Traffic impacts are situations that impact the traffic flow, but, do NOT include road work. Traffic impacts can cause road closures or slow down traffic. Traffic impacts can be planned, such as parades, or unplanned, such as stalled cars. There are 28 traffic impacts to report.

Road closed due to traffic impact 16 Road(s) closed due to traffic impact
Expect delays due to traffic impact 2 Expected delay(s) due to traffic impact
Possible delays due to traffic impact 2 Possible delay(s) due to traffic impact
Road closed due to winter weather 0 Closure(s) due to winter weather
Planned road closure 8 Closure(s) due to planned event(s)
Expect delays due to planned event 0 Expected delay(s) due to planned event(s)
Possible delays due to planned event 0 Possible delay(s) due to planned event(s)
Road closed due to traffic impact RT V N - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .253 mile(s) after CRD TWIN OAKS LN E, and ends .372 mile(s) after CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT V S - ADAIR County - CLOSED
BRIDGE DAMAGE
Road closure begins .372 mile(s) before CRD TWIN OAKS LN E, and ends .253 mile(s) before CRD TWIN OAKS LN E.
Reported 12/12/2024 2:07:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT D N - CALDWELL County - CLOSED
BRIDGE DAMAGE
Road closure begins .01 mile(s) after CRD STINSON DR E, and ends .052 mile(s) after CRD STINSON DR E.
Reported 6/26/2024 9:48:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT D S - CALDWELL County - CLOSED
BRIDGE DAMAGE
Road closure begins .052 mile(s) before CRD STINSON DR E, and ends .01 mile(s) before CRD STINSON DR E.
Reported 6/26/2024 9:48:00 AM.
Road closed until further notice.
Road closed due to planned event RT P W - DEKALB County - CLOSED
PLANNED
Road closure begins .03 mile(s) after RT O E, and ends .009 mile(s) before CST ELM ST E.
Reported 6/7/2025 6:00:00 AM.
Closure estimated to last 17 hour(s).
Road closed due to planned event RT P E - DEKALB County - CLOSED
PLANNED
Road closure begins .009 mile(s) after CST ELM ST E, and ends .03 mile(s) before RT O E.
Reported 6/7/2025 6:00:00 AM.
Closure estimated to last 17 hour(s).
Possible delays due to traffic impact RT D N - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins .001 mile(s) after RP RTD TO IS44E E, and ends RT WW E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Possible delays due to traffic impact RT D S - FRANKLIN County - POSSIBLE DELAYS
BRIDGE DAMAGE
Incident begins RT WW E, and ends .001 mile(s) before RP RTD TO IS44E E.
Reported 2/16/2025 11:32:00 AM.
Traffic will be implacted until further notice.
Expect delays due to traffic impact US 24 E - JACKSON County - EXPECT DELAYS
ROADWAY DAMAGE
Incident begins .001 mile(s) before CST NORTHERN BLVD S, and ends .03 mile(s) after CST NORTHERN BLVD S.
Reported 4/13/2023 4:30:00 PM.
Traffic will be implacted until further notice.
Road closed due to traffic impact RT W S - JEFFERSON County - CLOSED
ROADWAY DAMAGE
Road closure begins .02 mile(s) after CRD TWIN RIVER RD E, and ends .015 mile(s) before PVT BOEMLER RD E.
Reported 4/10/2025 6:47:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT W N - JEFFERSON County - CLOSED
ROADWAY DAMAGE
Road closure begins .015 mile(s) after PVT BOEMLER RD E, and ends .02 mile(s) before CRD TWIN RIVER RD E.
Reported 4/10/2025 6:47:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV N - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .012 mile(s) before CRD BISON ST E, and ends .024 mile(s) after CRD ARCTIC RD E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT VV S - MACON County - CLOSED
BRIDGE CLOSED
Road closure begins .024 mile(s) before CRD ARCTIC RD E, and ends .012 mile(s) after CRD BISON ST E.
Reported 5/24/2024 9:49:00 AM.
Road closed until further notice.
Road closed due to planned event MO 79 S - MARION County - CLOSED
PLANNED
Road closure begins CST CHURCH ST E, and ends .252 mile(s) after RR HANNIBAL SIDING S.
Reported 7/5/2025 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to planned event CST MAIN ST N - MARION County - CLOSED
PLANNED
Road closure begins CST JANET TRAIL E, and ends CST JEFFERSON ST E.
Reported 6/14/2025 10:00:00 AM.
Closure estimated to last 1 hour(s).
Road closed due to planned event CST MAIN ST S - MARION County - CLOSED
PLANNED
Road closure begins CST JEFFERSON ST E, and ends CST JANET TRAIL E.
Reported 6/14/2025 10:00:00 AM.
Closure estimated to last 1 hour(s).
Road closed due to traffic impact RT NN N - MISSISSIPPI County - CLOSED
ROADWAY DAMAGE
Road closure begins .011 mile(s) before CRD 222 E, and ends .02 mile(s) after CRD 351 S.
Reported 4/6/2025 6:21:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT AA N - NEW MADRID County - CLOSED
BRIDGE DAMAGE
Road closure begins .005 mile(s) before CST LYNUAL ST E, and ends OR 60 E.
Reported 12/19/2024 8:43:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT NN E - NODAWAY County - CLOSED
BRIDGE CLOSED
Road closure begins .002 mile(s) after CRD ORION RD S, and ends .001 mile(s) after CRD PANTHER RD S.
Reported 7/10/2024 2:46:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT NN W - NODAWAY County - CLOSED
BRIDGE CLOSED
Road closure begins .001 mile(s) before CRD PANTHER RD S, and ends .002 mile(s) before CRD ORION RD S.
Reported 7/10/2024 2:46:00 PM.
Road closed until further notice.
Road closed due to planned event RT D N - PIKE County - CLOSED
PLANNED
Road closure begins .002 mile(s) before OR 61 S, and ends .001 mile(s) after CRD VO-TECH RD E.
Reported 6/21/2025 11:00:00 AM.
Closure estimated to last 5 hour(s).
Road closed due to planned event RT D S - PIKE County - CLOSED
PLANNED
Road closure begins .001 mile(s) before CRD VO-TECH RD E, and ends .002 mile(s) after OR 61 S.
Reported 6/21/2025 11:00:00 AM.
Closure estimated to last 5 hour(s).
Road closed due to planned event MO 79 N - RALLS County - CLOSED
PLANNED
Road closure begins .252 mile(s) before RR HANNIBAL SIDING S, and ends CST CHURCH ST E.
Reported 7/5/2025 6:00:00 AM.
Closure estimated to last 3 hour(s).
Road closed due to traffic impact CRD LEMON TRL S - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after CRD 118TH RD E, and ends .007 mile(s) before OR 70 E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Road closed due to traffic impact CRD LEMON TRL N - SALINE County - CLOSED
BRIDGE DAMAGE
Road closure begins .007 mile(s) after OR 70 E, and ends .007 mile(s) before CRD 118TH RD E.
Reported 3/11/2023 12:26:00 PM.
Road closed until further notice.
Road closed due to traffic impact RT AA S - SCOTT County - CLOSED
BRIDGE DAMAGE
Road closure begins OR 60 E, and ends .005 mile(s) after CST LYNUAL ST E.
Reported 12/19/2024 8:43:00 AM.
Road closed until further notice.
Road closed due to traffic impact RT NN S - SCOTT County - CLOSED
ROADWAY DAMAGE
Road closure begins .02 mile(s) before CRD 351 S, and ends .011 mile(s) after CRD 222 E.
Reported 4/6/2025 6:21:00 PM.
Road closed until further notice.
Expect delays due to traffic impact RP IS55S TO LOUGHBOROUGH AVE S - ST. LOUIS CITY County - EXPECT DELAYS
SIGNAL ISSUE
Incident begins .074 mile(s) before CST LOUGHBOROUGH AVE E, and ends CST LOUGHBOROUGH AVE E.
Reported 10/20/2024 11:42:00 AM.
Traffic will be implacted until further notice.

Flooding

BACK TO TOP

Floods are a special category of traffic impacts causing water to pool on the roadway, typically due to exceessive rainfall. Flooding may cause a road closure, or an expected delay. There are 42 flooding impact(s) to report.

Road closed due to flooding 42 Road(s) closed due to flooding
Expect delays due to flooding 0 Expected delay(s) due to flooding
Road closed due to flooding RT C W - BARRY County - CLOSED
Flat Creek
Flooding reported beginning .753 mile(s) before RT VV S and ending .083 mile(s) before RT VV S.
Road impacted since 4/19/2025 12:40:00 PM.
NOTES: Please use alternate route.
Road closed due to flooding RT C E - BARRY County - CLOSED
Flat Creek
Flooding reported beginning .083 mile(s) after RT VV S and ending .753 mile(s) after RT VV S.
Road impacted since 4/19/2025 12:40:00 PM.
NOTES: Please use alternate route.
Road closed due to flooding RT U E - BARRY County - CLOSED
Flooding reported beginning MO 37 S and ending .025 mile(s) after CRD 1095 S.
Road impacted since 4/19/2025 7:24:00 PM.
Road closed due to flooding RT U W - BARRY County - CLOSED
Flooding reported beginning .025 mile(s) before CRD 1095 S and ending MO 37 S.
Road impacted since 4/19/2025 7:24:00 PM.
Road closed due to flooding MO 142 E - BUTLER County - CLOSED
Flooding reported beginning CRD 320 E and ending .022 mile(s) after CRD 316 E.
Road impacted since 4/21/2025 7:43:00 AM.
NOTES: USE ALT ROUTE
Road closed due to flooding MO 142 W - BUTLER County - CLOSED
Flooding reported beginning .022 mile(s) before CRD 316 E and ending CRD 322 E.
Road impacted since 4/21/2025 7:43:00 AM.
NOTES: USE ALT ROUTE
Road closed due to flooding RT U N - DOUGLAS County - CLOSED
Flooding reported beginning MO 76 E and ending .185 mile(s) after CRD U-106 E.
Road impacted since 4/19/2025 4:18:00 PM.
NOTES: FLOODING USE ALT ROUTE
Road closed due to flooding RT U S - DOUGLAS County - CLOSED
Flooding reported beginning .185 mile(s) before CRD U-106 E and ending MO 76 E.
Road impacted since 4/19/2025 4:18:00 PM.
NOTES: FLOODING USE ALT ROUTE
Road closed due to flooding RT Y W - DOUGLAS County - CLOSED
Flooding reported beginning MO 76 E and ending .118 mile(s) after CRD Y-526 E.
Road impacted since 4/19/2025 4:21:00 PM.
NOTES: FLOODING USE ALT RTE
Road closed due to flooding RT Y E - DOUGLAS County - CLOSED
Flooding reported beginning .118 mile(s) before CRD Y-526 E and ending MO 76 E.
Road impacted since 4/19/2025 4:21:00 PM.
NOTES: FLOODING USE ALT RTE
Road closed due to flooding RT N E - HENRY County - CLOSED
Flooding reported beginning .322 mile(s) before CST FIRST ST E and ending .031 mile(s) before CST FIRST ST E.
Road impacted since 4/20/2025 11:16:00 AM.
NOTES: CLOSED DUE TO FLOODING
Road closed due to flooding RT N W - HENRY County - CLOSED
Flooding reported beginning .031 mile(s) after CST FIRST ST E and ending .322 mile(s) after CST FIRST ST E.
Road impacted since 4/20/2025 11:16:00 AM.
NOTES: CLOSED DUE TO FLOODING
Road closed due to flooding RT K E - HOWELL County - CLOSED
Flooding reported beginning RT MM S and ending .104 mile(s) before CRD 7530 E.
Road impacted since 4/19/2025 4:07:00 PM.
NOTES: FLOODING, USE ALT RTE
Road closed due to flooding RT K W - HOWELL County - CLOSED
Flooding reported beginning .104 mile(s) after CRD 7530 E and ending RT MM S.
Road impacted since 4/19/2025 4:07:00 PM.
NOTES: FLOODING, USE ALT RTE
Road closed due to flooding RT F W - IRON County - CLOSED
Flooding reported beginning .001 mile(s) after CRD 165 S and ending .004 mile(s) before MO 49 S.
Road impacted since 4/3/2025 12:26:00 PM.
NOTES: Closed due to flooding. Please seek alternate route.
Road closed due to flooding RT F E - IRON County - CLOSED
Flooding reported beginning .004 mile(s) after MO 49 S and ending .001 mile(s) before CRD 165 S.
Road impacted since 4/3/2025 12:26:00 PM.
NOTES: Closed due to flooding. Please seek alternate route.
Road closed due to flooding MO 23 N - JOHNSON County - CLOSED
Blackwater RIver
Flooding reported beginning .002 mile(s) after CRD 950 E and ending .013 mile(s) after CRD 1125 E.
Road impacted since 4/20/2025 11:55:00 AM.
NOTES: MO 23 CLOSED BETWEEN CRD 950NE AND CRD 1125NE. USE ALTERNATE ROUTE.
Road closed due to flooding MO 23 S - JOHNSON County - CLOSED
Blackwater RIver
Flooding reported beginning .013 mile(s) before CRD 1125 E and ending .002 mile(s) before CRD 950 E.
Road impacted since 4/20/2025 11:55:00 AM.
NOTES: MO 23 CLOSED BETWEEN CRD 950NE AND CRD 1125NE. USE ALTERNATE ROUTE.
Road closed due to flooding RT V E - JOHNSON County - CLOSED
Flooding reported beginning .006 mile(s) before CRD 201 S and ending .012 mile(s) before CRD 550 E.
Road impacted since 4/21/2025 6:25:00 AM.
Road closed due to flooding RT V W - JOHNSON County - CLOSED
Flooding reported beginning .012 mile(s) after CRD 550 E and ending .006 mile(s) after CRD 201 S.
Road impacted since 4/21/2025 6:25:00 AM.
Road closed due to flooding RT OO W - MISSISSIPPI County - CLOSED
FLASH FLOODING
Flooding reported beginning CRD 525 S and ending RT BB S.
Road impacted since 4/5/2025 10:30:00 PM.
NOTES: Use alt route.
Road closed due to flooding MO 162 W - NEW MADRID County - CLOSED
Flooding reported beginning 1.694 mile(s) before CRD 439 S and ending .083 mile(s) before CRD 439 S.
Road impacted since 4/7/2025 12:39:00 PM.
NOTES: Road CLOSED due to flooding. Please seek alternate route.
Road closed due to flooding MO 162 E - NEW MADRID County - CLOSED
Flooding reported beginning .083 mile(s) after CRD 439 S and ending 1.694 mile(s) after CRD 439 S.
Road impacted since 4/7/2025 12:39:00 PM.
NOTES: Road CLOSED due to flooding. Please seek alternate route.
Road closed due to flooding RT OO E - NEW MADRID County - CLOSED
FLASH FLOODING
Flooding reported beginning RT BB S and ending CRD 525 S.
Road impacted since 4/5/2025 10:30:00 PM.
NOTES: Use alt route.
Road closed due to flooding RT P E - NEW MADRID County - CLOSED
Flooding reported beginning .003 mile(s) before RT V S and ending .004 mile(s) before RT BB S.
Road impacted since 4/9/2025 10:01:00 AM.
NOTES: WATER OVER ROADWAY USE ALT ROUTE
Road closed due to flooding RT P W - NEW MADRID County - CLOSED
Flooding reported beginning .004 mile(s) after RT BB S and ending .003 mile(s) after RT V S.
Road impacted since 4/9/2025 10:01:00 AM.
NOTES: WATER OVER ROADWAY USE ALT ROUTE
Road closed due to flooding RT O N - PETTIS County - CLOSED
MUDDY CREEK
Flooding reported beginning .239 mile(s) before CRD FARMERS CITY RD S and ending CRD LOOK OUT RD E.
Road impacted since 4/20/2025 8:33:00 PM.
NOTES: ROAD CLOSED DUE TO FLOODING ROUTE OF BETWEEN LOOKER RD TO FARMER CITY USE ALT ROU
Road closed due to flooding RT O S - PETTIS County - CLOSED
MUDDY CREEK
Flooding reported beginning CRD LOOK OUT RD E and ending .239 mile(s) after CRD FARMERS CITY RD S.
Road impacted since 4/20/2025 8:33:00 PM.
NOTES: ROAD CLOSED DUE TO FLOODING ROUTE OF BETWEEN LOOKER RD TO FARMER CITY USE ALT ROU
Road closed due to flooding OR 70 W - SALINE County - CLOSED
Flooding reported beginning .306 mile(s) after RP IS70E TO MO127 E and ending .316 mile(s) before CO NOR70 TO SOR70 S.
Road impacted since 4/20/2025 5:41:00 PM.
NOTES: Water over roadway
Road closed due to flooding OR 70 E - SALINE County - CLOSED
Flooding reported beginning .316 mile(s) after CO NOR70 TO SOR70 S and ending .306 mile(s) before RP IS70E TO MO127 E.
Road impacted since 4/20/2025 5:41:00 PM.
NOTES: Water over roadway
Road closed due to flooding RT UU W - SALINE County - CLOSED
Flooding reported beginning CRD LEMON TRL S and ending US 65 S.
Road impacted since 4/21/2025 7:04:00 AM.
Road closed due to flooding RT UU E - SALINE County - CLOSED
Flooding reported beginning US 65 S and ending CRD LEMON TRL S.
Road impacted since 4/21/2025 7:04:00 AM.
Road closed due to flooding RT HH W - SCOTT County - CLOSED
Flooding reported beginning .002 mile(s) after CST INGRAM RD S and ending .019 mile(s) before US 61 S.
Road impacted since 4/20/2025 7:19:00 PM.
NOTES: Route HH Closed Due to Flooding Use Alt Route
Road closed due to flooding RT HH E - SCOTT County - CLOSED
Flooding reported beginning .019 mile(s) after US 61 S and ending .002 mile(s) before CST INGRAM RD S.
Road impacted since 4/20/2025 7:19:00 PM.
NOTES: Route HH Closed Due to Flooding Use Alt Route
Road closed due to flooding RT N S - SHELBY County - CLOSED
North Fork Salt River
Flooding reported beginning .069 mile(s) before CRD 314 E and ending .054 mile(s) after CRD 322 E.
Road impacted since 4/21/2025 6:27:00 AM.
NOTES: Water is over the road. Please use alternate route.
Road closed due to flooding RT N N - SHELBY County - CLOSED
North Fork Salt River
Flooding reported beginning .054 mile(s) before CRD 322 E and ending .069 mile(s) after CRD 316 E.
Road impacted since 4/21/2025 6:27:00 AM.
NOTES: Water is over the road. Please use alternate route.
Road closed due to flooding RT V S - VERNON County - CLOSED
Flooding reported beginning .071 mile(s) after CRD DODGE E and ending .001 mile(s) after CST NORTH ST E.
Road impacted since 4/20/2025 6:06:00 PM.
NOTES: Water over roadway
Road closed due to flooding RT V N - VERNON County - CLOSED
Flooding reported beginning .001 mile(s) before CST NORTH ST E and ending .071 mile(s) before CRD DODGE E.
Road impacted since 4/20/2025 6:06:00 PM.
NOTES: Water over roadway
Road closed due to flooding RT KK N - WAYNE County - CLOSED
Flooding reported beginning .011 mile(s) before CRD 456 E and ending .259 mile(s) before MO 34 E.
Road impacted since 4/5/2025 7:49:00 AM.
NOTES: Water over road. Please seek alternate route.
Road closed due to flooding RT KK S - WAYNE County - CLOSED
Flooding reported beginning .259 mile(s) after MO 34 E and ending .011 mile(s) after CRD 456 E.
Road impacted since 4/5/2025 7:49:00 AM.
NOTES: Water over road. Please seek alternate route.
Road closed due to flooding RT Z S - WRIGHT County - CLOSED
Flooding reported beginning .042 mile(s) before CRD DORIS CEMETERY RD S and ending .762 mile(s) after CRD DANDELION RD E.
Road impacted since 4/19/2025 3:29:00 PM.
NOTES: FLOODING, USE ALT RTE
Road closed due to flooding RT Z N - WRIGHT County - CLOSED
Flooding reported beginning .762 mile(s) before CRD DANDELION RD E and ending .042 mile(s) after CRD DORIS CEMETERY RD S.
Road impacted since 4/19/2025 3:29:00 PM.
NOTES: FLOODING, USE ALT RTE

Work Zone: Road Closed

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. Some work zones require that all lanes be closed to traffic to conduct the work. There are 103 closure(s) due to work zone(s) to report.

Road closed due to work zone 103 Road(s) closed due to work zone
Road closed due to workzone RP TRUMAN PKWY TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST LAFAYETTE AVE E and ends at .01 mile(s) after CST RUSSELL BLVD E.
Work is scheduled from 06-DEC-2022 to 29-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST IVY W - ST. CHARLES County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at MO 94 W and ends at CST OLD MO 94 E.
Work is scheduled from 18-JUL-2022 to 01-AUG-2030.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL S - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) before IS 70 W and ends at .022 mile(s) after IS 70 E.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CRD LEMON TRL N - SALINE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .022 mile(s) before IS 70 E and ends at .015 mile(s) after IS 70 W.
Work is scheduled from 14-MAR-2023 to 31-DEC-2037.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 33 N - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .087 mile(s) after RT CC E and ends at .031 mile(s) before CRD BURRIS RD S.
Work is scheduled from 29-AUG-2024 to 17-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 33 S - CLAY County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .031 mile(s) after CRD BURRIS RD S and ends at .087 mile(s) before RT CC E.
Work is scheduled from 29-AUG-2024 to 17-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .439 mile(s) after CRD SHERWOOD FOREST E and ends at .938 mile(s) after CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Z E - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .938 mile(s) before CRD SHERWOOD FOREST E and ends at .439 mile(s) before CRD SHERWOOD FOREST E.
Work is scheduled from 14-OCT-2024 to 08-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS55N BLOOMSDALE N - STE. GENEVIEVE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at IS 55 N.
Work is scheduled from 10-OCT-2024 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J W - CARROLL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .155 mile(s) before CRD 281 S and ends at .039 mile(s) before CRD 281 S.
Work is scheduled from 13-JAN-2025 to 23-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J E - CARROLL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .039 mile(s) after CRD 281 S and ends at .155 mile(s) after CRD 281 S.
Work is scheduled from 13-JAN-2025 to 23-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 160 W - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after RT BB S and ends at .002 mile(s) before US 63 N.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone RP IS55S TO US67N N - JEFFERSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 55 S and ends at .005 mile(s) before US 67 N.
Work is scheduled from 10-DEC-2024 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 W - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after CRD ROCKWOOD RD S and ends at .001 mile(s) before PVT STAGE COACH RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 90 E - MCDONALD County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT STAGE COACH RD S and ends at .002 mile(s) before CRD ROCKWOOD RD S.
Work is scheduled from 20-JAN-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US67S TO IS55S S - JEFFERSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 67 S and ends at IS 55 S.
Work is scheduled from 28-FEB-2025 to 22-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D W - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .994 mile(s) before CRD MUSSEL FORK AVE S and ends at .656 mile(s) before CRD MUSSEL FORK AVE S.
Work is scheduled from 24-FEB-2025 to 15-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - CHARITON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .656 mile(s) after CRD MUSSEL FORK AVE S and ends at .994 mile(s) after CRD MUSSEL FORK AVE S.
Work is scheduled from 24-FEB-2025 to 15-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS270W TO RIVERVIEW DR W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at IS 270 W and ends at RT H N.
Work is scheduled from 13-JAN-2025 to 02-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RA IS70W BOONVILLE W - COOPER County - ALL LANES CLOSED
SIDEWALK/ADA IMPROVEMENTS
Road closure begins at IS 70 W.
Work is scheduled from 21-JAN-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP GERMANIA ST TO IS55N N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST GERMANIA AVE E and ends at IS 55 N.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS55N TO IDAHO AVE N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at IS 55 N and ends at CST IDAHO AVE E.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP LOUGHBOROUGH AVE TO IS55N N - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST IDAHO AVE E and ends at IS 55 N.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP CHEROKEE ST TO IS55S S - ST. LOUIS CITY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at CST CHEROKEE ST E and ends at IS 55 S.
Work is scheduled from 17-JAN-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 53 N - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) after RT H S and ends at .003 mile(s) before RT J E.
Work is scheduled from 06-JAN-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 53 S - DUNKLIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT J E and ends at .035 mile(s) before RT H S.
Work is scheduled from 06-JAN-2025 to 18-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E N - NEW MADRID County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .002 mile(s) after CRD 829 S and ends at .003 mile(s) before CRD 845 S.
Work is scheduled from 17-FEB-2025 to 18-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E S - NEW MADRID County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .003 mile(s) after CRD 845 S and ends at .002 mile(s) before CRD 829 S.
Work is scheduled from 17-FEB-2025 to 18-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT K E - AUDRAIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .051 mile(s) after CRD 638 E and ends at .057 mile(s) before CRD 553 S.
Work is scheduled from 17-FEB-2025 to 13-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT K W - AUDRAIN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .057 mile(s) after CRD 553 S and ends at .051 mile(s) before CRD 638 E.
Work is scheduled from 17-FEB-2025 to 13-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ N - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .521 mile(s) before RT RA E and ends at .422 mile(s) before RT RA E.
Work is scheduled from 24-MAR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT ZZ S - MONTGOMERY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .422 mile(s) after RT RA E and ends at .521 mile(s) after RT RA E.
Work is scheduled from 24-MAR-2025 to 13-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP US24E TO MO6 E - MARION County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at US 24 E and ends at MO 6 E.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO6 TO US24E E - MARION County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 6 E and ends at .004 mile(s) before US 24 E.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT DD E - BUCHANAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .024 mile(s) after CRD AUXIER RD SE S and ends at .023 mile(s) before CRD 135 SE S.
Work is scheduled from 03-MAR-2025 to 15-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT DD W - BUCHANAN County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .023 mile(s) after CRD 135 SE S and ends at .024 mile(s) before CRD AUXIER RD SE S.
Work is scheduled from 03-MAR-2025 to 15-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D S - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .015 mile(s) after CRD JEWELL DR E and ends at .035 mile(s) before CRD KERR RD E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D N - CALDWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .035 mile(s) after CRD KERR RD E and ends at .015 mile(s) before CRD JEWELL DR E.
Work is scheduled from 10-MAR-2025 to 12-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 50 E - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at CST SE SHENANDOAH DR E and ends at .358 mile(s) before CST MILTON THOMPSON RD S.
Work is scheduled from 26-MAR-2025 to 15-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone N OR 50 W - JACKSON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .358 mile(s) after CST MILTON THOMPSON RD S and ends at CST SE SHENANDOAH DR E.
Work is scheduled from 26-MAR-2025 to 15-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J E - SHELBY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .253 mile(s) before CRD 179 S and ends at .028 mile(s) before CRD 179 S.
Work is scheduled from 24-MAR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT J W - SHELBY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .028 mile(s) after CRD 179 S and ends at .253 mile(s) after CRD 179 S.
Work is scheduled from 24-MAR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone US 160 E - HOWELL County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .002 mile(s) after US 63 N and ends at .001 mile(s) before RT BB S.
Work is scheduled from 11-NOV-2024 to 19-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
News Release
Road closed due to workzone RA IS29N DEARBORN N - PLATTE County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at IS 29 N and ends at .003 mile(s) before IS 29 N.
Work is scheduled from 17-JAN-2025 to 31-OCT-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RP RIVERVIEW DR TO IS270W W - ST. LOUIS CITY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .005 mile(s) before RT H S and ends at .006 mile(s) before IS 270 W.
Work is scheduled from 13-JAN-2025 to 02-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 6 E - MARION County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RP US24W TO MO6 W and ends at OR 24 E.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 6 W - MARION County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at OR 24 E and ends at .003 mile(s) before RP MO6 TO US24W W.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NOLAND RD N - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .008 mile(s) before MO 350 E and ends at .001 mile(s) before MO 350 E.
Work is scheduled from 14-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST NOLAND RD S - JACKSON County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) after MO 350 E and ends at .008 mile(s) after MO 350 E.
Work is scheduled from 14-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP IS70E TO MYRTLE AVE E - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at IS 70 E and ends at .003 mile(s) before CST MYRTLE AVE S.
Work is scheduled from 20-MAR-2025 to 20-MAR-2031.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D E - RALLS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .196 mile(s) before CRD NEVILLE RD S and ends at .169 mile(s) before CRD NEVILLE RD S.
Work is scheduled from 26-MAR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT D W - RALLS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .169 mile(s) after CRD NEVILLE RD S and ends at .196 mile(s) after CRD NEVILLE RD S.
Work is scheduled from 26-MAR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y S - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .003 mile(s) after RT VV S and ends at .005 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y N - LAFAYETTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .005 mile(s) after RT VV S and ends at .003 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT Y W - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT V S and ends at .001 mile(s) before PVT 607 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Y E - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after PVT 607 S and ends at RT V S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT V S - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at RT Y E and ends at .001 mile(s) before CRD 606 S.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT V N - CAPE GIRARDEAU County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CRD 606 S and ends at RT Y E.
Work is scheduled from 20-MAR-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z S - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .008 mile(s) before CRD 437 S and ends at .01 mile(s) after CRD 439 S.
Work is scheduled from 14-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT Z N - SCOTT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .01 mile(s) before CRD 439 S and ends at .008 mile(s) after CRD 437 S.
Work is scheduled from 14-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone S OR 44 E - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .23 mile(s) before CRD OLD ROUTE 66 E and ends at .127 mile(s) before CRD OLD ROUTE 66 E.
Work is scheduled from 07-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone S OR 44 W - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .127 mile(s) after CRD OLD ROUTE 66 E and ends at .23 mile(s) after CRD OLD ROUTE 66 E.
Work is scheduled from 07-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone W OR 67 N - MADISON County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .13 mile(s) before MO 72 E and ends at .015 mile(s) before MO 72 E.
Work is scheduled from 24-MAR-2025 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone PVT OVERPASS S - JACKSON County - ALL LANES CLOSED
INTERSECTION IMPROVEMENTS
Road closure begins at .024 mile(s) before CST TRUMAN RD E and ends at .019 mile(s) after CST TRUMAN RD E.
Work is scheduled from 11-APR-2025 to 31-DEC-2032.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP MO43 TO IS44W W - NEWTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 43 N and ends at IS 44 W.
Work is scheduled from 26-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO86 TO IS44E E - NEWTON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at MO 86 E and ends at .011 mile(s) before IS 44 E.
Work is scheduled from 26-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT U W - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .003 mile(s) after CRD 681 S and ends at .006 mile(s) after CRD 668 E.
Work is scheduled from 21-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RT U E - BUTLER County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .006 mile(s) before CRD 668 E and ends at .003 mile(s) before CRD 681 S.
Work is scheduled from 21-APR-2025 to 23-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST THIRD ST E - JEFFERSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .001 mile(s) after CST CROMWELL RD S and ends at .011 mile(s) after IS 55 N.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST THIRD ST W - JEFFERSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .011 mile(s) before IS 55 N and ends at .001 mile(s) before CST CROMWELL RD S.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP CLEAVER II BLVD TO US71N N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .012 mile(s) after CO CLEAVER II BLVD TO E 43RD ST N and ends at .012 mile(s) before US 71 N.
Work is scheduled from 03-APR-2025 to 25-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 43RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .004 mile(s) after CO CLEAVER II BLVD TO E 43RD ST N and ends at .003 mile(s) before CST MICHIGAN AVE S.
Work is scheduled from 03-APR-2025 to 25-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST E 43RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .003 mile(s) after CST MICHIGAN AVE S and ends at .004 mile(s) before CO E 43RD ST TO E 39TH ST N.
Work is scheduled from 03-APR-2025 to 25-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT KK W - FRANKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at CRD BUCKLICK SCHOOL RD E and ends at .001 mile(s) after CRD KOELKEBECK RD S.
Work is scheduled from 16-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT KK E - FRANKLIN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .001 mile(s) before CRD KOELKEBECK RD S and ends at CRD BUCKLICK SCHOOL RD E.
Work is scheduled from 16-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST CONWAY RD W - ST. LOUIS County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .02 mile(s) before IS 270 E and ends at .009 mile(s) before OR 64 E.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT N W - HENRY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .208 mile(s) before CRD NW-800 E and ends at .014 mile(s) after RT M E.
Work is scheduled from 09-APR-2025 to 15-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT N E - HENRY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .014 mile(s) before RT M E and ends at .208 mile(s) after CRD NW-800 E.
Work is scheduled from 09-APR-2025 to 15-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP US24W TO IS435N N - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .004 mile(s) after US 24 E and ends at .01 mile(s) before IS 435 N.
Work is scheduled from 16-APR-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST ST JOHNS CHURCH RD E - JEFFERSON County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Road closure begins at .001 mile(s) after CST PATRICK PL S and ends at US 61 S.
Work is scheduled from 14-APR-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST ST JOHNS CHURCH RD W - JEFFERSON County - ALL LANES CLOSED
LIGHTING/SIGNAL/SIGN WORK
Road closure begins at US 67 S and ends at .001 mile(s) before CST PATRICK PL S.
Work is scheduled from 14-APR-2025 to 01-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT E N - SHELBY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 15 S and ends at MO 156 E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT E S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 156 E and ends at MO 15 S.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone MO 752 E - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at US 59 S and ends at CST SHERMAN ST S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone MO 752 W - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .001 mile(s) before CST SHERMAN ST S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST LAKE AVE S - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .017 mile(s) before CST KENTUCKY ST E and ends at .004 mile(s) before CST HYDE PARK AVE E.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone CST EUREKA AVE N - BUCHANAN County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Road closure begins at .019 mile(s) before US 59 S and ends at US 59 S.
Work is scheduled from 21-APR-2025 to 18-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT V N - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .178 mile(s) after CRD TWIN OAKS LN E and ends at .484 mile(s) after CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone RT V S - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Road closure begins at .484 mile(s) before CRD TWIN OAKS LN E and ends at .178 mile(s) before CRD TWIN OAKS LN E.
Work is scheduled from 09-APR-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Road closed due to workzone US 136 E - PUTNAM County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .1 mile(s) before MO 139 S and ends at .018 mile(s) after RT U S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone US 136 W - PUTNAM County - ALL LANES CLOSED
CULVERT REPLACEMENT
Road closure begins at .018 mile(s) before RT U S and ends at .1 mile(s) after MO 139 S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 06:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT TT N - CHARITON County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at .015 mile(s) after MO 139 S and ends at US 36 W.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT TT S - LINN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at US 36 W and ends at .015 mile(s) before MO 139 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT HH E - NEWTON County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Road closure begins at .004 mile(s) after MO 86 E and ends at .015 mile(s) after CST BOYD ST E.
Work is scheduled from 22-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT TT W - DENT County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .238 mile(s) after CRD 4020 E and ends at .254 mile(s) before CRD 4480 S.
Work is scheduled from 22-APR-2025 to 15-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT TT E - DENT County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .254 mile(s) after CRD 4480 S and ends at .238 mile(s) before CRD 4020 E.
Work is scheduled from 22-APR-2025 to 15-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RP MO291 TO IS35S S - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at MO 291 S and ends at .009 mile(s) before IS 35 S.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS35S TO US69N N - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at IS 35 S and ends at .004 mile(s) before CST LIGHTBURNE ST S.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will start daily at 05:00 PM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Road closed due to workzone CST HELEN AVE W - SCOTT County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .004 mile(s) after US 62 E and ends at .001 mile(s) after CST PRAIRIE AVE S.
Work is scheduled from 23-APR-2025 to 28-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone CST HELEN AVE E - SCOTT County - ALL LANES CLOSED
PAVEMENT REPAIR
Road closure begins at .001 mile(s) before CST PRAIRIE AVE S and ends at .004 mile(s) before US 62 E.
Work is scheduled from 23-APR-2025 to 28-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Road closed due to workzone RP IS70E TO BEARDSLEY RD S - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Road closure begins at .003 mile(s) after IS 70 E and ends at .006 mile(s) before CST BEARDSLEY RD S.
Work is scheduled from 23-APR-2025 to 26-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Road closed due to workzone RT A N - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 24-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Road closed due to workzone RT A S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Road closure begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 24-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.

