Use the dropdown boxes below to filter the results.

Traffic Impact

BACK TO TOP

Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 48 traffic impacts to report.

Road closed due to traffic impact 16 Road(s) closed due to traffic impact
Expect delays due to traffic impact 14 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 2 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 14 Closure(s) due to planned event(s)
Expect delays due to planned event 2 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to traffic impact RT V N - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .253 mile(s) after CRD TWIN OAKS LN E, and ends .372 mile(s) after CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT V S - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .372 mile(s) before CRD TWIN OAKS LN E, and ends .253 mile(s) before CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Expect delays due to planned event MO 6 W - DEKALB County - EXPECT DELAYS
PLANNED
Incident begins .133 mile(s) after CRD UNKNOWN S, and ends .199 mile(s) after RT P E.
Reported 6/7/2025 5:00:00 AM.
Traffic impact estimated to last 18 hour(s).
Expect delays due to planned event MO 6 E - DEKALB County - EXPECT DELAYS
PLANNED
Incident begins .199 mile(s) before RT P E, and ends .133 mile(s) before CRD UNKNOWN S.
Reported 6/7/2025 5:00:00 AM.
Traffic impact estimated to last 18 hour(s).
Road closed due to planned event RT O E - DEKALB County - CLOSED
PLANNED
Road closure begins .02 mile(s) after MO 6 E, and ends .016 mile(s) before RT P E.
Reported 6/7/2025 5:00:00 AM.
Closure estimated to last 18 hour(s).
Road closed due to planned event RT O W - DEKALB County - CLOSED
PLANNED
Road closure begins .016 mile(s) after RT P E, and ends .02 mile(s) before MO 6 E.
Reported 6/7/2025 5:00:00 AM.
Closure estimated to last 18 hour(s).
Road closed due to planned event RT P E - DEKALB County - CLOSED
PLANNED
Road closure begins .034 mile(s) after MO 6 E, and ends .03 mile(s) before RT O E.
Reported 6/7/2025 6:00:00 AM.
Closure estimated to last 17 hour(s).
Road closed due to planned event RT P W - DEKALB County - CLOSED
PLANNED
Road closure begins .03 mile(s) after RT O E, and ends .009 mile(s) before CST ELM ST E.
Reported 6/7/2025 6:00:00 AM.
Closure estimated to last 17 hour(s).
Possible delays due to traffic impact RT D S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins RT WW E, and ends .001 mile(s) before RP RTD TO IS44E E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins .001 mile(s) after RP RTD TO IS44E E, and ends RT WW E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact US 24 E - JACKSON County - EXPECT DELAYS
ROADWAY DAMAGE
Incident begins .001 mile(s) before CST NORTHERN BLVD S, and ends .03 mile(s) after CST NORTHERN BLVD S.
Reported 4/13/2023 4:30:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RP IS49N TO MO150W W - JACKSON County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .002 mile(s) before IS 49 N, and ends MO 150 W.
Reported 5/5/2025 5:05:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RP MO150W TO IS49S S - JACKSON County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins MO 150 W, and ends .002 mile(s) after IS 49 S.
Reported 5/5/2025 5:03:00 AM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to planned event BU 61 N - MARION County - CLOSED
PLANNED
Road closure begins .005 mile(s) after CST JANET TRAIL E, and ends .002 mile(s) after RT BB S.
Reported 7/26/2025 10:00:00 AM.
Closure estimated to last 1.5 hour(s).
Road closed due to planned event BU 61 S - MARION County - CLOSED
PLANNED
Road closure begins .002 mile(s) before RT BB S, and ends .005 mile(s) before CST JANET TRAIL E.
Reported 7/26/2025 10:00:00 AM.
Closure estimated to last 1.5 hour(s).
Road closed due to planned event MO 79 S - MARION County - CLOSED
PLANNED
Road closure begins CST CHURCH ST E, and ends .252 mile(s) after RR HANNIBAL SIDING S.
Reported 7/5/2025 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to planned event CST MAIN ST N - MARION County - CLOSED
PLANNED
Road closure begins CST JANET TRAIL E, and ends .001 mile(s) before CST JEFFERSON ST E.
Reported 6/14/2025 10:00:00 AM.
Closure estimated to last 1 hour(s).
Road closed due to planned event CST MAIN ST S - MARION County - CLOSED
PLANNED
Road closure begins CST JEFFERSON ST E, and ends CST JANET TRAIL E.
Reported 6/14/2025 10:00:00 AM.
Closure estimated to last 1 hour(s).
Road closed due to traffic impact MO 102 E - MISSISSIPPI County - CLOSED
ROADWAY DAMAGE
Road closure begins .084 mile(s) before CRD 526 E, and ends .006 mile(s) after CRD 524 E.
Reported 5/3/2025 1:43:00 PM.
Road closed until further notice.
Road closed due to traffic impact MO 102 W - MISSISSIPPI County - CLOSED
ROADWAY DAMAGE
Road closure begins .006 mile(s) before CRD 524 E, and ends .084 mile(s) after CRD 526 E.
Reported 5/3/2025 1:43:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT AA N - NEW MADRID County - CLOSED
BRIDGE DAMAGE
Road closure begins .005 mile(s) before CST LYNUAL ST E, and ends OR 60 E.
Reported 12/19/2024 8:43:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT NN W - NODAWAY County - CLOSED
BRIDGE CLOSED
Road closure begins .001 mile(s) before CRD PANTHER RD S, and ends .002 mile(s) before CRD ORION RD S.
Reported 7/10/2024 2:46:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT NN E - NODAWAY County - CLOSED
BRIDGE CLOSED
Road closure begins .002 mile(s) after CRD ORION RD S, and ends .001 mile(s) after CRD PANTHER RD S.
Reported 7/10/2024 2:46:00 PM.
Road closed until further notice.
Road closed due to planned event BU 61 N - RALLS County - CLOSED
PLANNED
Road closure begins CST FIFTH ST E, and ends CST THIRD ST E.
Reported 6/5/2025 5:00:00 PM.
Closure estimated to last 68 hour(s).
Road closed due to planned event BU 61 S - RALLS County - CLOSED
PLANNED
Road closure begins CST THIRD ST E, and ends CST FIFTH ST E.
Reported 6/5/2025 5:00:00 PM.
Closure estimated to last 68 hour(s).
Road closed due to planned event MO 79 N - RALLS County - CLOSED
PLANNED
Road closure begins .252 mile(s) before RR HANNIBAL SIDING S, and ends CST CHURCH ST E.
Reported 7/5/2025 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to planned event CST FOURTH ST E - RALLS County - CLOSED
PLANNED
Road closure begins CST CHURCH ST S, and ends CST COLLEGE ST S.
Reported 6/5/2025 5:00:00 PM.
Closure estimated to last 68 hour(s).
Road closed due to planned event CST FOURTH ST W - RALLS County - CLOSED
PLANNED
Road closure begins CST COLLEGE ST S, and ends CST CHURCH ST S.
Reported 6/5/2025 5:00:00 PM.
Closure estimated to last 68 hour(s).
Road closed due to traffic impact CRD LEMON TRL N - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after OR 70 E, and ends .007 mile(s) before CRD 118TH RD E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Road closed due to traffic impact CRD LEMON TRL S - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after CRD 118TH RD E, and ends .007 mile(s) before OR 70 E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT AA S - SCOTT County - CLOSED
BRIDGE DAMAGE
Road closure begins OR 60 E, and ends .005 mile(s) after CST LYNUAL ST E.
Reported 12/19/2024 8:43:00 AM.
Road closed until further notice.
Expect delays due to traffic impact OR 70 E - ST. CHARLES County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .004 mile(s) before CST LOMBARD ST E, and ends CST VETERANS MEMORIAL PKWY E.
Reported 6/5/2025 5:37:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact MO 141 N - ST. LOUIS County - EXPECT DELAYS
OTHER
Incident begins .106 mile(s) before PVT CASINO CENTER DR S, and ends .086 mile(s) before PVT CASINO CENTER DR S.
Reported 6/5/2025 1:36:00 PM.
Traffic impact estimated to last 2 hour(s).
Expect delays due to traffic impact MO 141 N - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .001 mile(s) before CST PRICHARD FARM RD S, and ends .001 mile(s) after CST PRICHARD FARM RD S.
Reported 6/5/2025 9:44:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact MO 141 S - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .001 mile(s) before CST PRICHARD FARM RD S, and ends .002 mile(s) after CST PRICHARD FARM RD S.
Reported 6/5/2025 9:44:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact IS 270 E - ST. LOUIS County - EXPECT DELAYS
OTHER
Incident begins .095 mile(s) before RP OR270E TO IS270E E, and ends .034 mile(s) before CO SOR270E TO NOR270W W.
Reported 6/5/2025 3:05:00 PM.
Traffic impact estimated to last 0.5 hour(s).
Expect delays due to traffic impact IS 44 E - ST. LOUIS County - EXPECT DELAYS
OTHER
Incident begins 1.112 mile(s) before RP IS44E TO MO141N N, and ends .612 mile(s) before RP IS44E TO MO141N N.
Reported 6/5/2025 2:56:00 PM.
Traffic impact estimated to last 0.5 hour(s).
Expect delays due to traffic impact RT H N - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .019 mile(s) before CST GIMBLIN RD E, and ends .013 mile(s) after CST GIMBLIN RD E.
Reported 5/7/2025 10:40:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT H S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .013 mile(s) before CST GIMBLIN RD E, and ends .019 mile(s) after CST GIMBLIN RD E.
Reported 5/7/2025 10:40:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RP IS55S TO GASCONADE ST W - ST. LOUIS CITY County - EXPECT DELAYS
UTILITY DAMAGE
Incident begins .021 mile(s) after IS 55 S, and ends CST GASCONADE ST E.
Reported 6/3/2025 6:21:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RP IS55S TO LOUGHBOROUGH AVE S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins IS 55 S, and ends CST LOUGHBOROUGH AVE E.
Reported 6/4/2025 4:03:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RP LOUGHBOROUGH AVE TO IS55N N - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins CST IDAHO AVE E, and ends IS 55 N.
Reported 6/4/2025 9:54:00 PM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT KK S - WAYNE County - CLOSED
ROADWAY DAMAGE
Road closure begins .259 mile(s) after MO 34 E, and ends .012 mile(s) after CRD 456 E.
Reported 4/5/2025 7:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT KK N - WAYNE County - CLOSED
ROADWAY DAMAGE
Road closure begins .012 mile(s) before CRD 456 E, and ends .259 mile(s) before MO 34 E.
Reported 4/5/2025 7:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT Y W - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .23 mile(s) before CRD BLACK HORSE RD S, and ends .013 mile(s) before CRD ST LUKE RD E.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT Y E - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .013 mile(s) after CRD ST LUKE RD E, and ends .23 mile(s) after CRD BLACK HORSE RD S.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.

Flooding

BACK TO TOP

Floods are a special category of traffic impacts causing water to pool on the roadway, typically due to exceessive rainfall. Flooding may cause a road closure, or an expected delay. There are 17 flooding impact(s) to report.

Road closed due to flooding 17 Road(s) closed due to flooding
Expect delays due to flooding 0 Expected delay(s) due to flooding
Road closed due to flooding MO 126 W - BARTON County - CLOSED
Flooding reported beginning .012 mile(s) after RP MO126 TO IS49S S and ending CRD SW 15TH LN S.
Road impacted since 6/4/2025 7:47:00 PM.
NOTES: MO 126 CLOSED BETWEEN I-49 AND SW 15TH.
Road closed due to flooding MO 126 E - BARTON County - CLOSED
Flooding reported beginning CRD SW 15TH LN S and ending .012 mile(s) before RP MO126 TO IS49S S.
Road impacted since 6/4/2025 7:47:00 PM.
NOTES: MO 126 CLOSED BETWEEN I-49 AND SW 15TH.
Road closed due to flooding RT V E - BENTON County - CLOSED
Flooding reported beginning .127 mile(s) after PVT MURDOCH PL S and ending .198 mile(s) after CRD HAIRPIN DR S.
Road impacted since 6/4/2025 12:38:00 PM.
Road closed due to flooding RT V W - BENTON County - CLOSED
Flooding reported beginning .198 mile(s) before CRD HAIRPIN DR S and ending .127 mile(s) before PVT MURDOCH PL S.
Road impacted since 6/4/2025 12:38:00 PM.
Road closed due to flooding RT Y N - CARTER County - CLOSED
Flooding reported beginning .04 mile(s) before CRD FOURTH ST E and ending .013 mile(s) before CRD 154 E.
Road impacted since 6/5/2025 11:15:00 AM.
NOTES: Water over road please alternate route
Road closed due to flooding RT O S - JASPER County - CLOSED
Flooding reported beginning .355 mile(s) after CST MAIN ST S and ending .477 mile(s) after CST MAIN ST S.
Road impacted since 6/5/2025 6:27:00 AM.
NOTES: WATER OVER ROADWAY USE ALT ROUTE
Road closed due to flooding RT O N - JASPER County - CLOSED
Flooding reported beginning .477 mile(s) before CST MAIN ST S and ending .355 mile(s) before CST MAIN ST S.
Road impacted since 6/5/2025 6:27:00 AM.
NOTES: WATER OVER ROADWAY USE ALT ROUTE
Road closed due to flooding RT T E - OZARK County - CLOSED
Flooding reported beginning .027 mile(s) after CRD 541 S and ending CRD T-522 E.
Road impacted since 5/27/2025 9:45:00 AM.
NOTES: Road closed due to flooding
Road closed due to flooding RT T W - OZARK County - CLOSED
Flooding reported beginning CRD T-522 E and ending .027 mile(s) before CRD 541 S.
Road impacted since 5/27/2025 9:45:00 AM.
NOTES: Road closed due to flooding
Road closed due to flooding RT F W - REYNOLDS County - CLOSED
Logan Creek
Flooding reported beginning .105 mile(s) after MO 106 E and ending .806 mile(s) after MO 106 E.
Road impacted since 6/5/2025 8:38:00 AM.
NOTES: Please use alternate route.
Road closed due to flooding RT F E - REYNOLDS County - CLOSED
Logan Creek
Flooding reported beginning .806 mile(s) before MO 106 E and ending .105 mile(s) before MO 106 E.
Road impacted since 6/5/2025 8:38:00 AM.
NOTES: Please use alternate route.
Road closed due to flooding RT NN W - SHANNON County - CLOSED
ROCKY CREEK
Flooding reported beginning CRD 522 E and ending .009 mile(s) before RT H S.
Road impacted since 6/5/2025 2:01:00 AM.
NOTES: ROAD FLOODED USE ALT ROUTE
Road closed due to flooding RT NN E - SHANNON County - CLOSED
ROCKY CREEK
Flooding reported beginning .009 mile(s) after RT H S and ending CRD 522 E.
Road impacted since 6/5/2025 2:01:00 AM.
NOTES: ROAD FLOODED USE ALT ROUTE
Road closed due to flooding RT W S - SHANNON County - CLOSED
Flooding reported beginning CRD 568 E and ending .232 mile(s) before US 60 W.
Road impacted since 6/5/2025 7:47:00 AM.
NOTES: Road closed due to flooding. Please seek alternate route.
Road closed due to flooding RT W N - SHANNON County - CLOSED
Flooding reported beginning .232 mile(s) after US 60 W and ending CRD 568 E.
Road impacted since 6/5/2025 7:47:00 AM.
NOTES: Road closed due to flooding. Please seek alternate route.
Road closed due to flooding RT V S - VERNON County - CLOSED
Flooding reported beginning .009 mile(s) before CRD CRD DALTON TO RTV S and ending RT D E.
Road impacted since 6/5/2025 10:15:00 AM.
NOTES: ROAD CLOSED DUE TO FLOODING
Road closed due to flooding RT V N - VERNON County - CLOSED
Flooding reported beginning RT D E and ending .009 mile(s) after CRD CRD DALTON TO RTV S.
Road impacted since 6/5/2025 10:15:00 AM.
NOTES: ROAD CLOSED DUE TO FLOODING

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 173 closure(s) due to work zone(s) to report.

Road closed due to work zone 173 Road(s) closed due to work zone
Road closed due to workzone US 67 S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .051 mile(s) after CST CONWAY RD E and ends at .05 mile(s) before CST CONWAY RD E.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D S - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) after CRD JEWELL DR E and ends at .035 mile(s) before CRD KERR RD E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D N - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) after CRD KERR RD E and ends at .015 mile(s) before CRD JEWELL DR E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP NW BRIARCLIFF PKWY E TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CST NW PLATTE RD E and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO RTJ E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 70 E and ends at RT DD S.
Work is scheduled from 01-MAY-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - RALLS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT B S and ends at MO 154 E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT EE S - GENTRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT P E and ends at RT T E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D W - RALLS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 154 E and ends at RT B S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT EE N - GENTRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT T E and ends at RT P E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone US 59 S - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .358 mile(s) before CRD ADOBE RD E and ends at .045 mile(s) before CRD 142 E.
Work is scheduled from 01-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 59 N - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .045 mile(s) after CRD 142 E and ends at .358 mile(s) after CRD ADOBE RD E.
Work is scheduled from 01-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ N - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .521 mile(s) before RT RA E and ends at .422 mile(s) before RT RA E.
Work is scheduled from 24-MAR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ S - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .422 mile(s) after RT RA E and ends at .521 mile(s) after RT RA E.
Work is scheduled from 24-MAR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO NW BRIARCLIFF PKWY E E - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 S and ends at .004 mile(s) before OR 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US169N TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after US 169 N and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9 TO NW BRIARCLIFF PKWY W W - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 N and ends at .005 mile(s) before CST NW PLATTE RD E.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55N TO US67S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 55 N and ends at .004 mile(s) before US 67 S.
Work is scheduled from 17-MAY-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS635S TO MO9S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after IS 635 S and ends at MO 9 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - STODDARD County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at MO 25 S and ends at .016 mile(s) before MO 153 S.
Work is scheduled from 02-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D W - STODDARD County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at .016 mile(s) after MO 153 S and ends at MO 25 S.
Work is scheduled from 02-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT VV E - NODAWAY County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .036 mile(s) after CRD MERCURY RD S and ends at .028 mile(s) before RT AH S.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone US 160 E - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after US 63 N and ends at .001 mile(s) before RT BB S.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone US 160 W - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT BB S and ends at .002 mile(s) before US 63 N.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone RT VV W - NODAWAY County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .028 mile(s) after RT AH S and ends at .036 mile(s) before CRD MERCURY RD S.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST EUREKA AVE N - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .019 mile(s) before US 59 S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS35S TO US69 S - CLINTON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at .002 mile(s) after IS 35 S and ends at US 69 S.
Work is scheduled from 04-JUN-2025 to 07-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US69 TO IS35S S - CLINTON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at US 69 S and ends at IS 35 S.
Work is scheduled from 04-JUN-2025 to 07-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone CST E 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST MONROE AVE S and ends at .003 mile(s) before CST INDIANA AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST INDIANA AVE S and ends at .003 mile(s) before CST MONROE AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) after US 69 S and ends at .008 mile(s) before OR 9 S.
Work is scheduled from 29-MAY-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHEROKEE ST TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST CHEROKEE ST E and ends at IS 55 S.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone IS 72 E - MARION County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .036 mile(s) after RP IS72E TO MO79 S and ends at US 36 E.
Work is scheduled from 30-MAY-2025 to 27-JUN-2025.
Work will start daily at 06:00 AM and end by 12:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone IS 72 W - MARION County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at US 36 W and ends at .031 mile(s) after RP MO79 TO IS72W W.
Work is scheduled from 30-MAY-2025 to 27-JUN-2025.
Work will start daily at 06:00 AM and end by 12:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D W - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .994 mile(s) before CRD MUSSEL FORK AVE S and ends at .656 mile(s) before CRD MUSSEL FORK AVE S.
Work is scheduled from 24-FEB-2025 to 15-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .656 mile(s) after CRD MUSSEL FORK AVE S and ends at .994 mile(s) after CRD MUSSEL FORK AVE S.
Work is scheduled from 24-FEB-2025 to 15-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 51 S - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .985 mile(s) before MO 72 E and ends at .018 mile(s) after CRD 376 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 51 N - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .018 mile(s) before CRD 376 E and ends at .985 mile(s) after MO 72 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 72 W - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .016 mile(s) before CRD 380 S and ends at .012 mile(s) after CRD 900 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 72 E - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .012 mile(s) before CRD 900 E and ends at .016 mile(s) after CRD 380 S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT FF S - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .004 mile(s) after OR 44 E and ends at .014 mile(s) after IS 44 E.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT FF N - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .014 mile(s) before IS 44 E and ends at .004 mile(s) before OR 44 E.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT J S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP BEDFORD AVE TO IS29S S - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .046 mile(s) before RP IS29S TO LEVEE RD S and ends at IS 35 S.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS70W TO 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 70 W and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT HH E - BENTON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at CRD WISCHMEIER AVE S and ends at CRD OLD 65 AVE S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US54W TO STADIUM BLVD E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 54 W and ends at .01 mile(s) before OR 54 E.
Work is scheduled from 05-JUN-2025 to 26-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO MYRTLE AVE E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 70 E and ends at .003 mile(s) before CST MYRTLE AVE S.
Work is scheduled from 20-MAR-2025 to 20-MAR-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO86 TO IS44E E - NEWTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after MO 86 E and ends at .015 mile(s) before IS 44 E.
Work is scheduled from 06-MAY-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO GERMANIA ST S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST GERMANIA AVE E.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP TRUMAN PKWY TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LAFAYETTE AVE E and ends at .01 mile(s) after CST RUSSELL BLVD E.
Work is scheduled from 06-DEC-2022 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 50 E - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at CST SE SHENANDOAH DR E and ends at .358 mile(s) before CST MILTON THOMPSON RD S.
Work is scheduled from 26-MAR-2025 to 15-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 50 W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .358 mile(s) after CST MILTON THOMPSON RD S and ends at CST SE SHENANDOAH DR E.
Work is scheduled from 26-MAR-2025 to 15-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS29N DEARBORN N - PLATTE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at IS 29 N and ends at .003 mile(s) before IS 29 N.
Work is scheduled from 17-JAN-2025 to 31-OCT-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MADISON ST TO US54W W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST MADISON ST S and ends at .017 mile(s) before US 54 W.
Work is scheduled from 06-MAY-2025 to 25-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP E 23RD ST TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST E 23RD ST E and ends at IS 70 W.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT HH W - BENTON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at CRD OLD 65 AVE S and ends at CRD WISCHMEIER AVE S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT HH E - BENTON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at CRD WISCHMEIER AVE S and ends at CRD OLD 65 AVE S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT HH W - BENTON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at CRD OLD 65 AVE S and ends at CRD WISCHMEIER AVE S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT NN W - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before CRD PANTHER RD S and ends at .024 mile(s) after CRD ORION RD S.
Work is scheduled from 06-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT NN E - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) before CRD ORION RD S and ends at .02 mile(s) after CRD PANTHER RD S.
Work is scheduled from 06-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT P E - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at MO 11 S and ends at MO 15 S.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT P W - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at MO 15 S and ends at MO 11 S.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 33 N - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .087 mile(s) after RT CC E and ends at .031 mile(s) before CRD BURRIS RD S.
Work is scheduled from 29-AUG-2024 to 17-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 33 N - CLAY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .062 mile(s) after CRD DIANA DR E and ends at .085 mile(s) after RT CC E.
Work is scheduled from 04-JUN-2025 to 27-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 33 S - CLAY County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .085 mile(s) before RT CC E and ends at .062 mile(s) before CRD DIANA DR E.
Work is scheduled from 04-JUN-2025 to 27-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST RIVERWAY BLVD N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) after OR 9 S and ends at .02 mile(s) before US 69 S.
Work is scheduled from 29-MAY-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CO RIVERWAY BLVD TO US69 W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after US 69 N and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST S EATHERTON RD S - ST. LOUIS County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .013 mile(s) after RR CENTRAL MIDLAND E and ends at MO 109 S.
Work is scheduled from 27-MAY-2025 to 24-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST S EATHERTON RD N - ST. LOUIS County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 109 S and ends at .013 mile(s) before RR CENTRAL MIDLAND E.
Work is scheduled from 27-MAY-2025 to 24-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT YY E - MACON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .001 mile(s) before CRD MARIGOLD AVE S and ends at CRD MAHOGANY ST E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO9S TO RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT YY W - MACON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at CRD MAHOGANY ST E and ends at .001 mile(s) after CRD MARIGOLD AVE S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US67N TO RTDW W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 N and ends at RT D W.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T W - RAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .082 mile(s) before CRD TRIPLE SPRINGS RD S and ends at .014 mile(s) before PVT FARM RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T E - RAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .014 mile(s) after PVT FARM RD S and ends at .082 mile(s) after CRD TRIPLE SPRINGS RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CONWAY RD W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before IS 270 E and ends at .009 mile(s) before OR 64 E.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTAE TO IS55S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .002 mile(s) before RP RTAW TO IS55S S and ends at .007 mile(s) before IS 55 S.
Work is scheduled from 02-JUN-2025 to 07-JUN-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT C E - WASHINGTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .078 mile(s) after CRD BIRCH ST S and ends at .094 mile(s) before CRD WEBSTER RD 627 E.
Work is scheduled from 27-MAY-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C W - WASHINGTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .094 mile(s) before CRD BIG RIVER RD 633 S and ends at .078 mile(s) before CRD BIRCH ST S.
Work is scheduled from 27-MAY-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP STADIUM BLVD TO US54E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after OR 54 E and ends at US 54 E.
Work is scheduled from 06-MAY-2025 to 25-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS635N TO US69N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .012 mile(s) after IS 635 N and ends at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS35N TO US69 N - CLINTON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at IS 35 N and ends at US 69 S.
Work is scheduled from 04-JUN-2025 to 07-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US69 TO IS35N N - CLINTON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Road closure begins at .003 mile(s) after US 69 S and ends at IS 35 N.
Work is scheduled from 04-JUN-2025 to 07-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT A E - MISSISSIPPI County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .094 mile(s) after MO 102 E and ends at .085 mile(s) before CRD 520 E.
Work is scheduled from 19-MAY-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT A W - MISSISSIPPI County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .085 mile(s) after CRD 520 E and ends at .094 mile(s) before MO 102 E.
