z S - ST. CHARLES County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST S CHURCH ST N and ends at .008 mile(s) before RP RTZ TO IS70E E.
Work is scheduled from 09-MAR-2026 to 24-APR-2026.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Project Site
Road closed due to workzone RT M S - PLATTE County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .037 mile(s) before CRD NICKOLS RD E and ends at RT H S.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS70E TO MYRTLE AVE E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 70 E and ends at .003 mile(s) before CST MYRTLE AVE S.
Work is scheduled from 20-MAR-2025 to 20-MAR-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H S - ST. CLAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .059 mile(s) after CRD NW 650 E and ends at .388 mile(s) before CRD NW 500 E.
Work is scheduled from 09-MAR-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO GERMANIA ST S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST GERMANIA AVE E.
Work is scheduled from 02-JUN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP TRUMAN PKWY TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LAFAYETTE AVE E and ends at .01 mile(s) after CST RUSSELL BLVD E.
Work is scheduled from 06-DEC-2022 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z S - RAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST AGNES ST E and ends at .001 mile(s) before CRD CENTENNIAL RD S.
Work is scheduled from 09-FEB-2026 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z N - RAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD CENTENNIAL RD S and ends at CST AGNES ST E.
Work is scheduled from 09-FEB-2026 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS44E ST CLAIR E - FRANKLIN County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Road closure begins at IS 44 E and ends at .109 mile(s) after IS 44 E.
Work is scheduled from 04-MAR-2026 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 2 E - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .289 mile(s) before CRD NE-401 S and ends at .394 mile(s) after CRD NE-401 S.
Work is scheduled from 05-JAN-2026 to 11-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 2 W - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .394 mile(s) before CRD NE-401 S and ends at .289 mile(s) after CRD NE-401 S.
Work is scheduled from 05-JAN-2026 to 11-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 102 W - MISSISSIPPI County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .017 mile(s) after CRD 526 E and ends at .01 mile(s) before CRD 528 E.
Work is scheduled from 24-MAR-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B N - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) after CRD 216 S and ends at .011 mile(s) before RT A E.
Work is scheduled from 02-FEB-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT M N - PLATTE County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .295 mile(s) after CRD E DYE STORE RD E and ends at .015 mile(s) before CRD NICHOLS RD S.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 102 E - MISSISSIPPI County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .01 mile(s) after CRD 528 E and ends at .017 mile(s) before CRD 526 E.
Work is scheduled from 24-MAR-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B S - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) after RT A E and ends at .011 mile(s) before CRD 216 S.
Work is scheduled from 02-FEB-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - WEBSTER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .092 mile(s) after CRD WILLOW LN E and ends at .806 mile(s) after CRD BLACK HORSE RD S.
Work is scheduled from 10-JUN-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 45 N - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before CRD NW 76TH ST E and ends at .013 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 09-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 45 S - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .013 mile(s) before PVT PRIVATE RD E and ends at .001 mile(s) after CRD NW 76TH ST E.
Work is scheduled from 09-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y E - WEBSTER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .806 mile(s) before CRD BLACK HORSE RD S and ends at .092 mile(s) before CRD WILLOW LN E.
Work is scheduled from 10-JUN-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 42 E - MARIES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .037 mile(s) after CRD 614 S and ends at .479 mile(s) after CRD 614 S.
Work is scheduled from 26-JAN-2026 to 04-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS670E TO US71N N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .011 mile(s) before CST HOLMES ST N and ends at .017 mile(s) before US 71 N.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST LEMONE INDUSTRIAL BLVD S - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .006 mile(s) before RT AC E and ends at RT AC E.
Work is scheduled from 16-MAR-2026 to 15-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z S - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after US 412 W and ends at .01 mile(s) before CRD 500 E.
Work is scheduled from 22-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z N - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .01 mile(s) after CRD 500 E and ends at .004 mile(s) before US 412 W.
Work is scheduled from 22-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone IS 70 W - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after RP IS70W TO MO47 W and ends at .012 mile(s) before RP MO47 TO IS70W W.
Work is scheduled from 27-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Road closed due to workzone IS 70 E - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .065 mile(s) after RP IS70E TO MO47 E and ends at .049 mile(s) before RP MO47 TO IS70E E.
Work is scheduled from 27-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Road closed due to workzone MO 47 N - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after RP MO47 TO IS70E E and ends at .004 mile(s) before RP IS70W TO MO47 W.
Work is scheduled from 27-MAR-2026 to 10-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Road closed due to workzone MO 47 S - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after RP IS70W TO MO47 W and ends at .004 mile(s) before RP MO47 TO IS70E E.
Work is scheduled from 27-MAR-2026 to 10-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Road closed due to workzone RP US67N TO RTDW W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 N and ends at RT D W.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT MM N - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .02 mile(s) after CRD COLEMAN RD S and ends at RT T E.
Work is scheduled from 14-JAN-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US69S TO IS29N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 S and ends at IS 29 N.
Work is scheduled from 13-FEB-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT MM S - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT T E and ends at .02 mile(s) before CRD COLEMAN RD S.
Work is scheduled from 14-JAN-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTHS TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT H S and ends at .075 mile(s) before IS 44 W.
Work is scheduled from 20-MAR-2026 to 31-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E E - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .401 mile(s) after RT Y S and ends at .583 mile(s) before CRD GAZETTE RD E.
Work is scheduled from 02-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E W - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .583 mile(s) after CRD GAZETTE RD E and ends at .401 mile(s) before RT Y S.
Work is scheduled from 02-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT JJ E - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .36 mile(s) after RT Y S and ends at .692 mile(s) before CRD KENNEDY AVE S.
Work is scheduled from 16-FEB-2026 to 23-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT JJ W - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .692 mile(s) after CRD KENNEDY AVE S and ends at .36 mile(s) before RT Y S.
Work is scheduled from 16-FEB-2026 to 23-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 2 W - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .341 mile(s) after CST BENTON ST E and ends at .541 mile(s) before CRD NE-1051 S.
Work is scheduled from 23-MAR-2026 to 21-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 2 E - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .541 mile(s) after CRD NE-1051 S and ends at .341 mile(s) before CST BENTON ST E.
Work is scheduled from 23-MAR-2026 to 21-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 46 E - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .018 mile(s) after RT Z S and ends at .02 mile(s) before CRD JAGUAR AVE S.
Work is scheduled from 05-MAR-2026 to 25-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO LOUGHBOROUGH AVE S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST LOUGHBOROUGH AVE E.
Work is scheduled from 02-JUN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H W - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at RT N E and ends at RT Z S.
Work is scheduled from 28-MAR-2026 to 28-MAR-2026.
Work will start daily at 01:00 PM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT H E - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at RT Z S and ends at RT N E.
Work is scheduled from 28-MAR-2026 to 28-MAR-2026.
Work will start daily at 01:00 PM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone MO 164 E - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) after RT N E and ends at .002 mile(s) before RT NN S.
Work is scheduled from 03-NOV-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS70E TO MERSINGTON AVE E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 70 E and ends at CST E 27TH ST E.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 70 W - CALLAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after PVT EMERALD LAKE RD S and ends at .007 mile(s) before PVT DUVALL DR S.
Work is scheduled from 18-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 70 E - BOONE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after PVT DUVALL DR S and ends at .006 mile(s) before PVT EMERALD LAKE RD S.
Work is scheduled from 18-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 52 E - BATES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after RP MO52 TO IS49S S and ends at .007 mile(s) before RP IS49N TO MO52 E.
Work is scheduled from 16-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NW COOKINGHAM DR W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP IS435S TO NW COOKINGHAM DR E and ends at .004 mile(s) before RP NW COOKINGHAM DR TO IS435N N.
Work is scheduled from 16-MAR-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 46 W - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) after CRD JAGUAR AVE S and ends at .018 mile(s) before RT Z S.
Work is scheduled from 05-MAR-2026 to 25-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 52 W - BATES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after RP IS49N TO MO52 E and ends at .002 mile(s) before RP MO52 TO IS49S S.
Work is scheduled from 16-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NW COOKINGHAM DR E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after RP NW COOKINGHAM DR TO IS435N N and ends at .003 mile(s) before RP IS435S TO NW COOKINGHAM DR E.
Work is scheduled from 16-MAR-2026 to 20-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP GERMANIA ST TO IS55N N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST GERMANIA AVE E and ends at IS 55 N.
Work is scheduled from 17-JAN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone WS IS70W MAYVIEW W - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .158 mile(s) before IS 70 W and ends at IS 70 W.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS70W BOONVILLE W - COOPER County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at IS 70 W.
Work is scheduled from 21-JAN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST N OAKWOOD AVE S - GREENE County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Road closure begins at US 60 W and ends at .001 mile(s) before US 60 E.
Work is scheduled from 25-MAR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD 8490 S - PHELPS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .008 mile(s) after RP IS44W TO SOR44 E and ends at .014 mile(s) before OR 44 E.
Work is scheduled from 16-MAR-2026 to 07-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD 8490 N - PHELPS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .014 mile(s) after OR 44 E and ends at .008 mile(s) before RP IS44W TO SOR44 E.
Work is scheduled from 16-MAR-2026 to 07-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CONLEY RD N - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .013 mile(s) before CST EAST BLVD E and ends at .004 mile(s) before CST CONLEY RD E.
Work is scheduled from 23-MAR-2026 to 25-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CONLEY RD S - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .002 mile(s) after CST CONLEY RD E and ends at .013 mile(s) after CST EAST BLVD E.
Work is scheduled from 23-MAR-2026 to 25-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 42 W - MARIES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .479 mile(s) before CRD 614 S and ends at .037 mile(s) before CRD 614 S.
Work is scheduled from 26-JAN-2026 to 04-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TERRILL ST S - WEBSTER County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at US 60 W and ends at US 60 E.
Work is scheduled from 11-AUG-2025 to 31-DEC-2066.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TERRILL ST N - WEBSTER County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at US 60 E and ends at US 60 W.
Work is scheduled from 11-AUG-2025 to 31-DEC-2066.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone PED OAKLEY OVERPASS N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before RP VAN BRUNT BLVD TO IS70E E and ends at .022 mile(s) after RP IS70W TO VAN BRUNT BLVD S.
Work is scheduled from 07-NOV-2025 to 30-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone PED OAKLEY OVERPASS S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .022 mile(s) before RP IS70W TO VAN BRUNT BLVD S and ends at .02 mile(s) after RP VAN BRUNT BLVD TO IS70E E.
Work is scheduled from 07-NOV-2025 to 30-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K E - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .478 mile(s) before MO 19 S and ends at .423 mile(s) before MO 19 S.
Work is scheduled from 08-DEC-2025 to 07-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K W - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .423 mile(s) after MO 19 S and ends at .478 mile(s) after MO 19 S.
Work is scheduled from 08-DEC-2025 to 07-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP LOUGHBOROUGH AVE TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LOUGHBOROUGH AVE E and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP BELLERIVE BLVD TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST VIRGINIA AVE S and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone PVT OVERPASS S - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .024 mile(s) before CST TRUMAN RD E and ends at .019 mile(s) after CST TRUMAN RD E.
Work is scheduled from 11-APR-2025 to 31-DEC-2032.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U S - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .399 mile(s) after CRD LONDON RD E and ends at .177 mile(s) before CRD LANDOR RD E.
Work is scheduled from 02-MAR-2026 to 24-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS29S TO RTD S - PLATTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 29 S and ends at .002 mile(s) before RT D W.
Work is scheduled from 03-FEB-2026 to 15-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T N - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .89 mile(s) before CRD EMBER RD S and ends at .487 mile(s) before CRD EMBER RD S.
Work is scheduled from 09-MAR-2026 to 17-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T S - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .487 mile(s) after CRD EMBER RD S and ends at .89 mile(s) after CRD EMBER RD S.
Work is scheduled from 09-MAR-2026 to 17-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 169 N - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .015 mile(s) after CRD 70 SE S and ends at .014 mile(s) before RT AC S.
Work is scheduled from 09-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF N - PUTNAM County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .444 mile(s) after CRD FLAX TRL S and ends at .626 mile(s) before CRD REED TRL S.
Work is scheduled from 23-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 82 E - ST. CLAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CRD NE 230 E and ends at .031 mile(s) before CRD NE 1289 S.
Work is scheduled from 01-DEC-2025 to 23-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 82 W - ST. CLAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .031 mile(s) after CRD NE 1289 S and ends at .004 mile(s) before CRD NE 230 E.
Work is scheduled from 01-DEC-2025 to 23-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF S - PUTNAM County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .626 mile(s) after CRD REED TRL S and ends at .444 mile(s) before CRD FLAX TRL S.
Work is scheduled from 23-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 248 W - BARRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .029 mile(s) after MO 39 S and ends at .016 mile(s) before CRD 1215 S.
Work is scheduled from 02-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 248 E - BARRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .016 mile(s) after CRD 1215 S and ends at .029 mile(s) before MO 39 S.
Work is scheduled from 02-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RIVERVIEW DR TO IS270W W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .005 mile(s) before RT H S and ends at .006 mile(s) before IS 270 W.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 109 N - ST. LOUIS County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .02 mile(s) after CST OLD EATHERTON RD S and ends at .006 mile(s) before CST VALLEY VIEW LN E.
Work is scheduled from 09-MAR-2026 to 30-NOV-2026.
Work will start daily at 12:00 AM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C N - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .478 mile(s) after CRD 454 E and ends at .004 mile(s) before CRD 432 E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C S - PEMISCOT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CRD 432 E and ends at .478 mile(s) before CRD 454 E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TECHNOLOGY DR N - ST. CHARLES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .129 mile(s) after CST ACADEMY PL S and ends at .094 mile(s) before CST WINGHAVEN POINTE DR S.
Work is scheduled from 11-AUG-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST TECHNOLOGY DR S - ST. CHARLES County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .094 mile(s) after CST WINGHAVEN POINTE DR S and ends at .129 mile(s) before CST ACADEMY PL S.
Work is scheduled from 11-AUG-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H E - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after MO 43 S and ends at RT Y S.
Work is scheduled from 23-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST NEW HAVEN RD E - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 63 S and ends at .027 mile(s) after CST LENOIR ST S.
Work is scheduled from 16-MAR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST NEW HAVEN RD W - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .027 mile(s) before CST LENOIR ST S and ends at US 63 S.
Work is scheduled from 16-MAR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D W - MISSISSIPPI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CRD 333 S and ends at .005 mile(s) after CRD 335 S.
Work is scheduled from 23-FEB-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - MISSISSIPPI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) before CRD 335 S and ends at CRD 333 S.
Work is scheduled from 23-FEB-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 169 S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .014 mile(s) after RT AC S and ends at .015 mile(s) before CRD 70 SE S.
Work is scheduled from 09-MAR-2026 to 03-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS270W TO RIVERVIEW DR W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 270 W and ends at RT H N.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF N - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at RT H E and ends at MO 6 E.
Work is scheduled from 27-MAR-2026 to 03-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT FF S - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at MO 6 E and ends at RT H E.
Work is scheduled from 27-MAR-2026 to 03-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone US 62 E - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .499 mile(s) before CRD 301 S and ends at .705 mile(s) after CRD 303 S.
Work is scheduled from 12-JAN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 62 W - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .705 mile(s) before CRD 303 S and ends at .499 mile(s) after CRD 217 S.
Work is scheduled from 12-JAN-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U N - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .177 mile(s) after CRD LANDOR RD E and ends at .399 mile(s) before CRD LONDON RD E.
Work is scheduled from 02-MAR-2026 to 24-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 139 N - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .066 mile(s) after CRD ARMOR RD E and ends at .21 mile(s) after CRD ARMOR RD E.
Work is scheduled from 05-JAN-2026 to 05-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT F S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .128 mile(s) after CRD CLINE RD E and ends at .061 mile(s) before CRD FAULKENBERRY RD E.
Work is scheduled from 25-FEB-2026 to 19-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT F N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .061 mile(s) after CRD FAULKENBERRY RD E and ends at .128 mile(s) before CRD CLINE RD E.
Work is scheduled from 25-FEB-2026 to 19-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 139 S - LINN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .21 mile(s) before CRD ARMOR RD E and ends at .066 mile(s) before CRD ARMOR RD E.
Work is scheduled from 05-JAN-2026 to 05-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDW TO US67S S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D W and ends at US 67 S.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone WS IS70W MAYVIEW W - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 W and ends at .106 mile(s) after IS 70 W.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RICHARDS RD TO US169N N - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at CST RICHARDS RD N and ends at US 169 N.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP THE PASEO TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .024 mile(s) after CST E 14TH ST E and ends at .015 mile(s) before IS 70 W.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone IS 70 W - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .021 mile(s) after IS 670 W and ends at .005 mile(s) after CST E 11TH ST W.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO RTDE E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 S and ends at RT D E.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MYRTLE AVE TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at OR 70 E and ends at IS 70 W.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT BB N - SCOTT County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .002 mile(s) before CST WAKEFIELD AVE E and ends at .005 mile(s) after RT Y E.
Work is scheduled from 16-FEB-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT BB S - SCOTT County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .005 mile(s) before RT Y E and ends at .002 mile(s) after CST WAKEFIELD AVE E.
Work is scheduled from 16-FEB-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B S - PLATTE County - ALL LANES CLOSED
Bridge replacement over Grove Creek
BRIDGE RECONSTRUCTION
Road closure begins at .05 mile(s) after CST MAIN ST E and ends at .035 mile(s) after CST PERRY ST E.
Work is scheduled from 12-JAN-2026 to 04-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B N - PLATTE County - ALL LANES CLOSED
Bridge replacement over Grove Creek
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) before CST PERRY ST E and ends at .05 mile(s) before CST MAIN ST E.
Work is scheduled from 12-JAN-2026 to 04-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT PP E - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .395 mile(s) after CRD BERRY DR S and ends at .482 mile(s) after CRD BERRY DR S.
Work is scheduled from 02-FEB-2026 to 12-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT PP W - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .482 mile(s) before CRD BERRY DR S and ends at .395 mile(s) before CRD BERRY DR S.
Work is scheduled from 02-FEB-2026 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 E - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .163 mile(s) after CST I-70 DR SE W and ends at .06 mile(s) before CST HILLSDALE RD S.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 W - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .06 mile(s) after CST HILLSDALE RD S and ends at .163 mile(s) before CST I-70 DR SE E.
Work is scheduled from 23-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST GENE FIELD RD E - BUCHANAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after CST QUAIL DR S and ends at .006 mile(s) before CST WOODLAND DR S.
Work is scheduled from 16-JAN-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 27TH ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CST NORTON AVE S and ends at .002 mile(s) before CST CLEVELAND AVE S.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST GENE FIELD RD W - BUCHANAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after CST WOODLAND DR S and ends at .006 mile(s) before CST QUAIL DR S.
Work is scheduled from 16-JAN-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT WW S - LAFAYETTE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at CRD OWL CREEK RD E and ends at CRD TEXAS PRAIRIE RD E.
Work is scheduled from 26-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT WW N - LAFAYETTE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at CRD TEXAS PRAIRIE RD E and ends at CRD OWL CREEK RD E.
Work is scheduled from 26-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone IS 29 N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .017 mile(s) after RP US69N TO US169N N and ends at .096 mile(s) before RP US169S TO IS29N N.
Work is scheduled from 13-FEB-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US69N TO US169N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 N and ends at .004 mile(s) before IS 29 N.
Work is scheduled from 13-FEB-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT AA N - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LYNUAL ST E and ends at .012 mile(s) before OR 60 E.
Work is scheduled from 06-OCT-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT N N - PUTNAM County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .424 mile(s) after CRD BLACKBERRY TRL E and ends at .059 mile(s) before CRD AGAVE TRL E.
Work is scheduled from 11-MAR-2026 to 20-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N S - PUTNAM County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .059 mile(s) after CRD AGAVE TRL E and ends at .424 mile(s) before CRD BLACKBERRY TRL E.
Work is scheduled from 11-MAR-2026 to 20-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT AA S - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .012 mile(s) after OR 60 E and ends at CST LYNUAL ST E.
Work is scheduled from 06-OCT-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD LEFHOLZ RD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD MCQUERRY RD E and ends at .002 mile(s) before OR 70 E.
Work is scheduled from 14-FEB-2026 to 15-JUL-2026.
Work will start daily at 09:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEFHOLZ RD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after OR 70 E and ends at .001 mile(s) before CRD MCQUERRY RD E.
Work is scheduled from 14-FEB-2026 to 15-JUL-2026.
Work will start daily at 09:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDE TO US67N N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D E and ends at US 67 N.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST INDIANA AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after CST E 18TH ST E and ends at .006 mile(s) before CST TRUMAN RD E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST INDIANA AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before CST E 18TH ST E.
Work is scheduled from 09-FEB-2026 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 27TH ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CST CLEVELAND AVE S and ends at .001 mile(s) before CST NORTON AVE S.
Work is scheduled from 02-DEC-2025 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST IVY W - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 94 W and ends at CST OLD MO 94 E.
Work is scheduled from 18-JUL-2022 to 01-AUG-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NW COOKINGHAM DR W - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .052 mile(s) before RP IS435S TO NW COOKINGHAM DR E and ends at .004 mile(s) before OR 435 S.
Work is scheduled from 27-MAR-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NW COOKINGHAM DR E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after OR 435 S and ends at .005 mile(s) before CST N PLATTE PURCHASE DR S.
Work is scheduled from 27-MAR-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 164 W - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after RT NN S and ends at .015 mile(s) before RT N E.
Work is scheduled from 03-NOV-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U N - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .459 mile(s) after PVT SE 840 P E and ends at .161 mile(s) before CRD SE-771 S.
Work is scheduled from 16-FEB-2026 to 30-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U S - HENRY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .161 mile(s) after CRD SE-771 S and ends at .459 mile(s) before PVT SE 840 P E.
Work is scheduled from 16-FEB-2026 to 30-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H W - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT Y S and ends at .001 mile(s) before MO 43 S.
Work is scheduled from 23-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT BB W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) before CRD 481 S and ends at CRD 476 S.
Work is scheduled from 02-FEB-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT BB E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CRD 483 S and ends at .002 mile(s) after CRD 481 S.
Work is scheduled from 02-FEB-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US169S TO IS435N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 169 S and ends at IS 435 N.
Work is scheduled from 27-MAR-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NOLAND RD S - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 350 E and ends at .069 mile(s) before CST BRICKYARD RD E.
Work is scheduled from 25-MAR-2026 to 09-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone CST KINGSHIGHWAY W - PHELPS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .01 mile(s) after LP 44 E and ends at .01 mile(s) before LP 44 E.
Work is scheduled from 23-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS35N TO US169N N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at IS 35 N and ends at US 169 N.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP LOU HOLLAND DR TO US169N N - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at CST RICHARDS RD S and ends at US 169 N.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CO 5TH ST TO US169N N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at CST W 5TH ST W and ends at US 169 N.
Work is scheduled from 16-DEC-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NOLAND RD N - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .069 mile(s) after CST BRICKYARD RD E and ends at MO 350 E.
Work is scheduled from 25-MAR-2026 to 09-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 466 work zones where you can expect delays, or, where delays are not expected, but possible, to report.

Expected delay(s) due to work zone 307 Expected delay(s) due to work zone
Possible delay(s) due to work zone 159 Possible delay(s) due to work zone
Possible delays due to workzone LP 44 W - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) before RT Z E and ends at .343 mile(s) after CST J H WILLIAMSON JR DR S.
Work is scheduled from 16-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 291 N - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after CST COURTNEY RD S and ends at .003 mile(s) after CST COBBLER RD E.
Work is scheduled from 22-DEC-2025 to 03-MAY-2027.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST CHESTNUT EXPY E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before LP 44 E and ends at .001 mile(s) before OR 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after OR 65 S and ends at .05 mile(s) before MO 266 W.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone LP 44 E - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST PLATTNER AVE S and ends at .053 mile(s) before CST J H WILLIAMSON JR DR S.
Work is scheduled from 16-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone N OR 44 E - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .216 mile(s) before CRD LANDON RD S and ends at .297 mile(s) before RT FF S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone N OR 44 W - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .297 mile(s) after RT FF S and ends at .216 mile(s) after CRD LANDON RD S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 100 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after RP MO100W TO MO141S S and ends at .001 mile(s) before IS 270 W.
Work is scheduled from 22-SEP-2025 to 01-JUN-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after RP IS270E TO MO100W W and ends at .001 mile(s) before RP MO141S TO MO100E E.
Work is scheduled from 22-SEP-2025 to 01-JUN-2027.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E S - HENRY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CRD NE 1100 RD E and ends at .234 mile(s) after CRD NE 1020 E.
Work is scheduled from 03-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP CHESTERFIELD AIRPORT RD TO IS64E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST CHESTERFIELD AIRPORT RD E and ends at IS 64 E.
Work is scheduled from 24-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .408 mile(s) before CRD 250 E and ends at .384 mile(s) before CRD 250 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E N - HENRY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .234 mile(s) before CRD NE 1020 E and ends at CRD NE 1100 RD E.
Work is scheduled from 03-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .384 mile(s) after CRD 250 E and ends at .408 mile(s) after CRD 250 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US36E TO RTC S - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after US 36 E and ends at RT C S.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .038 mile(s) after CRD SHETLAND RD S and ends at .006 mile(s) before CRD TEAL DR S.
Work is scheduled from 23-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .006 mile(s) after CRD TEAL DR S and ends at .038 mile(s) before CRD SHETLAND RD S.
Work is scheduled from 23-FEB-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 160 W - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .022 mile(s) before CST FRANCIS S and ends at .113 mile(s) after CST OAK S.