Work Zone: Expected and Possible Delays

BACK TO TOP

A work zone is planned work to improve the roadway or areas adjacent to the roadway. Examples include re-surfacing, mowing or culvert replacement. The following work zones are either expected to cause delays, or, are not expected to cause delays, but, may still cause delays under certain conditions. There are 551 work zones where you can expect delays, or, where delays are not expected, but possible, to report.

Expected delay(s) due to work zone 335 Expected delay(s) due to work zone
Possible delay(s) due to work zone 216 Possible delay(s) due to work zone
Possible delays due to workzone CST NW BARRY RD W - CLAY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .025 mile(s) before RP US169N TO BARRY RD N and ends at .026 mile(s) before RP BARRY RD W TO US169S S.
Work is scheduled from 02-JAN-2023 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US67N TO IS55N N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 N and ends at IS 55 N.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US67S TO IS55S S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at US 67 S and ends at IS 55 S.
Work is scheduled from 22-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55S TO US67S S - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .005 mile(s) after IS 55 S and ends at .004 mile(s) before US 67 S.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS55N TO US67N N - JEFFERSON County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .013 mile(s) after IS 55 N and ends at .004 mile(s) before US 67 N.
Work is scheduled from 26-JAN-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .01 mile(s) before CST WILD HORSE RANCH LN S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT CC E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .01 mile(s) after CST WILD HORSE RANCH LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at RT CC E and ends at .08 mile(s) before CST WILDWOOD POINT E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 109 N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .08 mile(s) after CST WILDWOOD POINT E and ends at RT CC E.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST S EATHERTON RD S - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .132 mile(s) before CST SKYWAY DR S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST S EATHERTON RD N - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .132 mile(s) after CST SKYWAY DR S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WILD HORSE CREEK RD E - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .096 mile(s) before PVT LAUREY LN S and ends at MO 109 S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST WILD HORSE CREEK RD W - ST. LOUIS County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at MO 109 S and ends at .096 mile(s) after PVT LAUREY LN S.
Work is scheduled from 06-MAR-2024 to 01-DEC-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 N - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 946 E and ends at .607 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 51 S - PERRY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .607 mile(s) before CRD 946 E and ends at .004 mile(s) after CRD 946 E.
Work is scheduled from 24-APR-2024 to 31-JUL-2026.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) before CST JEAN DR E and ends at .005 mile(s) after CST THOROUGHMAN AVE E.
Work is scheduled from 06-MAY-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT N N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST THOROUGHMAN AVE E and ends at .002 mile(s) after CST JEAN DR E.
Work is scheduled from 06-MAY-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after RT OO E and ends at US 160 W.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 744 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 160 W and ends at .001 mile(s) before RT OO E.
Work is scheduled from 10-JUN-2024 to 31-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM N - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at MO 100 E and ends at RT T E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM S - FRANKLIN County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at RT T E and ends at MO 100 E.
Work is scheduled from 11-JUL-2024 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP US61N TO MO47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at US 61 N and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61N N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 N.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP US61S TO MO47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) after US 61 S and ends at MO 47 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP MO47 TO US61S S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at US 61 S.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .027 mile(s) before RP US67S TO IS55N N and ends at .063 mile(s) after RP IS55S TO US67S S.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 W - TANEY County - EXPECT DELAYS
Long Creek Bridge
BRIDGE RECONSTRUCTION
Work zone begins at .218 mile(s) after PVT BRIDGEVIEW DR S and ends at .164 mile(s) before CRD LEISURE LN E.
Work is scheduled from 12-OCT-2022 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Possible delays due to workzone MO 86 W - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .194 mile(s) after PVT BRIDGEVIEW DR S and ends at .175 mile(s) before CRD LEISURE LN E.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D W - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST PAGE BLVD E and ends at .012 mile(s) before RP IS170W TO RTDW W.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT D E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .013 mile(s) after RP RTDE TO IS170W W and ends at .001 mile(s) before CST PAGE BLVD E.
Work is scheduled from 01-MAR-2024 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 350 E - JACKSON County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at CST 55TH ST E and ends at .024 mile(s) after RP IS435N TO MO350W W.
Work is scheduled from 18-SEP-2024 to 30-OCT-2025.
Work will start daily at 08:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 55 N - STE. GENEVIEVE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) before RA IS55N BLOOMSDALE N and ends at .009 mile(s) after RA IS55N BLOOMSDALE N.
Work is scheduled from 11-OCT-2024 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 86 E - TANEY County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .175 mile(s) after CRD LEISURE LN E and ends at .194 mile(s) before PVT BRIDGEVIEW DR S.
Work is scheduled from 29-AUG-2022 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 E - TANEY County - EXPECT DELAYS
Long Creek Bridge
BRIDGE RECONSTRUCTION
Work zone begins at .164 mile(s) after CRD LEISURE LN E and ends at .222 mile(s) before PVT BRIDGEVIEW DR S.
Work is scheduled from 12-OCT-2022 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Project Site
Expect delays due to workzone RP MO744 TO US65S S - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 744 E and ends at .008 mile(s) before US 65 S.
Work is scheduled from 27-OCT-2024 to 01-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone RP US65N TO MO744 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 65 N and ends at MO 744 E.
Work is scheduled from 27-OCT-2024 to 01-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone RP MO744 TO US65N N - GREENE County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at MO 744 E and ends at US 65 N.
Work is scheduled from 30-OCT-2024 to 01-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone RP US65S TO MO744 W - GREENE County - EXPECT DELAYS
PAVEMENT MARKING
Work zone begins at .002 mile(s) after US 65 S and ends at .001 mile(s) before MO 744 E.
Work is scheduled from 30-OCT-2024 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Expect delays due to workzone CST MCNUTT ST S - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) before CST HERCULANEUM CROSSING S and ends at CST PROVIDENCE WAY E.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST MCNUTT ST N - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at CST PROVIDENCE WAY E and ends at .013 mile(s) after CST HERCULANEUM CROSSING S.
Work is scheduled from 01-OCT-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD W - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .184 mile(s) before CST SARAH ANN BLVD E and ends at MO 47 S.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CRD FRENCHMANS BLUFF RD E - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at MO 47 S and ends at .184 mile(s) after CST SARAH ANN BLVD E.
Work is scheduled from 18-NOV-2024 to 30-JUN-2026.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 49 S - CRAWFORD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at MO 19 S and ends at .045 mile(s) after CST OGLE DR S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 49 N - IRON County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .045 mile(s) before CST OGLE DR S and ends at MO 19 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP RTAB TO IS270E E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT AB E and ends at IS 270 E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270E TO RTAB E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 E and ends at RT AB E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO RTAB W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 W and ends at RT AB E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP RTAB TO IS270W W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT AB E and ends at IS 270 W.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .008 mile(s) before RP IS270E TO IS64E E and ends at .06 mile(s) after RP IS270E TO MO340E E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .028 mile(s) before RP MO340E TO IS270W W and ends at .006 mile(s) after RP IS64E TO IS270W W.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64W W - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 W and ends at .034 mile(s) before RP IS270E TO IS64W W.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before RT CC E and ends at .023 mile(s) after RT F E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .035 mile(s) after CRD SMELSER RD E and ends at .02 mile(s) before CO US65N TO US65S W.
Work is scheduled from 06-MAY-2024 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after CO US65S TO US65N W and ends at .035 mile(s) before CRD SMELSER RD E.
Work is scheduled from 06-MAY-2024 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .012 mile(s) before CST INDEPENDENCE AVE W and ends at OR 291 S.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at OR 291 S and ends at .012 mile(s) after CST INDEPENDENCE AVE E.
Work is scheduled from 05-SEP-2023 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - CHRISTIAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .023 mile(s) before RT F E and ends at .013 mile(s) after RT CC E.
Work is scheduled from 13-NOV-2023 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .048 mile(s) after CST OLD CAP AU GRIS RD E and ends at .316 mile(s) after CST DUGAN LN E.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .639 mile(s) before RP IS70W TO RTM W and ends at 1.065 mile(s) after RP RTJ TO IS70W W.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - HENRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .063 mile(s) after MO 52 E and ends at .011 mile(s) after CRD SW 450TH RD E.
Work is scheduled from 05-AUG-2024 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .2 mile(s) before RP IS70W TO US63C N and ends at .021 mile(s) after RR COLT S.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.013 mile(s) after RP RTJ TO IS70W W and ends at 1.456 mile(s) before RP IS70W TO US65N N.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS270W TO IS64E E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 270 W and ends at .02 mile(s) before RP IS64W TO IS270W W.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64E TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .03 mile(s) after RP IS64E TO IS270W W and ends at IS 270 E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RP IS64W TO IS270E E - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at IS 64 W and ends at IS 270 E.
Work is scheduled from 24-DEC-2024 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .143 mile(s) before PVT MANLEY QUARRY RD E and ends at .042 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 28-FEB-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 52 E - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .025 mile(s) before CST BROWN RD S and ends at .015 mile(s) after CST WEST VIEW DR S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 52 W - MORGAN County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .015 mile(s) before CST WEST VIEW DR S and ends at .025 mile(s) after CST BROWN RD S.
Work is scheduled from 27-JAN-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - STONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 248 E and ends at .028 mile(s) before PVT SHADY LN E.
Work is scheduled from 20-JAN-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 W - ST. LOUIS CITY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST RIVER DES PERES BLVD E and ends at .004 mile(s) before CST SUNSET OFFICE DR E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 366 E - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) after CST SUNSET OFFICE DR E and ends at .005 mile(s) after CST RIVER DES PERES BLVD E.
Work is scheduled from 02-JAN-2025 to 31-DEC-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 155 S - PEMISCOT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CRD 534 E and ends at .002 mile(s) before US 412 E.
Work is scheduled from 16-APR-2025 to 02-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 155 N - PEMISCOT County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after US 412 W and ends at .001 mile(s) before CRD 534 E.
Work is scheduled from 16-APR-2025 to 02-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 W - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before US 65 N and ends at .008 mile(s) after CST CHIEFS CT E.
Work is scheduled from 20-JAN-2025 to 31-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 248 E - TANEY County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .008 mile(s) before CST CHIEFS CT E and ends at .008 mile(s) after US 65 N.
Work is scheduled from 20-JAN-2025 to 31-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 N - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .019 mile(s) before CRD CAROLYNNE DR E and ends at .026 mile(s) before CST GREEN PARK RD E.
Work is scheduled from 13-JAN-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - ST. LOUIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .026 mile(s) after CST GREEN PARK RD E and ends at .019 mile(s) after CRD CAROLYNNE DR E.
Work is scheduled from 13-JAN-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Z E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after RP RTZ TO IS55S S and ends at .003 mile(s) before RP IS55N TO RTZ E.
Work is scheduled from 14-MAR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT Z W - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after RP IS55N TO RTZ E and ends at .001 mile(s) before RP RTZ TO IS55S S.
Work is scheduled from 14-MAR-2025 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT MM W - CAMDEN County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .534 mile(s) before CRD PORTO CIMA DR S and ends at .102 mile(s) before CRD PORTO CIMA DR S.
Work is scheduled from 10-FEB-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
News Release
Expect delays due to workzone RT MM E - CAMDEN County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .102 mile(s) after CRD VIA DEL LAGO DR S and ends at .534 mile(s) after CRD VIA DEL LAGO DR S.
Work is scheduled from 10-FEB-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
News Release
Expect delays due to workzone MO 21 N - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .002 mile(s) after MO 49 S and ends at .004 mile(s) before RT E E.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 21 S - IRON County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT E E and ends at .002 mile(s) before MO 49 S.
Work is scheduled from 17-FEB-2025 to 06-OCT-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B N - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CRD 785 S and ends at .003 mile(s) after CRD 784 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT B S - REYNOLDS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) before CRD 784 S and ends at .004 mile(s) after CRD 785 S.
Work is scheduled from 03-MAR-2025 to 31-OCT-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - MARION County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .115 mile(s) before RP US24E TO MO6 E and ends at .164 mile(s) after RP MO6 TO US24E E.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 N - MARION County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .1 mile(s) before RP US24E TO MO6 E and ends at .15 mile(s) after RP MO6 TO US24E E.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 N - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .067 mile(s) after CST REBAR RD E and ends at .323 mile(s) after OR 65 S.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 65 S - PETTIS County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .322 mile(s) before OR 65 S and ends at .068 mile(s) before CO US65S TO EOR65 E.
Work is scheduled from 27-JAN-2025 to 15-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT D N - LACLEDE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT E E and ends at US 54 E.
Work is scheduled from 03-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone RT D S - CAMDEN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 54 E and ends at RT E E.
Work is scheduled from 03-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 W - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .265 mile(s) before RP IS70W TO US54E E and ends at .444 mile(s) after RR FULTON BRANCH S.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 177 S - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT J E and ends at PVT PRIVATE RD E.
Work is scheduled from 04-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:30 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 177 N - CAPE GIRARDEAU County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at PVT PRIVATE RD E and ends at RT J E.
Work is scheduled from 04-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:30 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 116 W - CLINTON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 169 S and ends at US 59 S.
Work is scheduled from 03-MAR-2025 to 05-MAY-2025.
Work will start daily at 05:30 AM and end by 07:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 116 E - BUCHANAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 59 S and ends at US 169 S.
Work is scheduled from 03-MAR-2025 to 05-MAY-2025.
Work will start daily at 05:30 AM and end by 07:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 350 E - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .147 mile(s) after CST E 83RD ST E and ends at .412 mile(s) before CO US50E TO US50W E.
Work is scheduled from 13-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 350 W - JACKSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .358 mile(s) after CO US50E TO US50W E and ends at .318 mile(s) before CST WESTRIDGE RD S.
Work is scheduled from 13-MAR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST JAMES RIVER FRWY W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) before CST GLENSTONE AVE N and ends at .008 mile(s) after BU 65 S.
Work is scheduled from 04-MAR-2025 to 04-MAY-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .013 mile(s) after CST FOREST AVE S and ends at .008 mile(s) after CST CLAREMONT AVE S.
Work is scheduled from 04-MAR-2025 to 27-JUN-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 12 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) before CST CLAREMONT AVE S and ends at CST FOREST AVE S.
Work is scheduled from 11-MAR-2025 to 15-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) before CST FOREST AVE S and ends at CST CLAREMONT AVE S.
Work is scheduled from 11-MAR-2025 to 15-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 221 S - ST. FRANCOIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CRD THIRD ST E and ends at .001 mile(s) after PVT ST FRANCOIS HILLS DR S.
Work is scheduled from 17-MAR-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 221 N - ST. FRANCOIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before PVT ST FRANCOIS HILLS DR S and ends at .003 mile(s) after CRD THIRD ST E.
Work is scheduled from 17-MAR-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 340 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after PVT MONARCH FIRE STATION E and ends at .049 mile(s) after CST COUNTRY RIDGE DR E.
Work is scheduled from 03-MAR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 1 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST N INDIANA AVE S and ends at .021 mile(s) after CST 72ND ST E.
Work is scheduled from 10-MAR-2025 to 02-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 1 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .021 mile(s) before CST 72ND ST E and ends at CST N INDIANA AVE N.
Work is scheduled from 10-MAR-2025 to 02-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD S - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD 1650 S and ends at US 24 E.
Work is scheduled from 24-MAR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD N - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at CRD 1650 S.
Work is scheduled from 24-MAR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D N - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after RT BB E and ends at RT C S.
Work is scheduled from 28-MAR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D S - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT C S and ends at .001 mile(s) before RT BB E.
Work is scheduled from 28-MAR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB W - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT A S and ends at MO 3 S.
Work is scheduled from 01-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB E - RANDOLPH County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 3 S and ends at RT A S.
Work is scheduled from 01-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H N - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT W E and ends at US 136 E.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H S - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 136 E and ends at RT W E.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .296 mile(s) after PVT UNKNOWN S and ends at .022 mile(s) before US 63 S.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT W W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .022 mile(s) after US 63 S and ends at .296 mile(s) before PVT UNKNOWN S.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT T E - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .013 mile(s) after US 63 S and ends at CRD OLIVE HILL WAY E.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT T W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD OLIVE HILL WAY E and ends at .013 mile(s) before US 63 S.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D E - SULLIVAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 6 E and ends at MO 149 S.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 149 S and ends at MO 6 E.
Work is scheduled from 22-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT M S - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .027 mile(s) before RT U E and ends at .009 mile(s) before RT VV S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT M N - CRAWFORD County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after RT VV S and ends at .027 mile(s) after RT U E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 150 E - JACKSON County - POSSIBLE DELAYS
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Work zone begins at RP MO150 TO MO291S S and ends at .007 mile(s) before RP US50E TO MO150 E.
Work is scheduled from 17-MAR-2025 to 01-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 150 W - JACKSON County - POSSIBLE DELAYS
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after RP MO150 TO US50E E and ends at .001 mile(s) after RP MO150 TO MO291S S.
Work is scheduled from 17-MAR-2025 to 01-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CRD DAVID DR W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after PVT IVEYRIDGE LN S and ends at .024 mile(s) after IS 49 S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CRD DAVID DR E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) before IS 49 S and ends at .014 mile(s) before PVT IVEYRIDGE LN S.
Work is scheduled from 10-MAR-2025 to 09-FEB-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT AB S - POLK County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 215 S and ends at CRD 222ND RD S.
Work is scheduled from 24-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AB N - POLK County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD 222ND RD S and ends at MO 215 S.
Work is scheduled from 24-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT UU E - POLK County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD 510TH RD E and ends at RT U S.
Work is scheduled from 24-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT UU W - POLK County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT U S and ends at CRD 505TH RD E.
Work is scheduled from 24-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .299 mile(s) before RT Y S and ends at .243 mile(s) before CRD FINCH DR S.
Work is scheduled from 17-MAR-2025 to 01-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .243 mile(s) after CRD FINCH DR S and ends at .299 mile(s) after RT CC S.
Work is scheduled from 17-MAR-2025 to 01-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .348 mile(s) before CRD HAMMER RD S and ends at .319 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 05-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .319 mile(s) before CRD HAMMER RD S and ends at .348 mile(s) after CRD HAMMER RD S.
Work is scheduled from 17-MAR-2025 to 05-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 N - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .009 mile(s) after MO 7 N and ends at .036 mile(s) before CRD 1250 E.
Work is scheduled from 25-MAR-2025 to 15-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 7 N - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) before CST S VANSANT RD S and ends at .005 mile(s) after MO 18 E.
Work is scheduled from 14-APR-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 18 E and ends at .003 mile(s) after CST S VANSANT RD S.
Work is scheduled from 14-APR-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 36 W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .017 mile(s) after US 24 W and ends at .426 mile(s) after RP US24W TO US36W W.
Work is scheduled from 26-MAR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 21 N - JEFFERSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .1 mile(s) before CRD OLD HWY 21 S and ends at .05 mile(s) before CRD TESSON FERRY RD S.
Work is scheduled from 16-MAR-2025 to 02-JUN-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT F S - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after MO 58 E and ends at .005 mile(s) before MO 2 E.
Work is scheduled from 31-MAR-2025 to 16-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT F N - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after MO 2 E and ends at .01 mile(s) before MO 58 E.
Work is scheduled from 31-MAR-2025 to 16-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT AA W - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after MO 23 S and ends at .01 mile(s) before CST LIPPER ST S.
Work is scheduled from 01-APR-2025 to 23-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT AA E - LAFAYETTE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after CST LIPPER ST S and ends at .006 mile(s) before MO 23 S.
Work is scheduled from 01-APR-2025 to 23-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT O N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after US 50 E and ends at .006 mile(s) before RT N E.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT O S - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after RT N E and ends at .001 mile(s) before US 50 E.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after RT M S and ends at .002 mile(s) before US 50 E.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT W S - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 50 E and ends at .003 mile(s) before RT M S.
Work is scheduled from 31-MAR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .011 mile(s) before CST GOLDEN BEAR DR E and ends at .021 mile(s) before CST OLYMPIC BLVD S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .021 mile(s) after CST OLYMPIC BLVD S and ends at .011 mile(s) before CST WOODLAND SPRINGS CT S.
Work is scheduled from 14-MAR-2025 to 31-DEC-2027.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F S - STODDARD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .007 mile(s) after CRD 468 E and ends at US 60 E.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F N - STODDARD County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at US 60 E and ends at .007 mile(s) before CRD 468 E.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 170 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RP IS170W TO MO115S S and ends at .001 mile(s) after CST SCUDDER AVE E.
Work is scheduled from 17-MAR-2025 to 30-MAY-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 N - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .056 mile(s) before RP US63N TO RTWW N and ends at .072 mile(s) after CST CLARK LN E.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .076 mile(s) before CST CLARK LN E and ends at .07 mile(s) after RP RTWW TO US63S S.
Work is scheduled from 11-OCT-2024 to 01-JAN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone LP 44 E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) after OR 44 E and ends at .005 mile(s) after BU 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY E - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) before LP 44 E and ends at .001 mile(s) before OR 65 S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 N - DENT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.245 mile(s) before CRD 6230 E and ends at 1.061 mile(s) before CRD 6230 E.
Work is scheduled from 02-DEC-2024 to 02-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 47 N - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) before CST NORTH LINCOLN DR S and ends at .026 mile(s) before PVT ANNA AVE S.
Work is scheduled from 24-JUN-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 47 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .026 mile(s) after PVT ANNA AVE S and ends at .014 mile(s) after CST NORTH LINCOLN DR S.
Work is scheduled from 24-JUN-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H S - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after CST HALL ST N and ends at .007 mile(s) before CST CARRIE AVE E.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT H N - ST. LOUIS CITY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after CST CARRIE AVE E and ends at .005 mile(s) before CST HALL ST S.
Work is scheduled from 05-SEP-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 19 S - DENT County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.061 mile(s) after CRD 6230 E and ends at 1.245 mile(s) after CRD 6230 E.
Work is scheduled from 02-DEC-2024 to 02-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone LP 44 W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before BU 65 S and ends at .008 mile(s) before CST BROADVIEW PL S.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CHESTNUT EXPY W - GREENE County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after OR 65 S and ends at .003 mile(s) after LP 44 E.
Work is scheduled from 16-DEC-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.065 mile(s) before RP IS70E TO RTJ E and ends at .648 mile(s) after RP RTHH TO IS70E E.
Work is scheduled from 08-JUL-2024 to 31-DEC-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 E - COOPER County - EXPECT DELAYS
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Work zone begins at .027 mile(s) after RR RIVER SUB E and ends at .146 mile(s) after RP RTBB TO IS70E E.
Work is scheduled from 14-SEP-2021 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 W - BOONE County - EXPECT DELAYS
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Work zone begins at .169 mile(s) before RP IS70W TO RTBB W and ends at .027 mile(s) before RR RIVER SUB E.
Work is scheduled from 14-SEP-2021 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Project Site
News Release
Expect delays due to workzone IS 70 E - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.477 mile(s) after RP US65N TO IS70E E and ends at .948 mile(s) before RP IS70E TO RTJ E.
Work is scheduled from 19-DEC-2024 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before RR COLT S and ends at .183 mile(s) after RP US63C TO IS70E E.
Work is scheduled from 13-OCT-2024 to 01-JAN-2027.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 61 S - LINCOLN County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .319 mile(s) before CST N LINCOLN DR E and ends at .041 mile(s) before CST OLD CAP AU GRIS RD E.
Work is scheduled from 11-JUL-2024 to 30-JUN-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 13 S - HENRY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) before CRD SW 450TH RD E and ends at .009 mile(s) before MO 52 W.
Work is scheduled from 05-AUG-2024 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .038 mile(s) after CST FIFTH ST E and ends at .015 mile(s) before RT OO S.
Work is scheduled from 10-FEB-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 N - HOLT County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .702 mile(s) after CRD BEAGLE RD S and ends at .037 mile(s) before RP IS29N TO RTW N.
Work is scheduled from 10-FEB-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 100 W - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .015 mile(s) after RT OO S and ends at .038 mile(s) before CST FIFTH ST E.
Work is scheduled from 10-FEB-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 S - SHANNON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD 19A E and ends at .009 mile(s) before CRD 430 E.
Work is scheduled from 03-MAR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 S - STONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .028 mile(s) after PVT SHADY LN E and ends at .001 mile(s) before MO 248 E.
Work is scheduled from 20-JAN-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 19 N - OREGON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after CRD 430 E and ends at .024 mile(s) after CRD 19A E.
Work is scheduled from 03-MAR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 8 E - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) before CRD OLD HWY 8 E and ends at .024 mile(s) after CRD RAILROAD RD 606 S.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 63 N - RANDOLPH County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .009 mile(s) before RT J E and ends at .041 mile(s) before CRD KITE PL E.
Work is scheduled from 20-FEB-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 24 W - MARION County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .159 mile(s) before RP US24W TO MO6 W and ends at .112 mile(s) after RP MO6 TO US24W W.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 S - MARION County - POSSIBLE DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .145 mile(s) before RP US24W TO MO6 W and ends at .098 mile(s) after RP MO6 TO US24W W.
Work is scheduled from 24-FEB-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 8 W - WASHINGTON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) before CRD RAILROAD RD 606 S and ends at .009 mile(s) after CRD OLD HWY 8 E.
Work is scheduled from 03-MAR-2025 to 01-DEC-2025.
Work will start daily at 06:00 AM and end by 11:59 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - CALLAWAY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .441 mile(s) before RR FULTON BRANCH S and ends at .259 mile(s) after RP US54E TO IS70E E.
Work is scheduled from 26-FEB-2025 to 31-DEC-2027.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 54 E - CALLAWAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .253 mile(s) before CST MOKANE RD E and ends at .246 mile(s) before CRD 147 S.
Work is scheduled from 24-MAR-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 54 W - CALLAWAY County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .249 mile(s) after OR 54 E and ends at .255 mile(s) after CST MOKANE RD E.
Work is scheduled from 24-MAR-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .054 mile(s) after RP IS44E TO MO13S S and ends at .002 mile(s) before US 65 S.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 29 N - ANDREW County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at 1.144 mile(s) after RP US169 TO IS29N N and ends at .056 mile(s) after US 59 N.