Work is scheduled from 19-MAY-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MANCHESTER TRFY TO IS70E E - JACKSON County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at CST MANCHESTER TRFY S and ends at IS 70 E.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS55S TO LOUGHBOROUGH AVE S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST LOUGHBOROUGH AVE E.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E E - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT K E and ends at RT A S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS55S TO RTAE E - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .021 mile(s) after IS 55 S and ends at .001 mile(s) after RP IS55S TO RTAW W.
Work is scheduled from 02-JUN-2025 to 07-JUN-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 96 E - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD INCA RD E and ends at .001 mile(s) before CRD INCA RD E.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 E - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT STAGE COACH RD S and ends at .002 mile(s) before CRD ROCKWOOD RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 W - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CRD ROCKWOOD RD S and ends at .001 mile(s) before PVT STAGE COACH RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 752 W - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before CST SHERMAN ST S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 752 E - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 59 S and ends at CST SHERMAN ST S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E W - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT A S and ends at RT K E.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT M E - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) before CRD PLUM TRL E and ends at .013 mile(s) before CST MILL ST S.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP GERMANIA ST TO IS55N N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST GERMANIA AVE E and ends at IS 55 N.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL S - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) before IS 70 W and ends at .022 mile(s) after IS 70 E.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS70W BOONVILLE W - COOPER County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at IS 70 W.
Work is scheduled from 21-JAN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO100W TO MO109 N - ST. LOUIS County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at MO 100 W and ends at .009 mile(s) before MO 109 N.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO109 TO MO100E E - ST. LOUIS County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .004 mile(s) after MO 109 N and ends at MO 100 E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT MM N - FRANKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .098 mile(s) before PVT DANFORTH DR S and ends at .281 mile(s) after PVT LIVESTOCK DR E.
Work is scheduled from 27-MAY-2025 to 10-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT MM S - FRANKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .298 mile(s) before PVT LIVESTOCK DR E and ends at .098 mile(s) after PVT DANFORTH DR S.
Work is scheduled from 27-MAY-2025 to 10-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y S - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT VV S and ends at .005 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y N - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after RT VV S and ends at .003 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL N - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .022 mile(s) before IS 70 E and ends at .015 mile(s) after IS 70 W.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT V S and ends at .001 mile(s) before PVT 607 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 9 N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) after RP MO9N TO US169N N and ends at .061 mile(s) before RP IS635S TO MO9N N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT 607 S and ends at RT V S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 9 S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after RP MO9S TO IS635S S and ends at .007 mile(s) before RP OUTER RD TO MO9S S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RIVERWAY BLVD TO US69S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after US 69 S and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT M W - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after CST MILL ST S and ends at .011 mile(s) after CRD PLUM TRL E.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT V N - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .178 mile(s) after CRD TWIN OAKS LN E and ends at .484 mile(s) after CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT V S - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .484 mile(s) before CRD TWIN OAKS LN E and ends at .178 mile(s) before CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone MO 33 S - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .031 mile(s) after CRD BURRIS RD S and ends at .087 mile(s) before RT CC E.
Work is scheduled from 29-AUG-2024 to 17-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D N - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins at .1 mile(s) after CRD 323RD ST E and ends at .028 mile(s) before CRD E 319TH ST E.
Work is scheduled from 19-MAY-2025 to 24-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D S - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins at .028 mile(s) after CRD E 319TH ST E and ends at .1 mile(s) before CRD 323RD ST E.
Work is scheduled from 19-MAY-2025 to 24-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E N - SALINE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .423 mile(s) before CRD MOUNT OLIVE RD E and ends at .002 mile(s) after RR RIVER SUB E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E S - SALINE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .002 mile(s) before RR RIVER SUB E and ends at .423 mile(s) after CRD MOUNT OLIVE RD E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD ROUTE 66 E - LACLEDE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after OR 44 E and ends at .003 mile(s) before CRD RUSTIC DR S.
Work is scheduled from 19-MAY-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD ROUTE 66 W - LACLEDE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CRD RUSTIC DR S and ends at .002 mile(s) before OR 44 E.
Work is scheduled from 19-MAY-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT V N - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD 606 S and ends at RT Y E.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP LOUGHBOROUGH AVE TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LOUGHBOROUGH AVE E and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT V S - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT Y E and ends at .001 mile(s) before CRD 606 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP BELLERIVE BLVD TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST VIRGINIA AVE S and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 53 N - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) after RT H S and ends at .003 mile(s) before RT J E.
Work is scheduled from 06-JAN-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone PVT OVERPASS S - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .024 mile(s) before CST TRUMAN RD E and ends at .019 mile(s) after CST TRUMAN RD E.
Work is scheduled from 11-APR-2025 to 31-DEC-2032.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 53 S - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT J E and ends at .035 mile(s) before RT H S.
Work is scheduled from 06-JAN-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO109 TO MO100W W - ST. LOUIS County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .014 mile(s) after MO 109 S and ends at .01 mile(s) before MO 100 W.
Work is scheduled from 30-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST LAKE AVE S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .017 mile(s) before CST KENTUCKY ST E and ends at .004 mile(s) before CST HYDE PARK AVE E.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ W - BOLLINGER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .493 mile(s) after CRD 806 E and ends at .312 mile(s) before CRD 807 S.
Work is scheduled from 19-MAY-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT ZZ E - BOLLINGER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .312 mile(s) after CRD 807 S and ends at .493 mile(s) before CRD 806 E.
Work is scheduled from 19-MAY-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS435N TO LANCER LN W W - JACKSON County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .007 mile(s) before CST RAYTOWN RD S and ends at PVT LANCER LN E.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO9N TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 N and ends at .038 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .439 mile(s) after CRD SHERWOOD FOREST E and ends at .938 mile(s) after CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .938 mile(s) before CRD SHERWOOD FOREST E and ends at .439 mile(s) before CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US69S TO IS635S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 S and ends at .039 mile(s) before IS 635 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RIVERVIEW DR TO IS270W W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .005 mile(s) before RT H S and ends at .006 mile(s) before IS 270 W.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T E - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after COE MILL CREEK LEVEE RD S and ends at .013 mile(s) before PVT FARM RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT T W - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after PVT FARM RD S and ends at .007 mile(s) before COE MILL CREEK LEVEE RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO US67N N - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 55 S and ends at .005 mile(s) before US 67 N.
Work is scheduled from 10-DEC-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT KK N - RAY County - ALL LANES CLOSED
ROAD MIX OVERLAY
Road closure begins at RT D E and ends at CRD W 208TH ST E.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT KK S - RAY County - ALL LANES CLOSED
ROAD MIX OVERLAY
Road closure begins at CRD W 208TH ST E and ends at RT D E.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U W - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .003 mile(s) after CRD 681 S and ends at .006 mile(s) after CRD 668 E.
Work is scheduled from 21-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U E - BUTLER County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .006 mile(s) before CRD 668 E and ends at .003 mile(s) before CRD 681 S.
Work is scheduled from 21-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E N - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E S - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Road closure begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS270W TO RIVERVIEW DR W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 270 W and ends at RT H N.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST JACKSON AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after OR 70 E and ends at .009 mile(s) before CST E 29TH ST E.
Work is scheduled from 27-MAY-2025 to 26-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS270E TO IS170E E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 170 E.
Work is scheduled from 27-MAY-2025 to 05-JUN-2025.
Work will start daily at 12:00 PM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 179 S - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .276 mile(s) after CRD BACON BRIDGE RD S and ends at .361 mile(s) after CRD BACON BRIDGE RD S.
Work is scheduled from 19-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 179 N - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .361 mile(s) before CRD BACON BRIDGE RD S and ends at .276 mile(s) before CRD BACON BRIDGE RD S.
Work is scheduled from 19-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDW TO US67S S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D W and ends at US 67 S.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 S and ends at .009 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after IS 70 E and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP E 23RD ST TO IS70E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST E 23RD ST E and ends at IS 70 E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO RTDE E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 S and ends at RT D E.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTJ TO IS70E E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT J S and ends at .036 mile(s) before IS 70 E.
Work is scheduled from 01-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z N - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .01 mile(s) before CRD 439 S and ends at .008 mile(s) after CRD 437 S.
Work is scheduled from 14-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z S - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) before CRD 437 S and ends at .01 mile(s) after CRD 439 S.
Work is scheduled from 14-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT AF E - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at .002 mile(s) before CRD PANTHER RD S and ends at .005 mile(s) after CRD 420 RD S.
Work is scheduled from 04-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT AF W - GENTRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at .005 mile(s) before CRD 420 RD S and ends at .002 mile(s) after CRD PANTHER RD S.
Work is scheduled from 04-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B N - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .97 mile(s) before CRD SQUIRREL RD S and ends at .616 mile(s) before CRD SQUIRREL RD S.
Work is scheduled from 12-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDE TO US67N N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D E and ends at US 67 N.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST IVY W - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 94 W and ends at CST OLD MO 94 E.
Work is scheduled from 18-JUL-2022 to 01-AUG-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST JACKSON AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .009 mile(s) after CST E 29TH ST E and ends at .006 mile(s) before OR 70 E.
Work is scheduled from 27-MAY-2025 to 26-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B S - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .616 mile(s) after CRD SQUIRREL RD S and ends at .97 mile(s) after CRD SQUIRREL RD S.
Work is scheduled from 12-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B E - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .117 mile(s) after RT N S and ends at .062 mile(s) before CRD 122 S.
Work is scheduled from 28-APR-2025 to 09-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B W - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .062 mile(s) after CRD 122 S and ends at .117 mile(s) before RT N S.
Work is scheduled from 28-APR-2025 to 09-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US54E TO MADISON ST E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 54 E and ends at CST MADISON ST S.
Work is scheduled from 05-JUN-2025 to 26-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT NN S - HENRY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at RT Z E and ends at .07 mile(s) before RT C E.
Work is scheduled from 19-MAY-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US67S TO IS55S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 67 S and ends at IS 55 S.
Work is scheduled from 28-FEB-2025 to 22-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 702 work zones where you can expect delays, or, where delays are not expected, but possible, to report.

Expected delay(s) due to work zone 433 Expected delay(s) due to work zone
Possible delay(s) due to work zone 269 Possible delay(s) due to work zone
Possible delays due to workzone RT Y W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .019 mile(s) after RT AA S and ends at .016 mile(s) after CRD 75 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 44 E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) after OR 44 E and ends at .005 mile(s) after BU 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 44 W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before BU 65 S and ends at .008 mile(s) before CST BROADVIEW PL S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before LP 44 E and ends at .001 mile(s) before OR 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after OR 65 S and ends at .003 mile(s) after LP 44 E.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .016 mile(s) before CRD 75 S and ends at .019 mile(s) before RT AA S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 141 S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .007 mile(s) before CST CONWAY RD E and ends at .042 mile(s) before RP MO141S TO OLD WOODS MILL RD E.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT EE E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .016 mile(s) after RT C S and ends at .003 mile(s) before RT AA S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT EE W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .003 mile(s) after RT AA S and ends at .016 mile(s) before RT C S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT JJ N - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at RT P E and ends at .011 mile(s) before CST PRAIRIE HILLS DR E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 72 W - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at US 61 S and ends at .001 mile(s) after CST LEE AVE S.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 72 E - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before CST LEE AVE S and ends at US 61 S.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 W - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .129 mile(s) before CST VIEW DR E and ends at .019 mile(s) after CST BROWN RD S.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 E - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .019 mile(s) before CST BROWN RD S and ends at .129 mile(s) after CST VIEW DR E.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 48 W - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .471 mile(s) after CRD 198 S and ends at .286 mile(s) before RT D S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 48 E - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .286 mile(s) after RT D S and ends at .471 mile(s) before CRD 198 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .095 mile(s) after CRD OGLE RD S and ends at .348 mile(s) before CRD WALDO RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .348 mile(s) after CRD WALDO RD S and ends at .095 mile(s) before CRD OGLE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 36 E - CALDWELL County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .483 mile(s) after RT P S and ends at .274 mile(s) before CRD ATLANTIC LOOP E.
Work is scheduled from 27-MAY-2025 to 06-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) after CRD RIDGLINE RD S and ends at .352 mile(s) before RT H S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .352 mile(s) after RT H S and ends at .228 mile(s) before CRD RIDGLINE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .292 mile(s) after CRD GRANT RD S and ends at .495 mile(s) before CRD LAKESITE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .495 mile(s) after CRD LAKESITE RD S and ends at .292 mile(s) before CRD GRANT RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) before CRD 356 S and ends at .002 mile(s) after CRD AUXIER RD SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT Z N - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT D E and ends at .002 mile(s) after CRD BUCKNER RD E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before CRD AUXIER RD SE S and ends at .008 mile(s) after CRD 356 S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP W - MORGAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CRD SCHMIDT RD E and ends at .009 mile(s) before RT D S.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP IS55S TO US67S S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .005 mile(s) after IS 55 S and ends at .004 mile(s) before US 67 S.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 131 N - JOHNSON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .022 mile(s) before CST WALNUT ST E and ends at .181 mile(s) before CRD 90 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 W and ends at IS 70 W.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP E - MORGAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after RT D S and ends at .002 mile(s) before CRD SCHMIDT RD E.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT Z S - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .002 mile(s) before CRD BUCKNER RD E and ends at RT D E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 W - LINN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .273 mile(s) after CRD ATLANTIC LOOP E and ends at .479 mile(s) before RT P S.
Work is scheduled from 27-MAY-2025 to 06-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - JASPER County - POSSIBLE DELAYS
MOWING
Work zone begins at .008 mile(s) after RT K E and ends at .012 mile(s) after CO US160 TO RTTS S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 N - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .335 mile(s) before RP IS49N TO RTH E and ends at .098 mile(s) after RP IS49N TO RTH E.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 291 N - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) after CST COURTNEY RD S and ends at .015 mile(s) before CST COURTNEY RD S.
Work is scheduled from 03-JUN-2025 to 06-JUN-2025.
Work will start daily at 05:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .128 mile(s) before RP RTAB TO IS55S S and ends at .523 mile(s) before BU 61 S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 131 S - JOHNSON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .181 mile(s) after CRD 90 S and ends at .022 mile(s) after CST WALNUT ST E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .01 mile(s) before CO US160 TO RTTS S and ends at .008 mile(s) before RT K E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .002 mile(s) after US 160 E and ends at CRD SE 40TH RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at CRD SE 40TH RD E and ends at .002 mile(s) before US 160 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .016 mile(s) after CRD BARTON CO BLVD E and ends at US 160 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at .016 mile(s) before CRD BARTON CO BLVD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 470 E - JACKSON County - EXPECT DELAYS
CONCRETE BARRIER WALL
Work zone begins at .003 mile(s) after CST HILLCREST RD S and ends at .006 mile(s) after CST VIEW HIGH DR S.
Work is scheduled from 02-JUN-2025 to 16-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 470 W - JACKSON County - EXPECT DELAYS
CONCRETE BARRIER WALL
Work zone begins at .006 mile(s) before CST VIEW HIGH DR S and ends at .002 mile(s) after CST HILLCREST RD S.
Work is scheduled from 02-JUN-2025 to 16-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT AA E - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after CST LIPPER ST S and ends at .006 mile(s) before MO 23 S.
Work is scheduled from 01-APR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP S - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after CRD DOWNEY RD E and ends at .007 mile(s) before MO 5 S.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 50 E - OSAGE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .201 mile(s) after CRD LOOSE CREEK HIGHWAY E and ends at .002 mile(s) after CRD COUNTY LINE RD S.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) before CRD COUNTY LINE RD S and ends at .201 mile(s) before CRD OLD 50 E.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP N - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after MO 5 S and ends at .004 mile(s) before CRD DOWNEY RD E.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) after CST HUNTLEIGH DR E and ends at CST DUNLORA LN S.
Work is scheduled from 13-MAY-2025 to 27-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .043 mile(s) before RP IS270E TO IS64E E and ends at .034 mile(s) before RP IS270E TO MO340E E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .066 mile(s) after RP MO340W TO IS270W W and ends at .041 mile(s) after RP IS64W TO IS270W W.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT KK E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT C S and ends at MO 185 S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 185 S and ends at RT C S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 E - MARION County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 61 S and ends at MO 79 S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 05:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST HOLMES RD S - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .01 mile(s) before RT D S and ends at .012 mile(s) after RP RTD TO MO150E E.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 5 N - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .01 mile(s) before CST LOCUST ST E and ends at .016 mile(s) after CST VIEW DR E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 5 S - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before CST VIEW DR E and ends at .01 mile(s) after CST LOCUST ST E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 435 N - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .219 mile(s) after RP RTW E TO IS435N N and ends at .07 mile(s) after CST E 87TH ST W.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 96 E - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 171 S and ends at .054 mile(s) before CRD 170 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD FF-210 E and ends at MO 14 E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 14 E and ends at CRD FF-210 E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C W - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .114 mile(s) before MO 87 S and ends at .12 mile(s) after MO 87 S.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT C E - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .12 mile(s) before MO 87 S and ends at .114 mile(s) after MO 87 S.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A E - CASS County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .024 mile(s) before CST IOWA ST S and ends at .006 mile(s) before CST HIGH SCHOOL AVE E.
Work is scheduled from 30-MAY-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST JEAN DR E and ends at .005 mile(s) after CST THOROUGHMAN AVE E.
Work is scheduled from 06-MAY-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST THOROUGHMAN AVE E and ends at .002 mile(s) after CST JEAN DR E.
Work is scheduled from 06-MAY-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) before RT OO S and ends at .108 mile(s) after CST BOONESS LN E.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .107 mile(s) before CST BOONESS LN E and ends at .003 mile(s) after RT OO S.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US67S TO IS55S S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 S and ends at IS 55 S.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 N - CARROLL County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .264 mile(s) before RT CC E and ends at .04 mile(s) before BU 36 E.
Work is scheduled from 28-MAY-2025 to 23-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.069 mile(s) before RP IS70E TO RTJ E and ends at 1.966 mile(s) after RP RTJ TO IS70E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .69 mile(s) after RP MO744 TO IS44W W and ends at .037 mile(s) after RP IS44W TO NORTON RD E.
Work is scheduled from 21-APR-2025 to 21-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after BU 36 W and ends at .264 mile(s) after RT CC E.
Work is scheduled from 28-MAY-2025 to 23-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .204 mile(s) before RP IS70E TO W WARRENTON BLVD E and ends at .054 mile(s) after RP IS70E TO RTT E.
Work is scheduled from 20-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before RR COLT S and ends at .183 mile(s) after RP US63C TO IS70E E.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .2 mile(s) before RP IS70W TO US63C N and ends at .021 mile(s) after RR COLT S.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H S - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .058 mile(s) before CRD RIDGELINE RD S and ends at .457 mile(s) before CRD GLENWOOD DR E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 12:08 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 124 E and ends at .102 mile(s) before CST INDUSTRIAL DR S.
Work is scheduled from 23-APR-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H N - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .457 mile(s) after CRD GLENWOOD DR E and ends at .058 mile(s) after CRD RIDGELINE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 12:08 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .102 mile(s) after CST INDUSTRIAL DR S and ends at MO 124 E.
Work is scheduled from 23-APR-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 169 S - BUCHANAN County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .186 mile(s) before CST PACIFIC ST E and ends at .127 mile(s) before CST PACIFIC ST E.
Work is scheduled from 26-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .116 mile(s) before CRD MARSHALL RD E and ends at .054 mile(s) after CRD MARSHALL RD E.
Work is scheduled from 03-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 N - BUCHANAN County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .127 mile(s) after CST PACIFIC ST E and ends at .186 mile(s) after CST PACIFIC ST E.
Work is scheduled from 26-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .053 mile(s) before CRD MARSHALL RD E and ends at .113 mile(s) after CRD MARSHALL RD E.
Work is scheduled from 03-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .317 mile(s) after CRD COULTER LN E and ends at .021 mile(s) after CST SPRING ST E.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RP IS44E TO MO13S S and ends at .002 mile(s) before US 65 S.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after US 65 S and ends at .044 mile(s) before RP MO13S TO IS44W W.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 160 E - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) before CST SPRING ST E and ends at .317 mile(s) before CRD COULTER LN E.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF S - POLK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 32 E and ends at RT EE E.
Work is scheduled from 28-MAY-2025 to 18-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF N - POLK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at RT EE E and ends at MO 32 E.
Work is scheduled from 28-MAY-2025 to 18-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT EE W - DALLAS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at US 65 N and ends at .03 mile(s) before RT H S.
Work is scheduled from 28-MAY-2025 to 30-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .035 mile(s) after CRD SMELSER RD E and ends at .02 mile(s) before CO US65N TO US65S W.
Work is scheduled from 06-MAY-2024 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT EE E - POLK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .03 mile(s) after RT H S and ends at US 65 S.
Work is scheduled from 28-MAY-2025 to 30-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after CO US65S TO US65N W and ends at .035 mile(s) before CRD SMELSER RD E.
Work is scheduled from 06-MAY-2024 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 86 E - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) before RT CC S and ends at CST ENTERPRISE ST S.
Work is scheduled from 18-APR-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .177 mile(s) before CST OAKRIDGE DR S and ends at .013 mile(s) before CST HOWARD BUSH DR S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - LAWRENCE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .831 mile(s) before CRD 1222 S and ends at .079 mile(s) after CRD 1222 S.
Work is scheduled from 01-JUN-2025 to 14-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 W - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST ENTERPRISE ST S and ends at .009 mile(s) after RT CC S.
Work is scheduled from 18-APR-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before CST AIRFLIGHT DR S and ends at .004 mile(s) before RT N S.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after RT N S and ends at .004 mile(s) after CST AIRFLIGHT DR S.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CST HIGH ST S and ends at .004 mile(s) before CST OAKRIDGE DR S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 S - GENTRY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .027 mile(s) before CRD 270 ST E and ends at .105 mile(s) after CRD 270 ST E.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 E - BARRY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .237 mile(s) before RT C E and ends at 1.075 mile(s) after MO 39 S.
Work is scheduled from 21-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 W - BARRY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at 1.075 mile(s) before MO 39 S and ends at .237 mile(s) after RT C E.
Work is scheduled from 21-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K S - WEBSTER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at US 60 W and ends at .023 mile(s) after CST SUMMIT AVE E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K N - WEBSTER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .023 mile(s) before CST SUMMIT AVE E and ends at US 60 W.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .033 mile(s) after RP IS64E TO MO364E E and ends at .035 mile(s) before RP IS64E TO RTK E.
Work is scheduled from 04-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:30 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone RT NN N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at .006 mile(s) before RT K E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .019 mile(s) after RT KK E and ends at .279 mile(s) before PVT BURT LN S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .006 mile(s) after RT K E and ends at US 160 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .279 mile(s) after PVT BURT LN S and ends at .019 mile(s) before RT KK E.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT V E and ends at .001 mile(s) before CRD NW 90TH RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT A N - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .156 mile(s) before CRD STEWART RD E and ends at .373 mile(s) after CRD STEWART RD E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A S - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .373 mile(s) before CRD STEWART RD E and ends at .156 mile(s) after CRD STEWART RD E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT FF S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .001 mile(s) after CRD NW 90TH RD E and ends at RT V E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .86 mile(s) before RP IS55S TO RTP S and ends at .031 mile(s) after RT A E.
Work is scheduled from 24-APR-2025 to 16-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C E - ST. FRANCOIS County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at RT K E and ends at MO 32 E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .006 mile(s) before IS 64 W and ends at .009 mile(s) before RT A E.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone US 61 S - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT A E and ends at .033 mile(s) after RP IS70W TO US61S S.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone US 61 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST HENNINGS DR E and ends at .013 mile(s) after CRD 502 E.
Work is scheduled from 19-MAR-2025 to 29-AUG-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .013 mile(s) before CRD 502 E and ends at .002 mile(s) before CST HENNINGS DR E.
Work is scheduled from 19-MAR-2025 to 29-AUG-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after RP LP49N TO IS44W W and ends at .189 mile(s) after MO 43 S.
Work is scheduled from 09-DEC-2024 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT AA W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after MO 23 S and ends at .01 mile(s) before CST LIPPER ST S.
Work is scheduled from 01-APR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 72 W - MADISON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) before BU 67 N and ends at .004 mile(s) before MO 21 S.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 72 E - IRON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after MO 21 S and ends at .005 mile(s) after BU 67 N.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z E - GENTRY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .187 mile(s) after CRD 617 RD S and ends at .079 mile(s) after CRD 106 ST S.
Work is scheduled from 02-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z W - DAVIESS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .079 mile(s) before CRD 106 ST S and ends at .187 mile(s) before CRD 617 RD S.
Work is scheduled from 02-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - TANEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .082 mile(s) after RT F E and ends at .069 mile(s) before OR 65 S.
Work is scheduled from 03-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 E - TANEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .069 mile(s) after OR 65 S and ends at .082 mile(s) before RT F E.
Work is scheduled from 03-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .08 mile(s) after CST WILDWOOD POINT E and ends at RT CC E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC E and ends at .08 mile(s) before CST WILDWOOD POINT E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after CST E 27TH ST E and ends at .039 mile(s) before RP IS70W TO ASKEW AVE W.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 435 S - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .312 mile(s) after RP US69S TO IS435S S and ends at .145 mile(s) after RP PARVIN RD TO IS435S S.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) before CST E 18TH ST E and ends at .007 mile(s) before CST CLEVELAND AVE S.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP RTA TO IS70W W - WARREN County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at IS 70 W.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .348 mile(s) before CRD HAMMER RD S and ends at .319 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .319 mile(s) before CRD HAMMER RD S and ends at .348 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD W VETERANS MEMORIAL PKWY W - WARREN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .256 mile(s) before RT B S and ends at .32 mile(s) after RT B S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD W VETERANS MEMORIAL PKWY E - WARREN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .32 mile(s) before RT B S and ends at .256 mile(s) after RT B S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT C S - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 17 S and ends at RT A E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT A N - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 60 E and ends at .243 mile(s) after CRD NORMANDY RD E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A S - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .243 mile(s) before CRD NORMANDY RD E and ends at US 60 E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone W OR 63 N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .009 mile(s) after RT VV S and ends at .463 mile(s) after CRD EAST CIRCLE DR S.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .148 mile(s) after CRD COUNTY LINE RD E and ends at .061 mile(s) after CST RICHLAND PKWY E.
Work is scheduled from 16-APR-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT C N - CAMDEN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A E and ends at MO 17 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 63 S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .463 mile(s) before CRD EAST CIRCLE DR S and ends at .009 mile(s) before RT VV S.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT FF E - JASPER County - POSSIBLE DELAYS
SURVEYING
Work zone begins at .091 mile(s) before RR HEAVAENER SUB S and ends at .065 mile(s) after CST DAVIS BLVD S.