Work is scheduled from 15-JAN-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 160 E - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .113 mile(s) before CST OAK S and ends at .022 mile(s) after CST FRANCIS S.
Work is scheduled from 15-JAN-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 19 N - DENT County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT TT E and ends at RT VV S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST W WARRENTON BLVD W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) before OR 70 W and ends at .001 mile(s) before RP W WARRENTON BLVD TO IS70W W.
Work is scheduled from 27-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB N - SCOTT County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) before RT Y E and ends at .24 mile(s) before CRD SUSAN E.
Work is scheduled from 16-FEB-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB S - SCOTT County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .24 mile(s) after CRD SUSAN E and ends at .001 mile(s) after RT Y E.
Work is scheduled from 16-FEB-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 1 N - CLAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before CST NE 44TH ST E and ends at .007 mile(s) before CST 64TH ST E.
Work is scheduled from 20-MAR-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST W WARRENTON BLVD E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) before RP W WARRENTON BLVD TO IS70W W and ends at .007 mile(s) after OR 70 E.
Work is scheduled from 27-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 1 S - CLAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after CST 64TH ST E and ends at .004 mile(s) after CST NE 44TH ST E.
Work is scheduled from 20-MAR-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before RP US67N TO IS55N N and ends at .016 mile(s) before CST MCNUTT ST N.
Work is scheduled from 15-SEP-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT NN N - CHRISTIAN County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .053 mile(s) before CST W TURNBERRY BLVD E and ends at .002 mile(s) before RT J E.
Work is scheduled from 24-FEB-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before RR COLT S and ends at .451 mile(s) after RP US54E TO IS70E E.
Work is scheduled from 13-OCT-2024 to 31-DEC-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .457 mile(s) before RP IS70W TO US54E E and ends at .021 mile(s) after RR COLT S.
Work is scheduled from 13-OCT-2024 to 31-DEC-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone CRD ARENA PKWY W - ST. CHARLES County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CRD HEMSATH RD S and ends at CRD UPPER BOTTOM RD E.
Work is scheduled from 09-MAR-2026 to 27-APR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT U E - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .055 mile(s) before RR UP S and ends at US 59 S.
Work is scheduled from 23-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT U W - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 59 S and ends at .055 mile(s) after RR UP S.
Work is scheduled from 23-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RP IS44E TO MO13S S and ends at .002 mile(s) before US 65 S.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after US 65 S and ends at .044 mile(s) before RP MO13N TO IS44W W.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 29 N - CLAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .068 mile(s) after RP DAVIDSON RD TO IS29N N and ends at .008 mile(s) before RP US69N TO US169N N.
Work is scheduled from 13-FEB-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT JJ N - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT BB E and ends at MO 215 S.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT JJ S - POLK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 215 S and ends at RT BB E.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .177 mile(s) before CST OAKRIDGE DR S and ends at .013 mile(s) before CST HOWARD BUSH DR S.
Work is scheduled from 01-JUN-2025 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .072 mile(s) after CST 136TH ST E and ends at .001 mile(s) before CST AMORY RD E.
Work is scheduled from 23-MAR-2026 to 04-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CST HOWARD BUSH DR S and ends at .004 mile(s) before CST OAKRIDGE DR S.
Work is scheduled from 01-JUN-2025 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) after RP BROOKLIN AVE TO IS70W W and ends at .034 mile(s) before RP THE PASEO TO IS70W W.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
MEDIAN OR SHOULDER
Work zone begins at .012 mile(s) after RT W S and ends at .031 mile(s) before RP IS70W TO RTF W.
Work is scheduled from 23-OCT-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) before RP IS255S TO US67 S and ends at .005 mile(s) before CST STARLING AIRPORT RD S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST KINGSHIGHWAY E - PHELPS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) after LP 44 W and ends at .012 mile(s) before LP 44 W.
Work is scheduled from 23-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after CST STARLING AIRPORT RD S and ends at .008 mile(s) after RP IS255S TO US67 S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .212 mile(s) before RP IS70E TO MO7 S and ends at .723 mile(s) after CRD LEFHOLZ RD S.
Work is scheduled from 08-DEC-2025 to 30-APR-2026.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at RP MO47 TO IS70E E and ends at .025 mile(s) after RP IS70E TO WILDCAT DR S.
Work is scheduled from 05-DEC-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone US 71 N - NODAWAY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) before CRD 140 ST E and ends at .012 mile(s) after CRD 130 ST E.
Work is scheduled from 27-MAR-2026 to 28-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .72 mile(s) before CRD LEFHOLZ RD S and ends at .216 mile(s) after RP MO7 TO IS70W W.
Work is scheduled from 08-DEC-2025 to 30-APR-2026.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT O N - STE. GENEVIEVE County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at MO 32 E and ends at US 61 S.
Work is scheduled from 03-FEB-2026 to 01-MAY-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O S - STE. GENEVIEVE County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at US 61 S and ends at MO 32 E.
Work is scheduled from 03-FEB-2026 to 01-MAY-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .063 mile(s) after CRD VALLEY WATER MILL RD E and ends at .27 mile(s) after CRD VALLEY WATER MILL RD E.
Work is scheduled from 25-MAR-2026 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US60E TO US160 E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .049 mile(s) before RP US60E TO US160E E and ends at US 160 W.
Work is scheduled from 24-FEB-2026 to 09-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 66 E - JASPER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before RT P E and ends at .003 mile(s) after CST 7TH ST E.
Work is scheduled from 22-FEB-2026 to 29-MAR-2026.
Work will start daily at 03:00 AM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Possible delays due to workzone MO 66 W - JASPER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) before CST 7TH ST E and ends at .006 mile(s) after RT P E.
Work is scheduled from 22-FEB-2026 to 29-MAR-2026.
Work will start daily at 03:00 AM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone RT D W - ST. LOUIS CITY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .007 mile(s) after CST HODIAMONT AVE S and ends at .015 mile(s) before CST IONA AVE S.
Work is scheduled from 09-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .348 mile(s) before CRD HAMMER RD S and ends at .319 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .319 mile(s) before CRD HAMMER RD S and ends at .348 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTE TO IS70W W - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT Y E and ends at .002 mile(s) before IS 70 W.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70E TO WILDCAT DR S - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE MAINTENANCE
Work zone begins at IS 70 E and ends at .001 mile(s) before CST WILDCAT DR S.
Work is scheduled from 04-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone RT B E - FRANKLIN County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 100 E and ends at .133 mile(s) after MO 100 E.
Work is scheduled from 26-JAN-2026 to 01-AUG-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .203 mile(s) after BK KATY TRAIL E and ends at .149 mile(s) after RP MO87 TO IS70E E.
Work is scheduled from 09-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT B W - FRANKLIN County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .133 mile(s) before MO 100 E and ends at MO 100 E.
Work is scheduled from 26-JAN-2026 to 01-AUG-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - SCOTT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .081 mile(s) after RP US60W TO IS55S S and ends at .001 mile(s) before US 62 E.
Work is scheduled from 03-NOV-2025 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .004 mile(s) after RP LP44W TO IS44W W and ends at .424 mile(s) after RP LP44W TO IS44W W.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .151 mile(s) before RP IS70W TO MO87 W and ends at .186 mile(s) before BK KATY TRAIL E.
Work is scheduled from 09-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - NEW MADRID County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after US 62 E and ends at .05 mile(s) before RP IS55S TO US60E E.
Work is scheduled from 03-NOV-2025 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .519 mile(s) after RA IS70W WRIGHT CITY W and ends at .001 mile(s) before RP IS70W TO MO47 W.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
News Release
Possible delays due to workzone MO 5 N - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .054 mile(s) after US 40 E and ends at .005 mile(s) before RT DD S.
Work is scheduled from 24-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 S - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .005 mile(s) after RT DD S and ends at .054 mile(s) before US 40 E.
Work is scheduled from 24-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - MONITEAU County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at BU 50 E and ends at .102 mile(s) after CRD COUNTY LINE RD E.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - MONITEAU County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .052 mile(s) after CO US50W TO COUNTRY SIDE RD E and ends at BU 50 E.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - ST. LOUIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) before CRD MEHL AVE S and ends at US 50 E.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - ST. LOUIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at .002 mile(s) after CRD MEHL AVE S.
Work is scheduled from 17-MAR-2026 to 31-DEC-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .053 mile(s) before RP IS70E TO RTT E and ends at CST WENTZVILLE PKWY E.
Work is scheduled from 12-SEP-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
News Release
Expect delays due to workzone RP US67N TO IS55N N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 N and ends at IS 55 N.
Work is scheduled from 22-JAN-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 12 E - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .024 mile(s) after RR MEXICO SUB E and ends at .011 mile(s) after CST HARDY AVE S.
Work is scheduled from 18-FEB-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT NN W - PERRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CRD 840 S and ends at .001 mile(s) before PVT PEACEFUL VALLEY DR E.
Work is scheduled from 23-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CRD BIG BEND RD W - ST. LOUIS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after IS 270 W and ends at .026 mile(s) after RP IS270W TO BIG BEND RD W.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD DONOVER DR S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 67 N and ends at .024 mile(s) after US 67 N.
Work is scheduled from 07-JUL-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DONOVER DR N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .024 mile(s) before US 67 N and ends at US 67 N.
Work is scheduled from 07-JUL-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 5 S - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .119 mile(s) before CST VIEW DR E and ends at .001 mile(s) before CST KIDWELL DR E.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone PVT CLOVER LEAF DR E - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 67 N and ends at .025 mile(s) before PVT HUNDRED OAKS DR S.
Work is scheduled from 07-JUL-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone PVT CLOVER LEAF DR W - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .025 mile(s) after PVT HUNDRED OAKS DR S and ends at US 67 N.
Work is scheduled from 07-JUL-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .045 mile(s) after RP IS70W TO RTE W and ends at .269 mile(s) after RP RTO TO IS70W W.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .239 mile(s) before RP IS70E TO RTM E and ends at .024 mile(s) before RP RTH TO IS70E E.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70E TO US40 E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at IS 70 E and ends at US 40 E.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT NN E - PERRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after PVT PEACEFUL VALLEY DR E and ends at .001 mile(s) after CRD 840 S.
Work is scheduled from 23-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 14 E - CHRISTIAN County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .03 mile(s) after CST N 18TH ST S and ends at .002 mile(s) before CST E OAK ST E.
Work is scheduled from 24-FEB-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. CHARLES County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .277 mile(s) after CO US67S TO US67N N and ends at .177 mile(s) before CST LEWIS & CLARK BLVD S.
Work is scheduled from 25-JAN-2026 to 31-MAR-2026.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 43 N - MCDONALD County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .417 mile(s) before CRD MILLER RD E and ends at .024 mile(s) before CRD MORRISON LOOP S.
Work is scheduled from 16-FEB-2026 to 04-MAY-2026.
Work will start daily at 12:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 30 E - FRANKLIN County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .068 mile(s) before CRD LEFLER LN S and ends at .015 mile(s) after PVT REICHL DR E.
Work is scheduled from 04-MAR-2026 to 01-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 14 W - CHRISTIAN County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST E OAK ST E and ends at .001 mile(s) after CST W JACKSON ST E.
Work is scheduled from 24-FEB-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 43 S - MCDONALD County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .024 mile(s) after CRD MORRISON LOOP S and ends at .417 mile(s) after CRD MILLER RD E.
Work is scheduled from 16-FEB-2026 to 04-MAY-2026.
Work will start daily at 12:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 30 W - JEFFERSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .015 mile(s) before PVT REICHL DR E and ends at .068 mile(s) after CRD LEFLER LN S.
Work is scheduled from 04-MAR-2026 to 01-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 785 S and ends at .003 mile(s) after CRD 784 S.
Work is scheduled from 03-MAR-2025 to 01-JUL-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before CRD 784 S and ends at .004 mile(s) after CRD 785 S.
Work is scheduled from 03-MAR-2025 to 01-JUL-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 169 N - BUCHANAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .205 mile(s) before RT AC S and ends at .005 mile(s) before CST LEONARD RD S.
Work is scheduled from 16-MAR-2026 to 04-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .048 mile(s) after RP IS270E TO IS64E E and ends at .175 mile(s) before RP IS270E TO MO340E E.
Work is scheduled from 05-NOV-2025 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 169 S - BUCHANAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) after CST LEONARD RD S and ends at .205 mile(s) after RT AC S.
Work is scheduled from 16-MAR-2026 to 04-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT MM S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .083 mile(s) after RP RTMM TO MO360E E and ends at .006 mile(s) before US 60 W.
Work is scheduled from 17-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .006 mile(s) after US 60 W and ends at .083 mile(s) before RP RTMM TO MO360E E.
Work is scheduled from 17-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .207 mile(s) after RP MO340W TO IS270W W and ends at .05 mile(s) before RP IS64E TO IS270W W.
Work is scheduled from 05-NOV-2025 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 21 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .148 mile(s) after CRD WALDEN RIDGE E and ends at .181 mile(s) before CRD MERAMEC BOTTOM RD E.
Work is scheduled from 10-MAR-2026 to 02-APR-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W S - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 4210 E and ends at MO 72 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 74 E - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) before MO 177 S and ends at .235 mile(s) after RR RIVER SUB S.
Work is scheduled from 02-MAR-2026 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 74 W - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) before RR RIVER SUB S and ends at .005 mile(s) after MO 177 S.
Work is scheduled from 02-MAR-2026 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 E - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .054 mile(s) before CO US50W TO US50E S and ends at .128 mile(s) after CO US50E TO US50W W.
Work is scheduled from 05-MAY-2025 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 W - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .13 mile(s) before CO US50E TO US50W W and ends at .054 mile(s) after CO US50W TO US50E S.
Work is scheduled from 05-MAY-2025 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST WILDCAT DR S - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at RP IS70W TO WILDCAT DR N and ends at .001 mile(s) before RP WILDCAT DR TO IS70E E.
Work is scheduled from 27-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Expect delays due to workzone CST WILDCAT DR N - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after RP WILDCAT DR TO IS70E E and ends at RP IS70W TO WILDCAT DR N.
Work is scheduled from 27-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CRD RIPA AVE E and ends at CST BROADWAY ST S.
Work is scheduled from 16-MAR-2026 to 03-JUN-2026.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 W - MACON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RP US36W TO LONG BRANCH LAKE RD N and ends at .036 mile(s) before RP LONG BRANCH LAKE RD TO US36W W.
Work is scheduled from 02-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 115 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CST NATURAL BRIDGE RD W and ends at .079 mile(s) after CST WEST DR S.
Work is scheduled from 24-FEB-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .034 mile(s) before CST OLD 71 BYPASS S and ends at .021 mile(s) after CST KENDALL DR S.
Work is scheduled from 11-FEB-2026 to 30-MAR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST BROADWAY ST S and ends at CRD RIPA AVE E.
Work is scheduled from 16-MAR-2026 to 03-JUN-2026.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 635 N - PLATTE County - EXPECT DELAYS
251212-C06 JKU0095 - bridge rehabilitation
BRIDGE MAINTENANCE
Work zone begins at .439 mile(s) before RP IS635N TO HORIZONS PKWY N and ends at .003 mile(s) after RP HORIZONS PKWY TO IS635N N.
Work is scheduled from 09-MAR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 55 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .19 mile(s) before RP IS55N TO REAVIS BARRACKS RD E and ends at .069 mile(s) before RP BATES ST TO IS55N N.
Work is scheduled from 06-DEC-2022 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone BU 60 E - NEW MADRID County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 60 E and ends at .023 mile(s) before MO 114 E.
Work is scheduled from 06-FEB-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone BU 60 W - SCOTT County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .023 mile(s) after MO 114 E and ends at US 60 E.
Work is scheduled from 06-FEB-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 E - MACON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after RP US36E TO LONG BRANCH LAKE RD S and ends at .027 mile(s) before RP LONG BRANCH LAKE RD TO US36E E.
Work is scheduled from 02-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at RT CC W and ends at RT BA S.
Work is scheduled from 25-MAR-2026 to 08-APR-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 635 S - PLATTE County - EXPECT DELAYS
251212-C06 JKU0095 - bridge rehabilitation
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) after RP IS635S TO HORIZONS PKWY S and ends at .531 mile(s) after RP HORIZONS PKWY TO IS635S S.
Work is scheduled from 09-MAR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP HORIZONS PKWY TO IS635S S - PLATTE County - EXPECT DELAYS
251212-C06 JKU0095 - bridge rehabilitation
BRIDGE MAINTENANCE
Work zone begins at CST HORIZONS PKWY N and ends at IS 635 S.
Work is scheduled from 09-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 67 N - JEFFERSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .047 mile(s) after CST LAKE DR E and ends at .003 mile(s) before CST SCENIC DR S.
Work is scheduled from 30-DEC-2025 to 30-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST MCNUTT ST S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before CST HERCULANEUM CROSSING S and ends at CST PROVIDENCE WAY E.
Work is scheduled from 01-OCT-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST MCNUTT ST N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST PROVIDENCE WAY E and ends at .013 mile(s) after CST HERCULANEUM CROSSING S.
Work is scheduled from 01-OCT-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70E TO RTE W - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 70 E and ends at RT Y E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 W - JASPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at LP 49 S and ends at .001 mile(s) before CST S ST LOUIS AVE S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 E - JASPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) after CST S ST LOUIS AVE S and ends at LP 49 S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
250919-C03, JKU0226
INTERSECTION IMPROVEMENTS
Work zone begins at .005 mile(s) after CST STERLING AVE S and ends at .003 mile(s) before CST HAWTHORNE AVE S.
Work is scheduled from 16-FEB-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 100 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST YALE AVE S and ends at .003 mile(s) before IS 55 S.
Work is scheduled from 25-AUG-2025 to 31-AUG-2026.
Work will start daily at 05:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M E - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before CST MELROSE ST S and ends at .001 mile(s) before OR 55 S.
Work is scheduled from 16-MAR-2026 to 14-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M W - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after OR 55 S and ends at .001 mile(s) after CST MELROSE ST S.
Work is scheduled from 16-MAR-2026 to 14-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT ZZ E - STODDARD County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CRD 518 E and ends at US 61 S.
Work is scheduled from 08-SEP-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 100 W - ST. LOUIS CITY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .003 mile(s) after IS 55 S and ends at .002 mile(s) before CST YALE AVE S.
Work is scheduled from 25-AUG-2025 to 31-AUG-2026.
Work will start daily at 05:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone S OR 70 W - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .048 mile(s) before PVT OUTER RD E and ends at US 40 W.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone BU 60 E - BUTLER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after RT W S and ends at .005 mile(s) before RT B E.
Work is scheduled from 09-MAR-2026 to 08-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone BU 60 W - BUTLER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after RT B E and ends at .001 mile(s) after RT W S.
Work is scheduled from 09-MAR-2026 to 08-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone S OR 70 E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at US 40 E and ends at .048 mile(s) after PVT OUTER RD W.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 70 W - MONTGOMERY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) before RP IS70W TO RTE W and ends at .024 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 24-FEB-2026 to 03-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT ZZ W - SCOTT County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at US 61 S and ends at CRD 518 E.
Work is scheduled from 08-SEP-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - MONTGOMERY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .03 mile(s) before RP IS70E TO RTE W and ends at .026 mile(s) after RP RTE TO IS70E E.
Work is scheduled from 24-FEB-2026 to 03-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 169 N - CLAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST NW BRIARCLIFF PKWY E and ends at .015 mile(s) before RP US69S TO US169N N.
Work is scheduled from 16-FEB-2026 to 19-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - COOPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .787 mile(s) before RR RIVER SUB E and ends at .233 mile(s) before BK KATY TRAIL E.
Work is scheduled from 09-MAR-2026 to 31-DEC-2027.
Work will start daily at 06:00 AM and end by 11:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .187 mile(s) before RP IS70W TO MO47 W and ends at .017 mile(s) after RP IS70W TO W WARRENTON BLVD W.
Work is scheduled from 24-OCT-2025 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - COOPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .25 mile(s) after BK KATY TRAIL E and ends at .786 mile(s) after RR RIVER SUB E.
Work is scheduled from 09-MAR-2026 to 31-DEC-2027.
Work will start daily at 06:00 AM and end by 11:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS55N TO US67S S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .135 mile(s) after IS 55 N and ends at US 67 S.
Work is scheduled from 15-SEP-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D E - PLATTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .197 mile(s) after CST NW LP COOKINGHAM DR E and ends at .08 mile(s) before CST N ROANRIDGE RD E.
Work is scheduled from 03-FEB-2026 to 31-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D W - PLATTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .08 mile(s) after CST N ROANRIDGE RD E and ends at .168 mile(s) before RP IS29N TO RTDW W.
Work is scheduled from 03-FEB-2026 to 31-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at RP US60E TO US160E E and ends at .013 mile(s) after CST WEAVER RD E.
Work is scheduled from 24-FEB-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 W - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .02 mile(s) before CRD KELLOGG AVE S and ends at .856 mile(s) before RR BROOKFIELD SUB E.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 E - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .345 mile(s) before RP US36E TO RTC S and ends at .107 mile(s) after CRD KELLOGG AVE S.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US36W TO RTO N - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 36 W and ends at RT C S.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55N TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at IS 55 N and ends at US 67 N.
Work is scheduled from 26-JAN-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. FRANCOIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before MO 221 N and ends at .108 mile(s) after CRD VALLES MINES SCHOOL RD S.
Work is scheduled from 23-FEB-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 S - ST. FRANCOIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .106 mile(s) before CRD VALLES MINES SCHOOL RD S and ends at .008 mile(s) before MO 221 N.
Work is scheduled from 23-FEB-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB N - STODDARD County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at RT M E and ends at .002 mile(s) before RT C E.
Work is scheduled from 16-MAR-2026 to 01-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB S - STODDARD County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .002 mile(s) after RT C E and ends at RT M E.
Work is scheduled from 16-MAR-2026 to 01-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF E - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 72 E and ends at MO 68 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF W - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 68 E and ends at MO 72 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST OLYMPIC BLVD S and ends at .011 mile(s) before CST WOODLAND SPRINGS CT S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 44 E - PHELPS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .018 mile(s) after OR 44 E and ends at .016 mile(s) after IS 44 E.
Work is scheduled from 25-MAR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .048 mile(s) before CST RICHLAND PKWY E and ends at .067 mile(s) after CST 163RD ST E.
Work is scheduled from 23-MAR-2026 to 15-AUG-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .067 mile(s) before CST 163RD ST E and ends at .048 mile(s) after CST RICHLAND PKWY E.
Work is scheduled from 23-MAR-2026 to 15-AUG-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before CST GOLDEN BEAR DR E and ends at .021 mile(s) before CST OLYMPIC BLVD S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 N - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) after CST DEKALB ST E and ends at .119 mile(s) after CST VIEW DR E.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 59 N - BUCHANAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST WILTON DR E and ends at CST OHIO ST E.
Work is scheduled from 23-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.419 mile(s) before RP IS44E TO LP44 W and ends at .06 mile(s) before PED SELMA AVE OVERPASS S.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB S - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .06 mile(s) before CST NW WOODBURY DR S and ends at .054 mile(s) before US 40 W.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB N - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .056 mile(s) after US 40 W and ends at .06 mile(s) after CST NW WOODBURY DR S.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .848 mile(s) before CRD LEFHOLZ RD S and ends at .446 mile(s) before US 40 W.
Work is scheduled from 28-MAR-2026 to 02-MAY-2026.
Work will start daily at 06:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP IS70W TO RTAA N - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at IS 70 W and ends at US 40 W.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST N JEFFERSON ST E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .031 mile(s) after CST JEFFERSON CT S and ends at RT BB N.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST N JEFFERSON ST W - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at RT BB N and ends at .031 mile(s) before CST JEFFERSON CT S.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .022 mile(s) before CST RABBIT TRACK RD E and ends at .011 mile(s) after CST E VALLEY ST E.
Work is scheduled from 02-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W N - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 72 E and ends at CRD 4210 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) before CST E VALLEY ST E and ends at .022 mile(s) after CST RABBIT TRACK RD E.
Work is scheduled from 02-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .681 mile(s) after RP MO141 TO IS44W W and ends at .882 mile(s) after RP MO141 TO IS44W W.
Work is scheduled from 17-MAR-2026 to 09-APR-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 72 E - BOLLINGER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .192 mile(s) before MO 51 S and ends at .006 mile(s) after CRD 380 S.
Work is scheduled from 02-MAR-2026 to 06-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 72 W - BOLLINGER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .006 mile(s) before CRD 380 S and ends at .196 mile(s) after MO 51 S.
Work is scheduled from 02-MAR-2026 to 06-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W N - ST. CHARLES County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at OR 70 E and ends at .01 mile(s) after OR 70 E.
Work is scheduled from 23-DEC-2025 to 29-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone RT W S - ST. CHARLES County - EXPECT DELAYS
Improve I-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .01 mile(s) before OR 70 E and ends at OR 70 E.
Work is scheduled from 23-DEC-2025 to 29-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone MO 179 S - MONITEAU County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at CRD BOXWOOD DR S and ends at CRD BACON BRIDGE RD S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 179 N - MONITEAU County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at CRD BACON BRIDGE RD S and ends at CRD BOXWOOD DR S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST NW BARRY RD W - CLAY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .037 mile(s) before RP BARRY RD TO US169N N and ends at .03 mile(s) before RP BARRY RD W TO US169S S.
Work is scheduled from 27-AUG-2022 to 01-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 49 S - IRON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .005 mile(s) after MO 72 E and ends at .011 mile(s) after MO 34 E.
Work is scheduled from 02-MAR-2026 to 01-AUG-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 49 N - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .011 mile(s) before MO 34 E and ends at .005 mile(s) before MO 72 E.