Work is scheduled from 10-MAR-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) after US 65 S and ends at .044 mile(s) before RP MO13S TO IS44W W.
Work is scheduled from 10-MAR-2025 to 21-MAY-2027.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 29 S - HOLT County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .055 mile(s) before US 59 N and ends at 1.129 mile(s) before RP IS29S TO US169 S.
Work is scheduled from 10-MAR-2025 to 01-JUL-2025.
Work will start daily at 06:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .002 mile(s) before PVT COUNTRY HAVEN DR E and ends at .012 mile(s) after PVT RIVER DALE DR E.
Work is scheduled from 03-MAR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 435 N - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after CST NE BIRMINGHAM RD E and ends at .231 mile(s) after RP OUTER RD TO IS435N N.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 61 N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .013 mile(s) before CRD 502 E and ends at .002 mile(s) before CST HENNINGS DR E.
Work is scheduled from 19-MAR-2025 to 17-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 N - CRAWFORD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .001 mile(s) before CRD EDGAR RD E and ends at .011 mile(s) before RT HH S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 19 S - CRAWFORD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .011 mile(s) after RT HH S and ends at .001 mile(s) after CRD EDGAR RD E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 435 S - CLAY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .312 mile(s) after RP US69S TO IS435S S and ends at .145 mile(s) after RP PARVIN RD TO IS435S S.
Work is scheduled from 12-MAR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .012 mile(s) before PVT RIVER DALE DR E and ends at .002 mile(s) after PVT COUNTRY HAVEN DR E.
Work is scheduled from 03-MAR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 61 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .002 mile(s) after CST HENNINGS DR E and ends at .013 mile(s) after CRD 502 E.
Work is scheduled from 19-MAR-2025 to 17-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) before CST DUNN RD E and ends at .001 mile(s) before CST CHAIN OF ROCKS BRG E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT H N - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after CST CHAIN OF ROCKS BRG E and ends at .001 mile(s) after CST DUNN RD E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 125 N - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .09 mile(s) after CST OLD ORCHARD DR S and ends at .008 mile(s) after OR 44 E.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 125 S - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .008 mile(s) before OR 44 E and ends at .09 mile(s) before CST OLD ORCHARD DR S.
Work is scheduled from 10-MAR-2025 to 22-MAY-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 270 E - ST. LOUIS County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .121 mile(s) after RP LILAC AVE TO IS270E E and ends at .024 mile(s) after RP RIVERVIEW DR TO IS270E E.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 270 W - ST. LOUIS CITY County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) before RP IS270W TO RIVERVIEW DR W and ends at .069 mile(s) before RP IS270W TO LILAC AVE W.
Work is scheduled from 10-MAR-2025 to 31-DEC-2026.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 126 E - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) before CST VINE S and ends at .004 mile(s) after CST MILL S.
Work is scheduled from 11-MAR-2025 to 18-MAY-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 126 W - BARTON County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .004 mile(s) before CST MILL S and ends at .005 mile(s) after CST VINE S.
Work is scheduled from 11-MAR-2025 to 18-MAY-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 13 S - JOHNSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .036 mile(s) after CRD 1250 E and ends at .009 mile(s) before MO 7 N.
Work is scheduled from 25-MAR-2025 to 15-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 76 W - TANEY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.042 mile(s) before RR AURORA SUB E and ends at .401 mile(s) after PVT PRIVATE RD E.
Work is scheduled from 13-MAR-2025 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before RP IS44W TO LP49S S and ends at .001 mile(s) before RP IS44W TO MO86E E.
Work is scheduled from 23-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .013 mile(s) before RP IS44W TO LP49S S and ends at .044 mile(s) before RP IS44W TO MO86E E.
Work is scheduled from 30-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) after RP IS44E TO MO43 S and ends at .001 mile(s) before RP IS44E TO LP49S S.
Work is scheduled from 30-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after MO 100 E and ends at .002 mile(s) after CST DUNLORA LN S.
Work is scheduled from 24-MAR-2025 to 06-MAY-2025.
Work will start daily at 08:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 S - HENRY County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .231 mile(s) after CST GERHART DR S and ends at .001 mile(s) before CST GOLDEN DR S.
Work is scheduled from 07-APR-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 7 N - HENRY County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .001 mile(s) after CST GOLDEN DR S and ends at .231 mile(s) before CST GERHART DR S.
Work is scheduled from 07-APR-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 44 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .02 mile(s) after MO 43 S and ends at .002 mile(s) before RP IS44E TO LP49S S.
Work is scheduled from 23-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 170 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at RP AIRPORT RD TO IS170E E and ends at .011 mile(s) before RP IS70W TO IS170E E.
Work is scheduled from 17-MAR-2025 to 30-MAY-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT T E - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 18 E and ends at CRD SW 450TH RD E.
Work is scheduled from 25-APR-2025 to 05-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T W - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD SW 450TH RD E and ends at MO 18 E.
Work is scheduled from 25-APR-2025 to 05-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT D S - PIKE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .022 mile(s) after RT FF S and ends at .005 mile(s) before RT FF S.
Work is scheduled from 01-APR-2025 to 10-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT D N - PIKE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after RT FF S and ends at .022 mile(s) before RT FF S.
Work is scheduled from 01-APR-2025 to 10-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 95 N - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .024 mile(s) after MO 14 E and ends at .012 mile(s) before CRD 95-142 E.
Work is scheduled from 31-MAR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 95 S - DOUGLAS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .012 mile(s) after CRD 95-142 E and ends at .024 mile(s) before MO 14 E.
Work is scheduled from 31-MAR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 61 N - PIKE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .064 mile(s) before RP US61N TO RTD N and ends at .023 mile(s) before RP RTD TO US61N N.
Work is scheduled from 01-APR-2025 to 10-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 61 S - PIKE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .027 mile(s) after RP US61S TO RTD S and ends at .077 mile(s) after RP RTD TO US61S S.
Work is scheduled from 01-APR-2025 to 10-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone IS 70 W - SALINE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .507 mile(s) before RP IS70W TO RTVV W and ends at .677 mile(s) after RP RTY TO IS70W W.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - LAFAYETTE County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .651 mile(s) before RP IS70E TO RTY E and ends at .551 mile(s) after RP RTY TO IS70E E.
Work is scheduled from 01-APR-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT OO E - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT M S and ends at MO 135 S.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT OO W - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 135 S and ends at RT M S.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT CC N - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 41 S and ends at CRD ARROW ROCK RD E.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT CC S - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD ARROW ROCK RD E and ends at MO 41 S.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT HH W - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT M S and ends at CRD SCHOOL HOUSE RD E.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT HH E - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD SCHOOL HOUSE RD E and ends at RT M S.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT NN E - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD SHACKELFORD BRIDGE DR E and ends at RT N E.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT NN W - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT N E and ends at CRD SHACKELFORD BRIDGE DR E.
Work is scheduled from 25-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - HOWELL County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .003 mile(s) before CRD 1010 S and ends at .048 mile(s) before CRD 2950 S.
Work is scheduled from 31-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 W - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before MO 43 N and ends at MO 43 N.
Work is scheduled from 28-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 86 E - NEWTON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 43 S and ends at .001 mile(s) before MO 43 N.
Work is scheduled from 28-MAR-2025 to 02-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RT Z N - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT D E and ends at .002 mile(s) after CRD BUCKNER RD E.
Work is scheduled from 14-APR-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z S - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .002 mile(s) before CRD BUCKNER RD E and ends at RT D E.
Work is scheduled from 14-APR-2025 to 16-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - STODDARD County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .009 mile(s) before CRD 799 S and ends at .003 mile(s) after US 62 E.
Work is scheduled from 10-APR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 E - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .05 mile(s) after OR 70 E and ends at .013 mile(s) before CST DUNN DR E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 54 W - CALLAWAY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) after CST DUNN DR E and ends at .05 mile(s) before OR 70 E.
Work is scheduled from 24-MAR-2025 to 31-MAR-2026.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) before CST PLEASANT VALLEY RD W and ends at CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .018 mile(s) after CST LIGHTBURNE ST S and ends at .004 mile(s) before CST PLEASANT VALLEY RD W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 10:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 N - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CST LIGHTBURNE ST S and ends at .417 mile(s) before RP IS35N TO 19TH ST E E.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 35 S - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .403 mile(s) after RP 19TH ST E TO IS35S S and ends at .018 mile(s) after CST LIGHTBURNE ST S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 PM and end by 11:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .008 mile(s) after CST WILLIS ST S and ends at .014 mile(s) before CST DODGION ST S.
Work is scheduled from 17-MAR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) before CRD MILITARY RD S and ends at .002 mile(s) before CRD WEISS AVE E.
Work is scheduled from 01-APR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 72 W - MADISON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) before BU 67 N and ends at .004 mile(s) before MO 21 S.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 72 E - IRON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after MO 21 S and ends at .005 mile(s) after BU 67 N.
Work is scheduled from 07-APR-2025 to 01-OCT-2025.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .008 mile(s) before RP US24 TO US63S S and ends at .09 mile(s) before RP MO22 TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .008 mile(s) before RP US24 TO US63S S and ends at .162 mile(s) after RP US24 TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .19 mile(s) before RR HANNIBAL DISTRICT E and ends at .055 mile(s) before RT EE E.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .037 mile(s) after RR HANNIBAL DISTRICT E and ends at .008 mile(s) after RP US63S TO RTEE W.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .01 mile(s) before RP RTEE TO US63S S and ends at .161 mile(s) after RP RTEE TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .176 mile(s) before RP US63S TO RTM W and ends at .011 mile(s) after RP US63S TO RTM W.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 2 E - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .005 mile(s) after CST SE OUTER RD S and ends at .002 mile(s) before CST BIRD AVE S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 2 W - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .002 mile(s) after CST BIRD AVE S and ends at .005 mile(s) before CST SE OUTER RD S.
Work is scheduled from 26-MAR-2025 to 27-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - RANDOLPH County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .024 mile(s) before RP RTM TO US63S S and ends at .163 mile(s) after RP RTM TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone US 63 S - BOONE County - EXPECT DELAYS
DIAMOND GRINDING
Work zone begins at .029 mile(s) before RP US63S TO MO22 E and ends at .09 mile(s) before RP MO22 TO US63S S.
Work is scheduled from 01-APR-2025 to 01-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .111 mile(s) before RP IS470W TO BLUE RIDGE BLVD N and ends at .055 mile(s) before CST HICKMAN MILLS DR S.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .282 mile(s) before RP IS470E TO BLUE RIDGE BLVD S and ends at .136 mile(s) after RP BLUE RIDGE BLVD TO IS470E E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470W TO BLUE RIDGE BLVD N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at IS 470 W and ends at CST BLUE RIDGE BLVD S.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP RAYTOWN RD TO US50W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST RAYTOWN RD S and ends at IS 470 W.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US50E TO RAYTOWN RD E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .014 mile(s) after IS 470 E and ends at CST RAYTOWN RD S.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP RAYTOWN RD TO US50E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST RAYTOWN RD S and ends at .005 mile(s) before IS 470 E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470W TO NE DOUGLAS ST S S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .011 mile(s) after IS 470 W and ends at CST NE DOUGLAS ST S.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP NE DOUGLAS ST N TO IS470W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE DOUGLAS ST N and ends at IS 470 W.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .022 mile(s) before CST NE DOUGLAS ST N and ends at .287 mile(s) after RP NE DOUGLAS ST N TO IS470W W.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP NE DOUGLAS ST S TO IS470E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE DOUGLAS ST S and ends at IS 470 E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .1 mile(s) before RP NE DOUGLAS ST S TO IS470E E and ends at .112 mile(s) after RP NE DOUGLAS ST S TO IS470E E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS470E TO BOWLIN RD E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .01 mile(s) after IS 470 E and ends at CST NE BOWLIN RD E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP BOWLIN RD TO IS470E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST NE BOWLIN RD E and ends at .001 mile(s) before IS 470 E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .022 mile(s) before RP IS470E TO BOWLIN RD E and ends at .029 mile(s) after RP BOWLIN RD TO IS470E E.
Work is scheduled from 26-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - WARREN County - POSSIBLE DELAYS
Improve I-70 Project #2
MILLING/RESURFACING WORK
Work zone begins at .201 mile(s) before RP IS70E TO W WARRENTON BLVD E and ends at .066 mile(s) after RP IS70E TO RTT E.
Work is scheduled from 10-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone US 50 E - FRANKLIN County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .068 mile(s) before RT BB S and ends at .008 mile(s) before CST MACARTHUR AVE S.
Work is scheduled from 31-MAR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - FRANKLIN County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .008 mile(s) after CST MACARTHUR AVE S and ends at .068 mile(s) after RT BB S.
Work is scheduled from 31-MAR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O W - JEFFERSON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT F S and ends at RT AT E.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT O E - FRANKLIN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT AT E and ends at RT F S.
Work is scheduled from 31-MAR-2025 to 30-APR-2026.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT HH E - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT B S and ends at RT Z S.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT HH W - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT Z S and ends at RT B S.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT OO E - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 124 E and ends at RT Z S.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT OO W - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at RT Z S and ends at MO 124 E.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z N - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD RANGELINE RD S and ends at CST JEFFERSON ST S.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z S - BOONE County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at CST JEFFERSON ST S and ends at CRD RANGELINE RD S.
Work is scheduled from 31-MAR-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 51 N - STODDARD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .053 mile(s) before RP MO51 TO US60E E and ends at .113 mile(s) before MO 91 S.
Work is scheduled from 14-APR-2025 to 31-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 51 S - BOLLINGER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .113 mile(s) after MO 91 S and ends at .053 mile(s) after RP MO51 TO US60E E.
Work is scheduled from 14-APR-2025 to 31-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 115 N - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .024 mile(s) after CST MALINE AVE S and ends at .01 mile(s) after CST ENGLER AVE E.
Work is scheduled from 01-MAR-2025 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 115 S - ST. LOUIS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .011 mile(s) before CST ENGLER AVE E and ends at .023 mile(s) before CST MALINE AVE S.
Work is scheduled from 01-MAR-2025 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST NORTH HANLEY RD N - ST. LOUIS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .028 mile(s) before MO 115 S and ends at .055 mile(s) after MO 115 S.
Work is scheduled from 24-MAR-2025 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone CST NORTH HANLEY RD S - ST. LOUIS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .055 mile(s) before MO 115 S and ends at .028 mile(s) after MO 115 S.
Work is scheduled from 24-MAR-2025 to 30-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 49 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .073 mile(s) before RP IS49N TO MO150W W and ends at .1 mile(s) after RP MO150E TO IS49N N.
Work is scheduled from 28-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 49 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .118 mile(s) before RP IS49S TO MO150E E and ends at .069 mile(s) after RP MO150W TO IS49S S.
Work is scheduled from 28-MAR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 115 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) after CST LINCOLN AVE S and ends at .001 mile(s) before CST COLONIAL AVE S.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 E - CLAY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .011 mile(s) before MO 1 S and ends at .011 mile(s) before RP MO152E TO IS35N N.
Work is scheduled from 07-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 W - CLAY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) before CST KANSAS ST W and ends at .005 mile(s) after MO 1 S.
Work is scheduled from 07-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 E - PLATTE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .005 mile(s) after RP MO152E TO IS29N N and ends at .01 mile(s) before MO 1 S.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 152 W - CLAY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .004 mile(s) after MO 1 S and ends at .004 mile(s) before RP MO152E TO IS29N N.
Work is scheduled from 24-MAR-2025 to 07-OCT-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at MO 8 E and ends at .001 mile(s) before CRD IRON ST S.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - ST. FRANCOIS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CRD IRON ST S and ends at MO 8 E.
Work is scheduled from 14-APR-2025 to 16-OCT-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 124 W - HOWARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .007 mile(s) before RT Y S and ends at MO 240 E.
Work is scheduled from 23-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 124 E - HOWARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 240 E and ends at .007 mile(s) after RT Y S.
Work is scheduled from 23-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) before CRD LAREDO AVE E and ends at .006 mile(s) after CRD SHERIDAN RD E.
Work is scheduled from 31-MAR-2025 to 17-MAY-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 156 W - KNOX County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .062 mile(s) after MO 151 S and ends at .337 mile(s) after MO 151 S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST CENTRAL AVE W - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after CST HOLLY DR S and ends at .012 mile(s) before CST HORINE RD S.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST CENTRAL AVE E - JEFFERSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) after CST HORINE RD S and ends at .004 mile(s) before CST HOLLY DR S.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 11 N - KNOX County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .072 mile(s) after CRD BOBCAT AVE S and ends at .145 mile(s) after CRD BOBCAT AVE S.
Work is scheduled from 21-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 151 S - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .3 mile(s) before RP US36W TO MO151 N and ends at .009 mile(s) before CST SWITZLER ST W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 151 N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after CST SWITZLER ST E and ends at .3 mile(s) after RP US36W TO MO151 N.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST OLD U S HWY 36 E - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .028 mile(s) before RP US36E TO BU36 W and ends at .001 mile(s) after MO 151 S.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST OLD U S HWY 36 W - SHELBY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before MO 151 S and ends at .028 mile(s) after RP US36E TO BU36 W.
Work is scheduled from 07-APR-2025 to 01-NOV-2025.
Work will start daily at 06:30 AM and end by 08:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone CST GLENSTONE AVE S - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .019 mile(s) before US 60 W and ends at .017 mile(s) after US 60 E.
Work is scheduled from 07-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST GLENSTONE AVE N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before US 60 E and ends at .021 mile(s) after US 60 W.
Work is scheduled from 07-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .001 mile(s) after CRD SAPPINGTON ACRES DR S and ends at .006 mile(s) after CRD BAPTIST CHURCH RD S.
Work is scheduled from 01-APR-2025 to 30-MAY-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 17 S - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at RT AW S and ends at .004 mile(s) before US 63 S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 17 N - TEXAS County - EXPECT DELAYS
CONCRETE OVERLAY
Work zone begins at .004 mile(s) after US 63 S and ends at RT AW S.
Work is scheduled from 14-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .037 mile(s) before RP IS470E TO VIEW HIGH DR S and ends at .136 mile(s) after RP VIEW HIGH DR TO IS470E E.
Work is scheduled from 01-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 470 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .176 mile(s) before RP IS470W TO VIEW HIGH DR N and ends at .037 mile(s) after RP VIEW HIGH DR TO IS470W W.
Work is scheduled from 01-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .023 mile(s) after PVT SUNSWEPT PARK DR E and ends at .007 mile(s) before CRD CANDLEWYCK CLUB DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 S - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after CRD CANDLEWYCK CLUB DR E and ends at .023 mile(s) before PVT SUNSWEPT PARK DR E.
Work is scheduled from 14-APR-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 92 E - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .146 mile(s) before CRD NORTH WATER S and ends at .157 mile(s) before CRD PLATTSBURG RD S.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK E - FRANKLIN County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at RT C S and ends at .003 mile(s) before MO 185 S.
Work is scheduled from 07-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK W - FRANKLIN County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after MO 185 S and ends at RT C S.
Work is scheduled from 07-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 70 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .005 mile(s) after RT N S and ends at .004 mile(s) after CST AIRFLIGHT DR S.
Work is scheduled from 17-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before CST AIRFLIGHT DR S and ends at .004 mile(s) before RT N S.
Work is scheduled from 17-MAR-2025 to 30-MAY-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) after CRD BRILLIANT LN E and ends at .011 mile(s) after CRD BETTYJEAN DR S.
Work is scheduled from 01-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT E S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 124 E and ends at .102 mile(s) before CST INDUSTRIAL DR S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT E N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .102 mile(s) after CST INDUSTRIAL DR S and ends at MO 124 E.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT E S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 124 E and ends at .102 mile(s) before CST INDUSTRIAL DR S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT VV S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD W DRIPPING SPRINGS RD E and ends at .034 mile(s) before OR 63 S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT VV N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .034 mile(s) after OR 63 S and ends at CRD W DRIPPING SPRINGS RD E.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD DUSTY RHODES LN E and ends at .059 mile(s) after CST TANZANITE DR S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .059 mile(s) before CST TANZANITE DR S and ends at CRD DUSTY RHODES LN E.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone W OR 63 S - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .463 mile(s) before CRD EAST CIRCLE DR S and ends at .009 mile(s) before RT VV S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone W OR 63 N - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .009 mile(s) after RT VV S and ends at .463 mile(s) after CRD EAST CIRCLE DR S.
Work is scheduled from 23-APR-2025 to 06-JUN-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 55 S - PEMISCOT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.832 mile(s) before US 61 S and ends at .058 mile(s) after CRD 547 S.
Work is scheduled from 14-APR-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 55 N - PEMISCOT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .041 mile(s) before RT E E and ends at .429 mile(s) after CRD 547 S.
Work is scheduled from 14-APR-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 55 N - PEMISCOT County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .022 mile(s) after WS IS55N STEELE N and ends at .425 mile(s) after CRD 444 E.
Work is scheduled from 14-APR-2025 to 02-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT K W - BARTON County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .029 mile(s) after RT V E and ends at .034 mile(s) before CRD NW STATE LINE LN S.
Work is scheduled from 07-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT K E - BARTON County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .034 mile(s) after CRD NW STATE LINE LN S and ends at .029 mile(s) before RT V E.
Work is scheduled from 07-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - ST. LOUIS CITY County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .009 mile(s) after PED CARROLL ST OVERPASS S and ends at .013 mile(s) after CST WEBER RD E.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 N - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .19 mile(s) before RP IS55N TO REAVIS BARRACKS RD E and ends at .069 mile(s) before RP BATES ST TO IS55N N.
Work is scheduled from 06-DEC-2022 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS64W TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) after OR 64 W and ends at .024 mile(s) after IS 64 E.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A N - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at US 60 E and ends at .243 mile(s) after CRD NORMANDY RD E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT A S - WEBSTER County - EXPECT DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .243 mile(s) before CRD NORMANDY RD E and ends at US 60 E.
Work is scheduled from 07-APR-2025 to 30-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 60 W - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .096 mile(s) before CRD WHITE ROSE LN S and ends at .032 mile(s) before PVT HONOR CAMP LN S.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 60 E - WEBSTER County - POSSIBLE DELAYS
INTERSECTION IMPROVEMENTS
Work zone begins at .032 mile(s) after PVT HONOR CAMP LN S and ends at .161 mile(s) before OR 60 E.
Work is scheduled from 07-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 231 N - JEFFERSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .008 mile(s) after US 67 S and ends at .178 mile(s) before PVT PRIVATE S.
Work is scheduled from 07-APR-2025 to 02-JUN-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 231 S - ST. LOUIS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .178 mile(s) after PVT PRIVATE S and ends at .008 mile(s) before US 67 S.
Work is scheduled from 07-APR-2025 to 02-JUN-2025.
Work will start daily at 06:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .322 mile(s) before CST SPIRIT OF ST LOUIS BLVD S and ends at .06 mile(s) before RP IS64W TO NOR40E E.
Work is scheduled from 31-MAR-2025 to 25-APR-2025.
Work will start daily at 12:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .093 mile(s) after CST RESEARCH PARK CIR E and ends at .056 mile(s) after RP SPIRT OF ST LOUIS BLVD TO IS64E E.
Work is scheduled from 08-APR-2025 to 30-NOV-2025.
Work will start daily at 12:00 AM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 5 N - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .01 mile(s) before CST LOCUST ST E and ends at .016 mile(s) after CST VIEW DR E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 5 S - HOWARD County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .016 mile(s) before CST VIEW DR E and ends at .01 mile(s) after CST LOCUST ST E.
Work is scheduled from 14-APR-2025 to 19-SEP-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 W and ends at IS 70 W.
Work is scheduled from 03-APR-2025 to 31-MAY-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS70E TO IS170W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 E and ends at .002 mile(s) before IS 170 W.
Work is scheduled from 03-APR-2025 to 31-MAY-2025.
Work will start daily at 07:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS170W TO IS70W W - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after IS 170 W and ends at .012 mile(s) before IS 70 W.
Work is scheduled from 08-APR-2025 to 31-MAY-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS170E TO IS70E E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 170 E and ends at .012 mile(s) before IS 70 E.
Work is scheduled from 03-APR-2025 to 31-MAY-2025.
Work will start daily at 09:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 64 E - ST. CHARLES County - POSSIBLE DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT DD S and ends at .002 mile(s) after RT K S.
Work is scheduled from 17-MAR-2025 to 09-MAY-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Possible delays due to workzone IS 64 W - ST. CHARLES County - POSSIBLE DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .001 mile(s) before RT K S and ends at .004 mile(s) before RT DD S.
Work is scheduled from 17-MAR-2025 to 09-MAY-2025.
Work will start daily at 08:00 PM and end by 05:30 AM.
Work will be conducted Monday through Friday.
Project Site
Expect delays due to workzone MO 150 W - JACKSON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .087 mile(s) after RP BOTTS RD S TO MO150W W and ends at .031 mile(s) after CRD PROSPECT AVE S.
Work is scheduled from 14-APR-2025 to 23-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 141 S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .007 mile(s) before CST CONWAY RD E and ends at .042 mile(s) before RP MO141S TO OLD WOODS MILL RD E.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone RP IS64E TO MO141S S - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .009 mile(s) after IS 64 E and ends at MO 141 S.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 160 E - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .246 mile(s) after CST FOURTH ST E and ends at .001 mile(s) before MO 39 S.
Work is scheduled from 14-APR-2025 to 14-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - DADE County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after MO 39 S and ends at .246 mile(s) before CST FOURTH ST E.
Work is scheduled from 14-APR-2025 to 14-JUL-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO141N TO IS64W W - ST. LOUIS County - POSSIBLE DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 141 N and ends at IS 64 W.
Work is scheduled from 14-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 7 N - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .04 mile(s) before CST ORIOLE ST S and ends at .039 mile(s) after CST MAVERICK TRL E.
Work is scheduled from 03-APR-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 7 S - CASS County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .039 mile(s) before CST MAVERICK TRL E and ends at .04 mile(s) after CST HOSPITAL RD S.
Work is scheduled from 03-APR-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .061 mile(s) before RP FAIRGROUNDS RD TO IS70E E and ends at .607 mile(s) after BK KATY TRAIL E.
Work is scheduled from 25-APR-2025 to 28-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 6 E - DEKALB County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) before MO 31 S and ends at US 69 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 6 W - DAVIESS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 69 S and ends at .004 mile(s) after MO 31 S.
Work is scheduled from 14-APR-2025 to 30-SEP-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 36 E - LINN County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .005 mile(s) before RT F S and ends at .03 mile(s) after MO 5 N.
Work is scheduled from 09-APR-2025 to 02-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - OSAGE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .019 mile(s) before CRD 801 E and ends at .002 mile(s) after CRD COUNTY LINE RD S.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 W - FRANKLIN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .002 mile(s) before CRD COUNTY LINE RD S and ends at .019 mile(s) after CRD 801 E.