Work is scheduled from 01-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF W - JASPER County - POSSIBLE DELAYS
SURVEYING
Work zone begins at .065 mile(s) before CST DAVIS BLVD S and ends at .091 mile(s) after RR HEAVAENER SUB S.
Work is scheduled from 01-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - COOPER County - EXPECT DELAYS
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Work zone begins at .027 mile(s) after RR RIVER SUB E and ends at .146 mile(s) after RP RTBB TO IS70E E.
Work is scheduled from 14-SEP-2021 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Work zone begins at .169 mile(s) before RP IS70W TO RTBB W and ends at .027 mile(s) before RR RIVER SUB E.
Work is scheduled from 14-SEP-2021 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
News Release
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .009 mile(s) after CRD SHERIDAN RD E and ends at .003 mile(s) after CRD KINGSTON DR E.
Work is scheduled from 18-MAY-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .068 mile(s) before RT BB S and ends at .008 mile(s) before CST MACARTHUR AVE S.
Work is scheduled from 31-MAR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK E - PERRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 51 S and ends at RT B S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after RT Y S and ends at .016 mile(s) after RT Y S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT KK W - CAPE GIRARDEAU County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at RT B S and ends at MO 51 S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) before RT Y S and ends at .011 mile(s) before RT Y S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST WILD HORSE CREEK RD W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .096 mile(s) after PVT LAUREY LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT E E and ends at .002 mile(s) before MO 49 S.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 N - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) after MO 49 S and ends at .004 mile(s) before RT E E.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H S - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after CST HALL ST N and ends at .007 mile(s) before CST CARRIE AVE E.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H N - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after CST CARRIE AVE E and ends at .005 mile(s) before CST HALL ST S.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US67N TO IS55N N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 N and ends at IS 55 N.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O N - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT B E and ends at RT H E.
Work is scheduled from 02-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O S - HICKORY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT H E and ends at RT B E.
Work is scheduled from 02-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD SHOTWELL RD E and ends at .009 mile(s) before CRD COUNTY LINE RD S.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after CRD COUNTY LINE RD S and ends at CRD SHOTWELL RD E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB S - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at US 54 W and ends at RT AA E.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 150 E - JACKSON County - POSSIBLE DELAYS
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Work zone begins at .044 mile(s) after RR SEDALIA SUB E and ends at .007 mile(s) before RP MO150 TO US50E E.
Work is scheduled from 17-MAR-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 150 W - JACKSON County - EXPECT DELAYS
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after RP MO150 TO US50E E and ends at .001 mile(s) after RP MO150 TO MO291S S.
Work is scheduled from 17-MAR-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB N - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at RT AA E and ends at US 54 W.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT MM E - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at CRD 389 S and ends at RT J S.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .001 mile(s) after CRD ZEBULON E and ends at .001 mile(s) before CST CHERRY ST S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .197 mile(s) after RP RTB TO IS44W W and ends at .514 mile(s) after RP RTB TO IS44W W.
Work is scheduled from 01-JUN-2025 to 14-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM W - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at RT J S and ends at CRD 397 S.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .001 mile(s) after CST CHERRY ST S and ends at .001 mile(s) before CRD ZEBULON E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT VV E - JASPER County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) before RP MO249N TO RTVV E and ends at .018 mile(s) before CRD ZORA ST E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WILD HORSE CREEK RD E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .096 mile(s) before PVT LAUREY LN S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP MO171S TO MO96W W - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 171 S and ends at MO 96 E.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H S - ST. FRANCOIS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .01 mile(s) before RT DD E and ends at .004 mile(s) before US 67 S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H N - MADISON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) after US 67 S and ends at .01 mile(s) after RT DD E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK N - MADISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD 404 E and ends at RT E E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .043 mile(s) before IS 170 W and ends at .013 mile(s) after IS 170 W.
Work is scheduled from 28-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD Y-523 E and ends at MO 76 E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) before PVT CARROLL WOOD WAY S and ends at PVT HACKBERRY DR S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 76 E and ends at CRD Y-523 E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 785 S and ends at .003 mile(s) after CRD 784 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before CRD 784 S and ends at .004 mile(s) after CRD 785 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) before CST NORTH LINCOLN DR S and ends at .026 mile(s) before PVT ANNA AVE S.
Work is scheduled from 24-JUN-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .026 mile(s) after PVT ANNA AVE S and ends at .014 mile(s) after CST NORTH LINCOLN DR S.
Work is scheduled from 24-JUN-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 89 N - OSAGE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .103 mile(s) after US 50 E and ends at .057 mile(s) before CST CHERRY ST E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 89 S - OSAGE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .057 mile(s) after CST CHERRY ST E and ends at .103 mile(s) before US 50 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 350 W - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after CST E 67TH ST E and ends at .031 mile(s) after CST E 63RD ST W.
Work is scheduled from 05-JUN-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CST KENT ST S and ends at MO 72 E.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 72 E and ends at CST KENT ST S.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 24 E - JACKSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) before CO US24W TO US24E S and ends at .001 mile(s) after CST CLIFF N DR S.
Work is scheduled from 05-JUN-2025 to 07-JUN-2025.
Work will start daily at 09:00 AM and end by 10:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DOOLITTLE OUTER RD W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at OR 44 E and ends at .362 mile(s) before OR 44 E.
Work is scheduled from 04-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 17 S - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at RT AW S and ends at .004 mile(s) before US 63 S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 17 N - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .004 mile(s) after US 63 S and ends at RT AW S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .023 mile(s) after PVT SUNSWEPT PARK DR E and ends at .007 mile(s) before CRD CANDLEWYCK CLUB DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after CRD CANDLEWYCK CLUB DR E and ends at .023 mile(s) before PVT SUNSWEPT PARK DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DOOLITTLE OUTER RD E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .362 mile(s) after OR 44 E and ends at OR 44 E.
Work is scheduled from 04-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 E - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .179 mile(s) after MO 58 E and ends at .25 mile(s) after CRD 121 S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 W - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .249 mile(s) before CRD 121 S and ends at .178 mile(s) before MO 58 E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70E TO RTA S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after IS 70 E and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 54 W - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .055 mile(s) before CST LINDEN DR E and ends at .015 mile(s) after CST STADIUM BLVD E.
Work is scheduled from 06-MAY-2025 to 26-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT KK S - MADISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT E E and ends at CRD 404 E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F W - TANEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .07 mile(s) after CRD COUNTRY HILLS DR S and ends at .107 mile(s) after CRD WALLEN BLUFF DR S.
Work is scheduled from 28-MAY-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F E - TANEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .107 mile(s) before CRD WALLEN BLUFF DR S and ends at .07 mile(s) before CRD COUNTRY HILLS DR S.
Work is scheduled from 28-MAY-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 72 E - PHELPS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .007 mile(s) before CST RUCKER AVE S and ends at .002 mile(s) after CST WALNUT S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 72 W - PHELPS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST WALNUT S and ends at .007 mile(s) after CST RUCKER AVE S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - CALLAWAY County - EXPECT DELAYS
FOG SEAL
Work zone begins at .191 mile(s) after RR JEFFERSON CITY SUB E and ends at .624 mile(s) after CRD 147 S.
Work is scheduled from 27-MAY-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
FOG SEAL
Work zone begins at .61 mile(s) before OR 54 E and ends at .193 mile(s) before RR JEFFERSON CITY SUB E.
Work is scheduled from 27-MAY-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTKS TO IS64E E - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT K S and ends at IS 64 E.
Work is scheduled from 03-JUN-2025 to 21-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Possible delays due to workzone RT B E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT N E and ends at .017 mile(s) before MO 97 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 E - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .025 mile(s) before CST BROWN RD S and ends at .015 mile(s) after CST WEST VIEW DR S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) before CST NORTHERN BLVD S and ends at .002 mile(s) before CST NORTHERN BLVD S.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 52 W - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) before CST WEST VIEW DR S and ends at .025 mile(s) after CST BROWN RD S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT HH W - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CRD SKYLINE DR S and ends at MO 5 S.
Work is scheduled from 27-MAY-2025 to 03-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT C E and ends at RT J E.
Work is scheduled from 22-MAY-2025 to 02-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E S - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT Z S and ends at RT C S.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E N - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT C S and ends at RT Z S.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT HH E and ends at .078 mile(s) after RT HH E.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .19 mile(s) before RP IS55N TO REAVIS BARRACKS RD E and ends at .069 mile(s) before RP BATES ST TO IS55N N.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT B W - CEDAR County - POSSIBLE DELAYS
MOWING
Work zone begins at .017 mile(s) after MO 97 S and ends at RT N E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT B E and ends at .018 mile(s) before RT BB S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .078 mile(s) before RT HH E and ends at RT HH E.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT B N - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at MO 221 S and ends at MO 32 E.
Work is scheduled from 19-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT B S - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at MO 32 E and ends at MO 221 S.
Work is scheduled from 19-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .018 mile(s) after RT BB S and ends at RT B E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E E - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 571 S and ends at .045 mile(s) before MO 37 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 N - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) before RP W 155TH ST TO IS49N N and ends at .001 mile(s) before RP IS49N TO MO150W W.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .055 mile(s) before RP MO150W TO IS49S S and ends at .046 mile(s) before RP IS49S TO E 155TH ST S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 169 S - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .032 mile(s) before RP US169 TO IS29N N and ends at .001 mile(s) before CST 37TH ST S.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 291 S - JACKSON County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .228 mile(s) after RR BROOKFIELD SUB E and ends at .007 mile(s) before US 40 W.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 291 N - JACKSON County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .012 mile(s) after US 40 W and ends at .231 mile(s) before RR BROOKFIELD SUB E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 435 N - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after CST NE BIRMINGHAM RD E and ends at .231 mile(s) after RP OUTER RD TO IS435N N.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 5 N - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CRD HUGHES DR E and ends at .006 mile(s) after CRD PASLEY RD E.
Work is scheduled from 04-JUN-2025 to 11-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.065 mile(s) before RP IS70E TO RTJ E and ends at .648 mile(s) after RP RTHH TO IS70E E.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST MCNUTT ST S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before CST HERCULANEUM CROSSING S and ends at CST PROVIDENCE WAY E.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 151 S - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .3 mile(s) before RP US36W TO MO151 N and ends at .009 mile(s) before CST SWITZLER ST W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST MCNUTT ST N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST PROVIDENCE WAY E and ends at .013 mile(s) after CST HERCULANEUM CROSSING S.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .639 mile(s) before RP IS70W TO RTM W and ends at 1.065 mile(s) after RP RTJ TO IS70W W.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 S - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CRD PASLEY RD E and ends at .005 mile(s) after CRD HUGHES DR E.
Work is scheduled from 04-JUN-2025 to 11-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 151 N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after CST SWITZLER ST E and ends at .3 mile(s) after RP US36W TO MO151 N.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .507 mile(s) before RP IS70W TO RTVV W and ends at .677 mile(s) after RP RTY TO IS70W W.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .651 mile(s) before RP IS70E TO RTY E and ends at .551 mile(s) after RP RTY TO IS70E E.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT KK E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 185 S and ends at .001 mile(s) before MO 100 E.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 6 E - DEKALB County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before MO 31 S and ends at US 69 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 6 W - DAVIESS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 69 S and ends at .004 mile(s) after MO 31 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .025 mile(s) after CST NATIONAL AVE N and ends at .012 mile(s) before MO 13 S.
Work is scheduled from 14-APR-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 100 E and ends at MO 185 S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CRD MILITARY RD S and ends at .001 mile(s) before CRD WEISS AVE E.
Work is scheduled from 02-JUN-2025 to 30-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT A S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .076 mile(s) before OR 70 E and ends at RT B S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 29 S - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) before RP IS29S TO MO273 S and ends at .005 mile(s) before RP IS29S TO RTD S.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .026 mile(s) after RP RTD TO IS29N N and ends at .021 mile(s) after RP MO273 TO IS29N N.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61S S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT DD N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .006 mile(s) before CRD 361 E and ends at .003 mile(s) after CRD 372 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CRD 372 E and ends at .006 mile(s) after CRD 361 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 W - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .018 mile(s) before CST 22ND ST S and ends at .026 mile(s) after RP IS64W TO BOYLE AVE N.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT HH E - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 5 S and ends at .001 mile(s) before CRD SKYLINE DR S.
Work is scheduled from 27-MAY-2025 to 03-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after US 50 E and ends at .006 mile(s) before RT N E.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT O S - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after RT N E and ends at .001 mile(s) before US 50 E.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A N - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .076 mile(s) after OR 70 E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after MO 13 S and ends at .019 mile(s) before CST NATIONAL AVE N.
Work is scheduled from 14-APR-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) before PVT COUNTRY HAVEN DR E and ends at .012 mile(s) after PVT RIVER DALE DR E.
Work is scheduled from 03-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .025 mile(s) after CST MILFORD AVE S and ends at .001 mile(s) before CST IONA AVE S.
Work is scheduled from 19-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .012 mile(s) before PVT RIVER DALE DR E and ends at .002 mile(s) after PVT COUNTRY HAVEN DR E.
Work is scheduled from 03-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - MONITEAU County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at .001 mile(s) before CRD MONITEAU COUNTY DR S.
Work is scheduled from 29-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CRD MONITEAU COUNTY DR S and ends at US 50 E.
Work is scheduled from 29-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 49 N - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .073 mile(s) before RT BB E and ends at .071 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 34 W - BOLLINGER County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .01 mile(s) after CRD 808 E and ends at .021 mile(s) before US 67 N.
Work is scheduled from 29-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 34 E - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .021 mile(s) after US 67 N and ends at .01 mile(s) before CRD 808 E.
Work is scheduled from 29-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 49 S - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .071 mile(s) before RT BB E and ends at .073 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP N - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT J E and ends at RT C E.
Work is scheduled from 22-MAY-2025 to 02-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .233 mile(s) before RR HEAVAENER SUB S and ends at .096 mile(s) after RR HEAVAENER SUB S.
Work is scheduled from 26-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .105 mile(s) before RR HEAVAENER SUB S and ends at .224 mile(s) after RR HEAVAENER SUB S.
Work is scheduled from 26-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .045 mile(s) before RP OR70E TO IS70E E and ends at .005 mile(s) before RP RTZ TO IS70E E.
Work is scheduled from 27-MAY-2025 to 21-JUN-2025.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) after CST CEMETERY ST E and ends at .068 mile(s) before CST MYRTLE ST E.
Work is scheduled from 03-JUN-2025 to 30-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST VIEW HIGH DR N - JACKSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .032 mile(s) after CST NW OLD VIEW HIGH RD E and ends at .039 mile(s) before CST NW VIEW HIGH PKWY N.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST VIEW HIGH DR S - JACKSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after CST NW VIEW HIGH PKWY N and ends at .033 mile(s) before CST NW OLD VIEW HIGH RD E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .068 mile(s) after CST MYRTLE ST E and ends at .011 mile(s) before CST CEMETERY ST E.
Work is scheduled from 03-JUN-2025 to 30-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .015 mile(s) after RP VANDEVENTER AVE TO IS64W W and ends at .017 mile(s) after CST 22ND ST S.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 740 W - BOONE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 163 S and ends at .003 mile(s) before CST WEST BLVD S.
Work is scheduled from 14-MAY-2025 to 13-JUN-2025.
Work will start daily at 08:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 740 E - BOONE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .003 mile(s) after CST WEST BLVD S and ends at MO 163 S.
Work is scheduled from 14-MAY-2025 to 13-JUN-2025.
Work will start daily at 08:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT M S and ends at .011 mile(s) before US 54 E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .011 mile(s) after US 54 E and ends at RT M S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 14 W - CHRISTIAN County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) after CRD NICE PLACE RD S and ends at .161 mile(s) before CRD POPPY LN S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 2 E - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) after CST SE OUTER RD S and ends at .002 mile(s) before CST BIRD AVE S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT F S - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after MO 58 E and ends at .005 mile(s) before MO 2 E.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 2 W - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST BIRD AVE S and ends at .005 mile(s) before CST SE OUTER RD S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .265 mile(s) before RP IS70W TO US54E E and ends at .444 mile(s) after RR FULTON BRANCH S.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55N TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .013 mile(s) after IS 55 N and ends at .004 mile(s) before US 67 N.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .441 mile(s) before RR FULTON BRANCH S and ends at .259 mile(s) after RP US54E TO IS70E E.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E N - CASS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 58 E and ends at .001 mile(s) before CRD 171ST ST E.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E S - CASS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) before CRD 171ST ST E and ends at .009 mile(s) before MO 58 E.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AC N - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .03 mile(s) before CST DORWOOD DR S and ends at .111 mile(s) after CST LUCAS AND HUNT RD S.
Work is scheduled from 15-MAY-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST OLYMPIC BLVD S and ends at .011 mile(s) before CST WOODLAND SPRINGS CT S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AC S - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .111 mile(s) before CST LUCAS AND HUNT RD S and ends at .03 mile(s) after CST DORWOOD DR S.
Work is scheduled from 15-MAY-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before CST GOLDEN BEAR DR E and ends at .021 mile(s) before CST OLYMPIC BLVD S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P W - SALINE County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .375 mile(s) after CRD RABBIT TRL S and ends at .867 mile(s) after CRD RABBIT TRL S.
Work is scheduled from 29-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before CRD BAILEY RD E and ends at .021 mile(s) before PVT N ELLISTON RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .021 mile(s) after PVT N ELLISTON RD E and ends at .002 mile(s) after CRD BAILEY RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT V N - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .022 mile(s) before CST NW LITTLE BLUE RD E and ends at .02 mile(s) after CST E 54TH TER E.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - BENTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .015 mile(s) after COE FISH HOOK RD E and ends at .066 mile(s) before RT UU S.
Work is scheduled from 27-MAY-2025 to 07-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 S - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .31 mile(s) after CRD 280 ST E and ends at 1.354 mile(s) after RT Z E.
Work is scheduled from 28-APR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 N - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.345 mile(s) before RT Z E and ends at .309 mile(s) before CRD 280 ST E.
Work is scheduled from 28-APR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 36 W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .27 mile(s) after RP US24W TO US36W W and ends at .034 mile(s) after CO US36W TO US36E S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 7 N - BENTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .066 mile(s) after RT UU S and ends at .015 mile(s) before COE OMAHA RD E.
Work is scheduled from 27-MAY-2025 to 07-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 13 N - STONE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .044 mile(s) before MO 248 E and ends at .181 mile(s) after US 160 E.
Work is scheduled from 14-MAY-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 13 S - STONE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .181 mile(s) before US 160 E and ends at .044 mile(s) after MO 248 E.
Work is scheduled from 14-MAY-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone CRD CAMPGROUND RD W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .003 mile(s) after OR 44 E and ends at OR 44 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F N - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after MO 2 E and ends at .01 mile(s) before MO 58 E.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 94 E - MONTGOMERY County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .009 mile(s) after MO 19 S and ends at .694 mile(s) after PVT POLO DOWNS PKWY S.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 94 W - WARREN County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .694 mile(s) before PVT POLO DOWNS PKWY S and ends at .009 mile(s) before MO 19 S.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CRD CAMPGROUND RD E - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at OR 44 E and ends at .003 mile(s) before OR 44 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - STE. GENEVIEVE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT WW S and ends at .023 mile(s) before RT OO S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F E - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .023 mile(s) after RT OO S and ends at RT WW S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 413 N - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at CST E ST E and ends at .028 mile(s) after CRD RAILEY CREEK RD S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 413 S - STONE County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .028 mile(s) before CRD RAILEY CREEK RD S and ends at CST E ST E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 143 S - IRON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 49 S and ends at .14 mile(s) after CRD 312 E.
Work is scheduled from 20-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 143 N - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .14 mile(s) before CRD 312 E and ends at MO 49 S.
Work is scheduled from 20-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AA W - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 49 S and ends at .454 mile(s) after CRD BLUFF VIEW DR S.
Work is scheduled from 22-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AA E - REYNOLDS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .454 mile(s) before CRD BLUFF VIEW DR S and ends at MO 49 S.
Work is scheduled from 22-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP MO96 TO MO171S S - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 96 E.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 74 W - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) before RR RIVER SUB S and ends at .003 mile(s) after CST FOUNTAIN ST S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT W N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after RT M S and ends at .002 mile(s) before US 50 E.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70W TO IS170E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 W and ends at .009 mile(s) before IS 170 E.
Work is scheduled from 02-JUN-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .299 mile(s) before RT Y S and ends at .243 mile(s) before CRD FINCH DR S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .243 mile(s) after CRD FINCH DR S and ends at .299 mile(s) after RT CC S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) before RP US24 TO US63S S and ends at .09 mile(s) before RP MO22 TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W S - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 50 E and ends at .003 mile(s) before RT M S.
Work is scheduled from 31-MAR-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H E - BUCHANAN County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .392 mile(s) after RT FF S and ends at .883 mile(s) after RT FF S.
Work is scheduled from 27-MAY-2025 to 05-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 116 W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .033 mile(s) after CO MO116 TO RTY E and ends at .026 mile(s) before OR 29 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 116 E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after OR 29 S and ends at .033 mile(s) before CO MO116 TO RTY E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M N - CALLAWAY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT HH S and ends at .018 mile(s) after CRD 2000 E.
Work is scheduled from 20-MAY-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before CST STADIUM BLVD E and ends at .022 mile(s) after CST LINDEN DR E.
Work is scheduled from 06-MAY-2025 to 25-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W N - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) after CST WALNUT ST S and ends at MO 52 E.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT W S - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 52 E and ends at .001 mile(s) before CST WALNUT ST S.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .017 mile(s) after US 24 W and ends at .426 mile(s) after RP US24W TO US36W W.
Work is scheduled from 26-MAR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D E - SULLIVAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 6 E and ends at MO 149 S.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M N - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .626 mile(s) before CRD NICHOLS SW E and ends at MO 116 E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 N - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .109 mile(s) before RP IS35N TO MO116 N and ends at .027 mile(s) after RP US69 TO IS35N N.
Work is scheduled from 12-MAY-2025 to 19-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 S - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .029 mile(s) after RP IS35S TO US69 S and ends at .117 mile(s) after RP MO116 TO IS35S S.
Work is scheduled from 12-MAY-2025 to 19-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) before CRD HORN S and ends at .408 mile(s) after CRD 115 SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .408 mile(s) before CRD 115 SE S and ends at .009 mile(s) after CRD HORN S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT F E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .008 mile(s) after RT N E and ends at .019 mile(s) after MO 43 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .019 mile(s) before MO 43 S and ends at .008 mile(s) before RT N E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .005 mile(s) before RT AA S and ends at .001 mile(s) before RP IS49N TO RTM E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M S - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 116 E and ends at .626 mile(s) after CRD NICHOLS SW E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 190 E and ends at .003 mile(s) before BU 36 W.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 65 N - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after BU 36 E and ends at .001 mile(s) before MO 190 E.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT M N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .001 mile(s) after RP IS49N TO RTM E and ends at .005 mile(s) after RT AA S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AA S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .01 mile(s) before CRD 2700 S and ends at .004 mile(s) before US 54 E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AA N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .004 mile(s) after US 54 E and ends at .01 mile(s) after CRD 2700 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST PERSHALL RD E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) before CST HAZELWOOD AVE S and ends at .004 mile(s) before OR 270 E.
Work is scheduled from 23-APR-2025 to 01-DEC-2025.
Work will start daily at 05:00 PM and end by 02:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST PERSHALL RD W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after OR 270 E and ends at .002 mile(s) after CST HAZELWOOD AVE S.
Work is scheduled from 23-APR-2025 to 01-DEC-2025.
Work will start daily at 05:00 PM and end by 02:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) before RP IS70E TO RTK S and ends at .018 mile(s) after CST SPENCER RD S.
Work is scheduled from 27-MAY-2025 to 22-JUL-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M S - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .018 mile(s) before CRD 2000 E and ends at RT HH S.
Work is scheduled from 20-MAY-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS64W TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after RP IS64W TO IS270W W and ends at IS 270 E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64E TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before RP IS64W TO IS270W W and ends at .024 mile(s) after RP IS64W TO IS270E E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST WEIER RD N - JEFFERSON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .024 mile(s) before RR DESOTO SUB S and ends at .077 mile(s) after RR DESOTO SUB S.
Work is scheduled from 04-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 136 E - NODAWAY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after RT PP S and ends at .005 mile(s) before CST MAIN ST E.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 W - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before US 65 N and ends at .008 mile(s) after CST CHIEFS CT E.
Work is scheduled from 20-JAN-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WEST OSAGE BEACH PKWY N - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .029 mile(s) before PVT CHATEAU LN S and ends at .001 mile(s) before US 54 E.
Work is scheduled from 27-MAY-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WEST OSAGE BEACH PKWY S - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at PVT GLAIZE BRIDGE HTS S and ends at .029 mile(s) after PVT CHATEAU LN S.
Work is scheduled from 27-MAY-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 E - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .008 mile(s) before CST CHIEFS CT E and ends at .008 mile(s) after US 65 N.
Work is scheduled from 20-JAN-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 136 W - NODAWAY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after CST MAIN ST E and ends at .005 mile(s) before RT PP S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 S - PERRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after RT F E and ends at .001 mile(s) before RT KK E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - CAPE GIRARDEAU County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after RT KK E and ends at .005 mile(s) before RT F E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST HOLMES RD N - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) before RP RTD TO MO150E E and ends at .008 mile(s) after RT D S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .028 mile(s) before CST NORTH & SOUTH RD S and ends at .019 mile(s) after CST NORTH & SOUTH RD S.
Work is scheduled from 29-MAY-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .019 mile(s) before CST NORTH & SOUTH RD S and ends at .028 mile(s) after CST NORTH & SOUTH RD S.
Work is scheduled from 29-MAY-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 40 E - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) before CST STERLING AVE S and ends at .039 mile(s) after CST OOIDA DR S.
Work is scheduled from 21-APR-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 40 W - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .039 mile(s) before CST OOIDA DR S and ends at .001 mile(s) after CST STERLING AVE S.
Work is scheduled from 21-APR-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT C E - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 61 S and ends at .001 mile(s) before MO 79 S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 3 N - RANDOLPH County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .891 mile(s) before CRD 2040 E and ends at .139 mile(s) after CRD 2040 E.
Work is scheduled from 22-MAY-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 3 S - RANDOLPH County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .139 mile(s) before CRD 2040 E and ends at .891 mile(s) after CRD 2040 E.