Work is scheduled from 02-MAR-2026 to 01-AUG-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 52 W - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .011 mile(s) before RT W N and ends at .037 mile(s) after CST BROWN RD S.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 52 E - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .037 mile(s) before CST BROWN RD S and ends at .01 mile(s) after RT W N.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT PP W - BUTLER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at BU 60 E and ends at .017 mile(s) after CST MAUD ST E.
Work is scheduled from 24-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT PP E - BUTLER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .017 mile(s) before CST MAUD ST E and ends at BU 60 E.
Work is scheduled from 24-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve I-70 project 2
SHOULDER WORK
Work zone begins at .001 mile(s) before CST WENTZVILLE PKWY E and ends at .127 mile(s) before WS IS70W FORISTELL W.
Work is scheduled from 23-FEB-2026 to 10-APR-2026.
Work will start daily at 08:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before MO 413 S and ends at .015 mile(s) after RT M E.
Work is scheduled from 18-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .013 mile(s) before RT M E and ends at .051 mile(s) after MO 413 N.
Work is scheduled from 18-FEB-2026 to 01-MAY-2028.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .01 mile(s) before CST VILLAGE LN E and ends at CST AMORY RD E.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M N - OREGON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at US 63 S and ends at US 160 E.
Work is scheduled from 16-MAR-2026 to 30-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M S - OREGON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at US 160 E and ends at US 63 S.
Work is scheduled from 16-MAR-2026 to 30-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 40 E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .05 mile(s) before CST OOIDA DR S and ends at RT AA E.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST MCQUERRY RD W - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .012 mile(s) before CST SUNNY LANE DR S and ends at RT BB S.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST MCQUERRY RD E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at RT BB S and ends at .012 mile(s) after CST SUNNY LANE DR S.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 40 W - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at RT AA W and ends at .05 mile(s) after CST OOIDA DR S.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 71 S - ANDREW County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .342 mile(s) before CRD 369 E and ends at .533 mile(s) after RP LP29 TO IS29S S.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 17 N - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST PARK ST S and ends at .013 mile(s) after CST BENTON ST S.
Work is scheduled from 09-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 17 S - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .013 mile(s) before CST BENTON ST S and ends at .001 mile(s) after CST PARK ST S.
Work is scheduled from 09-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT Z E - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at LP 44 E and ends at .104 mile(s) after CST RIDGEVIEW DR S.
Work is scheduled from 16-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT Z W - PULASKI County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .104 mile(s) before CST RIDGEVIEW DR S and ends at LP 44 E.
Work is scheduled from 16-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .479 mile(s) after RP RTFS TO IS70E E and ends at .91 mile(s) before RP IS70E TO RTD E.
Work is scheduled from 22-SEP-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.103 mile(s) after RP RTD TO IS70W W and ends at .477 mile(s) before RP IS70W TO RTHS S.
Work is scheduled from 22-SEP-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 160 E - DADE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) after CST CHESTNUT S and ends at .006 mile(s) before CST N LOCUST S.
Work is scheduled from 11-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB N - SCOTT County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at MO 114 E and ends at RT ZZ E.
Work is scheduled from 08-SEP-2025 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C W - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .008 mile(s) before CRD NE 4TH LN S and ends at .012 mile(s) after CRD UNKNOWN S.
Work is scheduled from 18-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C E - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .012 mile(s) before CRD UNKNOWN S and ends at .008 mile(s) after CRD NE 4TH LN S.
Work is scheduled from 18-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP WILDCAT DR TO IS70W W - WARREN County - EXPECT DELAYS
Improve I-70 project 2
BRIDGE MAINTENANCE
Work zone begins at CST WILDCAT DR S and ends at IS 70 W.
Work is scheduled from 04-MAR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone RT M E - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at RT A E and ends at .005 mile(s) before IS 55 N.
Work is scheduled from 25-MAR-2026 to 17-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .207 mile(s) before RP IS70E TO MO7 S and ends at .723 mile(s) after CRD LEFHOLZ RD S.
Work is scheduled from 10-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .72 mile(s) before CRD LEFHOLZ RD S and ends at .211 mile(s) after RP MO7 TO IS70W W.
Work is scheduled from 10-DEC-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 S - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .169 mile(s) before IS 435 S and ends at .141 mile(s) before RP IS29S TO RTD S.
Work is scheduled from 01-DEC-2025 to 01-NOV-2026.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) before RP US69S TO IS29N N and ends at .164 mile(s) after IS 435 N.
Work is scheduled from 01-DEC-2025 to 01-NOV-2026.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M W - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after IS 55 N and ends at RT A E.
Work is scheduled from 25-MAR-2026 to 17-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .27 mile(s) after US 63C S and ends at .067 mile(s) before RP US63S TO RTWW S.
Work is scheduled from 20-FEB-2026 to 01-JAN-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at .009 mile(s) before RT N E.
Work is scheduled from 10-SEP-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone US 169 N - JACKSON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .024 mile(s) before CST W 3RD ST E and ends at .026 mile(s) before RP IS29S TO US169N N.
Work is scheduled from 09-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Y W - POLK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD 480TH RD E and ends at .005 mile(s) after MO 13 N.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 E - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .03 mile(s) before CRD SUPERIOR RD E and ends at .034 mile(s) after LP 44 W.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y E - POLK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before MO 13 N and ends at CRD 480TH RD E.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS270W TO IS64E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 270 W and ends at .008 mile(s) before RP IS270E TO IS64E E.
Work is scheduled from 07-JAN-2026 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 265 S - STONE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .016 mile(s) before CST AIR PORT RD E and ends at .299 mile(s) before PVT PRAISE LN E.
Work is scheduled from 12-JAN-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 265 N - STONE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .299 mile(s) after PVT PRAISE LN E and ends at .016 mile(s) after CST AIR PORT RD E.
Work is scheduled from 12-JAN-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 160 W - DADE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) after CST N LOCUST S and ends at .011 mile(s) before CST CHESTNUT S.
Work is scheduled from 11-MAR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 S - DAVIESS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .002 mile(s) after MO 6 E and ends at .001 mile(s) after CST HUGHES ST S.
Work is scheduled from 18-MAR-2026 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT Y S - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD 138 E and ends at .113 mile(s) before MO 124 E.
Work is scheduled from 17-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP RTC TO US36E E - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT O S and ends at US 36 E.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y N - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .113 mile(s) after MO 124 E and ends at CRD 138 E.
Work is scheduled from 17-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - CALDWELL County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) before CST HUGHES ST S and ends at .002 mile(s) before MO 6 E.
Work is scheduled from 18-MAR-2026 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT Y E - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .032 mile(s) before RT E E and ends at .001 mile(s) after RT E E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y W - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before RT E E and ends at .032 mile(s) after RT E E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 64 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .025 mile(s) after RT N E and ends at .006 mile(s) before RP PITMAN AVE TO US40W W.
Work is scheduled from 10-SEP-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone IS 435 S - PLATTE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .044 mile(s) after RP IS435S TO NW COOKINGHAM DR E and ends at .07 mile(s) before RP NW COOKINGHAM DR TO IS435S S.
Work is scheduled from 27-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 435 N - CLAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .063 mile(s) after RP IS435N TO NW COOKINGHAM DR W and ends at .013 mile(s) before RP NW COOKINGHAM DR TO IS435N N.
Work is scheduled from 27-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .007 mile(s) before CST FLORISSANT RD S and ends at .06 mile(s) before CST FAIRVIEW LN E.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 W - CAMDEN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST CAMDEN CT NE E and ends at .012 mile(s) after CRD BUMPER HILL RD E.
Work is scheduled from 03-NOV-2025 to 01-NOV-2027.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - CAMDEN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .012 mile(s) before CRD BUMPER HILL RD E and ends at .021 mile(s) before CST CAMDEN CT NE E.
Work is scheduled from 03-NOV-2025 to 01-NOV-2027.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .03 mile(s) after CRD 250 E and ends at .064 mile(s) after CRD 250 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .064 mile(s) before CRD 250 E and ends at .03 mile(s) before CRD 250 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after CST CONVENTION CENTER BLVD S and ends at .017 mile(s) before CST MAIN ST S.
Work is scheduled from 24-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 S - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .029 mile(s) before US 69 S and ends at .03 mile(s) after CST W 3RD ST E.
Work is scheduled from 09-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST W NEWTON ST E - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .008 mile(s) before RT W N and ends at .007 mile(s) after CST MAPLE AVE S.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at CST WENTZVILLE PKWY E and ends at .097 mile(s) after RP RTW TO IS70W W.
Work is scheduled from 12-SEP-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
News Release
Possible delays due to workzone CST W NEWTON ST W - MORGAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .007 mile(s) before CST MAPLE AVE S and ends at .007 mile(s) after RT W S.
Work is scheduled from 16-DEC-2025 to 30-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 N - BOLLINGER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .175 mile(s) before MO 72 E and ends at .101 mile(s) after MO 72 W.
Work is scheduled from 02-MAR-2026 to 06-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 8 E - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) before CRD OLD HWY 8 E and ends at .024 mile(s) after CRD RAILROAD RD 606 S.
Work is scheduled from 03-MAR-2025 to 12-JUN-2026.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 51 S - BOLLINGER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .099 mile(s) before MO 72 W and ends at .177 mile(s) after MO 72 E.
Work is scheduled from 02-MAR-2026 to 06-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 8 W - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD RAILROAD RD 606 S and ends at .009 mile(s) after CRD OLD HWY 8 E.
Work is scheduled from 03-MAR-2025 to 12-JUN-2026.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone BU 60 E - BUTLER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST RIVERVIEW DR E and ends at CST OLD HWY B E.
Work is scheduled from 09-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB S - SCOTT County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT ZZ E and ends at MO 114 E.
Work is scheduled from 08-SEP-2025 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 21 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .064 mile(s) before CRD GRIFFIN RD E and ends at .013 mile(s) after PVT TESSON GARDENS CT E.
Work is scheduled from 27-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .188 mile(s) after RP MO84 TO IS55S S and ends at .038 mile(s) after RP IS55S TO US412W W.
Work is scheduled from 27-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .173 mile(s) before CRD SHETLAND RD S and ends at .011 mile(s) after CRD TEAL DR S.
Work is scheduled from 23-MAR-2026 to 03-APR-2026.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .051 mile(s) before RP WILDCAT DR TO IS70W W and ends at .043 mile(s) before RP IS70W TO MO47 W.
Work is scheduled from 05-DEC-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .299 mile(s) before RT CC S and ends at .243 mile(s) before CRD FINCH DR S.
Work is scheduled from 17-MAR-2025 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 136 W - ATCHISON County - EXPECT DELAYS
CONCRETE BARRIER WALL
Work zone begins at .08 mile(s) before CRD INDUSTRIAL RD E and ends at .021 mile(s) after CST WATER ST S.
Work is scheduled from 09-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT J N - RALLS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .865 mile(s) after RT EE S and ends at .927 mile(s) before CRD WILLOW LN E.
Work is scheduled from 13-MAR-2026 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .243 mile(s) after CRD FINCH DR S and ends at .299 mile(s) after RT CC S.
Work is scheduled from 17-MAR-2025 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST DUNN RD E and ends at .001 mile(s) before CST CHAIN OF ROCKS BRG E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST CHAIN OF ROCKS BRG E and ends at .001 mile(s) after CST DUNN RD E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 370 E - ST. CHARLES County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .612 mile(s) before CST N 5TH ST S and ends at .008 mile(s) before MO 141 S.
Work is scheduled from 04-MAR-2026 to 31-MAR-2026.
Work will start daily at 06:00 PM and end by 05:30 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after IS 270 W and ends at .047 mile(s) after RP IS270W TO IS64E E.
Work is scheduled from 07-JAN-2026 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 125 N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .09 mile(s) after CST OLD ORCHARD DR S and ends at .008 mile(s) after OR 44 E.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at OR 44 E and ends at .09 mile(s) before CST OLD ORCHARD DR S.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .694 mile(s) after RP RTFS TO IS70E E and ends at 1.239 mile(s) before RP IS70E TO RTD E.
Work is scheduled from 22-SEP-2025 to 30-APR-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .084 mile(s) after RP RTWW TO US63N N and ends at .245 mile(s) before US 63C S.
Work is scheduled from 20-FEB-2026 to 01-JAN-2027.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .06 mile(s) after CST FAIRVIEW LN E and ends at .008 mile(s) after CST FLORISSANT RD N.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at 1.43 mile(s) after RP RTD TO IS70W W and ends at .694 mile(s) before RP IS70W TO RTHS S.
Work is scheduled from 22-SEP-2025 to 30-APR-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 366 W - ST. LOUIS CITY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .04 mile(s) after CST WEIL AVE E and ends at CST CREIGHTON DR S.
Work is scheduled from 09-FEB-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - JACKSON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .005 mile(s) before RR ROOFING SUPPLY STUB S and ends at .01 mile(s) after CST GRANDVIEW RD S.
Work is scheduled from 25-MAR-2026 to 30-MAR-2026.
Work will start daily at 09:00 AM and end by 03:10 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 12 W - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .021 mile(s) before CST NORTHERN BLVD S and ends at .017 mile(s) after CST HOME AVE S.
Work is scheduled from 20-OCT-2025 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST E 14TH ST E - JACKSON County - EXPECT DELAYS
250620-C04 JKU0024 Holmes Brdige Reconstruction
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST CHERRY ST S and ends at CST CHARLOTTE ST S.
Work is scheduled from 22-AUG-2025 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .025 mile(s) before PED PEDESTRIAN WALKWAY E and ends at .147 mile(s) before US 40 E.
Work is scheduled from 28-FEB-2026 to 31-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .203 mile(s) before US 40 E and ends at .003 mile(s) before RP IS70W TO 23RD ST E.
Work is scheduled from 28-FEB-2026 to 31-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - BATES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) before MO 52 E and ends at .022 mile(s) after MO 52 E.
Work is scheduled from 23-MAR-2026 to 28-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT O E - DADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .319 mile(s) after US 160 E and ends at .501 mile(s) before US 160 E.
Work is scheduled from 26-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O W - DADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .501 mile(s) after US 160 E and ends at .319 mile(s) before US 160 E.
Work is scheduled from 26-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 180 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD AUSTIN ST S and ends at CRD WAGELEY PL E.
Work is scheduled from 04-MAR-2026 to 29-MAY-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP LONG BRANCH LAKE RD TO US36W W - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD LONG BRANCH LAKE RD S and ends at US 36 W.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - PHELPS County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD 7490 S and ends at RT P E.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 N - BUCHANAN County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after MO 6 E and ends at .001 mile(s) before US 169 S.
Work is scheduled from 06-FEB-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .044 mile(s) after RP IS70W TO RTE W and ends at .269 mile(s) after RP RTO TO IS70W W.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .239 mile(s) before RP IS70E TO RTM E and ends at .023 mile(s) before RP RTH TO IS70E E.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US36W TO LONG BRANCH LAKE RD N - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) after US 36 W and ends at CRD LONG BRANCH LAKE RD S.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - BUCHANAN County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .015 mile(s) before US 169 S and ends at .002 mile(s) before MO 6 E.
Work is scheduled from 06-FEB-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 25 S - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .028 mile(s) after MO 77 S and ends at .001 mile(s) before MO 91 S.
Work is scheduled from 02-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 25 N - STODDARD County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after MO 91 S and ends at .021 mile(s) before MO 77 S.
Work is scheduled from 02-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT J S - RALLS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .927 mile(s) after CRD WILLOW LN E and ends at .865 mile(s) before RT EE S.
Work is scheduled from 13-MAR-2026 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 125 S and ends at .04 mile(s) before MO 13 N.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT CC E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .04 mile(s) after MO 13 N and ends at MO 125 S.
Work is scheduled from 09-MAR-2026 to 09-JUN-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .213 mile(s) after RT O S and ends at .099 mile(s) after RT A S.
Work is scheduled from 07-JUL-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RT NN S and ends at RT Y E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 21 S - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .19 mile(s) after RT BB S and ends at .418 mile(s) after CRD BRITTON RD E.
Work is scheduled from 16-MAR-2026 to 30-APR-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 N - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .418 mile(s) before CRD BRITTON RD E and ends at .187 mile(s) before RT BB S.
Work is scheduled from 16-MAR-2026 to 30-APR-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E E - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT Y E and ends at .003 mile(s) before RT NN S.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .655 mile(s) after PVT HONOR CAMP LN S and ends at .103 mile(s) before RT NN S.
Work is scheduled from 07-JUL-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO BIG BEND RD W - ST. LOUIS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .076 mile(s) after IS 270 W and ends at CRD BIG BEND RD E.
Work is scheduled from 28-MAR-2026 to 29-MAR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 7 S - PULASKI County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .177 mile(s) before CRD ROCHESTER RD E and ends at .225 mile(s) after CRD ROCHESTER RD E.
Work is scheduled from 16-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 7 N - PULASKI County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .225 mile(s) before CRD ROCHESTER RD E and ends at .177 mile(s) after CRD ROCHESTER RD E.
Work is scheduled from 16-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .045 mile(s) after RT A E and ends at .001 mile(s) before CST WENTZVILLE PKWY E.
Work is scheduled from 17-SEP-2025 to 29-MAY-2026.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Possible delays due to workzone MO 115 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST NATURAL BRIDGE RD W and ends at .079 mile(s) after CST CLEARVIEW DR S.
Work is scheduled from 23-MAR-2026 to 29-MAY-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST WENTZVILLE PKWY E and ends at .044 mile(s) before RT A E.
Work is scheduled from 17-SEP-2025 to 29-MAY-2026.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Project Site
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .058 mile(s) before US 40 E and ends at .021 mile(s) before IS 670 W.
Work is scheduled from 03-MAR-2025 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .109 mile(s) before IS 670 E and ends at .049 mile(s) after US 40 E.
Work is scheduled from 03-MAR-2025 to 31-DEC-2028.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 92 W - PLATTE County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .015 mile(s) after CO MO92 TO SP45 E and ends at .613 mile(s) after CO MO92 TO SP45 E.
Work is scheduled from 26-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 92 E - PLATTE County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .613 mile(s) before CO MO92 TO SP45 E and ends at .015 mile(s) before CO MO92 TO SP45 E.
Work is scheduled from 26-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 370 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CST N 5TH ST S and ends at .068 mile(s) after MO 141 S.
Work is scheduled from 02-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT EE E - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 72 E and ends at CRD 5225 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT EE W - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 5225 E and ends at MO 32 E.
Work is scheduled from 25-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T W - PERRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .015 mile(s) before PVT WOODRIDGE LN E and ends at .008 mile(s) before RT CC S.
Work is scheduled from 23-MAR-2026 to 20-AUG-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 N - MACON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before RP US63N TO US36E E and ends at .02 mile(s) after RP US36W TO US63 N.
Work is scheduled from 09-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T E - PERRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after RT CC S and ends at .015 mile(s) after PVT WOODRIDGE LN E.
Work is scheduled from 23-MAR-2026 to 20-AUG-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 S - MACON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) before RP US36W TO US63 N and ends at .014 mile(s) after RP US63N TO US36E E.
Work is scheduled from 09-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 273 S - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .06 mile(s) after MO 45 S and ends at MO 371 S.
Work is scheduled from 02-MAR-2026 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 273 N - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 371 S and ends at .06 mile(s) before MO 45 S.
Work is scheduled from 02-MAR-2026 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 267 N - ST. LOUIS County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at US 50 E and ends at CST ALABAMA AVE E.
Work is scheduled from 10-SEP-2025 to 01-NOV-2027.
Work will start daily at 05:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT VV S and ends at RT TT E.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 47 S - LINCOLN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at RT AA S and ends at .008 mile(s) after RT D S.
Work is scheduled from 16-MAR-2026 to 31-MAY-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 47 N - LINCOLN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .008 mile(s) before RT D S and ends at RT AA S.
Work is scheduled from 16-MAR-2026 to 31-MAY-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 267 S - ST. LOUIS County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at CST ALABAMA AVE E and ends at US 50 E.
Work is scheduled from 10-SEP-2025 to 01-NOV-2027.
Work will start daily at 05:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP LP44E TO IS44W W - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at LP 44 E and ends at IS 44 W.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 370 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) before RP MO141 TO MO370W W and ends at .001 mile(s) after CST N 5TH ST S.
Work is scheduled from 02-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST BUSINESS 13 S - STONE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .091 mile(s) before CST WOODY LN S and ends at .055 mile(s) before PVT BRANSONWEST RV LN E.
Work is scheduled from 22-FEB-2026 to 26-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST BUSINESS 13 N - STONE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .055 mile(s) after PVT BRANSONWEST RV LN E and ends at .091 mile(s) after CST WOODY LN S.
Work is scheduled from 22-FEB-2026 to 26-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP LP44W TO IS44W W - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at LP 44 W and ends at IS 44 W.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 52 E - BATES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after CRD NW 2 E and ends at .123 mile(s) after RT BB S.
Work is scheduled from 18-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 W - BATES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .123 mile(s) before RT BB S and ends at .018 mile(s) before CRD NW 2 E.
Work is scheduled from 18-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 10 W - CARROLL County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .053 mile(s) after CRD 308 E and ends at CRD MERRIFIELD LN E.
Work is scheduled from 02-MAR-2026 to 01-JUL-2026.
Work will start daily at 06:30 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 350 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .19 mile(s) after CST E 83RD ST E and ends at .009 mile(s) after CO US50E TO US50W E.
Work is scheduled from 22-JAN-2026 to 05-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 350 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .01 mile(s) before CO US50E TO US50W E and ends at .36 mile(s) before CST WESTRIDGE RD S.
Work is scheduled from 22-JAN-2026 to 05-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 10 E - RAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD MERRIFIELD LN E and ends at .053 mile(s) before CRD 308 E.
Work is scheduled from 02-MAR-2026 to 01-JUL-2026.
Work will start daily at 06:30 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) after CRD TIFFANY SQUARE PKWY E and ends at .077 mile(s) before CST GREEN PARK RD E.
Work is scheduled from 27-MAY-2025 to 27-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST E DEERWOOD DR W - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .012 mile(s) after CST CRICKET DR S and ends at US 61 S.
Work is scheduled from 28-JAN-2026 to 27-JAN-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST E DEERWOOD DR E - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at US 61 S and ends at .012 mile(s) before CST CRICKET DR S.
Work is scheduled from 28-JAN-2026 to 27-JAN-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .017 mile(s) after CST COUNTRY RIDGE DR E and ends at .001 mile(s) before CST RIVER VALLEY DR S.
Work is scheduled from 02-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CST RIVER VALLEY DR S and ends at .017 mile(s) before CST COUNTRY RIDGE DR E.
Work is scheduled from 02-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - PULASKI County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CRD ACE ST E and ends at .001 mile(s) after CRD ANN ST E.
Work is scheduled from 02-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - PULASKI County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CRD ANN ST E and ends at .001 mile(s) after CRD ACE ST E.
Work is scheduled from 02-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 370 E - ST. CHARLES County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD ELM POINT IND DR E and ends at .001 mile(s) before RP MO370E TO IS270E E.
Work is scheduled from 08-SEP-2025 to 30-OCT-2026.
Work will start daily at 09:00 AM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 370 W - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .149 mile(s) before RP IS270W TO MO370W W and ends at .004 mile(s) after CRD ELM POINT IND DR E.
Work is scheduled from 08-SEP-2025 to 30-OCT-2026.
Work will start daily at 06:00 PM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 136 E - ATCHISON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .194 mile(s) before CRD G AVE S and ends at .017 mile(s) before US 71 S.
Work is scheduled from 09-MAR-2026 to 14-AUG-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 N - ST. CHARLES County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .148 mile(s) after CST LEWIS & CLARK BLVD N and ends at .271 mile(s) before CO US67S TO US67N N.
Work is scheduled from 25-JAN-2026 to 29-MAR-2026.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.477 mile(s) after RP US65N TO IS70E E and ends at .948 mile(s) before RP IS70E TO RTJ E.
Work is scheduled from 19-DEC-2024 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.013 mile(s) after RP RTJ TO IS70W W and ends at 1.456 mile(s) before RP IS70W TO US65N N.
Work is scheduled from 19-DEC-2024 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .028 mile(s) before RP US67S TO IS55N N and ends at RP IS55S TO US67S S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .116 mile(s) after CRD BUCK CREEK RD W E and ends at .039 mile(s) before US 61 S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS70W TO RTE W - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 70 W and ends at RT Y E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after PED CARROLL ST OVERPASS S and ends at .013 mile(s) after CST WEBER RD E.
Work is scheduled from 06-DEC-2022 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .047 mile(s) after RP IS55N TO MO141S S and ends at .033 mile(s) before RP MERAMEC BOTTOM RD TO IS55N N.
Work is scheduled from 24-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 44 W - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .027 mile(s) after CRD SUPERIOR RD E and ends at .554 mile(s) before RP IS44W TO RTH N.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 44 E - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .461 mile(s) after RP RTH TO IS44E E and ends at .812 mile(s) before CRD SUPERIOR RD E.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Z W - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after RP IS55N TO RTZ E and ends at .002 mile(s) before RP RTZ TO IS55S S.
Work is scheduled from 27-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Z E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after RP RTZ TO IS55S S and ends at .005 mile(s) before RP IS55N TO RTZ E.
Work is scheduled from 27-MAR-2026 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after RP IS55S TO MERAMEC BOTTOM RD W and ends at .083 mile(s) before RP MO141N TO IS55S S.
Work is scheduled from 24-MAR-2026 to 30-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 W - JASPER County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at LP 49 S and ends at .001 mile(s) before RT P E.