Work is scheduled from 31-MAR-2025 to 13-MAR-2026.
Work will start daily at 06:30 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 71 N - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .035 mile(s) after CST DR MARTIN LUTHER KING JR BLVD W and ends at .069 mile(s) after CST E 43RD ST E.
Work is scheduled from 04-APR-2025 to 25-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST SW BLUE PKWY W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .003 mile(s) after CST SW 3RD ST E and ends at .003 mile(s) before CST SW 2ND ST E.
Work is scheduled from 09-APR-2025 to 29-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT AB E - ST. LOUIS County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .001 mile(s) after RP RTABW TO MO141S S and ends at .035 mile(s) before CST PEBBLE ACRES DR S.
Work is scheduled from 21-APR-2025 to 23-MAY-2025.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .025 mile(s) after CST NATIONAL AVE N and ends at .012 mile(s) before MO 13 S.
Work is scheduled from 14-APR-2025 to 17-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - GREENE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after MO 13 S and ends at .019 mile(s) before CST NATIONAL AVE N.
Work is scheduled from 14-APR-2025 to 17-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 49 S - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .071 mile(s) before RT BB E and ends at .073 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 01-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 49 N - IRON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .073 mile(s) before RT BB E and ends at .071 mile(s) after RT BB E.
Work is scheduled from 10-MAR-2025 to 01-SEP-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT K W - CAPE GIRARDEAU County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 25 N and ends at MO 25 S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT K E - CAPE GIRARDEAU County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 25 S and ends at .001 mile(s) after MO 25 N.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST LEONARD ST S - CLAY County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .013 mile(s) before MO 291 N and ends at MO 291 S.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will start daily at 08:30 PM and end by 12:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 61 N - JEFFERSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .083 mile(s) before CST GRANDVIEW PARK DR E and ends at .044 mile(s) before US 67 S.
Work is scheduled from 08-APR-2025 to 09-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 61 S - JEFFERSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .044 mile(s) after US 67 N and ends at .083 mile(s) after CST GRANDVIEW PARK DR E.
Work is scheduled from 08-APR-2025 to 09-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .146 mile(s) after RP US71S TO DR MARTIN LUTHER KING JR BLVD E E and ends at .113 mile(s) before CST CLEAVER II BLVD E.
Work is scheduled from 08-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .07 mile(s) before CST LINWOOD BLVD E and ends at .022 mile(s) after CST LINWOOD BLVD E.
Work is scheduled from 08-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T S - CARTER County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .937 mile(s) after US 60 E and ends at .009 mile(s) before CRD 211 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT T N - CARTER County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .009 mile(s) after CRD 211 S and ends at .937 mile(s) before US 60 E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 29 S - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .006 mile(s) before RP IS29S TO MO273 S and ends at .005 mile(s) before RP IS29S TO RTD S.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 29 N - PLATTE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .026 mile(s) after RP RTD TO IS29N N and ends at .021 mile(s) after RP MO273 TO IS29N N.
Work is scheduled from 14-APR-2025 to 07-NOV-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 64 W - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .018 mile(s) before CST 22ND ST S and ends at .026 mile(s) after RP IS64W TO BOYLE AVE N.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 64 E - ST. LOUIS CITY County - EXPECT DELAYS
MICROSURFACING
Work zone begins at .015 mile(s) after RP VANDEVENTER AVE TO IS64W W and ends at .017 mile(s) after CST 22ND ST S.
Work is scheduled from 21-APR-2025 to 01-AUG-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 E - BARTON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .069 mile(s) after RR FORT SCOTT SUB E and ends at .071 mile(s) before CRD SE 40TH LN S.
Work is scheduled from 14-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - BARTON County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .071 mile(s) after CRD SE 40TH LN S and ends at .069 mile(s) before RR FORT SCOTT SUB E.
Work is scheduled from 14-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .03 mile(s) before CST ADAMS DAIRY PKWY S and ends at .075 mile(s) after CST ADAMS DAIRY PKWY N.
Work is scheduled from 14-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT AA W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .013 mile(s) before CST ADAMS DAIRY PKWY S and ends at .063 mile(s) before CST AUTUMN CT S.
Work is scheduled from 14-APR-2025 to 15-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .032 mile(s) after CST 36TH TER E and ends at .012 mile(s) after CST 39TH ST E.
Work is scheduled from 10-APR-2025 to 10-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .008 mile(s) before CRD 356 S and ends at .002 mile(s) after CRD AUXIER RD SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT H E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before CRD AUXIER RD SE S and ends at .008 mile(s) after CRD 356 S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD W - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) before CRD HORN S and ends at .408 mile(s) after CRD 115 SE S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .408 mile(s) before CRD 115 SE S and ends at .009 mile(s) after CRD HORN S.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P W - DEKALB County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .036 mile(s) before CRD THORNTON RD S and ends at .014 mile(s) after RT UU S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT P E - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before RT UU S and ends at .036 mile(s) after CRD THORNTON RD S.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD S - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CRD 372 E and ends at .006 mile(s) after CRD 361 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT DD N - ANDREW County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .006 mile(s) before CRD 361 E and ends at .003 mile(s) after CRD 372 E.
Work is scheduled from 11-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M S - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at MO 116 E and ends at .626 mile(s) after CRD NICHOLS SW E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT M N - BUCHANAN County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .626 mile(s) before CRD NICHOLS SW E and ends at MO 116 E.
Work is scheduled from 10-APR-2025 to 28-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT WW W - DADE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .442 mile(s) after CRD 1177 S and ends at .64 mile(s) after CRD 2037 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT WW E - LAWRENCE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .64 mile(s) before CRD 2037 S and ends at .442 mile(s) before CRD 1177 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 64 W - LACLEDE County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .202 mile(s) before MO 64A E and ends at .392 mile(s) before CRD CAT HOLLOW TR S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 64 E - DALLAS County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .392 mile(s) after CRD CAT HOLLOW TR S and ends at .202 mile(s) after MO 64A E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 64 W - HICKORY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .041 mile(s) before CRD 298 E and ends at .112 mile(s) before RT NN E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F W - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 87 S and ends at .01 mile(s) before RT MM S.
Work is scheduled from 14-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT F E - MONITEAU County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at .01 mile(s) after RT MM S and ends at MO 87 S.
Work is scheduled from 14-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 127 S - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .005 mile(s) after IS 70 E and ends at .006 mile(s) before OR 50 E.
Work is scheduled from 16-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 127 N - PETTIS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after OR 50 E and ends at .005 mile(s) before IS 70 E.
Work is scheduled from 16-APR-2025 to 30-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 50 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .067 mile(s) before RP US50W TO MO7 W and ends at .16 mile(s) after RP MO7 TO US50W W.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .206 mile(s) before RP US50E TO MO7 E and ends at .123 mile(s) after RP MO7 TO US50E E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US50E TO MO7 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 50 E and ends at MO 7 S.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7 TO US50E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 50 E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7 TO IS70E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at .002 mile(s) before IS 70 E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 70 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .001 mile(s) after MO 7 S and ends at .071 mile(s) after RP MO7 TO IS70E E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US24W TO MO7 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 24 W and ends at MO 7 S.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7N TO US24W W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 24 W.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP US24E TO MO7 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 24 E and ends at .005 mile(s) before MO 7 S.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RP MO7 TO US24E E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at MO 7 S and ends at US 24 E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .051 mile(s) before RP US24E TO MO7 E and ends at .074 mile(s) after RP MO7 TO US24E E.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .051 mile(s) before RP US24W TO MO7 N and ends at .055 mile(s) after RP MO7N TO US24W W.
Work is scheduled from 11-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 65 S - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after MO 190 E and ends at .003 mile(s) before BU 36 W.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 65 N - LIVINGSTON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after BU 36 E and ends at .001 mile(s) before MO 190 E.
Work is scheduled from 21-APR-2025 to 25-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 50 W - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at CRD SHOTWELL RD E and ends at .009 mile(s) before CRD COUNTY LINE RD S.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 50 E - FRANKLIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after CRD COUNTY LINE RD S and ends at CRD SHOTWELL RD E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 62 W - NEW MADRID County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .339 mile(s) before MO 153 S and ends at .003 mile(s) before CST PATTERSON ST E.
Work is scheduled from 25-NOV-2024 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 62 E - NEW MADRID County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after CST PATTERSON ST E and ends at .339 mile(s) after MO 153 S.
Work is scheduled from 25-NOV-2024 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .054 mile(s) after CST WOODLAND AVE S and ends at .005 mile(s) after CST MAPLE AVE E.
Work is scheduled from 17-APR-2025 to 16-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST VIEW HIGH DR N - JACKSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .032 mile(s) after CST NW OLD VIEW HIGH RD E and ends at .039 mile(s) before CST NW VIEW HIGH PKWY N.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone CST VIEW HIGH DR S - JACKSON County - POSSIBLE DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after CST NW VIEW HIGH PKWY N and ends at .033 mile(s) before CST NW OLD VIEW HIGH RD E.
Work is scheduled from 14-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 58 E - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after IS 49 N and ends at .029 mile(s) after CST CLINT DR E.
Work is scheduled from 21-APR-2025 to 12-MAY-2025.
Work will start daily at 07:30 PM and end by 07:30 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 58 W - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .029 mile(s) before CST CLINT DR E and ends at .003 mile(s) before IS 49 N.
Work is scheduled from 21-APR-2025 to 12-MAY-2025.
Work will start daily at 07:30 PM and end by 07:30 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 94 W - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .072 mile(s) after RT H E and ends at .1 mile(s) after CRD RAILROAD AVE E.
Work is scheduled from 15-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 94 E - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .1 mile(s) before CRD RAILROAD AVE E and ends at .072 mile(s) before RT H E.
Work is scheduled from 15-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 40 E - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at CST STERLING AVE S and ends at .047 mile(s) after CST OOIDA DR S.
Work is scheduled from 16-APR-2025 to 06-MAY-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 40 W - JACKSON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .047 mile(s) before CST OOIDA DR S and ends at CST STERLING AVE S.
Work is scheduled from 16-APR-2025 to 06-MAY-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted all week, including weekends.
Possible delays due to workzone IS 44 E - ST. LOUIS CITY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .058 mile(s) before CST MACKLIND AVE S and ends at .103 mile(s) before CST 39TH ST S.
Work is scheduled from 23-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 7 N - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .087 mile(s) before CST RICHLAND PKWY E and ends at .04 mile(s) after CST 163RD ST E.
Work is scheduled from 11-MAR-2025 to 20-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 7 S - CASS County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .148 mile(s) after CRD COUNTY LINE RD E and ends at .061 mile(s) after CST RICHLAND PKWY E.
Work is scheduled from 16-APR-2025 to 18-JUL-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RP MO39 TO IS44E E - LAWRENCE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at MO 265 S and ends at .015 mile(s) before IS 44 E.
Work is scheduled from 21-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT C S - CASS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after RT J S and ends at MO 2 E.
Work is scheduled from 16-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT C N - CASS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 2 E and ends at .003 mile(s) before RT J S.
Work is scheduled from 16-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP S - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after CRD DOWNEY RD E and ends at .007 mile(s) before MO 5 S.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP N - COOPER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) after MO 5 S and ends at .004 mile(s) before CRD DOWNEY RD E.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP E - MORGAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .009 mile(s) after RT D S and ends at .002 mile(s) before CRD SCHMIDT RD E.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT PP W - MORGAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CRD SCHMIDT RD E and ends at .009 mile(s) before RT D S.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB N - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT A S and ends at MO 135 S.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT BB S - COOPER County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 135 S and ends at RT A S.
Work is scheduled from 21-APR-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT AA S - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 19 S and ends at CRD CHERRYVILLE RD E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT AA N - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD CHERRYVILLE RD E and ends at MO 19 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT N - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 8 E and ends at CRD LIBERTY RD E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT TT S - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD LIBERTY RD E and ends at MO 8 E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 E - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .009 mile(s) before RT CC S and ends at CST ENTERPRISE ST S.
Work is scheduled from 18-APR-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 86 W - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST ENTERPRISE ST S and ends at .009 mile(s) after RT CC S.
Work is scheduled from 18-APR-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T S - OSAGE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .067 mile(s) after CST 1ST ST E and ends at .065 mile(s) before RT AA S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT T N - OSAGE County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .065 mile(s) after RT AA S and ends at .067 mile(s) before CST 1ST ST E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST FRONT ST S - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .041 mile(s) after CST LOCUST ST E and ends at MO 76 E.
Work is scheduled from 18-APR-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone CST WASHBURN ST S - BARRY County - EXPECT DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at CST LOCUST ST E and ends at .002 mile(s) before CST CASS AVE E.
Work is scheduled from 18-APR-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST E WINNER RD E - JACKSON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at US 24 W and ends at .001 mile(s) before US 24 E.
Work is scheduled from 16-APR-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT CC W - GREENE County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at MO 125 S and ends at .084 mile(s) before RT AE S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP S - GREENE County - EXPECT DELAYS
ROAD MIX OVERLAY
Work zone begins at .002 mile(s) after IS 44 W and ends at .001 mile(s) before MO 174 E.
Work is scheduled from 22-APR-2025 to 25-APR-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT AA N - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .296 mile(s) before CRD LONE STAR RD E and ends at .045 mile(s) before CRD LONE STAR RD E.
Work is scheduled from 20-APR-2025 to 02-MAY-2025.
Work will start daily at 12:07 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT D E - DALLAS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .264 mile(s) before CRD THOMAS CREEK RD S and ends at .427 mile(s) before CRD SIMPSON RD S.
Work is scheduled from 20-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT H S - POLK County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .532 mile(s) before CRD 530TH RD E and ends at .485 mile(s) before CRD 530TH RD E.
Work is scheduled from 20-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 12:07 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 670 E - JACKSON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .147 mile(s) before CST GENESSEE ST S and ends at .012 mile(s) after CST HICKORY ST S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 670 W - JACKSON County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .016 mile(s) before CST HICKORY ST S and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 06:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone CST DUNN RD W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .01 mile(s) after OR 270 E and ends at .114 mile(s) after CST HAZELCREST DR S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 55 S - SCOTT County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .987 mile(s) before RT U E and ends at 1.62 mile(s) before RT H S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 55 S - SCOTT County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .534 mile(s) after RP RTAB TO IS55S S and ends at .515 mile(s) after RR CHESTER SUB S.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 34 E - WAYNE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .166 mile(s) before CRD 312 E and ends at .19 mile(s) after CRD 312 E.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 34 W - WAYNE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .19 mile(s) before CRD 312 E and ends at .166 mile(s) after CRD 312 E.
Work is scheduled from 21-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 N - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .028 mile(s) after RP IS55N TO US67N N and ends at .238 mile(s) after RR RIVER SUB S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone IS 55 S - JEFFERSON County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .269 mile(s) before RR RIVER SUB S and ends at .04 mile(s) before RP US67N TO IS55S S.
Work is scheduled from 01-APR-2025 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone US 67 N - JEFFERSON County - EXPECT DELAYS
MEDIAN OR SHOULDER
Work zone begins at .142 mile(s) before RT CC S and ends at .02 mile(s) after RP IS55N TO US67N N.
Work is scheduled from 05-FEB-2024 to 31-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - GREENE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .69 mile(s) after RP MO744 TO IS44W W and ends at .037 mile(s) after RP IS44W TO NORTON RD E.
Work is scheduled from 21-APR-2025 to 21-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .046 mile(s) after CST PHELPS RD S and ends at .062 mile(s) after CST BRECKENRIDGE AVE S.
Work is scheduled from 17-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 02:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z E - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at BU 54 E and ends at RT A S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ S - CAMDEN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at RT F S.
Work is scheduled from 22-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ N - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT F S and ends at RT H E.
Work is scheduled from 22-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST CONWAY RD E and ends at .006 mile(s) before CST CONWAY RD E.
Work is scheduled from 18-APR-2025 to 28-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone N OR 44 W - ST. LOUIS County - EXPECT DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CST NORTH HIGHWAY DR W and ends at .001 mile(s) before MO 141 S.
Work is scheduled from 21-APR-2025 to 02-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .062 mile(s) after CST NW VALLEY VIEW RD E and ends at .266 mile(s) before CST POWELL AVE S.
Work is scheduled from 17-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 40 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .005 mile(s) after CRD BELLEMERE RD E and ends at .412 mile(s) after CST POWELL AVE S.
Work is scheduled from 17-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 12 W - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .011 mile(s) before CST NORTHERN BLVD S and ends at .002 mile(s) before CST NORTHERN BLVD S.
Work is scheduled from 21-APR-2025 to 19-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone MO 240 W - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .896 mile(s) after CRD 240TH RD E and ends at US 65 S.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 240 E - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 65 S and ends at .896 mile(s) before CRD 240TH RD E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD TEL-HAVEN CT E and ends at .042 mile(s) after CRD TEL-HAVEN CT E.
Work is scheduled from 22-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 170 W - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at CST EAGER RD E and ends at .196 mile(s) before PED PED OVER IS170 E.
Work is scheduled from 21-APR-2025 to 05-MAY-2025.
Work will start daily at 06:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT VV E - CASS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .166 mile(s) after CST LEXINGTON RD N and ends at .431 mile(s) before CRD GRAHAM RD S.
Work is scheduled from 21-APR-2025 to 03-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 5 S - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .003 mile(s) after RT DD S and ends at .009 mile(s) before CST STAGE COACH RD S.
Work is scheduled from 23-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 5 N - HOWARD County - POSSIBLE DELAYS
ROADSIDE WORK
Work zone begins at .009 mile(s) after CST STAGE COACH RD S and ends at .003 mile(s) before RT DD S.
Work is scheduled from 23-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT VV W - CASS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .147 mile(s) before CST CHESTNUT ST S and ends at .035 mile(s) before CST CHESTNUT ST S.
Work is scheduled from 21-APR-2025 to 03-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT VV E - CASS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .035 mile(s) after CST CHESTNUT ST S and ends at .147 mile(s) after CST CHESTNUT ST S.
Work is scheduled from 21-APR-2025 to 03-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT VV W - CASS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) after RT E S and ends at .003 mile(s) before MO 7 S.
Work is scheduled from 21-APR-2025 to 03-MAY-2025.
Work will start daily at 06:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone IS 44 E - ST. LOUIS County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .059 mile(s) before RR CUBA SUB E and ends at .029 mile(s) before RP BIG BEND RD TO IS44E E.
Work is scheduled from 21-APR-2025 to 05-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at RT HH E and ends at .078 mile(s) after RT HH E.
Work is scheduled from 21-APR-2025 to 01-JUL-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .078 mile(s) before RT HH E and ends at RT HH E.
Work is scheduled from 21-APR-2025 to 01-JUL-2025.
Work will start daily at 09:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 W - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .313 mile(s) before MO 76 E and ends at .055 mile(s) after CST SHORTY COOPER ST S.
Work is scheduled from 21-APR-2025 to 23-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 160 E - TANEY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .055 mile(s) before CST SHORTY COOPER ST S and ends at .313 mile(s) after MO 76 W.
Work is scheduled from 21-APR-2025 to 23-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 E - PHELPS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .259 mile(s) before RP IS44E TO RTV E and ends at .957 mile(s) after RP RTV TO IS44E E.
Work is scheduled from 20-APR-2025 to 26-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 44 W - PHELPS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .365 mile(s) after RP RTV TO IS44W W and ends at .474 mile(s) before RP IS44W TO US63 N.
Work is scheduled from 21-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 231 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CRD GEBHARDT DR E and ends at CRD ENGLAND TOWN DR E.
Work is scheduled from 23-APR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M W - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at US 63 S and ends at RT J S.
Work is scheduled from 21-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT M E - PHELPS County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT J S and ends at US 63 S.
Work is scheduled from 21-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone MO 367 S - ST. LOUIS County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .003 mile(s) after CST LEWIS & CLARK BLVD N and ends at IS 70 E.
Work is scheduled from 11-DEC-2024 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 367 N - ST. LOUIS CITY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at OR 70 W and ends at .003 mile(s) before CST LEWIS & CLARK BLVD S.
Work is scheduled from 11-DEC-2024 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone MO 9 S - CLAY County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .113 mile(s) after CST 12TH AVE E and ends at .06 mile(s) before CST GRAND BLVD S.
Work is scheduled from 22-APR-2025 to 25-APR-2025.
Work will start daily at 08:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT YY E - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 13 S and ends at RT CC S.
Work is scheduled from 22-APR-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT YY W - JOHNSON County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT KK S and ends at MO 13 S.
Work is scheduled from 22-APR-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone MO 33 S - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .059 mile(s) before CRD NE 184TH ST E and ends at .455 mile(s) before CRD NE 123RD ST E.
Work is scheduled from 25-APR-2025 to 30-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 33 N - CLAY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .455 mile(s) after CRD NE 123RD ST E and ends at .059 mile(s) after CRD NE 184TH ST E.
Work is scheduled from 25-APR-2025 to 30-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 24 E - LAFAYETTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at MO 13 N and ends at .109 mile(s) after CST MAIN ST E.
Work is scheduled from 22-APR-2025 to 30-MAY-2025.
Work will start daily at 09:00 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 E - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .066 mile(s) after RP CHIPMAN RD TO US50E E and ends at .053 mile(s) after CST NW O BRIEN RD E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 50 W - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .047 mile(s) before CST NW O BRIEN RD E and ends at .073 mile(s) before RP US50W TO CHIPMAN RD W.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 435 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .064 mile(s) before RR PITTSBURG SUB S and ends at .078 mile(s) before RP IS435N TO GREGORY BLVD N.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .035 mile(s) before CST E 39TH ST E and ends at .078 mile(s) after CST E 39TH ST E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .03 mile(s) after CST E 27TH ST E and ends at .001 mile(s) before CST E 25TH ST E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 N - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .069 mile(s) after RP US71N TO THE PASEO N and ends at .032 mile(s) before CST E 18TH ST E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 71 S - JACKSON County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .035 mile(s) after CST E 18TH ST E and ends at .081 mile(s) before CST E 25TH ST E.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RP IS70E TO IS170W W - ST. LOUIS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at IS 70 E and ends at .106 mile(s) after RP IS170W TO IS70W W.
Work is scheduled from 23-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W S - WARREN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A S and ends at .006 mile(s) before OR 70 E.
Work is scheduled from 24-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT W N - WARREN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .006 mile(s) after OR 70 E and ends at RT A S.
Work is scheduled from 24-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone IS 35 N - DAVIESS County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.521 mile(s) after RP RTDD TO IS35N N and ends at .411 mile(s) after CRD GRANITE AVE E.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 N - ST. FRANCOIS County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .003 mile(s) after CRD BLOMEIER RD S and ends at .003 mile(s) after CST DOUBET RD E.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone US 67 S - ST. FRANCOIS County - POSSIBLE DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .008 mile(s) before CST DOUBET RD E and ends at .005 mile(s) before CRD BLOMEIER RD S.
Work is scheduled from 31-MAR-2025 to 30-APR-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 67 S - JEFFERSON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .026 mile(s) before RT CC S and ends at .064 mile(s) after RT CC S.
Work is scheduled from 24-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 02:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT EE S - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .02 mile(s) after MO 20 E and ends at .003 mile(s) before RT K S.
Work is scheduled from 23-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Expect delays due to workzone RT EE N - SALINE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .003 mile(s) after RT K S and ends at .02 mile(s) before MO 20 E.
Work is scheduled from 23-APR-2025 to 30-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Possible delays due to workzone MO 210 W - RAY County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at MO 10 E and ends at .1 mile(s) after CST LIBERTY BEND RD S.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 210 E - CLAY County - POSSIBLE DELAYS
PAVEMENT STRIPING
Work zone begins at .1 mile(s) before CST LIBERTY BEND RD S and ends at MO 10 E.
Work is scheduled from 24-APR-2025 to 25-APR-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ N - CLAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .014 mile(s) after MO 210 E and ends at RT H E.
Work is scheduled from 24-APR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT JJ S - CLAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at .014 mile(s) before MO 210 E.
Work is scheduled from 24-APR-2025 to 30-APR-2025.
Work will start daily at 09:00 AM and end by 12:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone US 60 W - GREENE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .113 mile(s) after BU 65 S and ends at .001 mile(s) after MO 13 S.
Work is scheduled from 24-APR-2025 to 16-MAY-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT Z W - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A S and ends at BU 54 E.
Work is scheduled from 21-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP W - BUTLER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST TUCKER RD E and ends at .002 mile(s) before CST WEST ENTRANCE S.
Work is scheduled from 24-APR-2025 to 12-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT PP E - BUTLER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at .002 mile(s) after CST WEST ENTRANCE S and ends at CST TUCKER RD E.
Work is scheduled from 24-APR-2025 to 12-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 115 N - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .02 mile(s) before CST AVONDALE AVE S and ends at .022 mile(s) after CST AVONDALE AVE S.
Work is scheduled from 25-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 12:01 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone MO 115 S - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .022 mile(s) before CST AVONDALE AVE S and ends at .02 mile(s) after CST AVONDALE AVE S.
Work is scheduled from 25-APR-2025 to 25-APR-2025.
Work will start daily at 09:00 AM and end by 12:01 PM.
Work will be conducted Monday through Friday.
Possible delays due to workzone RT KK N - CASS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .006 mile(s) after CRD 163RD ST E and ends at .007 mile(s) before RT E S.
Work is scheduled from 24-APR-2025 to 03-MAY-2025.
Work will start daily at 01:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Possible delays due to workzone RT KK S - JACKSON County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .007 mile(s) after RT E S and ends at .006 mile(s) before CRD 163RD ST E.
Work is scheduled from 24-APR-2025 to 03-MAY-2025.
Work will start daily at 01:00 PM and end by 08:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Expect delays due to workzone RT TT W - ST. CLAIR County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT T E and ends at MO 13 S.
Work is scheduled from 25-APR-2025 to 05-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone RT TT E - ST. CLAIR County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 13 S and ends at RT T E.
Work is scheduled from 25-APR-2025 to 05-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Expect delays due to workzone IS 55 S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .86 mile(s) before RP IS55S TO RTP S and ends at .031 mile(s) after RT A E.
Work is scheduled from 24-APR-2025 to 31-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.

