Missouri Department of Transportation

For immediate assistance, please contact us at 1-888-ASK-MODOT ( 1-888-275-6636 ). For more information about MoDOT, please visit our home page.

Report Date: Thursday, July 17, 2025 2:44:25 AM

Use the dropdown boxes below to filter the results.

Traffic Impact

BACK TO TOP

Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 28 traffic impacts to report.

Road closed due to traffic impact 14 Road(s) closed due to traffic impact
Expect delays due to traffic impact 9 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 3 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 2 Closure(s) due to planned event(s)
Expect delays due to planned event 0 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to traffic impact RT V N - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .253 mile(s) after CRD TWIN OAKS LN E, and ends .372 mile(s) after CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT V S - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .372 mile(s) before CRD TWIN OAKS LN E, and ends .253 mile(s) before CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT PP W - CHARITON County - CLOSED
BRIDGE DAMAGE
Road closure begins .054 mile(s) after CRD SALT LICK AVE S, and ends .116 mile(s) after CRD SALT LICK AVE S.
Reported 6/17/2025 5:31:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT PP E - CHARITON County - CLOSED
BRIDGE DAMAGE
Road closure begins .116 mile(s) before CRD SALT LICK AVE S, and ends .054 mile(s) before CRD SALT LICK AVE S.
Reported 6/17/2025 5:31:00 PM.
Road closed until further notice.
Possible delays due to traffic impact RT D N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins .001 mile(s) after RP RTD TO IS44E E, and ends RT WW E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins RT WW E, and ends .001 mile(s) before RP RTD TO IS44E E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact US 24 E - JACKSON County - EXPECT DELAYS
ROADWAY DAMAGE
Incident begins .001 mile(s) before CST NORTHERN BLVD S, and ends .031 mile(s) after CST NORTHERN BLVD S.
Reported 4/13/2023 4:30:00 PM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RP IS29N TO FRONT ST E E - JACKSON County - POSSIBLE DELAYS
OTHER
Incident begins .02 mile(s) before CST FRONT ST E, and ends CST FRONT ST E.
Reported 7/17/2025 1:50:00 AM.
Traffic impact estimated to last 1.5 hour(s).
Road closed due to traffic impact MO 13 S - LAFAYETTE County - CLOSED
UTILITY DAMAGE
Road closure begins .025 mile(s) after OR 70 E, and ends .024 mile(s) before CRD BORLAND RD E.
Reported 7/13/2025 12:23:00 AM.
Road closed until further notice.
Road closed due to traffic impact MO 13 N - LAFAYETTE County - CLOSED
UTILITY DAMAGE
Road closure begins .024 mile(s) after CRD BORLAND RD E, and ends .025 mile(s) before OR 70 E.
Reported 7/13/2025 12:23:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to planned event BU 61 N - MARION County - CLOSED
PLANNED
Road closure begins .005 mile(s) after CST JANET TRAIL E, and ends .002 mile(s) after RT BB S.
Reported 7/26/2025 10:00:00 AM.
Closure estimated to last 1.5 hour(s).
Road closed due to planned event BU 61 S - MARION County - CLOSED
PLANNED
Road closure begins .002 mile(s) before RT BB S, and ends .005 mile(s) before CST JANET TRAIL E.
Reported 7/26/2025 10:00:00 AM.
Closure estimated to last 1.5 hour(s).
Road closed due to traffic impact CRD LEMON TRL S - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after CRD 118TH RD E, and ends .007 mile(s) before OR 70 E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Road closed due to traffic impact CRD LEMON TRL N - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after OR 70 E, and ends .007 mile(s) before CRD 118TH RD E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Expect delays due to traffic impact OR 270 W - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .008 mile(s) before CRD LILAC AVE S, and ends .004 mile(s) after CRD LILAC AVE S.
Reported 7/15/2025 7:00:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact OR 270 E - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .004 mile(s) before CRD LILAC AVE S, and ends .008 mile(s) after CRD LILAC AVE S.
Reported 7/15/2025 7:00:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact OR 44 W - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .021 mile(s) before CST CENTRAL AVE S, and ends .017 mile(s) after CST CENTRAL AVE S.
Reported 7/16/2025 5:53:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact OR 44 E - ST. LOUIS County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .017 mile(s) before CST CENTRAL AVE S, and ends .021 mile(s) after CST CENTRAL AVE S.
Reported 7/16/2025 5:53:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact MO 115 S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .041 mile(s) before CST JEFFERSON AVE S, and ends .004 mile(s) before CST PARNELL ST S.
Reported 7/16/2025 9:15:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact MO 115 N - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .008 mile(s) before CST PARNELL ST S, and ends .048 mile(s) after CST FARRAR ST E.
Reported 7/16/2025 9:15:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT H N - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .019 mile(s) before CST GIMBLIN RD E, and ends .013 mile(s) after CST GIMBLIN RD E.
Reported 5/7/2025 10:40:00 PM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact RT H S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .013 mile(s) before CST GIMBLIN RD E, and ends .019 mile(s) after CST GIMBLIN RD E.
Reported 5/7/2025 10:40:00 PM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT KK S - WAYNE County - CLOSED
ROADWAY DAMAGE
Road closure begins .259 mile(s) after MO 34 E, and ends .012 mile(s) after CRD 456 E.
Reported 4/5/2025 7:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT KK N - WAYNE County - CLOSED
ROADWAY DAMAGE
Road closure begins .012 mile(s) before CRD 456 E, and ends .259 mile(s) before MO 34 E.
Reported 4/5/2025 7:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT Y W - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .23 mile(s) before CRD BLACK HORSE RD S, and ends .013 mile(s) before CRD ST LUKE RD E.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT Y E - WEBSTER County - CLOSED
BRIDGE DAMAGE
Road closure begins .013 mile(s) after CRD ST LUKE RD E, and ends .23 mile(s) after CRD BLACK HORSE RD S.
Reported 6/4/2025 9:55:00 PM.
Road closed until further notice.

Flooding

BACK TO TOP

Floods are a special category of traffic impacts causing water to pool on the roadway, typically due to exceessive rainfall. Flooding may cause a road closure, or an expected delay. There are 2 flooding impact(s) to report.

Road closed due to flooding 2 Road(s) closed due to flooding
Expect delays due to flooding 0 Expected delay(s) due to flooding
Road closed due to flooding RT E E - PLATTE County - CLOSED
Flooding reported beginning .035 mile(s) before CRD LANE TREE DR S and ending .158 mile(s) before RT B S.
Road impacted since 6/26/2025 10:20:00 AM.
Road closed due to flooding RT E W - PLATTE County - CLOSED
Flooding reported beginning .158 mile(s) after RT B S and ending .035 mile(s) after CRD LANE TREE DR S.
Road impacted since 6/26/2025 10:20:00 AM.

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 187 closure(s) due to work zone(s) to report.

Road closed due to work zone 187 Road(s) closed due to work zone
Road closed due to workzone RP TRUMAN PKWY TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LAFAYETTE AVE E and ends at .01 mile(s) after CST RUSSELL BLVD E.
Work is scheduled from 06-DEC-2022 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST IVY W - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 94 W and ends at CST OLD MO 94 E.
Work is scheduled from 18-JUL-2022 to 01-AUG-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL S - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) before IS 70 W and ends at .022 mile(s) after IS 70 E.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL N - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .022 mile(s) before IS 70 E and ends at .015 mile(s) after IS 70 W.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 33 N - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .087 mile(s) after RT CC E and ends at .031 mile(s) before CRD BURRIS RD S.
Work is scheduled from 29-AUG-2024 to 17-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 33 S - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .031 mile(s) after CRD BURRIS RD S and ends at .087 mile(s) before RT CC E.
Work is scheduled from 29-AUG-2024 to 17-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .439 mile(s) after CRD SHERWOOD FOREST E and ends at .938 mile(s) after CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .938 mile(s) before CRD SHERWOOD FOREST E and ends at .439 mile(s) before CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO US67N N - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 55 S and ends at .005 mile(s) before US 67 N.
Work is scheduled from 10-DEC-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 W - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CRD ROCKWOOD RD S and ends at .001 mile(s) before PVT STAGE COACH RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 E - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT STAGE COACH RD S and ends at .002 mile(s) before CRD ROCKWOOD RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO IS55S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 67 S and ends at IS 55 S.
Work is scheduled from 28-FEB-2025 to 22-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS270W TO RIVERVIEW DR W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 270 W and ends at RT H N.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS70W BOONVILLE W - COOPER County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at IS 70 W.
Work is scheduled from 21-JAN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP GERMANIA ST TO IS55N N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST GERMANIA AVE E and ends at IS 55 N.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHEROKEE ST TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST CHEROKEE ST E and ends at IS 55 S.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D S - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) after CRD JEWELL DR E and ends at .035 mile(s) before CRD KERR RD E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D N - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) after CRD KERR RD E and ends at .015 mile(s) before CRD JEWELL DR E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS29N DEARBORN N - PLATTE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at IS 29 N and ends at .003 mile(s) before IS 29 N.
Work is scheduled from 17-JAN-2025 to 31-OCT-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO MYRTLE AVE E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 70 E and ends at .003 mile(s) before CST MYRTLE AVE S.
Work is scheduled from 20-MAR-2025 to 20-MAR-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y S - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT VV S and ends at .005 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y N - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after RT VV S and ends at .003 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT V S and ends at .001 mile(s) before PVT 607 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Y E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT 607 S and ends at RT V S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT V S - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT Y E and ends at .001 mile(s) before CRD 606 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT V N - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD 606 S and ends at RT Y E.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone PVT OVERPASS S - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .024 mile(s) before CST TRUMAN RD E and ends at .019 mile(s) after CST TRUMAN RD E.
Work is scheduled from 11-APR-2025 to 31-DEC-2032.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT B S - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .616 mile(s) after CRD SQUIRREL RD S and ends at .97 mile(s) after CRD SQUIRREL RD S.
Work is scheduled from 12-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT B N - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .97 mile(s) before CRD SQUIRREL RD S and ends at .616 mile(s) before CRD SQUIRREL RD S.
Work is scheduled from 12-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 S and ends at .009 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9N TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 N and ends at .038 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CO RIVERWAY BLVD TO US69 W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after US 69 N and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP NW BRIARCLIFF PKWY E TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CST NW PLATTE RD E and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO NW BRIARCLIFF PKWY E E - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 S and ends at .004 mile(s) before OR 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS635S TO MO9S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after IS 635 S and ends at MO 9 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT M E - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) before CRD PLUM TRL E and ends at .013 mile(s) before CST MILL ST S.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT M W - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after CST MILL ST S and ends at .011 mile(s) after CRD PLUM TRL E.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 752 E - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 59 S and ends at CST SHERMAN ST S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 752 W - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before CST SHERMAN ST S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST EUREKA AVE N - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .019 mile(s) before US 59 S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT V N - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .178 mile(s) after CRD TWIN OAKS LN E and ends at .484 mile(s) after CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT V S - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .484 mile(s) before CRD TWIN OAKS LN E and ends at .178 mile(s) before CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT E E - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .178 mile(s) before CRD PEARL LN S and ends at .028 mile(s) before CRD PEARL LN S.
Work is scheduled from 18-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT E W - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .028 mile(s) after CRD PEARL LN S and ends at .178 mile(s) after CRD PEARL LN S.
Work is scheduled from 18-JUN-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT D N - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins at .1 mile(s) after CRD 323RD ST E and ends at .028 mile(s) before CRD E 319TH ST E.
Work is scheduled from 19-MAY-2025 to 24-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D S - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins at .028 mile(s) after CRD E 319TH ST E and ends at .1 mile(s) before CRD 323RD ST E.
Work is scheduled from 19-MAY-2025 to 24-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 51 S - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .985 mile(s) before MO 72 E and ends at .018 mile(s) after CRD 376 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 51 N - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .018 mile(s) before CRD 376 E and ends at .985 mile(s) after MO 72 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 72 W - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .016 mile(s) before CRD 380 S and ends at .012 mile(s) after CRD 900 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 72 E - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .012 mile(s) before CRD 900 E and ends at .016 mile(s) after CRD 380 S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTJ TO IS70E E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at RT J S and ends at .036 mile(s) before IS 70 E.
Work is scheduled from 01-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70W TO 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 70 W and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP E 23RD ST TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST E 23RD ST E and ends at IS 70 W.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after IS 70 E and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP E 23RD ST TO IS70E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST E 23RD ST E and ends at IS 70 E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST MONROE AVE S and ends at .003 mile(s) before CST INDIANA AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CST INDIANA AVE S and ends at .003 mile(s) before CST MONROE AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US169N TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after US 169 N and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9 TO NW BRIARCLIFF PKWY W W - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 9 N and ends at .005 mile(s) before CST NW PLATTE RD E.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS270E TO IS170E E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 170 E.
Work is scheduled from 20-JUN-2025 to 27-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT NN W - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before CRD PANTHER RD S and ends at .024 mile(s) after CRD ORION RD S.
Work is scheduled from 06-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT NN E - NODAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) before CRD ORION RD S and ends at .02 mile(s) after CRD PANTHER RD S.
Work is scheduled from 06-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDW TO US67S S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D W and ends at US 67 S.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67N TO RTDW W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 N and ends at RT D W.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTDE TO US67N N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT D E and ends at US 67 N.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO RTDE E - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 67 S and ends at RT D E.
Work is scheduled from 05-MAY-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MADISON ST TO US54W W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST MADISON ST S and ends at .017 mile(s) before US 54 W.
Work is scheduled from 06-MAY-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 96 E - JASPER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD INCA RD E and ends at .001 mile(s) before CRD INCA RD E.
Work is scheduled from 12-MAY-2025 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST JACKSON AVE N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .009 mile(s) after CST E 29TH ST E and ends at .006 mile(s) before OR 70 E.
Work is scheduled from 27-MAY-2025 to 26-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST JACKSON AVE S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after OR 70 E and ends at .009 mile(s) before CST E 29TH ST E.
Work is scheduled from 27-MAY-2025 to 26-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55N TO US67S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 55 N and ends at .004 mile(s) before US 67 S.
Work is scheduled from 17-MAY-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ W - BOLLINGER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .493 mile(s) after CRD 806 E and ends at .312 mile(s) before CRD 807 S.
Work is scheduled from 19-MAY-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT ZZ E - BOLLINGER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .312 mile(s) after CRD 807 S and ends at .493 mile(s) before CRD 806 E.
Work is scheduled from 19-MAY-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT C E - WASHINGTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .078 mile(s) after CRD BIRCH ST S and ends at .094 mile(s) before CRD WEBSTER RD 627 E.
Work is scheduled from 27-MAY-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C W - WASHINGTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .094 mile(s) before CRD BIG RIVER RD 633 S and ends at .078 mile(s) before CRD BIRCH ST S.
Work is scheduled from 27-MAY-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C E - CRAWFORD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after RP IS44W TO RTC W and ends at .004 mile(s) before RT J S.
Work is scheduled from 09-JUN-2025 to 04-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT C W - CRAWFORD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after RT J S and ends at .005 mile(s) before RP IS44W TO RTC W.
Work is scheduled from 09-JUN-2025 to 04-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO GERMANIA ST S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST GERMANIA AVE E.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP LOUGHBOROUGH AVE TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LOUGHBOROUGH AVE E and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO LOUGHBOROUGH AVE S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 S and ends at CST LOUGHBOROUGH AVE E.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP BELLERIVE BLVD TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST VIRGINIA AVE S and ends at IS 55 S.
Work is scheduled from 02-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST N STATE ST S - ST. FRANCOIS County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .002 mile(s) before MO 8 E and ends at .129 mile(s) after MO 8 E.
Work is scheduled from 26-JUN-2025 to 15-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST N STATE ST N - ST. FRANCOIS County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .129 mile(s) before MO 8 E and ends at .002 mile(s) after MO 8 E.
Work is scheduled from 26-JUN-2025 to 15-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT MM S - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .003 mile(s) after RT T E and ends at .007 mile(s) after CRD LAKE RD E.
Work is scheduled from 10-JUN-2025 to 10-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT MM N - FRANKLIN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .007 mile(s) before CRD LAKE RD E and ends at .003 mile(s) before RT T E.
Work is scheduled from 10-JUN-2025 to 10-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST BENTON BLVD N - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) after CST TRUMAN RD E and ends at .007 mile(s) before RP BENTON BLVD TO IS70W W.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST BENTON BLVD S - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after RP BENTON BLVD TO IS70W W and ends at .008 mile(s) before CST TRUMAN RD E.
Work is scheduled from 06-JUN-2025 to 15-AUG-2027.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 59 S - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .358 mile(s) before CRD ADOBE RD E and ends at .045 mile(s) before CRD 142 E.
Work is scheduled from 01-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 59 N - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .045 mile(s) after CRD 142 E and ends at .358 mile(s) after CRD ADOBE RD E.
Work is scheduled from 01-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone BU 50 E - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at US 50 W and ends at .043 mile(s) before CST W YOUNG AVE E.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone BU 50 W - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .043 mile(s) after CST W YOUNG AVE E and ends at US 50 W.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CO US50E TO BU50 E - JOHNSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at US 50 E and ends at BU 50 E.
Work is scheduled from 09-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US54W TO STADIUM BLVD E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 54 W and ends at .01 mile(s) before OR 54 E.
Work is scheduled from 05-JUN-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US54E TO MADISON ST E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 54 E and ends at CST MADISON ST S.
Work is scheduled from 05-JUN-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 E - CALLAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at 1.087 mile(s) before RT J S and ends at RT J S.
Work is scheduled from 12-MAY-2025 to 27-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 70 W - CALLAWAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at RT J S and ends at 1.087 mile(s) after RT J S.
Work is scheduled from 12-MAY-2025 to 27-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H N - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) before CRD 75 E and ends at .472 mile(s) after CRD 75 E.
Work is scheduled from 17-JUN-2025 to 29-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT H S - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .472 mile(s) before CRD 75 E and ends at .007 mile(s) after CRD 75 E.
Work is scheduled from 17-JUN-2025 to 29-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - WEBSTER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .092 mile(s) after CRD WILLOW LN E and ends at .806 mile(s) after CRD BLACK HORSE RD S.
Work is scheduled from 10-JUN-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y E - WEBSTER County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .806 mile(s) before CRD BLACK HORSE RD S and ends at .092 mile(s) before CRD WILLOW LN E.
Work is scheduled from 10-JUN-2025 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55S TO RTAE E - JEFFERSON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at IS 55 S and ends at .001 mile(s) after RP IS55S TO RTAW W.
Work is scheduled from 16-JUN-2025 to 18-JUL-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD 127 E - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after OR 44 E and ends at CRD 112 E.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD 127 W - GREENE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CRD 112 E and ends at .001 mile(s) before OR 44 E.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone US 160 W - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT BB S and ends at .002 mile(s) before US 63 N.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone US 160 E - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after US 63 N and ends at .001 mile(s) before RT BB S.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone RP RIVERVIEW DR TO IS270W W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .005 mile(s) before RT H S and ends at .006 mile(s) before IS 270 W.
Work is scheduled from 13-JAN-2025 to 06-SEP-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RIVERWAY BLVD TO US69S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .007 mile(s) after US 69 S and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US69S TO IS635S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 S and ends at .039 mile(s) before IS 635 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS635N TO US69N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .012 mile(s) after IS 635 N and ends at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 9 S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .013 mile(s) after RP MO9S TO IS635S S and ends at .007 mile(s) before RP OUTER RD TO MO9S S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO9S TO RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST LAKE AVE S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .017 mile(s) before CST KENTUCKY ST E and ends at .004 mile(s) before CST HYDE PARK AVE E.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 9 N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) after RP MO9N TO US169N N and ends at .061 mile(s) before RP IS635S TO MO9N N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 6 E - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP IS35S TO MO6 S and ends at .005 mile(s) before RP IS35N TO MO6 N.
Work is scheduled from 09-JUN-2025 to 19-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 6 W - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after RP MO6 TO IS35N N and ends at .003 mile(s) before RP IS35S TO MO6 S.
Work is scheduled from 09-JUN-2025 to 19-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD W VETERANS MEMORIAL PKWY E - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) after RT B S and ends at .257 mile(s) after RT B S.
Work is scheduled from 20-JUN-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone CRD W VETERANS MEMORIAL PKWY W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .257 mile(s) before RT B S and ends at .001 mile(s) before RT B S.
Work is scheduled from 20-JUN-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone CRD ROUTE 66 W - LACLEDE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after CRD RUSTIC DR S and ends at .002 mile(s) before OR 44 E.
Work is scheduled from 19-MAY-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD ROUTE 66 E - LACLEDE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after OR 44 E and ends at .003 mile(s) before CRD RUSTIC DR S.
Work is scheduled from 19-MAY-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 179 N - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .361 mile(s) before CRD BACON BRIDGE RD S and ends at .276 mile(s) before CRD BACON BRIDGE RD S.
Work is scheduled from 19-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 179 S - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .276 mile(s) after CRD BACON BRIDGE RD S and ends at .361 mile(s) after CRD BACON BRIDGE RD S.
Work is scheduled from 19-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone US 67 S - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .051 mile(s) after CST CONWAY RD E and ends at .05 mile(s) before CST CONWAY RD E.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CONWAY RD W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before IS 270 E and ends at .007 mile(s) before OR 64 W.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J W - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .1 mile(s) before CRD ALPINE AVE S and ends at .006 mile(s) before CRD ALPINE AVE S.
Work is scheduled from 01-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT J E - MACON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .006 mile(s) after CRD ALPINE AVE S and ends at .1 mile(s) after CRD ALPINE AVE S.
Work is scheduled from 01-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone CRD BEAMER LN N - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .015 mile(s) after CRD COTTON DODD RD E and ends at .025 mile(s) after IS 44 W.
Work is scheduled from 30-JUN-2025 to 30-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD BEAMER LN S - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .025 mile(s) before IS 44 W and ends at .015 mile(s) before CRD COTTON DODD RD E.
Work is scheduled from 30-JUN-2025 to 30-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD JADE DR E - CALLAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .648 mile(s) after OR 70 E and ends at .074 mile(s) before OR 70 E.
Work is scheduled from 17-JUN-2025 to 06-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CRD JADE DR W - CALLAWAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .074 mile(s) after OR 70 E and ends at .648 mile(s) before OR 70 E.
Work is scheduled from 17-JUN-2025 to 06-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone N OR 50 E - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at CST SE SHENANDOAH DR E and ends at .12 mile(s) before CST MILTON THOMPSON RD S.
Work is scheduled from 18-JUN-2025 to 10-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 50 W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .12 mile(s) after CST MILTON THOMPSON RD S and ends at CST SE SHENANDOAH DR E.
Work is scheduled from 18-JUN-2025 to 10-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO IS35S S - JACKSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .013 mile(s) after IS 70 E and ends at .005 mile(s) before IS 35 S.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS35N TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .036 mile(s) after IS 35 N and ends at .007 mile(s) before IS 70 W.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTEE TO IS49S S - MCDONALD County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at RT EE E and ends at IS 49 S.
Work is scheduled from 07-JUL-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D W - NEW MADRID County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .016 mile(s) after RT W E and ends at .004 mile(s) after RT JJ S.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT D E - NEW MADRID County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) before RT JJ S and ends at .016 mile(s) before RT W E.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 75 N - MISSISSIPPI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .004 mile(s) after CST B ST S and ends at MO 105 S.
Work is scheduled from 07-JUL-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 21 N - IRON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at .002 mile(s) after RT AA E and ends at .002 mile(s) before RT CC E.
Work is scheduled from 07-JUL-2025 to 20-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 21 S - IRON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at .002 mile(s) after RT CC E and ends at .002 mile(s) before RT AA E.
Work is scheduled from 07-JUL-2025 to 20-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone W OR 67 N - MADISON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at CRD 502 E and ends at MO 72 E.
Work is scheduled from 23-JUN-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone W OR 67 S - MADISON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at MO 72 E and ends at CRD 502 E.
Work is scheduled from 23-JUN-2025 to 01-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 92 E - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .079 mile(s) after PK TRYST FALLS PARK RD S and ends at .159 mile(s) after PK TRYST FALLS PARK RD S.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 92 W - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .159 mile(s) before PK TRYST FALLS PARK RD S and ends at .079 mile(s) before PK TRYST FALLS PARK RD S.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 190 W - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .046 mile(s) after CRD 332 ST S and ends at .034 mile(s) before RR TRENTON SUB S.
Work is scheduled from 07-JUL-2025 to 20-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 190 E - DAVIESS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .034 mile(s) after RR TRENTON SUB S and ends at .046 mile(s) before CRD 332 ST S.
Work is scheduled from 07-JUL-2025 to 20-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS55S FRUITLAND S - CAPE GIRARDEAU County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at IS 55 S.
Work is scheduled from 25-JUN-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 67 N - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .05 mile(s) after CST CONWAY RD E and ends at .05 mile(s) before CST CONWAY RD E.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 75 S - MISSISSIPPI County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 105 S and ends at .004 mile(s) before CST B ST S.
Work is scheduled from 07-JUL-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP E 29TH TER TO IS70E E - JACKSON County - ALL LANES CLOSED
ROADSIDE WORK
Road closure begins at CST E 29TH ST E and ends at .002 mile(s) before IS 70 E.
Work is scheduled from 07-JUL-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP STADIUM BLVD TO US54E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after OR 54 E and ends at US 54 E.
Work is scheduled from 01-JUL-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone IS 44 E - FRANKLIN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .216 mile(s) before RP IS44E TO RTAF S and ends at .037 mile(s) after RT AF S.
Work is scheduled from 06-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Road closed due to workzone RT M S - MADISON County - ALL LANES CLOSED
CORE DRILLING
Road closure begins at .012 mile(s) after CRD 310 S and ends at .009 mile(s) before CRD 303 S.
Work is scheduled from 09-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT M N - MADISON County - ALL LANES CLOSED
CORE DRILLING
Road closure begins at .009 mile(s) after CRD 303 S and ends at .012 mile(s) before CRD 310 S.
Work is scheduled from 09-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST BELCREST AVE S - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before BU 65 N and ends at .003 mile(s) after BU 65 N.
Work is scheduled from 14-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST BELCREST AVE N - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .003 mile(s) before BU 65 N and ends at .001 mile(s) after BU 65 N.
Work is scheduled from 14-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT M E - LINCOLN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at MO 79 S and ends at CRD STERLING HARBOR RD E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT M W - LINCOLN County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at CRD STERLING HARBOR RD E and ends at MO 79 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT A E - JEFFERSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .008 mile(s) after RP RTAE TO IS55S S and ends at .006 mile(s) before RP IS55N TO RTAE E.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 10:00 PM and end by 03:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT A W - JEFFERSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .006 mile(s) after RP IS55N TO RTAE E and ends at .008 mile(s) before RP RTAE TO IS55S S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 10:00 PM and end by 03:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS55N TO RTAW W - JEFFERSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at .008 mile(s) after RP IS55N TO RTAE E and ends at RT A E.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 10:00 PM and end by 03:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTAW TO IS55S S - JEFFERSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at RT A E and ends at .005 mile(s) before RP RTAE TO IS55S S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 10:00 PM and end by 03:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP RTAE TO IS55N N - JEFFERSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Road closure begins at RT A E and ends at .008 mile(s) before RP RTAW TO IS55N N.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 10:00 PM and end by 03:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT CC N - CALDWELL County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at MO 13 S and ends at .08 mile(s) before MO 6 E.
Work is scheduled from 16-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT CC S - DAVIESS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Road closure begins at .08 mile(s) after MO 6 E and ends at MO 13 S.
Work is scheduled from 16-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RP US50E TO US54W W - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after US 63 S and ends at .005 mile(s) before US 54 W.
Work is scheduled from 14-JUL-2025 to 06-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP BU50 TO US54E E - COLE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP US54E TO BU50 E and ends at .006 mile(s) before US 54 E.
Work is scheduled from 14-JUL-2025 to 06-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT OO W - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at RT Y S and ends at MO 52 E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT OO E - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 52 E and ends at RT Y S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST CHASSELLE LN S - ST. LOUIS County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at .005 mile(s) before RT AB E and ends at RT AB E.
Work is scheduled from 16-JUL-2025 to 13-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST CHASSELLE LN N - ST. LOUIS County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at RT AB E and ends at .005 mile(s) after RT AB E.
Work is scheduled from 16-JUL-2025 to 13-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RTA TO IS70W W - CALLAWAY County - ALL LANES CLOSED
SHOULDER WORK
Road closure begins at RT Z E and ends at IS 70 W.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT N N - ATCHISON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at .089 mile(s) after MO 46 E and ends at US 136 E.
Work is scheduled from 15-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT N S - ATCHISON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at US 136 E and ends at .089 mile(s) before MO 46 E.
Work is scheduled from 15-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS470W TO VIEW HIGH DR N - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 470 W and ends at CST VIEW HIGH DR S.
Work is scheduled from 14-JUL-2025 to 07-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NEW HAVEN RD E - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .035 mile(s) after RT AC E and ends at .002 mile(s) after PVT HARTWICK TRAIL RD S.
Work is scheduled from 07-JUL-2025 to 07-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NEW HAVEN RD W - BOONE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .002 mile(s) before PVT HARTWICK TRAIL RD S and ends at .035 mile(s) before RT AC E.
Work is scheduled from 07-JUL-2025 to 07-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US65N TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 65 N and ends at IS 44 W.
Work is scheduled from 17-JUL-2025 to 18-JUL-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US65S TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 65 S and ends at IS 44 W.
Work is scheduled from 17-JUL-2025 to 18-JUL-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST RIVERWAY BLVD N - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .002 mile(s) after OR 9 S and ends at .006 mile(s) before US 69 S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .006 mile(s) after US 69 S and ends at .002 mile(s) before OR 9 S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 37 S - JASPER County - ALL LANES CLOSED
RAILROAD MAINTENANCE
Road closure begins at .109 mile(s) before RR AURORA SUB E and ends at .167 mile(s) after RR AURORA SUB E.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z S - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .003 mile(s) after CST S CHURCH ST N and ends at .004 mile(s) before RP RTZ TO IS70E E.
Work is scheduled from 15-JUL-2025 to 01-AUG-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z N - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .004 mile(s) after RP RTZ TO IS70E E and ends at .003 mile(s) before CST S CHURCH ST S.
Work is scheduled from 15-JUL-2025 to 01-AUG-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone IS 670 W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .02 mile(s) after RP IS670W TO WYOMING ST N and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 16-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP WYOMING ST TO IS670W W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at CST WYOMING ST N and ends at .147 mile(s) after CST GENESSEE ST S.
Work is scheduled from 16-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:10 AM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US69 TO IS35N N - CLINTON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .011 mile(s) after US 69 S and ends at .036 mile(s) before IS 35 N.
Work is scheduled from 14-JUL-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS35N TO US69 N - CLINTON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .009 mile(s) after IS 35 N and ends at .006 mile(s) before US 69 S.
Work is scheduled from 14-JUL-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 774 work zones where you can expect delays, or, where delays are not expected, but possible, to report.