Work is scheduled from 22-MAY-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 E - JASPER County - POSSIBLE DELAYS
Street Lighting repairs
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .469 mile(s) before RP IS44E TO CRD 100 S and ends at .028 mile(s) after MO 96 E.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - LAWRENCE County - POSSIBLE DELAYS
Street Lighting repairs
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .05 mile(s) before MO 96 E and ends at .456 mile(s) after RP CRD 100 TO IS44W W.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P E - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 87 S and ends at CST MAIN ST E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P W - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST MAIN ST E and ends at MO 87 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) after RP RTMM TO MO360E E and ends at .004 mile(s) before RP MO360W TO RTMM N.
Work is scheduled from 29-MAY-2025 to 15-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT MM S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after RP MO360W TO RTMM N and ends at .009 mile(s) before RP RTMM TO MO360E E.
Work is scheduled from 29-MAY-2025 to 15-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 160 W - TANEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .076 mile(s) before CRD DAYTON RD S and ends at .117 mile(s) before CRD KEYSTONE RD S.
Work is scheduled from 02-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 E - STONE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .117 mile(s) after CRD KEYSTONE RD S and ends at .076 mile(s) after CRD DAYTON RD S.
Work is scheduled from 02-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C W - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after MO 79 S and ends at US 61 S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN W - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at MO 221 S and ends at RT N S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN E - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT N S and ends at MO 221 S.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB N - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .014 mile(s) after MO 32 E and ends at RT M E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB S - ST. FRANCOIS County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT M E and ends at .014 mile(s) before MO 32 E.
Work is scheduled from 02-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .09 mile(s) before RP IS49S TO CIVIL WAR RD N and ends at .09 mile(s) before RP CIVIL WAR RD TO IS49S S.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .016 mile(s) after MO 43 S and ends at RT T S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT T S and ends at .016 mile(s) before MO 43 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST FOREST AVE S and ends at CST CLAREMONT AVE S.
Work is scheduled from 11-MAR-2025 to 13-JUN-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 15 S - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after RT D E and ends at .089 mile(s) before CST WADE ST S.
Work is scheduled from 19-MAY-2025 to 30-JUN-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after CST LIGHTBURNE ST S and ends at .004 mile(s) before CST PLEASANT VALLEY RD W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 15 N - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .089 mile(s) after CST WADE ST S and ends at .005 mile(s) before RT D E.
Work is scheduled from 19-MAY-2025 to 30-JUN-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P W - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 66 E and ends at CRD STATELINE RD S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .023 mile(s) before RT F E and ends at .013 mile(s) after RT CC E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT ZZ N - GREENE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) after CRD 194 E and ends at .001 mile(s) before CRD 186 E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before RT CC E and ends at .023 mile(s) after RT F E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT W E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .296 mile(s) after PVT UNKNOWN S and ends at .022 mile(s) before US 63 S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .022 mile(s) after US 63 S and ends at .296 mile(s) before PVT UNKNOWN S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP RTAB TO IS270E E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT AB E and ends at IS 270 E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at .013 mile(s) before IS 64 W.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at .064 mile(s) after RP IS270W TO IS64E E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M N - BARRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .069 mile(s) after RT E E and ends at MO 76 E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 96 W - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after MO 171 N and ends at .001 mile(s) before CRD INCA RD E.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 124 E and ends at .102 mile(s) before CST INDUSTRIAL DR S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT VV S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD W DRIPPING SPRINGS RD E and ends at .034 mile(s) before OR 63 S.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 52 W - BATES County - EXPECT DELAYS
MOWING
Work zone begins at .236 mile(s) after CRD NW 591 S and ends at CRD NW 14361 S.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 12:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 E - BATES County - EXPECT DELAYS
MOWING
Work zone begins at CRD SW 14267 S and ends at .236 mile(s) before CRD NW 591 S.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 12:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT VV N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .034 mile(s) after OR 63 S and ends at CRD W DRIPPING SPRINGS RD E.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 52 W - BATES County - EXPECT DELAYS
MOWING
Work zone begins at .236 mile(s) after CRD NW 591 S and ends at CRD NW 14361 S.
Work is scheduled from 28-MAY-2025 to 05-JUN-2025.
Work will start daily at 12:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AB E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after RP RTABW TO MO141S S and ends at .035 mile(s) before CST PEBBLE ACRES DR S.
Work is scheduled from 21-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT E - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 19 S and ends at CRD 4030 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 8 E and ends at .001 mile(s) before CRD IRON ST S.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CRD IRON ST S and ends at MO 8 E.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT W - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 4030 S and ends at MO 19 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 74 E - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CST FOUNTAIN ST S and ends at .235 mile(s) after RR RIVER SUB S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Y N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .225 mile(s) before CRD 4 S and ends at .27 mile(s) after CRD 4 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 78 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CST PEARL ST S and ends at CST NOLAND RD S.
Work is scheduled from 27-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 160 W and ends at .001 mile(s) before RT OO E.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after RT OO E and ends at US 160 W.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Z E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after RP RTZ TO IS55S S and ends at .003 mile(s) before RP IS55N TO RTZ E.
Work is scheduled from 14-MAR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 N - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .089 mile(s) before RP EATON ST TO IS35N N and ends at RP IS35N TO US169N N.
Work is scheduled from 03-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 S - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) before RP IS35N TO IS70W W and ends at .097 mile(s) after RP IS35S TO EATON ST N.
Work is scheduled from 03-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .007 mile(s) before CST FLORISSANT RD S and ends at .06 mile(s) before CST FAIRVIEW LN E.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT B S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .053 mile(s) after OR 70 E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 13 S - HENRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) before CRD SW 450TH RD E and ends at .009 mile(s) before MO 52 W.
Work is scheduled from 05-AUG-2024 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT B N - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .053 mile(s) before OR 70 E and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 19 N - OREGON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .003 mile(s) after US 160 E and ends at .013 mile(s) before US 60 E.
Work is scheduled from 28-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - HENRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .063 mile(s) after MO 52 E and ends at .011 mile(s) after CRD SW 450TH RD E.
Work is scheduled from 05-AUG-2024 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) before CST PLEASANT VALLEY RD W and ends at CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 19 S - SHANNON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .013 mile(s) after US 60 E and ends at .003 mile(s) before US 160 E.
Work is scheduled from 28-MAY-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST FRONT ST S - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .041 mile(s) after CST LOCUST ST E and ends at MO 76 E.
Work is scheduled from 18-APR-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 24 E - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .158 mile(s) after MO 224 E and ends at .006 mile(s) after CRD E WALNUT ST E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 24 W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) before CRD E WALNUT ST E and ends at .158 mile(s) before MO 224 E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .093 mile(s) after CST RESEARCH PARK CIR E and ends at .056 mile(s) after RP SPIRT OF ST LOUIS BLVD TO IS64E E.
Work is scheduled from 08-APR-2025 to 30-NOV-2025.
Work will start daily at 12:00 AM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 64 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .123 mile(s) before CST SPIRIT OF ST LOUIS BLVD S and ends at .088 mile(s) before RP IS64W TO NOR40E E.
Work is scheduled from 22-MAY-2025 to 12-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 47 N - WASHINGTON County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .233 mile(s) before CRD PROVIDENCE RD E and ends at .37 mile(s) after CRD PROVIDENCE RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 47 S - WASHINGTON County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .37 mile(s) before CRD PROVIDENCE RD E and ends at .233 mile(s) after CRD PROVIDENCE RD E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT YY W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .018 mile(s) before RP US65N TO RTYY E and ends at CST DIVISION ST E.
Work is scheduled from 25-MAY-2025 to 07-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .013 mile(s) after MO 571 S and ends at .197 mile(s) after MO 571 S.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .162 mile(s) before CRD JACKPINE RD E and ends at .293 mile(s) after CRD JACKPINE RD E.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB S - WASHINGTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .021 mile(s) after RT C E and ends at .088 mile(s) before CRD ROBINSON RD S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB N - WASHINGTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .088 mile(s) after CRD ROBINSON RD S and ends at .021 mile(s) before RT C E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AA N - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 66 E and ends at .058 mile(s) before RT HH E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 340 E - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after IS 270 E and ends at .003 mile(s) after CST WARSON RD S.
Work is scheduled from 27-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT HH E - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at CST MAIN ST E and ends at .022 mile(s) before OR 49 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT C E and ends at RT K E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT K E and ends at RT C E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .031 mile(s) after MO 43 S and ends at .022 mile(s) before CRD NW STATE LINE LN S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .022 mile(s) after CRD NW STATE LINE LN S and ends at .031 mile(s) before MO 43 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F E - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 37 S and ends at .043 mile(s) before RT U S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 37 N - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at .002 mile(s) before RP MO37 TO IS44E E and ends at .304 mile(s) before MO 96 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST RIVER DES PERES BLVD E and ends at .004 mile(s) before CST SUNSET OFFICE DR E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 670 E - JACKSON County - POSSIBLE DELAYS
SWEEPING PAVEMENT
Work zone begins at .064 mile(s) before CST GENESSEE ST S and ends at .013 mile(s) before IS 70 E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 S - STONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .028 mile(s) after PVT SHADY LN E and ends at .001 mile(s) before MO 248 E.
Work is scheduled from 20-JAN-2025 to 19-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) after CST SUNSET OFFICE DR E and ends at .005 mile(s) after CST RIVER DES PERES BLVD E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 8 E - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) before CRD OLD HWY 8 E and ends at .024 mile(s) after CRD RAILROAD RD 606 S.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .002 mile(s) after CST NE DOUGLAS ST S and ends at .019 mile(s) before MO 291 N.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .027 mile(s) after MO 291 S and ends at .002 mile(s) after CST NE DOUGLAS ST S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 8 W - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD RAILROAD RD 606 S and ends at .009 mile(s) after CRD OLD HWY 8 E.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .016 mile(s) before RP MO340W TO IS270E E and ends at .057 mile(s) before CST WARSON RD S.
Work is scheduled from 27-MAY-2025 to 06-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 25 S - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at US 61 S and ends at .001 mile(s) before CST KENT ST S.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 25 N - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after CST KENT ST S and ends at US 61 S.
Work is scheduled from 12-MAY-2025 to 16-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 S - SHANNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD 19A E and ends at .009 mile(s) before CRD 430 E.
Work is scheduled from 03-MAR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 N - OREGON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after CRD 430 E and ends at .024 mile(s) after CRD 19A E.
Work is scheduled from 03-MAR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) before CST SPENCER RD S and ends at .167 mile(s) after CST WOODLAWN AVE S.
Work is scheduled from 27-MAY-2025 to 22-JUL-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at 1.321 mile(s) before RP IS55N TO US61 S and ends at .022 mile(s) after RP IS55N TO US61 S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .02 mile(s) before RP US61 TO IS55S S and ends at 1.323 mile(s) after RP US61 TO IS55S S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B E - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .033 mile(s) after CRD MAY RD E and ends at .158 mile(s) before CRD ADAMS RD E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B W - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .158 mile(s) after CRD ADAMS RD E and ends at .033 mile(s) before CRD MAY RD E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST DUNN RD E and ends at .001 mile(s) before CST CHAIN OF ROCKS BRG E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST CHAIN OF ROCKS BRG E and ends at .001 mile(s) after CST DUNN RD E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 152 E - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after RP MO152E TO IS29N N and ends at .01 mile(s) before MO 1 S.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 W - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) after MO 1 S and ends at .004 mile(s) before RP MO152E TO IS29N N.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .09 mile(s) after CST OLD ORCHARD DR S and ends at .008 mile(s) after OR 44 E.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .008 mile(s) before OR 44 E and ends at .09 mile(s) before CST OLD ORCHARD DR S.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 270 E - ST. LOUIS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .224 mile(s) before RP IS270E TO RTDE E and ends at .104 mile(s) before RP MO364E TO IS270E E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 10:00 PM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Y S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .27 mile(s) before CRD 4 S and ends at .225 mile(s) after CRD 4 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .06 mile(s) after CST FAIRVIEW LN E and ends at .008 mile(s) after CST FLORISSANT RD N.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - MONTGOMERY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .031 mile(s) before RP IS70W TO RTE W and ends at .027 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - MONTGOMERY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .034 mile(s) before RP IS70E TO RTE W and ends at .045 mile(s) after RP RTE TO IS70E E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 30 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) before CRD WEBER RD E and ends at .002 mile(s) before CRD VASEL DR S.
Work is scheduled from 28-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .01 mile(s) after CST WILD HORSE RANCH LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 62 E - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after CST PATTERSON ST E and ends at .339 mile(s) after MO 153 S.
Work is scheduled from 25-NOV-2024 to 23-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .01 mile(s) before CST WILD HORSE RANCH LN S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 62 W - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .339 mile(s) before MO 153 S and ends at .003 mile(s) before CST PATTERSON ST E.
Work is scheduled from 25-NOV-2024 to 23-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST REPUBLIC ST E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .042 mile(s) before US 60 W and ends at .012 mile(s) after CST MONASTERY ST E.
Work is scheduled from 13-MAY-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .056 mile(s) before RP US63N TO RTWW N and ends at .072 mile(s) after CST CLARK LN E.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .076 mile(s) before CST CLARK LN E and ends at .07 mile(s) after RP RTWW TO US63S S.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST REPUBLIC ST W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) before CST MONASTERY ST E and ends at .042 mile(s) after US 60 W.
Work is scheduled from 13-MAY-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS64E TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) after IS 64 E and ends at MO 141 S.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .169 mile(s) after CRD HICKLIN RD S and ends at .123 mile(s) after CST W KATIE TRL E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 24 E - JACKSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .123 mile(s) before CST W KATIE TRL E and ends at .169 mile(s) before CRD HICKLIN RD S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 13 N - ST. CLAIR County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before RT TT E and ends at .31 mile(s) before CRD NE 50 E.
Work is scheduled from 02-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 87 N - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .063 mile(s) before RT C E and ends at .078 mile(s) after RT C E.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 87 S - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .078 mile(s) before RT C E and ends at .063 mile(s) after RT C E.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT MM W - JEFFERSON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .18 mile(s) before PVT BUCKEYE VALLEY RD E and ends at .003 mile(s) before MO 30 W.
Work is scheduled from 28-MAY-2025 to 30-JUN-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS64W TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) after OR 64 W and ends at .024 mile(s) after IS 64 E.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO RTAB W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 W and ends at RT AB E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 E - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .246 mile(s) after CST FOURTH ST E and ends at .001 mile(s) before MO 39 S.
Work is scheduled from 14-APR-2025 to 14-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V W - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .013 mile(s) after CRD 271 S and ends at .005 mile(s) before CRD 273 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS270E TO RTAB E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 E and ends at RT AB E.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT V E - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) after CRD 273 S and ends at .013 mile(s) before CRD 271 S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT MM E - JEFFERSON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .003 mile(s) after MO 30 W and ends at .18 mile(s) after PVT PEACEFUL VALLEY E.
Work is scheduled from 28-MAY-2025 to 30-JUN-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 69 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .013 mile(s) after RP US69S TO IS435S S and ends at .012 mile(s) before CST EMERSON AVE S.
Work is scheduled from 04-JUN-2025 to 11-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US61N TO MO47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at US 61 N and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61N N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 N.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 86 E - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .175 mile(s) after CRD LEISURE LN E and ends at .194 mile(s) before PVT BRIDGEVIEW DR S.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 86 W - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .194 mile(s) after PVT BRIDGEVIEW DR S and ends at .175 mile(s) before CRD LEISURE LN E.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS70W TO RTA W - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 W and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT FF W - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .571 mile(s) before CRD 240 E and ends at CRD 225 E.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT FF E - CALLAWAY County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at CRD 225 E and ends at .571 mile(s) after CRD 240 E.
Work is scheduled from 19-MAY-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 160 W - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after MO 39 S and ends at .246 mile(s) before CST FOURTH ST E.
Work is scheduled from 14-APR-2025 to 14-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO141N TO IS64W W - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 141 N and ends at IS 64 W.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 744 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after CST KEARNEY ST E and ends at .005 mile(s) before US 160 E.
Work is scheduled from 06-MAY-2025 to 10-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - WEBSTER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .065 mile(s) before OR 60 E and ends at .067 mile(s) after CST LYNCH DR S.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after US 160 E and ends at .01 mile(s) before CST KEARNEY ST E.
Work is scheduled from 06-MAY-2025 to 10-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .142 mile(s) before RT CC S and ends at .02 mile(s) after RP IS55N TO US67N N.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - WEBSTER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .068 mile(s) before CST LYNCH DR S and ends at .065 mile(s) after OR 60 E.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .036 mile(s) before CRD THORNTON RD S and ends at .014 mile(s) after RT UU S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before RT UU S and ends at .036 mile(s) after CRD THORNTON RD S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 340 E - ST. LOUIS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .026 mile(s) after IS 270 E and ends at .048 mile(s) after CST OLD OLIVE STREET RD E.
Work is scheduled from 28-MAY-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 55 S - STE. GENEVIEVE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .004 mile(s) after RT OO E and ends at .374 mile(s) before RA IS55S BLOOMSDALE S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55S TO RTEE S - NEW MADRID County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at IS 55 S and ends at RT EE E.
Work is scheduled from 30-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 23 N - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) after RT DD E and ends at RT MM S.
Work is scheduled from 12-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 63 N - BOONE County - POSSIBLE DELAYS
MEDIAN OR SHOULDER
Work zone begins at .348 mile(s) after RP DISCOVERY PKWY TO US63N N and ends at .362 mile(s) before RP US63N TO MO740 E.
Work is scheduled from 19-MAY-2025 to 23-JUN-2026.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .013 mile(s) after CST FOREST AVE S and ends at .008 mile(s) after CST CLAREMONT AVE S.
Work is scheduled from 04-MAR-2025 to 27-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 49 N - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .08 mile(s) before CST ROBERT ELLIS YOUNG DR S and ends at .079 mile(s) after CST ROBERT ELLIS YOUNG DR S.
Work is scheduled from 27-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS70E TO IS435S S - JACKSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at IS 70 E and ends at .046 mile(s) after RP IS70E TO BLUE RIDGE CUTOFF E.
Work is scheduled from 05-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WEST OSAGE BEACH PKWY S - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST BROADWATER LN S and ends at .028 mile(s) before CST OAK LN S.
Work is scheduled from 27-MAY-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS170E TO IS70E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 E and ends at .012 mile(s) before IS 70 E.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST WEST OSAGE BEACH PKWY N - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .028 mile(s) after CST OAK LN S and ends at .002 mile(s) after CST BROADWATER LN S.
Work is scheduled from 27-MAY-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD SAINT ROBERT OUTER RD E - PULASKI County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT Y S and ends at .003 mile(s) before MO 28 E.
Work is scheduled from 19-MAY-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 W - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .015 mile(s) after RT OO S and ends at .038 mile(s) before CST FIFTH ST E.
Work is scheduled from 10-FEB-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .038 mile(s) after CST FIFTH ST E and ends at .015 mile(s) before RT OO S.
Work is scheduled from 10-FEB-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 170 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RP AIRPORT RD TO IS170E E and ends at .011 mile(s) before RP IS70W TO IS170E E.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 08:30 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD SAINT ROBERT OUTER RD W - PULASKI County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after MO 28 E and ends at RT Y S.
Work is scheduled from 19-MAY-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .059 mile(s) before RP DRTDE TO US67S S and ends at CST FLOM CT E.
Work is scheduled from 05-MAY-2025 to 16-JUN-2025.
Work will start daily at 08:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS670E TO THE PASEO N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .008 mile(s) after IS 670 E and ends at .005 mile(s) after CST THE PASEO S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 49 N - JASPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .019 mile(s) after RT M E and ends at .004 mile(s) before CST MAIN ST S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST FLOM CT E and ends at .001 mile(s) before OR D E.
Work is scheduled from 05-MAY-2025 to 16-JUN-2025.
Work will start daily at 08:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 49 N - JASPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .137 mile(s) before CST MAPLE RD E and ends at .022 mile(s) before RT M E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 N - HOLT County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .132 mile(s) before US 59 S and ends at .381 mile(s) before CRD BEAGLE RD S.
Work is scheduled from 28-MAY-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 43 S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 54 W and ends at .15 mile(s) after RT K E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 43 N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .15 mile(s) before RT K E and ends at US 54 W.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C N - PLATTE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at CST SKYVIEW AVE S and ends at .179 mile(s) before CRD NW MARTIN RD E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - HOLT County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .382 mile(s) after CRD BEAGLE RD S and ends at .127 mile(s) before RP US59 TO IS29S S.
Work is scheduled from 28-MAY-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT C S - PLATTE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .179 mile(s) after CRD NW MARTIN RD E and ends at CST SKYVIEW AVE S.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 43 N - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at .073 mile(s) after MO 171 N and ends at .093 mile(s) before RT H E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T W - GREENE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .012 mile(s) before RT EE E and ends at .005 mile(s) before RT F S.
Work is scheduled from 03-JUN-2025 to 13-JUN-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 171 N - JASPER County - POSSIBLE DELAYS
MOWING
Work zone begins at .04 mile(s) after CST JOPLIN ST S and ends at .103 mile(s) before RT H E.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after RP IS44E TO MO43 S and ends at .001 mile(s) before RP IS44E TO LP49S S.
Work is scheduled from 30-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT W E and ends at US 136 E.
Work is scheduled from 19-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H S - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 136 E and ends at RT W E.
Work is scheduled from 19-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 86 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before MO 43 N and ends at MO 43 N.
Work is scheduled from 28-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 86 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 43 S and ends at .001 mile(s) before MO 43 N.
Work is scheduled from 28-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 21 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) after CRD TIFFANY SQUARE PKWY E and ends at .077 mile(s) before CST GREEN PARK RD E.
Work is scheduled from 27-MAY-2025 to 27-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD DUSTY RHODES LN E and ends at .059 mile(s) after CST TANZANITE DR S.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .059 mile(s) before CST TANZANITE DR S and ends at CRD DUSTY RHODES LN E.
Work is scheduled from 23-APR-2025 to 03-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 50 W - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .008 mile(s) after CST MACARTHUR AVE S and ends at .068 mile(s) after RT BB S.
Work is scheduled from 31-MAR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .083 mile(s) before CST GRANDVIEW PARK DR E and ends at .044 mile(s) before US 67 S.
Work is scheduled from 08-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .044 mile(s) after US 67 N and ends at .083 mile(s) after CST GRANDVIEW PARK DR E.
Work is scheduled from 08-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 170 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RP IS170W TO MO115S S and ends at .001 mile(s) after CST SCUDDER AVE E.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 160 W - STONE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .024 mile(s) before CRD KEYSTONE RD S and ends at MO 248 E.
Work is scheduled from 14-MAY-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 160 E - STONE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 248 E and ends at .024 mile(s) after CRD KEYSTONE RD S.
Work is scheduled from 14-MAY-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M N - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT AT E and ends at .072 mile(s) after CRD ST LOUIS ROCK RD E.
Work is scheduled from 19-MAY-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M S - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .072 mile(s) before CRD ST LOUIS ROCK RD E and ends at RT AT E.
Work is scheduled from 19-MAY-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP MO96 TO MO171N N - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 96 E and ends at MO 171 N.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 23 S - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT MM S and ends at .001 mile(s) before RT DD E.
Work is scheduled from 12-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone CST S EATHERTON RD N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .132 mile(s) after CST SKYWAY DR S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST S EATHERTON RD S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .132 mile(s) before CST SKYWAY DR S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.736 mile(s) after RP CRD 100 TO IS44W W and ends at 1.727 mile(s) before RP IS44W TO IS49N N.
Work is scheduled from 26-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .013 mile(s) after RP RTDE TO IS170W W and ends at .001 mile(s) before CST PAGE BLVD E.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST PAGE BLVD E and ends at .012 mile(s) before RP IS170W TO RTDW W.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT J N - CEDAR County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .486 mile(s) after CRD 1000 E and ends at .001 mile(s) after CRD 418 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT J S - CEDAR County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before CRD 418 E and ends at .486 mile(s) before CRD 1000 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF W - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 59 S and ends at .103 mile(s) before CST JAGUAR RD S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H W - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at .214 mile(s) after MO 43 S and ends at .245 mile(s) before MO 171 S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.477 mile(s) after RP US65N TO IS70E E and ends at .948 mile(s) before RP IS70E TO RTJ E.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.013 mile(s) after RP RTJ TO IS70W W and ends at 1.456 mile(s) before RP IS70W TO US65N N.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT M W - WRIGHT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .022 mile(s) before CO RTM TO CRD ORCHARD RD E and ends at .004 mile(s) before CRD HUNTERS CREEK RD S.
Work is scheduled from 14-MAY-2025 to 15-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - WRIGHT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after CRD HUNTERS CREEK RD S and ends at .022 mile(s) after CO RTM TO CRD ORCHARD RD E.
Work is scheduled from 14-MAY-2025 to 15-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after PED CARROLL ST OVERPASS S and ends at .013 mile(s) after CST WEBER RD E.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after IS 170 W and ends at .012 mile(s) before IS 70 W.
Work is scheduled from 08-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 169 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .046 mile(s) after CST NW 132ND ST E and ends at .029 mile(s) before CST NW 128TH ST E.
Work is scheduled from 28-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 67 S - BUTLER County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST OAK GROVE RD E and ends at .007 mile(s) after CRD INDUSTRIAL PARK RD E.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone BU 67 N - BUTLER County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .007 mile(s) before CRD INDUSTRIAL PARK RD E and ends at CST OAK GROVE RD E.
Work is scheduled from 19-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 5 N - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) after CST DEKALB ST E and ends at MO 52 E.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .143 mile(s) before PVT MANLEY QUARRY RD E and ends at .042 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 28-FEB-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 5 S - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 52 E and ends at .022 mile(s) before CST KIDWELL DR E.
Work is scheduled from 05-MAY-2025 to 06-JUN-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .027 mile(s) before RP US67S TO IS55N N and ends at .063 mile(s) after RP IS55S TO US67S S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 113 S - NODAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) before CST MAPLE ST S and ends at US 59 S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C E - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT D S and ends at US 65 S.
Work is scheduled from 02-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C W - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 65 S and ends at RT D S.
Work is scheduled from 02-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD E - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 73 S and ends at CRD HACKBERRY RD E.
Work is scheduled from 19-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD W - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD HACKBERRY RD E and ends at MO 73 S.
Work is scheduled from 19-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT NN E - CLINTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .166 mile(s) before CRD NW KELLER RD S and ends at .276 mile(s) after CRD NW KELLER RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT NN W - CLINTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .276 mile(s) before CRD NW KELLER RD S and ends at .166 mile(s) after CRD NW KELLER RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - BENTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .053 mile(s) before CRD TRUMAN DAM ACCESS RD E and ends at .063 mile(s) after CRD TRUMAN DAM ACCESS RD E.