Work Zone: Future

BACK TO TOP

A future work zone is planned work that has not begun yet. This may include closures and/or traffic delays. There are 435 work zone(s) planned for a future date.

Future work zone(s) 435 Future work zone(s)
Future work zone RT A W - CASS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .018 mile(s) after CRD SLIFFE RD S and ends at .028 mile(s) before CRD SHIPLEY RD S.
Work is scheduled from 08-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A E - CASS County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .028 mile(s) after CRD SHIPLEY RD S and ends at .018 mile(s) before CRD SLIFFE RD S.
Work is scheduled from 08-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY E - RANDOLPH County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at .01 mile(s) before MO 151 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .01 mile(s) after MO 151 S and ends at US 24 E.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D N - CARTER County - EXPECT DELAYS
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) after CRD 123 S and ends at .002 mile(s) before CO MO21 TO RTD S.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 08:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE S - CLAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at MO 210 E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT EE N - CLAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 210 E and ends at RT H E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at RT H S and ends at PVT RIDGEMOUNT DR S.
Work is scheduled from 07-MAY-2025 to 07-MAY-2025.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP NW BRIARCLIFF PKWY E TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after CST NW PLATTE RD E and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone W OR 27 N - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 309 E and ends at CRD 307 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT H E - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at MO 17 S and ends at CRD MARYS HOME RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT H W - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CRD OLD TEN MILE RD S and ends at MO 17 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO RTJ E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at IS 70 E and ends at RT DD S.
Work is scheduled from 01-MAY-2025 to 01-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 52 W - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .129 mile(s) before CST VIEW DR E and ends at .019 mile(s) after CST BROWN RD S.
Work is scheduled from 28-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 52 E - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .019 mile(s) before CST BROWN RD S and ends at .129 mile(s) after CST VIEW DR E.
Work is scheduled from 28-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at PVT RIDGEMOUNT DR S and ends at RT H S.
Work is scheduled from 07-MAY-2025 to 07-MAY-2025.
Work will start daily at 07:00 AM and end by 08:00 PM.
Work will be conducted Monday through Friday.
Future work zone W OR 27 S - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 307 E and ends at CRD 309 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AH W - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) after OR 44 E and ends at OR 44 E.
Work is scheduled from 07-MAY-2025 to 07-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS670W TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at IS 35 S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP WYOMING ST TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST WYOMING ST N and ends at .001 mile(s) before IS 670 E.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT V S - AUDRAIN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 22 E and ends at RT U S.
Work is scheduled from 13-MAY-2025 to 29-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT V N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT U S and ends at MO 22 E.
Work is scheduled from 13-MAY-2025 to 29-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT AB E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST LADUE RD E and ends at .005 mile(s) before RP MO141N TO RTABE E.
Work is scheduled from 01-MAY-2025 to 05-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B N - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 136 E and ends at MO 27 N.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AB E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at CST LADUE RD E and ends at .005 mile(s) before RP MO141N TO RTABE E.
Work is scheduled from 01-MAY-2025 to 01-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 27 N and ends at US 136 E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T E - GREENE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .039 mile(s) before RT N S and ends at .015 mile(s) before IS 44 W.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 05:00 PM and end by 07:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO9S TO NW BRIARCLIFF PKWY E E - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at MO 9 S and ends at .004 mile(s) before OR 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - WEBSTER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .897 mile(s) after RA IS44W CONWAY W and ends at 1.311 mile(s) after RP SAMPSON RD TO IS44W W.
Work is scheduled from 04-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Future work zone IS 44 E - WEBSTER County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.275 mile(s) before RP IS44E TO SAMPSON RD E and ends at .711 mile(s) before RA IS44E CONWAY E.
Work is scheduled from 04-MAY-2025 to 06-JUN-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before CST BROOKLYN AVE S and ends at .025 mile(s) after RP IS70E TO 18TH ST E.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS670E TO US71N N - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 E and ends at US 71 N.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS70W TO 13TH ST E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at .004 mile(s) before CST CHARLOTTE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 49 N - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .35 mile(s) after RP CST W FAIRVIEW AVE TO IS49N N and ends at .191 mile(s) after CST ROBERT ELLIS YOUNG DR S.
Work is scheduled from 06-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - BOONE County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at 1.069 mile(s) before RP IS70E TO RTJ E and ends at 1.966 mile(s) after RP RTJ TO IS70E E.
Work is scheduled from 01-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 36 E - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .035 mile(s) after CST 11TH ST S and ends at .065 mile(s) after RP US36E TO CRAIG PKWY E.
Work is scheduled from 02-JUN-2025 to 05-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP US169N TO MO9N N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after US 169 N and ends at MO 9 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP MO9 TO NW BRIARCLIFF PKWY W W - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at MO 9 N and ends at .005 mile(s) before CST NW PLATTE RD E.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 60 E - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .177 mile(s) before CST OAKRIDGE DR S and ends at .013 mile(s) before CST HOWARD BUSH DR S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - LAWRENCE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .831 mile(s) before CRD 1222 S and ends at .079 mile(s) after CRD 1222 S.
Work is scheduled from 18-MAY-2025 to 31-MAY-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT U E - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT T E and ends at RT D S.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST E 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after RP IS70W TO 23RD ST E and ends at .002 mile(s) before RP E 23RD ST TO IS70E E.
Work is scheduled from 01-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT U W - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT D S and ends at RT T E.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS635S TO MO9S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) after IS 635 S and ends at MO 9 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 60 W - NEWTON County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at CST HIGH ST S and ends at .004 mile(s) before CST OAKRIDGE DR S.
Work is scheduled from 01-JUN-2025 to 01-AUG-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST E 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .002 mile(s) after RP E 23RD ST TO IS70E E and ends at .002 mile(s) before RP IS70W TO 23RD ST E.
Work is scheduled from 01-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 221 N - IRON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .001 mile(s) before CST MAPLE ST E and ends at .314 mile(s) after RR DESOTO SUB S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD 1090 N - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at MO 37 S and ends at RT W E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 221 S - IRON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .314 mile(s) before RR DESOTO SUB S and ends at .001 mile(s) after CST MAPLE ST E.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 39 S - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .322 mile(s) after CRD HATCHER MOUNTAIN RD E and ends at .306 mile(s) after CRD 2135 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone CRD 1090 S - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at RT W E and ends at MO 37 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 39 N - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .306 mile(s) before CRD 2135 E and ends at .322 mile(s) before CRD HATCHER MOUNTAIN RD E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP US60E TO US160E E - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 60 E and ends at .004 mile(s) before US 160 E.
Work is scheduled from 07-MAY-2025 to 08-MAY-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT D W - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .034 mile(s) before PVT WILDLIFE LN S and ends at .008 mile(s) before CST PETER ST S.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT D E - ST. CHARLES County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at .008 mile(s) after CST PETER ST S and ends at .034 mile(s) after PVT WILDLIFE LN S.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 61 N - ST. CHARLES County - POSSIBLE DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .006 mile(s) before IS 64 W and ends at .009 mile(s) before RT A E.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Future work zone US 61 S - ST. CHARLES County - POSSIBLE DELAYS
Improve I-70 Project #2
ROADSIDE WORK
Work zone begins at .004 mile(s) after RT A E and ends at .033 mile(s) after RP IS70W TO US61S S.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Project Site
Future work zone RT J S - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .077 mile(s) after RR THAYER NORTH SUB E and ends at .1 mile(s) after CRD SPRING CIR E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y E - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 161 E and ends at MO 81 S.
Work is scheduled from 19-MAY-2025 to 20-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS435N TO MO152W W - CLAY County - ALL LANES CLOSED
MILLING/RESURFACING WORK
Work zone begins at IS 435 N and ends at MO 152 W.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will start daily at 06:00 PM and end by 07:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT Y W - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 81 S and ends at CRD 161 E.
Work is scheduled from 19-MAY-2025 to 20-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 78 E - JACKSON County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CST VERMONT AVE S and ends at .01 mile(s) before CST SCOTT AVE S.
Work is scheduled from 28-APR-2025 to 23-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 W - ST. LOUIS County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .009 mile(s) before RP IS270W TO US50E E and ends at .067 mile(s) before RP IS55N TO IS270E E.
Work is scheduled from 12-MAY-2025 to 12-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - GREENE County - EXPECT DELAYS
CORE DRILLING
Work zone begins at .1 mile(s) before CRD SPRING CIR E and ends at .077 mile(s) before RR THAYER NORTH SUB E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .014 mile(s) after CST E 27TH ST E and ends at .039 mile(s) before RP IS70W TO ASKEW AVE W.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .006 mile(s) before CST E 18TH ST E and ends at .007 mile(s) before CST CLEVELAND AVE S.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS670E TO WYOMING ST S - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .146 mile(s) before CST GENESSEE ST S and ends at CST WYOMING ST N.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .064 mile(s) after RP IS70E TO LP70E E and ends at .661 mile(s) after BK KATY TRAIL E.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT AA E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at MO 15 S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at US 24 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y E - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after RT N S and ends at .002 mile(s) before CRD 585 S.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT Y W - STODDARD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after CRD 385 S and ends at .002 mile(s) before RT N S.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone CST E 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CST MONROE AVE S and ends at .003 mile(s) before CST INDIANA AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST E 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after CST INDIANA AVE S and ends at .003 mile(s) before CST MONROE AVE S.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .005 mile(s) after US 69 S and ends at .003 mile(s) before OR 9 S.
Work is scheduled from 14-MAY-2025 to 24-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST RIVERWAY BLVD N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .003 mile(s) after OR 9 S and ends at .005 mile(s) before US 69 S.
Work is scheduled from 14-MAY-2025 to 24-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 6 E - SULLIVAN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after CST FRONT ST E and ends at .002 mile(s) before BU 63 S.
Work is scheduled from 18-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT E S - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .018 mile(s) before RT H E and ends at .045 mile(s) before RT D E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - CASS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .009 mile(s) after RT C S and ends at .011 mile(s) before CST SCHOOL RD S.
Work is scheduled from 28-APR-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT J S - CASS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .011 mile(s) after CST SCHOOL RD S and ends at .009 mile(s) before RT C S.
Work is scheduled from 28-APR-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT E N - NEW MADRID County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .045 mile(s) after RT D E and ends at .018 mile(s) after RT H E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .033 mile(s) after IS 35 N and ends at IS 670 E.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 6 W - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after BU 63 S and ends at .002 mile(s) before CST FRONT ST E.
Work is scheduled from 18-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT O N - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT B E and ends at RT H E.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 51 S - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .985 mile(s) before MO 72 E and ends at .018 mile(s) after CRD 376 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 51 N - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .018 mile(s) before CRD 376 E and ends at .985 mile(s) after MO 72 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 72 W - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .016 mile(s) before CRD 380 S and ends at .012 mile(s) after CRD 900 E.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 72 E - BOLLINGER County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at .012 mile(s) before CRD 900 E and ends at .016 mile(s) after CRD 380 S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF S - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after OR 44 E and ends at .014 mile(s) after IS 44 E.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT FF N - CRAWFORD County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) before IS 44 E and ends at .004 mile(s) before OR 44 E.
Work is scheduled from 28-APR-2025 to 20-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .197 mile(s) after RP RTB TO IS44W W and ends at .514 mile(s) after RP RTB TO IS44W W.
Work is scheduled from 18-MAY-2025 to 31-MAY-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 470 E - JACKSON County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .037 mile(s) after RP IS470E TO BLUE RIDGE BLVD S and ends at .032 mile(s) after CST JAMES A REED RD S.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT V N - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .027 mile(s) after CRD SW 8508 E and ends at .078 mile(s) before RT U E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V S - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .078 mile(s) after RT U E and ends at .027 mile(s) before CRD SW 8508 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C N - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at MO 52 E and ends at .043 mile(s) before CRD NW 5002 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C S - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .043 mile(s) after CRD NW 5002 E and ends at MO 52 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 E - OSAGE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .01 mile(s) before CST TENTH ST S and ends at .001 mile(s) before CST LINNWOOD DR E.
Work is scheduled from 05-MAY-2025 to 24-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO 23RD ST E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at IS 70 W and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 44 W - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .896 mile(s) after RA IS44W CONWAY W and ends at 1.314 mile(s) after RP SAMPSON RD TO IS44W W.
Work is scheduled from 17-MAY-2025 to 18-MAY-2025.
Work will start daily at 06:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone IS 49 S - BATES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.368 mile(s) after RP RTA TO IS49S S and ends at 1.233 mile(s) before RP IS49S TO RTE W.
Work is scheduled from 04-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.278 mile(s) before RP IS44E TO SAMPSON RD E and ends at .71 mile(s) before RA IS44E CONWAY E.
Work is scheduled from 17-MAY-2025 to 18-MAY-2025.
Work will start daily at 06:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone US 36 W - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before MO 129 N and ends at .003 mile(s) after CRD ATLANTIC LOOP E.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 10:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 69 S - CLINTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .349 mile(s) before OR 35 S and ends at .052 mile(s) after MO 116 E.
Work is scheduled from 28-APR-2025 to 16-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 69 N - CLINTON County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .053 mile(s) before MO 116 E and ends at .349 mile(s) after OR 35 S.
Work is scheduled from 28-APR-2025 to 16-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP BROADWAY TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST BROADWAY BLVD S and ends at IS 35 S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35N TO 14TH ST E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 N and ends at CST W 14TH ST E.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .02 mile(s) before RP IS70E TO TRUMAN RD E and ends at .016 mile(s) before RP E 23RD ST TO IS70E E.
Work is scheduled from 01-MAY-2025 to 02-MAY-2025.
Work will start daily at 08:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT B E - RANDOLPH County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at RT A S and ends at .001 mile(s) before US 63 S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - RANDOLPH County - POSSIBLE DELAYS
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after US 63 S and ends at RT A S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 7 S and ends at CRD SE-561 E.
Work is scheduled from 05-MAY-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - HENRY County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD SE-561 E and ends at MO 7 S.
Work is scheduled from 05-MAY-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 64 E - HICKORY County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .112 mile(s) after RT NN E and ends at .041 mile(s) after CRD 298 E.
Work is scheduled from 05-MAY-2025 to 15-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - COOPER County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.849 mile(s) before RT M S and ends at .98 mile(s) before RT M S.
Work is scheduled from 29-MAY-2025 to 30-MAY-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT E N - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at .002 mile(s) before MO 6 E.
Work is scheduled from 06-MAY-2025 to 09-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after MO 6 E and ends at MO 156 E.
Work is scheduled from 06-MAY-2025 to 09-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - PHELPS County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .236 mile(s) before RP IS44E TO RTV E and ends at 1.19 mile(s) after RP RTV TO IS44E E.
Work is scheduled from 27-APR-2025 to 02-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone US 50 W - OSAGE County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .001 mile(s) after CST LINNWOOD DR E and ends at .01 mile(s) after CST TENTH ST S.
Work is scheduled from 05-MAY-2025 to 24-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT O S - HICKORY County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT H E and ends at RT B E.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 255 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at US 50 W and ends at .076 mile(s) before RP US50W TO KOCH RD N.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 63 N - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT A S and ends at .002 mile(s) before US 63 N.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 63 S - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .002 mile(s) after US 63 N and ends at .001 mile(s) after RT A S.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS670W TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .018 mile(s) after CST CENTRAL ST N and ends at IS 35 N.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP PENNSYLVANIA AVE TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST PENNSYLVANIA AVE S and ends at IS 35 S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 36 W - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) before RT K S and ends at BU 36 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 01:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U S - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at RT V S and ends at MO 124 E.
Work is scheduled from 13-MAY-2025 to 29-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35S TO PENN VALLEY DR S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .004 mile(s) before RP SOUTHWEST TRFY TO IS35N N.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 35 S - CLINTON County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .085 mile(s) after RP IS35S TO US69 S and ends at .006 mile(s) before RP MO116 TO IS35S S.
Work is scheduled from 28-APR-2025 to 16-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U N - BOONE County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at MO 124 E and ends at RT V S.
Work is scheduled from 13-MAY-2025 to 29-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP E 23RD ST TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST E 23RD ST E and ends at IS 70 W.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT TT N - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before CRD STANEK RD S and ends at CRD QUARRY RD E.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .004 mile(s) before CST E 18TH ST E and ends at .03 mile(s) after RP E 23RD ST TO IS70E E.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP US67S TO CST OAK GROVE RD E - BUTLER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at US 67 S and ends at .007 mile(s) before CST OAK GROVE RD E.
Work is scheduled from 13-MAY-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP CST OAK GROVE RD TO US67N N - BUTLER County - EXPECT DELAYS
LIGHTING/SIGNAL/SIGN WORK
Work zone begins at CST OAK GROVE RD E and ends at US 67 N.
Work is scheduled from 13-MAY-2025 to 30-MAY-2025.
Work will start daily at 06:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 E - NODAWAY County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .046 mile(s) after CRD PLEASANT VIEW DR S and ends at .155 mile(s) after MO 46 E.
Work is scheduled from 02-MAY-2025 to 08-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS670E TO US71S S - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 E and ends at .001 mile(s) before US 71 S.
Work is scheduled from 05-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS70E TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at US 71 S and ends at IS 670 W.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT TT S - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD QUARRY RD E and ends at .002 mile(s) after CRD STANEK RD S.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V E - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at US 54 W and ends at CST FERRY ST S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - MILLER County - POSSIBLE DELAYS
CULVERT REPLACEMENT
Work zone begins at CST FERRY ST S and ends at US 54 W.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - DEKALB County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .406 mile(s) after CRD MAPLE RD S and ends at .234 mile(s) before CRD LOCUST RD S.
Work is scheduled from 09-MAY-2025 to 12-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT A N - WEBSTER County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .002 mile(s) after US 60 W and ends at .004 mile(s) before CRD NORMANDY RD E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT A S - WEBSTER County - ALL LANES CLOSED
PERMIT OR UTILITY WORK
Work zone begins at .004 mile(s) after CRD NORMANDY RD E and ends at .002 mile(s) before US 60 W.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone MO 6 E - ADAIR County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .039 mile(s) after OR 63 S and ends at .006 mile(s) before MO 15 S.
Work is scheduled from 18-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 6 W - KNOX County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .006 mile(s) after MO 15 S and ends at .039 mile(s) before OR 63 S.
Work is scheduled from 18-JUN-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone CO RIVERWAY BLVD TO US69 W - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after US 69 N and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP MO9S TO RIVERWAY BLVD S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS670E TO IS35S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 E and ends at .003 mile(s) before IS 35 S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 55 S - STE. GENEVIEVE County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .662 mile(s) before RA IS55S BLOOMSDALE S and ends at .03 mile(s) after RA IS55S BLOOMSDALE S.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP WYOMING ST TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST WYOMING ST N and ends at IS 670 E.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 29 S - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .31 mile(s) after CRD 280 ST E and ends at 1.354 mile(s) after RT Z E.
Work is scheduled from 28-APR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 29 N - ATCHISON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at 1.345 mile(s) before RT Z E and ends at .309 mile(s) before CRD 280 ST E.
Work is scheduled from 28-APR-2025 to 01-SEP-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 36 W - MARION County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .27 mile(s) after RP US24W TO US36W W and ends at .034 mile(s) after CO US36W TO US36E S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 49 S - BATES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 1.309 mile(s) before RR NEVADA SUB S and ends at 1.208 mile(s) before RR NEVADA SUB S.
Work is scheduled from 04-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .088 mile(s) after RP IS70E TO LP70E E and ends at .636 mile(s) after BK KATY TRAIL E.
Work is scheduled from 16-MAY-2025 to 19-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B E - HOWARD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 3 S and ends at RT A S.
Work is scheduled from 01-MAY-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 63 N - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .001 mile(s) before CST KOHL ST E and ends at CRD WALNUT ST E.
Work is scheduled from 01-MAY-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 63 S - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at CRD WALNUT ST E and ends at .001 mile(s) after CST KOHL ST E.
Work is scheduled from 01-MAY-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A S and ends at MO 3 S.
Work is scheduled from 01-MAY-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 65 N - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .337 mile(s) before CRD SELMORE OVERPASS E and ends at .066 mile(s) after RP US65N TO MO14 N.
Work is scheduled from 14-MAY-2025 to 15-MAY-2025.
Work will start daily at 11:59 PM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone US 65 S - CHRISTIAN County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .072 mile(s) before RP MO14 TO US65S S and ends at .337 mile(s) after CRD SELMORE OVERPASS E.
Work is scheduled from 14-MAY-2025 to 15-MAY-2025.
Work will start daily at 11:59 PM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT JJ S - WASHINGTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at RT C E and ends at CRD BRINLEY RD E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT JJ N - WASHINGTON County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at CRD BRINLEY RD E and ends at RT C E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .326 mile(s) after RR DOD S and ends at .045 mile(s) after CRD 6410 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT J N - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .045 mile(s) before CRD 6410 S and ends at .326 mile(s) before RR DOD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 17 S - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .123 mile(s) before CRD LEXINGTON RD E and ends at .021 mile(s) before CRD LEXINGTON RD E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 17 N - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after CRD LEXINGTON RD E and ends at .123 mile(s) after CRD LEXINGTON RD E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 89 S - OSAGE County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .017 mile(s) before CST LINNWOOD DR E and ends at .004 mile(s) after CST SECOND ST E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 89 N - MARIES County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .004 mile(s) before CST SECOND ST E and ends at .017 mile(s) after CST LINNWOOD DR E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - FRANKLIN County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .129 mile(s) before US 50 E and ends at .34 mile(s) after RT O E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 09:00 AM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT AA N - COLE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .365 mile(s) after RT A E and ends at .523 mile(s) after RT A E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA S - COLE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .523 mile(s) before RT A E and ends at .365 mile(s) before RT A E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone N OR 270 W - ST. LOUIS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .127 mile(s) before CST WASHINGTON ST E and ends at .028 mile(s) after CO SOR270E TO NOR270W W.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone MO 143 S - IRON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 49 S and ends at .14 mile(s) after CRD 312 E.
Work is scheduled from 20-MAY-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 143 N - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .14 mile(s) before CRD 312 E and ends at MO 49 S.
Work is scheduled from 20-MAY-2025 to 05-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 49 S and ends at .454 mile(s) after CRD BLUFF VIEW DR S.
Work is scheduled from 22-MAY-2025 to 09-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - REYNOLDS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .454 mile(s) before CRD BLUFF VIEW DR S and ends at MO 49 S.
Work is scheduled from 22-MAY-2025 to 09-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK N - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at CRD TURTLE AVE S.
Work is scheduled from 02-MAY-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD TURTLE AVE S and ends at MO 156 E.
Work is scheduled from 02-MAY-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT TT N - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT D S and ends at CRD QUARRY RD E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT TT S - LINCOLN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD QUARRY RD E and ends at RT D S.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 74 W - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .228 mile(s) before RR RIVER SUB S and ends at .003 mile(s) after CST FOUNTAIN ST S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RP IS670E TO US71N N - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 E and ends at .003 mile(s) before US 71 N.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP US71N TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at US 71 N and ends at IS 670 W.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT M W - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) after CST MILL ST S and ends at .011 mile(s) after CRD PLUM TRL E.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT M E - WORTH County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .011 mile(s) before CRD PLUM TRL E and ends at .013 mile(s) before CST MILL ST S.
Work is scheduled from 28-APR-2025 to 24-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS155S TO RTU S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at IS 155 S and ends at RT U E.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - HENRY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 13 S and ends at RT N E.
Work is scheduled from 01-MAY-2025 to 15-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 E - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .103 mile(s) before CRD 138 S.
Work is scheduled from 01-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 W - CLARK County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .103 mile(s) after CRD 138 S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 01-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 9 S - PLATTE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .043 mile(s) after MO 45 S and ends at .018 mile(s) after CST LAKEVIEW DR E.
Work is scheduled from 30-APR-2025 to 02-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .039 mile(s) after LP 49 S and ends at CRD ROWAN DR E.
Work is scheduled from 29-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA E - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD ROWAN DR E and ends at .039 mile(s) before LP 49 S.
Work is scheduled from 29-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT AA W - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .039 mile(s) after LP 49 S and ends at CRD ROWAN DR E.
Work is scheduled from 29-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .001 mile(s) after CST WALNUT ST S and ends at MO 52 E.
Work is scheduled from 28-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT W S - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 52 E and ends at .001 mile(s) before CST WALNUT ST S.
Work is scheduled from 28-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS635N TO US69N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .012 mile(s) after IS 635 N and ends at US 69 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at .001 mile(s) before RT B S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at .001 mile(s) after RT B S and ends at MO 15 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF W - CAPE GIRARDEAU County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) before CRD 435 S and ends at .001 mile(s) after CRD 436 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT FF E - CAPE GIRARDEAU County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) before CRD 436 S and ends at .002 mile(s) after CRD 435 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP WYOMING ST TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST WYOMING ST N and ends at .147 mile(s) after CST GENESSEE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35N TO BROADWAY S S - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .008 mile(s) before RP IS35N TO IS670E E and ends at CST BROADWAY BLVD S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 670 E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .147 mile(s) before CST GENESSEE ST S and ends at .001 mile(s) before CST TROOST AVE S.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 670 W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST TROOST AVE S and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT UU N - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at RT H E and ends at .042 mile(s) before CRD NE 5004 E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT UU S - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .042 mile(s) after CRD NE 5004 E and ends at RT H E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO2W TO IS49S S - CASS County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at MO 2 E and ends at IS 49 S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B S and ends at MO 15 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at RT B S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY E - RANDOLPH County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at US 24 E and ends at MO 151 S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT YY W - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 151 S and ends at US 24 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 PM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - JASPER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .161 mile(s) before RP IS49S TO CIVIL WAR RD N and ends at .117 mile(s) after CRD CIVIL WAR RD S.
Work is scheduled from 06-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 74 E - CAPE GIRARDEAU County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .003 mile(s) before CST FOUNTAIN ST S and ends at .235 mile(s) after RR RIVER SUB S.
Work is scheduled from 28-APR-2025 to 01-NOV-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT V E - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at 2.021 mile(s) before CRD 6 S and ends at MO 81 S.
Work is scheduled from 21-MAY-2025 to 21-MAY-2025.
Work will start daily at 02:00 PM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 81 S and ends at 2.021 mile(s) after CRD 6 S.
Work is scheduled from 21-MAY-2025 to 21-MAY-2025.
Work will start daily at 02:00 PM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 100 W - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at CST SEVEN TRAILS DR S and ends at .006 mile(s) after CST BALLPARK DR S.
Work is scheduled from 26-APR-2025 to 26-APR-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 100 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) before CST BALLPARK DR S and ends at .004 mile(s) after CST RIES RD S.
Work is scheduled from 26-APR-2025 to 26-APR-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - MONTGOMERY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at RA IS70E MINEOLA E and ends at RP IS70E TO RTJS E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 W - ST. LOUIS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .115 mile(s) before CST WASHINGTON ST E and ends at .068 mile(s) after CO SOR270E TO NOR270W W.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 270 E - ST. LOUIS County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .072 mile(s) before CO SOR270E TO NOR270W W and ends at .004 mile(s) after RP IS270E TO OR270E E.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone RP IS35S TO IS670E E - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at IS 670 E.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone S OR 270 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .009 mile(s) after CO SOR270E TO NOR270W W and ends at .086 mile(s) after CST WASHINGTON ST E.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will start daily at 10:00 PM and end by 05:00 AM.
Work will be conducted all week, including weekends.
Future work zone IS 49 S - CASS County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .038 mile(s) before RP MO2 TO IS49S S and ends at .003 mile(s) before WS IS49S HARRISONVILLE S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - CASS County - EXPECT DELAYS
SHOULDER WORK
Work zone begins at .002 mile(s) after WS IS49N HARRISONVILLE N and ends at .065 mile(s) before RP IS49N TO MO2 E.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F E - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT OO S and ends at RT WW S.
Work is scheduled from 08-MAY-2025 to 22-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP E - PIKE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 323 S and ends at CRD 338 S.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT F W - STE. GENEVIEVE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT WW S and ends at RT OO S.
Work is scheduled from 08-MAY-2025 to 22-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP W - PIKE County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD 338 S and ends at CRD 323 S.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT NN W - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 221 S and ends at RT N S.
Work is scheduled from 12-MAY-2025 to 26-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 14 W - CHRISTIAN County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .006 mile(s) after CRD VERMULE RD S and ends at .341 mile(s) after CRD VERMULE RD S.