Expected delay(s) due to work zone 453 Expected delay(s) due to work zone
Possible delay(s) due to work zone 321 Possible delay(s) due to work zone
Possible delays due to workzone CST NW BARRY RD W - CLAY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .025 mile(s) before RP US169N TO BARRY RD N and ends at .026 mile(s) before RP BARRY RD W TO US169S S.
Work is scheduled from 02-JAN-2023 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US67N TO IS55N N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 N and ends at IS 55 N.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US67S TO IS55S S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 S and ends at IS 55 S.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55S TO US67S S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .005 mile(s) after IS 55 S and ends at .004 mile(s) before US 67 S.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55N TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .013 mile(s) after IS 55 N and ends at .004 mile(s) before US 67 N.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST JEAN DR E and ends at .005 mile(s) after CST THOROUGHMAN AVE E.
Work is scheduled from 06-MAY-2024 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST THOROUGHMAN AVE E and ends at .002 mile(s) after CST JEAN DR E.
Work is scheduled from 06-MAY-2024 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after RT OO E and ends at US 160 W.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 160 W and ends at .001 mile(s) before RT OO E.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM N - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at MO 100 E and ends at RT T E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM S - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at RT T E and ends at MO 100 E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US61N TO MO47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at US 61 N and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61N N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 N.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US61S TO MO47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) after US 61 S and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61S S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 S.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 86 W - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .194 mile(s) after PVT BRIDGEVIEW DR S and ends at .175 mile(s) before CRD LEISURE LN E.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST PAGE BLVD E and ends at .012 mile(s) before RP IS170W TO RTDW W.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .013 mile(s) after RP RTDE TO IS170W W and ends at .001 mile(s) before CST PAGE BLVD E.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 86 E - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .175 mile(s) after CRD LEISURE LN E and ends at .194 mile(s) before PVT BRIDGEVIEW DR S.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST MCNUTT ST S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before CST HERCULANEUM CROSSING S and ends at CST PROVIDENCE WAY E.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST MCNUTT ST N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST PROVIDENCE WAY E and ends at .013 mile(s) after CST HERCULANEUM CROSSING S.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD W - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .184 mile(s) before CST SARAH ANN BLVD E and ends at MO 47 S.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD E - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at .184 mile(s) after CST SARAH ANN BLVD E.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 65 S - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before RT CC E and ends at .023 mile(s) after RT F E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .023 mile(s) before RT F E and ends at .013 mile(s) after RT CC E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 E - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .025 mile(s) before CST BROWN RD S and ends at .015 mile(s) after CST WEST VIEW DR S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 W - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) before CST WEST VIEW DR S and ends at .025 mile(s) after CST BROWN RD S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST RIVER DES PERES BLVD E and ends at .004 mile(s) before CST SUNSET OFFICE DR E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) after CST SUNSET OFFICE DR E and ends at .005 mile(s) after CST RIVER DES PERES BLVD E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Z E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after RP RTZ TO IS55S S and ends at .003 mile(s) before RP IS55N TO RTZ E.
Work is scheduled from 14-MAR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 785 S and ends at .003 mile(s) after CRD 784 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before CRD 784 S and ends at .004 mile(s) after CRD 785 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .067 mile(s) after CST REBAR RD E and ends at .323 mile(s) after OR 65 S.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .322 mile(s) before OR 65 S and ends at .068 mile(s) before CO US65S TO EOR65 E.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT W E and ends at US 136 E.
Work is scheduled from 19-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H S - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 136 E and ends at RT W E.
Work is scheduled from 19-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .296 mile(s) after PVT UNKNOWN S and ends at .022 mile(s) before US 63 S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .022 mile(s) after US 63 S and ends at .296 mile(s) before PVT UNKNOWN S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT M S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .027 mile(s) before RT U E and ends at .009 mile(s) before RT VV S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after RT VV S and ends at .027 mile(s) after RT U E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DAVID DR W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after PVT IVEYRIDGE LN S and ends at .024 mile(s) after IS 49 S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DAVID DR E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before IS 49 S and ends at .014 mile(s) before PVT IVEYRIDGE LN S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before CST GOLDEN BEAR DR E and ends at .021 mile(s) before CST OLYMPIC BLVD S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST OLYMPIC BLVD S and ends at .011 mile(s) before CST WOODLAND SPRINGS CT S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 170 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RP IS170W TO MO115S S and ends at .001 mile(s) after CST SCUDDER AVE E.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .056 mile(s) before RP US63N TO RTWW N and ends at .072 mile(s) after CST CLARK LN E.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .076 mile(s) before CST CLARK LN E and ends at .07 mile(s) after RP RTWW TO US63S S.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) before CST NORTH LINCOLN DR S and ends at .026 mile(s) before PVT ANNA AVE S.
Work is scheduled from 24-JUN-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .026 mile(s) after PVT ANNA AVE S and ends at .014 mile(s) after CST NORTH LINCOLN DR S.
Work is scheduled from 24-JUN-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 8 E - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) before CRD OLD HWY 8 E and ends at .024 mile(s) after CRD RAILROAD RD 606 S.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 N - RANDOLPH County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .009 mile(s) before RT J E and ends at .041 mile(s) before CRD KITE PL E.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - MACON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .039 mile(s) after CRD KITE PL E and ends at .01 mile(s) after RT J E.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 8 W - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD RAILROAD RD 606 S and ends at .009 mile(s) after CRD OLD HWY 8 E.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RP IS44E TO MO13S S and ends at .002 mile(s) before US 65 S.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after US 65 S and ends at .044 mile(s) before RP MO13S TO IS44W W.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 435 N - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after CST NE BIRMINGHAM RD E and ends at .231 mile(s) after RP OUTER RD TO IS435N N.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 136 W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .306 mile(s) after RT N S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 136 E - PUTNAM County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .306 mile(s) before RT N S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 136 E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .103 mile(s) before CRD 138 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 136 W - CLARK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .103 mile(s) after CRD 138 S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 26-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 170 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RP AIRPORT RD TO IS170E E and ends at .011 mile(s) before RP IS70W TO IS170E E.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 08:30 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT Z N - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT D E and ends at .002 mile(s) after CRD BUCKNER RD E.
Work is scheduled from 14-APR-2025 to 29-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z S - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .002 mile(s) before CRD BUCKNER RD E and ends at RT D E.
Work is scheduled from 14-APR-2025 to 29-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST LIGHTBURNE ST S and ends at .417 mile(s) before RP IS35N TO 19TH ST E E.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .403 mile(s) after RP 19TH ST E TO IS35S S and ends at .018 mile(s) after CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 72 W - MADISON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) before BU 67 N and ends at .004 mile(s) before MO 21 S.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 72 E - IRON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after MO 21 S and ends at .005 mile(s) after BU 67 N.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 2 E - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) after CST SE OUTER RD S and ends at .002 mile(s) before CST BIRD AVE S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 2 W - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST BIRD AVE S and ends at .005 mile(s) before CST SE OUTER RD S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT O W - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT F S and ends at RT AT E.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT AT E and ends at RT F S.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 E - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after RP MO152E TO IS29N N and ends at .01 mile(s) before MO 1 S.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 W - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) after MO 1 S and ends at .004 mile(s) before RP MO152E TO IS29N N.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 8 E and ends at .001 mile(s) before CRD IRON ST S.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CRD IRON ST S and ends at MO 8 E.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST OLD U S HWY 36 E - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .028 mile(s) before RP US36E TO BU36 W and ends at .001 mile(s) after MO 151 S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST OLD U S HWY 36 W - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before MO 151 S and ends at .028 mile(s) after RP US36E TO BU36 W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST GLENSTONE AVE S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .019 mile(s) before US 60 W and ends at .017 mile(s) after US 60 E.
Work is scheduled from 30-APR-2025 to 15-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST GLENSTONE AVE N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before US 60 E and ends at .021 mile(s) after US 60 W.
Work is scheduled from 30-APR-2025 to 15-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .19 mile(s) before RP IS55N TO REAVIS BARRACKS RD E and ends at .069 mile(s) before RP BATES ST TO IS55N N.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS64W TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) after OR 64 W and ends at .024 mile(s) after IS 64 E.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A N - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 60 E and ends at .243 mile(s) after CRD NORMANDY RD E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A S - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .243 mile(s) before CRD NORMANDY RD E and ends at US 60 E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 W and ends at IS 70 W.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS70E TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 E and ends at .002 mile(s) before IS 170 W.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after IS 170 W and ends at .012 mile(s) before IS 70 W.
Work is scheduled from 08-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS170E TO IS70E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 E and ends at .012 mile(s) before IS 70 E.
Work is scheduled from 03-APR-2025 to 31-AUG-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 141 S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .007 mile(s) before CST CONWAY RD E and ends at .042 mile(s) before RP MO141S TO OLD WOODS MILL RD E.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS64E TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) after IS 64 E and ends at MO 141 S.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP MO141N TO IS64W W - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 141 N and ends at IS 64 W.
Work is scheduled from 14-APR-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 49 S - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .071 mile(s) before RT BB E and ends at .073 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 49 N - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .073 mile(s) before RT BB E and ends at .071 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS35N TO IS670W W - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 N and ends at IS 670 W.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS35N TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .033 mile(s) after IS 35 N and ends at IS 670 E.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP BROADWAY TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST BROADWAY BLVD S and ends at IS 35 S.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS670W TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at IS 35 S.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS35S TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at IS 670 E.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS670W TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .018 mile(s) after CST CENTRAL ST N and ends at IS 35 N.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP PENNSYLVANIA AVE TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST PENNSYLVANIA AVE S and ends at IS 35 S.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) before CRD 356 S and ends at .002 mile(s) after CRD AUXIER RD SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before CRD AUXIER RD SE S and ends at .008 mile(s) after CRD 356 S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) before CRD HORN S and ends at .408 mile(s) after CRD 115 SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .408 mile(s) before CRD 115 SE S and ends at .009 mile(s) after CRD HORN S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .036 mile(s) before CRD THORNTON RD S and ends at .014 mile(s) after RT UU S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before RT UU S and ends at .036 mile(s) after CRD THORNTON RD S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CRD 372 E and ends at .006 mile(s) after CRD 361 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .006 mile(s) before CRD 361 E and ends at .003 mile(s) after CRD 372 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M S - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 116 E and ends at .626 mile(s) after CRD NICHOLS SW E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M N - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .626 mile(s) before CRD NICHOLS SW E and ends at MO 116 E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 190 E and ends at .003 mile(s) before BU 36 W.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 65 N - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after BU 36 E and ends at .001 mile(s) before MO 190 E.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS35S TO PENN VALLEY DR S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .004 mile(s) before RP SOUTHWEST TRFY TO IS35N N.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP PENN VALLEY DR N TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .044 mile(s) after CST PENN VALLEY DR S and ends at IS 35 N.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS35S TO EATON ST N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .089 mile(s) after IS 35 S.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP EATON ST TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .092 mile(s) before IS 35 N and ends at IS 35 N.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 74 W - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) before RR RIVER SUB S and ends at .003 mile(s) after CST FOUNTAIN ST S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 74 E - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CST FOUNTAIN ST S and ends at .235 mile(s) after RR RIVER SUB S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 29 S - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .31 mile(s) after CRD 280 ST E and ends at 1.354 mile(s) after RT Z E.
Work is scheduled from 28-APR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) after RP IS55N TO US67N N and ends at .238 mile(s) after RR RIVER SUB S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .269 mile(s) before RR RIVER SUB S and ends at .04 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .69 mile(s) after RP MO744 TO IS44W W and ends at .037 mile(s) after RP IS44W TO NORTON RD E.
Work is scheduled from 21-APR-2025 to 21-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 36 W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .27 mile(s) after RP US24W TO US36W W and ends at .034 mile(s) after CO US36W TO US36E S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .06 mile(s) after CST FAIRVIEW LN E and ends at .008 mile(s) after CST FLORISSANT RD N.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .007 mile(s) before CST FLORISSANT RD S and ends at .06 mile(s) before CST FAIRVIEW LN E.
Work is scheduled from 27-APR-2025 to 01-JUL-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST PERSHALL RD W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after OR 270 E and ends at .002 mile(s) after CST HAZELWOOD AVE S.
Work is scheduled from 23-APR-2025 to 01-DEC-2025.
Work will start daily at 05:00 PM and end by 02:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST PERSHALL RD E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) before CST HAZELWOOD AVE S and ends at .004 mile(s) before OR 270 E.
Work is scheduled from 23-APR-2025 to 01-DEC-2025.
Work will start daily at 05:00 PM and end by 02:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 39 S - LAWRENCE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .151 mile(s) before CRD 2130 E and ends at .286 mile(s) before CRD 2185 E.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 39 N - LAWRENCE County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .286 mile(s) after CRD 2185 E and ends at .151 mile(s) after CRD 2130 E.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 76 E - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .264 mile(s) before PVT DEERFOOT TRL S and ends at .372 mile(s) after CRD N EDGEWATER VILLAGE DR S.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 76 W - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .372 mile(s) before CRD N EDGEWATER VILLAGE DR S and ends at .264 mile(s) after PVT DEERFOOT TRL S.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 265 S - LAWRENCE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .089 mile(s) after OR 44 E and ends at .326 mile(s) before CRD 2175 E.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 265 N - LAWRENCE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .326 mile(s) after CRD 2175 E and ends at .089 mile(s) before OR 44 E.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .179 mile(s) after MO 58 E and ends at .25 mile(s) after CRD 121 S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A N - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .076 mile(s) after OR 70 E.
Work is scheduled from 12-MAY-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT A S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .076 mile(s) before OR 70 E and ends at RT B S.
Work is scheduled from 12-MAY-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT B S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .053 mile(s) after OR 70 E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT B N - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .053 mile(s) before OR 70 E and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP IS70W TO RTA W - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 W and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP RTA TO IS70W W - WARREN County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at IS 70 W.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP RTA TO IS70E E - WARREN County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at IS 70 E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP IS70E TO RTA S - WARREN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after IS 70 E and ends at RT A S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .06 mile(s) before RP DRTDE TO US67S S and ends at .001 mile(s) before CST FLOM CT E.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST FLOM CT E and ends at OR D E.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP RTAB TO IS270E E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT AB E and ends at IS 270 E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO RTAB W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 W and ends at RT AB E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270E TO RTAB E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 E and ends at RT AB E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP RTAB TO IS270W W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after RT AB E and ends at IS 270 W.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .043 mile(s) before RP IS270E TO IS64E E and ends at .034 mile(s) before RP IS270E TO MO340E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .066 mile(s) after RP MO340W TO IS270W W and ends at .041 mile(s) after RP IS64W TO IS270W W.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64W TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after RP IS64W TO IS270W W and ends at IS 270 E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64E TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before RP IS64W TO IS270W W and ends at .024 mile(s) after RP IS64W TO IS270E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at .013 mile(s) before IS 64 W.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at .064 mile(s) after RP IS270W TO IS64E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 291 S - CLAY County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .017 mile(s) before CST STEWART RD S and ends at .009 mile(s) before CST KANSAS ST E.
Work is scheduled from 02-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 96 W - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after MO 171 N and ends at .001 mile(s) before CRD INCA RD E.
Work is scheduled from 12-MAY-2025 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO96 TO MO171N N - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 96 E and ends at MO 171 N.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO171S TO MO96W W - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 171 S and ends at MO 96 E.
Work is scheduled from 12-MAY-2025 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO96 TO MO171S S - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 96 E.
Work is scheduled from 12-MAY-2025 to 30-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 23 N - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) after RT DD E and ends at RT MM S.
Work is scheduled from 12-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 23 S - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT MM S and ends at .001 mile(s) before RT DD E.
Work is scheduled from 12-MAY-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 N - CARROLL County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .264 mile(s) before RT CC E and ends at .04 mile(s) before BU 36 E.
Work is scheduled from 28-MAY-2025 to 23-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after BU 36 W and ends at .264 mile(s) after RT CC E.
Work is scheduled from 28-MAY-2025 to 23-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT C W - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .014 mile(s) after CRD 424 S and ends at .012 mile(s) before RT H S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C E - MARIES County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .012 mile(s) after RT H S and ends at .014 mile(s) before CRD 424 S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Y N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .225 mile(s) before CRD 4 S and ends at .27 mile(s) after CRD 4 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT Y S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .27 mile(s) before CRD 4 S and ends at .225 mile(s) after CRD 4 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after RT Y S and ends at .016 mile(s) after RT Y S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) before RT Y S and ends at .011 mile(s) before RT Y S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 48 W - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .471 mile(s) after CRD 198 S and ends at .286 mile(s) before RT D S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 48 E - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .286 mile(s) after RT D S and ends at .471 mile(s) before CRD 198 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .095 mile(s) after CRD OGLE RD S and ends at .348 mile(s) before CRD WALDO RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .348 mile(s) after CRD WALDO RD S and ends at .095 mile(s) before CRD OGLE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .352 mile(s) after RT H S and ends at .228 mile(s) before CRD RIDGLINE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) after CRD RIDGLINE RD S and ends at .352 mile(s) before RT H S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .292 mile(s) after CRD GRANT RD S and ends at .495 mile(s) before CRD LAKESITE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT E E - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .495 mile(s) after CRD LAKESITE RD S and ends at .292 mile(s) before CRD GRANT RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A S - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .373 mile(s) before CRD STEWART RD E and ends at .156 mile(s) after CRD STEWART RD E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A N - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .156 mile(s) before CRD STEWART RD E and ends at .373 mile(s) after CRD STEWART RD E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H S - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .058 mile(s) before CRD RIDGELINE RD S and ends at .457 mile(s) before CRD GLENWOOD DR E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 12:08 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .457 mile(s) after CRD GLENWOOD DR E and ends at .058 mile(s) after CRD RIDGELINE RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 12:08 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT NN E - CLINTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .166 mile(s) before CRD NW KELLER RD S and ends at .276 mile(s) after CRD NW KELLER RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT NN W - CLINTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .276 mile(s) before CRD NW KELLER RD S and ends at .166 mile(s) after CRD NW KELLER RD S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 116 W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .033 mile(s) after CO MO116 TO RTY E and ends at .026 mile(s) before OR 29 S.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 116 E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .026 mile(s) after OR 29 S and ends at .033 mile(s) before CO MO116 TO RTY E.
Work is scheduled from 02-JUN-2025 to 28-NOV-2025.
Work will start daily at 05:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT KK E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT C S and ends at MO 185 S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 185 S and ends at RT C S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 185 S and ends at .001 mile(s) before MO 100 E.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 100 E and ends at MO 185 S.
Work is scheduled from 12-MAY-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - WRIGHT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after CRD HUNTERS CREEK RD S and ends at .022 mile(s) after CO RTM TO CRD ORCHARD RD E.
Work is scheduled from 14-MAY-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - WRIGHT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .022 mile(s) before CO RTM TO CRD ORCHARD RD E and ends at .004 mile(s) before CRD HUNTERS CREEK RD S.
Work is scheduled from 14-MAY-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AC S - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .111 mile(s) before CST LUCAS AND HUNT RD S and ends at .03 mile(s) after CST DORWOOD DR S.
Work is scheduled from 15-MAY-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT AC N - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .03 mile(s) before CST DORWOOD DR S and ends at .111 mile(s) after CST LUCAS AND HUNT RD S.
Work is scheduled from 15-MAY-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone S OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .043 mile(s) after CST JAMES BLVD E and ends at .104 mile(s) before CRD DILLION OUTER RD E.
Work is scheduled from 19-JUN-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone S OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .104 mile(s) after CRD DILLION OUTER RD E and ends at .043 mile(s) before CST JAMES BLVD E.
Work is scheduled from 19-JUN-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DOOLITTLE OUTER RD W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at OR 44 E and ends at .362 mile(s) before OR 44 E.
Work is scheduled from 04-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DOOLITTLE OUTER RD E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .362 mile(s) after OR 44 E and ends at OR 44 E.
Work is scheduled from 04-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT Y E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD Y-523 E and ends at MO 76 E.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 76 E and ends at CRD Y-523 E.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD FF-210 E and ends at MO 14 E.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT FF E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 14 E and ends at CRD FF-210 E.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AF E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 5 S and ends at CRD AF-304 E.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AF W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD AF-304 E and ends at MO 5 S.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H E - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 17 S and ends at CRD MARYS HOME RD S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H W - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD OLD TEN MILE RD S and ends at MO 17 S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C W - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .114 mile(s) before MO 87 S and ends at .12 mile(s) after MO 87 S.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT C E - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .12 mile(s) before MO 87 S and ends at .114 mile(s) after MO 87 S.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 8 W - ST. FRANCOIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) after US 67 S and ends at CST MEADOW LN S.
Work is scheduled from 09-JUN-2025 to 15-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 8 E - ST. FRANCOIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST MEADOW LN S and ends at .001 mile(s) before US 67 S.
Work is scheduled from 09-JUN-2025 to 15-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 S - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) after RP IS35S TO US69 S and ends at .122 mile(s) after RP MO116 TO IS35S S.
Work is scheduled from 14-JUL-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 N - CLINTON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .181 mile(s) before RP IS35N TO MO116 N and ends at .024 mile(s) after RP US69 TO IS35N N.
Work is scheduled from 19-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 44 E - WEBSTER County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .516 mile(s) after RA IS44E CONWAY E and ends at .326 mile(s) before MO 185 S.