Work is scheduled from 16-MAR-2026 to 01-DEC-2028.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 66 E - JASPER County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .001 mile(s) after RT P E and ends at LP 49 S.
Work is scheduled from 16-MAR-2026 to 01-DEC-2028.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 30 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .054 mile(s) before MO 141 S and ends at .011 mile(s) before CRD HANNOVER AVE E.
Work is scheduled from 20-JAN-2026 to 01-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 30 W - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) after CRD HANNOVER AVE E and ends at .054 mile(s) after MO 141 S.
Work is scheduled from 20-JAN-2026 to 01-NOV-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .058 mile(s) after RT Z E and ends at .1 mile(s) after CST MCNUTT ST N.
Work is scheduled from 28-FEB-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64E TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .108 mile(s) after IS 64 E and ends at IS 270 E.
Work is scheduled from 07-JAN-2026 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .029 mile(s) before US 67 N and ends at US 67 S.
Work is scheduled from 05-OCT-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 67 S and ends at .029 mile(s) after US 67 N.
Work is scheduled from 05-OCT-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
MEDIAN OR SHOULDER
Work zone begins at .031 mile(s) after RP RTF TO IS70E E and ends at .007 mile(s) before RT W S.
Work is scheduled from 23-OCT-2025 to 29-MAY-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone S OR 64 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after CST MERTZ RD S and ends at .038 mile(s) after CO IS64E TO OR64E E.
Work is scheduled from 24-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST MAIN ST N - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .043 mile(s) after CST BROADWAY ST E and ends at RT BB N.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST MAIN ST S - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at RT BB S and ends at .043 mile(s) before CST BROADWAY ST E.
Work is scheduled from 24-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .085 mile(s) before RP RICHARDSON RD TO IS55N N and ends at .387 mile(s) after RP MERAMEC BOTTOM RD TO IS55N N.
Work is scheduled from 25-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .398 mile(s) before RP IS55S TO MERAMEC BOTTOM RD W and ends at .128 mile(s) before RP IS55S TO RICHARDSON RD S.
Work is scheduled from 25-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 61 S - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .07 mile(s) before CST E DEERWOOD DR E and ends at .085 mile(s) after CST E DEERWOOD DR E.
Work is scheduled from 28-JAN-2026 to 27-JAN-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .085 mile(s) before CST W DEERWOOD DR E and ends at .07 mile(s) after CST W DEERWOOD DR E.
Work is scheduled from 28-JAN-2026 to 27-JAN-2027.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
CONCRETE BARRIER WALL
Work zone begins at .048 mile(s) after RR SAINT LOUIS DISTRICT E and ends at .122 mile(s) before RP IS270E TO JAMES S MCDONNELL BLVD E.
Work is scheduled from 27-MAR-2026 to 07-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
CONCRETE BARRIER WALL
Work zone begins at .13 mile(s) after RP JAMES S MCDONNELL BLVD TO IS270W W and ends at .052 mile(s) before RR SAINT LOUIS DISTRICT E.
Work is scheduled from 27-MAR-2026 to 07-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTE TO IS70E E - MONTGOMERY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at RT E E and ends at .001 mile(s) before IS 70 E.
Work is scheduled from 24-FEB-2026 to 24-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y W - SCOTT County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .195 mile(s) before RT BB S and ends at .063 mile(s) before CRD HALE RD S.
Work is scheduled from 29-DEC-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT J N - NEW MADRID County - POSSIBLE DELAYS
ROAD MIX OVERLAY
Work zone begins at MO 153 S and ends at US 62 E.
Work is scheduled from 19-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT J S - NEW MADRID County - POSSIBLE DELAYS
ROAD MIX OVERLAY
Work zone begins at US 62 E and ends at MO 153 S.
Work is scheduled from 19-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 45 N - PLATTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .454 mile(s) before CRD NW MAINLINER RD S and ends at .017 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 07-JUL-2025 to 01-JUN-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 45 S - PLATTE County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .017 mile(s) before PVT PRIVATE RD E and ends at .454 mile(s) after CRD NW MAINLINER RD S.
Work is scheduled from 07-JUL-2025 to 01-JUN-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone CST N RANDOLPH RD S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .047 mile(s) before CST NE 43RD ST E and ends at CST NE PARVIN RD E.
Work is scheduled from 09-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 N - NODAWAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .209 mile(s) before RT CC E and ends at .279 mile(s) after CRD ECHO RD S.
Work is scheduled from 26-MAR-2026 to 31-DEC-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .008 mile(s) before CST WAPLES ST E and ends at .281 mile(s) before RR RIVER SUB E.
Work is scheduled from 18-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 N - CARROLL County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .281 mile(s) after RR RIVER SUB E and ends at .008 mile(s) after CST WAPLES ST E.
Work is scheduled from 18-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 project 2
CONCRETE BARRIER WALL
Work zone begins at .038 mile(s) before RP W WARRENTON BLVD TO IS70E E and ends at .144 mile(s) after RP MO47 TO IS70E E.
Work is scheduled from 24-OCT-2025 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .058 mile(s) after RP IS55S TO RTZ W and ends at .214 mile(s) after RR DESOTO SUB S.
Work is scheduled from 27-MAR-2026 to 28-MAR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .219 mile(s) before RR DESOTO SUB S and ends at .07 mile(s) before RP RTZ TO IS55N N.
Work is scheduled from 27-MAR-2026 to 28-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP LONG BRANCH LAKE RD TO US36E E - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD LONG BRANCH LAKE RD S and ends at US 36 E.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US36E TO LONG BRANCH LAKE RD S - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 36 E and ends at CRD LONG BRANCH LAKE RD S.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - FRANKLIN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .016 mile(s) after CRD ST MARYS RD S and ends at .072 mile(s) after CO WOR44 TO EOR44 E.
Work is scheduled from 13-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T W - ST. LOUIS County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) after MO 100 W and ends at MO 100 E.
Work is scheduled from 11-FEB-2026 to 01-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD W - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .268 mile(s) before CST BLUFFVIEW DR S and ends at MO 47 S.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD E - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at .268 mile(s) after CST BLUFFVIEW DR S.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 70 W - JACKSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .006 mile(s) before RP IS35N TO IS70W W and ends at US 169 S.
Work is scheduled from 09-MAR-2026 to 27-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 70 E - JACKSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at US 40 E and ends at .032 mile(s) after CST MULBERRY ST S.
Work is scheduled from 09-MAR-2026 to 27-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT M W - SCOTT County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after IS 55 S and ends at RT A E.
Work is scheduled from 25-MAR-2026 to 17-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 E - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .052 mile(s) before OR 70 E and ends at .053 mile(s) after CST DUNN DR E.
Work is scheduled from 24-MAR-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .053 mile(s) before CST DUNN DR E and ends at .052 mile(s) after OR 54 E.
Work is scheduled from 24-MAR-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 W - MACON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .031 mile(s) after RP US36W TO US63 N and ends at .019 mile(s) before RP US63 TO US36W W.
Work is scheduled from 02-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 E - MACON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) after RP US36E TO US63 E and ends at .018 mile(s) before RP US63N TO US36E E.
Work is scheduled from 02-FEB-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T E - FRANKLIN County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 100 E and ends at .008 mile(s) before MO 100 W.
Work is scheduled from 11-FEB-2026 to 01-NOV-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - WAYNE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) before CRD 546 E and ends at .005 mile(s) before CRD 547 E.
Work is scheduled from 06-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 N - WAYNE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) after CRD 547 E and ends at .005 mile(s) after CRD 406 E.
Work is scheduled from 06-FEB-2026 to 01-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD VELMA AVE E and ends at CRD HOLDEN AVE E.
Work is scheduled from 27-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W S - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) before CRD NW 9TH RD E and ends at .016 mile(s) before RR FORT SCOTT SUB E.
Work is scheduled from 23-FEB-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55S TO US67N N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .09 mile(s) after IS 55 S and ends at US 67 N.
Work is scheduled from 15-SEP-2025 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y E - SCOTT County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .063 mile(s) after CRD HALE RD S and ends at .195 mile(s) after RT BB S.
Work is scheduled from 29-DEC-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP RTO TO US36W W - MACON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT C S and ends at .006 mile(s) before US 36 W.
Work is scheduled from 16-MAR-2026 to 01-OCT-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W N - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .016 mile(s) after RR FORT SCOTT SUB E and ends at .004 mile(s) after CRD NW 9TH RD E.
Work is scheduled from 23-FEB-2026 to 30-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP FAIRGROUNDS RD TO IS70E E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at OR 70 W and ends at IS 70 E.
Work is scheduled from 24-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 W - BATES County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .012 mile(s) before LP 49 S and ends at .024 mile(s) before RP IS49N TO MO52 E.
Work is scheduled from 18-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - PHELPS County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT P E and ends at CRD 7490 S.
Work is scheduled from 23-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - PERRY County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .824 mile(s) after CRD 830 E and ends at .278 mile(s) after RP RTM TO IS55S S.
Work is scheduled from 27-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 E - BATES County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .024 mile(s) after RP IS49N TO MO52 E and ends at .012 mile(s) after LP 49 S.
Work is scheduled from 18-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEW MADRID County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .568 mile(s) before CO US60W TO US60E E and ends at .476 mile(s) before RT FF S.
Work is scheduled from 27-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
250919-C03, JKU0226
INTERSECTION IMPROVEMENTS
Work zone begins at .003 mile(s) after CST HAWTHORNE AVE S and ends at .005 mile(s) before CST STERLING AVE S.
Work is scheduled from 16-FEB-2026 to 15-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .06 mile(s) before RP DRTDE TO US67S S and ends at .001 mile(s) before CST FLOM CT E.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST FLOM CT E and ends at OR D E.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after RP US67S TO RTDW W and ends at .016 mile(s) before RP DRTDE TO US67S S.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 N - BUCHANAN County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .661 mile(s) after RT O E and ends at .167 mile(s) after CRD 369 E.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 S - ANDREW County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .161 mile(s) before CRD 369 E and ends at .66 mile(s) before RT O E.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 229 S - ANDREW County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .109 mile(s) after IS 29 S and ends at IS 29 S.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 229 N - BUCHANAN County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .086 mile(s) after IS 29 N and ends at IS 29 N.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT M E - SCOTT County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT A E and ends at .001 mile(s) before IS 55 S.
Work is scheduled from 25-MAR-2026 to 17-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) after RP IS55N TO US67S N and ends at .238 mile(s) after RR RIVER SUB S.
Work is scheduled from 01-APR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .269 mile(s) before RR RIVER SUB S and ends at .04 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 01-APR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .032 mile(s) before RP IS70E TO RTJ E and ends at .595 mile(s) before RT Z S.
Work is scheduled from 17-NOV-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - COOPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .594 mile(s) after RT Z S and ends at .097 mile(s) after RP RTJ TO IS70W W.
Work is scheduled from 17-NOV-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64W TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 64 W and ends at IS 270 E.
Work is scheduled from 07-JAN-2026 to 29-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) after RP US67N TO RTDE E and ends at .01 mile(s) after RP RTDW TO US67N N.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 36 W - BUCHANAN County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .086 mile(s) after RT AC S and ends at .149 mile(s) after RP IS229S TO US36W W.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 36 E - BUCHANAN County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .142 mile(s) before RP US36E TO MO759S S and ends at .092 mile(s) before RT AC S.
Work is scheduled from 08-MAR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT B N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after CRD 245 E and ends at .054 mile(s) before CRD 242 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .054 mile(s) after CRD 242 E and ends at .003 mile(s) before CRD 245 E.
Work is scheduled from 16-MAR-2026 to 12-MAY-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .045 mile(s) after RP IS70W TO RTE W and ends at .269 mile(s) after RP RTO TO IS70W W.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will start daily at 06:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .239 mile(s) before RP IS70E TO RTM E and ends at .024 mile(s) before RP RTH TO IS70E E.
Work is scheduled from 15-DEC-2025 to 30-APR-2026.
Work will start daily at 06:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RP IS55S TO US67S S and ends at .185 mile(s) before CRD BUCK CREEK RD W E.
Work is scheduled from 23-JUN-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS44E TO LP44W W - PULASKI County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 44 E and ends at .005 mile(s) before LP 44 E.
Work is scheduled from 02-FEB-2026 to 04-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 340 E - ST. LOUIS County - EXPECT DELAYS
J6P3510C
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) after CST EMERSON RD S and ends at .019 mile(s) after CRD CRAIG RD S.
Work is scheduled from 09-MAR-2026 to 10-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) before CST INDEPENDENCE AVE W and ends at OR 291 S.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at OR 291 S and ends at .004 mile(s) before CST DUVALL RD S.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 17 N - HOWELL County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .281 mile(s) before CRD 9920 E and ends at .006 mile(s) after CRD 8270 E.
Work is scheduled from 16-MAR-2026 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 17 S - HOWELL County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .006 mile(s) before CRD 8270 E and ends at .281 mile(s) after CRD 9920 E.
Work is scheduled from 16-MAR-2026 to 05-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .042 mile(s) before CRD 197 S and ends at .074 mile(s) after CRD 197 S.
Work is scheduled from 23-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 N - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 946 E and ends at .607 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 S - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .607 mile(s) before CRD 946 E and ends at .004 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST GLENSTONE AVE S - GREENE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .037 mile(s) after LP 44 W and ends at .051 mile(s) before CST HIGH ST E.
Work is scheduled from 15-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .129 mile(s) before RP CHESTERFIELD AIRPORT RD TO IS64E E and ends at .03 mile(s) after RR CENTRAL MIDLAND E.
Work is scheduled from 24-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 180 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) after RT EE S and ends at .006 mile(s) after CST CALVERT AVE S.
Work is scheduled from 26-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 370 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .36 mile(s) before CST N 5TH ST S and ends at .021 mile(s) before MO 141 S.
Work is scheduled from 01-DEC-2025 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .907 mile(s) after RP SAMPSON RD TO IS44E E and ends at .631 mile(s) before RP IS44E TO RTJ E.
Work is scheduled from 22-MAR-2026 to 04-APR-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .322 mile(s) before OR 65 S and ends at .068 mile(s) before CO US65S TO EOR65 E.
Work is scheduled from 27-JAN-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .067 mile(s) after CST REBAR RD E and ends at .323 mile(s) after OR 65 S.
Work is scheduled from 27-JAN-2025 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST W DEERWOOD DR W - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at US 61 S and ends at .067 mile(s) before CST TERRACE PARK PL S.
Work is scheduled from 28-JAN-2026 to 29-MAY-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST W DEERWOOD DR E - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .067 mile(s) after CST TERRACE PARK PL S and ends at US 61 S.
Work is scheduled from 28-JAN-2026 to 29-MAY-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 54 E - MILLER County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .091 mile(s) before MO 242 W and ends at .068 mile(s) after MO 17 S.
Work is scheduled from 16-DEC-2025 to 01-MAY-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .121 mile(s) after RP LILAC AVE TO IS270E E and ends at .024 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) before RP IS270W TO RIVERVIEW DR W and ends at .069 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 54 W - COLE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .068 mile(s) before MO 17 S and ends at .341 mile(s) after RP MO242 TO US54W W.
Work is scheduled from 16-DEC-2025 to 01-MAY-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O W - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT F S and ends at RT AT E.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT AT E and ends at RT F S.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 402 work zone(s) planned for a future date.

Future work zone(s) 402 Future work zone(s)
Future work zone RT N W - CLARK County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT K S and ends at RT H E.
Work is scheduled from 07-APR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - CASS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .419 mile(s) before CRD 195TH ST E and ends at .041 mile(s) after CRD 195TH ST E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST NW COLBERN RD W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .01 mile(s) before CST NW BLUE PKWY N and ends at CST BANNISTER RD E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .142 mile(s) before RT AA S and ends at .351 mile(s) before CRD 820 E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - NEW MADRID County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .148 mile(s) after RP MO80 TO IS55N N and ends at .235 mile(s) after CRD 820 E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .96 mile(s) after CRD 820 E and ends at .542 mile(s) before RT AA S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 179 S - COLE County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after US 50 W and ends at .001 mile(s) before RP US50E TO MO179 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP DIX RD TO US50E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST DIX RD S and ends at .089 mile(s) before US 50 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 55 S - CAPE GIRARDEAU County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .551 mile(s) before RP IS55S TO RTK S and ends at .016 mile(s) after MO 74 W.
Work is scheduled from 24-APR-2026 to 15-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone US 60 E - NEWTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .262 mile(s) before RT CC S and ends at .072 mile(s) before CRD FINCH DR S.
Work is scheduled from 01-APR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 60 W - NEWTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .072 mile(s) after CRD FINCH DR S and ends at .262 mile(s) after RT CC S.
Work is scheduled from 01-APR-2026 to 15-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT H N - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .294 mile(s) before CRD 204 E and ends at .01 mile(s) after CRD 204 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H S - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .01 mile(s) before CRD 204 E and ends at .294 mile(s) after CRD 204 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH E - SCOTT County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .143 mile(s) before CST INGRAM RD S and ends at .007 mile(s) after CRD LITTLE DR S.
Work is scheduled from 20-APR-2026 to 18-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH W - SCOTT County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .007 mile(s) before CRD LITTLE DR S and ends at .143 mile(s) after CST INGRAM RD S.
Work is scheduled from 20-APR-2026 to 18-MAY-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .137 mile(s) before CST JACKPINE RD E and ends at .002 mile(s) after CST JACKPINE RD E.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .023 mile(s) after RT Z E and ends at .042 mile(s) after RT M E.
Work is scheduled from 31-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .049 mile(s) before RT M E and ends at .026 mile(s) before RT Z E.
Work is scheduled from 02-APR-2026 to 04-APR-2026.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 63 S - PHELPS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before LP 44 E and ends at CST N SPILMAN AVE S.
Work is scheduled from 01-APR-2026 to 02-APR-2026.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 63 N - PHELPS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST 2ND ST E and ends at .003 mile(s) before LP 44 E.
Work is scheduled from 01-APR-2026 to 02-APR-2026.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 14 E - DOUGLAS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .217 mile(s) before MO 181 S and ends at .129 mile(s) after CRD 14-361 S.
Work is scheduled from 31-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 52 W - BATES County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .126 mile(s) after CRD NW 591 S and ends at CRD NW 14361 S.
Work is scheduled from 30-MAR-2026 to 12-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST COUNTRY RIDGE DR E and ends at CST RIVER VALLEY DR S.
Work is scheduled from 01-APR-2026 to 30-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 52 E - BATES County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD SW 14267 S and ends at .126 mile(s) before CRD NW 591 S.
Work is scheduled from 30-MAR-2026 to 12-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - SHANNON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) after RT FF S and ends at RT M S.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M S - DUNKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at MO 25 S and ends at MO 153 S.
Work is scheduled from 06-APR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 153 S - PEMISCOT County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .022 mile(s) after RT EE E and ends at .013 mile(s) after RT EE S.
Work is scheduled from 06-APR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at MO 413 S and ends at .214 mile(s) after CRD HOUND DOG RD S.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST RIVER VALLEY DR S and ends at CST COUNTRY RIDGE DR E.
Work is scheduled from 01-APR-2026 to 30-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 49 N - CRAWFORD County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .278 mile(s) before CRD DILLARD MILL RD S and ends at .14 mile(s) before CRD DILLARD MILL RD S.
Work is scheduled from 06-APR-2026 to 09-APR-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after US 69 N and ends at .081 mile(s) after RR BROOKFIELD SUB E.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 124 W - BOONE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) after CRD OLD NUMBER 7 S and ends at .001 mile(s) before CRD PROCTOR RD S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 83 S - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .303 mile(s) before CRD 353RD RD E and ends at .868 mile(s) after CRD 353RD RD E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - JEFFERSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .073 mile(s) after RP IS55N TO CST MCNUTT ST N and ends at .007 mile(s) after RT Z E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone CST BOLIVAR ST N - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .028 mile(s) after PVT ST MARYS MEDICAL PLZ S and ends at .003 mile(s) before CST W MCCARTY ST E.
Work is scheduled from 06-APR-2026 to 10-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST BOLIVAR ST S - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CST W MCCARTY ST E and ends at .028 mile(s) before PVT ST MARYS MEDICAL PLZ S.
Work is scheduled from 06-APR-2026 to 10-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 435 N - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .083 mile(s) before RR BROOKFIELD SUB E and ends at .01 mile(s) before US 69 N.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT T S - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) after MO 86 E and ends at .003 mile(s) before CST MAIN ST E.
Work is scheduled from 01-APR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT T N - NEWTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after CST MAIN ST E and ends at .004 mile(s) before MO 86 E.
Work is scheduled from 01-APR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D N - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .106 mile(s) after CRD E RIVER RIDGE RD E and ends at .107 mile(s) before RT NN E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D S - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .107 mile(s) after RT NN E and ends at .106 mile(s) before CRD E RIVER RIDGE RD E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 83 N - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .868 mile(s) before CRD 353RD RD E and ends at .303 mile(s) after CRD 353RD RD E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - TANEY County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .045 mile(s) before COE STONEY RIDGE HOOK RD S and ends at .057 mile(s) before CRD SLOUGH HOLLOW RD S.
Work is scheduled from 31-MAR-2026 to 10-APR-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 W - TANEY County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .057 mile(s) after CRD SLOUGH HOLLOW RD S and ends at .045 mile(s) after COE STONEY RIDGE HOOK RD S.
Work is scheduled from 31-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at IS 55 S and ends at US 62 E.
Work is scheduled from 08-APR-2026 to 10-APR-2026.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - NEW MADRID County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after US 62 E and ends at .008 mile(s) after IS 55 S.
Work is scheduled from 08-APR-2026 to 10-APR-2026.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - SHANNON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .026 mile(s) before RT E S and ends at .025 mile(s) before MO 19 N.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone PVT OVERPASS S - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at RP US63N TO US50W W and ends at US 63 S.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 63 S - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after RP US63S TO US50W W and ends at .005 mile(s) before BU 50 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone N OR 70 E - CALLAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .477 mile(s) before RT FF E and ends at .307 mile(s) before RT FF E.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone N OR 70 W - CALLAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .307 mile(s) after RT FF E and ends at .477 mile(s) after RT FF E.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 435 N - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .031 mile(s) after RP OUTER RD TO IS435N N and ends at .138 mile(s) before CST NE 53RD TER E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .085 mile(s) before RP IS435S TO MO45 S and ends at .093 mile(s) after RP IS435S TO MO45 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .156 mile(s) before RP IS435S TO NW COOKINGHAM DR E and ends at .034 mile(s) after RP IS435S TO NW COOKINGHAM DR E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .099 mile(s) after IS 49 S and ends at .245 mile(s) after IS 49 S.
Work is scheduled from 11-APR-2026 to 12-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT J N - MERCER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT JJ E and ends at RT E E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - MERCER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT E E and ends at RT JJ E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 29 S - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .027 mile(s) after RP IS29S TO IS229N N and ends at .003 mile(s) before RT Z E.
Work is scheduled from 06-APR-2026 to 10-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B W - LINN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD CORD DR S and ends at .003 mile(s) after CRD CLARK DR S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - LINN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) before CRD CLARK DR S and ends at .003 mile(s) before CRD CORD DR S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .227 mile(s) before RP IS70E TO MO7 S and ends at .12 mile(s) after RP MO7 TO IS70E E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 10:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 111 N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .048 mile(s) before CRD 170 E and ends at .022 mile(s) before CRD 170 E.
Work is scheduled from 29-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .214 mile(s) before CRD HOUND DOG RD S and ends at MO 413 S.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .096 mile(s) after IS 49 S and ends at .244 mile(s) after IS 49 S.
Work is scheduled from 18-APR-2026 to 19-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 111 S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .022 mile(s) after CRD 170 E and ends at .048 mile(s) after CRD 170 E.
Work is scheduled from 29-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 E - JOHNSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .161 mile(s) after PVT PRIVATE DR S and ends at .574 mile(s) after CRD NE 801 S.
Work is scheduled from 30-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 7 N - JACKSON County - NO DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after US 40 W and ends at .002 mile(s) before CST SHAW PKWY E.
Work is scheduled from 06-APR-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 7 S - JACKSON County - NO DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST SHAW PKWY E and ends at .001 mile(s) before US 40 W.
Work is scheduled from 06-APR-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 106 E - SHANNON County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .003 mile(s) after RT D E and ends at .001 mile(s) after CRD 423 S.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 29 N - PLATTE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before RT Z E and ends at .074 mile(s) before RP IS229S TO IS29N N.
Work is scheduled from 06-APR-2026 to 10-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 50 W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after BU 50 E and ends at .046 mile(s) before RP US63S TO US50W W.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 106 W - SHANNON County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .001 mile(s) before CRD 423 S and ends at .003 mile(s) before RT D E.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 W - JOHNSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .398 mile(s) after CST ANGUS LN S and ends at .34 mile(s) before CRD 175TH ST E.
Work is scheduled from 30-MAR-2026 to 01-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .25 mile(s) before CST CENTRAL AVE S and ends at .008 mile(s) before PVT MARITZ ENT S.
Work is scheduled from 30-MAR-2026 to 11-APR-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 54 E - COLE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .132 mile(s) before PVT BASLER LN S and ends at .175 mile(s) before CRD MONTICELLO RD E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO MO7 S - JACKSON County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at MO 7 S.
Work is scheduled from 20-JUL-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT M W - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 89 S and ends at .463 mile(s) before CRD 718 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT E E - HOWARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 87 S and ends at MO 5 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .022 mile(s) before RP US60W TO IS55S S and ends at .018 mile(s) before US 62 E.