Work is scheduled from 01-MAY-2025 to 08-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - JACKSON County - EXPECT DELAYS
BRIDGE RECONSTRUCTION
Work zone begins at .017 mile(s) before CST LISTER AVE S and ends at .01 mile(s) before RP E 23RD ST TO IS70W W.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 35 N - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .089 mile(s) before RP EATON ST TO IS35N N and ends at RP IS35N TO US169N N.
Work is scheduled from 05-MAY-2025 to 03-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 35 S - JACKSON County - EXPECT DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .007 mile(s) before RP IS35N TO IS70W W and ends at .097 mile(s) after RP IS35S TO EATON ST N.
Work is scheduled from 05-MAY-2025 to 03-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT NN E - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT N S and ends at MO 221 S.
Work is scheduled from 12-MAY-2025 to 26-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO BROADWAY N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .02 mile(s) before RP IS35N TO IS670E E and ends at CST TRUMAN RD E.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 34 W - BOLLINGER County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .01 mile(s) after CRD 808 E and ends at .021 mile(s) before US 67 N.
Work is scheduled from 13-MAY-2025 to 27-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 670 W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST TROOST AVE S and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 34 E - WAYNE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .021 mile(s) after US 67 N and ends at .01 mile(s) before CRD 808 E.
Work is scheduled from 13-MAY-2025 to 27-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 7 N - HENRY County - POSSIBLE DELAYS
MEDIAN OR SHOULDER
Work zone begins at .804 mile(s) after CRD NW-401 S and ends at .134 mile(s) after CO CRD NW 637P RD TO MO7 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP INDIANA AVE TO IS70E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST E 19TH ST E and ends at IS 70 E.
Work is scheduled from 02-MAY-2025 to 05-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday.
Future work zone RT AA E - NEWTON County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD ROWAN DR E and ends at .039 mile(s) before LP 49 S.
Work is scheduled from 29-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT VV N - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at RT H E and ends at .045 mile(s) before CRD NE 5004 E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 19 N - OREGON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .003 mile(s) after US 160 E and ends at .013 mile(s) before US 60 E.
Work is scheduled from 28-MAY-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 N - CLAY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at .277 mile(s) before RP IS35N TO MO92 N and ends at .013 mile(s) before MO 92 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 670 E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .147 mile(s) before CST GENESSEE ST S and ends at CST TROOST AVE S.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 19 S - SHANNON County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .013 mile(s) after US 60 E and ends at .003 mile(s) before US 160 E.
Work is scheduled from 28-MAY-2025 to 12-JUN-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT VV S - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .045 mile(s) after CRD NE 5004 E and ends at RT H E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK N - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .038 mile(s) after MO 18 E and ends at .154 mile(s) before CRD NE 15254 E.
Work is scheduled from 01-MAY-2025 to 08-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK S - BATES County - ALL LANES CLOSED
CHIP SEAL OVERLAY
Work zone begins at .154 mile(s) after CRD NE 15254 E and ends at .038 mile(s) before MO 18 E.
Work is scheduled from 01-MAY-2025 to 08-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 13 N - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .119 mile(s) before CRD 88 E and ends at .062 mile(s) before CO MO13N TO MO13S S.
Work is scheduled from 04-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 82 E - ST. CLAIR County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .704 mile(s) after CRD NE 601 S and ends at .84 mile(s) after CRD NE 601 S.
Work is scheduled from 04-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM S - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT H E and ends at CRD NIXON SCHOOL RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT MM N - CRAWFORD County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD NIXON SCHOOL RD S and ends at RT H E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST WEST OSAGE BEACH PKWY N - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .015 mile(s) after CST OAK LN S and ends at .003 mile(s) before CST BROADWATER LN S.
Work is scheduled from 28-APR-2025 to 22-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST WEST OSAGE BEACH PKWY S - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .003 mile(s) after CST BROADWATER LN S and ends at .015 mile(s) before CST OAK LN S.
Work is scheduled from 28-APR-2025 to 22-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at RT B S.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B S and ends at MO 15 S.
Work is scheduled from 05-MAY-2025 to 05-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST NW BRIARCLIFF PKWY W - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) after CST NW PLATTE RD E and ends at .007 mile(s) before OR 9 N.
Work is scheduled from 05-MAY-2025 to 14-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone CST NW BRIARCLIFF PKWY E - CLAY County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .015 mile(s) before MO 9 S and ends at .008 mile(s) before CST NW PLATTE RD E.
Work is scheduled from 05-MAY-2025 to 14-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT V E - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .027 mile(s) after US 61 N and ends at .02 mile(s) before RT JJ E.
Work is scheduled from 05-MAY-2025 to 02-JUN-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT V W - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .02 mile(s) after RT JJ E and ends at .027 mile(s) before US 61 N.
Work is scheduled from 05-MAY-2025 to 02-JUN-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone N OR 64 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE INSPECTION
Work zone begins at .029 mile(s) after CST DAUPHINE DR E and ends at .118 mile(s) before CST CIVIC CENTER DR E.
Work is scheduled from 05-MAY-2025 to 07-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 W - WARREN County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .03 mile(s) before RP IS70W TO W WARRENTON BLVD W and ends at .412 mile(s) after RP RTE TO IS70W W.
Work is scheduled from 14-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - MONTGOMERY County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .419 mile(s) before RP IS70E TO RTE W and ends at .009 mile(s) after RP W WARRENTON BLVD TO IS70E E.
Work is scheduled from 14-JUL-2025 to 26-SEP-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 9 N - CLAY County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .024 mile(s) after RP MO9N TO US169N N and ends at .061 mile(s) before RP IS635S TO MO9N N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 9 S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) after RP MO9S TO IS635S S and ends at .007 mile(s) before RP OUTER RD TO MO9S S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP RIVERWAY BLVD TO US69S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after US 69 S and ends at US 69 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 70 W - MONTGOMERY County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .016 mile(s) after RP MO161 TO IS70W W and ends at 1.978 mile(s) after RA IS70W MINEOLA W.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35S TO EATON ST N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 S and ends at .089 mile(s) after IS 35 S.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS670E TO WYOMING ST S - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .146 mile(s) before CST GENESSEE ST S and ends at CST WYOMING ST N.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP PENN VALLEY DR N TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .044 mile(s) after CST PENN VALLEY DR S and ends at IS 35 N.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP EATON ST TO IS35N N - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .092 mile(s) before IS 35 N and ends at IS 35 N.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 70 E - MONTGOMERY County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .035 mile(s) before RP IS70E TO RTFN E and ends at .002 mile(s) before RT E E.
Work is scheduled from 05-MAY-2025 to 10-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 15 S and ends at .022 mile(s) before RT B S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .022 mile(s) after RT B S and ends at MO 15 S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 164 W - DUNKLIN County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .024 mile(s) after RT TT S and ends at RT N E.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 S - MADISON County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .318 mile(s) after RP RTE TO US67S S and ends at .162 mile(s) before RT A E.
Work is scheduled from 28-APR-2025 to 09-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 14 E - CHRISTIAN County - EXPECT DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .341 mile(s) before CRD VERMULE RD S and ends at .006 mile(s) before CRD VERMULE RD S.
Work is scheduled from 01-MAY-2025 to 08-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - AUDRAIN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) before RT T E and ends at MO 22 E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP TRUMAN RD TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST MCGEE ST S and ends at IS 670 E.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS670W TO TRUMAN RD W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at CST TRUMAN RD W.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS670W TO TRUMAN RD W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at .001 mile(s) before CST TRUMAN RD W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS670W TO WYOMING ST N - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at CST WYOMING ST N.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP WYOMING ST TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST WYOMING ST N and ends at .146 mile(s) after CST GENESSEE ST S.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 107 N - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 154 E and ends at US 24 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 107 S - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at US 24 E and ends at MO 154 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 21 N - WASHINGTON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .002 mile(s) before CRD SHALE RD E and ends at .007 mile(s) before PVT DIAMOND RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 6 E.
Work is scheduled from 30-APR-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 6 E and ends at MO 156 E.
Work is scheduled from 30-APR-2025 to 02-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - CAPE GIRARDEAU County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .11 mile(s) before RR RIVER SUB S and ends at .06 mile(s) before US 61 N.
Work is scheduled from 27-APR-2025 to 28-APR-2025.
Work will start daily at 06:00 AM and end by 10:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Future work zone RT HH N - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at CRD 252 E and ends at RT Y E.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K W - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 61 N and ends at .016 mile(s) after CRD CHERRY ST E.
Work is scheduled from 05-MAY-2025 to 02-JUN-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT K E - LINCOLN County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .016 mile(s) before CRD CHERRY ST E and ends at US 61 N.
Work is scheduled from 05-MAY-2025 to 02-JUN-2025.
Work will start daily at 06:30 AM and end by 06:30 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 13 N - HENRY County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .293 mile(s) after RT Z E and ends at .491 mile(s) after RT Z E.
Work is scheduled from 04-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B E - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .03 mile(s) before RT A S and ends at RT T S.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B W - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT T S and ends at .03 mile(s) after RT A S.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT Y E and ends at CRD 249 E.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W N - ATCHISON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .047 mile(s) after CRD 285 ST E and ends at RT J S.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT W S - ATCHISON County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT J S and ends at .047 mile(s) before CRD N AVE E.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS35N TO IS70W W - JACKSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .007 mile(s) before RR UNKNOWN S and ends at .031 mile(s) after IS 70 W.
Work is scheduled from 13-MAY-2025 to 13-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT W S and ends at MO 129 S.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 01:00 PM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 E - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before MO 3 S and ends at RT C S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at RT O S and ends at .003 mile(s) after MO 3 S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 08:00 AM and end by 01:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 35 S - CLAY County - POSSIBLE DELAYS
PAVEMENT REPAIR
Work zone begins at 1.61 mile(s) after CRD NE 189TH ST E and ends at 1.541 mile(s) before MO 33 S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 07:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70W TO 13TH ST E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at CST CHARLOTTE ST S.
Work is scheduled from 30-MAY-2025 to 01-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP BROADWAY TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CST TRUMAN RD E and ends at IS 670 E.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP TRUMAN RD TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at CST MCGEE ST S and ends at .001 mile(s) before IS 670 E.
Work is scheduled from 09-MAY-2025 to 11-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone MO 15 S - AUDRAIN County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .001 mile(s) after CST WADE ST S and ends at RT D E.
Work is scheduled from 05-MAY-2025 to 06-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y E - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD 161 E and ends at MO 81 S.
Work is scheduled from 12-MAY-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y W - CLARK County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 81 S and ends at CRD 161 E.
Work is scheduled from 12-MAY-2025 to 14-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO9N TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at MO 9 N and ends at .038 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP US69S TO IS635S S - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at US 69 S and ends at .039 mile(s) before IS 635 S.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS670E TO US71S S - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 E and ends at .004 mile(s) before US 71 S.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT D N - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Work zone begins at .1 mile(s) after CRD 323RD ST E and ends at .028 mile(s) before CRD E 319TH ST E.
Work is scheduled from 12-MAY-2025 to 17-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS470E TO BLUE RIDGE BLVD S - JACKSON County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .014 mile(s) after IS 470 E and ends at .006 mile(s) before CST BLUE RIDGE BLVD S.
Work is scheduled from 01-MAY-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) before US 71 S and ends at .001 mile(s) before IS 670 W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT D S - CASS County - ALL LANES CLOSED
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Work zone begins at .028 mile(s) after CRD E 319TH ST E and ends at .1 mile(s) before CRD 323RD ST E.
Work is scheduled from 12-MAY-2025 to 17-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP BROADWAY TO IS670E E - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CST TRUMAN RD E and ends at IS 670 E.
Work is scheduled from 16-MAY-2025 to 17-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT BB N - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 32 E and ends at RT M E.
Work is scheduled from 13-MAY-2025 to 27-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 S - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .046 mile(s) after US 71 S and ends at 1.836 mile(s) after RP MO90 TO IS49S S.
Work is scheduled from 04-MAY-2025 to 17-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 49 N - MCDONALD County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.925 mile(s) before RP IS49N TO MO90 E and ends at .067 mile(s) after US 71 N.
Work is scheduled from 04-MAY-2025 to 17-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T E - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .007 mile(s) after COE MILL CREEK LEVEE RD S and ends at .013 mile(s) before PVT FARM RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT T W - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .013 mile(s) after PVT FARM RD S and ends at .007 mile(s) before COE MILL CREEK LEVEE RD S.
Work is scheduled from 05-MAY-2025 to 14-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT BB S - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT M E and ends at MO 32 E.
Work is scheduled from 13-MAY-2025 to 27-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 E - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE DECK SEALING
Work zone begins at .028 mile(s) before IS 255 N and ends at .192 mile(s) before RP IS55S TO IS270E E.
Work is scheduled from 13-MAY-2025 to 13-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at CRD 7140 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT CC E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 7360 E and ends at US 63 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD S - PEMISCOT County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .002 mile(s) after CRD 551 S and ends at .003 mile(s) after CRD 570 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 136 W - SCHUYLER County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .002 mile(s) after US 63 S and ends at .306 mile(s) after RT N S.
Work is scheduled from 01-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone US 136 E - PUTNAM County - EXPECT DELAYS
RESURFACING PAVEMENT
Work zone begins at .306 mile(s) before RT N S and ends at .002 mile(s) before US 63 S.
Work is scheduled from 01-MAY-2025 to 01-NOV-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT DD N - PEMISCOT County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .003 mile(s) before CRD 570 E and ends at .002 mile(s) before CRD 551 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J W - STE. GENEVIEVE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at US 61 S and ends at .398 mile(s) after US 61 S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J E - STE. GENEVIEVE County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .398 mile(s) before US 61 S and ends at US 61 S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 60 E - BUTLER County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .005 mile(s) after BU 60 E and ends at .006 mile(s) before RT T S.
Work is scheduled from 28-APR-2025 to 30-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS55S TO RTA S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at IS 55 S and ends at RT BB E.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 169 S - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .014 mile(s) after IS 29 S and ends at .034 mile(s) before RT FF S.
Work is scheduled from 19-MAY-2025 to 28-MAY-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 6 W - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .004 mile(s) before IS 29 N and ends at .002 mile(s) after IS 29 S.
Work is scheduled from 29-MAY-2025 to 30-MAY-2025.
Work will start daily at 08:00 PM and end by 08:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT TT E - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .029 mile(s) before CST BRAEMORE RD E and ends at .01 mile(s) before MO 740 E.
Work is scheduled from 26-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT KK N - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at CRD TURTLE AVE S.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT KK S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at CRD TURTLE AVE S and ends at MO 156 E.
Work is scheduled from 28-APR-2025 to 28-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS70E TO IS35S S - JACKSON County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at IS 70 E and ends at IS 35 S.
Work is scheduled from 12-MAY-2025 to 12-MAY-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - LACLEDE County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at MO 5 S and ends at CRD BLUFF TR E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E E - DALLAS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD BLUFF TR E and ends at MO 5 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP MO13S TO US60E E - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at MO 13 S and ends at .002 mile(s) before RP KANSAS EXPY N TO US60E E.
Work is scheduled from 07-MAY-2025 to 08-MAY-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT TT W - BOONE County - EXPECT DELAYS
MILLING/RESURFACING WORK
Work zone begins at .01 mile(s) after MO 740 E and ends at .029 mile(s) after CST BRAEMORE RD E.
Work is scheduled from 26-MAY-2025 to 20-JUN-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP US71N TO IS670W W - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at .004 mile(s) after US 71 N and ends at IS 670 W.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone BU 63 S - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 N and ends at RT A S.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST WEST OSAGE BEACH PKWY N - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at .016 mile(s) before PVT CHATEAU LN S and ends at .013 mile(s) before US 54 E.
Work is scheduled from 28-APR-2025 to 22-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST WEST OSAGE BEACH PKWY S - CAMDEN County - POSSIBLE DELAYS
SIDEWALK/ADA IMPROVEMENTS
Work zone begins at PVT GLAIZE BRIDGE HTS S and ends at .016 mile(s) after PVT CHATEAU LN S.
Work is scheduled from 28-APR-2025 to 22-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone BU 63 N - RANDOLPH County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT A S and ends at US 63 N.
Work is scheduled from 30-APR-2025 to 01-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone CST NW PRAIRIE VIEW RD N - PLATTE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .02 mile(s) after CST N TIFFANY SPRINGS PKWY W and ends at .001 mile(s) after CST NW TRANSCON DR E.
Work is scheduled from 05-MAY-2025 to 12-MAY-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 21 S - WASHINGTON County - POSSIBLE DELAYS
SHOULDER WORK
Work zone begins at .007 mile(s) after PVT DIAMOND RD S and ends at .002 mile(s) after CRD SHALE RD E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone CST NW PRAIRIE VIEW RD S - PLATTE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at .001 mile(s) before CST NW TRANSCON DR E and ends at .02 mile(s) before CST N TIFFANY SPRINGS PKWY W.
Work is scheduled from 05-MAY-2025 to 12-MAY-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RP IS29N TO RTDW W - PLATTE County - EXPECT DELAYS
ROADSIDE WORK
Work zone begins at IS 29 N and ends at .037 mile(s) before RT D W.
Work is scheduled from 12-MAY-2025 to 15-MAY-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - BUCHANAN County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .018 mile(s) before RP CRAIG PKWY TO US36W W and ends at .009 mile(s) after CST 12TH ST S.
Work is scheduled from 06-JUN-2025 to 11-JUN-2025.
Work will start daily at 08:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT BB E - ST. CLAIR County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .135 mile(s) after RT H S and ends at CRD W DIVISION E.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT BB W - ST. CLAIR County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at CRD W DIVISION E and ends at .135 mile(s) before RT H S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 5 N - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at .022 mile(s) after CST DEKALB ST E and ends at MO 52 E.
Work is scheduled from 30-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone MO 5 S - MORGAN County - EXPECT DELAYS
NEW PAVEMENT CONSTRUCTION
Work zone begins at MO 52 E and ends at .022 mile(s) before CST KIDWELL DR E.
Work is scheduled from 30-APR-2025 to 30-MAY-2025.
Work will start daily at 06:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP MO9S TO IS635N N - PLATTE County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at MO 9 S and ends at .009 mile(s) before IS 635 N.
Work is scheduled from 05-MAY-2025 to 02-OCT-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP IS70E TO 23RD ST W - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .001 mile(s) after IS 70 E and ends at CST E 23RD ST E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RP E 23RD ST TO IS70E E - JACKSON County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at CST E 23RD ST E and ends at IS 70 E.
Work is scheduled from 05-MAY-2025 to 01-DEC-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone IS 635 N - PLATTE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .027 mile(s) after US 69 S and ends at .04 mile(s) after US 69 N.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C E - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at RT D S and ends at US 65 S.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C W - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 65 S and ends at RT D S.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD E - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 73 S and ends at CRD HACKBERRY RD E.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT DD W - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at CRD HACKBERRY RD E and ends at MO 73 S.
Work is scheduled from 05-MAY-2025 to 09-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E W - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .028 mile(s) after CRD PEARL LN S and ends at .178 mile(s) after CRD PEARL LN S.
Work is scheduled from 26-MAY-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RT E E - ADAIR County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .178 mile(s) before CRD PEARL LN S and ends at .028 mile(s) before CRD PEARL LN S.
Work is scheduled from 26-MAY-2025 to 01-DEC-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP IS35N TO IS670W W - JACKSON County - POSSIBLE DELAYS
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 35 N and ends at IS 670 W.
Work is scheduled from 05-MAY-2025 to 03-JUL-2025.
Work will start daily at 07:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday, and Saturday.
Future work zone RP RTJ TO IS70E E - CALLAWAY County - ALL LANES CLOSED
NEW PAVEMENT CONSTRUCTION
Work zone begins at RT J S and ends at .036 mile(s) before IS 70 E.
Work is scheduled from 01-MAY-2025 to 01-AUG-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 36 E - MACON County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .004 mile(s) before OR 36 E and ends at .001 mile(s) after CRD FIREWORKS AVE S.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 10:00 AM.
Work will be conducted Monday through Friday.
Future work zone IS 72 W - MARION County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at US 36 W and ends at .062 mile(s) before RP MO79 TO IS72W W.
Work is scheduled from 12-MAY-2025 to 28-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 50 E - COLE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .022 mile(s) before CRD CONSERVATION RD S and ends at .028 mile(s) before US 63 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 50 W - OSAGE County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .078 mile(s) after US 63 N and ends at .022 mile(s) after CRD CONSERVATION RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 72 E - MARION County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .128 mile(s) before MO 79 S and ends at .001 mile(s) before US 36 E.
Work is scheduled from 12-MAY-2025 to 28-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B W - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 83 S and ends at MO 13 S.
Work is scheduled from 12-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 E - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at 1.273 mile(s) before RP IS44E TO SAMPSON RD E and ends at .711 mile(s) before RA IS44E CONWAY E.
Work is scheduled from 10-MAY-2025 to 11-MAY-2025.
Work will start daily at 06:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT B E - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 13 S and ends at MO 83 S.
Work is scheduled from 12-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - WEBSTER County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .897 mile(s) after RA IS44W CONWAY W and ends at 1.31 mile(s) after RP SAMPSON RD TO IS44W W.
Work is scheduled from 10-MAY-2025 to 11-MAY-2025.
Work will start daily at 06:00 PM and end by 12:00 PM.
Work will be conducted all week, including weekends.
Future work zone RT A N - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at RT Z E and ends at .052 mile(s) before CRD 1062 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT A S - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .052 mile(s) after CRD 1062 E and ends at RT Z E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 07:30 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT U E - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT T E and ends at RT D S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT U W - LEWIS County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at RT D S and ends at RT T E.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E N - SHELBY County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 15 S and ends at MO 156 E.
Work is scheduled from 29-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT E S - KNOX County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 156 E and ends at MO 15 S.
Work is scheduled from 29-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 N - PEMISCOT County - POSSIBLE DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .006 mile(s) after RP IS55N TO MO84 E and ends at .109 mile(s) after RP MO84 TO IS55N N.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 55 S - PEMISCOT County - EXPECT DELAYS
GUARD RAIL/CABLE WORK
Work zone begins at .227 mile(s) after RP US412E TO IS55S S and ends at 1.046 mile(s) after RP US412E TO IS55S S.
Work is scheduled from 28-APR-2025 to 02-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT K S - ST. CLAIR County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at MO 82 E and ends at .038 mile(s) before US 54 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT K N - ST. CLAIR County - EXPECT DELAYS
CHIP SEAL OVERLAY
Work zone begins at .038 mile(s) after US 54 E and ends at MO 82 E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:30 PM.
Work will be conducted Monday through Friday.
Future work zone MO 86 E - NEWTON County - POSSIBLE DELAYS
RAILROAD MAINTENANCE
Work zone begins at .059 mile(s) before RR CHEROKEE SUB E and ends at .03 mile(s) before LP 49 S.
Work is scheduled from 28-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 86 W - NEWTON County - POSSIBLE DELAYS
RAILROAD MAINTENANCE
Work zone begins at .004 mile(s) after LP 49 N and ends at .062 mile(s) after RR CHEROKEE SUB E.
Work is scheduled from 28-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 44 W - LAWRENCE County - EXPECT DELAYS
PAVEMENT REPAIR
Work zone begins at .083 mile(s) before CRD 1222 S and ends at .828 mile(s) after CRD 1222 S.
Work is scheduled from 18-MAY-2025 to 31-MAY-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday.
Future work zone RP IS670W TO WYOMING ST N - JACKSON County - ALL LANES CLOSED
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Work zone begins at IS 670 W and ends at CST WYOMING ST N.
Work is scheduled from 06-JUN-2025 to 07-JUN-2025.
Work will be conducted 24 hours a day.
Work will be conducted Monday through Friday, and Saturday.
Future work zone IS 44 W - GREENE County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at 2.249 mile(s) after RP RTT TO IS44W W and ends at 1.737 mile(s) before RP IS44W TO RTK N.
Work is scheduled from 18-MAY-2025 to 30-MAY-2025.
Work will start daily at 07:00 PM and end by 07:00 AM.
Work will be conducted Monday through Friday, and Sunday.
Future work zone RT V E - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at 2.021 mile(s) before CRD 6 S and ends at MO 81 S.
Work is scheduled from 27-MAY-2025 to 27-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT V W - CLARK County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 81 S and ends at 2.021 mile(s) after CRD 6 S.
Work is scheduled from 27-MAY-2025 to 27-MAY-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT HH N - POLK County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at MO 64 E and ends at US 65 S.
Work is scheduled from 12-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone WS IS35N KEARNEY N - CLAY County - ALL LANES CLOSED
PAVEMENT REPAIR
Work zone begins at IS 35 N and ends at .007 mile(s) before IS 35 N.
Work is scheduled from 29-APR-2025 to 01-MAY-2025.
Work will start daily at 05:00 PM and end by 11:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT HH S - DALLAS County - POSSIBLE DELAYS
MILLING/RESURFACING WORK
Work zone begins at US 65 S and ends at MO 64 E.
Work is scheduled from 12-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 36 W - DEKALB County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at .051 mile(s) after RT C S and ends at .433 mile(s) before CO US36E TO RTM W.
Work is scheduled from 13-MAY-2025 to 15-MAY-2025.
Work will start daily at 06:00 AM and end by 07:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT B S - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .616 mile(s) after CRD SQUIRREL RD S and ends at .97 mile(s) after CRD SQUIRREL RD S.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B N - HOLT County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .97 mile(s) before CRD SQUIRREL RD S and ends at .616 mile(s) before CRD SQUIRREL RD S.
Work is scheduled from 05-MAY-2025 to 31-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT J N - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at CRD 436 E and ends at .03 mile(s) after PVT OWL CREEK LN E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT J S - CALLAWAY County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .03 mile(s) before PVT OWL CREEK LN E and ends at CRD 436 E.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RP KANSAS EXPY N TO US60E E - GREENE County - ALL LANES CLOSED
RESURFACING PAVEMENT
Work zone begins at .001 mile(s) after CST KANSAS EXPY N and ends at US 60 E.
Work is scheduled from 07-MAY-2025 to 08-MAY-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted Monday through Friday.
Future work zone RT E S - AUDRAIN County - ALL LANES CLOSED
PATCHING DRIVE SURFACE
Work zone begins at MO 15 S and ends at .006 mile(s) after RT T E.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 70 E - ST. CHARLES County - EXPECT DELAYS
BRIDGE MAINTENANCE
Work zone begins at .123 mile(s) after RP IS70E TO LP70E E and ends at .762 mile(s) before RP IS70E TO MO141S S.
Work is scheduled from 09-MAY-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT C W - STE. GENEVIEVE County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at MO 32 E and ends at RT K E.
Work is scheduled from 05-MAY-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT C E - ST. FRANCOIS County - POSSIBLE DELAYS
SCRUB SEALING PAVEMENT
Work zone begins at RT K E and ends at MO 32 E.
Work is scheduled from 05-MAY-2025 to 19-MAY-2025.
Work will start daily at 06:00 AM and end by 06:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 67 N - ST. LOUIS County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .021 mile(s) after RP NATURAL BRIDGE RD TO US67N N and ends at .051 mile(s) after CST NATURAL BRIDGE RD E.
Work is scheduled from 28-APR-2025 to 08-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT D E - MONROE County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at MO 15 S and ends at RT B S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT D W - RALLS County - ALL LANES CLOSED
SEAL COAT OVERLAY
Work zone begins at RT B S and ends at MO 15 S.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 E - ST. LOUIS County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .59 mile(s) before CST CLAYTON RD E and ends at .119 mile(s) before RP IS270E TO IS64E E.
Work is scheduled from 26-APR-2025 to 27-APR-2025.
Work will start daily at 10:00 PM and end by 06:00 AM.
Work will be conducted all week, including weekends.
Future work zone RT B E - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .117 mile(s) after RT N S and ends at .062 mile(s) before CRD 122 S.
Work is scheduled from 28-APR-2025 to 09-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT B W - ANDREW County - ALL LANES CLOSED
BRIDGE RECONSTRUCTION
Work zone begins at .062 mile(s) after CRD 122 S and ends at .117 mile(s) before RT N S.
Work is scheduled from 28-APR-2025 to 09-JUL-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone US 71 N - CASS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .018 mile(s) after RP IS49N TO RTJ N and ends at .078 mile(s) before RP RTJ TO IS49N N.
Work is scheduled from 28-APR-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT C S - CASS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .002 mile(s) after RT J S and ends at .012 mile(s) before RT J S.
Work is scheduled from 28-APR-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone RT C N - CASS County - ALL LANES CLOSED
BRIDGE MAINTENANCE
Work zone begins at .012 mile(s) after RT J S and ends at .002 mile(s) before RT J S.
Work is scheduled from 28-APR-2025 to 12-MAY-2025.
Work will be conducted 24 hours a day.
Work will be conducted all week, including weekends.
Future work zone MO 248 E - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .577 mile(s) before MO 39 S and ends at .44 mile(s) before MO 39 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 21 S - ST. LOUIS County - NO DELAYS
BRIDGE DECK SEALING
Work zone begins at .013 mile(s) after CRD CONCORD SCHOOL RD E and ends at .051 mile(s) after RP IS270W TO MO21 W.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 248 W - BARRY County - ALL LANES CLOSED
BRIDGE INSPECTION
Work zone begins at .44 mile(s) after MO 39 S and ends at .577 mile(s) after MO 39 S.
Work is scheduled from 29-APR-2025 to 29-APR-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y N - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at LP 44 E and ends at .026 mile(s) after IS 44 W.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT Y S - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .022 mile(s) before IS 44 W and ends at LP 44 W.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T N - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .677 mile(s) before CRD RIVERSIDE RD S and ends at .393 mile(s) before CRD RIVERSIDE RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT T S - PULASKI County - POSSIBLE DELAYS
BRIDGE MAINTENANCE
Work zone begins at .393 mile(s) after CRD RIVERSIDE RD S and ends at .677 mile(s) after CRD RIVERSIDE RD S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 06:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone IS 270 E - ST. LOUIS County - EXPECT DELAYS
BRIDGE DECK SEALING
Work zone begins at .004 mile(s) after RP IS55N TO IS270E E and ends at .161 mile(s) after CRD VON TALGE RD S.
Work is scheduled from 14-MAY-2025 to 14-MAY-2025.
Work will start daily at 09:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 21 N - ST. LOUIS County - NO DELAYS
BRIDGE DECK SEALING
Work zone begins at .051 mile(s) before RP MO21 TO IS270W W and ends at .013 mile(s) before CRD CONCORD SCHOOL RD E.
Work is scheduled from 28-APR-2025 to 29-APR-2025.
Work will start daily at 09:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone US 160 E - GREENE County - POSSIBLE DELAYS
PERMIT OR UTILITY WORK
Work zone begins at .016 mile(s) after CST CRESTVIEW AVE S and ends at .015 mile(s) before CST MAPLE LN S.
Work is scheduled from 12-MAY-2025 to 16-MAY-2025.
Work will start daily at 07:00 AM and end by 05:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP W - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at .001 mile(s) after CRD CORSO RD E and ends at CRD LIBERTY CHURCH RD E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone RT M W - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at US 63 S and ends at .022 mile(s) before RT J S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT M E - PHELPS County - POSSIBLE DELAYS
PATCHING DRIVE SURFACE
Work zone begins at .022 mile(s) after RT J S and ends at US 63 S.
Work is scheduled from 28-APR-2025 to 01-MAY-2025.
Work will start daily at 08:30 AM and end by 03:30 PM.
Work will be conducted Monday through Friday.
Future work zone RT PP E - LINCOLN County - ALL LANES CLOSED
CULVERT REPLACEMENT
Work zone begins at CRD LIBERTY CHURCH RD E and ends at .001 mile(s) before CRD CORSO RD E.
Work is scheduled from 30-APR-2025 to 30-APR-2025.
Work will start daily at 07:00 AM and end by 04:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 43 S - MCDONALD County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .327 mile(s) before MO 76 E and ends at .051 mile(s) before CRD COWSKIN RD E.
Work is scheduled from 06-MAY-2025 to 15-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.
Future work zone MO 43 N - MCDONALD County - POSSIBLE DELAYS
BRIDGE INSPECTION
Work zone begins at .051 mile(s) after CRD COWSKIN RD E and ends at .327 mile(s) after MO 76 E.
Work is scheduled from 06-MAY-2025 to 15-MAY-2025.
Work will start daily at 08:00 AM and end by 03:00 PM.
Work will be conducted Monday through Friday.