Work is scheduled from 09-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - FRANKLIN County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .319 mile(s) after MO 185 S and ends at .513 mile(s) before RA IS44W CONWAY W.
Work is scheduled from 09-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST BROADWAY E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .079 mile(s) after CST TRIMBLE RD E and ends at .011 mile(s) before US 63 S.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST BROADWAY W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) after US 63 S and ends at .079 mile(s) before CST TRIMBLE RD E.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT WW E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .02 mile(s) after CST BROADWAY E and ends at .053 mile(s) before CST LEGION LN E.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT WW W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .053 mile(s) after CST LEGION LN E and ends at .02 mile(s) before CST BROADWAY E.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT WW W - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .123 mile(s) after CST OLD HAWTHORNE DR WEST S and ends at .284 mile(s) before CST HOYLAKE DR S.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT WW E - BOONE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .284 mile(s) after CST HOYLAKE DR S and ends at .123 mile(s) before CST OLD HAWTHORNE DR WEST S.
Work is scheduled from 09-JUN-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - HOLT County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .382 mile(s) after CRD BEAGLE RD S and ends at .127 mile(s) before RP US59 TO IS29S S.
Work is scheduled from 28-MAY-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - HOLT County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .132 mile(s) before US 59 S and ends at .381 mile(s) before CRD BEAGLE RD S.
Work is scheduled from 28-MAY-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W S - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 79 S and ends at .018 mile(s) before RT B E.
Work is scheduled from 14-JUL-2025 to 22-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W N - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after RT B E and ends at MO 79 S.
Work is scheduled from 14-JUL-2025 to 22-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT WW W - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after RT W S and ends at .01 mile(s) after US 61 N.
Work is scheduled from 14-JUL-2025 to 22-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT WW E - PIKE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) before US 61 N and ends at .003 mile(s) before RT W S.
Work is scheduled from 14-JUL-2025 to 22-AUG-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP IS270W TO IS170E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 270 W and ends at IS 170 E.
Work is scheduled from 13-JUN-2025 to 01-DEC-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS70W TO IS170E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 W and ends at .009 mile(s) before IS 170 E.
Work is scheduled from 02-JUN-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT V N - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .022 mile(s) before CST NW LITTLE BLUE RD E and ends at .02 mile(s) after CST E 54TH TER E.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 104 E - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 21 S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 104 W - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 21 S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT N E - BOLLINGER County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 51 S and ends at .022 mile(s) after CST BELL ST E.
Work is scheduled from 16-JUN-2025 to 29-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT N W - CAPE GIRARDEAU County - EXPECT DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .022 mile(s) before CST BELL ST E and ends at MO 51 S.
Work is scheduled from 16-JUN-2025 to 29-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 155 S - PEMISCOT County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .879 mile(s) before US 412 E and ends at .046 mile(s) before US 412 E.
Work is scheduled from 09-JUN-2025 to 17-JUL-2025.
Work will start daily at 07:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 155 N - PEMISCOT County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .055 mile(s) after US 412 W and ends at .594 mile(s) after US 412 W.
Work is scheduled from 09-JUN-2025 to 17-JUL-2025.
Work will start daily at 07:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K E - REYNOLDS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .008 mile(s) before RT O E and ends at .001 mile(s) before CST SECOND ST E.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K W - IRON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) after CST SECOND ST E and ends at .008 mile(s) after RT O E.
Work is scheduled from 09-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP HANLEY RD TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at CST HANLEY RD S and ends at IS 170 W.
Work is scheduled from 13-JUL-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS64W TO BRENTWOOD BLVD N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .001 mile(s) before CST HANLEY RD S and ends at CST S BRENTWOOD BLVD S.
Work is scheduled from 16-JUL-2025 to 27-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT N E - DOUGLAS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 5 S and ends at MO 181 S.
Work is scheduled from 10-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT N W - OZARK County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 181 S and ends at MO 5 S.
Work is scheduled from 10-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - OSAGE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .201 mile(s) after CRD LOOSE CREEK HIGHWAY E and ends at .755 mile(s) after CRD MORRE RD E.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 29 N - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.332 mile(s) before RT Z E and ends at .341 mile(s) before CRD 280 ST E.
Work is scheduled from 27-JUN-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 S - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .342 mile(s) after CRD 280 ST E and ends at 1.341 mile(s) after RT Z E.
Work is scheduled from 27-JUN-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 435 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .039 mile(s) before RR PITTSBURG SUB S and ends at .139 mile(s) before RP IS435N TO GREGORY BLVD N.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .116 mile(s) before CST NW O BRIEN RD E and ends at .164 mile(s) after CST NW O BRIEN RD E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 S - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .022 mile(s) before RP IS35N TO IS670W W and ends at .097 mile(s) after RP IS35S TO EATON ST N.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 N - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .089 mile(s) before RP EATON ST TO IS35N N and ends at .03 mile(s) before CST W 14TH ST E.
Work is scheduled from 13-JUN-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RP US50E TO MO7 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 50 E and ends at MO 7 S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .193 mile(s) before RP US50E TO MO7 E and ends at .039 mile(s) after RP MO7 TO US50E E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 37 S - BARRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .044 mile(s) before CST COUNTY ST E and ends at .005 mile(s) before CST EDGEWOOD DR E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 37 N - BARRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after CST EDGEWOOD DR E and ends at .044 mile(s) after CST COUNTY ST E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone BU 60 W - LAWRENCE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 60 E and ends at .01 mile(s) after RT H S.
Work is scheduled from 12-JUN-2025 to 31-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone BU 60 E - BARRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) before RT H S and ends at US 60 E.
Work is scheduled from 12-JUN-2025 to 31-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7N TO US24W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 24 W.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US24W TO MO7 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 24 W and ends at MO 7 S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US24E TO MO7 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 24 E and ends at MO 7 S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7 TO US24E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 24 E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US50W TO RAYTOWN RD W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 W and ends at CST RAYTOWN RD S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP RAYTOWN RD TO US50W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST RAYTOWN RD S and ends at .001 mile(s) before IS 470 W.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US50E TO RAYTOWN RD E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 E and ends at CST RAYTOWN RD S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7 TO IS70E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at IS 70 E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP RAYTOWN RD TO US50E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST RAYTOWN RD S and ends at IS 470 E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .042 mile(s) before RP IS470E TO VIEW HIGH DR S and ends at .032 mile(s) after RP VIEW HIGH DR TO IS470E E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470W TO NE DOUGLAS ST S S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 W and ends at CST NE DOUGLAS ST S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP NE DOUGLAS ST N TO IS470W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE DOUGLAS ST N and ends at .012 mile(s) before IS 470 W.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP NE DOUGLAS ST S TO IS470E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE DOUGLAS ST S and ends at IS 470 E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470W TO BLUE RIDGE BLVD N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 W and ends at .023 mile(s) before CST BLUE RIDGE BLVD N.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .106 mile(s) before RP IS470E TO BLUE RIDGE BLVD S and ends at .084 mile(s) after RP BLUE RIDGE BLVD TO IS470E E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) before CST NORTHERN BLVD S and ends at .003 mile(s) after CST NORTHERN BLVD S.
Work is scheduled from 19-MAY-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST FOREST AVE S and ends at .008 mile(s) after CST CRISP AVE S.
Work is scheduled from 11-MAR-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 136 W - NODAWAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .023 mile(s) after RT J S and ends at .187 mile(s) after CRD 270 ST E.
Work is scheduled from 23-JUN-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 136 E - NODAWAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .187 mile(s) before CRD 270 ST E and ends at .023 mile(s) before RT J S.
Work is scheduled from 23-JUN-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 35 N - DAVIESS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .44 mile(s) before RP IS35N TO MO6 N and ends at .578 mile(s) after RP MO6 TO IS35N N.
Work is scheduled from 23-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 S - DAVIESS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .602 mile(s) before RP IS35S TO MO6 S and ends at .401 mile(s) after RP MO6 TO IS35S S.
Work is scheduled from 23-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT TT S - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD STONE RD E and ends at MO 90 E.
Work is scheduled from 07-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT TT N - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 90 E and ends at CRD STONE RD E.
Work is scheduled from 07-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT MM S - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 90 E and ends at CRD BENTON RD E.
Work is scheduled from 08-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT MM N - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD BENTON RD E and ends at MO 90 E.
Work is scheduled from 08-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT B W - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT BB E and ends at MO 43 S.
Work is scheduled from 14-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT B E - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 43 S and ends at RT BB E.
Work is scheduled from 14-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at OR 291 S and ends at .015 mile(s) after CST INDEPENDENCE AVE E.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST WILD HORSE CREEK RD E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .095 mile(s) before PVT LAUREY LN S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 N - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 946 E and ends at .607 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 S - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .607 mile(s) before CRD 946 E and ends at .004 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .048 mile(s) after CST OLD CAP AU GRIS RD E and ends at .316 mile(s) after CST DUGAN LN E.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .2 mile(s) before RP IS70W TO US63C N and ends at .021 mile(s) after RR COLT S.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.013 mile(s) after RP RTJ TO IS70W W and ends at 1.456 mile(s) before RP IS70W TO US65N N.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) before CST INDEPENDENCE AVE W and ends at OR 291 S.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .265 mile(s) before RP IS70W TO US54E E and ends at .613 mile(s) after RP US54W TO IS70W W.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .243 mile(s) after CRD FINCH DR S and ends at .299 mile(s) after RT CC S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .299 mile(s) before RT Y S and ends at .243 mile(s) before CRD FINCH DR S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .348 mile(s) before CRD HAMMER RD S and ends at .319 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .319 mile(s) before CRD HAMMER RD S and ends at .348 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 N - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) after MO 49 S and ends at .004 mile(s) before RT E E.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT E E and ends at .002 mile(s) before MO 49 S.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H N - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after CST CARRIE AVE E and ends at .005 mile(s) before CST HALL ST S.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone LP 44 E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) after OR 44 E and ends at .005 mile(s) after BU 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 44 W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before BU 65 S and ends at .008 mile(s) before CST BROADVIEW PL S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after OR 65 S and ends at .003 mile(s) after LP 44 E.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .319 mile(s) before CST N LINCOLN DR E and ends at .041 mile(s) before CST OLD CAP AU GRIS RD E.
Work is scheduled from 11-JUL-2024 to 15-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST CHESTNUT EXPY E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before LP 44 E and ends at .001 mile(s) before OR 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H S - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after CST HALL ST N and ends at .007 mile(s) before CST CARRIE AVE E.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before RR COLT S and ends at .183 mile(s) after RP US63C TO IS70E E.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.477 mile(s) after RP US65N TO IS70E E and ends at .948 mile(s) before RP IS70E TO RTJ E.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 W - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .015 mile(s) after RT OO S and ends at .038 mile(s) before CST FIFTH ST E.
Work is scheduled from 10-FEB-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .038 mile(s) after CST FIFTH ST E and ends at .015 mile(s) before RT OO S.
Work is scheduled from 10-FEB-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 S - SHANNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD 19A E and ends at .009 mile(s) before CRD 430 E.
Work is scheduled from 03-MAR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 N - OREGON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after CRD 430 E and ends at .024 mile(s) after CRD 19A E.
Work is scheduled from 03-MAR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .585 mile(s) before RP IS70E TO US54W W and ends at .259 mile(s) after RP US54E TO IS70E E.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 435 S - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .312 mile(s) after RP US69N TO IS435S S and ends at .145 mile(s) after RP PARVIN RD TO IS435S S.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 61 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST HENNINGS DR E and ends at .013 mile(s) after CRD 502 E.
Work is scheduled from 19-MAR-2025 to 29-AUG-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .013 mile(s) before CRD 502 E and ends at .002 mile(s) before CST BRUNT BLVD E.
Work is scheduled from 19-MAR-2025 to 29-AUG-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST DUNN RD E and ends at .001 mile(s) before CST CHAIN OF ROCKS BRG E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 6 W - KNOX County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after MO 15 S and ends at .039 mile(s) before OR 63 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .507 mile(s) before RP IS70W TO RTVV W and ends at .677 mile(s) after RP RTY TO IS70W W.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 125 N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .09 mile(s) after CST OLD ORCHARD DR S and ends at .008 mile(s) after OR 44 E.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST CHAIN OF ROCKS BRG E and ends at .001 mile(s) after CST DUNN RD E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 125 S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .008 mile(s) before OR 44 E and ends at .09 mile(s) before CST OLD ORCHARD DR S.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .121 mile(s) after RP LILAC AVE TO IS270E E and ends at .024 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) before RP IS270W TO RIVERVIEW DR W and ends at .069 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 6 E - SULLIVAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CST FRONT ST E and ends at .002 mile(s) before BU 63 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 6 W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after BU 63 S and ends at .002 mile(s) before CST FRONT ST E.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 6 E - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after OR 63 S and ends at .006 mile(s) before MO 15 S.
Work is scheduled from 16-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .651 mile(s) before RP IS70E TO RTY E and ends at .551 mile(s) after RP RTY TO IS70E E.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 E - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .05 mile(s) after OR 70 E and ends at .013 mile(s) before CST DUNN DR E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 151 N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after CST SWITZLER ST E and ends at .3 mile(s) after RP US36W TO MO151 N.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after CST LIGHTBURNE ST S and ends at .004 mile(s) before CST PLEASANT VALLEY RD W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) before CST PLEASANT VALLEY RD W and ends at CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 151 S - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .3 mile(s) before RP US36W TO MO151 N and ends at .009 mile(s) before CST SWITZLER ST W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) after CST DUNN DR E and ends at .05 mile(s) before OR 70 E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 60 W - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .096 mile(s) before CRD WHITE ROSE LN S and ends at .032 mile(s) before PVT HONOR CAMP LN S.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 60 E - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .032 mile(s) after PVT HONOR CAMP LN S and ends at .161 mile(s) before OR 60 E.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 17 S - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at RT AW S and ends at .004 mile(s) before US 63 S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .093 mile(s) after CST RESEARCH PARK CIR E and ends at .056 mile(s) after RP SPIRT OF ST LOUIS BLVD TO IS64E E.
Work is scheduled from 08-APR-2025 to 30-NOV-2025.
Work will start daily at 12:00 AM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 17 N - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .004 mile(s) after US 63 S and ends at RT AW S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .023 mile(s) after PVT SUNSWEPT PARK DR E and ends at .007 mile(s) before CRD CANDLEWYCK CLUB DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after RT N S and ends at .004 mile(s) after CST AIRFLIGHT DR S.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before CST AIRFLIGHT DR S and ends at .004 mile(s) before RT N S.
Work is scheduled from 17-MAR-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after CRD CANDLEWYCK CLUB DR E and ends at .023 mile(s) before PVT SUNSWEPT PARK DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after PED CARROLL ST OVERPASS S and ends at .013 mile(s) after CST WEBER RD E.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 E - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .246 mile(s) after CST FOURTH ST E and ends at .001 mile(s) before MO 39 S.
Work is scheduled from 14-APR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after MO 39 S and ends at .246 mile(s) before CST FOURTH ST E.
Work is scheduled from 14-APR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 6 W - DAVIESS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 69 S and ends at .004 mile(s) after MO 31 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 6 E - DEKALB County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before MO 31 S and ends at US 69 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 5 N - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .01 mile(s) before CST LOCUST ST E and ends at .016 mile(s) after CST VIEW DR E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 5 S - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before CST VIEW DR E and ends at .01 mile(s) after CST LOCUST ST E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .015 mile(s) after RP VANDEVENTER AVE TO IS64W W and ends at .017 mile(s) after CST 22ND ST S.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) before RP IS29S TO MO273 S and ends at .005 mile(s) before RP IS29S TO RTD S.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .026 mile(s) after RP RTD TO IS29N N and ends at .021 mile(s) after RP MO273 TO IS29N N.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 64 W - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .018 mile(s) before CST 22ND ST S and ends at .026 mile(s) after RP IS64W TO BOYLE AVE N.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .148 mile(s) after CRD COUNTY LINE RD E and ends at .061 mile(s) after CST RICHLAND PKWY E.
Work is scheduled from 16-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .177 mile(s) before CST OAKRIDGE DR S and ends at .013 mile(s) before CST HIGH ST S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CST HIGH ST S and ends at .004 mile(s) before CST OAKRIDGE DR S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT HH E and ends at .078 mile(s) after RT HH E.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .078 mile(s) before RT HH E and ends at RT HH E.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .142 mile(s) before RT CC S and ends at .02 mile(s) after RP IS55N TO US67N N.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 W - BARRY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at 1.075 mile(s) before MO 39 S and ends at .237 mile(s) after RT C E.
Work is scheduled from 21-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 248 E - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .165 mile(s) before PVT JUNCTION HOLLOW LN S and ends at .029 mile(s) after MO 13 S.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 E - BARRY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .237 mile(s) before RT C E and ends at 1.075 mile(s) after MO 39 S.
Work is scheduled from 21-MAY-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.069 mile(s) before RP IS70E TO RTJ E and ends at 1.966 mile(s) after RP RTJ TO IS70E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .86 mile(s) before RP IS55S TO RTP S and ends at .031 mile(s) after RT A E.
Work is scheduled from 24-APR-2025 to 29-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 248 W - STONE County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .029 mile(s) before MO 13 S and ends at .165 mile(s) after PVT JUNCTION HOLLOW LN S.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 176 E - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .116 mile(s) after US 65 N and ends at .003 mile(s) after CST LARKSPUR AVE S.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 176 W - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .003 mile(s) before CST LARKSPUR AVE S and ends at .116 mile(s) before US 65 N.
Work is scheduled from 23-JUN-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - JOHNSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .249 mile(s) before CRD 121 S and ends at .178 mile(s) before MO 58 E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD W VETERANS MEMORIAL PKWY W - WARREN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .256 mile(s) before RT B S and ends at .32 mile(s) after RT B S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD W VETERANS MEMORIAL PKWY E - WARREN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .32 mile(s) before RT B S and ends at .256 mile(s) after RT B S.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - MONTGOMERY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .031 mile(s) before RP IS70W TO RTE W and ends at .027 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 E - MONTGOMERY County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .034 mile(s) before RP IS70E TO RTE W and ends at .045 mile(s) after RP RTE TO IS70E E.
Work is scheduled from 12-MAY-2025 to 03-OCT-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after RP US67S TO RTDW W and ends at .016 mile(s) before RP DRTDE TO US67S S.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) after RP US67N TO RTDE E and ends at .01 mile(s) after RP RTDW TO US67N N.
Work is scheduled from 30-JUN-2025 to 06-NOV-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 S - BENTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .015 mile(s) after COE FISH HOOK RD E and ends at .066 mile(s) before RT UU S.
Work is scheduled from 27-MAY-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 N - BENTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .066 mile(s) after RT UU S and ends at .015 mile(s) before COE OMAHA RD E.
Work is scheduled from 27-MAY-2025 to 25-JUL-2025.
Work will start daily at 12:00 AM and end by 11:59 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .055 mile(s) before CST LINDEN DR E and ends at .015 mile(s) after CST STADIUM BLVD E.
Work is scheduled from 06-MAY-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 E - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before CST STADIUM BLVD E and ends at .022 mile(s) after CST LINDEN DR E.
Work is scheduled from 06-MAY-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 36 E - CALDWELL County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .483 mile(s) after RT P S and ends at .274 mile(s) before CRD ATLANTIC LOOP E.
Work is scheduled from 27-MAY-2025 to 06-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 36 W - LINN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .273 mile(s) after CRD ATLANTIC LOOP E and ends at .479 mile(s) before RT P S.
Work is scheduled from 27-MAY-2025 to 06-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .009 mile(s) after CRD SAPPINGTON BARRACKS RD E and ends at .003 mile(s) after CRD KINGSTON DR E.
Work is scheduled from 18-MAY-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 63 N - BOONE County - POSSIBLE DELAYS
MEDIAN OR SHOULDER
Work zone begins at .348 mile(s) after RP DISCOVERY PKWY TO US63N N and ends at .362 mile(s) before RP US63N TO MO740 E.
Work is scheduled from 19-MAY-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - WEBSTER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .065 mile(s) before OR 60 E and ends at .067 mile(s) after CST LYNCH DR S.
Work is scheduled from 27-MAY-2025 to 20-JUL-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone US 60 E - WEBSTER County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .068 mile(s) before CST LYNCH DR S and ends at .065 mile(s) after OR 60 E.
Work is scheduled from 27-MAY-2025 to 20-JUL-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Possible delays due to workzone RT P W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT T S and ends at RT J S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E S - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT Z S and ends at RT C S.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone N OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CST LAWRENCE ST E and ends at RT V E.
Work is scheduled from 23-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) before RP IS70E TO RTK S and ends at .018 mile(s) after CST SPENCER RD S.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone N OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT V E and ends at CST PARKER LN E.
Work is scheduled from 23-JUN-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) before CST SPENCER RD S and ends at .167 mile(s) after CST WOODLAWN AVE S.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone N OR 44 E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .086 mile(s) before CST HISTORIC US 66 E and ends at .002 mile(s) before RT V E.
Work is scheduled from 23-JUN-2025 to 11-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT P E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT J S and ends at RT T S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone N OR 44 W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after RT V E and ends at .086 mile(s) after CST HISTORIC US 66 E.
Work is scheduled from 23-JUN-2025 to 11-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 94 E - MONTGOMERY County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .009 mile(s) after MO 19 S and ends at .694 mile(s) after PVT POLO DOWNS PKWY S.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) after CRD TIFFANY SQUARE PKWY E and ends at .077 mile(s) before CST GREEN PARK RD E.
Work is scheduled from 27-MAY-2025 to 27-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 94 W - WARREN County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .694 mile(s) before PVT POLO DOWNS PKWY S and ends at .009 mile(s) before MO 19 S.
Work is scheduled from 02-JUN-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E N - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT C S and ends at RT Z S.
Work is scheduled from 02-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 40 E - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) before CST STERLING AVE S and ends at .039 mile(s) after CST OOIDA DR S.
Work is scheduled from 21-APR-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 40 W - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .039 mile(s) before CST OOIDA DR S and ends at .001 mile(s) after CST STERLING AVE S.
Work is scheduled from 21-APR-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 87 S - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .078 mile(s) before RT C E and ends at .063 mile(s) after RT C E.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 87 N - MONITEAU County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .063 mile(s) before RT C E and ends at .078 mile(s) after RT C E.
Work is scheduled from 02-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .169 mile(s) after CRD HICKLIN RD S and ends at .123 mile(s) after CST W KATIE TRL E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 24 E - JACKSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .123 mile(s) before CST W KATIE TRL E and ends at .169 mile(s) before CRD HICKLIN RD S.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .123 mile(s) before CST SPIRIT OF ST LOUIS BLVD S and ends at .088 mile(s) before RP IS64W TO NOR40E E.
Work is scheduled from 22-MAY-2025 to 12-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 24 E - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .158 mile(s) after MO 224 E and ends at .006 mile(s) after CRD E WALNUT ST E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 24 W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) before CRD E WALNUT ST E and ends at .158 mile(s) before MO 224 E.
Work is scheduled from 02-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) before RT OO S and ends at .108 mile(s) after CST BOONESS LN E.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .107 mile(s) before CST BOONESS LN E and ends at .003 mile(s) after RT OO S.
Work is scheduled from 27-MAY-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) after CST CENTRAL ST S and ends at .164 mile(s) after CRD BURNLEY RD S.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .163 mile(s) before CRD BURNLEY RD S and ends at .006 mile(s) before CST CENTRAL ST S.