Work is scheduled from 03-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 76 E - BARRY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .127 mile(s) after CRD 2180 E and ends at .024 mile(s) before CRD 1227 S.
Work is scheduled from 20-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DAVID DR E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before IS 49 S and ends at .014 mile(s) before PVT IVEYRIDGE LN S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DAVID DR W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after PVT IVEYRIDGE LN S and ends at .024 mile(s) after IS 49 S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST WASHBURN ST S - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST LOCUST ST E and ends at .002 mile(s) before CST CASS AVE E.
Work is scheduled from 18-APR-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 76 W - BARRY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .024 mile(s) after CRD 1227 S and ends at .127 mile(s) before CRD 2180 E.
Work is scheduled from 20-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST NW BARRY RD W - CLAY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .025 mile(s) before RP US169N TO BARRY RD N and ends at .026 mile(s) before RP BARRY RD W TO US169S S.
Work is scheduled from 02-JAN-2023 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP RTA TO IS70E E - WARREN County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at IS 70 E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST OLD U S HWY 36 E - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .028 mile(s) before RP US36E TO BU36 W and ends at .001 mile(s) after MO 151 S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST OLD U S HWY 36 W - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before MO 151 S and ends at .028 mile(s) after RP US36E TO BU36 W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD W - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .184 mile(s) before CST SARAH ANN BLVD E and ends at MO 47 S.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD E - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at .184 mile(s) after CST SARAH ANN BLVD E.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .013 mile(s) after MO 364 E and ends at .002 mile(s) after RT K S.
Work is scheduled from 17-MAR-2025 to 23-JUN-2025.
Work will start daily at 07:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone IS 64 W - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .001 mile(s) before RT K S and ends at .001 mile(s) before MO 364 E.
Work is scheduled from 17-MAR-2025 to 23-JUN-2025.
Work will start daily at 08:30 PM and end by 09:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone CST CHOUTEAU TRFY S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at RP CHOUTEAU TRFY TO MO210W W and ends at .001 mile(s) before MO 269 N.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 55 N - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .48 mile(s) after RP US61 TO IS55N N and ends at .445 mile(s) before PVT SUGAR PINE RD E.
Work is scheduled from 23-MAY-2025 to 15-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST GLENSTONE AVE N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before US 60 E and ends at .021 mile(s) after US 60 W.
Work is scheduled from 07-APR-2025 to 30-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at OR 49 S and ends at .002 mile(s) after RT NN S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .002 mile(s) before RT NN S and ends at OR 49 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT E E and ends at RT B E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT B E and ends at RT E E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 126 W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .011 mile(s) before CST HICKS S and ends at CRD SW STATE LINE LN S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 126 E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at CRD SW STATE LINE LN S and ends at .011 mile(s) after CST HICKS S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 37 N - JASPER County - POSSIBLE DELAYS
MOWING
Work zone begins at .005 mile(s) after RT A E and ends at US 160 E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 37 S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at .005 mile(s) before RT K E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT YY W - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at MO 171 N and ends at .018 mile(s) before CRD STATELINE AVE S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CST HARDY AVE S and ends at .007 mile(s) before CST NORTHERN BLVD S.
Work is scheduled from 16-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - LAWRENCE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .083 mile(s) before CRD 1222 S and ends at .828 mile(s) after CRD 1222 S.
Work is scheduled from 01-JUN-2025 to 14-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT EE S - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .02 mile(s) after MO 20 E and ends at .003 mile(s) before RT K S.
Work is scheduled from 23-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 169 N - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .055 mile(s) before CST 37TH ST S and ends at .05 mile(s) after RP IS29N TO US169 N.
Work is scheduled from 03-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT T W - CHRISTIAN County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .751 mile(s) before CRD KELTNER RD E and ends at .052 mile(s) before CRD MARSHFIELD RD S.
Work is scheduled from 03-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 N - ANDREW County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at 1.144 mile(s) after RP US169 TO IS29N N and ends at .056 mile(s) after US 59 N.
Work is scheduled from 10-MAR-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .403 mile(s) after RP 19TH ST E TO IS35S S and ends at .018 mile(s) after CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT EE N - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after RT K S and ends at .02 mile(s) before MO 20 E.
Work is scheduled from 23-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 291 S - CLAY County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .017 mile(s) before CST STEWART RD S and ends at .009 mile(s) before CST KANSAS ST E.
Work is scheduled from 02-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 S - HOLT County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .055 mile(s) before US 59 N and ends at 1.129 mile(s) before RP IS29S TO US169 S.
Work is scheduled from 10-MAR-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 59 N - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at .084 mile(s) after RT FF E and ends at .022 mile(s) after IS 44 W.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .05 mile(s) after OR 70 E and ends at .013 mile(s) before CST DUNN DR E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US61S TO MO47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) after US 61 S and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 61 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .319 mile(s) before CST N LINCOLN DR E and ends at .041 mile(s) before CST OLD CAP AU GRIS RD E.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT BB N - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT A S and ends at MO 135 S.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT J N - PETTIS County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .28 mile(s) before CRD LONG GROVE RD S and ends at .51 mile(s) before CRD 133RD TRL E.
Work is scheduled from 29-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT BB S - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 135 S and ends at RT A S.
Work is scheduled from 21-APR-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT AE W - SALINE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .012 mile(s) after CRD SALINE COUNTY LINE RD S and ends at RT J S.
Work is scheduled from 29-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST LIGHTBURNE ST S and ends at .417 mile(s) before RP IS35N TO 19TH ST E E.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 61 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .048 mile(s) after CST OLD CAP AU GRIS RD E and ends at .316 mile(s) after CST DUGAN LN E.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) after CST DUNN DR E and ends at .05 mile(s) before OR 70 E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AE E - SALINE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at RT J S and ends at .012 mile(s) before CRD SALINE COUNTY LINE RD S.
Work is scheduled from 29-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AC N - SALINE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .257 mile(s) after CRD 225TH LN S and ends at RT P E.
Work is scheduled from 29-MAY-2025 to 06-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 E - ST. FRANCOIS County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .013 mile(s) after CST PLANTATION DR S and ends at BU 67 S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 W - ST. FRANCOIS County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at BU 67 S and ends at .013 mile(s) before CST PLANTATION DR S.
Work is scheduled from 02-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 267 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .066 mile(s) after PVT LEMAY PLAZA E and ends at .043 mile(s) before PVT TRACEYRICH DR E.
Work is scheduled from 01-JUN-2025 to 08-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone MO 39 N - BARRY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .167 mile(s) before MO 76 E and ends at .108 mile(s) after MO 248 E.
Work is scheduled from 11-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) after RP IS55N TO US67N N and ends at .238 mile(s) after RR RIVER SUB S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST GLENSTONE AVE S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .019 mile(s) before US 60 W and ends at .017 mile(s) after US 60 E.
Work is scheduled from 07-APR-2025 to 30-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .269 mile(s) before RR RIVER SUB S and ends at .04 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 39 S - BARRY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .108 mile(s) before MO 248 E and ends at .167 mile(s) after MO 76 E.
Work is scheduled from 11-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT OO N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD JORDAN RD S and ends at RT C E.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT J S - SALINE County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .51 mile(s) after CRD 133RD TRL E and ends at .28 mile(s) after CRD LONG GROVE RD S.
Work is scheduled from 29-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 S - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .032 mile(s) after RP IS35S TO 20TH ST W and ends at .058 mile(s) after CST W 27TH ST E.
Work is scheduled from 03-JUN-2025 to 20-JUN-2025.
Work will start daily at 05:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS70E TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 E and ends at .002 mile(s) before IS 170 W.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT OO S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT C E and ends at CRD JORDAN RD S.
Work is scheduled from 05-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT HH N - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 64 E and ends at US 65 S.
Work is scheduled from 22-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT YY E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST DIVISION ST E and ends at .018 mile(s) after RP US65N TO RTYY E.
Work is scheduled from 25-MAY-2025 to 07-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 127 S - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after IS 70 E and ends at .006 mile(s) before OR 50 E.
Work is scheduled from 16-APR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 127 N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after OR 50 E and ends at .005 mile(s) before IS 70 E.
Work is scheduled from 16-APR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT MM N - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at MO 100 E and ends at RT T E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM S - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at RT T E and ends at MO 100 E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .087 mile(s) before CST RICHLAND PKWY E and ends at .04 mile(s) after CST 163RD ST E.
Work is scheduled from 11-MAR-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .012 mile(s) before CST INDEPENDENCE AVE W and ends at OR 291 S.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at OR 291 S and ends at .012 mile(s) after CST INDEPENDENCE AVE E.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 51 N - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 946 E and ends at .607 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 S - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .607 mile(s) before CRD 946 E and ends at .004 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT YY W - BUCHANAN County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .036 mile(s) after CST 38TH ST S and ends at US 169 S.
Work is scheduled from 27-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 W - MACON County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .255 mile(s) before RP US36W TO US63 N and ends at .082 mile(s) after RP US63 TO US36W W.
Work is scheduled from 28-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT U S - JASPER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) after LP 44 E and ends at .015 mile(s) before LP 44 E.
Work is scheduled from 03-JUN-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 54 E and ends at .003 mile(s) before RT FF E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 60 W - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .096 mile(s) before CRD WHITE ROSE LN S and ends at .032 mile(s) before PVT HONOR CAMP LN S.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 60 E - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .032 mile(s) after PVT HONOR CAMP LN S and ends at .161 mile(s) before OR 60 E.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT AF W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD AF-304 E and ends at MO 5 S.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .003 mile(s) after RT FF E and ends at US 54 E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .016 mile(s) after CRD 100 S and ends at .014 mile(s) before RT F E.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .014 mile(s) after RT F E and ends at .016 mile(s) before CRD 100 S.
Work is scheduled from 02-JUN-2025 to 15-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 370 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .06 mile(s) after CST ST LOUIS MILLS BLVD E and ends at .128 mile(s) before CST MISSOURI BOTTOM RD E.
Work is scheduled from 26-MAY-2025 to 05-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .322 mile(s) before OR 65 S and ends at .068 mile(s) before CO US65S TO EOR65 E.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .067 mile(s) after CST REBAR RD E and ends at .323 mile(s) after OR 65 S.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 27 S - CLARK County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .585 mile(s) before RT B S and ends at .285 mile(s) before RT B S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 27 N - CLARK County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .282 mile(s) after RT B S and ends at .578 mile(s) after RT B S.
Work is scheduled from 04-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AF E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 5 S and ends at CRD AF-304 E.
Work is scheduled from 02-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .121 mile(s) after RP LILAC AVE TO IS270E E and ends at .024 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) before RP IS270W TO RIVERVIEW DR W and ends at .069 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT HH S - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 65 S and ends at MO 64 E.
Work is scheduled from 22-MAY-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O W - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT F S and ends at RT AT E.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT AT E and ends at RT F S.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTAB TO IS270W W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after RT AB E and ends at IS 270 W.
Work is scheduled from 01-MAY-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT P W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT K E and ends at .101 mile(s) before RR PITTSBURG SUB S.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST NE STROTHER RD E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .007 mile(s) before CST NE RALPH POWELL RD S and ends at CST NE TODD GEORGE PKWY S.
Work is scheduled from 05-MAY-2025 to 27-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT P E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .101 mile(s) after RR PITTSBURG SUB S and ends at RT K E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 514 work zone(s) planned for a future date.

Future work zone(s) 514 Future work zone(s)
Future work zone RT RA N - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD JARGON PL E and ends at RT J E.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT RA S - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT J E and ends at CRD JARGON PL E.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO RTA S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at RT Z S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT Z S and ends at MO 15 S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before RT Z S and ends at RT E S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT E S and ends at .001 mile(s) after RT Z S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT E S and ends at RT B S.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at RT B S and ends at RT E S.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 22 E and ends at RT U S.
Work is scheduled from 06-JUN-2025 to 29-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT EE N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 47 S and ends at RT Y E.
Work is scheduled from 23-JUN-2025 to 23-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT Y E and ends at MO 47 S.
Work is scheduled from 23-JUN-2025 to 23-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - PIKE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) after CST JACKSON ST E and ends at US 54 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD MORGAN RD E and ends at US 63 S.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at CRD MORGAN RD E.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 S - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT Y S and ends at .001 mile(s) after MO 129 S.
Work is scheduled from 24-JUN-2025 to 24-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W E - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST SECOND ST E and ends at US 63 S.
Work is scheduled from 09-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W W - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at US 63 S and ends at .001 mile(s) after CST SECOND ST E.
Work is scheduled from 09-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - ADAIR County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST CLINTON ST E and ends at CRD REDTAIL HAWK LN S.
Work is scheduled from 16-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - MONTGOMERY County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .537 mile(s) after RT N S and ends at .811 mile(s) after RT Z S.
Work is scheduled from 11-JUN-2025 to 25-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT V N - ADAIR County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CRD REDTAIL HAWK LN S and ends at CST CLINTON ST E.
Work is scheduled from 16-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P S - AUDRAIN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT PP S and ends at US 54 E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P N - AUDRAIN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 54 E and ends at RT PP S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT P S and ends at MO 19 S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 19 S and ends at RT P S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD JOHN CREECH RD S and ends at .306 mile(s) after CRD JOHN CREECH RD S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .306 mile(s) before CRD JOHN CREECH RD S and ends at CRD JOHN CREECH RD S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T W - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT U E and ends at MO 6 E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T E - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 6 E and ends at RT U E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT U E and ends at .839 mile(s) after RT U E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .839 mile(s) before RT U E and ends at RT U E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at RT ZZ S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT ZZ S and ends at MO 15 S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at CRD 743 S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CRD 743 S and ends at MO 15 S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - MARION County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 79 S and ends at US 61 S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST NORTH LINCOLN DR S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD N - LEWIS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CRD 211 (230TH ST) E and ends at MO 6 E.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - LEWIS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 6 E and ends at CRD 226 (CACTUS ST) E.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST NORTH LINCOLN DR S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .03 mile(s) before OR 70 E.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B N - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .03 mile(s) after OR 70 E and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 79 S - LINCOLN County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .21 mile(s) before CRD DYER RD S and ends at .131 mile(s) before CRD OLD MONROE RD S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD MORGAN RD E and ends at US 63 S.
Work is scheduled from 23-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at CRD MORGAN RD E.
Work is scheduled from 23-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Z E and ends at MO 11 S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 47 S and ends at RT KK E.
Work is scheduled from 24-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT KK E and ends at MO 47 S.
Work is scheduled from 24-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 11 S and ends at RT Z E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K N - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT AA E and ends at CRD KENNEDY ST E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K S - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD KENNEDY ST E and ends at .001 mile(s) after RT DD E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 154 E - RALLS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .034 mile(s) before MO 19 S and ends at US 54 E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M S - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .012 mile(s) before CST PARK ST E and ends at .001 mile(s) before CST THIRD ST S.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M N - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST THIRD ST S and ends at .012 mile(s) after CST PARK ST E.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K W - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at US 63 S and ends at .001 mile(s) after CST 5TH ST E.
Work is scheduled from 09-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K E - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST SIXTH ST E and ends at US 63 S.
Work is scheduled from 09-JUN-2025 to 07-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 154 W - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 54 E and ends at .034 mile(s) after MO 19 S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after BU 63 S and ends at .002 mile(s) before CST FRONT ST E.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 168 E - MARION County - ALL LANES CLOSED
ROADSIDE WORK
Work zone begins at RT JJ S and ends at .001 mile(s) before CRD 402 E.
Work is scheduled from 24-JUN-2025 to 25-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST FIFTH ST S - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST LOCUST ST E and ends at .001 mile(s) before CST HICHORY ST E.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST FIFTH ST N - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST HICHORY ST E and ends at .001 mile(s) after CST LOCUST ST E.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 W - MARION County - ALL LANES CLOSED
ROADSIDE WORK
Work zone begins at .001 mile(s) after CRD 402 E and ends at RT JJ S.
Work is scheduled from 24-JUN-2025 to 25-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY E - RANDOLPH County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 24 E and ends at MO 151 S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT KK E and ends at CRD PENROD RD E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD PENROD RD E and ends at RT KK E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY W - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 151 S and ends at US 24 E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - KNOX County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after MO 15 S and ends at .039 mile(s) before OR 63 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 6 E - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after OR 63 S and ends at .006 mile(s) before MO 15 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 79 S - LINCOLN County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .23 mile(s) before RP RTC TO MO79 W and ends at .611 mile(s) after CRD DYER RD S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 09:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT N E and ends at RT B E.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT B E and ends at RT N E.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 63 N - RANDOLPH County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .009 mile(s) before RT J E and ends at .041 mile(s) before CRD KITE PL E.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 63 S - MACON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .039 mile(s) after CRD KITE PL E and ends at .01 mile(s) after RT J E.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone E OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT KK E and ends at .273 mile(s) after PVT PARK DR E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone E OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .273 mile(s) before PVT PARK DR E and ends at RT KK E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 79 S and ends at .018 mile(s) before RT B E.
Work is scheduled from 14-JUL-2025 to 11-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT W N - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after RT B E and ends at MO 79 S.
Work is scheduled from 14-JUL-2025 to 11-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT W N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT KK E and ends at RT B E.
Work is scheduled from 25-JUN-2025 to 25-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 211 (230TH ST) E and ends at MO 6 E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at CRD 226 (CACTUS ST) E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E E - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT K E and ends at .001 mile(s) before RT A S.
Work is scheduled from 17-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT A S and ends at RT K E.
Work is scheduled from 17-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT B E and ends at RT KK E.
Work is scheduled from 25-JUN-2025 to 25-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT T S and ends at MO 79 S.
Work is scheduled from 18-JUN-2025 to 18-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 79 S and ends at RT T S.
Work is scheduled from 18-JUN-2025 to 18-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 W - CLARK County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) before RR BNSF RAILWAY MARCELINE SUB E and ends at .02 mile(s) after RR BNSF RAILWAY MARCELINE SUB E.
Work is scheduled from 01-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 E - CLARK County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .02 mile(s) before RR BNSF RAILWAY MARCELINE SUB E and ends at .016 mile(s) after RR BNSF RAILWAY MARCELINE SUB E.
Work is scheduled from 01-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 79 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT N E and ends at .001 mile(s) after RT B E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT B E and ends at RT N E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD W VETERANS MEMORIAL PKWY E - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) after RT B S and ends at .257 mile(s) after RT B S.
Work is scheduled from 21-JUN-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone CRD W VETERANS MEMORIAL PKWY W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .257 mile(s) before RT B S and ends at .001 mile(s) before RT B S.
Work is scheduled from 21-JUN-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 19 S - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .019 mile(s) before CST STURGEON ST S and ends at .131 mile(s) before CRD STRUBE RD E.
Work is scheduled from 04-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .131 mile(s) after CRD STRUBE RD E and ends at .019 mile(s) after CST STURGEON ST S.
Work is scheduled from 04-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT U W - LEWIS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT D S and ends at .001 mile(s) before RT T E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after RT T E and ends at RT D S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 N - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT K S and ends at .001 mile(s) before RT N S.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 S - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT N S and ends at .001 mile(s) after RT K S.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at PK UNKNOWN E and ends at RT J S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT J S and ends at PK UNKNOWN E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - LINCOLN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 79 S and ends at CRD STERLING HARBOR RD E.
Work is scheduled from 01-JUL-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - LINCOLN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CRD STERLING HARBOR RD E and ends at MO 79 S.
Work is scheduled from 01-JUL-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) before RT B S and ends at .006 mile(s) before MO 154 E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .006 mile(s) after MO 154 E and ends at .001 mile(s) after RT B S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 N - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT Y S and ends at .001 mile(s) before MO 149 S.
Work is scheduled from 25-JUN-2025 to 25-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 S - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after MO 149 S and ends at RT Y S.
Work is scheduled from 25-JUN-2025 to 25-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 N - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 149 S and ends at .001 mile(s) before RT K S.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 S - ADAIR County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT K S and ends at MO 149 S.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .103 mile(s) before CRD 138 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 W - CLARK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .103 mile(s) after CRD 138 S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT D W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 149 S and ends at MO 6 E.
Work is scheduled from 07-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 E - CLARK County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CRD 152 E and ends at .001 mile(s) before CRD SOUTH ST E.
Work is scheduled from 23-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 W - CLARK County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after CRD SOUTH ST E and ends at .001 mile(s) after CRD 152 E.
Work is scheduled from 23-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM E - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT C E and ends at .001 mile(s) before CRD POINT RD E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM W - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after CRD POINT RD E and ends at RT C E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone E OR 61 S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST SOUTH LINCOLN DR S and ends at .001 mile(s) before RT C E.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone E OR 61 N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT C E and ends at CST SOUTH LINCOLN DR N.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A N - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .009 mile(s) after RT B S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT A S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) before RT B S and ends at RT B S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 3 N - RANDOLPH County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .993 mile(s) before CRD 2075 E and ends at .042 mile(s) after CRD 2075 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 154 E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .003 mile(s) before MO 19 S and ends at US 54 E.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 3 S - RANDOLPH County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .042 mile(s) before CRD 2075 E and ends at .993 mile(s) after CRD 2075 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 154 W - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 54 E and ends at .003 mile(s) after MO 19 S.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD LILLEY LN E and ends at CRD HARTLEY LN E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD HARTLEY LN E and ends at CRD LILLEY LN E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW E - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) before US 61 N and ends at .003 mile(s) before RT W S.
Work is scheduled from 14-JUL-2025 to 04-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT WW W - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after RT W S and ends at .01 mile(s) after US 61 N.
Work is scheduled from 14-JUL-2025 to 04-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 W - WARREN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .03 mile(s) before RP IS70W TO W WARRENTON BLVD W and ends at .412 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 14-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .419 mile(s) before RP IS70E TO RTE W and ends at .009 mile(s) after RP W WARRENTON BLVD TO IS70E E.
Work is scheduled from 14-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT CC E - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD SYCAMORE TRL E and ends at RT H S.
Work is scheduled from 23-JUN-2025 to 23-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO RTA W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .085 mile(s) after IS 70 W and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT CC W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT H S and ends at CRD SYCAMORE TRL E.
Work is scheduled from 23-JUN-2025 to 23-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 24 E - MARION County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .393 mile(s) after CRD 355 S and ends at .04 mile(s) after RR HANNIBAL SUB S.
Work is scheduled from 13-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C W - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 79 S and ends at US 61 S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .028 mile(s) after CRD PEARL LN S and ends at .178 mile(s) after CRD PEARL LN S.
Work is scheduled from 18-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT OO N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD JORDAN RD S and ends at RT C E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT C E and ends at CRD JORDAN RD S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 S - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .156 mile(s) before CRD STRUBE RD E and ends at .264 mile(s) before CST MARKET ST S.
Work is scheduled from 04-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .264 mile(s) after CST MARKET ST S and ends at .156 mile(s) after CRD STRUBE RD E.
Work is scheduled from 04-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at CRD 743 S.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK W - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 743 S and ends at MO 15 S.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT RA E - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .492 mile(s) before RT ZZ S and ends at .423 mile(s) before RT ZZ S.
Work is scheduled from 09-JUN-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT RA W - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .423 mile(s) after RT ZZ S and ends at .492 mile(s) after RT ZZ S.
Work is scheduled from 09-JUN-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT T E - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 6 E and ends at RT U E.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T W - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT U E and ends at MO 6 E.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at CST ATTERBERRY ST S.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .306 mile(s) after RT N S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT M E - MACON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST ATTERBERRY ST S and ends at US 63 S.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .011 mile(s) before MO 156 E and ends at MO 6 E.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at .011 mile(s) after MO 156 E.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP RTA TO IS70E E - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .028 mile(s) before IS 70 E.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 W - CLARK County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at CRD SOUTH ST E and ends at CRD 152 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 11 S and ends at MO 15 S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - KNOX County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at MO 11 S.
Work is scheduled from 16-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - MONTGOMERY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CRD WHITESIDE SCH RD S and ends at .849 mile(s) after CRD WHITESIDE SCH RD S.
Work is scheduled from 09-JUN-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - MONTGOMERY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .849 mile(s) before CRD WHITESIDE SCH RD S and ends at .001 mile(s) after CRD WHITESIDE SCH RD S.
Work is scheduled from 09-JUN-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 E - MARION County - ALL LANES CLOSED
ROADSIDE WORK
Work zone begins at CRD 402 E and ends at .001 mile(s) before CRD 404 E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 168 W - MARION County - ALL LANES CLOSED
ROADSIDE WORK
Work zone begins at .001 mile(s) after CRD 404 E and ends at CRD 402 E.
Work is scheduled from 26-JUN-2025 to 26-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C E - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 61 S and ends at MO 79 S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E E - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .178 mile(s) before CRD PEARL LN S and ends at .028 mile(s) before CRD PEARL LN S.
Work is scheduled from 18-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT J S - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD W VETERANS MEMORIAL PKWY E - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .047 mile(s) before RT B S and ends at .002 mile(s) before RT B S.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone CRD W VETERANS MEMORIAL PKWY W - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) after RT B S and ends at .047 mile(s) after RT B S.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B S - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) after RT A S and ends at .051 mile(s) after OR 70 E.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B N - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .051 mile(s) before OR 70 E and ends at .015 mile(s) before RT A S.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP RTA TO IS70W W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .039 mile(s) before IS 70 W.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT AA W - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at CRD 956 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 956 E and ends at MO 15 S.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 202 W - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST SIXTH ST S and ends at .006 mile(s) after CST FOURTH ST S.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 202 E - SCHUYLER County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) before CST FOURTH ST S and ends at CST SIXTH ST S.
Work is scheduled from 09-JUN-2025 to 23-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK E - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at OR 61 S and ends at RT W S.
Work is scheduled from 18-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK W - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT W S and ends at OR 61 S.
Work is scheduled from 18-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) before RT ZZ S and ends at RT B S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B S and ends at .001 mile(s) after RT ZZ S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - PIKE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at US 54 E and ends at .002 mile(s) before CST JACKSON ST E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST BENTON BLVD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before RP BENTON BLVD TO IS70W W.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST BENTON BLVD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after RP BENTON BLVD TO IS70W W and ends at .008 mile(s) before CST TRUMAN RD E.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS670W TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at IS 35 S.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT Z W - PLATTE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .942 mile(s) after CRD SHERWOOD FOREST E and ends at .135 mile(s) before CST HACKETT RD E.