Work is scheduled from 30-MAR-2026 to 01-APR-2026.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT E W - HOWARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 5 S and ends at MO 87 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 37 N - BARRY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .008 mile(s) before PVT KOON DR E and ends at .007 mile(s) after CRD 1110 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) before CRD 170 ST E and ends at .002 mile(s) after RT NN E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before RT NN E and ends at .007 mile(s) after CRD 170 ST E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AF N - WRIGHT County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .768 mile(s) before CRD MINGS DR E and ends at .708 mile(s) before CRD MINGS DR E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - GREENE County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .024 mile(s) after RP US60E TO MO125 S and ends at .029 mile(s) before RP MO125 TO US60E E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - GREENE County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .02 mile(s) after RP US60W TO MO125 N and ends at .022 mile(s) before RP MO125 TO US60W W.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .046 mile(s) after CRD INDIAN CREEK RD E and ends at .163 mile(s) before RP IS49S TO MO76 W.
Work is scheduled from 19-APR-2026 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 2 E - CASS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CST SOUTH ST E and ends at .006 mile(s) before RT ZZ S.
Work is scheduled from 06-APR-2026 to 06-JUN-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 124 E - BOONE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CRD PROCTOR RD S and ends at .006 mile(s) before CRD OLD NUMBER 7 S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - JACKSON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .002 mile(s) before CST E WINNER RD E and ends at .003 mile(s) after MO 78 W.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 435 N - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .082 mile(s) before RP IS435N TO RTC N and ends at .025 mile(s) after RP IS435N TO RTDW N.
Work is scheduled from 31-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .055 mile(s) before CST N CONGRESS AVE S and ends at .131 mile(s) after RP SKYVIEW AVE TO IS435S S.
Work is scheduled from 31-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - ATCHISON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .015 mile(s) after CRD N AVE E and ends at .01 mile(s) after RT Z E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at RT NN E and ends at .01 mile(s) before RT NN E.
Work is scheduled from 03-APR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 N - JACKSON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) before MO 78 W and ends at .002 mile(s) after CST E WINNER RD E.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - WEBSTER County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at RP US60E TO RTVV S and ends at .002 mile(s) before RP RTVV TO US60E E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - WEBSTER County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .004 mile(s) after RP US60W TO RTVV N and ends at .014 mile(s) before RP RTVV TO US60W W.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - OREGON County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .483 mile(s) after RT Y S and ends at .558 mile(s) after RT Y S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST WALNUT ST S - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after CST INDEPENDENCE AVE W and ends at .004 mile(s) before CST E 6TH ST E.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST WALNUT ST N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after CST E 6TH ST E and ends at .005 mile(s) before CST INDEPENDENCE AVE W.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT YY N - ST. CLAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .142 mile(s) before CRD NW 40 E and ends at RT B E.
Work is scheduled from 02-APR-2026 to 16-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY S - ST. CLAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B E and ends at .142 mile(s) after CRD NW 40 E.
Work is scheduled from 02-APR-2026 to 16-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - WEBSTER County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .028 mile(s) after RP US60W TO RTPP W and ends at .069 mile(s) after CST FRONT ST E.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - WEBSTER County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .084 mile(s) before CST FRONT ST E and ends at .263 mile(s) after RT PP E.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - MERCER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at US 65 S and ends at CRD APOLLO ST E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - CAPE GIRARDEAU County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .153 mile(s) before RP IS55S TO RTK S and ends at .132 mile(s) after RP RTK TO IS55S S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .008 mile(s) after RT C E and ends at .004 mile(s) after CRD MIKE RD E.
Work is scheduled from 03-APR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .004 mile(s) before CRD MIKE RD E and ends at .008 mile(s) before RT C E.
Work is scheduled from 03-APR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - ATCHISON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) before RT Z E and ends at .015 mile(s) before CRD N AVE E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - MERCER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD APOLLO ST E and ends at US 65 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT V E - LEWIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .091 mile(s) after CRD 589 (CAMPBELL ST) S and ends at .079 mile(s) before CRD 591 (305TH ST) E.
Work is scheduled from 06-APR-2026 to 05-JUN-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT AA E - ST. CLAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT A E and ends at CRD NW 801 S.
Work is scheduled from 01-APR-2026 to 16-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - ST. CLAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD NW 801 S and ends at RT A E.
Work is scheduled from 01-APR-2026 to 16-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST HERKY-HORINE RD E - JEFFERSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .019 mile(s) before IS 55 S and ends at .013 mile(s) after IS 55 N.
Work is scheduled from 17-APR-2026 to 20-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone CST HERKY-HORINE RD W - JEFFERSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before IS 55 N and ends at .019 mile(s) after IS 55 S.
Work is scheduled from 17-APR-2026 to 20-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 55 N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .211 mile(s) before RP IS55N TO RTP N and ends at 1.573 mile(s) before CRD 604 E.
Work is scheduled from 13-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - SHANNON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .195 mile(s) after CST SUNSET ST S and ends at .008 mile(s) after RT E S.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after RT NN E and ends at RT NN E.
Work is scheduled from 03-APR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at RP ELM AVE TO IS44W W and ends at .054 mile(s) after CST SO ROCK HILL RD S.
Work is scheduled from 02-APR-2026 to 07-APR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 2 W - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after RT ZZ S and ends at CST SOUTH ST E.
Work is scheduled from 06-APR-2026 to 06-JUN-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 63 S - HOWELL County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .003 mile(s) before BU 63 S and ends at .001 mile(s) before US 160 W.
Work is scheduled from 13-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 63 N - HOWELL County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after US 160 E and ends at .005 mile(s) after BU 63 S.
Work is scheduled from 13-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 69 N - CLAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .057 mile(s) before CST HEARTLAND DR S and ends at .246 mile(s) before CST CHANDLER RD S.
Work is scheduled from 11-MAY-2026 to 14-MAY-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 W - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .21 mile(s) before RT N N and ends at .007 mile(s) before RT N N.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N W - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT K S and ends at RT H E.
Work is scheduled from 28-APR-2026 to 28-APR-2026.
Work will start daily at 08:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - SHANNON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) before RT W S and ends at .024 mile(s) before RT J S.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - WAYNE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .003 mile(s) after CRD 302 E and ends at .003 mile(s) before PVT PRIVATE RD S.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - FRANKLIN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after RP IS44W TO RTD S and ends at .008 mile(s) before RP RTD TO IS44W W.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - FRANKLIN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .028 mile(s) after RP IS44W TO RTAF N and ends at .002 mile(s) after RP IS44W TO RTD S.
Work is scheduled from 06-APR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT N E - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT H E and ends at RT K S.
Work is scheduled from 28-APR-2026 to 28-APR-2026.
Work will start daily at 08:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY E - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .021 mile(s) after US 63 S and ends at CRD MAHOGANY ST E.
Work is scheduled from 04-MAY-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 111 N - HOLT County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .021 mile(s) after CRD LONE ELM RD E and ends at .048 mile(s) after CRD LONE ELM RD E.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - LEWIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .079 mile(s) after CRD 591 (305TH ST) E and ends at .091 mile(s) before CRD 589 (CAMPBELL ST) S.
Work is scheduled from 06-APR-2026 to 05-JUN-2026.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 111 S - HOLT County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .048 mile(s) before CRD LONE ELM RD E and ends at .021 mile(s) before CRD LONE ELM RD E.
Work is scheduled from 30-MAR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U W - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at RT H S and ends at MO 3 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - MARION County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) after CST NORTH ST E and ends at .005 mile(s) after CST OLIVE ST S.
Work is scheduled from 31-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 106 W - SHANNON County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .476 mile(s) after CRD 531 S and ends at .599 mile(s) after CRD 531 S.
Work is scheduled from 06-APR-2026 to 09-APR-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - MARION County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CST OLIVE ST S and ends at .006 mile(s) before CST NORTH ST E.
Work is scheduled from 31-MAR-2026 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST MAIN ST E - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .018 mile(s) after CST UNNAMED CONNECTOR S and ends at CST E MAIN S.
Work is scheduled from 30-MAR-2026 to 16-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST MAIN ST W - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST E MAIN S and ends at .018 mile(s) before CST UNNAMED CONNECTOR S.
Work is scheduled from 30-MAR-2026 to 16-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - NEWTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) before CRD TEAL DR S and ends at .011 mile(s) before CRD SHETLAND RD S.
Work is scheduled from 07-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - HOWELL County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after MO 17 S and ends at .001 mile(s) before MO 17 S.
Work is scheduled from 20-APR-2026 to 24-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 83 S - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .092 mile(s) after CRD MOCKINGBIRD RD E and ends at .167 mile(s) before PVT RAMBLING DR S.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLINTON County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .583 mile(s) before RP IS35N TO MO116 N and ends at .866 mile(s) after RP US69 TO IS35N N.
Work is scheduled from 01-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 109 S - ST. LOUIS County - NO DELAYS
BRIDGE MAINTENANCE
Work zone begins at .075 mile(s) after CST BALD HILL RD S and ends at .031 mile(s) after CRD BALD PATE RD S.
Work is scheduled from 30-MAR-2026 to 30-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLINTON County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .81 mile(s) before RP IS35S TO US69 S and ends at .591 mile(s) after RP MO116 TO IS35S S.
Work is scheduled from 01-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone BU 67 S - BUTLER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .016 mile(s) after BU 60 E and ends at RT M E.
Work is scheduled from 30-MAR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 8 E - WASHINGTON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .031 mile(s) before PVT SANDSTONE RD S and ends at .035 mile(s) after PVT SANDSTONE RD S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 8 W - WASHINGTON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .035 mile(s) before PVT SANDSTONE RD S and ends at .031 mile(s) after PVT SANDSTONE RD S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 6 E and ends at RT MM E.
Work is scheduled from 09-APR-2026 to 17-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F W - MARION County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .364 mile(s) after PVT PRIVATE DR S and ends at .169 mile(s) after CRD 275 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F E - MARION County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .169 mile(s) before CRD 275 S and ends at .364 mile(s) before PVT PRIVATE DR S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 83 N - BENTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .167 mile(s) after PVT RAMBLING DR S and ends at .092 mile(s) before CRD MOCKINGBIRD RD E.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP RTE TO IS70W W - LAFAYETTE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT H S and ends at IS 70 W.
Work is scheduled from 30-MAR-2026 to 29-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP MO350W TO COLBERN RD W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 350 W and ends at .002 mile(s) before CST BANNISTER RD E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD 160 ST E and ends at .01 mile(s) after CRD 150 ST E.
Work is scheduled from 31-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) before CRD 150 ST E and ends at .003 mile(s) before CRD 160 ST E.
Work is scheduled from 31-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY W - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD MAHOGANY ST E and ends at .021 mile(s) before US 63 S.
Work is scheduled from 04-MAY-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT DD N - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT MM E and ends at MO 6 E.
Work is scheduled from 09-APR-2026 to 17-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US54E TO US50W W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after US 54 E and ends at US 50 W.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 160 E - DADE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CRD 91 S and ends at .001 mile(s) before CRD 105 S.
Work is scheduled from 06-APR-2026 to 04-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT ZZ W - CRAWFORD County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at MO 19 S and ends at RT F S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 W - DADE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CRD 105 S and ends at .001 mile(s) before CRD 91 S.
Work is scheduled from 06-APR-2026 to 04-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 70 W - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .041 mile(s) after RP IS70W TO RTE W and ends at .1 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM N - BARRY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .059 mile(s) after CRD 2205 E and ends at .065 mile(s) before CRD 2195 E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - LAFAYETTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .176 mile(s) before RP IS70E TO RTH E and ends at .018 mile(s) before RP RTH TO IS70E E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 05:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 67 N - BUTLER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT M E and ends at .016 mile(s) before BU 60 E.
Work is scheduled from 30-MAR-2026 to 29-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .029 mile(s) after RP IS49N TO IS44W W and ends at .08 mile(s) after MO 59 N.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 60 W - BUTLER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .066 mile(s) after RP BU60 TO RTB E and ends at .022 mile(s) after CST MAGNOLIA AVE E.
Work is scheduled from 17-APR-2026 to 18-MAY-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone CST VANDIVER DR E - BOONE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before US 63 S and ends at .001 mile(s) after US 63 N.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST VANDIVER DR W - BOONE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before US 63 N and ends at .001 mile(s) after US 63 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H S - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT C E and ends at MO 68 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .463 mile(s) after CRD 718 E and ends at MO 89 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 69 S - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at .02 mile(s) before CST N BRIGHTON AVE S and ends at .006 mile(s) after CST N BRIGHTON AVE S.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD OLD HWY 21 N - JEFFERSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .039 mile(s) after RP OLD HWY 21 TO RTME E and ends at .021 mile(s) before RP RTMW TO OLD HWY 21 N.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .631 mile(s) after MO 571 S and ends at .421 mile(s) before RP IS49S TO CEDAR RD W.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 41 N - CARROLL County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .054 mile(s) before CRD 381 S and ends at .012 mile(s) after CRD 280 E.
Work is scheduled from 30-MAR-2026 to 23-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 41 S - CARROLL County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) before CRD 280 E and ends at .054 mile(s) after CRD 381 S.
Work is scheduled from 30-MAR-2026 to 23-APR-2026.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US69 TO IS35S S - CLINTON County - ALL LANES CLOSED
CONCRETE OVERLAY
Work zone begins at US 69 S and ends at IS 35 S.
Work is scheduled from 01-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT MM S - BARRY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .065 mile(s) after CRD 2195 E and ends at .059 mile(s) before CRD 2205 E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U W - CARROLL County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .017 mile(s) after CRD 231 S and ends at .023 mile(s) after CRD 221 S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - CARROLL County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .023 mile(s) before CRD 221 S and ends at .017 mile(s) before CRD 231 S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 3 S and ends at RT H S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP E 29TH TER TO IS70E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST E 29TH ST E and ends at .013 mile(s) before IS 70 E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .057 mile(s) before CST E 27TH ST E and ends at .006 mile(s) before RP IS70E TO VAN BRUNT BLVD N.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 106 E - SHANNON County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .115 mile(s) after CRD 308 E and ends at .187 mile(s) after CRD 308 E.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 65 N - SALINE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .211 mile(s) after CRD KEOKUK AVE S and ends at .067 mile(s) before CRD 145TH RD E.
Work is scheduled from 06-APR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 65 S - SALINE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .067 mile(s) after CRD 145TH RD E and ends at .213 mile(s) before CRD JEWEL AVE S.
Work is scheduled from 06-APR-2026 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 149 N - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before CST N COMMERCIAL ST E and ends at .002 mile(s) after CST N COMMERCIAL ST E.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RP IS35S TO US69 S - CLINTON County - ALL LANES CLOSED
CONCRETE OVERLAY
Work zone begins at IS 35 S and ends at US 69 S.
Work is scheduled from 01-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT E N - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .022 mile(s) before CRD 150 ST E and ends at MO 246 E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - NODAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at MO 246 E and ends at .022 mile(s) after CRD 150 ST E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 E - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before RT C E and ends at CST BRECKENRIDGE AVE S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 149 S - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST N COMMERCIAL ST E and ends at .003 mile(s) after CST N COMMERCIAL ST E.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT WW E - FRANKLIN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after OR 44 E and ends at .002 mile(s) before RP RTD TO IS44E E.
Work is scheduled from 06-APR-2026 to 25-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT WW W - FRANKLIN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after RP RTD TO IS44E E and ends at .002 mile(s) before OR 44 E.
Work is scheduled from 06-APR-2026 to 25-MAY-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .073 mile(s) before CRD CIVIL WAR RD S and ends at .033 mile(s) after RP RTV TO IS49N N.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .021 mile(s) after RP US50E TO DIX RD E and ends at .005 mile(s) before BU 50 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 49 S - BARTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .071 mile(s) after RP MO126 TO IS49S S and ends at .714 mile(s) before RR NEVADA SUB S.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 W - MARION County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CST BRECKENRIDGE AVE S and ends at .001 mile(s) after RT C E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - LINN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .015 mile(s) after CRD FRESNO DR S and ends at .437 mile(s) before CRD HYDE RD E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - LINN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .437 mile(s) after CRD HYDE RD E and ends at .015 mile(s) before CRD FRESNO DR S.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - DAVIESS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .137 mile(s) after CRD UNITY AVE E and ends at .146 mile(s) after CRD UNITY AVE E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT BB W - DAVIESS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .146 mile(s) before CRD UNITY AVE E and ends at .137 mile(s) before CRD UNITY AVE E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .071 mile(s) before RP IS49S TO RTD W and ends at .294 mile(s) after RR NEVADA SUB S.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - BARTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .089 mile(s) before RR NEVADA SUB S and ends at .3 mile(s) before RP IS49S TO RTH W.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H N - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 68 E and ends at RT C E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT UU N - DAVIESS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .065 mile(s) before CRD FLINT AVE S and ends at RT B E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT UU S - DAVIESS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at RT B E and ends at .065 mile(s) after CRD FLINT AVE S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at CRD 234 E and ends at .004 mile(s) before CRD 232 E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .208 mile(s) before RP IS55N TO US61 S and ends at .117 mile(s) after US 61 N.
Work is scheduled from 10-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST NE PARVIN RD E - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .063 mile(s) after CST N CORRINGTON AVE S and ends at .018 mile(s) after CST RANDOLPH RD S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST NE PARVIN RD W - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .018 mile(s) before CST RANDOLPH RD S and ends at .063 mile(s) before CST N CORRINGTON AVE S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V N - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after CRD 232 E and ends at CRD 232 E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - BARTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.638 mile(s) after RP CRD SE 30TH RD TO IS49S S and ends at 1.035 mile(s) before RP IS49S TO MO126 W.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .843 mile(s) before CRD SE 232ND ST E and ends at .308 mile(s) before RT V E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT ZZ E - CRAWFORD County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at RT F S and ends at MO 19 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .85 mile(s) before CRD LEFHOLZ RD S and ends at .447 mile(s) before US 40 W.
Work is scheduled from 30-MAR-2026 to 30-APR-2026.
Work will start daily at 10:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 E - COLE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .043 mile(s) after CRD HERITAGE HWY S and ends at .053 mile(s) before PVT BASLER LN S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - SCOTT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .097 mile(s) before RT AB E and ends at .002 mile(s) before CST E MAIN ST E.
Work is scheduled from 13-APR-2026 to 24-APR-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT O N - CEDAR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B E and ends at CRD 1550 E.
Work is scheduled from 13-APR-2026 to 16-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.295 mile(s) before RP IS49N TO RTH E and ends at .158 mile(s) after RP RTH TO IS49N N.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 W - COLE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .171 mile(s) after CRD MONTICELLO RD E and ends at .138 mile(s) after CO US54W TO US54E S.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .072 mile(s) after CST NUTMEG RD E and ends at 1.13 mile(s) before RP IS49N TO RTM E.
Work is scheduled from 12-APR-2026 to 25-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD ST CHARLES RD E - BOONE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RP ST CHARLES RD TO IS70E E and ends at .003 mile(s) before RP IS70W TO ST CHARLES RD E.
Work is scheduled from 10-APR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CRD ST CHARLES RD W - BOONE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RP IS70W TO ST CHARLES RD E and ends at .003 mile(s) before RP ST CHARLES RD TO IS70E E.
Work is scheduled from 10-APR-2026 to 22-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 143 N - IRON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) before CRD 163 E and ends at CRD 161 S.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 143 S - IRON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 161 S and ends at .007 mile(s) after CRD 163 E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J W - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST ELM ST S and ends at CST MISSOURI AVE E.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT J E - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST MISSOURI AVE E and ends at CST ELM ST S.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLINTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .573 mile(s) after RP US69 TO IS35N N and ends at .972 mile(s) after RP US69 TO IS35N N.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 153 N - DUNKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .013 mile(s) before RT EE S and ends at .022 mile(s) before RT EE E.
Work is scheduled from 06-APR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST METROPOLITAN BLVD S - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at RT M E and ends at .003 mile(s) before OR 55 N.
Work is scheduled from 10-APR-2026 to 13-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT Z S - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 6 E and ends at RT MM E.
Work is scheduled from 02-APR-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N E - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT H E and ends at RT K S.
Work is scheduled from 07-APR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 126 W - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .024 mile(s) after CST DEPOT S and ends at .031 mile(s) before CRD SE 100TH LN S.
Work is scheduled from 30-MAR-2026 to 15-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 126 E - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .031 mile(s) after CRD SE 100TH LN S and ends at .024 mile(s) before CST DEPOT S.
Work is scheduled from 30-MAR-2026 to 15-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 35 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .008 mile(s) before IS 70 E and ends at .012 mile(s) before RP INDEPENDENCE AVE TO IS29N N.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 136 E and ends at RT N E.
Work is scheduled from 21-APR-2026 to 22-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT N E and ends at US 136 E.
Work is scheduled from 21-APR-2026 to 22-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 E - PLATTE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .063 mile(s) after CST N CONGRESS AVE N and ends at .039 mile(s) before RP BRIGHTON AVE TO MO152E E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 W - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .044 mile(s) after RP MO152W TO BRIGHTON AVE N and ends at .035 mile(s) after IS 29 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D S - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .011 mile(s) after US 63 S and ends at MO 156 E.
Work is scheduled from 04-MAY-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 63 S - HOWELL County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .066 mile(s) after US 60 E and ends at .017 mile(s) after RT N E.
Work is scheduled from 06-APR-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT MM W - LINN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .097 mile(s) after CST MAIN ST E and ends at .029 mile(s) before MO 139 S.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 149 S - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before CST WALNUT ST S and ends at .002 mile(s) after CST WALNUT ST S.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 149 N - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST WALNUT ST S and ends at .003 mile(s) after CST WALNUT ST S.
Work is scheduled from 20-APR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT C N - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at RT T E.
Work is scheduled from 30-MAR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT C S - MACON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at RT T E.
Work is scheduled from 30-MAR-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT D N - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 156 E and ends at .011 mile(s) before US 63 S.
Work is scheduled from 04-MAY-2026 to 01-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone BU 63 S - RANDOLPH County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .036 mile(s) after CST CARPENTER ST E and ends at .02 mile(s) after RT A S.
Work is scheduled from 11-MAY-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone BU 63 N - RANDOLPH County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .02 mile(s) before RT A S and ends at .036 mile(s) before CST CARPENTER ST E.
Work is scheduled from 11-MAY-2026 to 01-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT MM E - LINN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .029 mile(s) after MO 139 S and ends at .097 mile(s) before CST MAIN ST E.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS635N TO IS29N N - PLATTE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after IS 635 N and ends at .018 mile(s) before IS 635 N.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM N - LAWRENCE County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .059 mile(s) after RT Z S and ends at US 160 E.
Work is scheduled from 01-APR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 AM.
Work will be conducted Monday through Friday.
Future work zone RT MM S - DADE County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 160 E and ends at .059 mile(s) before RT Z S.
Work is scheduled from 01-APR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 03:30 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) after PVT MARITZ ENT S and ends at .254 mile(s) after CST CENTRAL AVE S.
Work is scheduled from 13-APR-2026 to 25-APR-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 291 S - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .294 mile(s) before CST CEMENT CITY RD E and ends at .031 mile(s) after CST CEMENT CITY RD E.
Work is scheduled from 02-MAY-2026 to 02-MAY-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 291 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .028 mile(s) before CST COURTNEY RD S and ends at .293 mile(s) after CST COURTNEY RD S.
Work is scheduled from 02-MAY-2026 to 02-MAY-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP US50W TO US54E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after US 63 N and ends at .011 mile(s) before US 54 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 63 N - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after US 50 W and ends at .006 mile(s) before RP US50E TO US54E E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 71 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before IS 70 W and ends at .028 mile(s) after RP IS35N TO INDEPENDENCE AVE E.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 09:00 AM and end by 02:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT Z N - SCOTLAND County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at CRD 764 E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 106 W - SHANNON County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .187 mile(s) before CRD 308 E and ends at .115 mile(s) before CRD 308 E.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 97 N - BARRY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .456 mile(s) before CRD 2040 E and ends at .076 mile(s) before CRD 2040 E.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 97 S - BARRY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .076 mile(s) after CRD 2040 E and ends at .456 mile(s) after CRD 2040 E.
Work is scheduled from 06-APR-2026 to 10-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 30 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CST GRANT RD E and ends at CST EDDIE AND PARK RD E.
Work is scheduled from 30-MAR-2026 to 06-APR-2026.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .35 mile(s) before CRD 604 E and ends at .3 mile(s) after RP RTP TO IS55S S.
Work is scheduled from 13-APR-2026 to 17-APR-2026.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - WEBSTER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .074 mile(s) after RP IS44W TO RTB N and ends at .08 mile(s) after MO 125 S.
Work is scheduled from 07-APR-2026 to 08-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT M N - DUNKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at MO 153 S and ends at MO 25 S.
Work is scheduled from 06-APR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 65 N - BENTON County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .153 mile(s) before MO 83 S and ends at .006 mile(s) before RP MO7N TO US65N N.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP US54W TO US50E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RP US63S TO US50W W and ends at .005 mile(s) before US 50 E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT VV S - BENTON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after RT AA E and ends at RT P E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT VV N - HICKORY County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT P E and ends at .001 mile(s) before RT AA E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .724 mile(s) after CRD 140 E and ends at .167 mile(s) after RT HH E.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .167 mile(s) before RT HH E and ends at .724 mile(s) before CRD 140 E.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - MILLER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .326 mile(s) before RT EE E and ends at .005 mile(s) before RT EE E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U N - MILLER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) after RT EE E and ends at .326 mile(s) after RT EE E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 09:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 7 N - BENTON County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .007 mile(s) after CST JACKSON ST S and ends at .253 mile(s) before PVT SUMMIT DR E.