Work is scheduled from 09-JUN-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT B S - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 32 E and ends at .025 mile(s) before RT F E.
Work is scheduled from 10-JUN-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 W - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .018 mile(s) after CST HICKORY ST S and ends at RT T S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 8 E - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT T S and ends at .018 mile(s) before CST HICKORY ST S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .025 mile(s) after RT F E and ends at MO 32 E.
Work is scheduled from 10-JUN-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .012 mile(s) after RT VV S and ends at .011 mile(s) before RT HH S.
Work is scheduled from 07-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .011 mile(s) after RT HH S and ends at .012 mile(s) before RT VV S.
Work is scheduled from 07-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 S - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CRD PASLEY RD E and ends at .005 mile(s) after CRD HUGHES DR E.
Work is scheduled from 04-JUN-2025 to 11-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 N - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) before CRD HUGHES DR E and ends at .006 mile(s) after CRD PASLEY RD E.
Work is scheduled from 04-JUN-2025 to 11-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .304 mile(s) before CRD SHEPHERD HILLS RD S and ends at .07 mile(s) before CO US54 W TO US54 E S.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after CO US60W TO US60E E and ends at .19 mile(s) after CRD 107 S.
Work is scheduled from 09-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .071 mile(s) after CO US54 W TO US54 E S and ends at .303 mile(s) after CRD SHEPHERD HILLS RD S.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 64 E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .001 mile(s) before RP IS64E TO BRENTWOOD BLVD S and ends at .09 mile(s) after RP IS170E TO IS64E E.
Work is scheduled from 13-JUL-2025 to 27-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 64 W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .011 mile(s) before RP BELLEVUE AVE TO IS64W W and ends at .036 mile(s) before RP HANLEY DR TO IS64W W.
Work is scheduled from 13-JUL-2025 to 27-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - GREENE County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .191 mile(s) before CRD 107 S and ends at .004 mile(s) before CO US60W TO US60E E.
Work is scheduled from 09-JUN-2025 to 31-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .069 mile(s) after RP US71N TO THE PASEO N and ends at .022 mile(s) after CST E 19TH ST E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .019 mile(s) before CST E 19TH ST E and ends at .081 mile(s) before CST E 25TH ST E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .032 mile(s) after CST E 27TH ST E and ends at .006 mile(s) before CST VINE ST S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .119 mile(s) before CST LINWOOD BLVD E and ends at .006 mile(s) before CST E 31ST ST E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .039 mile(s) after RP US71S TO MICHIGAN AVE S and ends at .119 mile(s) after CST E 39TH ST E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .098 mile(s) after RP US71S TO DR MARTIN LUTHER KING JR BLVD E E and ends at .028 mile(s) before CST CLEAVER II BLVD E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .156 mile(s) before CST NW O BRIEN RD E and ends at .122 mile(s) after CST NW O BRIEN RD E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .008 mile(s) before RP IS49N TO MO150W W and ends at .105 mile(s) before RP MO150E TO IS49N N.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - GASCONADE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .755 mile(s) before CRD MORRE RD E and ends at .201 mile(s) before CRD OLD 50 E.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .085 mile(s) after RP IS49S TO MO150E E and ends at .004 mile(s) after RP MO150W TO IS49S S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 S - COOPER County - POSSIBLE DELAYS
BRIDGE DECK SEALING
Work zone begins at .352 mile(s) after RR RIVER SUB E and ends at .258 mile(s) before CRD JACKS LN E.
Work is scheduled from 07-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 41 N - COOPER County - POSSIBLE DELAYS
BRIDGE DECK SEALING
Work zone begins at .258 mile(s) after CRD JACKS LN E and ends at .352 mile(s) before RR RIVER SUB E.
Work is scheduled from 07-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .017 mile(s) after RP US50W TO MO7 W and ends at .147 mile(s) after RP MO7 TO US50W W.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .072 mile(s) before RP IS470W TO VIEW HIGH DR N and ends at .042 mile(s) after RP VIEW HIGH DR TO IS470W W.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .058 mile(s) before RP IS470W TO BLUE RIDGE BLVD N and ends at .084 mile(s) after CST HILLCREST RD S.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .035 mile(s) before CST HARDY AVE S and ends at .009 mile(s) after CST NORTHERN BLVD S.
Work is scheduled from 12-JUN-2025 to 19-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - MILLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .315 mile(s) after RP MO17 TO US54W W and ends at .008 mile(s) before MO 242 E.
Work is scheduled from 18-JUN-2025 to 31-OCT-2025.
Work will start daily at 02:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 54 E - MILLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .025 mile(s) after MO 242 E and ends at .312 mile(s) before RP US54E TO MO17 E.
Work is scheduled from 18-JUN-2025 to 31-OCT-2025.
Work will start daily at 02:30 AM and end by 09:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone CST S EATHERTON RD S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .132 mile(s) before CST SKYWAY DR S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .01 mile(s) before CST WILD HORSE RANCH LN S and ends at MO 109 N.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .01 mile(s) after CST WILD HORSE RANCH LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .08 mile(s) after CST WILDWOOD POINT E and ends at RT CC E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC E and ends at .079 mile(s) before CST WILDWOOD POINT E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST S EATHERTON RD N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 N and ends at .132 mile(s) after CST SKYWAY DR S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WILD HORSE CREEK RD W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .094 mile(s) after PVT LAUREY LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - DALLAS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST ASH ST S and ends at .009 mile(s) before MO 32 E.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 S - DALLAS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) after MO 32 E and ends at .001 mile(s) after CST ASH ST S.
Work is scheduled from 16-JUN-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K S - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT Y S and ends at CRD GREENWOOD RD E.
Work is scheduled from 16-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K N - WRIGHT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD GREENWOOD RD E and ends at RT Y S.
Work is scheduled from 16-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .016 mile(s) after RT D E and ends at MO 114 E.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 114 E and ends at .016 mile(s) before RT D E.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.191 mile(s) after RP RTHH TO IS70E E and ends at .758 mile(s) before RP IS70E TO US54W W.
Work is scheduled from 17-JUN-2025 to 06-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .786 mile(s) after RP US54W TO IS70W W and ends at 1.182 mile(s) before RP IS70W TO RTM W.
Work is scheduled from 17-JUN-2025 to 06-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.065 mile(s) before RP IS70E TO RTJ E and ends at .17 mile(s) after RP US54E TO IS70E E.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .176 mile(s) before RP IS70W TO US54E E and ends at 1.065 mile(s) after RP RTJ TO IS70W W.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT K N - SHANNON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .023 mile(s) after RT KK E and ends at MO 19 S.
Work is scheduled from 30-JUN-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT K S - DENT County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 19 S and ends at .023 mile(s) before RT KK E.
Work is scheduled from 30-JUN-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT J E - DENT County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 72 E and ends at .001 mile(s) before MO 32 E.
Work is scheduled from 14-JUL-2025 to 25-JUL-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT J W - DENT County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .001 mile(s) after MO 72 E and ends at MO 72 E.
Work is scheduled from 14-JUL-2025 to 25-JUL-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 47 S - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .015 mile(s) before MO 21 S and ends at .141 mile(s) after PVT EDGEWOOD DR S.
Work is scheduled from 06-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 47 N - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .141 mile(s) before PVT EDGEWOOD DR S and ends at .015 mile(s) after MO 21 S.
Work is scheduled from 06-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT V E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 47 S and ends at .105 mile(s) before MO 100 E.
Work is scheduled from 23-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT V W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .105 mile(s) after MO 100 E and ends at MO 47 S.
Work is scheduled from 23-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - SCOTT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CST DAMES AVE E and ends at .001 mile(s) before OR 55 S.
Work is scheduled from 23-JUN-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - SCOTT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after OR 55 S and ends at .001 mile(s) after CST DAMES AVE E.
Work is scheduled from 23-JUN-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 W - FRANKLIN County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .065 mile(s) after CRD THIEBES RD S and ends at .148 mile(s) before CRD DECKER RD S.
Work is scheduled from 26-JUN-2025 to 31-JUL-2025.
Work will start daily at 08:30 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .148 mile(s) after CRD DECKER RD S and ends at .065 mile(s) before CRD THIEBES RD S.
Work is scheduled from 26-JUN-2025 to 31-JUL-2025.
Work will start daily at 08:30 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 N - GASCONADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .024 mile(s) before CRD LISKE RD S and ends at .029 mile(s) before CST 17TH ST E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - GASCONADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .029 mile(s) after CST 17TH ST E and ends at .024 mile(s) after CRD LISKE RD S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AB W - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) after CST LADUEMONT DR S and ends at .168 mile(s) after CST MASON RD S.
Work is scheduled from 18-JUN-2025 to 31-OCT-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 E - BARRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .252 mile(s) before CRD DOWNING ST S and ends at .051 mile(s) before MO 13 S.
Work is scheduled from 23-JUN-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 W - STONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .051 mile(s) after MO 13 S and ends at .252 mile(s) after CRD DOWNING ST S.
Work is scheduled from 23-JUN-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .014 mile(s) after CST UNION ST S and ends at .035 mile(s) after CST RIVER BLVD S.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 S - MCDONALD County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before RT EE E and ends at .001 mile(s) after RT H E.
Work is scheduled from 07-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - CAPE GIRARDEAU County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .001 mile(s) after CST WILSON RD E and ends at .004 mile(s) after CST BRITTANY DR S.
Work is scheduled from 30-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - CAPE GIRARDEAU County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) before CST BRITTANY DR S and ends at .088 mile(s) after LP 55 N.
Work is scheduled from 30-JUN-2025 to 31-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 76 W - TANEY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .083 mile(s) before PVT ROD EPPS LN E and ends at .128 mile(s) before CST TRUMPET CIR E.
Work is scheduled from 28-JUN-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 76 E - TANEY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .128 mile(s) after CST TRUMPET CIR E and ends at .083 mile(s) after PVT ROD EPPS LN E.
Work is scheduled from 28-JUN-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT F E - TANEY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .032 mile(s) before CRD LOWE RD S and ends at .114 mile(s) before CRD COUNTRY HILLS DR S.
Work is scheduled from 14-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:00 AM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT F W - TANEY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .114 mile(s) after CRD COUNTRY HILLS DR S and ends at .032 mile(s) after CRD LOWE RD S.
Work is scheduled from 28-JUN-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 63 N - PHELPS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .026 mile(s) after CRD 5300 E and ends at .017 mile(s) before RT W E.
Work is scheduled from 23-JUN-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 63 S - PHELPS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .017 mile(s) after RT W E and ends at .026 mile(s) before CRD 5300 E.
Work is scheduled from 23-JUN-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .213 mile(s) after RT O S and ends at .099 mile(s) after RT A S.
Work is scheduled from 07-JUL-2025 to 02-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .027 mile(s) before RP US67S TO IS55N N and ends at .055 mile(s) before RP IS55S TO US67S S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .031 mile(s) before RP IS55S TO US67S S and ends at .074 mile(s) after RT CC S.
Work is scheduled from 23-JUN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 60 E - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .484 mile(s) before CO US60E TO RTA N and ends at .103 mile(s) before RT NN S.
Work is scheduled from 07-JUL-2025 to 02-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 30 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CRD GRAVOIS LP E and ends at MO 21 S.
Work is scheduled from 30-JUN-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - FRANKLIN County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .069 mile(s) before RT BB S and ends at .014 mile(s) before CST MACARTHUR AVE S.
Work is scheduled from 30-JUN-2025 to 31-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - FRANKLIN County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .014 mile(s) after CST MACARTHUR AVE S and ends at .069 mile(s) after RT BB S.
Work is scheduled from 30-JUN-2025 to 31-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - FRANKLIN County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after CRD COUNTY LINE RD S and ends at .034 mile(s) before CRD SHOTWELL RD E.
Work is scheduled from 30-JUN-2025 to 31-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - FRANKLIN County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .034 mile(s) after CRD SHOTWELL RD E and ends at .005 mile(s) before CRD COUNTY LINE RD S.
Work is scheduled from 30-JUN-2025 to 31-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 N - STODDARD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .053 mile(s) before RP MO51 TO US60E E and ends at .113 mile(s) before MO 91 S.
Work is scheduled from 25-JUN-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 51 S - BOLLINGER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .113 mile(s) after MO 91 S and ends at .053 mile(s) after RP MO51 TO US60E E.
Work is scheduled from 25-JUN-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - MADISON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) after US 67 S and ends at .01 mile(s) after RT DD E.
Work is scheduled from 25-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. FRANCOIS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .01 mile(s) before RT DD E and ends at .004 mile(s) before US 67 S.
Work is scheduled from 25-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK S - MADISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT E E and ends at CRD 404 E.
Work is scheduled from 25-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK N - MADISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD 404 E and ends at RT E E.
Work is scheduled from 25-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 63 S - HOWELL County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .009 mile(s) before US 160 W and ends at .04 mile(s) before MO 17 S.
Work is scheduled from 07-JUL-2025 to 07-AUG-2025.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 63 N - HOWELL County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .04 mile(s) after MO 17 N and ends at .009 mile(s) after US 160 E.
Work is scheduled from 07-JUL-2025 to 07-AUG-2025.
Work will start daily at 09:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AB E - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .041 mile(s) before CST MASON RD S and ends at .026 mile(s) before CST WEXLER MANOR CT S.
Work is scheduled from 18-JUN-2025 to 31-OCT-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F S - MONTGOMERY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT V E and ends at OR 70 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F N - MONTGOMERY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at OR 70 E and ends at RT V E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - RIPLEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at US 160 E and ends at MO 142 E.
Work is scheduled from 09-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - RIPLEY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 142 E and ends at US 160 E.
Work is scheduled from 09-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 N - SHANNON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .051 mile(s) after US 60 W and ends at .001 mile(s) after CST RIVERVIEW DR E.
Work is scheduled from 07-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - SHANNON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before CST RIVERVIEW DR E and ends at .051 mile(s) before US 60 W.
Work is scheduled from 07-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 171 N - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .05 mile(s) after CRD 162 S and ends at .007 mile(s) after RP MO96 TO MO171N N.
Work is scheduled from 26-JUN-2025 to 15-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 171 S - JASPER County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .182 mile(s) before PED RUBY JACK TRAIL E and ends at .003 mile(s) before MO 96 E.
Work is scheduled from 26-JUN-2025 to 15-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 45 S - PLATTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .017 mile(s) before PVT PRIVATE RD E and ends at .454 mile(s) after CRD NW MAINLINER RD S.
Work is scheduled from 07-JUL-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 45 N - PLATTE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .454 mile(s) before CRD NW MAINLINER RD S and ends at .017 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 07-JUL-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 12 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST HARRIS AVE S and ends at .001 mile(s) before CST CRISP AVE S.
Work is scheduled from 27-JUN-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST CRISP AVE S and ends at .001 mile(s) before CST HARVARD AVE S.
Work is scheduled from 27-JUN-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 170 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .076 mile(s) before RP IS170W TO IS70E E and ends at .018 mile(s) after IS 70 W.
Work is scheduled from 23-JUN-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP MO7 TO US50E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 50 E.
Work is scheduled from 10-JUN-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .12 mile(s) after PVT PRIVATE DR S and ends at RT E S.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT F E - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT E S and ends at .12 mile(s) before PVT PRIVATE DR S.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT A S and ends at .199 mile(s) after CRD 129 S.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P E - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .199 mile(s) before CRD 129 S and ends at RT A S.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT Y W - LEWIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 16 E and ends at RT K E.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT Y E - LEWIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT K E and ends at MO 16 E.
Work is scheduled from 07-JUL-2025 to 30-SEP-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .248 mile(s) before RR CENTRAL MIDLAND E and ends at .008 mile(s) before CRD OLD HIGHWAY 100 E.
Work is scheduled from 14-JUL-2025 to 15-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 49 S - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .34 mile(s) after US 71 S and ends at 1.868 mile(s) after RP MO90 TO IS49S S.
Work is scheduled from 11-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 49 N - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.964 mile(s) before RP IS49N TO MO90 E and ends at .052 mile(s) before US 71 S.
Work is scheduled from 11-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 S - CLAY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .003 mile(s) after RP IS35S TO MO92 S and ends at .583 mile(s) after RP 19TH ST E TO IS35S S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT O S and ends at CRD AK-541 S.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT NN E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD AK-541 S and ends at RT O S.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AK S - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 14 E and ends at CRD AK-541 S.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AK N - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD AK-541 S and ends at MO 14 E.
Work is scheduled from 30-JUN-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT WW W - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .012 mile(s) after CRD WW-234 E and ends at RT C S.
Work is scheduled from 30-JUN-2025 to 30-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT WW E - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT C S and ends at .012 mile(s) before CRD WW-234 E.
Work is scheduled from 30-JUN-2025 to 30-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 76 E - TANEY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .584 mile(s) after RP MO376 TO MO76E E and ends at 1.012 mile(s) after RR AURORA SUB E.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT UU E - STONE County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at MO 86 E and ends at COE OLD HIGHWAY 86 E.
Work is scheduled from 14-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT UU W - STONE County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at COE OLD HIGHWAY 86 E and ends at MO 86 E.
Work is scheduled from 17-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K N - STONE County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at RT A E and ends at .009 mile(s) before RT M E.
Work is scheduled from 15-JUL-2025 to 29-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT B E - BARRY County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at MO 97 S and ends at MO 37 S.
Work is scheduled from 17-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P W - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .057 mile(s) after PVT HILL TRAIL CT S and ends at .054 mile(s) before CST TOWNVIEW DR S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P E - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .054 mile(s) after CST TOWNVIEW DR S and ends at .057 mile(s) before PVT HILL TRAIL CT S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 7 N - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .168 mile(s) after CST HERRING RD E and ends at RP US50E TO MO7 E.
Work is scheduled from 30-JUN-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT U E - NEW MADRID County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .003 mile(s) after RT WW E and ends at .047 mile(s) before CRD 727 S.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT U W - NEW MADRID County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .047 mile(s) after CRD 727 S and ends at .003 mile(s) before RT WW E.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT OO E - NEW MADRID County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at RT BB S and ends at CRD 525 S.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT OO W - MISSISSIPPI County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at CRD 525 S and ends at RT BB S.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AA W - MISSISSIPPI County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 77 S and ends at MO 80 E.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AA E - MISSISSIPPI County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 80 E and ends at MO 77 S.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O W - MISSISSIPPI County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at CRD 214 E and ends at CRD 221 S.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O E - MISSISSIPPI County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at CRD 221 S and ends at CRD 214 E.
Work is scheduled from 01-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 29 S - ANDREW County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .26 mile(s) before CRD 404 E and ends at .392 mile(s) after CRD 404 E.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 29 N - ANDREW County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .323 mile(s) before CRD 422 E and ends at .17 mile(s) after CRD 422 E.
Work is scheduled from 07-JUL-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST MURDOCH AVE W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) before IS 44 E and ends at .002 mile(s) before RP MURDOCH AVE TO IS44W W.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 N - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .074 mile(s) after IS 29 N and ends at .032 mile(s) before RP IS35N TO US69S S.
Work is scheduled from 16-JUL-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 35 S - CLAY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .062 mile(s) after RP PLEASANT VALLEY RD TO IS35S S and ends at .037 mile(s) after IS 29 N.
Work is scheduled from 16-JUL-2025 to 10-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 55 N - CAPE GIRARDEAU County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .48 mile(s) after RP US61 TO IS55N N and ends at .44 mile(s) before RP IS55N TO RTKK N.
Work is scheduled from 23-MAY-2025 to 15-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AF N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .01 mile(s) before IS 44 E and ends at .01 mile(s) after IS 44 W.
Work is scheduled from 06-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Possible delays due to workzone RT AF S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .013 mile(s) after RP IS44W TO RTAF N and ends at .015 mile(s) after IS 44 E.
Work is scheduled from 06-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Possible delays due to workzone RT MM E - JEFFERSON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .003 mile(s) after PVT FRANZ DR S and ends at .064 mile(s) before PVT PEACEFUL VALLEY E.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 05:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT MM W - JEFFERSON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .064 mile(s) after PVT BUCKEYE VALLEY RD E and ends at .003 mile(s) before PVT FRANZ DR S.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 05:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT MM E - JEFFERSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) before PVT FRANZ DR S and ends at .083 mile(s) before PVT PEACEFUL VALLEY E.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT MM W - JEFFERSON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .083 mile(s) after PVT BUCKEYE VALLEY RD E and ends at .011 mile(s) after PVT FRANZ DR S.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CST MARY DR E and ends at .035 mile(s) before CST GRANDVIEW PARK DR E.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .035 mile(s) after CST GRANDVIEW PARK DR E and ends at .022 mile(s) before CST BLACK OAK TRL S.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) before PVT PINE DR E and ends at .003 mile(s) after PVT NEW TOWNE RD E.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) before PVT NEW TOWNE RD E and ends at .008 mile(s) after PVT PINE DR E.
Work is scheduled from 01-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before MO 340 W and ends at .011 mile(s) before CST CORPORATE SQUARE DR S.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 86 E - NEWTON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) after CST BROOK ST E and ends at .054 mile(s) after CST N LINCOLN ST S.
Work is scheduled from 16-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 86 W - NEWTON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .054 mile(s) before CST N LINCOLN ST S and ends at .011 mile(s) before CST BROOK ST E.
Work is scheduled from 16-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone LP 49 S - JASPER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST 13TH ST E and ends at CST 17TH ST E.
Work is scheduled from 07-JUL-2025 to 05-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone LP 49 N - JASPER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST 17TH ST E and ends at CST 13TH ST E.
Work is scheduled from 07-JUL-2025 to 05-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 291 S - CLAY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .014 mile(s) before RR BROOKFIELD SUB E and ends at .149 mile(s) after RR BROOKFIELD SUB E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 291 N - JACKSON County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .152 mile(s) before RR BROOKFIELD SUB E and ends at .01 mile(s) after RR BROOKFIELD SUB E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 13 S - RAY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .572 mile(s) before RR RIVER SUB E and ends at .194 mile(s) after RR RIVER SUB E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 21 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD BUTLER HILL RD E and ends at CRD GREEN TRACE LN E.
Work is scheduled from 14-JUL-2025 to 01-AUG-2025.
Work will start daily at 09:00 AM and end by 03:30 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .033 mile(s) before CST E 27TH ST E and ends at .041 mile(s) after CST VAN BRUNT BLVD N.
Work is scheduled from 07-JUL-2025 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .079 mile(s) after CST JACKSON AVE S and ends at .024 mile(s) after RP E 23RD ST TO IS70W W.
Work is scheduled from 09-JUL-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .013 mile(s) before RP IS70E TO 23RD ST W and ends at .044 mile(s) after RP IS70E TO MYRTLE AVE E.
Work is scheduled from 09-JUL-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 62 W - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .339 mile(s) before MO 153 S and ends at .003 mile(s) before CST PATTERSON ST E.
Work is scheduled from 03-JUL-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 62 E - NEW MADRID County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after CST PATTERSON ST E and ends at .339 mile(s) after MO 153 S.
Work is scheduled from 03-JUL-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WEST OSAGE BEACH PKWY N - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .028 mile(s) before PVT CHATEAU LN S and ends at .019 mile(s) before US 54 E.
Work is scheduled from 07-JUL-2025 to 25-JUL-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - ST. LOUIS County - POSSIBLE DELAYS
SURVEYING
Work zone begins at .191 mile(s) after RP RTU TO IS70E E and ends at RP TUCKER BLVD TO IS70E E.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD LIBERTY RD E and ends at MO 8 E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 8 E and ends at CRD LIBERTY RD E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .027 mile(s) before CST CHESTNUT AVE S and ends at .032 mile(s) before CST INDIANA AVE S.
Work is scheduled from 08-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) after RP MYRTLE AVE TO IS70W W and ends at .002 mile(s) after CST TRUMAN RD E.
Work is scheduled from 08-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P S - PEMISCOT County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at 1.112 mile(s) before CRD 266 E and ends at .006 mile(s) after CST CLEVELAND ST E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT P N - PEMISCOT County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) before CST CLEVELAND ST E and ends at 1.112 mile(s) after CRD 266 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F E - CALLAWAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT J S and ends at .044 mile(s) before CST HOSPITAL DR S.