Work is scheduled from 10-JUN-2025 to 10-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO 13TH ST E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at .004 mile(s) before CST CHARLOTTE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - SALINE County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .812 mile(s) before RT Z S and ends at .535 mile(s) before RT N S.
Work is scheduled from 11-JUN-2025 to 25-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RP IS70W TO IS35S S - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .006 mile(s) after IS 29 N and ends at .008 mile(s) before IS 35 S.
Work is scheduled from 12-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .033 mile(s) after IS 35 N and ends at IS 670 E.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT Z E - PLATTE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .135 mile(s) after CST HACKETT RD E and ends at .958 mile(s) before CRD SHERWOOD FOREST E.
Work is scheduled from 10-JUN-2025 to 10-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - PLATTE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CRD COUNTY LINE RD S and ends at .431 mile(s) after CRD SHERWOOD FOREST E.
Work is scheduled from 10-JUN-2025 to 10-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - PLATTE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .43 mile(s) before CRD SHERWOOD FOREST E and ends at .002 mile(s) before CRD COUNTY LINE RD S.
Work is scheduled from 10-JUN-2025 to 10-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP BROADWAY TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST BROADWAY BLVD S and ends at IS 35 S.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35N TO 14TH ST E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 N and ends at CST W 14TH ST E.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 131 S - JOHNSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .117 mile(s) after CST 20TH ST E and ends at .009 mile(s) before MO 2 E.
Work is scheduled from 09-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 131 N - JOHNSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .009 mile(s) after MO 2 E and ends at .117 mile(s) before CST 20TH ST E.
Work is scheduled from 09-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US169S TO MO9S S - CLAY County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .029 mile(s) after US 169 S and ends at .017 mile(s) before MO 9 S.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 PM and end by 10:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP PENNSYLVANIA AVE TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST PENNSYLVANIA AVE S and ends at IS 35 S.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 45 S - PLATTE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .007 mile(s) before CST BELL RD S and ends at .008 mile(s) after CST MELODY LN S.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35S TO PENN VALLEY DR S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .004 mile(s) before RP SOUTHWEST TRFY TO IS35N N.
Work is scheduled from 17-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B E - CASS County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .013 mile(s) after IS 49 N and ends at CRD GREGG RD S.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - CASS County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at CRD GREGG RD S and ends at .013 mile(s) before IS 49 N.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ N - CASS County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at RT N E and ends at .248 mile(s) after CRD 301ST ST E.
Work is scheduled from 20-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ S - CASS County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .248 mile(s) before CRD 301ST ST E and ends at RT N E.
Work is scheduled from 20-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS29S TO US169N N - CLAY County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .008 mile(s) after IS 29 S and ends at .015 mile(s) before US 169 N.
Work is scheduled from 12-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS670W TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .018 mile(s) after CST CENTRAL ST N and ends at IS 35 N.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .116 mile(s) after CST TROOST AVE S and ends at .006 mile(s) after CST THE PASEO S.
Work is scheduled from 06-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS470W TO IS70E E - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .012 mile(s) after IS 470 W and ends at .008 mile(s) before IS 70 E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS35S TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at IS 670 E.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 152 W - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at .001 mile(s) before IS 29 S and ends at RT N S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 152 E - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at RT N S and ends at .001 mile(s) after IS 29 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP WYOMING ST TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST WYOMING ST N and ends at .147 mile(s) after CST GENESSEE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 670 W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST TROOST AVE S and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT C N - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at CST SKYVIEW AVE S and ends at MO 92 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C S - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at MO 92 E and ends at CST SKYVIEW AVE S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT B S and ends at RT U E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E E - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT U E and ends at RT B S.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD N - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT E E and ends at RT Z E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT Z E and ends at RT E E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO IS470E E - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after IS 70 E and ends at .012 mile(s) before IS 470 E.
Work is scheduled from 10-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 24 W - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) after CST CENTRAL ST S and ends at .164 mile(s) after CRD BURNLEY RD S.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 24 E - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) before CRD BURNLEY RD S and ends at .006 mile(s) before CST CENTRAL ST S.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CO US50E TO BU50 E - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at US 50 E and ends at BU 50 E.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 169 S - CLAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .014 mile(s) after RP MO152W TO US169S S and ends at .002 mile(s) before RR UNKNOWN S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO BROADWAY N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .02 mile(s) before RP IS35N TO IS670E E and ends at CST TRUMAN RD E.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35N TO BROADWAY S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) before RP IS35N TO IS670E E and ends at CST BROADWAY BLVD S.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 670 W - JACKSON County - POSSIBLE DELAYS
SWEEPING PAVEMENT
Work zone begins at .002 mile(s) before US 71 S and ends at .007 mile(s) before CST WYOMING ST N.
Work is scheduled from 06-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 71 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .054 mile(s) before PED US71 BIKE PED TRL S and ends at .106 mile(s) before CST HICKMAN MILLS DR W.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35S TO EATON ST N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .089 mile(s) after IS 35 S.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP PENN VALLEY DR N TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .044 mile(s) after CST PENN VALLEY DR S and ends at IS 35 N.
Work is scheduled from 17-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP EATON ST TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .092 mile(s) before IS 35 N and ends at IS 35 N.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS670W TO TRUMAN RD W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at .001 mile(s) before CST TRUMAN RD W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT Z E - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT H S and ends at US 169 S.
Work is scheduled from 13-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE N - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at RT E E and ends at RT Z E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH E - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at OR 29 S and ends at CRD INTERURBAN RD SOUTH S.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH W - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at CRD INTERURBAN RD SOUTH S and ends at OR 29 S.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO IS470W W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .028 mile(s) after IS 70 W and ends at IS 470 W.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before US 71 S and ends at .001 mile(s) before IS 670 W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B N - PLATTE County - EXPECT DELAYS
MOWING
Work zone begins at MO 92 E and ends at .063 mile(s) before MO 116 E.
Work is scheduled from 12-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS470E TO IS70E E - JACKSON County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at IS 470 E and ends at .07 mile(s) before IS 70 E.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone BU 50 E - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at US 50 W and ends at .043 mile(s) before CST W YOUNG AVE E.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone BU 50 W - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .043 mile(s) after CST W YOUNG AVE E and ends at US 50 W.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP US71N TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after US 71 N and ends at IS 670 W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 35 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at RP IS670W TO IS35N N and ends at .009 mile(s) after CST W 12TH ST E.
Work is scheduled from 06-JUN-2025 to 06-JUN-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO IS670W W - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 N and ends at IS 670 W.
Work is scheduled from 19-JUN-2025 to 19-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS470E TO IS70W W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) after IS 470 E and ends at IS 70 W.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO IS470W W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .013 mile(s) after IS 70 E and ends at .012 mile(s) before IS 470 W.
Work is scheduled from 10-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS670W TO WYOMING ST N - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at CST WYOMING ST N.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 71 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .053 mile(s) before PED US71 BIKE PED TRL S and ends at .009 mile(s) before RP RTW TO US71N N.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 71 S - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .15 mile(s) after CST HICKMAN MILLS DR E and ends at .022 mile(s) before PED US71 BIKE PED TRL S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 71 S - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .026 mile(s) before RP US71S TO RTW E and ends at .009 mile(s) after RT W E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .041 mile(s) after CST THE PASEO N and ends at .02 mile(s) before CST INDIANA AVE S.
Work is scheduled from 06-JUN-2025 to 09-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT WW E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .02 mile(s) after CST BROADWAY E and ends at .053 mile(s) before CST LEGION LN E.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - GASCONADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .035 mile(s) before RT NN E and ends at .029 mile(s) before CST 17TH ST E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 S - GASCONADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .029 mile(s) after CST 17TH ST E and ends at .035 mile(s) after RT NN E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - CAMDEN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CST LOCUST ST S and ends at MO 7 S.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V N - CAMDEN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at MO 7 S and ends at CST LAKE ST S.
Work is scheduled from 16-JUN-2025 to 19-JUN-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT U S and ends at MO 22 E.
Work is scheduled from 06-JUN-2025 to 29-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 104 E - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 21 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 104 W - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 21 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT J W - COOPER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 87 S and ends at .006 mile(s) before MO 5 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J E - COOPER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .006 mile(s) after MO 5 S and ends at MO 87 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone N OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CST LAWRENCE ST E and ends at RT V E.
Work is scheduled from 23-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT JJ N - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT F S and ends at RT H E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ S - CAMDEN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at RT F S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT V S and ends at MO 124 E.
Work is scheduled from 06-JUN-2025 to 29-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT U N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 124 E and ends at RT V S.
Work is scheduled from 06-JUN-2025 to 29-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone N OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT V E and ends at CST LAWRENCE ST E.
Work is scheduled from 23-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT A W - WASHINGTON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) after CRD WILLOW RD S and ends at .338 mile(s) after CRD WILLOW RD S.
Work is scheduled from 09-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:30 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT A E - WASHINGTON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .338 mile(s) before CRD WILLOW RD S and ends at .02 mile(s) before CRD WILLOW RD S.
Work is scheduled from 09-JUN-2025 to 18-JUN-2025.
Work will start daily at 07:30 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT V E - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 54 W and ends at CST FERRY ST S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST FERRY ST S and ends at US 54 W.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF N - MILLER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 54 W and ends at RT A E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF S - COLE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A E and ends at US 54 W.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 17 S and ends at CRD MARYS HOME RD S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD OLD TEN MILE RD S and ends at MO 17 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .027 mile(s) before RT U E and ends at .009 mile(s) before RT VV S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after RT VV S and ends at .027 mile(s) after RT U E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 W - COLE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before CRD W BRAZITO RD E and ends at .217 mile(s) after CRD PLEASANT HILL RD S.
Work is scheduled from 23-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT A N - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT Z E and ends at .021 mile(s) before CRD 1062 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A S - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .021 mile(s) after CRD 1062 E and ends at RT Z E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW S - MORGAN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after RT T S and ends at CRD LITTLE BUFFALO RD E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST JAMES BLVD E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at OR 44 E and ends at .001 mile(s) before MO 68 E.
Work is scheduled from 01-JUL-2025 to 11-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST JAMES BLVD W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 8 E and ends at OR 44 E.
Work is scheduled from 01-JUL-2025 to 11-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW N - MORGAN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD LITTLE BUFFALO RD E and ends at .009 mile(s) before RT T S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 E - MILLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .223 mile(s) after CST WOOD RIVER RD E and ends at .312 mile(s) before RP US54E TO MO17 E.
Work is scheduled from 17-JUN-2025 to 31-OCT-2025.
Work will start daily at 05:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 54 W - MILLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .315 mile(s) after RP MO17 TO US54W W and ends at .22 mile(s) before CST WOOD RIVER RD E.
Work is scheduled from 17-JUN-2025 to 31-OCT-2025.
Work will start daily at 05:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone CST BROADWAY E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .079 mile(s) after CST TRIMBLE RD E and ends at .011 mile(s) before US 63 S.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .012 mile(s) after RT VV S and ends at .011 mile(s) before RT HH S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .011 mile(s) after RT HH S and ends at .012 mile(s) before RT VV S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT A S - MARIES County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .024 mile(s) after US 63 S and ends at RT E S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 8 W - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .018 mile(s) after CST HICKORY ST S and ends at RT T S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 8 E - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT T S and ends at .018 mile(s) before CST HICKORY ST S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT A N - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT E S and ends at .024 mile(s) before US 63 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT W W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at .1 mile(s) before CRD 7460 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT W E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .1 mile(s) after CRD 7220 E and ends at US 63 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA N - MARIES County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at RT T S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA S - OSAGE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT T S and ends at US 63 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST BROADWAY W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) after US 63 S and ends at .079 mile(s) before CST TRIMBLE RD E.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .123 mile(s) after CST OLD HAWTHORNE DR WEST S and ends at .284 mile(s) before CST HOYLAKE DR S.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .284 mile(s) after CST HOYLAKE DR S and ends at .123 mile(s) before CST OLD HAWTHORNE DR WEST S.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U N - WASHINGTON County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .004 mile(s) before PVT SAVOY RD S and ends at .119 mile(s) after CRD PROVINCE RD 520 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - WASHINGTON County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .119 mile(s) before CRD PROVINCE RD 520 E and ends at .004 mile(s) after PVT SAVOY RD S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT K S - PULASKI County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at 2.606 mile(s) after CRD STEVENS RD E and ends at MO 32 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AC W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT K S and ends at RT N S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AC E - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT N S and ends at RT K S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone S OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .104 mile(s) after CRD DILLION OUTER RD E and ends at .043 mile(s) before CST JAMES BLVD E.
Work is scheduled from 19-JUN-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone S OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .043 mile(s) after CST JAMES BLVD E and ends at .104 mile(s) before CRD DILLION OUTER RD E.
Work is scheduled from 19-JUN-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone MO 187 S - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 87 S and ends at .006 mile(s) after PVT PRIVATE E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 187 N - HOWARD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) before PVT PRIVATE E and ends at MO 87 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 54 E - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .304 mile(s) before CRD SHEPHERD HILLS RD S and ends at .07 mile(s) before CO US54 W TO US54 E S.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted all week, including weekends.
Future work zone US 54 W - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .071 mile(s) after CO US54 W TO US54 E S and ends at .303 mile(s) after CRD SHEPHERD HILLS RD S.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted all week, including weekends.
Future work zone RT C W - CRAWFORD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after RT J S and ends at .005 mile(s) before RP IS44W TO RTC W.
Work is scheduled from 09-JUN-2025 to 04-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT C E - CRAWFORD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after RP IS44W TO RTC W and ends at .004 mile(s) before RT J S.
Work is scheduled from 09-JUN-2025 to 04-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT TT E - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .029 mile(s) before CST BRAEMORE RD E and ends at .01 mile(s) before MO 740 E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT TT W - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) after MO 740 E and ends at .029 mile(s) after CST BRAEMORE RD E.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT C E - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .012 mile(s) after RT H S and ends at .014 mile(s) before CRD 424 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C W - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .014 mile(s) after CRD 424 S and ends at .012 mile(s) before RT H S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K N - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 32 E and ends at 2.606 mile(s) before CRD STEVENS RD E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone N OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .086 mile(s) before CST HISTORIC US 66 E and ends at .002 mile(s) before RT V E.
Work is scheduled from 23-JUN-2025 to 11-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone N OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after RT V E and ends at .086 mile(s) after CST HISTORIC US 66 E.
Work is scheduled from 23-JUN-2025 to 11-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT AA S - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT P E and ends at CRD 7640 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA N - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 7640 E and ends at RT P E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT NN W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT E E and ends at CRD KINFOLK RD E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT NN E - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD KETTLE RD E and ends at RT E E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT WW W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .053 mile(s) after CST LEGION LN E and ends at .02 mile(s) before CST BROADWAY E.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C W - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .031 mile(s) after MO 5 S and ends at .005 mile(s) before IS 44 E.
Work is scheduled from 09-JUN-2025 to 09-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C E - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after IS 44 E and ends at .031 mile(s) before MO 5 S.
Work is scheduled from 09-JUN-2025 to 09-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT T S and ends at RT J S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT J S and ends at RT T S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .107 mile(s) after CST FIRMA RD S and ends at .143 mile(s) after CST HACKMAN RD E.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .143 mile(s) before CST HACKMAN RD E and ends at .107 mile(s) before CST FIRMA RD S.
Work is scheduled from 30-JUN-2025 to 30-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .13 mile(s) after CST STATE HWY 79 OLD S and ends at .046 mile(s) after RP RTC TO MO79 E.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - FRANKLIN County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .319 mile(s) after MO 185 S and ends at .513 mile(s) before RA IS44W CONWAY W.
Work is scheduled from 09-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT MM S - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) after RT T E and ends at .007 mile(s) after CRD LAKE RD E.
Work is scheduled from 10-JUN-2025 to 10-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT MM N - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .007 mile(s) before CRD LAKE RD E and ends at .003 mile(s) before RT T E.
Work is scheduled from 10-JUN-2025 to 10-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 141 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .103 mile(s) before CST RIVER RD E and ends at .033 mile(s) before CST RIVER RD E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT C N - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at CST SALT RIVER RD E and ends at .081 mile(s) after RT B E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C S - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .081 mile(s) before RT B E and ends at CST SALT RIVER RD E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .231 mile(s) after CST FIRMA RD S and ends at .02 mile(s) after CST MAPLE LEAF LN E.
Work is scheduled from 17-JUN-2025 to 17-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .158 mile(s) before CST WENTZVILLE PKWY E and ends at .053 mile(s) before RP OR70E TO IS70E E.
Work is scheduled from 09-JUN-2025 to 21-JUN-2025.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Future work zone MO 79 S - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .025 mile(s) before CST MAPLE LEAF LN E and ends at .45 mile(s) after RT M S.
Work is scheduled from 18-JUN-2025 to 18-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 64 E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .124 mile(s) before RP SOR64 TO IS64E E and ends at .041 mile(s) after MO 340 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 141 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after RP IS44W TO MO141N N and ends at .07 mile(s) before CST ELAM AVE E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS270W TO IS170E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at IS 170 E.
Work is scheduled from 13-JUN-2025 to 01-DEC-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) before RP IS64W TO US67S S and ends at .003 mile(s) before CST SWAN DR E.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after CST SWAN DR E and ends at .001 mile(s) after US 61 N.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .032 mile(s) after PVT MONSANTO S and ends at .008 mile(s) after CST WARSON RD S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .022 mile(s) before CST ASHBY RD S and ends at .016 mile(s) before CST WARSON RD S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .015 mile(s) before CST FROST AVE E and ends at CST FEE FEE HILLS DR E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - ST. CHARLES County - POSSIBLE DELAYS
MILLING DRIVE SURFACE
Work zone begins at .159 mile(s) before RT DD S and ends at .005 mile(s) after RT F E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - ST. CHARLES County - POSSIBLE DELAYS
MILLING DRIVE SURFACE
Work zone begins at .005 mile(s) before RT F E and ends at .159 mile(s) after RT DD S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 30 E - FRANKLIN County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at RT WW E and ends at .011 mile(s) after RT WW E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 S - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .006 mile(s) before RT TT S and ends at .004 mile(s) after RT TT S.
Work is scheduled from 06-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 N - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) before RT TT S and ends at .006 mile(s) after RT TT S.
Work is scheduled from 06-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 170 W - ST. LOUIS County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .003 mile(s) after RP IS170W TO IS70W W and ends at .005 mile(s) before CST AIRPORT RD E.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 366 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST SUNSET OFFICE DR E and ends at .107 mile(s) after CST SUNSET OFFICE DR E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) after RP US67S TO RTDW W and ends at .012 mile(s) before RP DRTDE TO US67S S.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 67 N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .02 mile(s) after RP US67N TO RTDE E and ends at .011 mile(s) after RP RTDW TO US67N N.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT Z N - ST. CHARLES County - ALL LANES CLOSED
Improve I-70 Project #2
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after RP RTZ TO IS70E E and ends at .008 mile(s) before CST S CHURCH ST S.
Work is scheduled from 10-JUN-2025 to 25-JUN-2025.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Future work zone CST PERSHALL RD W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at OR 270 E and ends at CST HAZELWOOD AVE S.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone CST PERSHALL RD E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST HAZELWOOD AVE S and ends at OR 270 E.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RP IS270E TO IS170E E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at IS 170 E.
Work is scheduled from 13-JUN-2025 to 20-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .036 mile(s) after RP RTDW TO US67N N and ends at .05 mile(s) before RP US67S TO RTDW W.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .045 mile(s) after RP DRTDE TO US67S S and ends at .05 mile(s) after RP RTDE TO US67N N.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT C N - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at CST SALT RIVER RD E and ends at .081 mile(s) after RT B E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 110 W - JEFFERSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT CC S.
Work is scheduled from 23-JUN-2025 to 26-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 110 E - JEFFERSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT CC S.
Work is scheduled from 23-JUN-2025 to 26-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .035 mile(s) after CST FRONTAGE AVE E and ends at .125 mile(s) after CST FRONTAGE AVE E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .018 mile(s) before CST MARGATEHALL DR E and ends at .032 mile(s) after CST FRONTAGE AVE E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .072 mile(s) before PVT MANLEY QUARRY RD E and ends at .071 mile(s) before RP RTAW TO IS55S S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will start daily at 10:00 PM and end by 02:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 64 E - ST. CHARLES County - EXPECT DELAYS
Improve I-70 Project #2
PAVEMENT REPAIR
Work zone begins at .006 mile(s) before MO 364 W and ends at .008 mile(s) before RP RTKS TO IS64E E.
Work is scheduled from 13-JUN-2025 to 16-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Future work zone US 61 S - ST. CHARLES County - ALL LANES CLOSED
Improve I-70 Project #2
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) before RP PITMAN AVE TO US61S S and ends at .008 mile(s) before IS 70 W.
Work is scheduled from 12-JUN-2025 to 01-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Future work zone IS 270 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at MO 367 N and ends at .012 mile(s) before RP DUNN RD TO IS270W W.
Work is scheduled from 08-JUN-2025 to 08-JUN-2025.
Work will start daily at 11:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Future work zone RT D E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .06 mile(s) before RP DRTDE TO US67S S and ends at .001 mile(s) before CST FLOM CT E.
Work is scheduled from 16-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST FLOM CT E and ends at OR D E.
Work is scheduled from 16-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after RP US67S TO RTDW W and ends at .016 mile(s) before RP DRTDE TO US67S S.
Work is scheduled from 16-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) after RP US67N TO RTDE E and ends at .01 mile(s) after RP RTDW TO US67N N.
Work is scheduled from 16-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .524 mile(s) before CRD DYER RD S and ends at .21 mile(s) before RP MO79 TO RTC N.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 W - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .076 mile(s) after CRD SUNDOWN LN S and ends at .011 mile(s) before RT F E.
Work is scheduled from 24-JUL-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 160 E - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .011 mile(s) after RT F E and ends at .076 mile(s) before CRD SUNDOWN LN S.
Work is scheduled from 24-JUL-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .516 mile(s) after RA IS44E CONWAY E and ends at .326 mile(s) before MO 185 S.
Work is scheduled from 09-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 76 E - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .264 mile(s) before PVT DEERFOOT TRL S and ends at .372 mile(s) after CRD N EDGEWATER VILLAGE DR S.
Work is scheduled from 09-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 76 W - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .372 mile(s) before CRD N EDGEWATER VILLAGE DR S and ends at .264 mile(s) after PVT DEERFOOT TRL S.
Work is scheduled from 09-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 176 E - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .116 mile(s) after US 65 N and ends at .003 mile(s) after CST LARKSPUR AVE S.
Work is scheduled from 16-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 176 W - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .003 mile(s) before CST LARKSPUR AVE S and ends at .116 mile(s) before US 65 N.
Work is scheduled from 16-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP CST CAMPBELL AVES TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at .002 mile(s) before US 60 W.
Work is scheduled from 10-JUN-2025 to 11-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP CST CAMPBELL AVES TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at .002 mile(s) before US 60 W.
Work is scheduled from 12-JUN-2025 to 13-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP CST CAMPBELL AVES TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at US 60 W.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .136 mile(s) before CRD 192 E and ends at .042 mile(s) before CST CAMPBELL AVE S.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 13 S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .028 mile(s) before RP MO13S TO IS44W W and ends at .009 mile(s) before OR 44 E.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT O S - NEWTON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .12 mile(s) before CRD QUEENS LACE DR E and ends at .078 mile(s) after CRD REDBUD RD E.
Work is scheduled from 08-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 S - LAWRENCE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .089 mile(s) after OR 44 E and ends at .326 mile(s) before CRD 2175 E.
Work is scheduled from 12-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 N - LAWRENCE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .326 mile(s) after CRD 2175 E and ends at .089 mile(s) before OR 44 E.
Work is scheduled from 12-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - NEWTON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .078 mile(s) before CRD REDBUD RD E and ends at .12 mile(s) after CRD QUEENS LACE DR E.
Work is scheduled from 08-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US160 TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at US 160 W.
Work is scheduled from 10-JUN-2025 to 11-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT CC W - CHRISTIAN County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .15 mile(s) before CST ROSEWOOD LN S and ends at .025 mile(s) after CST MAIN ST S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT CC E - CHRISTIAN County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .025 mile(s) before CST MAIN ST S and ends at .15 mile(s) after CST ROSEWOOD LN S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 59 S - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .019 mile(s) after CRD MT SHIRA RD S and ends at .246 mile(s) after CRD MT SHIRA RD S.
Work is scheduled from 07-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 59 N - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .246 mile(s) before CRD MT SHIRA RD S and ends at .019 mile(s) before CRD MT SHIRA RD S.
Work is scheduled from 07-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U W - BATES County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .004 mile(s) after CRD SW 11517 S and ends at CRD SW 2788 E.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - BATES County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD SW 2788 E and ends at .004 mile(s) before CRD SW 11517 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 39 S - LAWRENCE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .151 mile(s) before CRD 2130 E and ends at .286 mile(s) before CRD 2185 E.
Work is scheduled from 18-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 39 N - LAWRENCE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .286 mile(s) after CRD 2185 E and ends at .151 mile(s) after CRD 2130 E.
Work is scheduled from 18-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - GREENE County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after CO US60W TO US60E E and ends at .19 mile(s) after CRD 107 S.
Work is scheduled from 09-JUN-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 60 E - GREENE County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .191 mile(s) before CRD 107 S and ends at .004 mile(s) before CO US60W TO US60E E.
Work is scheduled from 09-JUN-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 65 N - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .62 mile(s) after RP RTEE TO US65N N and ends at .004 mile(s) before RP US65N TO MO14 N.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 65 S - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before RP MO14 TO US65S S and ends at .622 mile(s) before RP US65S TO RTEE W.
Work is scheduled from 23-JUN-2025 to 24-JUN-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT E E - VERNON County - ALL LANES CLOSED
CORE DRILLING
Work zone begins at .481 mile(s) after CRD 2625 S and ends at .694 mile(s) after CRD 2625 S.
Work is scheduled from 23-JUN-2025 to 27-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - VERNON County - ALL LANES CLOSED
CORE DRILLING
Work zone begins at .694 mile(s) before CRD 2625 S and ends at .481 mile(s) before CRD 2625 S.
Work is scheduled from 23-JUN-2025 to 27-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST BURTON AVE N - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) before BU 65 N and ends at BU 65 N.
Work is scheduled from 16-JUN-2025 to 23-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone CST BURTON AVE S - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at BU 65 N and ends at .005 mile(s) after BU 65 N.