Work is scheduled from 07-APR-2026 to 07-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST METROPOLITAN BLVD N - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after OR 55 S and ends at RT M E.
Work is scheduled from 10-APR-2026 to 13-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 83 N - BENTON County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .319 mile(s) after RT EE S and ends at .011 mile(s) before CRD BALKE RD E.
Work is scheduled from 08-APR-2026 to 08-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 33 N - CLAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .032 mile(s) before CST MAJOR ST E and ends at .032 mile(s) after CST MAJOR ST E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 39 S - CEDAR County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .455 mile(s) before CRD 450 E and ends at .314 mile(s) before CRD 450 E.
Work is scheduled from 13-APR-2026 to 17-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - BUCHANAN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .083 mile(s) before RT AC S and ends at .156 mile(s) after CRD CRAIG PKWY S.
Work is scheduled from 01-APR-2026 to 02-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - ST. CHARLES County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .104 mile(s) after RP IS70W TO MO94E E and ends at .008 mile(s) before RP FAIRGROUNDS RD TO IS70W W.
Work is scheduled from 03-APR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - HOWELL County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at CST RAMSEUR FARM RD E and ends at .002 mile(s) before US 63 S.
Work is scheduled from 06-APR-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 160 W - HOWELL County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .002 mile(s) after US 63 S and ends at CST RAMSEUR FARM RD E.
Work is scheduled from 06-APR-2026 to 30-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 35 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .308 mile(s) after RP US69N TO IS35N N and ends at .005 mile(s) after CST POE AVE S.
Work is scheduled from 10-APR-2026 to 10-APR-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO S - LAFAYETTE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .003 mile(s) after CRD NEWTON RD E and ends at .005 mile(s) before CRD CUMBERLAND RD E.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 33 S - CLAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .032 mile(s) before CST MAJOR ST E and ends at .032 mile(s) after CST MAJOR ST E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D S - LAFAYETTE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD HAPPY HOLLOW RD E and ends at .011 mile(s) before CRD TEXAS PRAIRIE RD E.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z N - SULLIVAN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT MM E and ends at MO 6 E.
Work is scheduled from 02-APR-2026 to 09-APR-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .008 mile(s) after RT Y E and ends at .054 mile(s) after RP IS44W TO MO38 W.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 11:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 59 S - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .095 mile(s) after CRD GRAYSTONE RD S and ends at .134 mile(s) after CRD GRAYSTONE RD S.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 E - PLATTE County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) before IS 29 N and ends at .002 mile(s) before US 169 S.
Work is scheduled from 01-APR-2026 to 12-JUN-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 44 E - JASPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .292 mile(s) after RP MO37 TO IS44E E and ends at .09 mile(s) after RT Z S.
Work is scheduled from 06-APR-2026 to 01-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .056 mile(s) before RP MO38 TO IS44E E and ends at .008 mile(s) before RT Y E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 11:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 W - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .006 mile(s) after US 169 S and ends at .001 mile(s) before IS 29 N.
Work is scheduled from 01-APR-2026 to 12-JUN-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 59 N - HOLT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .134 mile(s) before CRD GRAYSTONE RD S and ends at .095 mile(s) before CRD GRAYSTONE RD S.
Work is scheduled from 31-MAR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 N - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .109 mile(s) before RP IS435N TO US169N N and ends at .056 mile(s) after RP IS435N TO US169S S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .194 mile(s) before RP IS435N TO WOODLAND AVE N and ends at .081 mile(s) after RP WOODLAND AVE TO IS435N N.
Work is scheduled from 31-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .088 mile(s) before RP EATON ST TO IS35N N and ends at .126 mile(s) before RP IS35S TO SOUTHWEST TRFY S S.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .081 mile(s) before RP IS435S TO WOODLAND AVE S and ends at .204 mile(s) after RP WOODLAND AVE TO IS435S S.
Work is scheduled from 31-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 435 S - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .021 mile(s) before RP US169S TO IS435S S and ends at .094 mile(s) after RP US169N TO IS435S S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - GREENE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .069 mile(s) before MO 125 S and ends at .005 mile(s) before MO 38 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 04:00 AM and end by 11:30 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - STODDARD County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) after CRD 517 S and ends at .008 mile(s) after RP US60W TO BU60 W.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - WEBSTER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .312 mile(s) before RP IS44W TO RTCC S and ends at .068 mile(s) after MO 125 S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 04:00 AM and end by 11:30 AM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - SCOTLAND County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 764 E and ends at RT H E.
Work is scheduled from 06-APR-2026 to 06-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF W - BOLLINGER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CRD 520 S and ends at .002 mile(s) before CRD 501 S.
Work is scheduled from 06-APR-2026 to 08-APR-2026.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D S - LAFAYETTE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .264 mile(s) before CRD OLD SANTE FE TRAIL E and ends at .161 mile(s) after CRD OLD SANTE FE TRAIL E.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF E - BOLLINGER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after CRD 501 S and ends at .001 mile(s) before CRD 520 S.
Work is scheduled from 06-APR-2026 to 08-APR-2026.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - PLATTE County - NO DELAYS
ROADSIDE WORK
Work zone begins at .708 mile(s) after RT N S and ends at .037 mile(s) after CRD RUNNING HORSE RD S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - PLATTE County - NO DELAYS
ROADSIDE WORK
Work zone begins at .03 mile(s) before CRD RUNNING HORSE RD S and ends at .648 mile(s) after CRD RUNNING HORSE RD S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 7 S - BENTON County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .099 mile(s) after CRD MAJORVILLE RD E and ends at 1.153 mile(s) before CRD RAWHIDE AVE S.
Work is scheduled from 09-APR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 55 S - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at RT M E and ends at .007 mile(s) before CST METROPOLITAN BLVD N.
Work is scheduled from 10-APR-2026 to 13-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone W OR 55 N - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) after CST METROPOLITAN BLVD S and ends at RT M E.
Work is scheduled from 10-APR-2026 to 13-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT VV N - BENTON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after RT AA E and ends at MO 7 S.
Work is scheduled from 07-APR-2026 to 07-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT VV S - BENTON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 7 S and ends at .001 mile(s) before RT AA E.
Work is scheduled from 07-APR-2026 to 07-APR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA S - JASPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .134 mile(s) before CRD N PROSPERITY AVE S and ends at .2 mile(s) before MO 66 E.
Work is scheduled from 06-APR-2026 to 08-APR-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - JASPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .073 mile(s) after RT M E and ends at RT H E.
Work is scheduled from 07-APR-2026 to 09-APR-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF W - BOLLINGER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) after CRD 512 E and ends at CRD 513 E.
Work is scheduled from 01-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF E - BOLLINGER County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 513 E and ends at .006 mile(s) before CRD 512 E.
Work is scheduled from 01-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 136 E and ends at CST EVANS ST E.
Work is scheduled from 27-APR-2026 to 27-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST EVANS ST E and ends at US 136 E.
Work is scheduled from 27-APR-2026 to 27-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .297 mile(s) after RT U S and ends at .636 mile(s) after RT U S.
Work is scheduled from 06-APR-2026 to 14-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D E - MERCER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .636 mile(s) before RT U S and ends at .297 mile(s) before RT U S.
Work is scheduled from 06-APR-2026 to 14-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT AA S - JASPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD CEDAR RD E and ends at MO 66 E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 E - HICKORY County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .012 mile(s) after CST FIRST ST S and ends at .014 mile(s) before RT U S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .016 mile(s) after RP IS55S TO RTZ W and ends at .045 mile(s) before RP IS55S TO CST MCNUTT ST E.
Work is scheduled from 10-APR-2026 to 11-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT H W - SCOTLAND County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT N E and ends at MO 15 S.
Work is scheduled from 20-APR-2026 to 20-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 55 S - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at RT M E and ends at .004 mile(s) before CST METROPOLITAN BLVD N.
Work is scheduled from 17-APR-2026 to 20-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone W OR 55 N - JEFFERSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after CST METROPOLITAN BLVD S and ends at RT M E.
Work is scheduled from 17-APR-2026 to 20-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 39 S - BARRY County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .014 mile(s) after CRD 2015 E and ends at .095 mile(s) after RT TT E.
Work is scheduled from 01-APR-2026 to 07-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT N E and ends at US 136 E.
Work is scheduled from 04-MAY-2026 to 04-MAY-2026.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at RT Z S.
Work is scheduled from 30-APR-2026 to 30-APR-2026.
Work will start daily at 11:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 136 E and ends at RT N E.
Work is scheduled from 04-MAY-2026 to 04-MAY-2026.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Z S and ends at MO 15 S.
Work is scheduled from 30-APR-2026 to 30-APR-2026.
Work will start daily at 11:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at RT N E.
Work is scheduled from 15-APR-2026 to 16-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 69 N - CLINTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .302 mile(s) before CRD SE ELISSA LN E and ends at .088 mile(s) before MO 116 E.
Work is scheduled from 05-JUN-2026 to 26-JUN-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 5 S - SULLIVAN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) before MO 6 E and ends at .001 mile(s) before CST E LINE ST E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 N - SULLIVAN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CST LINE ST E and ends at .003 mile(s) after MO 6 E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT N E and ends at MO 15 S.
Work is scheduled from 15-APR-2026 to 16-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 69 S - CLINTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .087 mile(s) after MO 116 E and ends at .302 mile(s) after CRD SE ELISSA LN E.
Work is scheduled from 05-JUN-2026 to 26-JUN-2026.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT BB S - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at RT N E and ends at .106 mile(s) before MO 96 E.
Work is scheduled from 30-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT BB N - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .106 mile(s) after MO 96 E and ends at RT N E.
Work is scheduled from 30-MAR-2026 to 01-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT N E - SCOTLAND County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT H E and ends at RT K S.
Work is scheduled from 13-APR-2026 to 14-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT N W - CLARK County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT K S and ends at RT H E.
Work is scheduled from 13-APR-2026 to 14-APR-2026.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO47 TO IS70W W - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at IS 70 W.
Work is scheduled from 27-APR-2026 to 12-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT F S - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .003 mile(s) before CST EVANS ST E and ends at US 136 E.
Work is scheduled from 04-MAY-2026 to 04-MAY-2026.
Work will start daily at 01:00 PM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 136 E and ends at .003 mile(s) after CST EVANS ST E.
Work is scheduled from 04-MAY-2026 to 04-MAY-2026.
Work will start daily at 01:00 PM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - LAFAYETTE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD CUMBERLAND RD E and ends at .001 mile(s) before PVT MOUNTAIN VIEW RD S.
Work is scheduled from 30-MAR-2026 to 09-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - CALLAWAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at BU 54 E and ends at RT J S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP US50E TO US54E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after US 50 E and ends at .008 mile(s) before RR BAGNELL IND LD E.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT H E - CALLAWAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT J S and ends at BU 54 E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP US50E TO US54W W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .019 mile(s) after US 50 E and ends at .005 mile(s) before US 54 W.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT OO W - HENRY County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Y S and ends at MO 52 E.
Work is scheduled from 31-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO E - HENRY County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 52 E and ends at RT Y S.
Work is scheduled from 31-MAR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .091 mile(s) before RT Z S and ends at .314 mile(s) before RP IS44W TO MO37 N.
Work is scheduled from 06-APR-2026 to 01-NOV-2026.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT V W - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after MO 39 S and ends at CRD 2110 E.
Work is scheduled from 08-APR-2026 to 24-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - PEMISCOT County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT A E and ends at RT Z S.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone BU 60 W - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) before CST N VALLEY ST S and ends at .004 mile(s) after CST N VALLEY ST S.
Work is scheduled from 02-APR-2026 to 21-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone BU 60 E - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .004 mile(s) before CST N VALLEY ST S and ends at .006 mile(s) after CST N VALLEY ST S.
Work is scheduled from 02-APR-2026 to 21-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT V E - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at CRD 2110 E and ends at .001 mile(s) before MO 39 S.
Work is scheduled from 08-APR-2026 to 24-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O S - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at RT Z S and ends at .004 mile(s) before MO 174 E.
Work is scheduled from 06-APR-2026 to 24-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .004 mile(s) after MO 174 E and ends at RT Z S.
Work is scheduled from 06-APR-2026 to 24-APR-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B N - PEMISCOT County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT Z S and ends at RT A E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 129 S - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) after CRD KEY RD E and ends at .003 mile(s) before CRD KEMPWOOD RD E.
Work is scheduled from 06-APR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 129 N - SULLIVAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CRD KEMPWOOD RD E and ends at .163 mile(s) before CRD KEY RD E.
Work is scheduled from 06-APR-2026 to 28-AUG-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT Z N - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT H E and ends at CRD 764 E.
Work is scheduled from 30-APR-2026 to 30-APR-2026.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - SCOTLAND County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 764 E and ends at RT H E.
Work is scheduled from 30-APR-2026 to 30-APR-2026.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT CC W - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .053 mile(s) after PVT COMMERCIAL RD S and ends at .015 mile(s) before CRD HERNDON ST E.
Work is scheduled from 09-APR-2026 to 31-AUG-2027.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC E - CHRISTIAN County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) after CRD HERNDON ST E and ends at .053 mile(s) before PVT COMMERCIAL RD S.
Work is scheduled from 09-APR-2026 to 31-AUG-2027.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M S - RAY County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .01 mile(s) before CRD W 168TH ST E and ends at .719 mile(s) before RT U E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M N - RAY County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .719 mile(s) after RT U E and ends at .01 mile(s) after CRD W 168TH ST E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .027 mile(s) before RT C E and ends at .013 mile(s) after CRD ADAMANTINE RD E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 96 E - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .091 mile(s) before MO 571 S and ends at .01 mile(s) after IS 49 N.
Work is scheduled from 15-APR-2026 to 16-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT F S - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .013 mile(s) before CRD ADAMANTINE RD E and ends at .027 mile(s) after RT C E.
Work is scheduled from 31-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .182 mile(s) before RT O S and ends at .467 mile(s) before CRD 55TH RD S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V E - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .467 mile(s) after CRD 55TH RD S and ends at .182 mile(s) after RT O S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO96 TO IS49S S - JASPER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at MO 571 N and ends at IS 49 S.
Work is scheduled from 15-APR-2026 to 16-APR-2026.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 123 N - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .031 mile(s) after CRD S 35TH RD S and ends at .013 mile(s) after CST MAIN ST E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 123 S - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .013 mile(s) before CST MAIN ST E and ends at .031 mile(s) before CRD S 35TH RD S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - LINCOLN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .233 mile(s) before RT U E and ends at .211 mile(s) before RT U E.
Work is scheduled from 30-MAR-2026 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT J S - LINCOLN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .211 mile(s) after RT U E and ends at .233 mile(s) after RT U E.
Work is scheduled from 30-MAR-2026 to 31-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone N OR 70 E - WARREN County - ALL LANES CLOSED
Improve I-70 project 2
BRIDGE RECONSTRUCTION
Work zone begins at .052 mile(s) before CST ANWIJO WAY E and ends at .004 mile(s) before MO 47 S.
Work is scheduled from 27-APR-2026 to 12-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 759 N - BUCHANAN County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .003 mile(s) after CST FLORENCE RD E and ends at .002 mile(s) after CST CEDAR ST E.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP W - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .02 mile(s) after CRD E 340TH RD E and ends at .385 mile(s) after PK POMME DE TERRE LAKE S.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N E - CEDAR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 39 S and ends at .023 mile(s) before RT J S.
Work is scheduled from 13-APR-2026 to 16-APR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP E - POLK County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .385 mile(s) before PK POMME DE TERRE LAKE S and ends at .02 mile(s) before CRD E 340TH RD E.
Work is scheduled from 30-MAR-2026 to 30-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) before CRD INGALLS RD E and ends at .007 mile(s) before CRD MIKE RD E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) after CRD MIKE RD E and ends at .005 mile(s) after CRD INGALLS RD E.
Work is scheduled from 02-APR-2026 to 02-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 18 W - BATES County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) after CST FOURTH ST E and ends at .007 mile(s) before CST 1ST ST E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 18 E - BATES County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) after CST 1ST ST E and ends at .006 mile(s) before CST FOURTH ST E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .011 mile(s) before CRD ADAMANTINE RD E and ends at .002 mile(s) after CRD INGALLS RD E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before CRD INGALLS RD E and ends at .011 mile(s) after CRD ADAMANTINE RD E.
Work is scheduled from 01-APR-2026 to 01-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 24 W - CHARITON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) before MO 129 S and ends at .001 mile(s) before MO 5 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 24 E - CHARITON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after MO 5 S and ends at .005 mile(s) after MO 129 S.
Work is scheduled from 30-MAR-2026 to 03-APR-2026.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .403 mile(s) before RP IS55N TO CST MCNUTT ST N and ends at .028 mile(s) before RP RTZ TO IS55N N.
Work is scheduled from 10-APR-2026 to 11-APR-2026.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP CST MCNUTT ST TO IS55N N - JEFFERSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at CST MCNUTT ST N and ends at IS 55 N.
Work is scheduled from 10-APR-2026 to 12-APR-2026.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 66 E - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .051 mile(s) before PVT S FORD LN S and ends at .001 mile(s) before RT P E.
Work is scheduled from 30-MAR-2026 to 02-APR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 23 N - JOHNSON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .023 mile(s) after CRD 625 E and ends at .049 mile(s) before RT CC S.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 23 S - JOHNSON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .049 mile(s) after RT CC S and ends at .023 mile(s) before CRD 625 E.
Work is scheduled from 30-MAR-2026 to 31-MAR-2026.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
155
IS 55 (Pemiscot) TO Tennessee Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
170
RT D / Page Avenue (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
170
IS 270 (St. Louis) TO RT D / Page Avenue (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
229
IS 29 North Jct (Andrew) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
255
IS 55 (St. Louis) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
270
IS 64 (St. Louis) TO IS 70 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
270
IS 70 (St. Louis) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
270
IS 55 (St. Louis) TO IS 44 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
270
IS 44 (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
US 169 North Jct (Buchanan) TO IS 229 South Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
MO 118 (Holt) TO Andrew County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
US 136 (Atchison) TO RT W (Holt) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
IS 229 SOUTH JCT (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
MO 45 (PLATTE) TO IS 35 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
MEXICO CITY AVE (PLATTE) TO MO 45 Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
Iowa Line TO US 136 (Atchison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
BUCHANAN COUNTY LINE TO MEXICO CITY AVE (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
RT W (Holt) TO MO 118 (Holt) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
29
Andrew County Line TO US 169 North Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
US 69 South Jct (Daviess) TO US 69 (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
Iowa Line TO RT A / Z (Harrison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
IS 70 E JCT (JACKSON) TO IS 670 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
CLINTON COUNTY LINE TO MO 152 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
MO 152 (CLAY) TO IS 29 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
RT H / AA (Harrison) TO RT DD (Daviess) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
RT DD (Daviess) TO US 69 South Jct (Daviess) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
RT A / Z (Harrison) TO RT H / AA (Harrison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
US 69 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
35
IS 670 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
IS 70 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
IS 470 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
KANSAS LINE TO IS 29 NORTH JCT (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
108TH STREET (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
PLATTE COUNTY LINE TO 108TH STREET (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
435
IS 29 SOUTH JCT (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 174 (Lawrence) TO MO 266 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
Oklahoma Line TO MO 37 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 5 (Laclede) TO Pulaski County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 125 (Greene) TO MO 38 (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
St. Louis City Line TO IS 70 (St. Louis City) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 38 (Webster) TO RT J / Y (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
RT J / Y (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 266 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
US 63 (Phelps) TO Crawford County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
Crawford County Line TO Franklin County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
Phelps County Line TO US 63 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
Laclede County Line TO Phelps County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
44
MO 37 (Jasper) TO MO 174 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
470
WOODS CHAPEL RD (JACKSON) TO 39TH STREET (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
470
IS 435 (JACKSON) TO WOODS CHAPEL RD (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
RT A / B (BATES) TO RT B (VERNON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
IS 435 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
JACKSON COUNTY LINE TO NORTH CASS PKWY (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
NORTH CASS PKWY (CASS) TO RT A / B (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
RT H / K (JASPER) TO IS 44 EAST JCT (JASPER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
RT B (VERNON) TO US 160 (BARTON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
RT A / B (CASS) TO RT A / B (BATES) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
IS 44 WEST JCT (JASPER) TO RT B (MCDONALD) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
RT B (MCDONALD) TO ARKANSAS LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
49
US 160 (BARTON) TO RT H / K (JASPER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
ST. LOUIS CITY LINE TO RT M (JEFFERSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT U (Pemiscot) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
MO 32 (Ste. Genevieve) TO RT N (Ste. Genevieve) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
MO 77 (Scott) TO IS 57 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT A (Pemiscot) TO RT U (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
US 61 / MO 34 (Cape Girardeau) TO MO 77 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
US 61 / US 62 South Jct (New Madrid) TO RT A (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT N (Ste. Genevieve) TO RT KK (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT TT (JEFFERSON) TO MO 32 (STE. GENEVIEVE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT KK (Cape Girardeau) TO US 61 / MO 34 (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
IS 44 TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
RT M (JEFFERSON) TO RT TT (JEFFERSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
MO 80 (New Madrid) TO US 61 / US 62 South Jct (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
55
IS 57 (Scott) TO MO 80 (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
57
Illinois Line TO IS 55 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
635
IS 29 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
64
St. Louis City Line TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
64
IS 70 (St. Charles) TO St. Louis County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
64
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
670
KANSAS LINE TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
IS 470 (JACKSON) TO RT F (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
KANSAS LINE TO IS 670 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 135 (Cooper) TO MO 179 (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
St. Louis City Line TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
RT W / T (St. Charles) TO St. Louis County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
US 65 (Saline) TO MO J (Saline) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
Cooper County Line TO MO 135 (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
Callaway County Line TO US 54 (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO J (Saline) TO Saline County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
IS 435 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
RT Y (Saline) TO US 65 (Saline) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 13 (Lafayette) TO RT Y (Saline) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
RT Z (Boone) TO Callaway County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 740 (Boone) TO RT Z (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 179 (Cooper) TO MO 740 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
RT D / YY (Callaway) TO MO 19 (Montgomery) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
US 54 (Callaway) TO RT D / YY (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
70
RT F (Jackson) TO MO 13 (Lafayette) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
MO 5 West Jct (Putnam) TO Schuyler County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
US 59 North Jct (Atchison) TO RT M (Atchison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
Mercer County Line TO US 65 West Jct (Mercer) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
Nebraska Line TO US 59 North Jct (Atchison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
RT P South Jct (Nodaway) TO US 169 East Jct (Gentry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
US 169 East Jct (Gentry) TO RT D (Harrison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
US 65 East Jct (Mercer) TO MO 139 West Jct (Putnam) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
US 71 South Jct (Nodaway) TO RT P South Jct (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
RT M (Atchison) TO US 71 North Jct (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
IS 35 (Harrison) TO Mercer County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
MO 139 West Jct (Putnam) TO MO 5 West Jct (Putnam) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
136
RT D (Harrison) TO IS 35 (Harrison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
159
IS 29 (Holt) TO Nebraska Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
RT M (Oregon) TO MO 19 South Jct (Oregon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 39 North Jct (Dade) TO RT F / V (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 21 South Jct (Ripley) TO Butler County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
US 65 (Taney) TO MO 76 East Jct (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
IS 49 (Barton) TO MO 126 (Barton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 126 (Barton) TO MO 39 North Jct (Dade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
Butler County Line TO US 67 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
RT F / V (Greene) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
RT V (Ozark) TO US 63 South Jct (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 13 (Stone) TO US 65 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
US 60 East Jct (Greene) TO MO 14 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 14 (Christian) TO MO 13 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
US 63 North Jct (Howell) TO RT M (Oregon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 43 (Barton) TO IS 49 (Barton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
Kansas Line TO MO 43 (Barton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
160
MO 5 West Jct (Ozark) TO RT V (Ozark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
166
Kansas Line TO IS 44 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
RT O (Gentry) TO US 136 East Jct (Gentry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
Iowa Line TO RT O (Gentry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
MO 31 (DeKalb) TO RT E (Andrew) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
RT VV (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
IS 29 South Jct (Buchanan) TO RT V V (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
RT M (Gentry) TO MO 31 (DeKalb) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
MO 152 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
US 136 West Jct (Gentry) TO RT M (Gentry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
RT E (Andrew) TO IS 29 North Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
IS 29 North Jct (Buchanan) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
169
MO 92 (CLAY) TO MO 152 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
Lafayette County Line TO MO 13 (Lafayette) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
MO 291 (JACKSON) TO LAFAYETTE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
MO 13 (Lafayette) TO US 65 (Lafayette) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
MO 5 West Jct (Chariton) TO Randolph County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
IS 435 (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
MO 11 (Chariton) TO MO 5 West Jct (Chariton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
24
US 65 (Carroll) TO MO 11 (Chariton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
MO 11 (Linn) TO Macon County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
US 65 (Livingston) TO RT W (Linn) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
MO 31 (DeKalb) TO MO 33 East Jct (DeKalb) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
MO 33 East Jct (DeKalb) TO RT J (Caldwell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
Kansas Line TO RT AC (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
RT J (Caldwell) TO RT A (Caldwell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
RT W (Linn) TO MO 11 (Linn) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
RT AC (Buchanan) TO MO 31 (DeKalb) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
36
RT A (Caldwell) TO US 65 (Livingston) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
40
MO 7 (JACKSON) TO IS 70 EAST JCT (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
40
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
40
Howard County Line TO SP 240 (Howard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
40
IS 70 WEST JCT (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
40
SP 240 (Howard) TO IS 70 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
412
RT C (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
412
Arkansas Line TO MO 25 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
412
MO 25 (Dunklin) TO RT C (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
IS 470 (Jackson) TO RT F (Jackson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT MM (Pettis) TO RT TT (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT F (Jackson) TO MO 13 (Johnson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
MO 135 West Jct (Pettis) TO RT E (Moniteau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT D / T (Cole) TO US 54 (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
MILITIA DRIVE (Cole) TO Cole County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
Osage County Line TO RT N (Osage) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
US 54 (Cole) TO MILITIA DRIVE (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