Winter Road Conditions

BACK TO TOP

Winter road conditions represent the current condition of major roads in Missouri with respect to the impact from winter precipitation. There are four (4) conditions: clear, mostly clear, partly covered and covered. If a road is bad enough that it warrants a closure, a traffic impact will be entered (see Traffic Impacts at the top of this report.) A description of three of the conditions (covered, partly covered and mostly clear) can be found at this MoDOT web page: Winter Driving. Below is a table of all winter road condition records. It is sorted according to type of road (interstates first and then lesser roads follow) and road name. The table contains (from left-to-right):

Route Location Road Condition Last Update
Interstate Route
155
IS 55 (Pemiscot) TO Tennessee Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
170
IS 270 (St. Louis) TO RT D / Page Avenue (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
170
RT D / Page Avenue (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
229
IS 29 North Jct (Andrew) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
255
IS 55 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 44 (St. Louis) TO IS 64 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 70 (St. Louis) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 64 (St. Louis) TO IS 70 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
270
IS 55 (St. Louis) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
Andrew County Line TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
MEXICO CITY AVE (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
BUCHANAN COUNTY LINE TO MEXICO CITY AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
IS 229 SOUTH JCT (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
29
MO 118 (Holt) TO Andrew County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
US 169 North Jct (Buchanan) TO IS 229 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
US 136 (Atchison) TO RT W (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
RT W (Holt) TO MO 118 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
29
Iowa Line TO US 136 (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT DD (Daviess) TO US 69 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
RT H / AA (Harrison) TO RT DD (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
Iowa Line TO RT A / Z (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 South Jct (Daviess) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
US 69 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
35
MO 152 (CLAY) TO IS 29 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
CLINTON COUNTY LINE TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 70 E JCT (JACKSON) TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
IS 670 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
35
RT A / Z (Harrison) TO RT H / AA (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Interstate Route
435
IS 70 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
108TH STREET (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
PLATTE COUNTY LINE TO 108TH STREET (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
KANSAS LINE TO IS 29 NORTH JCT (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 29 SOUTH JCT (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
435
IS 470 (JACKSON) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
US 63 (Phelps) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 38 (Webster) TO RT J / Y (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Crawford County Line TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
RT J / Y (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 266 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 5 (Laclede) TO Pulaski County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 174 (Lawrence) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Phelps County Line TO US 63 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 125 (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
MO 37 (Jasper) TO MO 174 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Laclede County Line TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Oklahoma Line TO MO 37 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis City Line TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
44
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
IS 435 (JACKSON) TO WOODS CHAPEL RD (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
470
WOODS CHAPEL RD (JACKSON) TO 39TH STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (BATES) TO RT B (VERNON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (VERNON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT A / B (CASS) TO RT A / B (BATES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
NORTH CASS PKWY (CASS) TO RT A / B (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
US 160 (BARTON) TO RT H / K (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT H / K (JASPER) TO IS 44 EAST JCT (JASPER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 44 WEST JCT (JASPER) TO RT B (MCDONALD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
IS 435 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
JACKSON COUNTY LINE TO NORTH CASS PKWY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
49
RT B (MCDONALD) TO ARKANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT A (Pemiscot) TO RT U (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
ST. LOUIS CITY LINE TO RT M (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
US 61 / US 62 South Jct (New Madrid) TO RT A (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT U (Pemiscot) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT N (Ste. Genevieve) TO RT KK (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
IS 44 TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
MO 80 (New Madrid) TO US 61 / US 62 South Jct (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
IS 57 (Scott) TO MO 80 (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
MO 32 (Ste. Genevieve) TO RT N (Ste. Genevieve) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
MO 77 (Scott) TO IS 57 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT KK (Cape Girardeau) TO US 61 / MO 34 (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
US 61 / MO 34 (Cape Girardeau) TO MO 77 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT TT (JEFFERSON) TO MO 32 (STE. GENEVIEVE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
55
RT M (JEFFERSON) TO RT TT (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
57
Illinois Line TO IS 55 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
635
IS 29 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
IS 70 (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
64
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
670
KANSAS LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 435 (JACKSON) TO IS 470 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Z (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT W / T (St. Charles) TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 179 (Cooper) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 135 (Cooper) TO MO 179 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 47 (Warren) TO RT W / T (St. Charles) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Interstate Route
70
RT D / YY (Callaway) TO MO 19 (Montgomery) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Interstate Route
70
IS 470 (JACKSON) TO RT F (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
KANSAS LINE TO IS 670 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 54 (Callaway) TO RT D / YY (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 19 (Montgomery) TO MO 47 (Warren) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Interstate Route
70
St. Louis City Line TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT Y (Saline) TO US 65 (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Callaway County Line TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 13 (Lafayette) TO RT Y (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO J (Saline) TO Saline County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
Cooper County Line TO MO 135 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
RT F (Jackson) TO MO 13 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
US 65 (Saline) TO MO J (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
St. Louis County Line TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
70
MO 740 (Boone) TO RT Z (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Interstate Route
72
US 61 (Marion) TO Illinois State Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
136
RT M (Atchison) TO US 71 North Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 71 South Jct (Nodaway) TO RT P South Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 63 North Jct (Schuyler) TO MO 15 West Jct (Scotland) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
136
RT A (Clark) TO MO 27 (Clark) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
136
RT D (Harrison) TO IS 35 (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
RT P South Jct (Nodaway) TO US 169 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 59 North Jct (Atchison) TO RT M (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 5 West Jct (Putnam) TO Schuyler County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 15 West Jct (Scotland) TO RT A (Clark) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
136
Nebraska Line TO US 59 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Mercer County Line TO US 65 West Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 65 East Jct (Mercer) TO MO 139 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
MO 139 West Jct (Putnam) TO MO 5 West Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
US 169 East Jct (Gentry) TO RT D (Harrison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
136
Schuyler County Line TO US 63 South Jct (Schuyler) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
136
IS 35 (Harrison) TO Mercer County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
159
IS 29 (Holt) TO Nebraska Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
160
RT F / V (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 39 North Jct (Dade) TO RT F / V (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT M (Oregon) TO MO 19 South Jct (Oregon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 65 (Taney) TO MO 76 East Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
Butler County Line TO US 67 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 13 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 60 East Jct (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 126 (Barton) TO MO 39 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 43 (Barton) TO IS 49 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
Kansas Line TO MO 43 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
US 63 North Jct (Howell) TO RT M (Oregon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 21 South Jct (Ripley) TO Butler County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 5 West Jct (Ozark) TO RT V (Ozark) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
MO 14 (Christian) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
RT V (Ozark) TO US 63 South Jct (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
160
IS 49 (Barton) TO MO 126 (Barton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
166
Kansas Line TO IS 44 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT VV (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
US 136 West Jct (Gentry) TO RT M (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
RT O (Gentry) TO US 136 East Jct (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
MO 152 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT E (Andrew) TO IS 29 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 North Jct (Buchanan) TO IS 29 South Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
IS 29 South Jct (Buchanan) TO RT V V (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
CLAY COUNTY LINE TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
RT M (Gentry) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
Iowa Line TO RT O (Gentry) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
169
MO 92 (CLAY) TO MO 152 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
169
MO 31 (DeKalb) TO RT E (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
US 63 (Randolph) TO MO 15 (Monroe) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
24
MO 291 (JACKSON) TO LAFAYETTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
US 61 North Jct (Marion) TO Illinois Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
24
IS 435 (JACKSON) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
US 36 (Marion) TO US 61 South Jct (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
24
MO 15 (Monroe) TO US 36 (Ralls) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
24
US 65 (Carroll) TO MO 11 (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
Lafayette County Line TO US 65 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
24
Randolph County Line TO US 63 (Randolph) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
24
MO 11 (Chariton) TO MO 5 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 5 West Jct (Chariton) TO Randolph County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
24
MO 13 (Lafayette) TO US 65 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
36
US 65 (Livingston) TO RT W (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 33 East Jct (DeKalb) TO RT J (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 11 (Linn) TO Macon County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT W (Linn) TO MO 11 (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 31 (DeKalb) TO MO 33 East Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT J (Caldwell) TO RT A (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
RT AC (Buchanan) TO MO 31 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
MO 15 (Shelby) TO US 24 (Ralls) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
36
US 63 (Macon) TO MO 15 (Shelby) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
36
RT A (Caldwell) TO US 65 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
US 24 (Ralls) TO US 61 (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
36
Kansas Line TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
36
Macon County Line TO US 63 (Macon) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
40
RT V (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
IS 70 WEST JCT (JACKSON) TO RT V (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
Howard County Line TO SP 240 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
MO 7 (JACKSON) TO IS 70 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
40
SP 240 (Howard) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
412
MO 25 (Dunklin) TO RT C (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
412
Arkansas Line TO MO 25 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
412
RT C (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 127 (Pettis) TO RT MM (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT F (Jackson) TO MO 13 (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 135 West Jct (Pettis) TO RT E (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Gasconade County Line TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
IS 470 (Jackson) TO RT F (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Moniteau County Line TO RT D / T (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MILITIA DRIVE (Cole) TO Cole County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
Osage County Line TO RT N (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT D / T (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
US 54 (Cole) TO MILITIA DRIVE (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT N (OSAGE) TO MO 19 WEST JCT (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 13 (Johnson) TO MO 127 (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT E (Moniteau) TO Moniteau County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT MM (Pettis) TO RT TT (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
RT TT (Pettis) TO MO 135 West Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
50
MO 19 WEST JCT (GASCONADE) TO FRANKLIN COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 5 (Camden) TO Grand Glaize Bridge Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 19 North Jct (Audrain) TO MO 154 (Pike) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
54
MO 154 (Pike) TO US 61 (Pike) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
54
US 63 North Jct (Callaway) TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT AA (Vernon) TO MO 39 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 39 (Cedar) TO MO 13 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Kansas Line TO MO 43 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
US 65 (Hickory) TO MO 73 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Audrain County Line TO RT JJ (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
54
MO 52 (Miller) TO MO 17 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT JJ (Audrain) TO MO 19 South Jct (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
54
MO 17 (Cole) TO RT CC (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 43 (Vernon) TO RT AA (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT CC (Cole) TO US 63 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
RT J (Callaway) TO IS 70 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
IS 70 (Callaway) TO Audrain County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 13 (St. Clair) TO MO 83 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
Grand Glaize Bridge TO MO 52 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 73 (Camden) TO MO 5 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 83 (Hickory) TO US 65 (Hickory) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
54
MO 19 South Jct (Audrain) TO MO 19 North Jct (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
54
US 61 (Pike) TO Illinois Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
59
Iowa Line TO US 136 North Jct (Atchison) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
US 136 South Jct (Atchison) TO IS 29 Exit 92 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
Pendelton St (Buchanan) TO IS 229 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 75 (Holt) TO IS 29 Exit 67 (Holt) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
MO 752 (Buchanan) TO Kansas Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
59
IS 29 Exit 53 (Andrew) TO Karnes Rd (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
60
MO 114 (Stoddard) TO IS 55 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 360 (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
IS 57 (Mississippi) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 59 South Jct (Newton) TO MO 59 North Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 17 East Jct (Howell) TO RT J (Carter) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 63 South Jct (Howell) TO MO 17 East Jct (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT P (Greene) TO MO 360 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 181 (Texas) TO US 63 South Jct (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 65 (Greene) TO RT FF (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 59 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT J (Carter) TO MO 21 North Jct (Carter) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT FF (Webster) TO MO 5 East Jct (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
US 67 South Jct (Butler) TO RT DD (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 95 (Wright) TO MO 181 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 5 East Jct (Wright) TO MO 95 (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT M (Newton) TO MO 37 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
RT DD (Butler) TO MO 114 (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 21 North Jct (Carter) TO Butler County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
Butler County Line TO US 67 South Jct (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
MO 37 (Barry) TO BU 60 East Jct (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
Oklahoma Line TO MO 59 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
60
BU 60 East Jct (Lawrence) Aurora TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 27 (Clark) TO MO 16 (Lewis) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
Iowa Line TO MO 27 (Clark) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
RT Y (CAPE GIRARDEAU) TO IS 55 EXIT 99 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
IS 55 EXIT 87 (SCOTT) TO MO 77 SOUTH JCT (SCOTT) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
US 67 (JEFFERSON) TO STE. GENEVIEVE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
Ste. Genevieve County Line TO MO 32 (St. Genevieve) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
ST. CHARLES COUNTY LINE TO IS 70 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
US 54 (Pike) TO RT D (Pike) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
RT D (Pike) TO MO 47 (Lincoln) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
MO 19 (Ralls) TO US 54 (Pike) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
MO 47 (Lincoln) TO St. Charles County Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
MO 168 South Jct (Marion) TO MO 19 (Ralls) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
US 24 North Jct (Marion) TO US 24 South Jct (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
MO 77 South Jct (Scott) TO US 60 (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
IS 55 Exit 99 (Cape Girardeau) TO IS 55 Exit 93 (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
US 24 South Jct (Marion) TO MO 168 South Jct (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
IS 55 Exit 44 (New Madrid) TO IS 55 Exit 32 (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
IS 55 Exit 8 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 32 (ST. GENEVIEVE) TO RT M (PERRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
RT M (PERRY) TO MO 51 (PERRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 16 (Lewis) TO US 24 North Jct (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
61
US 60 (NEW MADRID) TO MO 80 (NEW MADRID) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
RT A (PERRY) TO RT Y (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 80 (NEW MADRID) TO IS 55 EXIT 49(NEW MADRID) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
61
MO 51 (PERRY) TO RT A (PERRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
62
US 61 (SCOTT) TO RT B (MISSISSIPPI) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
62
RT B (MISSISSIPPI) TO IS 57 (MISSISSIPPI) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
62
MO 53 (Dunklin) TO RT W (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
62
RT W (New Madrid) TO US 61 (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 156 (Macon) TO US 36 (Macon) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63
US 24 (Randolph) TO MO 22 (Boone) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63
US 50 East Jct (Osage) TO RT P (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
IS 44 (Phelps) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT P (Osage) TO MO 42 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
Phelps County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT H (Boone) TO US 54 (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
US 136 South Jct (Schuyler) TO MO 6 North Jct (Adair) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63
US 60 South Jct (Texas) TO US 160 North Jct (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
US 36 (Macon) TO US 24 (Randolph) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63
MO 42 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 6 North Jct (Adair) TO MO 156 (Macon) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63
US 160 North Jct (Texas) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 32 (Texas) TO US 60 North Jct (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
RT B (Boone) TO RT H (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
MO 22 (Boone) TO RT B (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
63
Iowa Line TO US 136 South Jct (Schuyler) Road reported clear CLEAR 04-24-2025 at 07:04 AM
United States Route
63C
US 63 (Boone) TO US 63 (Boone) Columbia Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT EE (Christian) TO MO 176 South Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 6 (Grundy) TO Livingston County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 52 South Jct (Benton) TO RT AC (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 60 (Greene) TO RT EE (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT AA (Benton) TO RT D (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
CRD Wildwood Rd S TO RT H (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT U (Carroll) TO US 24 (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Saline County Line TO RT YY (Saline) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 24 (Carroll) TO Saline County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
RT YY (Saline) TO CRD Wildwood Rd S Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
US 136 North Jct (Mercer) TO RT C (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
US 36 (Livingston) TO RT U (Carroll) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 32 (Dallas) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
IS 44 (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 52 North Jct (Pettis) TO MO 52 South Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
MO 125 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
CRD KA LINE DR E (Pettis) TO MO 52 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT H (Pettis) TO CRD KA LINE DR E (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT AC (Benton) TO RT AA (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT D (Dallas) TO MO 32 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
65
RT C (Grundy) TO MO 6 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Iowa Line TO US 136 North Jct (Mercer) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
Livingston County Line TO US 36 (Livingston) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
65
MO 176 South Jct (Taney) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 32 North Jct (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT M (Jefferson) TO US 61 South Jct (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Dorsett Rd / Midland Blvd (St. Louis) TO Swan Dr (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Illinois Line TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 172 (Wayne) TO US 60 North Jct (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
US 61 South Jct (Jefferson) TO RT V (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
US 60 South Jct (Butler) TO RT M (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT EE (Wayne) TO MO 172 (Wayne) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 72 (Madison) TO RT EE (Wayne) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT V (Jefferson) TO MO 32 North Jct (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
RT M (Butler) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
MO 267 (St. Louis) TO RT M (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
IS 270 (St. Louis) TO Dorsett Rd / Midland Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
67
Prospect Ave (St. Louis) TO MO 267 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
MO 6 South Jct (Daviess) TO IS 35 South Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
MO 92 (CLAY) TO IS 35 NORTH JCT (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 35 South Jct (Daviess) TO LP 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
69
IS 635 (PLATTE) TO KANSAS LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
CLINTON COUNTY LINE TO MO 92 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
PLATTE COUNTY LINE TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
69
IS 35 SOUTH JCT (CLAY) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
RT B (Andrew) TO IS 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
Iowa Line TO RT FF (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
US 136 East Jct (Nodaway) TO RT B (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
United States Route
71
IS 670 (JACKSON) TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
Is 49 (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
United States Route
71
RT FF (Nodaway) TO US 136 East Jct (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
1
MO 152 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
1
IS 35 (CLAY) TO MO 210 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
10
CLAY COUNTY LINE TO RT M (RAY) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
10
CARROLL COUNTY LINE TO US 65 (CARROLL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
10
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
10
RT M (RAY) TO CARROLL COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
MO 19 North Jct (Gasconade) TO Franklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
Frene Creek Rd (Gasconade) TO MO 19 South Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
St. Louis County Line TO Big Bend Blvd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
100
Franklin County Line TO St. Louis County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
103
US 60 (Carter) TO Skyline Dr (Carter) Van Buren Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
105
US 62 (Mississippi) TO MO 80 (Mississippi) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
109
RT CC (St. Louis) TO RT W (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
110
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
112
RT F (Barry) TO MO 76 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
114
MO 25 (Stoddard) TO Airport Rd (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
114
US 60 (Stoddard) TO US 61 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
115
IS 70 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
116
US 169 (Clinton) TO MO 33 East Jct (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
MO 13 NORTH JCT (CALDWELL) TO RT A (CALDWELL) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
MO 33 East Jct (Clinton) TO US 69 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
116
US 69 (Clinton) TO MO 13 South Jct (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
12
IS 435 (JACKSON) TO SPRING ST. (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
123
RT BB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
124
RT B (Boone) TO MO 22 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT C (Greene) TO RT OO West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
RT OO West Jct (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
MO 14 East Jct (Christian) TO RT T (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 65 (Greene) TO RT E (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
125
US 60 (Greene) TO MO 14 West Jct (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 70 (Lafayette) TO US 50 West Jct (Johnson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
RT BB (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 50 EAST JCT (JOHNSON) TO MO 2 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 160 Reed Spring Jct (Stone) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 36 (Caldwell) TO Ray County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
MO 32 (Polk) TO RT BB (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
IS 44 (Greene) TO US 60 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
St. Clair County Line TO MO 82 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 6 West Jct (Daviess) TO US 36 (Caldwell) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
13
MO 82 (St. Clair) TO US 54 (St. Clair) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 224 West Jct (Lafayette) TO IS 70 (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 2 (Johnson) TO MO 7 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
Ray County Line TO MO 224 West Jct (Lafayette) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
US 54 (St. Clair) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
13
MO 7 South Jct (Henry) TO St. Clair County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
US 50 (JOHNSON) TO MO 58 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
MO 224 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
131
LAFAYETTE COUNTY LINE TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
MO 7 (Pulaski) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
133
Maries County Line TO MO 17 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
135
MO 52 (Morgan) TO MO 5 (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
MO 125 (Christian) TO RT BB (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT P (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
US 65 (Christian) TO MO 125 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
14
RT BB (Douglas) TO RT FF (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 370 (St. Louis) TO MO 364 (St. Louis Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 30 (ST. LOUIS) TO US 67 (JEFFERSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
141
MO 364 (ST. LOUIS) TO MO 30 (ST. LOUIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
US 63 (OREGON) TO RT V (RIPLEY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
MO 158 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
RT V (RIPLEY) TO MO 21 WEST JCT (RIPLEY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
142
MO 21 East Jct (Ripley) TO RT E (Ripley) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
148
US 136 (Nodaway) TO Iowa Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
15
RT E (Shelby) TO US 36 (Shelby) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
15
US 36 (Shelby) TO US 24 (Monroe) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
15
Iowa Line TO US 136 East Jct (Scotland) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
15
MO 6 South Jct (Knox) TO RT E (Shelby) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
15
US 24 (Monroe) TO US 54 (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
15
US 136 West Jct (Scotland) TO MO 6 North Jct (Knox) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
150
MO 291 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
150
KANSAS LINE TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
IS 435 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
152
PLATTE COUNTY LINE TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
158
US 67 (Butler) TO MO 142 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
163
IS 70 (Boone) TO RT K (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
164
RT NN (Pemiscot) TO US 61 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
164
US 412 West Jct (Dunklin) TO RT NN (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
164
RT D (Pemiscot) TO RT DD (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
RT K (Miller) TO IS 44 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 52 West Jct (Miller) TO RT K (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
RT AW (Texas) TO MO 32 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 54 (Cole) TO Miller County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
US 63 (Howell) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
Miller County Line TO MO 52 West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
17
MO 32 (Texas) TO US 63 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 96 (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
Kansas Line TO MO 96 West Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 43 (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
171
MO 249 (Jasper) TO MO 96 W Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
173
MO 265 (Stone) TO MO 248 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
MO 39 (Lawrence) TO RT P (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
174
RT P (Greene) TO US 60 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
175
IS 49 (Newton) TO MO 86 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
177
RT J (Cape Girardeau) TO Lexington Ave (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
177
US 61 (Cape Girardeau) TO RT J (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
179
Industrial Dr (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
18
Montgomery St (Henry) TO MO 13 (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
180
IS 270 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
185
RT H (Franklin) TO SP 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 154 South Jct (Ralls) TO US 54 North Jct (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
19
IS 70 (Montgomery) TO MO 100 North Jct (Gasconade) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
19
MO 106 (Shannon) TO US 60 East Jct (Shannon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 8 East Jct (Crawford) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 54 South Jct (Audrain) TO IS 70 (Montgomery) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
19
MO 100 North Jct (Gasconade) TO MO 28 East Jct (Gasconade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
Crawford County Line TO IS 44 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
MO 28 West Jct (Gasconade) TO Crawford County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 61 (Ralls) TO MO 154 South Jct (Ralls) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
19
Dent County Line TO RT B (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
IS 44 (Crawford) TO MO 8 West Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
19
US 160 South Jct (Oregon) TO RT E (Oregon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
KANSAS STATE LINE TO I-49 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
I-49 TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
JOHNSON COUNTY LINE TO MO 52 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
RT ZZ (JOHNSON) TO HENRY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
2
CASS COUNTY LINE TO RT ZZ (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 72 South Jct (Reynolds) TO US 60 North Jct (Carter) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
US 160 South Jct (Ripley) TO RT FF (Ripley) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 32 North Jct (Washington) TO MO 72 South Jct (Reynolds) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 8 (Washington) TO MO 32 North Jct (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
Washington County Line TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
RT M / MM (Jefferson) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
US 60 South Jct (Carter) TO US 160 North Jct (Ripley) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
21
MO 30 (St. Louis) TO RT M / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
CLAY COUNTY LINE TO MO 10 (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
IS 29 (CLAY) TO MO 291 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
210
MO 291 (JACKSON) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
22
US 63 (Boone) TO MO 15 (Audrain) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
221
US 67 (St. Francois) TO RT B (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
224
HIGHLAND AVE WEST JCT (LAFAYETTE) TO US 24 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
LAFAYETTE COUNTY LINE TO US 50 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 24 (LAFAYETTE) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
23
US 50 TO MO 2 (HENRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
231
St. Louis City Line TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
US 65 (SALINE) TO MO 5 W JCT (HOWARD) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
240
MO 5 East Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
242
RT MM (Camden) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 76 (Barry) TO MO 39 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 265 West Jct (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
248
MO 465 (Taney) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
249
MO 171 (Jasper) TO IS 44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
US 61 (Cape Girardeau) TO MO 77 (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
US 62 South Jct (Dunklin) TO MO 53 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
RT D (Stoddard) TO US 62 North Jct (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
MO 91 (Stoddard) TO RT M (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
MO 53 (Dunklin) TO US 412 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
RT M (Stoddard) TO RT D (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
25
MO 77 (Cape Girardeau) TO MO 91 (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
265
MO 413 (Stone) TO MO 248 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
265
MO 76 (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
266
RT T (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
267
St. Louis City Line TO US 50 / 61 / 67 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
27
Iowa Line TO US 61 (Clark) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
28
RT EE (GASCONADE) TO US 50 (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
RT EE (MARIES) TO RT EE (GASCONADE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
IS 44 (Pulaski) TO RT MM (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
28
US 63 East Jct (Maries) TO RT EE (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 435 (CLAY) TO IS 35 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
JACKSON COUNTY LINE TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
CLAY COUNTY LINE TO 39ST STREET (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 470 SOUTH JCT (JACKSON) TO US 50 EAST JCT (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
IS 35 (CLAY) TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
291
US 50 WEST JCT (JACKSON) TO MO 150 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
IS 44 (Franklin) TO Jefferson County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
Jefferson County Line TO RT W / MM (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
30
RT W / MM (Jefferson) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 65 (Dallas) TO RT A / OO Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 5 South Jct (Laclede) TO RT N (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 245 (Cedar) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 17 (Texas) TO US 63 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 13 (Polk) TO RT P (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT CC (Cedar) TO MO 245 (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 72 East Jct (Dent) TO MO 49 East Jct (Iron) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 67 South Jct (St. Francois) TO IS 55 (Ste. Genevieve) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 54 (Cedar) TO RT CC (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
IS 55 (STE. GENEVIEVE) TO FOURTH ST. (STE. GENEVIEVE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 72 West Jct (Dent) TO MO 72 East Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT N (St. Francois) TO US 67 North Jct (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT P (Polk) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
RT A / OO (Laclede) TO MO 5 North Jct (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
US 63 (Texas) TO MO 72 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
32
MO 49 East Jct (Iron) TO MO 21 South Jct (Iron) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
33
CLINTON COUNTY LINE TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
33
MO 6 (DeKalb) TO US 36 (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
33
MO 116 (CLINTON) TO CLAY COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
34
RT KK (WAYNE) TO US 67 (WAYNE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
34
RT Y (BOLLINGER) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
34
US 67 (WAYNE) TO RT Y (BOLLINGER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
34
MO 21 (REYNOLDS) TO RT KK (WAYNE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
340
MO 100 (St. Louis) TO Ferguson Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
350
IS 435 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
360
IS 44 (GREENE) TO US 60 (GREENE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
RT N (ST. CHARLES) TO MO 94 (ST. CHARLES) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
364
MO 94 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
366
IS 44 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
367
US 67 (St. Louis) TO IS 70 (St. Louis City) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
RT W (Barry) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
US 60 (Barry) TO RT W (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
37
IS 44 (Jasper) TO US 60 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
Missouri River (St. Louis County Line) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
370
IS 70 (St. Charles) TO Missouri River (St. Louis County Line) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
376
MO 265 (Taney) TO MO 76 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
38
RT J (Webster) TO RT P (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 248 (Barry) TO MO 86 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
IS 44 (Lawrence) TO US 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 96 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 160 South Jct (Dade) TO MO 96 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
RT Y (Dade) TO US 160 North Jct (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
MO 32 East Jct (Cedar) TO RT Y (Dade) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
39
US 60 (Lawrence) TO MO 248 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
41
US 24 (CARROLL) TO SALINE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
41
SALINE COUNTY LINE TO MO 240 WEST JCT (SALINE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
MO 13 (Greene) TO US 60 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
413
US 60 West Jct (Christian) TO MO 265 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT C West Jct (Miller) TO RT A (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
US 54 (Camden) TO RT C West Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
42
RT A (Miller) TO US 63 (Maries) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 54 (VERNON) TO RT V (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT V (BARTON) TO US 160 (BARTON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 96 (Jasper) TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
RT C (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
IS 44 West Jct (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
Newton County Line TO IS 44 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
MO 171 (Jasper) TO Murphy Blvd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
43
US 160 (Barton) TO MO 96 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
US 59 (BUCHANAN) TO PLATTE COUNTY LINE Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
45
BUCHANAN COUNTY LINE TO SPUR 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
SPUR 45 (PLATTE) TO IS 435 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
45
IS 435 (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
46
RT W (Nodaway) TO US 169 (Worth) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
US 136 East Jct (Nodaway) TO RT W (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
46
MO 113 (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
47
RT A (Lincoln) TO IS 70 (Warren) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
47
MO 79 (Lincoln) TO US 61 (Lincoln) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
47
IS 70 (Warren) TO MO 94 North Jct (Warren) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
47
US 50 East Jct (Franklin) TO MO 30 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
MO 94 North Jct (Warren) TO Franklin County Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
47
Franklin County Line TO US 50 West Jct (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
47
US 61 (Lincoln) TO RT A (Lincoln) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
47
RT E (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Howard County Line TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 54 (Camden) TO Laclede County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
RT O (Morgan) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Linn County Line TO US 36 West Jct (Linn) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT V (Chariton) TO MO 240 South Jct (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 136 West Jct (Putnam) TO RT M (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
MO 6 North Jct (Sullivan) TO Linn County Line Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
MO 240 South Jct (Howard) TO US 40 (Howard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
Iowa Line TO US 136 East Jct (Putnam) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT J (Laclede) TO MO 38 (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
RT J (Cooper) TO US 50 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 38 (Wright) TO US 60 East Jct (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 160 West Jct (Ozark) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
RT M (Sullivan) TO MO 6 North Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
US 36 East Jct (Linn) TO RT E (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
IS 44 (Laclede Co.) TO RT J (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 52 North Jct (Morgan) TO RT O (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 14 (Douglas) TO MO 95 North Jct (Ozark) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 60 West Jct (Wright) TO MO 14 (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 24 East Jct (Chariton) TO RT V (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
RT E (Chariton) TO US 24 West Jct (Chariton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
5
Laclede County Line TO IS 44 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
US 50 East Jct (Moniteau) TO MO 52 North Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
5
MO 95 North Jct (Ozark) TO US 160 East Jct (Ozark) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
51
RT C (Bollinger) TO US 60 (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
51
MO 72 (BOLLINGER) TO MO 34 (BOLLINGER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
51
RT KK (PERRY) TO MO 72 (BOLLINGER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
51
MO 34 (BOLLINGER) TO RT C (BOLLINGER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
51
ILLINOIS LINE TO RT KK (PERRY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
MO 5 East Jct (Morgan) TO RT AA (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
US 65 South Jct (Benton) TO RT FF (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
MO 7 North Jct (Henry) TO RT B (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT B (Pettis) TO US 65 North Jct (Pettis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
NW 2501 (Bates) TO LP 49 (Bates) Butler Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT FF (Morgan) TO MO 5 West Jct (Morgan) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
52
RT AA (Morgan) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
53
Dunklin County Line TO MO 25 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
53
BU 67 (Butler) TO Dunklin County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
571
MO 96 (Jasper) TO IS 49 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT D (CASS) TO DEAN AVENUE (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
PRAIRIE RD (CASS) TO MO 291 N JCT (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
CASS COUNTY LINE TO RT AA (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
RT AA (JOHNSON) TO US 50 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
58
MO 291 SOUTH JCT (CASS) TO JOHNSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
MO 76 South Jct (McDonald) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
IS 44 (Jasper) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
59
LP 49 South Jct (Newton) TO MO 76 South Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
6
US 169 (Buchanan) TO MO 31 North Jct (DeKalb) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
IS 35 (Daviess) TO MO 13East Jct (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
US 65 (Grundy) TO RT W (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 31 North Jct (DeKalb) TO IS 35 (Daviess) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 15 North Jct (Knox) TO RT D (Lewis) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
6
RT W (Sullivan) TO MO 5 South Jct (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 13 East Jct (Daviess) TO RT P/WW (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
RT D (Sullivan) TO US 63 North Jct (Adair) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
6
RT D (Lewis) TO MO 156 (Lewis) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
6
MO 156 (Lewis) TO US 61 (Marion) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
6
US 63 South Jct (Adair) TO MO 15 North Jct (Knox) Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
6
RT P/WW (Grundy) TO US 65 (Grundy) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
6
MO 5 North Jct (Sullivan) TO RT D (Sullivan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
64
RT KK (Laclede) TO MO 5 (Laclede) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
Kansas Line TO LP 49 (Jasper) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
LP 49 (Rangeline Rd) (Jasper) TO MO 249 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
66
MO 249 (Jasper) TO I-44 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
Maries County Line TO IS 44 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
68
US 63 (Maries) TO Phelps County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 13 North Jct (Henry) TO RT PP (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 49 South Jct (Cass) TO RT B (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 65 South Jct (Benton) TO RT NN (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT B (Cass) TO MO 13 North Jct (Henry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT NN (Camden) TO MO 5 North Jct (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
RT PP (Henry) TO US 65 North Jct (Benton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
IS 70 (Jackson) TO MO 150 South Jct (Jackson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
7
MO 150 South Jct (Jackson) TO IS 49 North Jct (Cass) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
RT F (MADISON) TO MO 51 (BOLLINGER) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 51 (BOLLINGER) TO MO 34 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
US 67 (Madison) TO RT F (Madison) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 34 (CAPE GIRARDEAU) TO US 61 WEST JCT (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 32 East Jct (Dent) TO MO 21 West Jct (Reynolds) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
Dent County Line TO MO 32 West Jct (Dent) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
US 63 (Phelps) TO Dent County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
Madison County Line TO US 67 (Madison) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
72
MO 21 East Jct (Iron) TO Madison County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
73
US 54 (Camden) TO US 65 (Dallas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
74
MO 25 (Cape Giradeau) TO IS 55 South Jct (Cape Giradeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
74
US 61 East Jct (Cape Girardeau) TO Illinois Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
74
IS 55 North Jct (Cape Giradeau) TO US 61 (Cape Girardeau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
740
IS 70 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
744
Springfield /Branson Airport (Greene) TO IS 44 East Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
752
US 59 (Buchanan) TO IS 229 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
759
4th St (Buchanan) TO Stockyards Expy (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Missouri Route
76
RT MM (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 173 (Stone) TO MO 13 North Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
US 160 East Jct (Taney) TO MO 125 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
MO 13 South Jct (Stone) TO US 65 N JCT (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
76
US 65 S JCT(Taney) TO US 160 West Jct (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
763
US 63 (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
765
US 65 NORTH JCT (PETTIS) TO US 65 SOUTH JCT (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
77
MO 25 (Cape Girardeau) TO US 61 West Jct (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
77
US 61 East Jct (Scott) TO RT D (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
78
IS 435 (JACKSON) TO MO 7 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
79
RT P (Lincoln) TO St. Charles County Line Road reported clear CLEAR 04-24-2025 at 07:04 AM
Missouri Route
79
St. Charles County Line TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
St. Francois County Line TO US 67 (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
IS 44 (Phelps) TO MO 68 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 21 (Washington) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 19 East Jct (Crawford) TO Washington County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
Washington County Line TO MO 21 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
8
MO 68 (Phelps) TO MO 19 East Jct (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
80
US 61 (New Madrid) TO CRD 523 (Mississippi) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
82
US 54 (Cedar) TO RT H (Cedar) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
83
RT B (Polk) TO MO 13 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
84
US 412 East Jct (Pemiscot) TO IS 55 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
84
IS 55 (Pemiscot) TO IS 155 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
84
Arkansas Line TO US 412 West Jct (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
US 60 North Jct (Newton) TO RT M (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
MO 39 (Stone) TO MO 13 West Jct (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT NN (Newton) TO US 60 South Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
MO 13 East Jct (Stone) TO US 65 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
IS 44 (Newton) TO RT C (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
86
RT F (Barry) TO MO 39 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
IS 70 (Cooper) TO RT J (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
US 40 / MO 5 (Cooper) TO IS 70 (Cooper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT J (Cooper) TO RT O (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT A (Moniteau) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
87
RT O (Moniteau) TO RT A (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
PLATTE COUNTY LINE TO JACKSON COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
JACKSON COUNTY LINE TO IS 70 Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
BARRY RD (PLATTE) TO IS 635 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
9
IS 635 (PLATTE) TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
90
MO 43 (McDonald) TO MO 59 West Jct (McDonald) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
91
MO 51 (Bollinger) TO MO 25 (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
KANSAS LINE TO CLAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
US 169 (CLAY) TO US 69 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
92
PLATTE COUNTY LINE TO US 169 (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT T (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
US 54 / US 63 (Callaway) TO RT D (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
RT J (St. Charles) TO US 67 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
94
IS 70 (St. Charles) TO RT J (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
95
RT W (Wright) TO RT ZZ (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 171 East Jct (Jasper) TO River St (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
River St (Jasper) TO RT U (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
RT U (Jasper) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 171 West Jct (Jasper) TO MO 43 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
96
MO 43 (Jasper) TO MO 171 East Jct (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Missouri Route
99
US 60 (Shannon) TO Obanion St (Shannon) Birch Tree Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 92 (CLAY) TO LIBERTY CITY LIMITS (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
RT PP (Bates) TO IS 49 (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 61 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 21 (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
MO 100 (Franklin) TO MO 47 (Frankiin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 69 (Clinton) TO West St (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
A
MO 38 (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
BU 60 (Wright) TO RT U (Wright) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
A
US 169 (Buchanan) TO RT O (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AA
RT H (Greene) TO US 65 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
RT HH (Jasper) TO RT V V (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
IS 29 (PLATTE) TO US 69 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 60 (Butler) TO RT B ( Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
Sanders Valley Rd (Christian) TO US 160 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AA
US 62 (Scott) TO NOR 60 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
MO 25/77 (Cape Girardeau) TO RT K (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
US 160 (Greene) TO MO 266 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AB
MO 141 (St. Louis) TO IS 270 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
MO 6 (Buchanan) TO US 36 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AC
Pickett Rd (Buchanan) TO US 169 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
AC
MO 163 (Boone) TO US 63 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AC
US 67 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AF
Spring Bluff Rd (Franklin) TO IS 44 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AT
US 50 (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
AW
RT TT (Pulaski) TO MO 17 (Texas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
US 61 (PERRY) TO MO 72 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
BU 60 (Butler) TO RT AA (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
RT W / M (Cole) TO MO 133 (Osage) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
Brown Station Rd North Jct (Boone) TO LP 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 124 (Boone) TO Brown Station Rd North Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
MO 266 (Greene) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
B
US 54 (Cole) TO RT W / M (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 63 (Phelps) TO MO 8 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 24 (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
US 54 (Vernon) TO RT F (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
BU 65 (Taney) TO Gobblers Knob Rd (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
BB
RT A (Franklin) TO US 50 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT O (Callaway) TO RT AD (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
IS 49 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT HH (Cole) TO US 54 (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT AB (Webster) TO US 60 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 133 (Pulaski) TO MO 28 (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
RT CC East Jct (Moniteau) TO RT HH (Cole) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 52 (Morgan) TO RT CC East Jct (Moniteau) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
C
MO 51 (Bollinger) TO MO 91 (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
RT AD (Howell) TO US 63 (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
RT M (Webster) TO IS 44 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
CC
MO 109 (St. Louis) TO Kehrs Mill Rd (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
BU 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
120TH ST. (PLATTE) TO IS 29 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 59 (Newton) TO Benton Ave (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
JACKSON COUNTY LINE TO RT Y (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 150 (JACKSON) TO CASS COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT Y (CASS) TO MO 2 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
US 69 (CLAY) TO RAY COUNTY LINE Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
CLAY COUNTY LINE TO RT KK (RAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
MO 171 (Jasper) TO RT O (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 170 (St. Louis) TO St. Louis City Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
IS 270 (St. Louis) TO IS 170 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
Rouggly Rd (St. Francois) TO RT W (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
CRD D-2 (Carter) TO BU 60 (Carter) Van Buren) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT NN (Polk) TO MO 32 (Polk) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
D
RT U (Pemiscot) TO MO 164 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 38 (Webster) TO Osage Rd (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (JOHNSON) TO MO 23 (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 164 (Pemiscot) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
US 40 / 61 (St. Charles) TO Diehr Rd (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
DD
MO 13 (Stone) TO CRD DD-25 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 124 (Boone) TO IS 70 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 84 (Dunklin) TO MO 25 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
MO 21 (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
E
RT N (Jefferson) TO St. Francois County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
SOR IS 70 (St. Louis) TO MO 180 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
RT AB (Greene) TO US 160 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
IS 55 (New Madrid) TO CRD 403 (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
US 160 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
EE
Colony Church Rd (St. Francois) TO RT D (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
IS 70 (JACKSON) TO US 50 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
RT J (Callaway) TO Jefferson St (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
Westview Ln (Washington) TO MO 8 (Washington) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
US 65 (Taney) TO US 160 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 112 (Barry) TO MO 86 (Barry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
LP 44 (Franklin) TO RT O (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
F
MO 5 (Camden) TO RT TT (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
US 60 (Greene) TO Weaver Rd (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
CRD 190 / Kodiak Rd (Jasper) TO MO 59 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
MO 43 (Jasper) TO CRD 190 / Kodiak Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
FF
RT W (Jefferson) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT FF WEST JCT (JACKSON) TO IS 70 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
MO 215 (Polk) TO IS 44 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
IS 44 (Lawrence) TO BU 60 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
RT W (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
MO 17 (Pulaski) TO Ft. Leonard Wood (Pulaski) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
H
LP 49 (Bates) TO Main St (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
MO 171 (Jasper) TO MO 571 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
US 61 (Scott) TO IS 55 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
Reynolds County Line TO MO 34 (Wayne) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
HH
MO 86 (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 65 (Christian) TO RT NN (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT WW (CALLAWAY) TO RT F (CALLAWAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
MO 58 (CASS) TO IS 49 (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
US 50 (JOHNSON) TO WHITEMAN AFB (JOHNSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
J
RT MM (Dunklin) TO BU 25 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
JJ
Well St (Jasper) TO RT P (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 49 (Vernon) TO CRD 1800 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT KK (Boone) TO MO 163 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
CRD 317 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 25 (CAPE GIRARDEAU) TO CRD 317 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT ZZ (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 14 (CHRISTIAN) TO RT M (STONE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 43 (Newton) TO Irwin Dr (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
RT N (SCOTT) TO RT AB (SCOTT) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
CRD 6470 (Howell) TO US 63 (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
MO 30 (Franklin) TO MO 185 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 70 (St. Charles) TO US 40 / 61 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
K
IS 229 (Andrew) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
KK
Beginning of Route (Camden) TO US 54 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 185 North Jct (Franklin) TO MO 100 (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
KK
MO 8 (Phelps) TO CRD 3610 (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
RT A (Scott) TO US 61 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
RT U (Stone) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
US 60 (Greene) TO RT FF (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 21 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
M
MO 79 (St. Charles) TO RT P (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
MO 30 (Jefferson) TO MO 21 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
RT TT (Camden) TO MO 242 (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
MM
IS 44 (Greene) TO MO 413 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 270 (St. Louis) TO MO 115 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT T (St. Charles) TO MO 94 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
IS 44 (Greene) TO CRD 168 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 21 (Jefferson) TO RT E / Miller St (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MO 32 (St. Francois) TO RT NN (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT F (Franklin) TO Meramec River (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
RT NN (St. Francois) TO MO 21 (Iron) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
N
MISSISSIPPI RIVER (SCOTT) TO MAIN ST. (SCOTT) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 86 (Newton) TO RT P (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
MO 164 (Dunklin) TO Arkansas Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
RT O (Franklin) TO Rock Church Rd (Franklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
NN
US 412 (Dunklin) TO MO 164 (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
RT C (Callaway) TO RT CC (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 32 (St. Francois) TO US 67 (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 72 (Phelps) TO Lions Club Dr (Phelps) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
RT AK (Franklin) TO RT F (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
US 67 (ST. FRANCOIS) TO RT D (ST. GENEIVE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 84 (Dunklin) TO RT V V (Dunklin) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
O
MO 5 (Morgan) TO End of Route Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 744 (Greene) TO MO 125 West Jct (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
Vintage Lane (Stone) TO MO 13 (Stone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 32 (St. Francois) TO MO 72 (Madison) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
OO
MO 125 East Jct (Greene) TO MO 38 (Webster) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
RT JJ (Jasper) TO MO 66 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 8 (St. Francois) TO MO 8 (St. Francois) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
US 60 (Greene) TO MO 14 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
US 61 (St. Charles) TO RT M (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
P
MO 366 (St. Louis) TO MO 30 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
Byrnes Mill Rd (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
PP
US 60 (Butler) TO BU 60 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
IS 70 (St. Charles) TO RT N (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
Ossenfort Rd (St. Louis) TO MO 100 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
RT N (St. Charles) TO RT TT ( St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
IS 55 (Perry) TO MO 51 (Perry) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
RT D (Wayne) TO US 60 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
T
Allan Rd (Taney) TO MO 76 (Taney) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
US 61 (Jefferson) TO RT AA (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
RT F (Camden) TO RT MM (Camden) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
LP 49 (Jasper) TO Duquesne Rd (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
TT
Beginning of Route (Boone) TO MO 740 (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
West Florissant Ave (St. Louis) TO Woodrow Ave (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
US 61 (New Madrid) TO RT WW (New Madrid) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
IS 55 (Pemiscot) TO MO 84 (Pemiscot) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
Oklahoma Line TO MO 43 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
U
CRD 54 SW (Buchanan) TO US 59 (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
US 40 (JACKSON) TO MO 350 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
Munn Ave (Nodaway) TO US 71 (Nodaway) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
V
IS 44 (Phelps) TO CRD 2060 (Phelps) Rolla Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
V
RT E (Jefferson) TO US 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
RT Y South Jct (Morgan) TO BU 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
KANSAS LINE TO IS 435 (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 109 (Jefferson) TO MO 30 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 14 (Christian) TO Jackson Spring Rd (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
MO 177 (CAPE GIRARDEAU) TO US 61 (CAPE GIRARDEAU) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
W
Logan Rd (Vernon) Nevada TO US 54 (Vernon) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
Callaway County Line TO RT J (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
US 63 (Boone) TO Callaway County Line Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
WW
BU 60 (Butler) TO MO 53 (Butler) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 25 (Stoddard) TO Pedestrian Factory Overpass (Stoddard) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 52 (Miller) TO CRD ISBON Rd (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 58 (CASS) TO RT YY (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
RT BB (Scott) TO US 61 (Scott) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
MO 127 (PETTIS) TO US 65 (PETTIS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Y
CRD 3670 (Howell) TO US 60 (Howell) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
RT Y (CASS) TO RT C (CASS) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 65 (Greene) TO MO 125 (Greene) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
Kansas Line TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
YY
US 169 (Buchanan) TO RT AC (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Rural Route
Z
BU 54 (Callaway) TO Chandler Dr (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
RT A (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Lincoln Dr (Madison) TO CRD 234 (Madison) Fredericktown Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
IS 29 (PLATTE) TO MCPHERSON AVE (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
IS 70 (St. Charles) TO RT D (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
Z
Main St (Jasper) Carl Junction TO MO 171 (Jasper) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Rural Route
ZZ
RT KK (Crawford) TO MO 19 (Crawford) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
29
US 59 South Jct (Andrew) TO US 169 North Jct (Buchanan) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
29
BU 71 (Andrew) TO LP 29 North Jct (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
35
US 69 (Clinton) TO IS 35 (Clinton) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Loop
Interstate Route
44
IS 44 (Franklin) TO IS 44 (St. Louis) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
MO 39 (Lawrence) TO IS 44 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
44
IS 44 West Jct (Greene) TO IS 44 East Jct (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 171 (Jasper) TO IS 44 (Newton) Joplin Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Bates) TO IS 49 South Jct (Bates) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 49 North Jct (Vernon) TO IS 49 South Jct (Vernon) Nevada Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
IS 44 (Newton) TO IS 49 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
49
MO 86 (Newton) TO BU 60 (Newton) Neosho Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
MO 763 East Jct (Boone) TO IS 70 East Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Loop
Interstate Route
70
IS 70 West Jct (Boone) TO MO 763 West Jct (Boone) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
10
MO 10 (RAY) TO MO 10 (RAY) RICHMOND Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
13
MO 20 (LAFAYETTE) TO MO 13 (LAFAYETTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
25
MO 25 North Jct (Dunklin) TO MO 25 South Jct (New Madrid) Malden Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
39
MO 174 (Lawrence) TO MO 39 (Lawrence) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
5
MO 14 (Douglas) Ava TO MO 5 (Douglas) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
50
MO 179 (Cole) TO US 50 (Cole) Missouri Blvd Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
US 54 South Jct (Callaway) TO 4TH St. (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 87 North Jct (Miller) TO US 54 (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
MO 52 (Miller) TO MO 87 South Jct (Miller) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
54
13TH St. (Callaway) TO US 54 North Jct (Callaway) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Wright) TO US 60 (Texas) Mountain Grove Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Texas) TO BU 63 (Texas) Willow Springs Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Newton) TO MO 86 East Jct (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Carter) TO RT D (Carter) Van Buren Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Texas) TO US 63 (Texas) Cabool Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Barry) TO US 60 (Barry) Monett Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Stoddard) TO MO 25 (Stoddard) Dexter Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
MO 86 West Jct (Newton) TO US 60 (Newton) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 (Lawrence) TO US 60 (Lawrence) Aurora Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Greene) TO RT B (Webster) Rogersville Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
Oklahoma Line TO MO 43 (Newton) Seneca Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
MO 5 (Wright) TO US 60 (Wright) Mansfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
60
US 60 West Jct (Butler) TO US 60 East Jct (Butler) Poplar Bluff Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
61
IS 55 EXIT 89 (SCOTT) TO US 61 (SCOTT) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
63
US 63 North Jct (Howell) TO US 63 South Jct (Howell) West Plains Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
63
US 63 North Jct (Texas) TO BU 60 (Texas) Willow Springs Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
65
US 65 (Greene) TO US 60 (Greene) Springfield Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
65
MO 14 (Christian) TO US 65 (Christian) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
67
MO 72 (Madison) TO US 67 (Madison) Fredericktown Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
67
BU 60 (Bulter) TO US 67 (Butler) Poplar Bluff Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
67
MO 8 (St. Francois) TO Main St (St. Francois) Park Hills Road reported clear CLEAR 04-23-2025 at 02:04 AM
Business Route
71
US 71 (Andrew) TO LP 29 (Andrew) Road reported clear CLEAR 04-22-2025 at 03:04 AM
Spur
169
US 169 (CLAY) TO RT DD (CLAY) Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
44
IS 44 (Phelps) St. Robert TO Ft. Leonard Wood Road reported clear CLEAR 04-23-2025 at 02:04 AM
Spur
45
MO 92 (PLATTE) TO MO 45 (PLATTE) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST BAGNELL DAM BLVD
Valley Rd (Miller) TO US 54 (Miller) Lake Ozark Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST CHOUTEAU TRFY
MO 210 (CLAY) TO FRONT ST (JACKSON) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CST S 5TH ST
MO 94 (St. Charles) TO IS 70 (St. Charles) Road reported clear CLEAR 04-23-2025 at 02:04 AM
CO IS55 TO US61
IS 55 (Jefferson) TO US 61 / 67 (Jefferson) Road reported clear CLEAR 04-23-2025 at 02:04 AM
BACK TO TOP