Work is scheduled from 16-JUN-2025 to 23-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT KK S - WEBSTER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .299 mile(s) before CRD WESTER BLUFF RD E and ends at .184 mile(s) after CRD WHITE OAK RD S.
Work is scheduled from 07-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK N - WEBSTER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .184 mile(s) before CRD WHITE OAK RD S and ends at .299 mile(s) after CRD WESTER BLUFF RD E.
Work is scheduled from 07-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 248 E - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .165 mile(s) before PVT JUNCTION HOLLOW LN S and ends at .029 mile(s) after MO 13 S.
Work is scheduled from 10-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 248 W - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .029 mile(s) before MO 13 S and ends at .165 mile(s) after PVT JUNCTION HOLLOW LN S.
Work is scheduled from 10-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 176 E - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .076 mile(s) before CRD ABESVILLE CIRCLE E and ends at .181 mile(s) after CRD PLEASANT VALLEY DR S.
Work is scheduled from 11-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 176 W - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .181 mile(s) before CRD PLEASANT VALLEY DR S and ends at .076 mile(s) after CRD ABESVILLE CIRCLE E.
Work is scheduled from 11-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US160 TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at .002 mile(s) before US 160 W.
Work is scheduled from 12-JUN-2025 to 13-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 52 E - BATES County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after CRD SE 775 S and ends at .073 mile(s) before RT BB S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 52 W - BATES County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .073 mile(s) after RT BB S and ends at .002 mile(s) before CRD SE 775 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .697 mile(s) before RP IS44E TO RTN E and ends at .532 mile(s) before RP IS44E TO RTN E.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - BATES County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .485 mile(s) before RT TT E and ends at .355 mile(s) after LP 49 S.
Work is scheduled from 09-JUN-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT HH W - BENTON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .02 mile(s) before CRD OLD 65 AVE S and ends at CRD EIFERT AVE S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 76 W - TANEY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .704 mile(s) before RR AURORA SUB E and ends at .388 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 05-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 76 E - TANEY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .539 mile(s) before PVT PRIVATE RD E and ends at 1.2 mile(s) before RP MO76E TO MO248 E.
Work is scheduled from 05-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 83 S and ends at MO 13 S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 13 S and ends at MO 83 S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 376 W - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .008 mile(s) before PVT MUTTON HOLLOW DR S and ends at .003 mile(s) before CST 76 COUNTRY BLVD E.
Work is scheduled from 09-JUN-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 376 E - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after CST SHEPHERD OF THE HILLS EXP E and ends at .008 mile(s) after PVT MUTTON HOLLOW DR S.
Work is scheduled from 09-JUN-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 90 W - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .229 mile(s) after PVT MUD HOLLOW RD E and ends at .141 mile(s) before CRD ROCKWOOD RD S.
Work is scheduled from 06-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 90 E - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .141 mile(s) after CRD ROCKWOOD RD S and ends at .229 mile(s) before PVT MUD HOLLOW RD E.
Work is scheduled from 06-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP US160 TO US60W W - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CST CAMPBELL AVE S and ends at .003 mile(s) before US 160 W.
Work is scheduled from 11-JUN-2025 to 12-JUN-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 8 W - ST. FRANCOIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) after US 67 S and ends at CST MEADOW LN S.
Work is scheduled from 09-JUN-2025 to 15-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 8 E - ST. FRANCOIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST MEADOW LN S and ends at .001 mile(s) before US 67 S.
Work is scheduled from 09-JUN-2025 to 15-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF N - OZARK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after CRD 314 E and ends at CRD 170 E.
Work is scheduled from 09-JUN-2025 to 02-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - CAPE GIRARDEAU County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at 1.009 mile(s) before RP IS55S TO MAIN ST E and ends at .643 mile(s) before RP IS55S TO MAIN ST E.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 412 W - DUNKLIN County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .077 mile(s) after RT AC S and ends at .17 mile(s) after RT AC S.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 61 N - NEW MADRID County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) before MO 80 E and ends at .002 mile(s) after CRD 828 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 61 S - NEW MADRID County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before CRD 828 E and ends at .01 mile(s) after MO 80 E.
Work is scheduled from 16-JUN-2025 to 18-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT AR S - OZARK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 142 E and ends at 1.05 mile(s) after CST VAUGHN S.
Work is scheduled from 09-JUN-2025 to 02-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AR N - OZARK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.05 mile(s) before CST VAUGHN S and ends at MO 142 E.
Work is scheduled from 09-JUN-2025 to 02-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - NEW MADRID County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at 1.452 mile(s) before CRD 820 E and ends at .772 mile(s) before CRD 604 E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - MADISON County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .001 mile(s) before RP BU67 TO US67N N and ends at .344 mile(s) after RP BU67 TO US67N N.
Work is scheduled from 16-JUN-2025 to 27-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST N STATE ST S - ST. FRANCOIS County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) before MO 8 E and ends at .129 mile(s) after MO 8 E.
Work is scheduled from 09-JUN-2025 to 15-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone CST N STATE ST N - ST. FRANCOIS County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .129 mile(s) before MO 8 E and ends at .002 mile(s) after MO 8 E.
Work is scheduled from 09-JUN-2025 to 15-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 155 S - PEMISCOT County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .879 mile(s) before US 412 E and ends at .046 mile(s) before US 412 E.
Work is scheduled from 09-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST BLOOMFIELD RD E - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before IS 55 S and ends at .012 mile(s) after IS 55 N.
Work is scheduled from 23-JUN-2025 to 26-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T W - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at CRD 322 E and ends at .002 mile(s) before OR 55 S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N W - CAPE GIRARDEAU County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .022 mile(s) before CST BELL ST E and ends at MO 51 S.
Work is scheduled from 16-JUN-2025 to 29-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N E - BOLLINGER County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 51 S and ends at .022 mile(s) after CST BELL ST E.
Work is scheduled from 16-JUN-2025 to 29-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T E - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .002 mile(s) after OR 55 S and ends at CRD 322 E.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - SCOTT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .239 mile(s) before BU 61 S and ends at .179 mile(s) before BU 61 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - SCOTT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .091 mile(s) after RP IS55S TO MO77 S and ends at .227 mile(s) after RP MO77 TO IS55S S.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 155 N - PEMISCOT County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .055 mile(s) after US 412 W and ends at .594 mile(s) after US 412 W.
Work is scheduled from 09-JUN-2025 to 19-JUN-2025.
Work will start daily at 07:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K E - REYNOLDS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .008 mile(s) before RT O E and ends at .001 mile(s) before CST SECOND ST E.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT K W - IRON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after CST SECOND ST E and ends at .008 mile(s) after RT O E.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - PERRY County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .001 mile(s) after RP IS55S TO MO51 S and ends at .278 mile(s) after RP MO51 TO IS55S S.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC N - PEMISCOT County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT A E and ends at CRD 208 E.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC S - PEMISCOT County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 208 E and ends at RT A E.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 412 E - DUNKLIN County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .124 mile(s) after CRD 601 S and ends at .24 mile(s) after CRD 601 S.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - ST. FRANCOIS County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .106 mile(s) before MO 32 E and ends at .009 mile(s) after MO 32 E.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT B S - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 32 E and ends at .025 mile(s) before RT F E.
Work is scheduled from 10-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B N - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .025 mile(s) after RT F E and ends at MO 32 E.
Work is scheduled from 10-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - NEW MADRID County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .352 mile(s) after RP RTP TO IS55S S and ends at .764 mile(s) after RP RTP TO IS55S S.
Work is scheduled from 30-JUN-2025 to 02-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 11 N - LINN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before MO 129 S and ends at .001 mile(s) before RT Y S.
Work is scheduled from 24-JUN-2025 to 24-JUN-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A W - NODAWAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .242 mile(s) after CRD DIAMOND TRL S and ends at .074 mile(s) before CST ELM ST E.
Work is scheduled from 09-JUN-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 6 E - SULLIVAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CST FRONT ST E and ends at .002 mile(s) before BU 63 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 113 N - HOLT County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at US 59 S and ends at US 136 E.
Work is scheduled from 13-JUN-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .023 mile(s) after LP 29 S and ends at .089 mile(s) after RP RIVERSIDE RD TO US36E E.
Work is scheduled from 08-JUN-2025 to 14-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 35 S - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after RP IS35S TO MO6 S and ends at .031 mile(s) before RP MO6 TO IS35S S.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 116 W - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after CRD NE MICHELE LANE RD S and ends at .004 mile(s) after CRD SE FAGIN LN S.
Work is scheduled from 11-JUN-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) after RP MO6 TO IS35S S and ends at .004 mile(s) before CRD 130 ST S.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 6 E - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after CRD 130 ST S and ends at .006 mile(s) before RP MO6 TO IS35S S.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT O W - ANDREW County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .044 mile(s) before CRD 290 S and ends at RT W S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - ANDREW County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 48 E and ends at .285 mile(s) before CRD 122 S.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - ANDREW County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at RT T E and ends at .009 mile(s) before CST PARK AVE E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) after RP IS35N TO MO6 N and ends at .028 mile(s) before RP MO6 TO IS35N N.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT C N - ANDREW County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .244 mile(s) after RT E E and ends at .076 mile(s) after CRD 177 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) after RP IS35S TO US69 S and ends at .122 mile(s) after RP MO116 TO IS35S S.
Work is scheduled from 19-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 11 S - CHARITON County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .036 mile(s) before RT C E and ends at .23 mile(s) before RT M E.
Work is scheduled from 11-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - GENTRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT H S and ends at US 169 S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V E - GENTRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 169 S and ends at RT H S.
Work is scheduled from 09-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 N - LINN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .012 mile(s) before CRD OLD HWY 5 S and ends at .01 mile(s) before CST B ST E.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 S - LINN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .01 mile(s) after CST B ST E and ends at .012 mile(s) after CRD OLD HWY 5 S.
Work is scheduled from 09-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - CLINTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after CO RTH TO RTA E and ends at .008 mile(s) after CRD NE SILVUS RD S.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - CLINTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .008 mile(s) before CRD NE SILVUS RD S and ends at .002 mile(s) before CO RTH TO RTA E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 116 E - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) before CRD NE MICHELE LANE RD S and ends at .008 mile(s) before US 69 S.
Work is scheduled from 09-JUN-2025 to 11-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 29 N - HOLT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .485 mile(s) after RP US59 TO IS29N N and ends at .864 mile(s) before CRD BEAGLE RD S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT JJ E - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .016 mile(s) before RT FF S and ends at MO 148 E.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ W - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 148 E and ends at .016 mile(s) after RT FF S.
Work is scheduled from 11-JUN-2025 to 11-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M S - ATCHISON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .039 mile(s) before CST MAPLE ST E and ends at .01 mile(s) after RT C E.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M N - ATCHISON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .01 mile(s) before RT C E and ends at .039 mile(s) after CST MAPLE ST E.
Work is scheduled from 12-JUN-2025 to 12-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 E - PUTNAM County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .306 mile(s) before RT N S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 6 E - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RP MO6 TO IS35S S and ends at .005 mile(s) before RP MO6 TO IS35N N.
Work is scheduled from 09-JUN-2025 to 19-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 6 W - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after RP IS35N TO MO6 N and ends at .003 mile(s) before RP MO6 TO IS35S S.
Work is scheduled from 09-JUN-2025 to 19-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B S - BUCHANAN County - EXPECT DELAYS
MOWING
Work zone begins at .063 mile(s) after MO 116 E and ends at MO 92 E.
Work is scheduled from 12-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .068 mile(s) before RP IS35N TO MO6 N and ends at .008 mile(s) before RP IS35N TO MO6 N.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 6 E - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) after RP MO6 TO IS35N N and ends at .068 mile(s) after RP MO6 TO IS35N N.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - ANDREW County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT T E and ends at .013 mile(s) before PVT COBB LANE E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - CLINTON County - EXPECT DELAYS
MOWING
Work zone begins at US 169 S and ends at RT H S.
Work is scheduled from 13-JUN-2025 to 20-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 148 E - NODAWAY County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .134 mile(s) after CRD 180 ST E and ends at .152 mile(s) after CRD HIGHLAND AVE S.
Work is scheduled from 06-JUN-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB S - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 136 E and ends at .005 mile(s) after CRD 220 ST E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB N - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .005 mile(s) before CRD 220 ST E and ends at US 136 E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB S - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .016 mile(s) before CRD 240 ST E and ends at .007 mile(s) before MO 46 E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB N - NODAWAY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .007 mile(s) after MO 46 E and ends at .016 mile(s) after CRD 240 ST E.
Work is scheduled from 10-JUN-2025 to 10-JUN-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T E - CARROLL County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at RT W E and ends at RT Z S.
Work is scheduled from 09-JUN-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .211 mile(s) before CRD SIOUX AVE S and ends at .631 mile(s) after MO 11 S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - CHARITON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .631 mile(s) before MO 11 S and ends at .211 mile(s) after CRD SIOUX AVE S.
Work is scheduled from 09-JUN-2025 to 09-JUN-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .136 mile(s) before RP US36W TO RTAC W and ends at .021 mile(s) after RP US36W TO LP29N N.
Work is scheduled from 08-JUN-2025 to 14-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B E - NODAWAY County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at US 71 S and ends at .018 mile(s) before MO 148 E.
Work is scheduled from 10-JUN-2025 to 13-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .181 mile(s) before RP IS35N TO MO116 N and ends at .024 mile(s) after RP US69 TO IS35N N.
Work is scheduled from 19-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
155
IS 55 (Pemiscot) TO Tennessee Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
170
IS 270 (St. Louis) TO RT D / Page Avenue (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
170
RT D / Page Avenue (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
229
IS 29 North Jct (Andrew) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
255
IS 55 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 44 (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 70 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 64 (St. Louis) TO IS 70 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 55 (St. Louis) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
Andrew County Line TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
MEXICO CITY AVE (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
BUCHANAN COUNTY LINE TO MEXICO CITY AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 229 SOUTH JCT (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
MO 118 (Holt) TO Andrew County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
US 169 North Jct (Buchanan) TO IS 229 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
US 136 (Atchison) TO RT W (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
RT W (Holt) TO MO 118 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
Iowa Line TO US 136 (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT DD (Daviess) TO US 69 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT H / AA (Harrison) TO RT DD (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
Iowa Line TO RT A / Z (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 South Jct (Daviess) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
MO 152 (CLAY) TO IS 29 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
CLINTON COUNTY LINE TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 70 E JCT (JACKSON) TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 670 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
RT A / Z (Harrison) TO RT H / AA (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
435
IS 70 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
108TH STREET (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
PLATTE COUNTY LINE TO 108TH STREET (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
KANSAS LINE TO IS 29 NORTH JCT (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 29 SOUTH JCT (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 470 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
US 63 (Phelps) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 38 (Webster) TO RT J / Y (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Crawford County Line TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
RT J / Y (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 266 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 5 (Laclede) TO Pulaski County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 174 (Lawrence) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Phelps County Line TO US 63 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 125 (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 37 (Jasper) TO MO 174 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Laclede County Line TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Oklahoma Line TO MO 37 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis City Line TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
IS 435 (JACKSON) TO WOODS CHAPEL RD (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
WOODS CHAPEL RD (JACKSON) TO 39TH STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (BATES) TO RT B (VERNON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (VERNON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (CASS) TO RT A / B (BATES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
NORTH CASS PKWY (CASS) TO RT A / B (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
US 160 (BARTON) TO RT H / K (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT H / K (JASPER) TO IS 44 EAST JCT (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 44 WEST JCT (JASPER) TO RT B (MCDONALD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 435 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
JACKSON COUNTY LINE TO NORTH CASS PKWY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (MCDONALD) TO ARKANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT A (Pemiscot) TO RT U (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
ST. LOUIS CITY LINE TO RT M (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
US 61 / US 62 South Jct (New Madrid) TO RT A (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT U (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT N (Ste. Genevieve) TO RT KK (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
IS 44 TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
MO 80 (New Madrid) TO US 61 / US 62 South Jct (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
IS 57 (Scott) TO MO 80 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
MO 32 (Ste. Genevieve) TO RT N (Ste. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
MO 77 (Scott) TO IS 57 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT KK (Cape Girardeau) TO US 61 / MO 34 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
US 61 / MO 34 (Cape Girardeau) TO MO 77 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT TT (JEFFERSON) TO MO 32 (STE. GENEVIEVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT M (JEFFERSON) TO RT TT (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
57
Illinois Line TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
635
IS 29 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
IS 70 (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
670
KANSAS LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 435 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Z (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT W / T (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 179 (Cooper) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 135 (Cooper) TO MO 179 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
RT D / YY (Callaway) TO MO 19 (Montgomery) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
IS 470 (JACKSON) TO RT F (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
KANSAS LINE TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 54 (Callaway) TO RT D / YY (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Y (Saline) TO US 65 (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Callaway County Line TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 13 (Lafayette) TO RT Y (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO J (Saline) TO Saline County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Cooper County Line TO MO 135 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT F (Jackson) TO MO 13 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 65 (Saline) TO MO J (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 740 (Boone) TO RT Z (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
RT M (Atchison) TO US 71 North Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 71 South Jct (Nodaway) TO RT P South Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
RT D (Harrison) TO IS 35 (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
RT P South Jct (Nodaway) TO US 169 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 59 North Jct (Atchison) TO RT M (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 5 West Jct (Putnam) TO Schuyler County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
Nebraska Line TO US 59 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Mercer County Line TO US 65 West Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 65 East Jct (Mercer) TO MO 139 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 139 West Jct (Putnam) TO MO 5 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 169 East Jct (Gentry) TO RT D (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
IS 35 (Harrison) TO Mercer County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
159
IS 29 (Holt) TO Nebraska Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
160
RT F / V (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 39 North Jct (Dade) TO RT F / V (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT M (Oregon) TO MO 19 South Jct (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
US 65 (Taney) TO MO 76 East Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
Butler County Line TO US 67 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
MO 13 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 60 East Jct (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 126 (Barton) TO MO 39 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 43 (Barton) TO IS 49 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
Kansas Line TO MO 43 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 63 North Jct (Howell) TO RT M (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
MO 21 South Jct (Ripley) TO Butler County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
MO 5 West Jct (Ozark) TO RT V (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 14 (Christian) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT V (Ozark) TO US 63 South Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
IS 49 (Barton) TO MO 126 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
166
Kansas Line TO IS 44 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT VV (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
US 136 West Jct (Gentry) TO RT M (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
RT O (Gentry) TO US 136 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
MO 152 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT E (Andrew) TO IS 29 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 North Jct (Buchanan) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 South Jct (Buchanan) TO RT V V (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT M (Gentry) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
Iowa Line TO RT O (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
MO 92 (CLAY) TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
MO 31 (DeKalb) TO RT E (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
MO 291 (JACKSON) TO LAFAYETTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
IS 435 (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
US 65 (Carroll) TO MO 11 (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
Lafayette County Line TO MO 13 (Lafayette) Road reported clear CLEAR 04-28-2025 at 10:04 AM
United States Route
24
MO 11 (Chariton) TO MO 5 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 5 West Jct (Chariton) TO Randolph County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 13 (Lafayette) TO US 65 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
36
US 65 (Livingston) TO RT W (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 33 East Jct (DeKalb) TO RT J (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 11 (Linn) TO Macon County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT W (Linn) TO MO 11 (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 31 (DeKalb) TO MO 33 East Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT J (Caldwell) TO RT A (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT AC (Buchanan) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
RT A (Caldwell) TO US 65 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
Kansas Line TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
40
Howard County Line TO SP 240 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
SP 240 (Howard) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
MO 7 (JACKSON) TO IS 70 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
RT V (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
IS 70 WEST JCT (JACKSON) TO RT V (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
412
Arkansas Line TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
412
MO 25 (Dunklin) TO RT C (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
412
RT C (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
50
RT E (Moniteau) TO Moniteau County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT MM (Pettis) TO RT TT (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT F (Jackson) TO MO 13 (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 13 (Johnson) TO MO 127 (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT N (OSAGE) TO MO 19 WEST JCT (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
US 54 (Cole) TO MILITIA DRIVE (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT D / T (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Osage County Line TO RT N (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 127 (Pettis) TO RT MM (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MILITIA DRIVE (Cole) TO Cole County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Moniteau County Line TO RT D / T (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
IS 470 (Jackson) TO RT F (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Gasconade County Line TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 135 West Jct (Pettis) TO RT E (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 19 WEST JCT (GASCONADE) TO FRANKLIN COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT TT (Pettis) TO MO 135 West Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Grand Glaize Bridge TO MO 52 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 73 (Camden) TO MO 5 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 83 (Hickory) TO US 65 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 13 (St. Clair) TO MO 83 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
IS 70 (Callaway) TO Audrain County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT J (Callaway) TO IS 70 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT CC (Cole) TO US 63 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 43 (Vernon) TO RT AA (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 17 (Cole) TO RT CC (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 52 (Miller) TO MO 17 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
US 65 (Hickory) TO MO 73 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Kansas Line TO MO 43 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 39 (Cedar) TO MO 13 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT AA (Vernon) TO MO 39 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
US 63 North Jct (Callaway) TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 5 (Camden) TO Grand Glaize Bridge Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
59
Iowa Line TO US 136 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 53 (Andrew) TO Karnes Rd (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
Pendelton St (Buchanan) TO IS 229 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 75 (Holt) TO IS 29 Exit 67 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
MO 752 (Buchanan) TO Kansas Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
US 136 South Jct (Atchison) TO IS 29 Exit 92 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
60
MO 114 (Stoddard) TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
IS 57 (Mississippi) TO Illinois Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
Oklahoma Line TO MO 59 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 37 (Barry) TO BU 60 East Jct (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 360 (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
Butler County Line TO US 67 South Jct (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 21 North Jct (Carter) TO Butler County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT DD (Butler) TO MO 114 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT M (Newton) TO MO 37 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 5 East Jct (Wright) TO MO 95 (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 95 (Wright) TO MO 181 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
US 67 South Jct (Butler) TO RT DD (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT FF (Webster) TO MO 5 East Jct (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT J (Carter) TO MO 21 North Jct (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 59 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 65 (Greene) TO RT FF (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 181 (Texas) TO US 63 South Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT P (Greene) TO MO 360 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 63 South Jct (Howell) TO MO 17 East Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 17 East Jct (Howell) TO RT J (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 59 South Jct (Newton) TO MO 59 North Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
BU 60 East Jct (Lawrence) Aurora TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 51 (PERRY) TO RT A (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
RT A (PERRY) TO RT Y (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 60 (NEW MADRID) TO MO 80 (NEW MADRID) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
RT M (PERRY) TO MO 51 (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 32 (ST. GENEVIEVE) TO RT M (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
IS 55 Exit 8 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
IS 55 Exit 44 (New Madrid) TO IS 55 Exit 32 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
IS 55 Exit 99 (Cape Girardeau) TO IS 55 Exit 93 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 77 South Jct (Scott) TO US 60 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
ST. CHARLES COUNTY LINE TO IS 70 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
Ste. Genevieve County Line TO MO 32 (St. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 67 (JEFFERSON) TO STE. GENEVIEVE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
RT Y (CAPE GIRARDEAU) TO IS 55 EXIT 99 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
IS 55 EXIT 87 (SCOTT) TO MO 77 SOUTH JCT (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 80 (NEW MADRID) TO IS 55 EXIT 49(NEW MADRID) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
RT W (New Madrid) TO US 61 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
MO 53 (Dunklin) TO RT W (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
RT B (MISSISSIPPI) TO IS 57 (MISSISSIPPI) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
US 61 (SCOTT) TO RT B (MISSISSIPPI) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
RT B (Boone) TO RT H (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
US 60 South Jct (Texas) TO US 160 North Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
MO 22 (Boone) TO RT B (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 32 (Texas) TO US 60 North Jct (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
US 160 North Jct (Texas) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
US 50 East Jct (Osage) TO RT P (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
IS 44 (Phelps) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT P (Osage) TO MO 42 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
Phelps County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT H (Boone) TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 42 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63C
US 63 (Boone) TO US 63 (Boone) Columbia Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT EE (Christian) TO MO 176 South Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT AC (Benton) TO RT AA (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
CRD KA LINE DR E (Pettis) TO MO 52 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 136 North Jct (Mercer) TO RT C (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
US 24 (Carroll) TO Saline County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
RT U (Carroll) TO US 24 (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
CRD Wildwood Rd S TO RT H (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 6 (Grundy) TO Livingston County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 52 South Jct (Benton) TO RT AC (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 60 (Greene) TO RT EE (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT AA (Benton) TO RT D (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT D (Dallas) TO MO 32 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT C (Grundy) TO MO 6 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Iowa Line TO US 136 North Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 176 South Jct (Taney) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
Livingston County Line TO US 36 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Saline County Line TO RT YY (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT YY (Saline) TO CRD Wildwood Rd S Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 36 (Livingston) TO RT U (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 32 (Dallas) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
IS 44 (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 52 North Jct (Pettis) TO MO 52 South Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 125 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT H (Pettis) TO CRD KA LINE DR E (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
IS 270 (St. Louis) TO Dorsett Rd / Midland Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT M (Butler) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT V (Jefferson) TO MO 32 North Jct (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
MO 72 (Madison) TO RT EE (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT EE (Wayne) TO MO 172 (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
US 60 South Jct (Butler) TO RT M (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
US 61 South Jct (Jefferson) TO RT V (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 172 (Wayne) TO US 60 North Jct (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
Illinois Line TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Dorsett Rd / Midland Blvd (St. Louis) TO Swan Dr (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Prospect Ave (St. Louis) TO MO 267 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 267 (St. Louis) TO RT M (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT M (Jefferson) TO US 61 South Jct (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 32 North Jct (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
69
PLATTE COUNTY LINE TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 635 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 35 SOUTH JCT (CLAY) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 35 South Jct (Daviess) TO LP 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
MO 92 (CLAY) TO IS 35 NORTH JCT (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
MO 6 South Jct (Daviess) TO IS 35 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
RT B (Andrew) TO IS 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
Iowa Line TO RT FF (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
US 136 East Jct (Nodaway) TO RT B (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
Is 49 (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
RT FF (Nodaway) TO US 136 East Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
1
MO 152 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
1
IS 35 (CLAY) TO MO 210 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
10
CLAY COUNTY LINE TO RT M (RAY) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
10
CARROLL COUNTY LINE TO US 65 (CARROLL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
10
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
10
RT M (RAY) TO CARROLL COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
MO 19 North Jct (Gasconade) TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
Frene Creek Rd (Gasconade) TO MO 19 South Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
St. Louis County Line TO Big Bend Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
103
US 60 (Carter) TO Skyline Dr (Carter) Van Buren Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
105
US 62 (Mississippi) TO MO 80 (Mississippi) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
109
RT CC (St. Louis) TO RT W (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
110
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
112
RT F (Barry) TO MO 76 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
114
MO 25 (Stoddard) TO Airport Rd (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
114
US 60 (Stoddard) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
115
IS 70 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
116
US 169 (Clinton) TO MO 33 East Jct (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
MO 13 NORTH JCT (CALDWELL) TO RT A (CALDWELL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
MO 33 East Jct (Clinton) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
US 69 (Clinton) TO MO 13 South Jct (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
12
IS 435 (JACKSON) TO SPRING ST. (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
123
RT BB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
124
RT B (Boone) TO MO 22 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT C (Greene) TO RT OO West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT OO West Jct (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
MO 14 East Jct (Christian) TO RT T (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 65 (Greene) TO RT E (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 60 (Greene) TO MO 14 West Jct (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 70 (Lafayette) TO US 50 West Jct (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