Work is scheduled from 07-JUL-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - CALLAWAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .044 mile(s) after CST HOSPITAL DR S and ends at RT J S.
Work is scheduled from 07-JUL-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT YY E - GREENE County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at CST COOPER BLVD E and ends at .224 mile(s) before CRD MUMFORD DR S.
Work is scheduled from 11-JUL-2025 to 31-AUG-2025.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C W - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST OLD HWY 66 S and ends at .001 mile(s) before CST OLD SPRINGFIELD RD E.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT C E - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CST OLD SPRINGFIELD RD E and ends at CST OLD HWY 66 S.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT JJ N - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST CEDAR E and ends at RT N E.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT JJ S - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at RT N E and ends at .001 mile(s) after CST CEDAR E.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N W - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST OLIVE E and ends at .01 mile(s) before IS 44 E.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT N E - CRAWFORD County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .01 mile(s) after IS 44 E and ends at .001 mile(s) after CST OLIVE E.
Work is scheduled from 07-JUL-2025 to 21-JUL-2025.
Work will start daily at 03:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP RTU TO IS155N N - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at RT U E and ends at .009 mile(s) before IS 155 N.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - CAPE GIRARDEAU County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .376 mile(s) after RT Y E and ends at .071 mile(s) before RP IS55S TO MAIN ST E.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - PERRY County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .267 mile(s) after RP MO51 TO IS55S S and ends at .7 mile(s) after RT K S.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - STE. GENEVIEVE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .006 mile(s) after RP IS55S TO RTN S and ends at .376 mile(s) before RP IS55S TO RTZ S.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55S TO RTKK S - CAPE GIRARDEAU County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at IS 55 S and ends at RT KK E.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone W OR 55 S - CAPE GIRARDEAU County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .663 mile(s) before PVT WOODVIEW LN S and ends at .346 mile(s) before PVT WOODVIEW LN S.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AB W - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST WEXLER MANOR CT S and ends at .001 mile(s) after CST LADUEMONT DR S.
Work is scheduled from 16-JUL-2025 to 13-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 E - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .037 mile(s) after RP US54E TO BU50 E and ends at .043 mile(s) after BU 50 E.
Work is scheduled from 14-JUL-2025 to 06-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 54 W - COLE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .043 mile(s) before BU 50 E and ends at .046 mile(s) before RP BU50 TO US54W W.
Work is scheduled from 14-JUL-2025 to 06-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS470E TO WOODS CHAPEL RD E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 E and ends at .004 mile(s) before CST NE WOODS CHAPEL RD E.
Work is scheduled from 15-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:30 AM and end by 07:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 S - BOLLINGER County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .081 mile(s) before MO 34 E and ends at CST SAMPLE ST E.
Work is scheduled from 14-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 34 E - WAYNE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .019 mile(s) after CST PINE ST E and ends at .177 mile(s) before CRD 341B S.
Work is scheduled from 11-JUL-2025 to 17-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 34 W - WAYNE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .177 mile(s) after CRD 341B S and ends at .019 mile(s) before CST PINE ST E.
Work is scheduled from 11-JUL-2025 to 17-NOV-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 N - BUTLER County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .03 mile(s) before CRD 632 E and ends at .244 mile(s) after CRD 627 E.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 S - BUTLER County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .244 mile(s) before CRD 627 E and ends at .03 mile(s) after CRD 632 E.
Work is scheduled from 11-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .762 mile(s) before RP IS70E TO RTT E and ends at .298 mile(s) before RP IS70E TO DAVID HOEKEL PKWY E.
Work is scheduled from 09-JUL-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .248 mile(s) before WS IS70W FORISTELL W and ends at .804 mile(s) after RP RTW TO IS70W W.
Work is scheduled from 09-JUL-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .029 mile(s) after RP IS70E TO WENTZVILLE PKWY E and ends at .053 mile(s) before RT A E.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RT A E and ends at .192 mile(s) after RP WENTZVILLE PKWY TO IS70W W.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 09:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at .002 mile(s) before CST PROSPECT RD E.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 W - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST PROSPECT RD E and ends at .006 mile(s) before RP PITMAN AVE TO US40W W.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .004 mile(s) before MO 364 E and ends at .004 mile(s) before RT K S.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:30 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 W - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .004 mile(s) after RT K S and ends at .006 mile(s) after MO 364 W.
Work is scheduled from 07-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:30 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP RTKS TO IS64E E - ST. CHARLES County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT K S and ends at IS 64 E.
Work is scheduled from 08-JUL-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after CST BROADWAY S and ends at US 63 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT H E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at .002 mile(s) before CST BROADWAY S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone S OR 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .1 mile(s) after PVT KENDALLWOOD DR S and ends at .007 mile(s) before CST E VETERANS MEMORIAL PKWY E.
Work is scheduled from 10-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone S OR 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .007 mile(s) after CST E VETERANS MEMORIAL PKWY E and ends at .1 mile(s) before PVT KENDALLWOOD DR S.
Work is scheduled from 10-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone S OR 70 E - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .22 mile(s) after CST VETERANS MEMORIAL PKWY E and ends at .534 mile(s) before CST SEEGER LN S.
Work is scheduled from 10-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone S OR 70 W - WARREN County - EXPECT DELAYS
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Work zone begins at .534 mile(s) after CST SEEGER LN S and ends at .22 mile(s) before CST VETERANS MEMORIAL PKWY E.
Work is scheduled from 10-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone MO 42 E - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CO RT C TO MO42 S and ends at .01 mile(s) after CRD MILL CREEK RD E.
Work is scheduled from 16-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 42 W - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) before CRD MILL CREEK RD E and ends at .001 mile(s) before CO RT C TO MO42 S.
Work is scheduled from 16-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C S - MILLER County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 17 S and ends at CRD SAND ROCK RD S.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C N - MILLER County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at CRD SAND ROCK RD S and ends at MO 17 S.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 435 S - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .287 mile(s) after CST N LEVEE RD E and ends at .032 mile(s) before US 24 W.
Work is scheduled from 14-JUL-2025 to 31-AUG-2025.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 435 N - JACKSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .032 mile(s) after US 24 E and ends at .285 mile(s) before CST N LEVEE RD E.
Work is scheduled from 14-JUL-2025 to 31-AUG-2025.
Work will start daily at 07:30 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 38 W - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .025 mile(s) before CST MABON ST S and ends at .064 mile(s) before CST ROLLA ST E.
Work is scheduled from 09-JUL-2025 to 10-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 38 E - WRIGHT County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .064 mile(s) after CST ROLLA ST E and ends at .025 mile(s) after CST MABON ST S.
Work is scheduled from 09-JUL-2025 to 10-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 54 E and ends at CRD LOGAN E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at CRD LOGAN E and ends at US 54 E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT DD E and ends at US 54 E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 54 E and ends at RT DD E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT BB S and ends at RT N E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT N E and ends at RT BB S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 1 N - CLAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .003 mile(s) before CST BROOKTREE LN E and ends at CST 72ND ST E.
Work is scheduled from 14-JUL-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 1 S - CLAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at CST 72ND ST E and ends at .003 mile(s) after CST BROOKTREE LN E.
Work is scheduled from 14-JUL-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT M S - BATES County - POSSIBLE DELAYS
MOWING
Work zone begins at .034 mile(s) after RT B E and ends at OR 49 S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at OR 49 S and ends at .034 mile(s) before RT B E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT M S and ends at US 54 E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT C N - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 54 E and ends at RT M S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT OO E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT M S and ends at RT C S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT OO W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT C S and ends at RT M S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .067 mile(s) after LP 49 S and ends at .021 mile(s) before US 54 E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT K W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .021 mile(s) after US 54 E and ends at .067 mile(s) before LP 49 S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .017 mile(s) before RR NEVADA SUB S and ends at .008 mile(s) after RT NN S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .008 mile(s) before RT NN S and ends at .017 mile(s) after RR NEVADA SUB S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD E - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .077 mile(s) after OR 49 S and ends at RT B E.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD W - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT B E and ends at .077 mile(s) before OR 49 S.
Work is scheduled from 09-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST NATIONAL AVE S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .006 mile(s) after RP US60W TO S NATIONAL AVE S and ends at .003 mile(s) before RP S NATIONAL AVE TO US60E E.
Work is scheduled from 10-JUL-2025 to 15-SEP-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST NATIONAL AVE N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after RP US60E TO N NATIONAL AVE N and ends at .006 mile(s) before RP N NATIONAL AVE TO US60W W.
Work is scheduled from 10-JUL-2025 to 15-SEP-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD RIPA AVE E and ends at CRD KINGSTON DR E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP BOWLIN RD TO IS470E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE BOWLIN RD E and ends at .004 mile(s) before IS 470 E.
Work is scheduled from 09-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470E TO BOWLIN RD E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .011 mile(s) after IS 470 E and ends at CST NE BOWLIN RD E.
Work is scheduled from 09-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470W TO LAKEWOOD BLVD W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .007 mile(s) after IS 470 W and ends at CST NE LAKEWOOD BLVD E.
Work is scheduled from 09-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone N OR 44 E - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .006 mile(s) after CRD FRONTAGE RD E and ends at .001 mile(s) after RT F S.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone N OR 44 W - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT F S and ends at .006 mile(s) before CRD FRONTAGE RD E.
Work is scheduled from 14-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E E - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .319 mile(s) after CRD BLUFF TR E and ends at .047 mile(s) before RT NN E.
Work is scheduled from 16-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT E W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .047 mile(s) after RT NN E and ends at .319 mile(s) before CRD BLUFF TR E.
Work is scheduled from 16-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A E - CAMDEN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 54 W and ends at .015 mile(s) after CST FLORA DR E.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A W - CAMDEN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .015 mile(s) before CST FLORA DR E and ends at .097 mile(s) after US 54 E.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .018 mile(s) after CRD 3210 S and ends at .006 mile(s) after CRD 4060 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F E - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .006 mile(s) before CRD 4060 S and ends at .018 mile(s) before CRD 3210 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB W - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .132 mile(s) before CRD 3370 S and ends at .159 mile(s) after CRD 3370 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB E - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .159 mile(s) before CRD 3370 S and ends at .132 mile(s) after CRD 3370 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after CST DURWOOD BLVD E and ends at .003 mile(s) after CRD 2200 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .003 mile(s) before CRD 2200 E and ends at .002 mile(s) before CST DURWOOD BLVD E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V E - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) after CRD 2350 S and ends at CRD 2370 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT V W - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at CRD 2370 S and ends at .002 mile(s) before CRD 2350 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 89 S - OSAGE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .01 mile(s) before CRD 623 S and ends at .008 mile(s) before PVT LEROY LN E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 89 N - OSAGE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .008 mile(s) after PVT LEROY LN E and ends at .01 mile(s) after CRD 623 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U N - OSAGE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .008 mile(s) before RT DD E and ends at .004 mile(s) before CRD 607 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U S - OSAGE County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .004 mile(s) after CRD 607 E and ends at .008 mile(s) after RT DD E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O W - FRANKLIN County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .26 mile(s) after CRD AMERICAN INN RD S and ends at RT AT E.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT RB S - POLK County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at PK POMME DE TERRE LAKE S and ends at .001 mile(s) before RT PP E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT RB N - POLK County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT PP E and ends at PK POMME DE TERRE LAKE S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP W - POLK County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .015 mile(s) before CRD 370TH RD E and ends at .006 mile(s) before MO 83 S.
Work is scheduled from 17-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP E - POLK County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .006 mile(s) after MO 83 S and ends at .015 mile(s) after CRD 370TH RD E.
Work is scheduled from 17-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone BU 67 N - BUTLER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .027 mile(s) before CST WESTWOOD BLVD S and ends at .003 mile(s) after MO 53 S.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) before CST MILEVA CT S and ends at .006 mile(s) before PVT TREELINE DR E.
Work is scheduled from 01-APR-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H N - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .006 mile(s) after PVT TREELINE DR E and ends at .001 mile(s) after CST MILEVA CT S.
Work is scheduled from 01-APR-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M S - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at .025 mile(s) before MO 96 E and ends at MO 174 E.
Work is scheduled from 16-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M N - LAWRENCE County - EXPECT DELAYS
SEAL COAT OVERLAY
Work zone begins at MO 174 E and ends at .025 mile(s) after MO 96 E.
Work is scheduled from 16-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT B S - COLE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .011 mile(s) after RT W S and ends at CST 3RD ST E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT B N - OSAGE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CST 3RD ST E and ends at .011 mile(s) before RT W S.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 47 N - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before RT E S and ends at .002 mile(s) after CST LONG ST S.
Work is scheduled from 09-JUN-2025 to 26-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 47 S - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST LONG ST S and ends at .002 mile(s) after RT E S.
Work is scheduled from 09-JUN-2025 to 26-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at IS 435 N and ends at .485 mile(s) after RP RTH TO IS29N N.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at .532 mile(s) before RP IS29S TO RTH S and ends at .213 mile(s) before IS 435 S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .02 mile(s) before IS 270 W and ends at .021 mile(s) before CST OLIVE BLVD W.
Work is scheduled from 15-JUL-2025 to 26-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS29N TO MO6 N - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 29 N and ends at MO 6 E.
Work is scheduled from 13-JUL-2025 to 17-JUL-2025.
Work will start daily at 10:00 PM and end by 08:30 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 S - HARRISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) before CRD E 100 ST E and ends at .001 mile(s) before CRD E 200 AVE S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 N - HARRISON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) after CRD E 200 AVE S and ends at .014 mile(s) before CRD E 100 ST E.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) before CST BRIGHTWELL CT S and ends at CST NEW FLORISSANT RD NORTH S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Y W - PETTIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at US 65 S and ends at CST W 16TH ST E.
Work is scheduled from 16-JUL-2025 to 18-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 291 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .059 mile(s) after RR KEARNY SPUR S and ends at .004 mile(s) before CST BROWN ST S.
Work is scheduled from 14-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB E - DADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .105 mile(s) before CRD N DADE 101 S and ends at .001 mile(s) before CST WETZEL S.
Work is scheduled from 15-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT BB W - DADE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after CST WETZEL S and ends at .105 mile(s) after CRD N DADE 101 S.
Work is scheduled from 15-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F W - SALINE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .238 mile(s) before CRD LOTUS AVE S and ends at MO 41 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F E - SALINE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 41 S and ends at .238 mile(s) after CRD LOTUS AVE S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at CRD 110 S and ends at MO 126 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at MO 126 E and ends at CRD 110 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - JASPER County - POSSIBLE DELAYS
MOWING
Work zone begins at .325 mile(s) before RT K E and ends at .006 mile(s) after CO US160 TO RTTS S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .006 mile(s) before CO US160 TO RTTS S and ends at .325 mile(s) after RT K E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at CRD SE 40TH RD E and ends at US 160 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT U W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at CRD SE 40TH RD E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at .006 mile(s) before RT B E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT A S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .006 mile(s) after RT B E and ends at US 160 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT J S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at RT H E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT J N - JASPER County - POSSIBLE DELAYS
MOWING
Work zone begins at RT H E and ends at US 160 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .044 mile(s) after US 160 E and ends at MO 126 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT O N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at MO 126 E and ends at .044 mile(s) before US 160 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W S - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT V E and ends at US 160 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at US 160 E and ends at RT V E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .01 mile(s) after IS 49 S and ends at RT W S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT DD E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at RT W S and ends at .01 mile(s) before IS 49 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 126 W - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .043 mile(s) after CST FORREST S and ends at .071 mile(s) before CRD SW STATE LINE LN S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 126 E - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .071 mile(s) after CRD SW STATE LINE LN S and ends at .043 mile(s) before CST FORREST S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .018 mile(s) before CST CRYSLER AVE S and ends at .01 mile(s) after CST MAPLE AVE E.
Work is scheduled from 15-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .01 mile(s) before CST MAPLE AVE E and ends at .018 mile(s) after CST CRYSLER AVE S.
Work is scheduled from 15-JUL-2025 to 18-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT U E - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at .004 mile(s) before PK SHRINE RD E.
Work is scheduled from 14-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT U W - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after PK SHRINE RD E and ends at US 24 E.
Work is scheduled from 14-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT Y S - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT M E and ends at MO 22 E.
Work is scheduled from 16-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT Y N - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 22 E and ends at RT M E.
Work is scheduled from 16-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT C S - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at MO 151 S.
Work is scheduled from 17-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT C N - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 151 S and ends at US 24 E.
Work is scheduled from 17-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT CC E - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT C S and ends at MO 15 S.
Work is scheduled from 16-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT CC W - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at RT C S.
Work is scheduled from 16-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT TT E - BATES County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at CRD NW 5002 E and ends at .007 mile(s) after CRD NW 2001 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT TT W - BATES County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .007 mile(s) before CRD NW 2001 S and ends at CRD NW 5002 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 52 E - BATES County - POSSIBLE DELAYS
MOWING
Work zone begins at .033 mile(s) after CRD SW 14267 S and ends at .006 mile(s) after RT HH E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 52 W - HENRY County - POSSIBLE DELAYS
MOWING
Work zone begins at .006 mile(s) before RT HH E and ends at .033 mile(s) before CRD NW 14361 S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF S - BATES County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at CRD NW 14512 E and ends at RT F E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT FF N - BATES County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at RT F E and ends at CRD NW 14512 E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK S - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 90 E and ends at .003 mile(s) after CRD JACKET RD E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT KK N - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .003 mile(s) before CRD JACKET RD E and ends at MO 90 E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 3 N - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT U E and ends at .004 mile(s) after CST HALLEY ST E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 3 S - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before CST HALLEY ST E and ends at RT U E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 13 S - HENRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .049 mile(s) before CRD SW 450TH RD E and ends at .021 mile(s) before MO 52 W.
Work is scheduled from 14-JUL-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST CHESTNUT EXPY W - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) before CST BROADVIEW PL S and ends at .002 mile(s) after CST BROADVIEW PL S.
Work is scheduled from 14-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY E - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) before OR 44 E and ends at .003 mile(s) after OR 44 E.
Work is scheduled from 14-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST BROADVIEW PL N - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at LP 44 E and ends at .001 mile(s) after LP 44 W.
Work is scheduled from 14-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST BROADVIEW PL S - GREENE County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .001 mile(s) before LP 44 W and ends at LP 44 E.
Work is scheduled from 14-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .061 mile(s) before CST RICHLAND PKWY E and ends at .148 mile(s) before CRD COUNTY LINE RD E.
Work is scheduled from 16-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 64 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before RR METROLINK E and ends at .017 mile(s) before CST 8TH ST S.
Work is scheduled from 14-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP 22ND ST TO IS64E E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at OR 64 E and ends at .005 mile(s) before IS 64 E.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS64E TO 14TH ST E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 64 E and ends at CST 14TH ST S.
Work is scheduled from 14-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 180 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) before CST ORLANDO AVE S and ends at .003 mile(s) before CST BROWN RD S.
Work is scheduled from 17-JUL-2025 to 24-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT NN S - BARRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 90 E and ends at CRD 2295 E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT EE E - BARRY County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .931 mile(s) after MO 39 S and ends at .594 mile(s) after CRD 2120 S.
Work is scheduled from 16-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 43 S - VERNON County - POSSIBLE DELAYS
MOWING
Work zone begins at .04 mile(s) after US 54 E and ends at .041 mile(s) before RT V E.
Work is scheduled from 15-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 43 N - BARTON County - POSSIBLE DELAYS
MOWING
Work zone begins at .041 mile(s) after RT V E and ends at .04 mile(s) before US 54 E.
Work is scheduled from 15-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B E - BATES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT A E and ends at .573 mile(s) before CRD SE 4265 S.
Work is scheduled from 15-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B W - BATES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .573 mile(s) after CRD SE 4265 S and ends at RT A E.
Work is scheduled from 15-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST GARRISON AVE S - JASPER County - EXPECT DELAYS
MOWING
Work zone begins at RT V E and ends at .007 mile(s) before CST HIGH ST E.
Work is scheduled from 15-JUL-2025 to 17-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS64W TO BOONES CROSSING RD N - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at IS 64 W and ends at .133 mile(s) before CST BOONES CROSSING RD N.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 04:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST SIX FLAGS RD N - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .027 mile(s) after LP 44 W and ends at .026 mile(s) after OR 44 E.
Work is scheduled from 17-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 44 W - WEBSTER County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .941 mile(s) before RP IS44W TO RTB N and ends at .751 mile(s) before RP IS44W TO RTB N.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 09:00 PM and end by 11:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 N - GREENE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .052 mile(s) before RP US65N TO RTDW W and ends at .001 mile(s) before RP RTDW TO US65N N.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:30 PM and end by 09:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .336 mile(s) after RR DESOTO SUB S and ends at .042 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 28-FEB-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 412 W - DUNKLIN County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at CRD 568 E and ends at .009 mile(s) after CRD 629 S.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 412 E - DUNKLIN County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .009 mile(s) before CRD 507 S and ends at CRD 568 E.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .502 mile(s) after RP RTO TO IS55S S and ends at .968 mile(s) after RP RTO TO IS55S S.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .691 mile(s) after RT J E and ends at 1.624 mile(s) before RP IS55S TO MO84 W.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT U E - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .135 mile(s) before RP RTU TO IS155S S and ends at .007 mile(s) before RP IS155N TO RTU N.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT U W - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .007 mile(s) after RP RTU TO IS155N N and ends at .135 mile(s) after RP RTU TO IS155S S.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP MO32 TO US67N N - ST. FRANCOIS County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .004 mile(s) after MO 32 W and ends at .005 mile(s) before US 67 N.
Work is scheduled from 17-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at US 65 N and ends at .012 mile(s) before RT H N.
Work is scheduled from 17-JUL-2025 to 18-JUL-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO94E TO SOR94 E - ST. CHARLES County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at MO 94 E and ends at OR 94 E.
Work is scheduled from 17-JUL-2025 to 17-JUL-2025.
Work will start daily at 07:00 PM and end by 08:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 21 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .026 mile(s) after CRD COVENTRY LN E and ends at PVT HERITAGE DR E.
Work is scheduled from 17-JUL-2025 to 24-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 21 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at PVT HERITAGE DR E and ends at .026 mile(s) before CRD COVENTRY LN E.
Work is scheduled from 17-JUL-2025 to 24-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 169 N - CLAY County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .085 mile(s) after RP LOU HOLLAND DR TO US169N N and ends at .021 mile(s) after RR UNKNOWN SIDING S.
Work is scheduled from 17-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 388 work zone(s) planned for a future date.

Future work zone(s) 388 Future work zone(s)
Future work zone RP US65N TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .006 mile(s) after US 65 N and ends at IS 44 W.
Work is scheduled from 18-JUL-2025 to 19-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 291 S - JACKSON County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .018 mile(s) after IS 470 W and ends at .002 mile(s) after CST SE HAMBLEN RD S.
Work is scheduled from 29-JUL-2025 to 29-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 13 N - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .036 mile(s) after PVT GOLDEN PLAZA - WALMART E and ends at .17 mile(s) after OR 44 E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 13 S - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .162 mile(s) before OR 44 E and ends at .036 mile(s) before PVT GOLDEN PLAZA - WALMART E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 291 N - JACKSON County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .011 mile(s) after US 50 W and ends at .037 mile(s) after IS 470 E.
Work is scheduled from 29-JUL-2025 to 29-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO RTA S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .13 mile(s) after CST STATE HWY 79 OLD S and ends at .046 mile(s) after RP RTC TO MO79 E.
Work is scheduled from 29-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP INDIANA AVE TO IS70W W - JACKSON County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST TRUMAN RD E and ends at .039 mile(s) before IS 70 W.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 07:30 AM and end by 07:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 19 S and ends at CRD SIG BASS RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD SIG BASS RD E and ends at MO 19 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone S OR 44 W - CRAWFORD County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at .003 mile(s) before RT H E and ends at OR 44 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone S OR 44 E - CRAWFORD County - POSSIBLE DELAYS
DIAMOND GRINDING
Work zone begins at OR 44 E and ends at .003 mile(s) after RT H E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP BLUE RIDGE BLVD TO IS470E E - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at CST BLUE RIDGE BLVD S and ends at IS 470 E.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 30 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST LOCKHAVEN CT E and ends at .017 mile(s) after CRD SAPPINGTON RD S.
Work is scheduled from 21-JUL-2025 to 28-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - BOONE County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .006 mile(s) after CST E SMITH E and ends at .007 mile(s) before CST W PATTON ST E.
Work is scheduled from 26-AUG-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V N - BOONE County - POSSIBLE DELAYS
PAVEMENT MARKING
Work zone begins at .007 mile(s) after CST E PATTON ST E and ends at .006 mile(s) before CST E SMITH E.
Work is scheduled from 26-AUG-2025 to 29-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - MILLER County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 42 E and ends at .306 mile(s) after CRD KENSER CREEK RD S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - MARIES County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .306 mile(s) before CRD KENSER CREEK RD S and ends at MO 42 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP MEMORIAL DR TO IS44W W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at OR 44 W and ends at IS 44 W.
Work is scheduled from 12-AUG-2025 to 19-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS44E TO PARK AVE N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at IS 44 E and ends at CST PARK AVE E.
Work is scheduled from 11-AUG-2025 to 18-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP 8TH ST TO IS44E E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at CST MARION ST E and ends at .015 mile(s) before IS 44 E.
Work is scheduled from 11-AUG-2025 to 18-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH W - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 3 S and ends at CRD GIFFORD TRL S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH E - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD GIFFORD TRL S and ends at MO 3 S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .528 mile(s) after CST FIRMA RD S and ends at .036 mile(s) before CST MAPLE LEAF LN E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT NN W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT E E and ends at CRD KETTLE RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE S - RALLS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT J S and ends at MO 19 S.
Work is scheduled from 28-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT NN E - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD KINFOLK RD E and ends at RT E E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 N - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .124 mile(s) after CST FIRMA RD S and ends at .22 mile(s) before RT Y E.
Work is scheduled from 04-AUG-2025 to 05-AUG-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .036 mile(s) after CST MAPLE LEAF LN E and ends at .528 mile(s) before CST FIRMA RD S.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O E - MORGAN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 5 S and ends at .002 mile(s) after PVT MILLSTONE EST S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - ST. CHARLES County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .22 mile(s) after RT Y E and ends at .124 mile(s) before CST FIRMA RD S.
Work is scheduled from 04-AUG-2025 to 05-AUG-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE N - RALLS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 19 S and ends at RT J S.
Work is scheduled from 28-JUL-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at 1.005 mile(s) after CRD 1147 S and ends at 1.047 mile(s) before RP IS44E TO MO174 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at 1.011 mile(s) after RP MO174 TO IS44W W and ends at 1.005 mile(s) before CRD 1147 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .085 mile(s) before MO 96 E and ends at .036 mile(s) after MO 96 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT O W - MORGAN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) before PVT MILLSTONE EST S and ends at MO 5 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - MORGAN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 5 S and ends at CRD P RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - MORGAN County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at CRD P RD E and ends at MO 5 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 89 S - OSAGE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at US 50 E and ends at .082 mile(s) before PVT TURNER LN S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 89 N - OSAGE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .082 mile(s) after PVT TURNER LN S and ends at US 50 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 W - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .076 mile(s) after CRD SUNDOWN LN S and ends at .011 mile(s) before RT F E.
Work is scheduled from 24-JUL-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - TANEY County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .011 mile(s) after RT F E and ends at .076 mile(s) before CRD SUNDOWN LN S.
Work is scheduled from 24-JUL-2025 to 31-AUG-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT U S - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 136 E and ends at US 63 S.
Work is scheduled from 07-AUG-2025 to 07-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U N - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at US 136 E.
Work is scheduled from 07-AUG-2025 to 07-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after CST MAIN ST S and ends at .628 mile(s) after BK KATY TRAIL E.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT Y W - HICKORY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .445 mile(s) before CRD 124 E and ends at .046 mile(s) before CRD 124 E.
Work is scheduled from 24-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y E - HICKORY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .046 mile(s) after CRD 124 E and ends at .445 mile(s) after CRD 124 E.
Work is scheduled from 24-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - WAYNE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .17 mile(s) before CRD 543 E and ends at .274 mile(s) after CRD 543 E.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 229 S - BUCHANAN County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .01 mile(s) before CST 22ND ST S and ends at IS 29 S.
Work is scheduled from 21-JUL-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 169 N - CLAY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .324 mile(s) before RP US169N TO CST 108TH ST E and ends at .008 mile(s) before RP US169N TO NW COOKINGHAM DR E.
Work is scheduled from 23-JUL-2025 to 15-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 229 N - BUCHANAN County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at IS 29 N and ends at .001 mile(s) after CST 22ND ST S.
Work is scheduled from 21-JUL-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 79 N - ST. CHARLES County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .015 mile(s) before RP IS70W TO MO79S S and ends at .071 mile(s) before CST TURNER BLVD W.
Work is scheduled from 18-JUL-2025 to 19-JUL-2025.
Work will start daily at 09:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone CST JACKSON ST W - WEBSTER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .006 mile(s) after MO 38 E and ends at MO 38 E.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST JACKSON ST E - WEBSTER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 38 E and ends at .006 mile(s) before MO 38 E.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 170 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .041 mile(s) after RP IS170W TO MO115S S and ends at .006 mile(s) after RP IS170W TO IS70W W.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT V N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CRD 346 E and ends at RT FF E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at RT FF E and ends at .001 mile(s) after CRD 346 E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS170W TO IS70W W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at IS 170 W and ends at IS 70 W.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 100 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST NEW BALLWIN RD S and ends at CST MAPLE LN S.
Work is scheduled from 19-JUL-2025 to 20-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST MAPLE LN S and ends at CST NEW BALLWIN RD S.
Work is scheduled from 19-JUL-2025 to 20-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD HUTT RD S - JACKSON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before US 50 E and ends at .017 mile(s) after US 50 E.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .03 mile(s) before OR 70 E.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT B N - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .03 mile(s) after OR 70 E and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT V N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 332 E and ends at CRD 344 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 344 E and ends at CRD 332 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 157 N - ADAIR County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at CRD THOUSAND HILLS TRL S and ends at MO 6 E.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 157 S - ADAIR County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at MO 6 E and ends at CRD THOUSAND HILLS TRL S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS170W TO IS70W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 W and ends at IS 70 W.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .527 mile(s) before RP IS44W TO MO744 E and ends at .131 mile(s) before RP IS44W TO MO744 E.
Work is scheduled from 28-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .072 mile(s) after RP IS44E TO RTH S and ends at .032 mile(s) before RP RTH TO IS44E E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .028 mile(s) after RP IS44W TO RTH N and ends at .047 mile(s) before RP RTH TO IS44W W.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT OO W - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at CRD 375 S and ends at .014 mile(s) after CRD 379 S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .255 mile(s) before RR AURORA SUB E and ends at .285 mile(s) after RR AURORA SUB E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .289 mile(s) before RR AURORA SUB E and ends at .251 mile(s) after RR AURORA SUB E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - SULLIVAN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT FF S and ends at MO 149 S.
Work is scheduled from 23-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 149 S and ends at RT FF S.
Work is scheduled from 23-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U N - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at RT D E.
Work is scheduled from 28-JUL-2025 to 29-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT V E and ends at RT A S.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT A S and ends at RT V E.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST TRUMAN RD W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after CST WYANDOTTE ST S and ends at CST BROADWAY BLVD S.
Work is scheduled from 19-JUL-2025 to 19-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT N S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 584 E and ends at CRD 595 S.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A E - CAMDEN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .007 mile(s) after US 54 E and ends at .005 mile(s) before CRD MIDWAY DR S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A W - CAMDEN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .005 mile(s) after CRD DUSTY TRL S and ends at .007 mile(s) before US 54 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT D E and ends at US 63 S.
Work is scheduled from 28-JUL-2025 to 29-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone S OR 70 E - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST VETERANS MEMORIAL PKWY E and ends at .023 mile(s) before PVT KENDALLWOOD DR S.
Work is scheduled from 28-JUL-2025 to 29-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone S OR 70 W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .023 mile(s) after PVT KENDALLWOOD DR S and ends at .021 mile(s) before CST VETERANS MEMORIAL PKWY E.
Work is scheduled from 28-JUL-2025 to 29-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT O S - NEWTON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .12 mile(s) before CRD QUEENS LACE DR E and ends at .078 mile(s) after CRD REDBUD RD E.
Work is scheduled from 08-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O E - SCHUYLER County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 63 S and ends at CRD GERMANIA AVE E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O W - SCHUYLER County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD HEREFORDALE DR E and ends at US 63 S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - SCHUYLER County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 63 S and ends at CRD W GROVE DR S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - SCHUYLER County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD W GROVE DR S and ends at US 63 S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF N - LINCOLN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD WELCH RD E and ends at .002 mile(s) before US 61 N.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF S - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after US 61 N and ends at CRD WELCH RD E.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 304 E and ends at US 61 N.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 32 E and ends at US 61 S.
Work is scheduled from 04-AUG-2025 to 05-SEP-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z N - BOONE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .047 mile(s) after RP IS70W TO RTZ W and ends at .054 mile(s) before RT OO E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - BOONE County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .054 mile(s) after RT OO E and ends at .047 mile(s) before RP IS70W TO RTZ W.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT TT S and ends at MO 149 S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - MACON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 149 S and ends at RT TT S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - COOPER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT H S and ends at RT B S.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - COOPER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT B S and ends at RT H S.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO94E TO RTN S - ST. CHARLES County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .017 mile(s) after MO 94 E and ends at RT N E.
Work is scheduled from 23-JUL-2025 to 24-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - LINCOLN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT Z E and ends at CRD 304 E.
Work is scheduled from 28-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 61 N and ends at CRD 318 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 318 E and ends at RT Z E.
Work is scheduled from 28-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP VANDEVENTER AVE TO IS44W W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at CST VANDEVENTER AVE S and ends at IS 44 W.
Work is scheduled from 05-AUG-2025 to 12-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - NEWTON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .078 mile(s) before CRD REDBUD RD E and ends at .12 mile(s) after CRD QUEENS LACE DR E.
Work is scheduled from 08-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 670 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before RP IS670W TO TRUMAN RD W and ends at .008 mile(s) after CST BROADWAY BLVD S.
Work is scheduled from 19-JUL-2025 to 19-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT N N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 584 E and ends at CRD 591 S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .024 mile(s) before RP IS44E TO LP44W W and ends at .042 mile(s) after RP MO13N TO IS44E E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .019 mile(s) before RP IS44W TO NORTON RD E and ends at .17 mile(s) after MO 266 E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT OO N - MARION County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 230 E and ends at MO 168 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO S - MARION County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 168 E and ends at CRD 230 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 S - STONE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST HIGH ST E and ends at .018 mile(s) before CST DOGWOOD LN E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - NEWTON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at LP 49 S and ends at CRD ROWAN DR E.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT AA E - NEWTON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD ROWAN DR E and ends at LP 49 S.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT N S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 591 S and ends at CRD 584 E.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 265 N - STONE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .018 mile(s) after CST DOGWOOD LN E and ends at .002 mile(s) after CST HIGH ST E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 595 S and ends at CRD 584 E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .061 mile(s) after RP IS44E TO LAFAYETTE AVE E and ends at .005 mile(s) after CST NEBRASKA AVE S.
Work is scheduled from 06-AUG-2025 to 13-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .172 mile(s) before CST GASCONADE ST E and ends at .017 mile(s) after CST BROADWAY ST S.
Work is scheduled from 11-AUG-2025 to 18-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O N - HENRY County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at .193 mile(s) after CRD NW 724-P E and ends at .011 mile(s) after CRD NW-950 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O S - HENRY County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at .011 mile(s) before CRD NW-950 E and ends at .193 mile(s) before CRD NW 724-P E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - CEDAR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after CRD 725 S and ends at .025 mile(s) before CRD 975 S.
Work is scheduled from 18-AUG-2025 to 16-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS170E TO IS64E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .01 mile(s) after IS 170 E and ends at .039 mile(s) before IS 64 E.
Work is scheduled from 23-JUL-2025 to 08-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT B W - CEDAR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .025 mile(s) after CRD 975 S and ends at .014 mile(s) before CRD 725 S.
Work is scheduled from 18-AUG-2025 to 16-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT OO W - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before US 61 N and ends at CRD HOBART RD E.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 S - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .019 mile(s) before CST STURGEON ST S and ends at .131 mile(s) before CRD STRUBE RD E.
Work is scheduled from 18-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .131 mile(s) after CRD STRUBE RD E and ends at .019 mile(s) after CST STURGEON ST S.
Work is scheduled from 18-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT OO E - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD HOBART RD E and ends at .001 mile(s) after US 61 N.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - SCHUYLER County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CRD W GROVE DR S and ends at US 63 S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - SCHUYLER County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 63 S and ends at CRD W GROVE DR S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - NEWTON County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .043 mile(s) after MO 43 N and ends at .021 mile(s) after RP MO97 TO IS44E E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .025 mile(s) before RP IS44W TO MO97 W and ends at .037 mile(s) after MO 43 S.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - DEKALB County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .017 mile(s) before CST VICTORY ST E and ends at .001 mile(s) after CST SE HILLCREST DR S.
Work is scheduled from 28-JUL-2025 to 11-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT N E - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .031 mile(s) after RT O S and ends at .04 mile(s) before CRD NW-501 S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N W - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .04 mile(s) after CRD NW-501 S and ends at .031 mile(s) before RT O S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - PEMISCOT County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .592 mile(s) after RP RTE TO IS55N N and ends at .342 mile(s) after CRD 547 S.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .048 mile(s) before RP RTB TO IS44E E and ends at .8 mile(s) after RP RTB TO IS44E E.
Work is scheduled from 27-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS470W TO PRYOR RD S - JACKSON County - EXPECT DELAYS
CORE DRILLING
Work zone begins at IS 470 W and ends at .002 mile(s) after MO 350 W.
Work is scheduled from 23-JUL-2025 to 25-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AT E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .043 mile(s) after US 50 E and ends at MO 100 E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AT W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 100 E and ends at .043 mile(s) before US 50 E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO249N TO MO171N N - JASPER County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at MO 249 N and ends at .096 mile(s) before MO 171 N.
Work is scheduled from 04-AUG-2025 to 07-AUG-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 169 N - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .674 mile(s) after CRD 190TH RD E and ends at .68 mile(s) after CRD 190TH RD E.
Work is scheduled from 28-JUL-2025 to 12-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 169 S - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .68 mile(s) before CRD 190TH RD E and ends at .674 mile(s) before CRD 190TH RD E.
Work is scheduled from 28-JUL-2025 to 12-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT PP E - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .213 mile(s) before CRD SALT LICK AVE S and ends at .018 mile(s) before CRD SALT LICK AVE S.
Work is scheduled from 28-JUL-2025 to 14-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT PP W - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .018 mile(s) after CRD SALT LICK AVE S and ends at .213 mile(s) after CRD SALT LICK AVE S.
Work is scheduled from 28-JUL-2025 to 14-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 97 N - CEDAR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .021 mile(s) after CRD 1550 E and ends at .03 mile(s) before CRD 1450 E.
Work is scheduled from 11-AUG-2025 to 15-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 97 S - CEDAR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .03 mile(s) after CRD 1450 E and ends at .021 mile(s) before CRD 1550 E.
Work is scheduled from 11-AUG-2025 to 15-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 55 N - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .02 mile(s) before MO 74 E and ends at .013 mile(s) after MO 74 E.
Work is scheduled from 20-JUL-2025 to 21-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 136 E and ends at RT D E.
Work is scheduled from 04-AUG-2025 to 05-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V E - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT D E and ends at US 136 E.
Work is scheduled from 04-AUG-2025 to 05-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS64E TO BRENTWOOD BLVD S - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at IS 64 E and ends at CST S BRENTWOOD BLVD S.
Work is scheduled from 23-JUL-2025 to 08-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone RP IS64E TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at IS 64 E and ends at .074 mile(s) after RP IS64W TO IS170W W.
Work is scheduled from 23-JUL-2025 to 08-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone RP IS44E TO VANDEVENTER AVE S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at IS 44 E and ends at OR 44 E.
Work is scheduled from 05-AUG-2025 to 12-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at US 61 S and ends at CRD 286 S.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 286 S and ends at US 61 S.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 59 S - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .019 mile(s) after CRD MT SHIRA RD S and ends at .246 mile(s) after CRD MT SHIRA RD S.
Work is scheduled from 07-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 59 N - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .246 mile(s) before CRD MT SHIRA RD S and ends at .019 mile(s) before CRD MT SHIRA RD S.
Work is scheduled from 07-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B N - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) after PVT RANCH RD E and ends at .009 mile(s) before CRD 1130 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .009 mile(s) after CRD 1130 S and ends at .004 mile(s) before PVT RANCH RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .043 mile(s) after MO 14 E and ends at .022 mile(s) after CST BUTTERFIELD DR E.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .022 mile(s) before CST BUTTERFIELD DR E and ends at .043 mile(s) before MO 14 E.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - JASPER County - ALL LANES CLOSED
RAILROAD MAINTENANCE
Work zone begins at .078 mile(s) before RR AURORA SUB E and ends at .018 mile(s) before CST 1ST ST E.
Work is scheduled from 24-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT U S and ends at .001 mile(s) before RT V E.
Work is scheduled from 06-AUG-2025 to 06-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - SCHUYLER County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after RT V E and ends at RT U S.
Work is scheduled from 06-AUG-2025 to 06-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 157 N - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD THOUSAND HILLS TRL S and ends at MO 6 E.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 157 S - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 6 E and ends at CRD THOUSAND HILLS TRL S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C N - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .766 mile(s) after CRD SILVERS RD S and ends at .04 mile(s) after RT B E.
Work is scheduled from 07-AUG-2025 to 07-AUG-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 137 N - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after RT AZ E and ends at .011 mile(s) after RT U E.
Work is scheduled from 21-JUL-2025 to 17-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 137 S - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .011 mile(s) before RT U E and ends at .007 mile(s) before RT AZ E.
Work is scheduled from 21-JUL-2025 to 17-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT C N - ST. CHARLES County - EXPECT DELAYS
BRIDGE FLUSHING
Work zone begins at .766 mile(s) after CRD SILVERS RD S and ends at .04 mile(s) after RT B E.
Work is scheduled from 07-AUG-2025 to 07-AUG-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 N - DOUGLAS County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .023 mile(s) before RT A E and ends at .042 mile(s) after MO 76 E.
Work is scheduled from 28-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 S - DOUGLAS County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .042 mile(s) before MO 76 E and ends at .023 mile(s) after RT A E.
Work is scheduled from 28-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A N - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .009 mile(s) after RT B S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT A S - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) before RT B S and ends at RT B S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT W S - HICKORY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .467 mile(s) after PVT PRIVATE RD S and ends at .594 mile(s) after CRD 120 E.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .005 mile(s) before US 65 N and ends at .007 mile(s) before RT H N.
Work is scheduled from 18-JUL-2025 to 19-JUL-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT TT N - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Z E and ends at CRD CONCORD ST E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT TT S - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD CONCORD ST E and ends at RT Z E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .115 mile(s) after CST YARNELL RD S and ends at .268 mile(s) after RP IS270E TO IS44W W.
Work is scheduled from 18-JUL-2025 to 18-JUL-2025.
Work will start daily at 09:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT C S and ends at CRD JADE PL S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD JADE PL S and ends at RT C S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP US65S TO IS44W W - GREENE County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at US 65 S and ends at IS 44 W.
Work is scheduled from 18-JUL-2025 to 19-JUL-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT W N - HICKORY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .594 mile(s) before CRD 120 E and ends at .467 mile(s) before PVT PRIVATE RD S.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO E - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD HOBART RD E and ends at US 61 N.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 11:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO W - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 61 N and ends at CRD HOBART RD E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 11:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F S - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 286 S and ends at US 61 S.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 01:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F N - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 61 S and ends at CRD 286 S.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 01:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH E - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .008 mile(s) after CST MAIN ST E and ends at .054 mile(s) before RT AA S.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 470 E - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) before CST HILLCREST RD S and ends at .002 mile(s) before CST RAYTOWN RD S.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 470 W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at .008 mile(s) after CST RAYTOWN RD S and ends at .071 mile(s) after CST HILLCREST RD S.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT BB N - BATES County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .072 mile(s) after MO 18 E and ends at RT MM E.
Work is scheduled from 11-AUG-2025 to 14-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB S - BATES County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT MM E and ends at .072 mile(s) before MO 18 E.
Work is scheduled from 11-AUG-2025 to 14-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM W - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .178 mile(s) before CRD NW-1571 S and ends at RT BB S.
Work is scheduled from 18-AUG-2025 to 21-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 29 S - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at .53 mile(s) before RP IS29S TO RTH S and ends at .332 mile(s) after IS 435 S.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM E - BATES County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT BB S and ends at .178 mile(s) after CRD NW-1571 S.
Work is scheduled from 18-AUG-2025 to 21-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - DAVIESS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 13 S and ends at .053 mile(s) before US 36 W.
Work is scheduled from 23-JUL-2025 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT M W - CALDWELL County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .053 mile(s) after US 36 W and ends at MO 13 S.
Work is scheduled from 23-JUL-2025 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 240 W - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after RT W E and ends at .004 mile(s) after CST DEPOT ST E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AC S - BUCHANAN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) after RP RTAC TO US36W W and ends at .013 mile(s) before RP US36E TO RIVERSIDE RD E.
Work is scheduled from 18-AUG-2025 to 21-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT AC N - BUCHANAN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .013 mile(s) after RP US36E TO RIVERSIDE RD E and ends at .016 mile(s) before RP RTAC TO US36W W.
Work is scheduled from 18-AUG-2025 to 21-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 229 N - BUCHANAN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .034 mile(s) after RP IS229N TO MO759S S and ends at .063 mile(s) after CST HIGHLAND AVE E.
Work is scheduled from 25-AUG-2025 to 28-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 240 E - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before CST DEPOT ST E and ends at .002 mile(s) before RT W E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 229 S - BUCHANAN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .053 mile(s) after RP IS229S TO HIGHLAND AVE S and ends at .003 mile(s) before RP MO759N TO IS229S S.
Work is scheduled from 25-AUG-2025 to 28-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT BB N - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at .008 mile(s) before RT A S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB S - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) after RT A S and ends at US 50 E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z N - MARION County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT C E and ends at MO 168 E.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - MARION County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 168 E and ends at .001 mile(s) after RT C E.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 41 S - CARROLL County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .443 mile(s) before RT F E and ends at .065 mile(s) before RT F E.
Work is scheduled from 22-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - WARREN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .03 mile(s) before RP IS70W TO W WARRENTON BLVD W and ends at .412 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 01-AUG-2025 to 31-OCT-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .419 mile(s) before RP IS70E TO RTE W and ends at .009 mile(s) after RP W WARRENTON BLVD TO IS70E E.
Work is scheduled from 01-AUG-2025 to 31-OCT-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) before CST PROSPECT AVE S and ends at .039 mile(s) before CST CLEVELAND AVE S.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST LISTER AVE S and ends at .044 mile(s) after RP IS70W TO ASKEW AVE W.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 97 N - BARRY County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at .007 mile(s) after RT B E and ends at .008 mile(s) after RR CHEROKEE SUB E.
Work is scheduled from 18-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 97 S - LAWRENCE County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at .008 mile(s) before RR CHEROKEE SUB E and ends at .007 mile(s) before RT B E.
Work is scheduled from 24-JUL-2025 to 07-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 79 S - LINCOLN County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .046 mile(s) before RP RTC TO MO79 E and ends at .13 mile(s) before CST STATE HWY 79 OLD S.
Work is scheduled from 29-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO RTA W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .085 mile(s) after IS 70 W and ends at RT A S.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT JJ W - MONTGOMERY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT E E and ends at RT F S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ E - MONTGOMERY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT F S and ends at RT E E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O E - SCHUYLER County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 63 S and ends at CRD GERMANIA AVE E.
Work is scheduled from 22-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O W - SCHUYLER County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at CRD HEREFORDALE DR E and ends at US 63 S.
Work is scheduled from 22-JUL-2025 to 23-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) after CST MAIN ST S and ends at .624 mile(s) after BK KATY TRAIL E.
Work is scheduled from 08-AUG-2025 to 11-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT HH E - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD GIFFORD TRL S and ends at MO 3 S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH W - ADAIR County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 3 S and ends at CRD GIFFORD TRL S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - JEFFERSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .018 mile(s) after IS 55 S and ends at RT A E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - JEFFERSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT A E and ends at .018 mile(s) before IS 55 S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 142 E - BUTLER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .001 mile(s) before RT HH S and ends at MO 53 S.
Work is scheduled from 18-JUL-2025 to 13-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT MM E and ends at RT DD S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT DD S and ends at RT MM E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 142 W - BUTLER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 53 S and ends at .001 mile(s) after RT HH S.
Work is scheduled from 18-JUL-2025 to 13-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .083 mile(s) before PED GRAND BLVD OVERPASS S and ends at .019 mile(s) after CST GRAND BLVD S.
Work is scheduled from 13-AUG-2025 to 20-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .781 mile(s) after RT D S and ends at .866 mile(s) after RT D S.
Work is scheduled from 01-SEP-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .059 mile(s) before IS 55 N and ends at .01 mile(s) after CST LAFAYETTE AVE E.
Work is scheduled from 13-AUG-2025 to 20-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP PRYOR RD TO IS470E E - JACKSON County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .031 mile(s) before US 50 E and ends at .017 mile(s) before IS 470 E.
Work is scheduled from 23-JUL-2025 to 25-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT U W - MONITEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .866 mile(s) before RT D S and ends at .781 mile(s) before RT D S.
Work is scheduled from 01-SEP-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS470W TO PRYOR RD S - JACKSON County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .012 mile(s) before MO 350 W and ends at CST NW PRYOR RD S.
Work is scheduled from 24-JUL-2025 to 25-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 24 E - JACKSON County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .006 mile(s) after MO 291 N and ends at .004 mile(s) after MO 7 S.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 24 W - JACKSON County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .009 mile(s) before MO 7 S and ends at .006 mile(s) before MO 291 N.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .039 mile(s) before CRD 1147 S and ends at .071 mile(s) after CRD 1147 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS170E TO IS64W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .035 mile(s) after IS 170 E and ends at IS 64 W.
Work is scheduled from 23-JUL-2025 to 08-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .071 mile(s) before CRD 1147 S and ends at .039 mile(s) after CRD 1147 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .007 mile(s) after CST MAIN ST S and ends at .63 mile(s) after BK KATY TRAIL E.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 29 N - PLATTE County - POSSIBLE DELAYS
MOWING
Work zone begins at IS 435 N and ends at .493 mile(s) after RP RTH TO IS29N N.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS470W TO LAKEWOOD BLVD W - JACKSON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 W and ends at CST NE LAKEWOOD BLVD E.
Work is scheduled from 22-JUL-2025 to 23-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - NEW MADRID County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .216 mile(s) after RP US61 TO IS55N N and ends at .403 mile(s) before RP IS55N TO RTP N.
Work is scheduled from 04-AUG-2025 to 07-AUG-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 61 N and ends at .001 mile(s) before CRD 318 E.
Work is scheduled from 04-AUG-2025 to 04-AUG-2025.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after CRD 304 E and ends at US 61 N.
Work is scheduled from 04-AUG-2025 to 04-AUG-2025.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before BK KATY TRAIL E and ends at .614 mile(s) after BK KATY TRAIL E.
Work is scheduled from 01-AUG-2025 to 04-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .049 mile(s) after RP IS44E TO JAMIESON AVE E and ends at .007 mile(s) after CST SOUTHWEST AVE E.
Work is scheduled from 04-AUG-2025 to 11-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .057 mile(s) before CST TOWER GROVE AVE S and ends at .012 mile(s) after CST KINGSHIGHWAY BLVD S.
Work is scheduled from 05-AUG-2025 to 12-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK S - WEBSTER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .299 mile(s) before CRD WESTER BLUFF RD E and ends at .184 mile(s) after CRD WHITE OAK RD S.
Work is scheduled from 07-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .076 mile(s) after CST MISSISSIPPI AVE S and ends at .011 mile(s) after RP TRUMAN PKWY TO IS55S S.
Work is scheduled from 07-AUG-2025 to 14-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK N - WEBSTER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .184 mile(s) before CRD WHITE OAK RD S and ends at .299 mile(s) after CRD WESTER BLUFF RD E.
Work is scheduled from 07-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 S - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .156 mile(s) before CRD STRUBE RD E and ends at .264 mile(s) before CST MARKET ST S.
Work is scheduled from 18-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .264 mile(s) after CST MARKET ST S and ends at .156 mile(s) after CRD STRUBE RD E.
Work is scheduled from 18-AUG-2025 to 30-OCT-2025.
Work will start daily at 07:00 AM and end by 05:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST NW COOKINGHAM DR E - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .057 mile(s) after RP US169S TO NW COOKINGHAM DR E and ends at .048 mile(s) after RP US169N TO IS435S S.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone CST NW COOKINGHAM DR W - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .048 mile(s) before RP NW COOKINGHAM DR TO IS435S S and ends at .057 mile(s) before RP US169S TO NW COOKINGHAM DR E.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT H N - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .047 mile(s) after MO 185 S and ends at US 50 E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - MARIES County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .569 mile(s) after CRD 320 S and ends at .01 mile(s) before CRD 322 E.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - MARIES County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after CRD 322 E and ends at .569 mile(s) before CRD 320 S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone BU 71 S - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .205 mile(s) after CST INDUSTRIAL PARK DR S and ends at .114 mile(s) before MO 76 E.
Work is scheduled from 28-JUL-2025 to 08-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP BRENTWOOD BLVD TO IS64W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at CST S BRENTWOOD BLVD S and ends at .008 mile(s) before IS 64 W.
Work is scheduled from 23-JUL-2025 to 30-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT H S - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at .047 mile(s) before MO 185 S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 14 W - DOUGLAS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after MO 181 S and ends at .003 mile(s) before RT W S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 14 E - DOUGLAS County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .03 mile(s) before MO 181 S and ends at .012 mile(s) after MO 181 S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT TT W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .032 mile(s) after CRD MILL HILL RD E and ends at MO 47 S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT TT E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 47 S and ends at .032 mile(s) before CRD MILL HILL RD E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .031 mile(s) before RP US65S TO IS44E E and ends at 1.18 mile(s) after RA IS44E STRAFFORD E.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at 1.805 mile(s) before RP IS44W TO MO125 W and ends at .018 mile(s) after RP IS44W TO US65S S.
Work is scheduled from 21-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - HOWELL County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .025 mile(s) before RT AM E and ends at .169 mile(s) after RT Y S.
Work is scheduled from 21-JUL-2025 to 30-OCT-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 W - CARTER County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .169 mile(s) before RT Y S and ends at .026 mile(s) after RT AM E.
Work is scheduled from 21-JUL-2025 to 30-OCT-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP S 7TH BLVD TO IS44W W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at CST S 7TH BLVD S and ends at IS 55 S.
Work is scheduled from 11-AUG-2025 to 18-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 66 W - JASPER County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CST MCCONNELL AVE S and ends at .023 mile(s) before CST TERRACE AVE S.
Work is scheduled from 21-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 470 W - JACKSON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .121 mile(s) before RP IS470W TO LAKEWOOD BLVD W and ends at .017 mile(s) before CST NE LAKEWOOD BLVD E.
Work is scheduled from 23-JUL-2025 to 24-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z N - MARION County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT C E and ends at MO 168 E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at 1.418 mile(s) before CRD 1100 S and ends at .685 mile(s) before CRD 1100 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .021 mile(s) after PED CARROLL ST OVERPASS S and ends at .018 mile(s) after CST LAFAYETTE AVE E.
Work is scheduled from 12-AUG-2025 to 19-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .687 mile(s) after CRD 1100 S and ends at 1.417 mile(s) after CRD 1100 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT Z S - MARION County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 168 E and ends at RT C E.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS470E TO BLUE RIDGE BLVD S - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at IS 470 E and ends at CST BLUE RIDGE BLVD N.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - JASPER County - NO DELAYS
CORE DRILLING
Work zone begins at .179 mile(s) after RP RTU TO IS44W W and ends at .153 mile(s) after RR UNKNOWN S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - JASPER County - NO DELAYS
CORE DRILLING
Work zone begins at .152 mile(s) before RR UNKNOWN S and ends at .176 mile(s) before RP IS44E TO RTU S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 17 S - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at 1.407 mile(s) after RT U E and ends at 1.444 mile(s) before CRD PUMP STATION RD E.
Work is scheduled from 04-AUG-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT OO E - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before CRD 379 S and ends at CRD 375 S.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP BLUE RIDGE BLVD TO IS470W W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at CST BLUE RIDGE BLVD N and ends at .022 mile(s) before IS 470 W.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 17 N - TEXAS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at 1.444 mile(s) after CRD PUMP STATION RD E and ends at 1.407 mile(s) before RT U E.
Work is scheduled from 04-AUG-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RP RTA TO IS70E E - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT A S and ends at .028 mile(s) before IS 70 E.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS64W TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at IS 64 W and ends at .004 mile(s) before IS 170 W.
Work is scheduled from 23-JUL-2025 to 08-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT OO W - WEBSTER County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .013 mile(s) after RT B S and ends at .02 mile(s) before CST E OLD ROUTE 66 E.
Work is scheduled from 21-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT OO E - GREENE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .02 mile(s) after CST E OLD ROUTE 66 E and ends at .013 mile(s) before RT B S.
Work is scheduled from 21-JUL-2025 to 28-JUL-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .118 mile(s) before CST HOLLY HILLS AVE E and ends at .028 mile(s) after CST CARONDELET BLVD E.
Work is scheduled from 25-JUL-2025 to 26-JUL-2025.
Work will start daily at 07:00 PM and end by 09:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 14 E - CHRISTIAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) after BU 65 S and ends at .013 mile(s) before RP MO14 TO US65N N.
Work is scheduled from 21-JUL-2025 to 18-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 13 S - HENRY County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .623 mile(s) after OR 13 S and ends at .036 mile(s) before BU 52 E.
Work is scheduled from 21-JUL-2025 to 29-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 14 W - CHRISTIAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after RP US65N TO MO14 N and ends at .007 mile(s) before BU 65 N.
Work is scheduled from 21-JUL-2025 to 18-AUG-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 87 S - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .006 mile(s) before CRD STRAWBERRY RD S and ends at .01 mile(s) before CRD CARY RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 87 N - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after CRD CARY RD E and ends at .006 mile(s) after CRD STRAWBERRY RD S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT K S - STONE County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at .009 mile(s) after RT M E and ends at RT A E.
Work is scheduled from 18-JUL-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - BARRY County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at MO 37 S and ends at MO 97 S.
Work is scheduled from 22-JUL-2025 to 05-AUG-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLAY County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at MO 92 E and ends at .003 mile(s) after RT PP E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLINTON County - POSSIBLE DELAYS
CORE DRILLING
Work zone begins at .009 mile(s) before RT PP E and ends at .007 mile(s) before MO 92 E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - ST. FRANCOIS County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .075 mile(s) before CO CRD BERRY RD TO US67 E and ends at .214 mile(s) before PVT PRIVATE RD S.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - LINCOLN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before CRD KELCH RD S and ends at RT HH S.
Work is scheduled from 29-JUL-2025 to 29-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - LINCOLN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT HH S and ends at .001 mile(s) after CRD KELCH RD S.
Work is scheduled from 29-JUL-2025 to 29-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - LINCOLN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD KELCH RD S and ends at MO 161 S.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - PIKE County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 161 S and ends at CRD KELCH RD S.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.147 mile(s) after CRD PLANK SCHOOL RD E and ends at .783 mile(s) before RP IS44E TO SAMPSON RD E.
Work is scheduled from 20-JUL-2025 to 25-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT V N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 332 E and ends at CRD 344 E.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 344 E and ends at CRD 332 E.
Work is scheduled from 30-JUL-2025 to 30-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .08 mile(s) before CST GRAND BLVD S and ends at .003 mile(s) before PED GRAND BLVD OVERPASS S.
Work is scheduled from 13-AUG-2025 to 20-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 76 W - TANEY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .704 mile(s) before RR AURORA SUB E and ends at .388 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 05-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 76 E - TANEY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .539 mile(s) before PVT PRIVATE RD E and ends at 1.2 mile(s) before RP MO76E TO MO248 E.
Work is scheduled from 05-AUG-2025 to 31-AUG-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - ST. LOUIS CITY County - POSSIBLE DELAYS
SURVEYING
Work zone begins at .012 mile(s) after IS 44 E and ends at .003 mile(s) before CST GOODFELLOW BLVD S.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US50E TO RAYTOWN RD E - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at IS 470 E and ends at CST RAYTOWN RD S.
Work is scheduled from 18-JUL-2025 to 21-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .005 mile(s) after RP MEMORIAL DR TO IS44W W and ends at .009 mile(s) after CST WALNUT ST E.
Work is scheduled from 12-AUG-2025 to 19-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) before RT VV S and ends at MO 149 S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 149 S and ends at .001 mile(s) after RT VV S.
Work is scheduled from 24-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .511 mile(s) after CRD 1222 S and ends at .765 mile(s) after CRD 1222 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .768 mile(s) before CRD 1222 S and ends at .515 mile(s) before CRD 1222 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .023 mile(s) after CRD BEEMONT RD S and ends at RT C S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ E - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 3 S and ends at CRD 222 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ W - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at CRD 222 E and ends at MO 3 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT UU S - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 50 E and ends at CRD NEIER RD E.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT ZZ W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after RT C S and ends at .018 mile(s) before RT Y S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P E - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CST EDWARD ST S and ends at .019 mile(s) before CRD 448 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P W - HOWARD County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .019 mile(s) after CRD 448 E and ends at .001 mile(s) after CST EDWARD ST S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at US 69 S and ends at .003 mile(s) before OR 9 S.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .059 mile(s) before CST 39TH ST S and ends at .005 mile(s) after CST COMPTON AVE S.
Work is scheduled from 06-AUG-2025 to 13-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J E - COOPER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .25 mile(s) after MO 5 S and ends at MO 87 S.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 68 W - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .026 mile(s) after CRD 4380 E and ends at .023 mile(s) after CRD 3570 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST RIVERWAY BLVD N - PLATTE County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after OR 9 S and ends at US 69 S.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT J W - COOPER County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at MO 87 S and ends at .25 mile(s) before MO 5 S.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .004 mile(s) after RP S 7TH BLVD TO IS44W W and ends at .019 mile(s) after MO 30 E.
Work is scheduled from 07-AUG-2025 to 14-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD W VETERANS MEMORIAL PKWY E - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .047 mile(s) before RT B S and ends at .002 mile(s) before RT B S.
Work is scheduled from 04-AUG-2025 to 05-SEP-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT FF S - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT C S and ends at CRD HERON ST E.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF N - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD HERON ST E and ends at RT C S.
Work is scheduled from 22-JUL-2025 to 22-JUL-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 149 S and ends at RT VV S.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - MACON County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT VV S and ends at MO 149 S.
Work is scheduled from 23-JUL-2025 to 23-JUL-2025.
Work will start daily at 11:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N N - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CRD 588 E and ends at US 24 E.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT N S - MONROE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at US 24 E and ends at .001 mile(s) after CRD 588 E.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC W - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at .019 mile(s) before CRD BARNITZ DR S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC E - DENT County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .019 mile(s) after CRD BARNITZ DR S and ends at RT H E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD OLD HALLS FERRY RD S and ends at .128 mile(s) after CRD HOLLOW BROOK DR S.
Work is scheduled from 21-JUL-2025 to 25-JUL-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .04 mile(s) after RP IS44E TO HAMPTON AVE S and ends at .046 mile(s) after PED FENDLER AND ASSOCIATES OVERPASS S.
Work is scheduled from 04-AUG-2025 to 11-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 42 E - MILLER County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .022 mile(s) before PVT SCHOOL OF THE OSAGE E and ends at .037 mile(s) after PVT SCHOOL OF THE OSAGE E.
Work is scheduled from 21-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 42 W - MILLER County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .037 mile(s) before PVT SCHOOL OF THE OSAGE E and ends at .022 mile(s) after PVT SCHOOL OF THE OSAGE E.
Work is scheduled from 21-JUL-2025 to 01-AUG-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 41 S - CARROLL County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .287 mile(s) before CRD 381 S and ends at .236 mile(s) before CRD 381 S.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD W VETERANS MEMORIAL PKWY W - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) after RT B S and ends at .047 mile(s) after RT B S.
Work is scheduled from 04-AUG-2025 to 05-SEP-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT W N - WARREN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .002 mile(s) after OR 70 E and ends at RT A S.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) after RT A S and ends at .051 mile(s) after OR 70 E.
Work is scheduled from 02-SEP-2025 to 16-SEP-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 100 W - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .035 mile(s) before PVT PRIVATE DR W and ends at .041 mile(s) before RT AT E.
Work is scheduled from 11-AUG-2025 to 31-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT B N - WARREN County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Work zone begins at .051 mile(s) before OR 70 E and ends at .015 mile(s) before RT A S.
Work is scheduled from 02-SEP-2025 to 16-SEP-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP RTA TO IS70W W - WARREN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT B S and ends at .039 mile(s) before IS 70 W.
Work is scheduled from 06-OCT-2025 to 19-NOV-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS470W TO BLUE RIDGE BLVD N - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at IS 470 W and ends at CST BLUE RIDGE BLVD S.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RP IS55N TO TRUMAN PKWY N N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .017 mile(s) before IS 44 E and ends at .007 mile(s) after IS 44 W.
Work is scheduled from 07-AUG-2025 to 14-AUG-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP RAYTOWN RD TO US50W W - JACKSON County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at CST RAYTOWN RD S and ends at IS 470 W.
Work is scheduled from 25-JUL-2025 to 28-JUL-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone US 24 W - CARROLL County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .445 mile(s) before RR RIVER SUB E and ends at .069 mile(s) after CST THOMAS DR E.
Work is scheduled from 22-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 169 N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after RP US169N TO NW COOKINGHAM DR E and ends at .052 mile(s) before RP IS435N TO US169N N.
Work is scheduled from 23-JUL-2025 to 15-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 100 E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .041 mile(s) after RT AT E and ends at .035 mile(s) after PVT PRIVATE DR W.
Work is scheduled from 11-AUG-2025 to 31-OCT-2025.
Work will start daily at 07:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 6 E - DEKALB County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CST SE HILLCREST DR S and ends at .017 mile(s) after CST VICTORY ST E.
Work is scheduled from 28-JUL-2025 to 11-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT W S - WARREN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT A S and ends at .002 mile(s) before OR 70 E.
Work is scheduled from 21-JUL-2025 to 21-JUL-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 110 E - JEFFERSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .258 mile(s) before PVT MABELS LN E and ends at RT CC S.
Work is scheduled from 21-JUL-2025 to 23-JUL-2025.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 90 W - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .229 mile(s) after PVT MUD HOLLOW RD E and ends at .141 mile(s) before CRD ROCKWOOD RD S.
Work is scheduled from 06-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 90 E - MCDONALD County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .141 mile(s) after CRD ROCKWOOD RD S and ends at .229 mile(s) before PVT MUD HOLLOW RD E.
Work is scheduled from 06-OCT-2025 to 24-OCT-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT HH N - LINCOLN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Z E and ends at .001 mile(s) after CRD 304 E.
Work is scheduled from 04-AUG-2025 to 04-AUG-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP W - LINCOLN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before CRD COX RD E and ends at .211 mile(s) after CRD 339 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP E - PIKE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .211 mile(s) before CRD 339 E and ends at .024 mile(s) after CRD COX RD E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P N - LINCOLN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .978 mile(s) after CST BROWNS MILL RD E and ends at .499 mile(s) before CRD KICKAPOO RD E.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P S - LINCOLN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .499 mile(s) after CRD KICKAPOO RD E and ends at .979 mile(s) before CST BROWNS MILL RD E.
Work is scheduled from 04-AUG-2025 to 07-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT P N - LINCOLN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .979 mile(s) after CST BROWNS MILL RD E and ends at .499 mile(s) before CRD KICKAPOO RD E.
Work is scheduled from 04-AUG-2025 to 07-AUG-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF N - LINCOLN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD WELCH RD E and ends at US 61 N.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 10:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT FF S - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 61 N and ends at CRD WELCH RD E.
Work is scheduled from 31-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 10:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .054 mile(s) before MO 96 E and ends at .062 mile(s) after MO 96 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) before CRD 318 E and ends at RT Z E.
Work is scheduled from 04-AUG-2025 to 04-AUG-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - LINCOLN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) before CRD KELCH RD S and ends at .001 mile(s) before RT HH S.
Work is scheduled from 05-AUG-2025 to 05-AUG-2025.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - LINCOLN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after RT HH S and ends at .001 mile(s) after CRD KELCH RD S.
Work is scheduled from 05-AUG-2025 to 05-AUG-2025.
Work will start daily at 08:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z E - PIKE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 161 S and ends at .001 mile(s) before CRD KELCH RD S.
Work is scheduled from 05-AUG-2025 to 05-AUG-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Z W - LINCOLN County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after CRD KELCH RD S and ends at MO 161 S.
Work is scheduled from 05-AUG-2025 to 05-AUG-2025.
Work will start daily at 12:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .111 mile(s) before CRD 1222 S and ends at .124 mile(s) after CRD 1222 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - NO DELAYS
CORE DRILLING
Work zone begins at .127 mile(s) before CRD 1222 S and ends at .108 mile(s) after CRD 1222 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT P S - LINCOLN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .499 mile(s) after CRD KICKAPOO RD E and ends at .978 mile(s) before CST BROWNS MILL RD E.
Work is scheduled from 28-JUL-2025 to 31-JUL-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at .005 mile(s) before MO 151 S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT M E - MONROE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after MO 151 S and ends at MO 15 S.
Work is scheduled from 21-JUL-2025 to 01-OCT-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS29S TO IS229N N - BUCHANAN County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at .007 mile(s) after IS 29 S and ends at .008 mile(s) before IS 229 N.
Work is scheduled from 21-JUL-2025 to 22-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT O S - STE. GENEVIEVE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at US 61 S and ends at MO 32 E.
Work is scheduled from 04-AUG-2025 to 05-SEP-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 8 E and ends at MO 185 S.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - WASHINGTON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 185 S and ends at MO 8 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 68 E - PHELPS County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .023 mile(s) before CRD 3570 S and ends at .026 mile(s) before CRD 4380 E.
Work is scheduled from 21-JUL-2025 to 24-JUL-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
155
IS 55 (Pemiscot) TO Tennessee Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
170
RT D / Page Avenue (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
170
IS 270 (St. Louis) TO RT D / Page Avenue (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
229
IS 29 North Jct (Andrew) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
255
IS 55 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 64 (St. Louis) TO IS 70 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 70 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 55 (St. Louis) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 44 (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
MO 118 (Holt) TO Andrew County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
Andrew County Line TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
US 169 North Jct (Buchanan) TO IS 229 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 229 SOUTH JCT (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
MEXICO CITY AVE (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
BUCHANAN COUNTY LINE TO MEXICO CITY AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
US 136 (Atchison) TO RT W (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
RT W (Holt) TO MO 118 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
Iowa Line TO US 136 (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
Iowa Line TO RT A / Z (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 South Jct (Daviess) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
CLINTON COUNTY LINE TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
MO 152 (CLAY) TO IS 29 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 70 E JCT (JACKSON) TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 670 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
RT A / Z (Harrison) TO RT H / AA (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT DD (Daviess) TO US 69 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT H / AA (Harrison) TO RT DD (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
435
IS 70 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
108TH STREET (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
PLATTE COUNTY LINE TO 108TH STREET (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 29 SOUTH JCT (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
KANSAS LINE TO IS 29 NORTH JCT (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 470 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 37 (Jasper) TO MO 174 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Crawford County Line TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
US 63 (Phelps) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 38 (Webster) TO RT J / Y (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
RT J / Y (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Laclede County Line TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 125 (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Phelps County Line TO US 63 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 174 (Lawrence) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 5 (Laclede) TO Pulaski County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 266 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Oklahoma Line TO MO 37 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis City Line TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
IS 435 (JACKSON) TO WOODS CHAPEL RD (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
WOODS CHAPEL RD (JACKSON) TO 39TH STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (MCDONALD) TO ARKANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT H / K (JASPER) TO IS 44 EAST JCT (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
US 160 (BARTON) TO RT H / K (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (CASS) TO RT A / B (BATES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (VERNON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 44 WEST JCT (JASPER) TO RT B (MCDONALD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
NORTH CASS PKWY (CASS) TO RT A / B (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (BATES) TO RT B (VERNON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 435 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
JACKSON COUNTY LINE TO NORTH CASS PKWY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
US 61 / MO 34 (Cape Girardeau) TO MO 77 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
ST. LOUIS CITY LINE TO RT M (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT U (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
IS 44 TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT N (Ste. Genevieve) TO RT KK (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT A (Pemiscot) TO RT U (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
MO 80 (New Madrid) TO US 61 / US 62 South Jct (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
IS 57 (Scott) TO MO 80 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
MO 32 (Ste. Genevieve) TO RT N (Ste. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
MO 77 (Scott) TO IS 57 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT KK (Cape Girardeau) TO US 61 / MO 34 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
US 61 / US 62 South Jct (New Madrid) TO RT A (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT TT (JEFFERSON) TO MO 32 (STE. GENEVIEVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
55
RT M (JEFFERSON) TO RT TT (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
57
Illinois Line TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Interstate Route
635
IS 29 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
IS 70 (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
670
KANSAS LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 435 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 740 (Boone) TO RT Z (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Y (Saline) TO US 65 (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Callaway County Line TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO J (Saline) TO Saline County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Cooper County Line TO MO 135 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 65 (Saline) TO MO J (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT W / T (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 179 (Cooper) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 13 (Lafayette) TO RT Y (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT F (Jackson) TO MO 13 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 54 (Callaway) TO RT D / YY (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 135 (Cooper) TO MO 179 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 470 (JACKSON) TO RT F (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT D / YY (Callaway) TO MO 19 (Montgomery) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Interstate Route
70
KANSAS LINE TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Z (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
MO 5 West Jct (Putnam) TO Schuyler County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 169 East Jct (Gentry) TO RT D (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
Nebraska Line TO US 59 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
RT P South Jct (Nodaway) TO US 169 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 59 North Jct (Atchison) TO RT M (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
136
IS 35 (Harrison) TO Mercer County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 71 South Jct (Nodaway) TO RT P South Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
RT M (Atchison) TO US 71 North Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
RT D (Harrison) TO IS 35 (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Mercer County Line TO US 65 West Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 65 East Jct (Mercer) TO MO 139 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 139 West Jct (Putnam) TO MO 5 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
159
IS 29 (Holt) TO Nebraska Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
160
MO 43 (Barton) TO IS 49 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 39 North Jct (Dade) TO RT F / V (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
Butler County Line TO US 67 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
RT M (Oregon) TO MO 19 South Jct (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
MO 126 (Barton) TO MO 39 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 13 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 5 West Jct (Ozark) TO RT V (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
Kansas Line TO MO 43 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT F / V (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
IS 49 (Barton) TO MO 126 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 63 North Jct (Howell) TO RT M (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
MO 14 (Christian) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 21 South Jct (Ripley) TO Butler County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
US 60 East Jct (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 65 (Taney) TO MO 76 East Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT V (Ozark) TO US 63 South Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
160
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
166
Kansas Line TO IS 44 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
MO 31 (DeKalb) TO RT E (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 North Jct (Buchanan) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 South Jct (Buchanan) TO RT V V (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
Iowa Line TO RT O (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
MO 152 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
MO 92 (CLAY) TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT VV (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
US 136 West Jct (Gentry) TO RT M (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
RT O (Gentry) TO US 136 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
RT M (Gentry) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT E (Andrew) TO IS 29 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 11 (Chariton) TO MO 5 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 5 West Jct (Chariton) TO Randolph County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
US 65 (Carroll) TO MO 11 (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
IS 435 (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
Lafayette County Line TO MO 13 (Lafayette) Road reported clear CLEAR 04-28-2025 at 10:04 AM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
24
MO 13 (Lafayette) TO US 65 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
MO 291 (JACKSON) TO LAFAYETTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
36
MO 11 (Linn) TO Macon County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 33 East Jct (DeKalb) TO RT J (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT W (Linn) TO MO 11 (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 31 (DeKalb) TO MO 33 East Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT J (Caldwell) TO RT A (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
RT AC (Buchanan) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
US 65 (Livingston) TO RT W (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
RT A (Caldwell) TO US 65 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
36
Kansas Line TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
40
Howard County Line TO SP 240 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
IS 70 WEST JCT (JACKSON) TO RT V (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
RT V (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
MO 7 (JACKSON) TO IS 70 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
SP 240 (Howard) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
412
Arkansas Line TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
412
MO 25 (Dunklin) TO RT C (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
412
RT C (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
50
MILITIA DRIVE (Cole) TO Cole County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 135 West Jct (Pettis) TO RT E (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
US 54 (Cole) TO MILITIA DRIVE (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT F (Jackson) TO MO 13 (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Gasconade County Line TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT TT (Pettis) TO MO 135 West Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT MM (Pettis) TO RT TT (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 19 WEST JCT (GASCONADE) TO FRANKLIN COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 127 (Pettis) TO RT MM (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT D / T (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
IS 470 (Jackson) TO RT F (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT E (Moniteau) TO Moniteau County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 13 (Johnson) TO MO 127 (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT N (OSAGE) TO MO 19 WEST JCT (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Moniteau County Line TO RT D / T (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Osage County Line TO RT N (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT J (Callaway) TO IS 70 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
IS 70 (Callaway) TO Audrain County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 13 (St. Clair) TO MO 83 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 5 (Camden) TO Grand Glaize Bridge Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 52 (Miller) TO MO 17 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Kansas Line TO MO 43 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
US 65 (Hickory) TO MO 73 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 39 (Cedar) TO MO 13 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
US 63 North Jct (Callaway) TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT AA (Vernon) TO MO 39 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 73 (Camden) TO MO 5 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT CC (Cole) TO US 63 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Grand Glaize Bridge TO MO 52 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 83 (Hickory) TO US 65 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
54
MO 43 (Vernon) TO RT AA (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 17 (Cole) TO RT CC (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
59
Pendelton St (Buchanan) TO IS 229 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 53 (Andrew) TO Karnes Rd (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
US 136 South Jct (Atchison) TO IS 29 Exit 92 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
Iowa Line TO US 136 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
MO 752 (Buchanan) TO Kansas Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 75 (Holt) TO IS 29 Exit 67 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
60
RT DD (Butler) TO MO 114 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 59 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 37 (Barry) TO BU 60 East Jct (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 181 (Texas) TO US 63 South Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT FF (Webster) TO MO 5 East Jct (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 17 East Jct (Howell) TO RT J (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
BU 60 East Jct (Lawrence) Aurora TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 21 North Jct (Carter) TO Butler County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 5 East Jct (Wright) TO MO 95 (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 95 (Wright) TO MO 181 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
US 67 South Jct (Butler) TO RT DD (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
Butler County Line TO US 67 South Jct (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
IS 57 (Mississippi) TO Illinois Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 59 South Jct (Newton) TO MO 59 North Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
Oklahoma Line TO MO 59 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 360 (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 63 South Jct (Howell) TO MO 17 East Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
RT P (Greene) TO MO 360 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 65 (Greene) TO RT FF (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT M (Newton) TO MO 37 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT J (Carter) TO MO 21 North Jct (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
60
MO 114 (Stoddard) TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 51 (PERRY) TO RT A (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
Ste. Genevieve County Line TO MO 32 (St. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
RT M (PERRY) TO MO 51 (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 32 (ST. GENEVIEVE) TO RT M (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
IS 55 EXIT 87 (SCOTT) TO MO 77 SOUTH JCT (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
RT Y (CAPE GIRARDEAU) TO IS 55 EXIT 99 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 67 (JEFFERSON) TO STE. GENEVIEVE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 77 South Jct (Scott) TO US 60 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
IS 55 Exit 99 (Cape Girardeau) TO IS 55 Exit 93 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
IS 55 Exit 8 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
IS 55 Exit 44 (New Madrid) TO IS 55 Exit 32 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
ST. CHARLES COUNTY LINE TO IS 70 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
US 60 (NEW MADRID) TO MO 80 (NEW MADRID) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
RT A (PERRY) TO RT Y (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
61
MO 80 (NEW MADRID) TO IS 55 EXIT 49(NEW MADRID) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
MO 53 (Dunklin) TO RT W (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
RT B (MISSISSIPPI) TO IS 57 (MISSISSIPPI) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
RT W (New Madrid) TO US 61 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
62
US 61 (SCOTT) TO RT B (MISSISSIPPI) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
RT H (Boone) TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 22 (Boone) TO RT B (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT B (Boone) TO RT H (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
US 160 North Jct (Texas) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
US 50 East Jct (Osage) TO RT P (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 32 (Texas) TO US 60 North Jct (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
RT P (Osage) TO MO 42 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
Phelps County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
IS 44 (Phelps) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 42 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63
US 60 South Jct (Texas) TO US 160 North Jct (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 05-02-2025 at 07:05 AM
United States Route
63C
US 63 (Boone) TO US 63 (Boone) Columbia Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT U (Carroll) TO US 24 (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
CRD Wildwood Rd S TO RT H (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
Livingston County Line TO US 36 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Saline County Line TO RT YY (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT YY (Saline) TO CRD Wildwood Rd S Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 36 (Livingston) TO RT U (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 32 (Dallas) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
IS 44 (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 52 North Jct (Pettis) TO MO 52 South Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 125 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT EE (Christian) TO MO 176 South Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 24 (Carroll) TO Saline County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 6 (Grundy) TO Livingston County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 52 South Jct (Benton) TO RT AC (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 60 (Greene) TO RT EE (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT AA (Benton) TO RT D (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT H (Pettis) TO CRD KA LINE DR E (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
CRD KA LINE DR E (Pettis) TO MO 52 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 136 North Jct (Mercer) TO RT C (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
RT AC (Benton) TO RT AA (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT D (Dallas) TO MO 32 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT C (Grundy) TO MO 6 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Iowa Line TO US 136 North Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 176 South Jct (Taney) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Illinois Line TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 172 (Wayne) TO US 60 North Jct (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT M (Butler) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
Prospect Ave (St. Louis) TO MO 267 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
IS 270 (St. Louis) TO Dorsett Rd / Midland Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 32 North Jct (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT EE (Wayne) TO MO 172 (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
MO 72 (Madison) TO RT EE (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT V (Jefferson) TO MO 32 North Jct (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
US 61 South Jct (Jefferson) TO RT V (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
US 60 South Jct (Butler) TO RT M (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
United States Route
67
RT M (Jefferson) TO US 61 South Jct (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Dorsett Rd / Midland Blvd (St. Louis) TO Swan Dr (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 267 (St. Louis) TO RT M (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
MO 92 (CLAY) TO IS 35 NORTH JCT (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
PLATTE COUNTY LINE TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
MO 6 South Jct (Daviess) TO IS 35 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
IS 35 SOUTH JCT (CLAY) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 35 South Jct (Daviess) TO LP 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 635 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
RT B (Andrew) TO IS 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
Iowa Line TO RT FF (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
RT FF (Nodaway) TO US 136 East Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
Is 49 (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
US 136 East Jct (Nodaway) TO RT B (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
1
MO 152 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
1
IS 35 (CLAY) TO MO 210 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
10
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
10
CARROLL COUNTY LINE TO US 65 (CARROLL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
10
RT M (RAY) TO CARROLL COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
10
CLAY COUNTY LINE TO RT M (RAY) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
100
Frene Creek Rd (Gasconade) TO MO 19 South Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
MO 19 North Jct (Gasconade) TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
St. Louis County Line TO Big Bend Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
103
US 60 (Carter) TO Skyline Dr (Carter) Van Buren Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
105
US 62 (Mississippi) TO MO 80 (Mississippi) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
109
RT CC (St. Louis) TO RT W (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
110
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
112
RT F (Barry) TO MO 76 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
114
US 60 (Stoddard) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
114
MO 25 (Stoddard) TO Airport Rd (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
115
IS 70 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
116
MO 13 NORTH JCT (CALDWELL) TO RT A (CALDWELL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
US 169 (Clinton) TO MO 33 East Jct (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
MO 33 East Jct (Clinton) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
US 69 (Clinton) TO MO 13 South Jct (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
12
IS 435 (JACKSON) TO SPRING ST. (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
123
RT BB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
124
RT B (Boone) TO MO 22 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
MO 14 East Jct (Christian) TO RT T (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT C (Greene) TO RT OO West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 60 (Greene) TO MO 14 West Jct (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 65 (Greene) TO RT E (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT OO West Jct (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 70 (Lafayette) TO US 50 West Jct (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 36 (Caldwell) TO Ray County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
US 50 EAST JCT (JOHNSON) TO MO 2 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 2 (Johnson) TO MO 7 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 54 (St. Clair) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
Ray County Line TO MO 224 West Jct (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 7 South Jct (Henry) TO St. Clair County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 160 Reed Spring Jct (Stone) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
RT BB (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 82 (St. Clair) TO US 54 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 224 West Jct (Lafayette) TO IS 70 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
St. Clair County Line TO MO 82 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 6 West Jct (Daviess) TO US 36 (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
MO 32 (Polk) TO RT BB (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
LAFAYETTE COUNTY LINE TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
US 50 (JOHNSON) TO MO 58 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
MO 224 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
Maries County Line TO MO 17 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
MO 7 (Pulaski) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
135
MO 52 (Morgan) TO MO 5 (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT BB (Douglas) TO RT FF (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
14
MO 125 (Christian) TO RT BB (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT P (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
US 65 (Christian) TO MO 125 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 370 (St. Louis) TO MO 364 (St. Louis Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 30 (ST. LOUIS) TO US 67 (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 364 (ST. LOUIS) TO MO 30 (ST. LOUIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
MO 158 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
RT V (RIPLEY) TO MO 21 WEST JCT (RIPLEY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
MO 21 East Jct (Ripley) TO RT E (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
142
US 63 (OREGON) TO RT V (RIPLEY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
148
US 136 (Nodaway) TO Iowa Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
150
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
150
KANSAS LINE TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
IS 435 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
158
US 67 (Butler) TO MO 142 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
163
IS 70 (Boone) TO RT K (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
164
RT D (Pemiscot) TO RT DD (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
164
US 412 West Jct (Dunklin) TO RT NN (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
164
RT NN (Pemiscot) TO US 61 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
17
RT AW (Texas) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 52 West Jct (Miller) TO RT K (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 32 (Texas) TO US 63 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
17
Miller County Line TO MO 52 West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
RT K (Miller) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 54 (Cole) TO Miller County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 63 (Howell) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
171
MO 249 (Jasper) TO MO 96 W Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
Kansas Line TO MO 96 West Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 96 (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 43 (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
173
MO 265 (Stone) TO MO 248 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
MO 39 (Lawrence) TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
RT P (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
175
IS 49 (Newton) TO MO 86 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
177
US 61 (Cape Girardeau) TO RT J (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
177
RT J (Cape Girardeau) TO Lexington Ave (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
179
Industrial Dr (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
18
Montgomery St (Henry) TO MO 13 (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
180
IS 270 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
185
RT H (Franklin) TO SP 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 100 North Jct (Gasconade) TO MO 28 East Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 160 South Jct (Oregon) TO RT E (Oregon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 28 West Jct (Gasconade) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
IS 44 (Crawford) TO MO 8 West Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 106 (Shannon) TO US 60 East Jct (Shannon) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
19
Crawford County Line TO IS 44 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
19
MO 8 East Jct (Crawford) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
Dent County Line TO RT B (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
I-49 TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
KANSAS STATE LINE TO I-49 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
JOHNSON COUNTY LINE TO MO 52 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
RT ZZ (JOHNSON) TO HENRY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
CASS COUNTY LINE TO RT ZZ (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
Washington County Line TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
US 160 South Jct (Ripley) TO RT FF (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 32 North Jct (Washington) TO MO 72 South Jct (Reynolds) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 72 South Jct (Reynolds) TO US 60 North Jct (Carter) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
21
MO 30 (St. Louis) TO RT M / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
RT M / MM (Jefferson) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 8 (Washington) TO MO 32 North Jct (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
US 60 South Jct (Carter) TO US 160 North Jct (Ripley) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
210
IS 29 (CLAY) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
MO 291 (JACKSON) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
CLAY COUNTY LINE TO MO 10 (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
22
US 63 (Boone) TO MO 15 (Audrain) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
221
US 67 (St. Francois) TO RT B (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
224
HIGHLAND AVE WEST JCT (LAFAYETTE) TO US 24 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 24 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
LAFAYETTE COUNTY LINE TO US 50 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 50 TO MO 2 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
231
St. Louis City Line TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
US 65 (SALINE) TO MO 5 W JCT (HOWARD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
MO 5 East Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
242
RT MM (Camden) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 465 (Taney) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 76 (Barry) TO MO 39 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 265 West Jct (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
249
MO 171 (Jasper) TO IS 44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
US 62 South Jct (Dunklin) TO MO 53 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
US 61 (Cape Girardeau) TO MO 77 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 53 (Dunklin) TO US 412 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 91 (Stoddard) TO RT M (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
RT M (Stoddard) TO RT D (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
MO 77 (Cape Girardeau) TO MO 91 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
25
RT D (Stoddard) TO US 62 North Jct (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
265
MO 413 (Stone) TO MO 248 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
265
MO 76 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
266
RT T (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
267
St. Louis City Line TO US 50 / 61 / 67 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
28
RT EE (GASCONADE) TO US 50 (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
RT EE (MARIES) TO RT EE (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
IS 44 (Pulaski) TO RT MM (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
US 63 East Jct (Maries) TO RT EE (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
CLAY COUNTY LINE TO 39ST STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
JACKSON COUNTY LINE TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 435 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 470 SOUTH JCT (JACKSON) TO US 50 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
US 50 WEST JCT (JACKSON) TO MO 150 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
IS 44 (Franklin) TO Jefferson County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
RT W / MM (Jefferson) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
Jefferson County Line TO RT W / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 54 (Cedar) TO RT CC (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT A / OO (Laclede) TO MO 5 North Jct (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 245 (Cedar) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT N (St. Francois) TO US 67 North Jct (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
US 67 South Jct (St. Francois) TO IS 55 (Ste. Genevieve) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
IS 55 (STE. GENEVIEVE) TO FOURTH ST. (STE. GENEVIEVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
MO 72 West Jct (Dent) TO MO 72 East Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 72 East Jct (Dent) TO MO 49 East Jct (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
MO 49 East Jct (Iron) TO MO 21 South Jct (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
32
MO 13 (Polk) TO RT P (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT CC (Cedar) TO MO 245 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 63 (Texas) TO MO 72 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT P (Polk) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 65 (Dallas) TO RT A / OO Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 5 South Jct (Laclede) TO RT N (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 17 (Texas) TO US 63 (Texas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
33
MO 6 (DeKalb) TO US 36 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
33
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
33
CLINTON COUNTY LINE TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
34
US 67 (WAYNE) TO RT Y (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
RT Y (BOLLINGER) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
RT KK (WAYNE) TO US 67 (WAYNE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
34
MO 21 (REYNOLDS) TO RT KK (WAYNE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
340
MO 100 (St. Louis) TO Ferguson Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
350
IS 435 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
360
IS 44 (GREENE) TO US 60 (GREENE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
RT N (ST. CHARLES) TO MO 94 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
MO 94 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
366
IS 44 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
367
US 67 (St. Louis) TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
RT W (Barry) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
IS 44 (Jasper) TO US 60 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
US 60 (Barry) TO RT W (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
IS 70 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
376
MO 265 (Taney) TO MO 76 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
38
RT J (Webster) TO RT P (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 248 (Barry) TO MO 86 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 96 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
RT Y (Dade) TO US 160 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 32 East Jct (Cedar) TO RT Y (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 60 (Lawrence) TO MO 248 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
IS 44 (Lawrence) TO US 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 160 South Jct (Dade) TO MO 96 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
41
US 24 (CARROLL) TO SALINE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
41
SALINE COUNTY LINE TO MO 240 WEST JCT (SALINE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
US 60 West Jct (Christian) TO MO 265 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
MO 13 (Greene) TO US 60 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT C West Jct (Miller) TO RT A (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT A (Miller) TO US 63 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
US 54 (Camden) TO RT C West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 171 (Jasper) TO Murphy Blvd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 54 (VERNON) TO RT V (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 96 (Jasper) TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT V (BARTON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT C (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
IS 44 West Jct (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
Newton County Line TO IS 44 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 160 (Barton) TO MO 96 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
IS 435 (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
BUCHANAN COUNTY LINE TO SPUR 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
SPUR 45 (PLATTE) TO IS 435 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
US 59 (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
US 136 East Jct (Nodaway) TO RT W (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
MO 113 (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
RT W (Nodaway) TO US 169 (Worth) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
RT E (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
47
Franklin County Line TO US 50 West Jct (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
47
US 50 East Jct (Franklin) TO MO 30 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
MO 79 (Lincoln) TO US 61 (Lincoln) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
5
RT M (Sullivan) TO MO 6 North Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT J (Cooper) TO US 50 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 36 East Jct (Linn) TO RT E (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
US 136 West Jct (Putnam) TO RT M (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
IS 44 (Laclede Co.) TO RT J (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 240 South Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 95 North Jct (Ozark) TO US 160 East Jct (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
MO 6 North Jct (Sullivan) TO Linn County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT O (Morgan) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
RT J (Laclede) TO MO 38 (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 50 East Jct (Moniteau) TO MO 52 North Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Iowa Line TO US 136 East Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT V (Chariton) TO MO 240 South Jct (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 54 (Camden) TO Laclede County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 38 (Wright) TO US 60 East Jct (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 160 West Jct (Ozark) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
Howard County Line TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Linn County Line TO US 36 West Jct (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT E (Chariton) TO US 24 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
Laclede County Line TO IS 44 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 52 North Jct (Morgan) TO RT O (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 14 (Douglas) TO MO 95 North Jct (Ozark) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 60 West Jct (Wright) TO MO 14 (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
5
US 24 East Jct (Chariton) TO RT V (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
51
RT C (Bollinger) TO US 60 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
RT KK (PERRY) TO MO 72 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
ILLINOIS LINE TO RT KK (PERRY) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
MO 72 (BOLLINGER) TO MO 34 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
51
MO 34 (BOLLINGER) TO RT C (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
52
MO 7 North Jct (Henry) TO RT B (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT AA (Morgan) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
US 65 South Jct (Benton) TO RT FF (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT FF (Morgan) TO MO 5 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
MO 5 East Jct (Morgan) TO RT AA (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT B (Pettis) TO US 65 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
NW 2501 (Bates) TO LP 49 (Bates) Butler Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
53
Dunklin County Line TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
53
BU 67 (Butler) TO Dunklin County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
571
MO 96 (Jasper) TO IS 49 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
CASS COUNTY LINE TO RT AA (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT AA (JOHNSON) TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
PRAIRIE RD (CASS) TO MO 291 N JCT (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT D (CASS) TO DEAN AVENUE (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
MO 291 SOUTH JCT (CASS) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
LP 49 South Jct (Newton) TO MO 76 South Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
IS 44 (Jasper) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
6
IS 35 (Daviess) TO MO 13East Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT D (Sullivan) TO US 63 North Jct (Adair) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
US 169 (Buchanan) TO MO 31 North Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 31 North Jct (DeKalb) TO IS 35 (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT P/WW (Grundy) TO US 65 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 5 North Jct (Sullivan) TO RT D (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
US 65 (Grundy) TO RT W (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
MO 13 East Jct (Daviess) TO RT P/WW (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT W (Sullivan) TO MO 5 South Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
64
RT KK (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
Kansas Line TO LP 49 (Jasper) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
LP 49 (Rangeline Rd) (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
MO 249 (Jasper) TO I-44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
Maries County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
US 63 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT B (Cass) TO MO 13 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 13 North Jct (Henry) TO RT PP (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 49 South Jct (Cass) TO RT B (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 65 South Jct (Benton) TO RT NN (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT NN (Camden) TO MO 5 North Jct (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT PP (Henry) TO US 65 North Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 70 (Jackson) TO MO 150 South Jct (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 150 South Jct (Jackson) TO IS 49 North Jct (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 32 East Jct (Dent) TO MO 21 West Jct (Reynolds) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
Dent County Line TO MO 32 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
US 63 (Phelps) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 34 (CAPE GIRARDEAU) TO US 61 WEST JCT (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
US 67 (Madison) TO RT F (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
RT F (MADISON) TO MO 51 (BOLLINGER) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 51 (BOLLINGER) TO MO 34 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
MO 21 East Jct (Iron) TO Madison County Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
72
Madison County Line TO US 67 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
73
US 54 (Camden) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
74
IS 55 North Jct (Cape Giradeau) TO US 61 (Cape Girardeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
74
US 61 East Jct (Cape Girardeau) TO Illinois Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
74
MO 25 (Cape Giradeau) TO IS 55 South Jct (Cape Giradeau) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
740
IS 70 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
744
Springfield /Branson Airport (Greene) TO IS 44 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
752
US 59 (Buchanan) TO IS 229 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
759
4th St (Buchanan) TO Stockyards Expy (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
76
US 65 S JCT(Taney) TO US 160 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
US 160 East Jct (Taney) TO MO 125 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 13 South Jct (Stone) TO US 65 N JCT (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 173 (Stone) TO MO 13 North Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
RT MM (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
763
US 63 (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
765
US 65 NORTH JCT (PETTIS) TO US 65 SOUTH JCT (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
77
MO 25 (Cape Girardeau) TO US 61 West Jct (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
77
US 61 East Jct (Scott) TO RT D (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
78
IS 435 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
79
St. Charles County Line TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
79
RT P (Lincoln) TO St. Charles County Line Road reported clear CLEAR 05-02-2025 at 07:05 AM
Missouri Route
8
MO 68 (Phelps) TO MO 19 East Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
8
MO 19 East Jct (Crawford) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
Washington County Line TO MO 21 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
IS 44 (Phelps) TO MO 68 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 21 (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
80
US 61 (New Madrid) TO CRD 523 (Mississippi) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
82
US 54 (Cedar) TO RT H (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
83
RT B (Polk) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
84
IS 55 (Pemiscot) TO IS 155 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
84
US 412 East Jct (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
84
Arkansas Line TO US 412 West Jct (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
86
MO 13 East Jct (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
MO 39 (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
US 60 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT F (Barry) TO MO 39 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT NN (Newton) TO US 60 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
IS 44 (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT A (Moniteau) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT O (Moniteau) TO RT A (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
US 40 / MO 5 (Cooper) TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT J (Cooper) TO RT O (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
BARRY RD (PLATTE) TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
IS 635 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
PLATTE COUNTY LINE TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
JACKSON COUNTY LINE TO IS 70 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
90
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
91
MO 51 (Bollinger) TO MO 25 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
92
US 169 (CLAY) TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
PLATTE COUNTY LINE TO US 169 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
KANSAS LINE TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT J (St. Charles) TO US 67 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT T (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
IS 70 (St. Charles) TO RT J (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
US 54 / US 63 (Callaway) TO RT D (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
95
RT W (Wright) TO RT ZZ (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Missouri Route
96
MO 43 (Jasper) TO MO 171 East Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
River St (Jasper) TO RT U (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 171 West Jct (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 171 East Jct (Jasper) TO River St (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
RT U (Jasper) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
99
US 60 (Shannon) TO Obanion St (Shannon) Birch Tree Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
A
MO 100 (Franklin) TO MO 47 (Frankiin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 92 (CLAY) TO LIBERTY CITY LIMITS (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
RT PP (Bates) TO IS 49 (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 61 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 69 (Clinton) TO West St (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
A
MO 38 (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
BU 60 (Wright) TO RT U (Wright) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
A
US 169 (Buchanan) TO RT O (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AA
IS 29 (PLATTE) TO US 69 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 60 (Butler) TO RT B ( Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AA
Sanders Valley Rd (Christian) TO US 160 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 62 (Scott) TO NOR 60 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AA
RT H (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
RT HH (Jasper) TO RT V V (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
MO 25/77 (Cape Girardeau) TO RT K (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
AB
US 160 (Greene) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
MO 141 (St. Louis) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
US 67 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
MO 163 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
MO 6 (Buchanan) TO US 36 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AC
Pickett Rd (Buchanan) TO US 169 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AF
Spring Bluff Rd (Franklin) TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AT
US 50 (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AW
RT TT (Pulaski) TO MO 17 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
BU 60 (Butler) TO RT AA (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
B
US 61 (PERRY) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
B
Brown Station Rd North Jct (Boone) TO LP 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 124 (Boone) TO Brown Station Rd North Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 266 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
US 54 (Cole) TO RT W / M (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
RT W / M (Cole) TO MO 133 (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 63 (Phelps) TO MO 8 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 54 (Vernon) TO RT F (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
BU 65 (Taney) TO Gobblers Knob Rd (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
RT A (Franklin) TO US 50 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT O (Callaway) TO RT AD (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
IS 49 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT HH (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT AB (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 133 (Pulaski) TO MO 28 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT CC East Jct (Moniteau) TO RT HH (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 52 (Morgan) TO RT CC East Jct (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 51 (Bollinger) TO MO 91 (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
CC
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
RT AD (Howell) TO US 63 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
CC
MO 109 (St. Louis) TO Kehrs Mill Rd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
RT M (Webster) TO IS 44 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
BU 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
120TH ST. (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 59 (Newton) TO Benton Ave (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
JACKSON COUNTY LINE TO RT Y (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT Y (CASS) TO MO 2 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
CLAY COUNTY LINE TO RT KK (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 171 (Jasper) TO RT O (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 170 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 270 (St. Louis) TO IS 170 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
Rouggly Rd (St. Francois) TO RT W (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
D
CRD D-2 (Carter) TO BU 60 (Carter) Van Buren) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
D
RT NN (Polk) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT U (Pemiscot) TO MO 164 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
DD
MO 38 (Webster) TO Osage Rd (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (JOHNSON) TO MO 23 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 164 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
DD
US 40 / 61 (St. Charles) TO Diehr Rd (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (Stone) TO CRD DD-25 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 124 (Boone) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 84 (Dunklin) TO MO 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
E
MO 21 (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
RT N (Jefferson) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
SOR IS 70 (St. Louis) TO MO 180 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
RT AB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
Colony Church Rd (St. Francois) TO RT D (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
EE
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
IS 55 (New Madrid) TO CRD 403 (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
F
IS 70 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
RT J (Callaway) TO Jefferson St (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
Westview Ln (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
US 65 (Taney) TO US 160 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 112 (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
LP 44 (Franklin) TO RT O (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 5 (Camden) TO RT TT (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
CRD 190 / Kodiak Rd (Jasper) TO MO 59 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
RT W (Jefferson) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
US 60 (Greene) TO Weaver Rd (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
MO 43 (Jasper) TO CRD 190 / Kodiak Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
MO 17 (Pulaski) TO Ft. Leonard Wood (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT FF WEST JCT (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
MO 215 (Polk) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
IS 44 (Lawrence) TO BU 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT W (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
H
LP 49 (Bates) TO Main St (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
MO 171 (Jasper) TO MO 571 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
US 61 (Scott) TO IS 55 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
HH
Reynolds County Line TO MO 34 (Wayne) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
HH
MO 86 (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 65 (Christian) TO RT NN (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT WW (CALLAWAY) TO RT F (CALLAWAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
MO 58 (CASS) TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 50 (JOHNSON) TO WHITEMAN AFB (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT MM (Dunklin) TO BU 25 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
JJ
Well St (Jasper) TO RT P (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT KK (Boone) TO MO 163 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 49 (Vernon) TO CRD 1800 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
CRD 317 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
MO 25 (CAPE GIRARDEAU) TO CRD 317 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
RT ZZ (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 14 (CHRISTIAN) TO RT M (STONE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 43 (Newton) TO Irwin Dr (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT N (SCOTT) TO RT AB (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
CRD 6470 (Howell) TO US 63 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
K
MO 30 (Franklin) TO MO 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 229 (Andrew) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
K
IS 70 (St. Charles) TO US 40 / 61 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
Beginning of Route (Camden) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 185 North Jct (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 8 (Phelps) TO CRD 3610 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
RT A (Scott) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
M
RT U (Stone) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
US 60 (Greene) TO RT FF (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 21 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 79 (St. Charles) TO RT P (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
RT TT (Camden) TO MO 242 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
IS 44 (Greene) TO MO 413 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 270 (St. Louis) TO MO 115 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 44 (Greene) TO CRD 168 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 21 (Jefferson) TO RT E / Miller St (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 32 (St. Francois) TO RT NN (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
N
RT F (Franklin) TO Meramec River (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT NN (St. Francois) TO MO 21 (Iron) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
N
MISSISSIPPI RIVER (SCOTT) TO MAIN ST. (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
NN
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 86 (Newton) TO RT P (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 164 (Dunklin) TO Arkansas Line Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
NN
RT O (Franklin) TO Rock Church Rd (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
US 412 (Dunklin) TO MO 164 (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
RT C (Callaway) TO RT CC (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 32 (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 72 (Phelps) TO Lions Club Dr (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
RT AK (Franklin) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
US 67 (ST. FRANCOIS) TO RT D (ST. GENEIVE) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 84 (Dunklin) TO RT V V (Dunklin) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
O
MO 5 (Morgan) TO End of Route Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 744 (Greene) TO MO 125 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
Vintage Lane (Stone) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 32 (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
OO
MO 125 East Jct (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
RT JJ (Jasper) TO MO 66 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 8 (St. Francois) TO MO 8 (St. Francois) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
P
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
US 61 (St. Charles) TO RT M (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 366 (St. Louis) TO MO 30 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
Byrnes Mill Rd (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
US 60 (Butler) TO BU 60 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
IS 70 (St. Charles) TO RT N (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
Ossenfort Rd (St. Louis) TO MO 100 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
RT N (St. Charles) TO RT TT ( St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
IS 55 (Perry) TO MO 51 (Perry) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
RT D (Wayne) TO US 60 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
T
Allan Rd (Taney) TO MO 76 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
US 61 (Jefferson) TO RT AA (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
RT F (Camden) TO RT MM (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
LP 49 (Jasper) TO Duquesne Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
Beginning of Route (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
West Florissant Ave (St. Louis) TO Woodrow Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
US 61 (New Madrid) TO RT WW (New Madrid) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
U
IS 55 (Pemiscot) TO MO 84 (Pemiscot) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
U
Oklahoma Line TO MO 43 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
CRD 54 SW (Buchanan) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
US 40 (JACKSON) TO MO 350 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
Munn Ave (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
IS 44 (Phelps) TO CRD 2060 (Phelps) Rolla Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
RT E (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
RT Y South Jct (Morgan) TO BU 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
KANSAS LINE TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 109 (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 14 (Christian) TO Jackson Spring Rd (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 177 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
W
Logan Rd (Vernon) Nevada TO US 54 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
Callaway County Line TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
US 63 (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
BU 60 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 25 (Stoddard) TO Pedestrian Factory Overpass (Stoddard) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 52 (Miller) TO CRD ISBON Rd (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 58 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
RT BB (Scott) TO US 61 (Scott) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Y
MO 127 (PETTIS) TO US 65 (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
CRD 3670 (Howell) TO US 60 (Howell) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
YY
RT Y (CASS) TO RT C (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 169 (Buchanan) TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
YY
Kansas Line TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
BU 54 (Callaway) TO Chandler Dr (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Main St (Jasper) Carl Junction TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Lincoln Dr (Madison) TO CRD 234 (Madison) Fredericktown Road reported clear CLEAR 05-29-2025 at 02:05 PM
Rural Route
Z
IS 70 (St. Charles) TO RT D (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
IS 29 (PLATTE) TO MCPHERSON AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
RT A (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
ZZ
RT KK (Crawford) TO MO 19 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
29
BU 71 (Andrew) TO LP 29 North Jct (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
29
US 59 South Jct (Andrew) TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
35
US 69 (Clinton) TO IS 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
44
IS 44 (Franklin) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
IS 44 West Jct (Greene) TO IS 44 East Jct (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
MO 39 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 171 (Jasper) TO IS 44 (Newton) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 44 (Newton) TO IS 49 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Vernon) TO IS 49 South Jct (Vernon) Nevada Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Bates) TO IS 49 South Jct (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 86 (Newton) TO BU 60 (Newton) Neosho Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
MO 763 East Jct (Boone) TO IS 70 East Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
IS 70 West Jct (Boone) TO MO 763 West Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
10
MO 10 (RAY) TO MO 10 (RAY) RICHMOND Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
13
MO 20 (LAFAYETTE) TO MO 13 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
25
MO 25 North Jct (Dunklin) TO MO 25 South Jct (New Madrid) Malden Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
39
MO 174 (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
5
MO 14 (Douglas) Ava TO MO 5 (Douglas) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
50
MO 179 (Cole) TO US 50 (Cole) Missouri Blvd Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
US 54 South Jct (Callaway) TO 4TH St. (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 87 North Jct (Miller) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 52 (Miller) TO MO 87 South Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
13TH St. (Callaway) TO US 54 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Wright) TO US 60 (Texas) Mountain Grove Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 West Jct (Texas) TO BU 63 (Texas) Willow Springs Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 (Newton) TO MO 86 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Carter) TO RT D (Carter) Van Buren Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 West Jct (Texas) TO US 63 (Texas) Cabool Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
US 60 (Barry) TO US 60 (Barry) Monett Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Stoddard) TO MO 25 (Stoddard) Dexter Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
MO 5 (Wright) TO US 60 (Wright) Mansfield Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
60
MO 86 West Jct (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Lawrence) TO US 60 (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Greene) TO RT B (Webster) Rogersville Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
Oklahoma Line TO MO 43 (Newton) Seneca Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Butler) TO US 60 East Jct (Butler) Poplar Bluff Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
61
IS 55 EXIT 89 (SCOTT) TO US 61 (SCOTT) Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
63
US 63 North Jct (Texas) TO BU 60 (Texas) Willow Springs Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
63
US 63 North Jct (Howell) TO US 63 South Jct (Howell) West Plains Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
65
MO 14 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
65
US 65 (Greene) TO US 60 (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
67
BU 60 (Bulter) TO US 67 (Butler) Poplar Bluff Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
67
MO 8 (St. Francois) TO Main St (St. Francois) Park Hills Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
67
MO 72 (Madison) TO US 67 (Madison) Fredericktown Road reported clear CLEAR 05-29-2025 at 02:05 PM
Business Route
71
US 71 (Andrew) TO LP 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Spur
169
US 169 (CLAY) TO RT DD (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
44
IS 44 (Phelps) St. Robert TO Ft. Leonard Wood Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
45
MO 92 (PLATTE) TO MO 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST BAGNELL DAM BLVD
Valley Rd (Miller) TO US 54 (Miller) Lake Ozark Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST CHOUTEAU TRFY
MO 210 (CLAY) TO FRONT ST (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST S 5TH ST
MO 94 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CO IS55 TO US61
IS 55 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
BACK TO TOP