MO 13 (Johnson) TO MO 127 (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT E (Moniteau) TO Moniteau County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT TT (Pettis) TO MO 135 West Jct (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
RT N (OSAGE) TO MO 19 WEST JCT (GASCONADE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
Gasconade County Line TO IS 44 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
Moniteau County Line TO RT D / T (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
MO 127 (Pettis) TO RT MM (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
50
MO 19 WEST JCT (GASCONADE) TO FRANKLIN COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
RT J (Callaway) TO IS 70 (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
IS 70 (Callaway) TO Audrain County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 13 (St. Clair) TO MO 83 (Hickory) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 5 (Camden) TO Grand Glaize Bridge Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 83 (Hickory) TO US 65 (Hickory) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 43 (Vernon) TO RT AA (Vernon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
RT CC (Cole) TO US 63 North Jct (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
RT AA (Vernon) TO MO 39 (Cedar) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 39 (Cedar) TO MO 13 (St. Clair) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
Kansas Line TO MO 43 (Vernon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
US 65 (Hickory) TO MO 73 (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 52 (Miller) TO MO 17 (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 17 (Cole) TO RT CC (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
US 63 North Jct (Callaway) TO RT J (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
Grand Glaize Bridge TO MO 52 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 73 (Camden) TO MO 5 (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
IS 29 Exit 75 (Holt) TO IS 29 Exit 67 (Holt) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
IS 29 Exit 53 (Andrew) TO Karnes Rd (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
Pendelton St (Buchanan) TO IS 229 North Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
Iowa Line TO US 136 North Jct (Atchison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
US 136 South Jct (Atchison) TO IS 29 Exit 92 (Holt) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
59
MO 752 (Buchanan) TO Kansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
RT J (Carter) TO MO 21 North Jct (Carter) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 181 (Texas) TO US 63 South Jct (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
US 63 South Jct (Howell) TO MO 17 East Jct (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
Butler County Line TO US 67 South Jct (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
Oklahoma Line TO MO 59 South Jct (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 37 (Barry) TO BU 60 East Jct (Lawrence) Aurora Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 5 East Jct (Wright) TO MO 95 (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 114 (Stoddard) TO IS 55 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 95 (Wright) TO MO 181 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
US 67 South Jct (Butler) TO RT DD (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 59 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
US 65 (Greene) TO RT FF (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
RT DD (Butler) TO MO 114 (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
RT M (Newton) TO MO 37 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
BU 60 East Jct (Lawrence) Aurora TO RT P (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 360 (Greene) TO US 65 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 59 South Jct (Newton) TO MO 59 North Jct (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
IS 57 (Mississippi) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 21 North Jct (Carter) TO Butler County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
RT FF (Webster) TO MO 5 East Jct (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
MO 17 East Jct (Howell) TO RT J (Carter) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
60
RT P (Greene) TO MO 360 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
Ste. Genevieve County Line TO MO 32 (St. Genevieve) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 51 (PERRY) TO RT A (PERRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
US 67 (JEFFERSON) TO STE. GENEVIEVE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
RT Y (CAPE GIRARDEAU) TO IS 55 EXIT 99 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
IS 55 Exit 44 (New Madrid) TO IS 55 Exit 32 (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
IS 55 Exit 99 (Cape Girardeau) TO IS 55 Exit 93 (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 80 (NEW MADRID) TO IS 55 EXIT 49(NEW MADRID) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
IS 55 EXIT 87 (SCOTT) TO MO 77 SOUTH JCT (SCOTT) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
RT A (PERRY) TO RT Y (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
US 60 (NEW MADRID) TO MO 80 (NEW MADRID) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
RT M (PERRY) TO MO 51 (PERRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 77 South Jct (Scott) TO US 60 (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
IS 55 Exit 8 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
ST. CHARLES COUNTY LINE TO IS 70 (ST. CHARLES) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 32 (ST. GENEVIEVE) TO RT M (PERRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
62
RT W (New Madrid) TO US 61 (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
62
MO 53 (Dunklin) TO RT W (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
62
RT B (MISSISSIPPI) TO IS 57 (MISSISSIPPI) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
62
US 61 (SCOTT) TO RT B (MISSISSIPPI) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
MO 32 (Texas) TO US 60 North Jct (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 60 South Jct (Texas) TO US 160 North Jct (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 50 East Jct (Osage) TO RT P (Osage) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
MO 22 (Boone) TO RT B (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
RT H (Boone) TO US 54 (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
RT B (Boone) TO RT H (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
US 160 North Jct (Texas) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
RT P (Osage) TO MO 42 (Maries) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
Phelps County Line TO IS 44 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
IS 44 (Phelps) TO MO 32 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63
MO 42 (Maries) TO Phelps County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
63C
US 63 (Boone) TO US 63 (Boone) Columbia Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 32 (Dallas) TO MO 125 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
IS 44 (Greene) TO US 60 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 52 North Jct (Pettis) TO MO 52 South Jct (Benton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT D (Dallas) TO MO 32 (Dallas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
Iowa Line TO US 136 North Jct (Mercer) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
Livingston County Line TO US 36 (Livingston) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
CRD Wildwood Rd S TO RT H (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 52 South Jct (Benton) TO RT AC (Benton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT AA (Benton) TO RT D (Dallas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
US 136 North Jct (Mercer) TO RT C (Grundy) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT C (Grundy) TO MO 6 (Grundy) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
Saline County Line TO RT YY (Saline) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT YY (Saline) TO CRD Wildwood Rd S Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 6 (Grundy) TO Livingston County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
US 60 (Greene) TO RT EE (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 125 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT U (Carroll) TO US 24 (Carroll) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT AC (Benton) TO RT AA (Benton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT EE (Christian) TO MO 176 South Jct (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
RT H (Pettis) TO CRD KA LINE DR E (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
US 24 (Carroll) TO Saline County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
MO 176 South Jct (Taney) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
CRD KA LINE DR E (Pettis) TO MO 52 North Jct (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
65
US 36 (Livingston) TO RT U (Carroll) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
IS 270 (St. Louis) TO Dorsett Rd / Midland Blvd (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
MO 72 (Madison) TO RT EE (Wayne) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
RT EE (Wayne) TO MO 172 (Wayne) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
US 60 South Jct (Butler) TO RT M (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
US 61 South Jct (Jefferson) TO RT V (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
RT V (Jefferson) TO MO 32 North Jct (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
MO 172 (Wayne) TO US 60 North Jct (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
RT M (Butler) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
Illinois Line TO IS 270 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
Dorsett Rd / Midland Blvd (St. Louis) TO Swan Dr (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
RT M (Jefferson) TO US 61 South Jct (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
MO 267 (St. Louis) TO RT M (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
MO 32 North Jct (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
67
Prospect Ave (St. Louis) TO MO 267 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
MO 6 South Jct (Daviess) TO IS 35 South Jct (Daviess) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
IS 35 SOUTH JCT (CLAY) TO PLATTE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
PLATTE COUNTY LINE TO IS 635 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
IS 635 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
MO 92 (CLAY) TO IS 35 NORTH JCT (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
69
IS 35 South Jct (Daviess) TO LP 35 (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
Is 49 (McDonald) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
RT B (Andrew) TO IS 29 (Andrew) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
RT FF (Nodaway) TO US 136 East Jct (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
Iowa Line TO RT FF (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
United States Route
71
US 136 East Jct (Nodaway) TO RT B (Andrew) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
1
MO 152 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
1
IS 35 (CLAY) TO MO 210 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
10
RT M (RAY) TO CARROLL COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
10
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
10
CARROLL COUNTY LINE TO US 65 (CARROLL) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
10
CLAY COUNTY LINE TO RT M (RAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
100
Frene Creek Rd (Gasconade) TO MO 19 South Jct (Gasconade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
100
St. Louis County Line TO Big Bend Blvd (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
100
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
100
MO 19 North Jct (Gasconade) TO Franklin County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
103
US 60 (Carter) TO Skyline Dr (Carter) Van Buren Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
105
US 62 (Mississippi) TO MO 80 (Mississippi) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
109
RT CC (St. Louis) TO RT W (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
110
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
112
RT F (Barry) TO MO 76 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
114
MO 25 (Stoddard) TO Airport Rd (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
114
US 60 (Stoddard) TO US 61 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
115
IS 70 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
116
US 69 (Clinton) TO MO 13 South Jct (Caldwell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
116
US 169 (Clinton) TO MO 33 East Jct (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
116
MO 13 NORTH JCT (CALDWELL) TO RT A (CALDWELL) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
116
MO 33 East Jct (Clinton) TO US 69 (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
12
IS 435 (JACKSON) TO SPRING ST. (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
123
RT BB (Greene) TO US 160 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
124
RT B (Boone) TO MO 22 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
125
MO 14 East Jct (Christian) TO RT T (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
125
RT C (Greene) TO RT OO West Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
125
RT OO West Jct (Greene) TO US 60 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
125
US 65 (Greene) TO RT E (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
125
US 60 (Greene) TO MO 14 West Jct (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 6 West Jct (Daviess) TO US 36 (Caldwell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 32 (Polk) TO RT BB (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 224 West Jct (Lafayette) TO IS 70 (Lafayette) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
Ray County Line TO MO 224 West Jct (Lafayette) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
RT BB (Greene) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 7 South Jct (Henry) TO St. Clair County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 2 (Johnson) TO MO 7 North Jct (Henry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
US 160 Reed Spring Jct (Stone) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
US 50 EAST JCT (JOHNSON) TO MO 2 (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
St. Clair County Line TO MO 82 (St. Clair) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
IS 70 (Lafayette) TO US 50 West Jct (Johnson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
MO 82 (St. Clair) TO US 54 (St. Clair) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
US 54 (St. Clair) TO MO 32 (Polk) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
13
US 36 (Caldwell) TO Ray County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
131
LAFAYETTE COUNTY LINE TO US 50 (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
131
MO 224 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
131
US 50 (JOHNSON) TO MO 58 (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
133
Maries County Line TO MO 17 (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
133
MO 7 (Pulaski) TO IS 44 (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
135
MO 52 (Morgan) TO MO 5 (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
14
US 65 (Christian) TO MO 125 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
14
RT BB (Douglas) TO RT FF (Douglas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
14
MO 125 (Christian) TO RT BB (Douglas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
14
RT P (Christian) TO US 65 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
141
MO 370 (St. Louis) TO MO 364 (St. Louis Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
141
MO 364 (ST. LOUIS) TO MO 30 (ST. LOUIS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
141
MO 30 (ST. LOUIS) TO US 67 (JEFFERSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
142
US 63 (OREGON) TO RT V (RIPLEY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
142
MO 158 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
142
MO 21 East Jct (Ripley) TO RT E (Ripley) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
142
RT V (RIPLEY) TO MO 21 WEST JCT (RIPLEY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
148
US 136 (Nodaway) TO Iowa Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
150
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
150
KANSAS LINE TO MO 291 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
152
IS 435 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
152
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
158
US 67 (Butler) TO MO 142 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
163
IS 70 (Boone) TO RT K (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
164
RT NN (Pemiscot) TO US 61 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
164
RT D (Pemiscot) TO RT DD (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
164
US 412 West Jct (Dunklin) TO RT NN (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
Miller County Line TO MO 52 West Jct (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
MO 52 West Jct (Miller) TO RT K (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
MO 32 (Texas) TO US 63 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
US 63 (Howell) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
RT K (Miller) TO IS 44 (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
RT AW (Texas) TO MO 32 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
17
US 54 (Cole) TO Miller County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
171
MO 96 (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
171
MO 43 (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
171
Kansas Line TO MO 96 West Jct (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
171
MO 249 (Jasper) TO MO 96 W Jct (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
173
MO 265 (Stone) TO MO 248 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
174
MO 39 (Lawrence) TO RT P (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
174
RT P (Greene) TO US 60 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
175
IS 49 (Newton) TO MO 86 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
177
RT J (Cape Girardeau) TO Lexington Ave (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
177
US 61 (Cape Girardeau) TO RT J (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
179
Industrial Dr (Cole) TO US 54 (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
18
Montgomery St (Henry) TO MO 13 (Henry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
180
IS 270 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
185
RT H (Franklin) TO SP 185 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
IS 44 (Crawford) TO MO 8 West Jct (Crawford) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
Dent County Line TO RT B (Dent) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
MO 28 West Jct (Gasconade) TO Crawford County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
US 160 South Jct (Oregon) TO RT E (Oregon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
MO 100 North Jct (Gasconade) TO MO 28 East Jct (Gasconade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
Crawford County Line TO IS 44 (Crawford) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
MO 8 East Jct (Crawford) TO Dent County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
MO 106 (Shannon) TO US 60 East Jct (Shannon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
2
I-49 TO JOHNSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
2
CASS COUNTY LINE TO RT ZZ (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
2
RT ZZ (JOHNSON) TO HENRY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
2
JOHNSON COUNTY LINE TO MO 52 (HENRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
2
KANSAS STATE LINE TO I-49 Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
MO 32 North Jct (Washington) TO MO 72 South Jct (Reynolds) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
RT M / MM (Jefferson) TO Washington County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
MO 8 (Washington) TO MO 32 North Jct (Washington) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
MO 72 South Jct (Reynolds) TO US 60 North Jct (Carter) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
US 160 South Jct (Ripley) TO RT FF (Ripley) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
MO 30 (St. Louis) TO RT M / MM (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
US 60 South Jct (Carter) TO US 160 North Jct (Ripley) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
21
Washington County Line TO MO 8 (Washington) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
210
IS 29 (CLAY) TO MO 291 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
210
MO 291 (JACKSON) TO RAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
210
CLAY COUNTY LINE TO MO 10 (RAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
22
US 63 (Boone) TO MO 15 (Audrain) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
221
US 67 (St. Francois) TO RT B (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
224
HIGHLAND AVE WEST JCT (LAFAYETTE) TO US 24 (LAFAYETTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
23
US 24 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
23
LAFAYETTE COUNTY LINE TO US 50 Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
23
US 50 TO MO 2 (HENRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
231
St. Louis City Line TO US 61 / 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
240
US 65 (SALINE) TO MO 5 W JCT (HOWARD) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
240
MO 5 East Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
242
RT MM (Camden) TO US 54 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
248
MO 265 West Jct (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
248
MO 465 (Taney) TO US 65 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
248
MO 76 (Barry) TO MO 39 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
249
MO 171 (Jasper) TO IS 44 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
RT D (Stoddard) TO US 62 North Jct (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
US 62 South Jct (Dunklin) TO MO 53 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
MO 91 (Stoddard) TO RT M (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
MO 77 (Cape Girardeau) TO MO 91 (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
RT M (Stoddard) TO RT D (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
MO 53 (Dunklin) TO US 412 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
25
US 61 (Cape Girardeau) TO MO 77 (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
265
MO 413 (Stone) TO MO 248 West Jct (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
265
MO 76 (Stone) TO US 65 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
266
RT T (Greene) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
267
St. Louis City Line TO US 50 / 61 / 67 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
28
RT EE (GASCONADE) TO US 50 (GASCONADE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
28
RT EE (MARIES) TO RT EE (GASCONADE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
28
IS 44 (Pulaski) TO RT MM (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
28
US 63 East Jct (Maries) TO RT EE (Maries) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
US 50 WEST JCT (JACKSON) TO MO 150 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
JACKSON COUNTY LINE TO IS 49 (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
IS 470 SOUTH JCT (JACKSON) TO US 50 EAST JCT (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
CLAY COUNTY LINE TO 39ST STREET (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
IS 35 (CLAY) TO LEONARD ST. Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
LEONARD ST. TO JACKSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
291
IS 435 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
30
IS 44 (Franklin) TO Jefferson County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
30
RT W / MM (Jefferson) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
30
Jefferson County Line TO RT W / MM (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
RT N (St. Francois) TO US 67 North Jct (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 13 (Polk) TO RT P (Polk) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
RT CC (Cedar) TO MO 245 (Cedar) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
US 63 (Texas) TO MO 72 West Jct (Dent) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 245 (Cedar) TO MO 13 (Polk) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 49 East Jct (Iron) TO MO 21 South Jct (Iron) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
IS 55 (STE. GENEVIEVE) TO FOURTH ST. (STE. GENEVIEVE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 72 East Jct (Dent) TO MO 49 East Jct (Iron) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
US 54 (Cedar) TO RT CC (Cedar) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 17 (Texas) TO US 63 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
US 65 (Dallas) TO RT A / OO Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
RT P (Polk) TO US 65 (Dallas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
US 67 South Jct (St. Francois) TO IS 55 (Ste. Genevieve) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 5 South Jct (Laclede) TO RT N (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
MO 72 West Jct (Dent) TO MO 72 East Jct (Dent) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
32
RT A / OO (Laclede) TO MO 5 North Jct (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
33
CLINTON COUNTY LINE TO US 69 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
33
MO 6 (DeKalb) TO US 36 (DeKalb) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
33
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
34
RT Y (BOLLINGER) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
34
US 67 (WAYNE) TO RT Y (BOLLINGER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
34
RT KK (WAYNE) TO US 67 (WAYNE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
34
MO 21 (REYNOLDS) TO RT KK (WAYNE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
340
MO 100 (St. Louis) TO Ferguson Ave (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
350
IS 435 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
360
IS 44 (GREENE) TO US 60 (GREENE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
364
RT N (ST. CHARLES) TO MO 94 (ST. CHARLES) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
364
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
364
MO 94 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
366
IS 44 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
367
US 67 (St. Louis) TO IS 70 (St. Louis City) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
37
RT W (Barry) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
37
IS 44 (Jasper) TO US 60 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
37
US 60 (Barry) TO RT W (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
370
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
370
IS 70 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
376
MO 265 (Taney) TO MO 76 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
38
RT J (Webster) TO RT P (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
US 160 South Jct (Dade) TO MO 96 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
MO 96 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
MO 248 (Barry) TO MO 86 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
IS 44 (Lawrence) TO US 60 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
MO 32 East Jct (Cedar) TO RT Y (Dade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
US 60 (Lawrence) TO MO 248 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
39
RT Y (Dade) TO US 160 North Jct (Dade) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
41
US 24 (CARROLL) TO SALINE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
41
SALINE COUNTY LINE TO MO 240 WEST JCT (SALINE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
413
MO 13 (Greene) TO US 60 East Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
413
US 60 West Jct (Christian) TO MO 265 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
42
RT A (Miller) TO US 63 (Maries) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
42
US 54 (Camden) TO RT C West Jct (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
42
RT C West Jct (Miller) TO RT A (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
IS 44 West Jct (Newton) TO RT C (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
MO 171 (Jasper) TO Murphy Blvd (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
US 160 (Barton) TO MO 96 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
Newton County Line TO IS 44 East Jct (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
US 54 (VERNON) TO RT V (BARTON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
RT V (BARTON) TO US 160 (BARTON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
RT C (Newton) TO US 60 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
43
MO 96 (Jasper) TO MO 171 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
45
US 59 (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
45
IS 435 (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
45
BUCHANAN COUNTY LINE TO SPUR 45 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
45
SPUR 45 (PLATTE) TO IS 435 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
46
MO 113 (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
46
US 136 East Jct (Nodaway) TO RT W (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
46
RT W (Nodaway) TO US 169 (Worth) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
US 50 East Jct (Franklin) TO MO 30 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
MO 79 (Lincoln) TO US 61 (Lincoln) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
Franklin County Line TO US 50 West Jct (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
RT E (Washington) TO St. Francois County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
IS 44 (Laclede Co.) TO RT J (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
Laclede County Line TO IS 44 (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 52 North Jct (Morgan) TO RT O (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 24 East Jct (Chariton) TO RT V (Chariton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 14 (Douglas) TO MO 95 North Jct (Ozark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 60 West Jct (Wright) TO MO 14 (Douglas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
Iowa Line TO US 136 East Jct (Putnam) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 50 East Jct (Moniteau) TO MO 52 North Jct (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT J (Laclede) TO MO 38 (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT J (Cooper) TO US 50 West Jct (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 38 (Wright) TO US 60 East Jct (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 160 West Jct (Ozark) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT M (Sullivan) TO MO 6 North Jct (Sullivan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 36 East Jct (Linn) TO RT E (Chariton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 6 North Jct (Sullivan) TO Linn County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT O (Morgan) TO US 54 (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 136 West Jct (Putnam) TO RT M (Sullivan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 95 North Jct (Ozark) TO US 160 East Jct (Ozark) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
MO 240 South Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
US 54 (Camden) TO Laclede County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT V (Chariton) TO MO 240 South Jct (Howard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
RT E (Chariton) TO US 24 West Jct (Chariton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
Linn County Line TO US 36 West Jct (Linn) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
Howard County Line TO IS 70 (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
5
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
51
RT C (Bollinger) TO US 60 (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
51
RT KK (PERRY) TO MO 72 (BOLLINGER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
51
MO 34 (BOLLINGER) TO RT C (BOLLINGER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
51
MO 72 (BOLLINGER) TO MO 34 (BOLLINGER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
51
ILLINOIS LINE TO RT KK (PERRY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
MO 7 North Jct (Henry) TO RT B (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
MO 5 East Jct (Morgan) TO RT AA (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
RT FF (Morgan) TO MO 5 West Jct (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
US 65 South Jct (Benton) TO RT FF (Morgan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
NW 2501 (Bates) TO LP 49 (Bates) Butler Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
RT B (Pettis) TO US 65 North Jct (Pettis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
52
RT AA (Morgan) TO US 54 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
53
Dunklin County Line TO MO 25 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
53
BU 67 (Butler) TO Dunklin County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
571
MO 96 (Jasper) TO IS 49 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
58
PRAIRIE RD (CASS) TO MO 291 N JCT (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
58
RT AA (JOHNSON) TO US 50 (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
58
CASS COUNTY LINE TO RT AA (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
58
MO 291 SOUTH JCT (CASS) TO JOHNSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
58
RT D (CASS) TO DEAN AVENUE (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
59
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
59
LP 49 South Jct (Newton) TO MO 76 South Jct (McDonald) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
59
IS 44 (Jasper) TO US 60 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
US 169 (Buchanan) TO MO 31 North Jct (DeKalb) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
MO 13 East Jct (Daviess) TO RT P/WW (Grundy) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
MO 31 North Jct (DeKalb) TO IS 35 (Daviess) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
RT P/WW (Grundy) TO US 65 (Grundy) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
MO 5 North Jct (Sullivan) TO RT D (Sullivan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
RT D (Sullivan) TO US 63 North Jct (Adair) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
IS 35 (Daviess) TO MO 13East Jct (Daviess) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
US 65 (Grundy) TO RT W (Sullivan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
RT W (Sullivan) TO MO 5 South Jct (Sullivan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
64
RT KK (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
66
LP 49 (Rangeline Rd) (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
66
Kansas Line TO LP 49 (Jasper) Joplin Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
66
MO 249 (Jasper) TO I-44 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
68
Maries County Line TO IS 44 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
68
US 63 (Maries) TO Phelps County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
RT PP (Henry) TO US 65 North Jct (Benton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
RT NN (Camden) TO MO 5 North Jct (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
RT B (Cass) TO MO 13 North Jct (Henry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
MO 13 North Jct (Henry) TO RT PP (Henry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
MO 150 South Jct (Jackson) TO IS 49 North Jct (Cass) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
IS 70 (Jackson) TO MO 150 South Jct (Jackson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
IS 49 South Jct (Cass) TO RT B (Cass) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
7
US 65 South Jct (Benton) TO RT NN (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
US 67 (Madison) TO RT F (Madison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
Madison County Line TO US 67 (Madison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
MO 32 East Jct (Dent) TO MO 21 West Jct (Reynolds) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
MO 34 (CAPE GIRARDEAU) TO US 61 WEST JCT (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
MO 21 East Jct (Iron) TO Madison County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
Dent County Line TO MO 32 West Jct (Dent) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
US 63 (Phelps) TO Dent County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
RT F (MADISON) TO MO 51 (BOLLINGER) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
72
MO 51 (BOLLINGER) TO MO 34 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
73
US 54 (Camden) TO US 65 (Dallas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
74
MO 25 (Cape Giradeau) TO IS 55 South Jct (Cape Giradeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
74
US 61 East Jct (Cape Girardeau) TO Illinois Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
74
IS 55 North Jct (Cape Giradeau) TO US 61 (Cape Girardeau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
740
IS 70 (Boone) TO US 63 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
744
Springfield /Branson Airport (Greene) TO IS 44 East Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
752
US 59 (Buchanan) TO IS 229 (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
759
4th St (Buchanan) TO Stockyards Expy (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
RT MM (Barry) TO MO 86 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
MO 13 South Jct (Stone) TO US 65 N JCT (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
US 65 S JCT(Taney) TO US 160 West Jct (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
US 160 East Jct (Taney) TO MO 125 West Jct (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
MO 173 (Stone) TO MO 13 North Jct (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
76
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
763
US 63 (Boone) TO MO 740 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
765
US 65 NORTH JCT (PETTIS) TO US 65 SOUTH JCT (PETTIS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
77
MO 25 (Cape Girardeau) TO US 61 West Jct (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
77
US 61 East Jct (Scott) TO RT D (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
78
IS 435 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
79
RT P (Lincoln) TO St. Charles County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
79
St. Charles County Line TO IS 70 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
IS 44 (Phelps) TO MO 68 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
Washington County Line TO MO 21 (Washington) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
MO 21 (Washington) TO St. Francois County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
MO 19 East Jct (Crawford) TO Washington County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
8
MO 68 (Phelps) TO MO 19 East Jct (Crawford) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
80
US 61 (New Madrid) TO CRD 523 (Mississippi) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
82
US 54 (Cedar) TO RT H (Cedar) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
83
RT B (Polk) TO MO 13 (Polk) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
84
Arkansas Line TO US 412 West Jct (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
84
IS 55 (Pemiscot) TO IS 155 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
84
US 412 East Jct (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
RT NN (Newton) TO US 60 South Jct (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
MO 39 (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
MO 13 East Jct (Stone) TO US 65 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
IS 44 (Newton) TO RT C (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
RT F (Barry) TO MO 39 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
86
US 60 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
87
US 40 / MO 5 (Cooper) TO IS 70 (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
87
RT J (Cooper) TO RT O (Moniteau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
87
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
87
RT O (Moniteau) TO RT A (Moniteau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
87
RT A (Moniteau) TO US 54 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
9
IS 635 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
9
PLATTE COUNTY LINE TO JACKSON COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
9
JACKSON COUNTY LINE TO IS 70 Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
9
BARRY RD (PLATTE) TO IS 635 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
90
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
91
MO 51 (Bollinger) TO MO 25 (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
92
PLATTE COUNTY LINE TO US 169 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
92
KANSAS LINE TO CLAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
92
US 169 (CLAY) TO US 69 (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
94
US 54 / US 63 (Callaway) TO RT D (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
94
RT T (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
94
IS 70 (St. Charles) TO RT J (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
94
RT J (St. Charles) TO US 67 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
95
RT W (Wright) TO RT ZZ (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
96
RT U (Jasper) TO IS 44 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
96
MO 171 East Jct (Jasper) TO River St (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
96
River St (Jasper) TO RT U (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
96
MO 171 West Jct (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
96
MO 43 (Jasper) TO MO 171 East Jct (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Missouri Route
99
US 60 (Shannon) TO Obanion St (Shannon) Birch Tree Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
MO 92 (CLAY) TO LIBERTY CITY LIMITS (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
MO 100 (Franklin) TO MO 47 (Frankiin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
US 61 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
RT PP (Bates) TO IS 49 (Bates) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
US 69 (Clinton) TO West St (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
MO 38 (Webster) TO US 60 (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
BU 60 (Wright) TO RT U (Wright) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
A
US 169 (Buchanan) TO RT O (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
US 62 (Scott) TO NOR 60 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
IS 29 (PLATTE) TO US 69 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
RT H (Greene) TO US 65 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
US 60 (Butler) TO RT B ( Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
RT HH (Jasper) TO RT V V (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AA
Sanders Valley Rd (Christian) TO US 160 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AB
MO 141 (St. Louis) TO IS 270 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AB
US 160 (Greene) TO MO 266 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AB
MO 25/77 (Cape Girardeau) TO RT K (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AC
MO 6 (Buchanan) TO US 36 (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AC
Pickett Rd (Buchanan) TO US 169 (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AC
MO 163 (Boone) TO US 63 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AC
US 67 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AF
Spring Bluff Rd (Franklin) TO IS 44 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AT
US 50 (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
AW
RT TT (Pulaski) TO MO 17 (Texas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
US 61 (PERRY) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
BU 60 (Butler) TO RT AA (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
Brown Station Rd North Jct (Boone) TO LP 70 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
MO 124 (Boone) TO Brown Station Rd North Jct (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
MO 266 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
US 54 (Cole) TO RT W / M (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
B
RT W / M (Cole) TO MO 133 (Osage) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
BB
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
BB
US 63 (Phelps) TO MO 8 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
BB
RT A (Franklin) TO US 50 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
BB
US 54 (Vernon) TO RT F (Vernon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
BB
BU 65 (Taney) TO Gobblers Knob Rd (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
RT CC East Jct (Moniteau) TO RT HH (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
RT O (Callaway) TO RT AD (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
IS 49 (CASS) TO RT YY (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
RT HH (Cole) TO US 54 (Cole) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
RT AB (Webster) TO US 60 (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
MO 133 (Pulaski) TO MO 28 (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
MO 52 (Morgan) TO RT CC East Jct (Moniteau) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
C
MO 51 (Bollinger) TO MO 91 (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
CC
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
CC
RT AD (Howell) TO US 63 (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
CC
RT M (Webster) TO IS 44 (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
CC
MO 109 (St. Louis) TO Kehrs Mill Rd (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
120TH ST. (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
MO 59 (Newton) TO Benton Ave (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
BU 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
JACKSON COUNTY LINE TO RT Y (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
RT Y (CASS) TO MO 2 (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
CLAY COUNTY LINE TO RT KK (RAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
IS 270 (St. Louis) TO IS 170 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
IS 170 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
Rouggly Rd (St. Francois) TO RT W (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
CRD D-2 (Carter) TO BU 60 (Carter) Van Buren) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
RT NN (Polk) TO MO 32 (Polk) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
RT U (Pemiscot) TO MO 164 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
D
MO 171 (Jasper) TO RT O (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
DD
MO 38 (Webster) TO Osage Rd (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
DD
MO 13 (Stone) TO CRD DD-25 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
DD
MO 164 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
DD
US 40 / 61 (St. Charles) TO Diehr Rd (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
DD
MO 13 (JOHNSON) TO MO 23 (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
E
MO 124 (Boone) TO IS 70 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
E
MO 84 (Dunklin) TO MO 25 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
E
MO 21 (Washington) TO MO 8 (Washington) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
E
RT N (Jefferson) TO St. Francois County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
EE
SOR IS 70 (St. Louis) TO MO 180 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
EE
Colony Church Rd (St. Francois) TO RT D (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
EE
IS 55 (New Madrid) TO CRD 403 (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
EE
RT AB (Greene) TO US 160 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
EE
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
IS 70 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
LP 44 (Franklin) TO RT O (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
RT J (Callaway) TO Jefferson St (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
Westview Ln (Washington) TO MO 8 (Washington) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
US 65 (Taney) TO US 160 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
MO 112 (Barry) TO MO 86 (Barry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
F
MO 5 (Camden) TO RT TT (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
FF
CRD 190 / Kodiak Rd (Jasper) TO MO 59 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
FF
RT W (Jefferson) TO RT F (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
FF
MO 43 (Jasper) TO CRD 190 / Kodiak Rd (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
FF
US 60 (Greene) TO Weaver Rd (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
MO 17 (Pulaski) TO Ft. Leonard Wood (Pulaski) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
MO 215 (Polk) TO IS 44 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
IS 44 (Lawrence) TO BU 60 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
RT W (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
LP 49 (Bates) TO Main St (Bates) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
H
RT FF WEST JCT (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
HH
MO 171 (Jasper) TO MO 571 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
HH
US 61 (Scott) TO IS 55 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
HH
Reynolds County Line TO MO 34 (Wayne) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
HH
MO 86 (Newton) TO US 60 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
J
US 65 (Christian) TO RT NN (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
J
RT WW (CALLAWAY) TO RT F (CALLAWAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
J
MO 58 (CASS) TO IS 49 (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
J
US 50 (JOHNSON) TO WHITEMAN AFB (JOHNSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
J
RT MM (Dunklin) TO BU 25 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
JJ
Well St (Jasper) TO RT P (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
RT KK (Boone) TO MO 163 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
IS 49 (Vernon) TO CRD 1800 (Vernon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
CRD 317 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
MO 25 (CAPE GIRARDEAU) TO CRD 317 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
RT ZZ (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
MO 14 (CHRISTIAN) TO RT M (STONE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
MO 43 (Newton) TO Irwin Dr (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
RT N (SCOTT) TO RT AB (SCOTT) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
CRD 6470 (Howell) TO US 63 (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
MO 30 (Franklin) TO MO 185 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
IS 229 (Andrew) TO US 59 (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
K
IS 70 (St. Charles) TO US 40 / 61 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
KK
Beginning of Route (Camden) TO US 54 (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
KK
MO 8 (Phelps) TO CRD 3610 (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
KK
MO 185 North Jct (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
M
RT A (Scott) TO US 61 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
M
RT U (Stone) TO MO 14 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
M
US 60 (Greene) TO RT FF (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
M
MO 21 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
M
MO 79 (St. Charles) TO RT P (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
MM
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
MM
RT TT (Camden) TO MO 242 (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
MM
IS 44 (Greene) TO MO 413 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
IS 270 (St. Louis) TO MO 115 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
RT F (Franklin) TO Meramec River (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
MISSISSIPPI RIVER (SCOTT) TO MAIN ST. (SCOTT) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
IS 44 (Greene) TO CRD 168 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
MO 21 (Jefferson) TO RT E / Miller St (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
MO 32 (St. Francois) TO RT NN (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
N
RT NN (St. Francois) TO MO 21 (Iron) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
NN
RT O (Franklin) TO Rock Church Rd (Franklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
NN
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
NN
MO 164 (Dunklin) TO Arkansas Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
NN
US 412 (Dunklin) TO MO 164 (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
NN
MO 86 (Newton) TO RT P (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
RT C (Callaway) TO RT CC (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
MO 32 (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
MO 72 (Phelps) TO Lions Club Dr (Phelps) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
US 67 (ST. FRANCOIS) TO RT D (ST. GENEIVE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
MO 84 (Dunklin) TO RT V V (Dunklin) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
MO 5 (Morgan) TO End of Route Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
O
RT AK (Franklin) TO RT F (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
OO
MO 125 East Jct (Greene) TO MO 38 (Webster) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
OO
MO 32 (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
OO
Vintage Lane (Stone) TO MO 13 (Stone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
OO
MO 744 (Greene) TO MO 125 West Jct (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
P
MO 366 (St. Louis) TO MO 30 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
P
RT JJ (Jasper) TO MO 66 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
P
MO 8 (St. Francois) TO MO 8 (St. Francois) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
P
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
P
US 61 (St. Charles) TO RT M (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
PP
US 60 (Butler) TO BU 60 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
PP
Byrnes Mill Rd (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
IS 70 (St. Charles) TO RT N (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
Ossenfort Rd (St. Louis) TO MO 100 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
RT N (St. Charles) TO RT TT ( St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
RT D (Wayne) TO US 60 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
IS 55 (Perry) TO MO 51 (Perry) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
T
Allan Rd (Taney) TO MO 76 (Taney) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
TT
US 61 (Jefferson) TO RT AA (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
TT
RT F (Camden) TO RT MM (Camden) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
TT
LP 49 (Jasper) TO Duquesne Rd (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
TT
Beginning of Route (Boone) TO MO 740 (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
U
West Florissant Ave (St. Louis) TO Woodrow Ave (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
U
US 61 (New Madrid) TO RT WW (New Madrid) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
U
IS 55 (Pemiscot) TO MO 84 (Pemiscot) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
U
Oklahoma Line TO MO 43 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
U
CRD 54 SW (Buchanan) TO US 59 (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
V
Munn Ave (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
V
IS 44 (Phelps) TO CRD 2060 (Phelps) Rolla Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
V
RT E (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
V
US 40 (JACKSON) TO MO 350 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
RT Y South Jct (Morgan) TO BU 54 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
MO 109 (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
MO 14 (Christian) TO Jackson Spring Rd (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
MO 177 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
KANSAS LINE TO IS 435 (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
W
Logan Rd (Vernon) Nevada TO US 54 (Vernon) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
WW
Callaway County Line TO RT J (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
WW
US 63 (Boone) TO Callaway County Line Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
WW
BU 60 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
MO 52 (Miller) TO CRD ISBON Rd (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
MO 58 (CASS) TO RT YY (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
RT BB (Scott) TO US 61 (Scott) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
MO 25 (Stoddard) TO Pedestrian Factory Overpass (Stoddard) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
MO 127 (PETTIS) TO US 65 (PETTIS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Y
CRD 3670 (Howell) TO US 60 (Howell) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
YY
US 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
YY
US 169 (Buchanan) TO RT AC (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
YY
Kansas Line TO MO 171 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
YY
RT Y (CASS) TO RT C (CASS) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
Main St (Jasper) Carl Junction TO MO 171 (Jasper) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
RT A (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
BU 54 (Callaway) TO Chandler Dr (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
Lincoln Dr (Madison) TO CRD 234 (Madison) Fredericktown Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
IS 70 (St. Charles) TO RT D (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
Z
IS 29 (PLATTE) TO MCPHERSON AVE (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Rural Route
ZZ
RT KK (Crawford) TO MO 19 (Crawford) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
29
BU 71 (Andrew) TO LP 29 North Jct (Andrew) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
29
US 59 South Jct (Andrew) TO US 169 North Jct (Buchanan) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
35
US 69 (Clinton) TO IS 35 (Clinton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
44
MO 39 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
44
IS 44 (Franklin) TO IS 44 (St. Louis) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
44
IS 44 West Jct (Greene) TO IS 44 East Jct (Greene) Springfield Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
49
IS 49 North Jct (Vernon) TO IS 49 South Jct (Vernon) Nevada Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
49
MO 86 (Newton) TO BU 60 (Newton) Neosho Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
49
MO 171 (Jasper) TO IS 44 (Newton) Joplin Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
49
IS 44 (Newton) TO IS 49 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
49
IS 49 North Jct (Bates) TO IS 49 South Jct (Bates) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
70
IS 70 West Jct (Boone) TO MO 763 West Jct (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Loop
Interstate Route
70
MO 763 East Jct (Boone) TO IS 70 East Jct (Boone) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
10
MO 10 (RAY) TO MO 10 (RAY) RICHMOND Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
13
MO 20 (LAFAYETTE) TO MO 13 (LAFAYETTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
25
MO 25 North Jct (Dunklin) TO MO 25 South Jct (New Madrid) Malden Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
39
MO 174 (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
5
MO 14 (Douglas) Ava TO MO 5 (Douglas) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
50
MO 179 (Cole) TO US 50 (Cole) Missouri Blvd Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
54
US 54 South Jct (Callaway) TO 4TH St. (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
54
MO 52 (Miller) TO MO 87 South Jct (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
54
13TH St. (Callaway) TO US 54 North Jct (Callaway) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
54
MO 87 North Jct (Miller) TO US 54 (Miller) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
MO 5 (Wright) TO US 60 (Wright) Mansfield Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 (Wright) TO US 60 (Texas) Mountain Grove Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 West Jct (Texas) TO BU 63 (Texas) Willow Springs Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 West Jct (Carter) TO RT D (Carter) Van Buren Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 (Barry) TO US 60 (Barry) Monett Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 (Stoddard) TO MO 25 (Stoddard) Dexter Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 (Newton) TO MO 86 East Jct (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 (Lawrence) TO US 60 (Lawrence) Aurora Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 West Jct (Greene) TO RT B (Webster) Rogersville Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
MO 86 West Jct (Newton) TO US 60 (Newton) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
Oklahoma Line TO MO 43 (Newton) Seneca Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 West Jct (Texas) TO US 63 (Texas) Cabool Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
60
US 60 West Jct (Butler) TO US 60 East Jct (Butler) Poplar Bluff Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
61
IS 55 EXIT 89 (SCOTT) TO US 61 (SCOTT) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
63
US 63 North Jct (Texas) TO BU 60 (Texas) Willow Springs Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
63
US 63 North Jct (Howell) TO US 63 South Jct (Howell) West Plains Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
65
MO 14 (Christian) TO US 65 (Christian) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
65
US 65 (Greene) TO US 60 (Greene) Springfield Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
67
BU 60 (Bulter) TO US 67 (Butler) Poplar Bluff Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
67
MO 8 (St. Francois) TO Main St (St. Francois) Park Hills Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
67
MO 72 (Madison) TO US 67 (Madison) Fredericktown Road reported clear CLEAR 03-28-2026 at 02:03 AM
Business Route
71
US 71 (Andrew) TO LP 29 (Andrew) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Spur
169
US 169 (CLAY) TO RT DD (CLAY) Road reported clear CLEAR 03-28-2026 at 02:03 AM
Spur
44
IS 44 (Phelps) St. Robert TO Ft. Leonard Wood Road reported clear CLEAR 03-28-2026 at 02:03 AM
Spur
45
MO 92 (PLATTE) TO MO 45 (PLATTE) Road reported clear CLEAR 03-28-2026 at 02:03 AM
CST BAGNELL DAM BLVD
Valley Rd (Miller) TO US 54 (Miller) Lake Ozark Road reported clear CLEAR 03-28-2026 at 02:03 AM
CST CHOUTEAU TRFY
MO 210 (CLAY) TO FRONT ST (JACKSON) Road reported clear CLEAR 03-28-2026 at 02:03 AM
CST S 5TH ST
MO 94 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP 11TH ST TO IS70E
RP 11TH ST TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP ADELAIDE AVE TO IS70E
RP ADELAIDE AVE TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP AIRFLIGHT DR TO IS70E
RP AIRFLIGHT DR TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP AIRFLIGHT DR TO IS70E
RP AIRFLIGHT DR TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP BIRCHER BLVD TO IS70E
RP BIRCHER BLVD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP BRYAN RD TO IS70E
RP BRYAN RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP CARRIE AVE TO IS70E
RP CARRIE AVE TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP CAVE SPRINGS RD N TO IS70E
RP CAVE SPRINGS RD N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP CYPRESS RD TO IS70E
RP CYPRESS RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP DAVID HOEKEL PKWY TO IS70E
RP DAVID HOEKEL PKWY TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP FAIRGROUNDS RD TO IS70E
RP FAIRGROUNDS RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP GOODFELLOW BLVD TO IS70E
RP GOODFELLOW BLVD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP GRAND AVE TO IS70E
RP GRAND AVE TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS170E TO IS70E
RP IS170E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS170W TO IS70E
RP IS170W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS270E TO IS70E
RP IS270E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS270W TO IS70E
RP IS270W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS470E TO IS70E
RP IS470E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS470W TO IS70E
RP IS470W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS64E TO IS70E
RP IS64E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS64W TO IS70E
RP IS64W TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO ADELAIDE AVE
RP IS70E TO ADELAIDE AVE E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO BERMUDA RD
RP IS70E TO BERMUDA RD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO BIRCHER BLVD
RP IS70E TO BIRCHER BLVD W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO BIRCHER BLVD
RP IS70E TO BIRCHER BLVD E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO BRYAN RD
RP IS70E TO BRYAN RD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO CARRIE AVE
RP IS70E TO CARRIE AVE E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO CAVE SPRINGS RD N
RP IS70E TO CAVE SPRINGS RD N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO CYPRESS RD
RP IS70E TO CYPRESS RD N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO DAVID HOEKEL PKWY
RP IS70E TO DAVID HOEKEL PKWY E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO FAIRGROUNDS RD
RP IS70E TO FAIRGROUNDS RD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO GOODFELLOW BLVD
RP IS70E TO GOODFELLOW BLVD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO GOODFELLOW BLVD
RP IS70E TO GOODFELLOW BLVD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO GRAND AVE
RP IS70E TO GRAND AVE E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS170E
RP IS70E TO IS170E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS270W
RP IS70E TO IS270W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS35S
RP IS70E TO IS35S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS435S
RP IS70E TO IS435S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS470E
RP IS70E TO IS470E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS470W
RP IS70E TO IS470W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO IS64E
RP IS70E TO IS64E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO JENNINGS STATION RD
RP IS70E TO JENNINGS STATION RD E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO LAKE ST LOUIS BLVD
RP IS70E TO LAKE ST LOUIS BLVD E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO LP70
RP IS70E TO LP70E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO LP70W
RP IS70E TO LP70W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MID RIVERS MALL DR S
RP IS70E TO MID RIVERS MALL DR S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO115
RP IS70E TO MO115 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO13
RP IS70E TO MO 13 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO131
RP IS70E TO MO131 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO141N
RP IS70E TO MO141N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO141S
RP IS70E TO MO141S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO163
RP IS70E TO MO163 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO180W
RP IS70E TO MO180W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO180W
RP IS70E TO MO180W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO19
RP IS70E TO MO19 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO23
RP IS70E TO MO23 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO47
RP IS70E TO MO47 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO7
RP IS70E TO MO7 S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO740E
RP IS70E TO MO740E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO740W
RP IS70E TO MO740W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO763N
RP IS70E TO MO763N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO763S
RP IS70E TO MO763S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO79
RP IS70E TO MO79 S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO87
RP IS70E TO MO87 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO94E
RP IS70E TO MO94E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO MO94W
RP IS70E TO MO94W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO NO HANLEY RD
RP IS70E TO NO HANLEY RD E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO OR70E
RP IS70E TO OR70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO PEAR TREE DR
RP IS70E TO PEAR TREE DR E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RIVERVIEW BLVD
RP IS70E TO RIVERVIEW BLVD E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTA
RP IS70E TO RTA W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTFN
RP IS70E TO RTFN N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTFS
RP IS70E TO RTFS S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTK
RP IS70E TO RTK S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTNN
RP IS70E TO RTNN N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTNS
RP IS70E TO RTNS S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTT
RP IS70E TO RTT E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTU
RP IS70E TO RTU E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO RTZ
RP IS70E TO RTZ S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO ST LOUIS AVE
RP IS70E TO ST LOUIS AVE E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO TUCKER BLVD
RP IS70E TO TUCKER BLVD S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US40
RP IS70E TO US40 W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US40
RP IS70E TO US40 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US40E
RP IS70E TO US40E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US40E
RP IS70E TO US40E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US40W
RP IS70E TO US40W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US54W
RP IS70E TO US54W W Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US61N
RP IS70E TO US61N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US63C
RP IS70E TO US63C S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US65N
RP IS70E TO US65N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US65S
RP IS70E TO US65S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US67N
RP IS70E TO US67N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO US67S
RP IS70E TO US67S S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO VETERANS MEMORIAL PKWY
RP IS70E TO VETERANS MEMORIAL PKWY E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO WENTZVILLE PKWY
RP IS70E TO WENTZVILLE PKWY E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO WEST FLORISSANT AVE
RP IS70E TO WEST FLORISSANT AVE S Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP IS70E TO ZUMBEHL RD N
RP IS70E TO ZUMBEHL RD N N Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP JENNINGS STATION RD TO IS70E
RP JENNINGS STATION RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP KINGSHIGHWAY BLVD N TO IS70E
RP KINGSHIGHWAY BLVD N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP KINGSHIGHWAY BLVD S TO IS70E
RP KINGSHIGHWAY BLVD S TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP LAKE ST LOUIS BLVD TO IS70E
RP LAKE ST LOUIS BLVD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP LAMBERT INTL BLVD TO IS70E
RP LAMBERT INTL BLVD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP LP70 TO IS70E
RP LP70 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP LP70E TO IS70E
RP LP70E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP LP70W TO IS70E
RP LP70W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MID RIVERS MALL DR N TO IS70E
RP MID RIVERS MALL DR N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO115 TO IS70E
RP MO115 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO115N TO IS70E
RP MO115N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO13 TO IS70E
RP MO13 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO141N TO IS70E
RP MO141N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO141S TO IS70E
RP MO141S TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO163 TO IS70E
RP MO163 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO180 TO IS70E
RP 180 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO19 TO IS70E
RP MO19 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO23 TO IS70E
RP MO23 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO370W TO IS70E
RP MO370W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO47 TO IS70E
RP MO47 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO5 TO IS70E
RP MO5 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO7 TO IS70E
RP MO7 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO740E TO IS70E
RP MO470E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO740W TO IS70E
RP MO470W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO763N TO IS70E
RP MO763N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO763S TO IS70E
RP MO763S TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO79 TO IS70E
RP MO79 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO79 TO IS70E
RP MO79 TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO87 TO IS70E
RP MO87 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO94E TO IS70E
RP MO94E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP MO94W TO IS70E
RP MO94W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP N HANLEY RD TO IS70E
RP N HANLEY RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP NATURAL BRIDGE RD TO IS70E
RP NATURAL BRIDGE RD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP OR70E TO IS70E
RP OR70E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP OR70E TO IS70E
RP OR70E TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTA TO IS70E
RP RTA TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTFN TO IS70E
RP RTFN TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTFS TO IS70E
RP RTFS TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTNN TO IS70E
RP RTNN TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTNS TO IS70E
RP RTNS TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTNS TO IS70E
RP RTNS TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTT TO IS70E
RP RTT TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTU TO IS70E
RP RTU TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP RTZ TO IS70E
RP RTZ TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP SANTA MONICA AVE TO IS70E
RP SANTA MONICA AVE TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP SOR70 TO IS70E
RP SOR70 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP T R HUGHES BLVD S TO IS70E
RP T R Hughes BLVD TO IS 70 (St. Charles) Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP TUCKER BLVD TO IS70E
RP TUCKER BLVD TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US40 TO IS70E
RP US40 TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US40E TO IS70E
RP US40E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US40W TO IS70E
RP US40W TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US54E TO IS70E
RP US54E TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US63C TO IS70E
RP US63C TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US65N TO IS70E
RP US65N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US65S TO IS70E
RP US65S TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US67N TO IS70E
RP US67N TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP US67S TO IS70E
RP US67S TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP WENTZVILLE PKWY TO IS70E
RP WENTZVILLE PKWY TO IS70 E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP WEST FLORISSANT AVE TO IS70E
RP WEST FLORISSANT AVE TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
RP ZUMBEHL RD S TO IS70E
RP ZUMBEHL RD S TO IS70E E Road reported clear CLEAR 03-28-2026 at 02:03 AM
CO IS55 TO US61
IS 55 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 03-28-2026 at 02:03 AM
WS IS70E FORISTELL
WS IS70E FORISTELL E TO WS IS70E FORISTELL E Road reported clear CLEAR 03-28-2026 at 02:03 AM
BACK TO TOP
Version Information: 22162 45493 2025-09-04 15:08:19Z