RT BB (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 50 EAST JCT (JOHNSON) TO MO 2 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 160 Reed Spring Jct (Stone) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 36 (Caldwell) TO Ray County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
MO 32 (Polk) TO RT BB (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
St. Clair County Line TO MO 82 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 6 West Jct (Daviess) TO US 36 (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
MO 82 (St. Clair) TO US 54 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 224 West Jct (Lafayette) TO IS 70 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 2 (Johnson) TO MO 7 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
Ray County Line TO MO 224 West Jct (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 54 (St. Clair) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 7 South Jct (Henry) TO St. Clair County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
US 50 (JOHNSON) TO MO 58 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
MO 224 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
LAFAYETTE COUNTY LINE TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
MO 7 (Pulaski) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
Maries County Line TO MO 17 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
135
MO 52 (Morgan) TO MO 5 (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
MO 125 (Christian) TO RT BB (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT P (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
US 65 (Christian) TO MO 125 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT BB (Douglas) TO RT FF (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
141
MO 370 (St. Louis) TO MO 364 (St. Louis Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 30 (ST. LOUIS) TO US 67 (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 364 (ST. LOUIS) TO MO 30 (ST. LOUIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
US 63 (OREGON) TO RT V (RIPLEY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
MO 158 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
RT V (RIPLEY) TO MO 21 WEST JCT (RIPLEY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
MO 21 East Jct (Ripley) TO RT E (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
148
US 136 (Nodaway) TO Iowa Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
150
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
150
KANSAS LINE TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
IS 435 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
158
US 67 (Butler) TO MO 142 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
163
IS 70 (Boone) TO RT K (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
164
RT NN (Pemiscot) TO US 61 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
164
US 412 West Jct (Dunklin) TO RT NN (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
164
RT D (Pemiscot) TO RT DD (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
17
RT K (Miller) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 52 West Jct (Miller) TO RT K (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
RT AW (Texas) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 54 (Cole) TO Miller County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 63 (Howell) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
17
Miller County Line TO MO 52 West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 32 (Texas) TO US 63 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
171
MO 96 (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
Kansas Line TO MO 96 West Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 43 (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 249 (Jasper) TO MO 96 W Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
173
MO 265 (Stone) TO MO 248 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
MO 39 (Lawrence) TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
RT P (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
175
IS 49 (Newton) TO MO 86 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
177
RT J (Cape Girardeau) TO Lexington Ave (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
177
US 61 (Cape Girardeau) TO RT J (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
179
Industrial Dr (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
18
Montgomery St (Henry) TO MO 13 (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
180
IS 270 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
185
RT H (Franklin) TO SP 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 106 (Shannon) TO US 60 East Jct (Shannon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
19
MO 8 East Jct (Crawford) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 100 North Jct (Gasconade) TO MO 28 East Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
Crawford County Line TO IS 44 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 28 West Jct (Gasconade) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
Dent County Line TO RT B (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
IS 44 (Crawford) TO MO 8 West Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 160 South Jct (Oregon) TO RT E (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
2
KANSAS STATE LINE TO I-49 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
I-49 TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
JOHNSON COUNTY LINE TO MO 52 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
RT ZZ (JOHNSON) TO HENRY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
CASS COUNTY LINE TO RT ZZ (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 72 South Jct (Reynolds) TO US 60 North Jct (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
US 160 South Jct (Ripley) TO RT FF (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 32 North Jct (Washington) TO MO 72 South Jct (Reynolds) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 8 (Washington) TO MO 32 North Jct (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
Washington County Line TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
RT M / MM (Jefferson) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
US 60 South Jct (Carter) TO US 160 North Jct (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 30 (St. Louis) TO RT M / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
CLAY COUNTY LINE TO MO 10 (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
IS 29 (CLAY) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
MO 291 (JACKSON) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
22
US 63 (Boone) TO MO 15 (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
221
US 67 (St. Francois) TO RT B (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
224
HIGHLAND AVE WEST JCT (LAFAYETTE) TO US 24 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
LAFAYETTE COUNTY LINE TO US 50 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 24 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 50 TO MO 2 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
231
St. Louis City Line TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
US 65 (SALINE) TO MO 5 W JCT (HOWARD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
MO 5 East Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
242
RT MM (Camden) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 76 (Barry) TO MO 39 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 265 West Jct (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 465 (Taney) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
249
MO 171 (Jasper) TO IS 44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
US 61 (Cape Girardeau) TO MO 77 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
US 62 South Jct (Dunklin) TO MO 53 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
RT D (Stoddard) TO US 62 North Jct (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 91 (Stoddard) TO RT M (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 53 (Dunklin) TO US 412 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
RT M (Stoddard) TO RT D (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 77 (Cape Girardeau) TO MO 91 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
265
MO 413 (Stone) TO MO 248 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
265
MO 76 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
266
RT T (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
267
St. Louis City Line TO US 50 / 61 / 67 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
28
RT EE (GASCONADE) TO US 50 (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
RT EE (MARIES) TO RT EE (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
IS 44 (Pulaski) TO RT MM (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
US 63 East Jct (Maries) TO RT EE (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 435 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
JACKSON COUNTY LINE TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
CLAY COUNTY LINE TO 39ST STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 470 SOUTH JCT (JACKSON) TO US 50 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
US 50 WEST JCT (JACKSON) TO MO 150 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
IS 44 (Franklin) TO Jefferson County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
Jefferson County Line TO RT W / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
RT W / MM (Jefferson) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 65 (Dallas) TO RT A / OO Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 5 South Jct (Laclede) TO RT N (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 245 (Cedar) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 17 (Texas) TO US 63 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
MO 13 (Polk) TO RT P (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT CC (Cedar) TO MO 245 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 72 East Jct (Dent) TO MO 49 East Jct (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
US 67 South Jct (St. Francois) TO IS 55 (Ste. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
US 54 (Cedar) TO RT CC (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
IS 55 (STE. GENEVIEVE) TO FOURTH ST. (STE. GENEVIEVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
MO 72 West Jct (Dent) TO MO 72 East Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT N (St. Francois) TO US 67 North Jct (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
RT P (Polk) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT A / OO (Laclede) TO MO 5 North Jct (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 63 (Texas) TO MO 72 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 49 East Jct (Iron) TO MO 21 South Jct (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
33
CLINTON COUNTY LINE TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
33
MO 6 (DeKalb) TO US 36 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
33
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
34
RT KK (WAYNE) TO US 67 (WAYNE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
RT Y (BOLLINGER) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
US 67 (WAYNE) TO RT Y (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
MO 21 (REYNOLDS) TO RT KK (WAYNE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
340
MO 100 (St. Louis) TO Ferguson Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
350
IS 435 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
360
IS 44 (GREENE) TO US 60 (GREENE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
RT N (ST. CHARLES) TO MO 94 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
MO 94 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
366
IS 44 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
367
US 67 (St. Louis) TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
RT W (Barry) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
US 60 (Barry) TO RT W (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
IS 44 (Jasper) TO US 60 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
IS 70 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
376
MO 265 (Taney) TO MO 76 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
38
RT J (Webster) TO RT P (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 248 (Barry) TO MO 86 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
IS 44 (Lawrence) TO US 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 96 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 160 South Jct (Dade) TO MO 96 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
RT Y (Dade) TO US 160 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 32 East Jct (Cedar) TO RT Y (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 60 (Lawrence) TO MO 248 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
41
US 24 (CARROLL) TO SALINE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
41
SALINE COUNTY LINE TO MO 240 WEST JCT (SALINE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
MO 13 (Greene) TO US 60 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
US 60 West Jct (Christian) TO MO 265 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT C West Jct (Miller) TO RT A (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
US 54 (Camden) TO RT C West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT A (Miller) TO US 63 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 54 (VERNON) TO RT V (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT V (BARTON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 96 (Jasper) TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT C (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
IS 44 West Jct (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
Newton County Line TO IS 44 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 171 (Jasper) TO Murphy Blvd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 160 (Barton) TO MO 96 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
US 59 (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
45
BUCHANAN COUNTY LINE TO SPUR 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
SPUR 45 (PLATTE) TO IS 435 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
IS 435 (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
46
RT W (Nodaway) TO US 169 (Worth) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
US 136 East Jct (Nodaway) TO RT W (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
MO 113 (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
MO 79 (Lincoln) TO US 61 (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
US 50 East Jct (Franklin) TO MO 30 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
Franklin County Line TO US 50 West Jct (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
RT E (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Howard County Line TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 54 (Camden) TO Laclede County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
RT O (Morgan) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Linn County Line TO US 36 West Jct (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT V (Chariton) TO MO 240 South Jct (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 136 West Jct (Putnam) TO RT M (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
MO 6 North Jct (Sullivan) TO Linn County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
MO 240 South Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Iowa Line TO US 136 East Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT J (Laclede) TO MO 38 (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
RT J (Cooper) TO US 50 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 38 (Wright) TO US 60 East Jct (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 160 West Jct (Ozark) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
RT M (Sullivan) TO MO 6 North Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
US 36 East Jct (Linn) TO RT E (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
IS 44 (Laclede Co.) TO RT J (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 52 North Jct (Morgan) TO RT O (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 14 (Douglas) TO MO 95 North Jct (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 60 West Jct (Wright) TO MO 14 (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 24 East Jct (Chariton) TO RT V (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT E (Chariton) TO US 24 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
Laclede County Line TO IS 44 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 50 East Jct (Moniteau) TO MO 52 North Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 95 North Jct (Ozark) TO US 160 East Jct (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
RT C (Bollinger) TO US 60 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
MO 72 (BOLLINGER) TO MO 34 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
RT KK (PERRY) TO MO 72 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
MO 34 (BOLLINGER) TO RT C (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
ILLINOIS LINE TO RT KK (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
52
MO 5 East Jct (Morgan) TO RT AA (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
US 65 South Jct (Benton) TO RT FF (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
MO 7 North Jct (Henry) TO RT B (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT B (Pettis) TO US 65 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
NW 2501 (Bates) TO LP 49 (Bates) Butler Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT FF (Morgan) TO MO 5 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT AA (Morgan) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
53
Dunklin County Line TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
53
BU 67 (Butler) TO Dunklin County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
571
MO 96 (Jasper) TO IS 49 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT D (CASS) TO DEAN AVENUE (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
PRAIRIE RD (CASS) TO MO 291 N JCT (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
CASS COUNTY LINE TO RT AA (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT AA (JOHNSON) TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
MO 291 SOUTH JCT (CASS) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
IS 44 (Jasper) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
LP 49 South Jct (Newton) TO MO 76 South Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
6
US 169 (Buchanan) TO MO 31 North Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
IS 35 (Daviess) TO MO 13East Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
US 65 (Grundy) TO RT W (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 31 North Jct (DeKalb) TO IS 35 (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
RT W (Sullivan) TO MO 5 South Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 13 East Jct (Daviess) TO RT P/WW (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT D (Sullivan) TO US 63 North Jct (Adair) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
RT P/WW (Grundy) TO US 65 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 5 North Jct (Sullivan) TO RT D (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
64
RT KK (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
Kansas Line TO LP 49 (Jasper) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
LP 49 (Rangeline Rd) (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
MO 249 (Jasper) TO I-44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
Maries County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
US 63 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 13 North Jct (Henry) TO RT PP (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 49 South Jct (Cass) TO RT B (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 65 South Jct (Benton) TO RT NN (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT B (Cass) TO MO 13 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT NN (Camden) TO MO 5 North Jct (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT PP (Henry) TO US 65 North Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 70 (Jackson) TO MO 150 South Jct (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 150 South Jct (Jackson) TO IS 49 North Jct (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
RT F (MADISON) TO MO 51 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 51 (BOLLINGER) TO MO 34 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
US 67 (Madison) TO RT F (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 34 (CAPE GIRARDEAU) TO US 61 WEST JCT (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 32 East Jct (Dent) TO MO 21 West Jct (Reynolds) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
Dent County Line TO MO 32 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
US 63 (Phelps) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
Madison County Line TO US 67 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 21 East Jct (Iron) TO Madison County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
73
US 54 (Camden) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
74
MO 25 (Cape Giradeau) TO IS 55 South Jct (Cape Giradeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
74
US 61 East Jct (Cape Girardeau) TO Illinois Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
74
IS 55 North Jct (Cape Giradeau) TO US 61 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
740
IS 70 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
744
Springfield /Branson Airport (Greene) TO IS 44 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
752
US 59 (Buchanan) TO IS 229 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
759
4th St (Buchanan) TO Stockyards Expy (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
76
RT MM (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 173 (Stone) TO MO 13 North Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
US 160 East Jct (Taney) TO MO 125 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 13 South Jct (Stone) TO US 65 N JCT (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
US 65 S JCT(Taney) TO US 160 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
763
US 63 (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
765
US 65 NORTH JCT (PETTIS) TO US 65 SOUTH JCT (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
77
MO 25 (Cape Girardeau) TO US 61 West Jct (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
77
US 61 East Jct (Scott) TO RT D (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
78
IS 435 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
79
RT P (Lincoln) TO St. Charles County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
79
St. Charles County Line TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
8
IS 44 (Phelps) TO MO 68 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 21 (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 19 East Jct (Crawford) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
Washington County Line TO MO 21 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 68 (Phelps) TO MO 19 East Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
80
US 61 (New Madrid) TO CRD 523 (Mississippi) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
82
US 54 (Cedar) TO RT H (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
83
RT B (Polk) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
84
US 412 East Jct (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
84
IS 55 (Pemiscot) TO IS 155 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
84
Arkansas Line TO US 412 West Jct (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
86
US 60 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
MO 39 (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT NN (Newton) TO US 60 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
MO 13 East Jct (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
IS 44 (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT F (Barry) TO MO 39 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
US 40 / MO 5 (Cooper) TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT J (Cooper) TO RT O (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT A (Moniteau) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT O (Moniteau) TO RT A (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
PLATTE COUNTY LINE TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
JACKSON COUNTY LINE TO IS 70 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
BARRY RD (PLATTE) TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
IS 635 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
90
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
91
MO 51 (Bollinger) TO MO 25 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
92
KANSAS LINE TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
US 169 (CLAY) TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
PLATTE COUNTY LINE TO US 169 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT T (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
US 54 / US 63 (Callaway) TO RT D (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT J (St. Charles) TO US 67 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
IS 70 (St. Charles) TO RT J (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
95
RT W (Wright) TO RT ZZ (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
96
MO 171 East Jct (Jasper) TO River St (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
River St (Jasper) TO RT U (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
RT U (Jasper) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 171 West Jct (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 43 (Jasper) TO MO 171 East Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
99
US 60 (Shannon) TO Obanion St (Shannon) Birch Tree Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
A
MO 92 (CLAY) TO LIBERTY CITY LIMITS (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
RT PP (Bates) TO IS 49 (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 61 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 100 (Franklin) TO MO 47 (Frankiin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 69 (Clinton) TO West St (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
A
MO 38 (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
BU 60 (Wright) TO RT U (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
A
US 169 (Buchanan) TO RT O (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AA
RT H (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
RT HH (Jasper) TO RT V V (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
IS 29 (PLATTE) TO US 69 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 60 (Butler) TO RT B ( Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AA
Sanders Valley Rd (Christian) TO US 160 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 62 (Scott) TO NOR 60 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AB
MO 25/77 (Cape Girardeau) TO RT K (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AB
US 160 (Greene) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
MO 141 (St. Louis) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
MO 6 (Buchanan) TO US 36 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AC
Pickett Rd (Buchanan) TO US 169 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AC
MO 163 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
US 67 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AF
Spring Bluff Rd (Franklin) TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AT
US 50 (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AW
RT TT (Pulaski) TO MO 17 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
US 61 (PERRY) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
B
BU 60 (Butler) TO RT AA (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
B
RT W / M (Cole) TO MO 133 (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
Brown Station Rd North Jct (Boone) TO LP 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 124 (Boone) TO Brown Station Rd North Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 266 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
US 54 (Cole) TO RT W / M (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 63 (Phelps) TO MO 8 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 54 (Vernon) TO RT F (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
BU 65 (Taney) TO Gobblers Knob Rd (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
RT A (Franklin) TO US 50 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT O (Callaway) TO RT AD (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
IS 49 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT HH (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT AB (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 133 (Pulaski) TO MO 28 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT CC East Jct (Moniteau) TO RT HH (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 52 (Morgan) TO RT CC East Jct (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 51 (Bollinger) TO MO 91 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
CC
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
RT AD (Howell) TO US 63 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
CC
RT M (Webster) TO IS 44 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
MO 109 (St. Louis) TO Kehrs Mill Rd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
BU 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
120TH ST. (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 59 (Newton) TO Benton Ave (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
JACKSON COUNTY LINE TO RT Y (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT Y (CASS) TO MO 2 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
CLAY COUNTY LINE TO RT KK (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 171 (Jasper) TO RT O (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 170 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 270 (St. Louis) TO IS 170 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
Rouggly Rd (St. Francois) TO RT W (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
D
CRD D-2 (Carter) TO BU 60 (Carter) Van Buren) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
D
RT NN (Polk) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT U (Pemiscot) TO MO 164 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
DD
MO 38 (Webster) TO Osage Rd (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (JOHNSON) TO MO 23 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 164 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
DD
US 40 / 61 (St. Charles) TO Diehr Rd (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (Stone) TO CRD DD-25 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 124 (Boone) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 84 (Dunklin) TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
E
MO 21 (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
RT N (Jefferson) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
SOR IS 70 (St. Louis) TO MO 180 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
RT AB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
IS 55 (New Madrid) TO CRD 403 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
EE
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
Colony Church Rd (St. Francois) TO RT D (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
F
IS 70 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
RT J (Callaway) TO Jefferson St (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
Westview Ln (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
US 65 (Taney) TO US 160 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 112 (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
LP 44 (Franklin) TO RT O (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 5 (Camden) TO RT TT (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
US 60 (Greene) TO Weaver Rd (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
CRD 190 / Kodiak Rd (Jasper) TO MO 59 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
MO 43 (Jasper) TO CRD 190 / Kodiak Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
RT W (Jefferson) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT FF WEST JCT (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
MO 215 (Polk) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
IS 44 (Lawrence) TO BU 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT W (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
H
MO 17 (Pulaski) TO Ft. Leonard Wood (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
LP 49 (Bates) TO Main St (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
MO 171 (Jasper) TO MO 571 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
US 61 (Scott) TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
HH
Reynolds County Line TO MO 34 (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
HH
MO 86 (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 65 (Christian) TO RT NN (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT WW (CALLAWAY) TO RT F (CALLAWAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
MO 58 (CASS) TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 50 (JOHNSON) TO WHITEMAN AFB (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT MM (Dunklin) TO BU 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
JJ
Well St (Jasper) TO RT P (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 49 (Vernon) TO CRD 1800 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT KK (Boone) TO MO 163 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
CRD 317 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
MO 25 (CAPE GIRARDEAU) TO CRD 317 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
RT ZZ (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 14 (CHRISTIAN) TO RT M (STONE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 43 (Newton) TO Irwin Dr (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT N (SCOTT) TO RT AB (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
CRD 6470 (Howell) TO US 63 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
MO 30 (Franklin) TO MO 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 70 (St. Charles) TO US 40 / 61 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 229 (Andrew) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
KK
Beginning of Route (Camden) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 185 North Jct (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 8 (Phelps) TO CRD 3610 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
RT A (Scott) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
M
RT U (Stone) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
US 60 (Greene) TO RT FF (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 21 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 79 (St. Charles) TO RT P (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
RT TT (Camden) TO MO 242 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
IS 44 (Greene) TO MO 413 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 270 (St. Louis) TO MO 115 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 44 (Greene) TO CRD 168 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 21 (Jefferson) TO RT E / Miller St (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 32 (St. Francois) TO RT NN (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
N
RT F (Franklin) TO Meramec River (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT NN (St. Francois) TO MO 21 (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
N
MISSISSIPPI RIVER (SCOTT) TO MAIN ST. (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
NN
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 86 (Newton) TO RT P (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 164 (Dunklin) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
NN
RT O (Franklin) TO Rock Church Rd (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
US 412 (Dunklin) TO MO 164 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
RT C (Callaway) TO RT CC (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 32 (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 72 (Phelps) TO Lions Club Dr (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
RT AK (Franklin) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
US 67 (ST. FRANCOIS) TO RT D (ST. GENEIVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 84 (Dunklin) TO RT V V (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 5 (Morgan) TO End of Route Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 744 (Greene) TO MO 125 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
Vintage Lane (Stone) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 32 (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
OO
MO 125 East Jct (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
RT JJ (Jasper) TO MO 66 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 8 (St. Francois) TO MO 8 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
P
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
US 61 (St. Charles) TO RT M (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 366 (St. Louis) TO MO 30 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
Byrnes Mill Rd (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
US 60 (Butler) TO BU 60 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
IS 70 (St. Charles) TO RT N (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
Ossenfort Rd (St. Louis) TO MO 100 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
RT N (St. Charles) TO RT TT ( St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
IS 55 (Perry) TO MO 51 (Perry) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
RT D (Wayne) TO US 60 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
Allan Rd (Taney) TO MO 76 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
US 61 (Jefferson) TO RT AA (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
RT F (Camden) TO RT MM (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
LP 49 (Jasper) TO Duquesne Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
Beginning of Route (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
West Florissant Ave (St. Louis) TO Woodrow Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
US 61 (New Madrid) TO RT WW (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
U
IS 55 (Pemiscot) TO MO 84 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
U
Oklahoma Line TO MO 43 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
CRD 54 SW (Buchanan) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
US 40 (JACKSON) TO MO 350 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
Munn Ave (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
IS 44 (Phelps) TO CRD 2060 (Phelps) Rolla Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
RT E (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
RT Y South Jct (Morgan) TO BU 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
KANSAS LINE TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 109 (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 14 (Christian) TO Jackson Spring Rd (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 177 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
W
Logan Rd (Vernon) Nevada TO US 54 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
Callaway County Line TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
US 63 (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
BU 60 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 25 (Stoddard) TO Pedestrian Factory Overpass (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 52 (Miller) TO CRD ISBON Rd (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 58 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
RT BB (Scott) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 127 (PETTIS) TO US 65 (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
CRD 3670 (Howell) TO US 60 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
YY
RT Y (CASS) TO RT C (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
Kansas Line TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 169 (Buchanan) TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
Z
BU 54 (Callaway) TO Chandler Dr (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
RT A (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Lincoln Dr (Madison) TO CRD 234 (Madison) Fredericktown Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Z
IS 29 (PLATTE) TO MCPHERSON AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
IS 70 (St. Charles) TO RT D (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Main St (Jasper) Carl Junction TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
ZZ
RT KK (Crawford) TO MO 19 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
29
US 59 South Jct (Andrew) TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
29
BU 71 (Andrew) TO LP 29 North Jct (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
35
US 69 (Clinton) TO IS 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
44
IS 44 (Franklin) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
MO 39 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
IS 44 West Jct (Greene) TO IS 44 East Jct (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 171 (Jasper) TO IS 44 (Newton) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Bates) TO IS 49 South Jct (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Vernon) TO IS 49 South Jct (Vernon) Nevada Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 44 (Newton) TO IS 49 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 86 (Newton) TO BU 60 (Newton) Neosho Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
MO 763 East Jct (Boone) TO IS 70 East Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
IS 70 West Jct (Boone) TO MO 763 West Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
10
MO 10 (RAY) TO MO 10 (RAY) RICHMOND Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
13
MO 20 (LAFAYETTE) TO MO 13 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
25
MO 25 North Jct (Dunklin) TO MO 25 South Jct (New Madrid) Malden Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
39
MO 174 (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
5
MO 14 (Douglas) Ava TO MO 5 (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
50
MO 179 (Cole) TO US 50 (Cole) Missouri Blvd Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
US 54 South Jct (Callaway) TO 4TH St. (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 87 North Jct (Miller) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 52 (Miller) TO MO 87 South Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
13TH St. (Callaway) TO US 54 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Wright) TO US 60 (Texas) Mountain Grove Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 West Jct (Texas) TO BU 63 (Texas) Willow Springs Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 (Newton) TO MO 86 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Carter) TO RT D (Carter) Van Buren Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 West Jct (Texas) TO US 63 (Texas) Cabool Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 (Barry) TO US 60 (Barry) Monett Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Stoddard) TO MO 25 (Stoddard) Dexter Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
MO 86 West Jct (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Lawrence) TO US 60 (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Greene) TO RT B (Webster) Rogersville Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
Oklahoma Line TO MO 43 (Newton) Seneca Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
MO 5 (Wright) TO US 60 (Wright) Mansfield Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 West Jct (Butler) TO US 60 East Jct (Butler) Poplar Bluff Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
61
IS 55 EXIT 89 (SCOTT) TO US 61 (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
63
US 63 North Jct (Howell) TO US 63 South Jct (Howell) West Plains Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
63
US 63 North Jct (Texas) TO BU 60 (Texas) Willow Springs Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
65
US 65 (Greene) TO US 60 (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
65
MO 14 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
67
MO 72 (Madison) TO US 67 (Madison) Fredericktown Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
67
BU 60 (Bulter) TO US 67 (Butler) Poplar Bluff Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
67
MO 8 (St. Francois) TO Main St (St. Francois) Park Hills Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
71
US 71 (Andrew) TO LP 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Spur
169
US 169 (CLAY) TO RT DD (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
44
IS 44 (Phelps) St. Robert TO Ft. Leonard Wood Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
45
MO 92 (PLATTE) TO MO 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST BAGNELL DAM BLVD
Valley Rd (Miller) TO US 54 (Miller) Lake Ozark Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST CHOUTEAU TRFY
MO 210 (CLAY) TO FRONT ST (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST S 5TH ST
MO 94 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CO IS55 TO US61
IS 55 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM