State Route RT K N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.053 MILE(S) BEFORE RP IS229N TO RTKN N.
Work will be done
on weekdays only.
Interstate IS 29 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 01-JUL-2025.
Road work begins
1.144 MILE(S) AFTER RP US169 TO IS29N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
12:00 PM.
US US 136 E East
-
ATCHISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 27-MAR-2025 to 04-APR-2025.
Road work begins
.001 MILE(S) BEFORE CST COLVAN ST S.
Work will be done
on weekdays only.
US US 136 W West
-
ATCHISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 27-MAR-2025 to 04-APR-2025.
Road work begins
CST COUNTRY CLUB DR S.
Work will be done
on weekdays only.
US US 59 N North
-
ATCHISON COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 31-MAR-2025 to 04-APR-2025.
Road work begins
.016 MILE(S) AFTER RT TT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
11:59 PM.
US US 59 S South
-
ATCHISON COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 31-MAR-2025 to 04-APR-2025.
Road work begins
.011 MILE(S) AFTER CRD 225 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
11:59 PM.
State Route MO 39 N North
-
BARRY COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.059 MILE(S) BEFORE CRD FISH N FUN RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 39 S South
-
BARRY COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.06 MILE(S) BEFORE CRD 2205 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 126 E East
-
BARTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins
.005 MILE(S) BEFORE CST VINE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
08:00 PM.
State Route MO 126 W West
-
BARTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CST MILL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
08:00 PM.
Interstate IS 49 N North
-
BATES COUNTY
- Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.021 MILE(S) AFTER RT B E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
BATES COUNTY
- Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
1.443 MILE(S) AFTER RP RTA TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins
.018 MILE(S) BEFORE RR COLT S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-JUL-2025.
Road work begins
1.065 MILE(S) BEFORE RP IS70E TO RTJ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins
.169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done
on weekdays only.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins
.2 MILE(S) BEFORE RP IS70W TO US63C N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
State Route RT F N North
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
MO 124 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT F S South
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
MO 22 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT PP N North
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2027.
Road work begins
.011 MILE(S) BEFORE CST GOLDEN BEAR DR E.
Work will be done
on weekdays only.
State Route RT PP S South
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2027.
Road work begins
.021 MILE(S) AFTER CST OLYMPIC BLVD S.
Work will be done
on weekdays only.
State Route RT T N North
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
RT F S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 63 N North
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins
.056 MILE(S) BEFORE RP US63N TO RTWW N.
Work will be done
7 days a week.
US US 63 S South
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins
.076 MILE(S) BEFORE CST CLARK LN E.
Work will be done
7 days a week.
US US 63 S South
-
BOONE COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.029 MILE(S) BEFORE RP US63S TO MO22 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT HH E East
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT HH W West
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
RT Z S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT OO E East
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
MO 124 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT OO W West
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
RT Z S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT Z N North
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
CRD RANGELINE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT Z S South
-
BOONE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 05-MAY-2025.
Road work begins
CST JEFFERSON ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 116 E East
-
BUCHANAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-MAR-2025 to 05-MAY-2025.
Road work begins
US 59 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:30 AM
and
07:30 PM.
Interstate IS 70 E East
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-FEB-2025 to 31-DEC-2027.
Road work begins
.441 MILE(S) BEFORE RR FULTON BRANCH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-JUL-2025.
Road work begins
.639 MILE(S) BEFORE RP IS70W TO RTM W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-FEB-2025 to 31-DEC-2027.
Road work begins
.265 MILE(S) BEFORE RP IS70W TO US54E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
US US 54 E East
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-MAR-2025 to 31-MAR-2026.
Road work begins
.05 MILE(S) AFTER OR 70 E.
Work will be done
on weekdays only.
US US 54 W West
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-MAR-2025 to 31-MAR-2026.
Road work begins
.016 MILE(S) AFTER CST DUNN DR E.
Work will be done
on weekdays only.
US US 54 E East
-
CALLAWAY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-JUL-2025.
Road work begins
.253 MILE(S) BEFORE CST MOKANE RD E.
Work will be done
on weekdays only.
US US 54 W West
-
CALLAWAY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-JUL-2025.
Road work begins
.249 MILE(S) AFTER OR 54 E.
Work will be done
on weekdays only.
State Route RT D S South
-
CAMDEN COUNTY
- Expect Delays
State Route RT MM E East
-
CAMDEN COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 10-FEB-2025 to 30-APR-2025.
Road work begins
.102 MILE(S) AFTER CRD VIA DEL LAGO DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
News Releases -
https://www.modot.org/node/62329
State Route RT MM W West
-
CAMDEN COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 10-FEB-2025 to 30-APR-2025.
Road work begins
.534 MILE(S) BEFORE CRD PORTO CIMA DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
News Releases -
https://www.modot.org/node/62329
State Route RT JJ S South
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.005 MILE(S) AFTER RT H E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 PM
and
04:00 PM.
State Route MO 177 N North
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2025 to 30-MAY-2025.
Road work begins
PVT PRIVATE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
06:00 PM.
State Route MO 177 S South
-
CAPE GIRARDEAU COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2025 to 30-MAY-2025.
Road work begins
RT J E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
06:00 PM.
State Route MO 7 N North
-
CASS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 20-JUN-2025.
Road work begins
.087 MILE(S) BEFORE CST RICHLAND PKWY E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F S South
-
CASS COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 02-APR-2025 to 04-APR-2025.
Road work begins
.174 MILE(S) BEFORE CRD 339TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 49 N North
-
CASS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 10-APR-2025.
Road work begins
.043 MILE(S) BEFORE RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:00 PM.
Interstate IS 49 S South
-
CASS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 10-APR-2025.
Road work begins
.028 MILE(S) AFTER RP IS49S TO RTA S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:00 PM.
State Route MO 2 E East
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.005 MILE(S) AFTER CST SE OUTER RD S.
Work will be done
on weekdays and Saturdays.
State Route MO 2 W West
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.002 MILE(S) AFTER CST BIRD AVE S.
Work will be done
on weekdays and Saturdays.
US US 65 N North
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.023 MILE(S) BEFORE RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.011 MILE(S) BEFORE RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.002 MILE(S) AFTER CST NE BIRMINGHAM RD E.
Work will be done
7 days a week.
Interstate IS 435 S South
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.312 MILE(S) AFTER RP US69S TO IS435S S.
Work will be done
7 days a week.
State Route MO 1 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 02-MAY-2025.
Road work begins
.021 MILE(S) BEFORE CST 72ND ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 1 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 02-MAY-2025.
Road work begins
CST N INDIANA AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 152 W West
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.004 MILE(S) AFTER MO 1 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 92 E East
-
CLAY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 05-MAR-2025 to 18-APR-2025.
Road work begins
.003 MILE(S) BEFORE CRD MT OLIVET RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT DD E East
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
.003 MILE(S) BEFORE COE LITTON WAY S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
MO 92 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CST N OAK TRFY N North
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-MAR-2025 to 04-APR-2025.
Road work begins
.018 MILE(S) BEFORE CST N CLIFF LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST N OAK TRFY S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-MAR-2025 to 04-APR-2025.
Road work begins
.026 MILE(S) BEFORE IS 29 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST NW BARRY RD W West
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2025.
Road work begins
.025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done
7 days a week.
Interstate IS 35 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.011 MILE(S) BEFORE RP IS35N TO IS435N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
Interstate IS 35 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.005 MILE(S) BEFORE IS 435 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.053 MILE(S) BEFORE CST NE PLEASANT VALLEY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.031 MILE(S) AFTER RP IS435N TO NE SHOAL CREEK PKWY N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.138 MILE(S) AFTER RP IS435N TO MO152W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.074 MILE(S) BEFORE CST NE PLEASANT VALLEY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.116 MILE(S) BEFORE CST NE SHOAL CREEK PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.245 MILE(S) BEFORE CST BARRY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 92 E East
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.146 MILE(S) BEFORE CRD NORTH WATER S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 92 W West
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.157 MILE(S) AFTER CRD PLATTSBURG RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 69 N North
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-MAR-2025 to 03-APR-2025.
Road work begins
.009 MILE(S) AFTER CST N AGNES AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 116 W West
-
CLINTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-MAR-2025 to 05-MAY-2025.
Road work begins
US 169 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:30 AM
and
07:30 PM.
Interstate IS 70 E East
-
COOPER COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins
.027 MILE(S) AFTER RR RIVER SUB E.
Work will be done
on weekdays only.
State Route RT CC N North
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
MO 41 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT CC S South
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD ARROW ROCK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD SCHOOL HOUSE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT NN E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD SHACKELFORD BRIDGE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT NN W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT OO E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT OO W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
MO 135 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 70 E East
-
COOPER COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 09-MAY-2025.
Road work begins
1.849 MILE(S) BEFORE RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CRD OLD ROUTE 66 E East
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
CRD OLD ROUTE 66 W West
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
Interstate IS 44 E East
-
CRAWFORD COUNTY
- Delays Possible
PAVEMENT MARKING
Scheduled from 31-MAR-2025 to 18-APR-2025.
Road work begins
.877 MILE(S) AFTER RT FF S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 19 N North
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.001 MILE(S) BEFORE CRD EDGAR RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route MO 19 S South
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.011 MILE(S) AFTER RT HH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route MO 49 S South
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route RT M N North
-
CRAWFORD COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.009 MILE(S) AFTER RT VV S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M S South
-
CRAWFORD COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.027 MILE(S) BEFORE RT U E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT FF N North
-
DADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
US 160 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT FF S South
-
DADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
CRD 132 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 97 N North
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.073 MILE(S) AFTER CRD 142 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 97 S South
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.038 MILE(S) BEFORE CRD 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 160 E East
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.303 MILE(S) BEFORE CRD 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 160 W West
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.275 MILE(S) BEFORE CRD 91 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT D E East
-
DALLAS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins
US 65 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D W West
-
DALLAS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins
.001 MILE(S) BEFORE CST MILL ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 35 N North
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.04 MILE(S) BEFORE RP IS35N TO RTB N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 35 N North
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.039 MILE(S) BEFORE RP IS35N TO RTDD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 35 N North
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.057 MILE(S) AFTER RP IS35N TO RTC N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 35 S South
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.078 MILE(S) BEFORE RT DD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 35 S South
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.029 MILE(S) BEFORE RP IS35S TO RTC S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 35 S South
-
DAVIESS COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.058 MILE(S) AFTER RP IS35S TO RTN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT CC N North
-
DAVIESS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.061 MILE(S) AFTER CRD VISTA AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT CC S South
-
DAVIESS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.113 MILE(S) AFTER RT HH E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 19 N North
-
DENT COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 02-DEC-2024 to 02-MAY-2025.
Road work begins
1.245 MILE(S) BEFORE CRD 6230 E.
Work will be done
7 days a week.
State Route MO 19 S South
-
DENT COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 02-DEC-2024 to 02-MAY-2025.
Road work begins
1.061 MILE(S) AFTER CRD 6230 E.
Work will be done
7 days a week.
State Route MO 14 E East
-
DOUGLAS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.049 MILE(S) BEFORE MO 181 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 95 N North
-
DOUGLAS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 01-MAY-2025.
Road work begins
.024 MILE(S) AFTER MO 14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 95 S South
-
DOUGLAS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 01-MAY-2025.
Road work begins
.012 MILE(S) AFTER CRD 95-142 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 412 E East
-
DUNKLIN COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 28-MAR-2025 to 03-APR-2025.
Road work begins
.055 MILE(S) BEFORE CRD 521 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 412 W West
-
DUNKLIN COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 28-MAR-2025 to 03-APR-2025.
Road work begins
CST REAGAN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 44 E East
-
FRANKLIN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.367 MILE(S) BEFORE CO WOR44 TO EOR44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 100 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 05-MAY-2025.
Road work begins
.038 MILE(S) AFTER CST FIFTH ST E.
Work will be done
on weekdays only.
State Route MO 100 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 05-MAY-2025.
Road work begins
.015 MILE(S) AFTER RT OO S.
Work will be done
on weekdays only.
State Route RT MM N North
-
FRANKLIN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins
MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT MM S South
-
FRANKLIN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins
RT T E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins
RT AT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Interstate IS 44 W West
-
FRANKLIN COUNTY
- Delays Possible
PAVEMENT MARKING
Scheduled from 31-MAR-2025 to 18-APR-2025.
Road work begins
.206 MILE(S) AFTER RP MO47 TO IS44W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 50 E East
-
FRANKLIN COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.068 MILE(S) BEFORE RT BB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
US US 50 W West
-
FRANKLIN COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.008 MILE(S) AFTER CST MACARTHUR AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
US US 50 W West
-
GASCONADE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 13-MAR-2026.
Road work begins
.275 MILE(S) AFTER CRD RIVER RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
CST CHESTNUT EXPY E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.003 MILE(S) BEFORE LP 44 E.
Work will be done
on weekdays only.
CST CHESTNUT EXPY W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.001 MILE(S) AFTER OR 65 S.
Work will be done
on weekdays only.
CST JAMES RIVER FRWY W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-MAR-2025 to 04-MAY-2025.
Road work begins
.005 MILE(S) BEFORE CST GLENSTONE AVE N.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins
.054 MILE(S) AFTER RP IS44E TO MO13S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins
.002 MILE(S) AFTER US 65 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Loop LP 44 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.009 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Loop LP 44 W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.005 MILE(S) BEFORE BU 65 S.
Work will be done
on weekdays only.
State Route MO 125 N North
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins
.09 MILE(S) AFTER CST OLD ORCHARD DR S.
Work will be done
on weekdays only.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins
.008 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
State Route MO 744 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins
US 160 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 744 W West
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins
.001 MILE(S) AFTER RT OO E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Ramp RP MO744 TO US65N N North
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins
MO 744 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 PM.
Ramp RP MO744 TO US65S S South
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins
MO 744 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Ramp RP US65N TO MO744 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins
US 65 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Ramp RP US65S TO MO744 W West
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins
.002 MILE(S) AFTER US 65 S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 AM
and
06:00 AM.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.003 MILE(S) BEFORE MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 44 E East
-
GREENE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.002 MILE(S) AFTER RP MO360W TO IS44E E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
GREENE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.062 MILE(S) BEFORE RP IS44W TO RTB W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 13 N North
-
HENRY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins
.063 MILE(S) AFTER MO 52 E.
Work will be done
7 days a week.
State Route MO 13 N North
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2025 to 05-MAY-2025.
Road work begins
.009 MILE(S) AFTER MO 7 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 S South
-
HENRY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins
.012 MILE(S) BEFORE CRD SW 450TH RD E.
Work will be done
7 days a week.
Interstate IS 29 N North
-
HOLT COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-FEB-2025 to 01-MAY-2025.
Road work begins
.702 MILE(S) AFTER CRD BEAGLE RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 29 S South
-
HOLT COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 01-JUL-2025.
Road work begins
.055 MILE(S) BEFORE US 59 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
12:00 PM.
State Route MO 124 E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
MO 240 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 124 W West
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) BEFORE RT Y S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 14 W West
-
HOWELL COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.013 MILE(S) AFTER RT AP S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
US US 60 E East
-
HOWELL COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.003 MILE(S) BEFORE CRD 1010 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 21 N North
-
IRON COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 17-FEB-2025 to 06-OCT-2025.
Road work begins
.002 MILE(S) AFTER MO 49 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 21 S South
-
IRON COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 17-FEB-2025 to 06-OCT-2025.
Road work begins
.004 MILE(S) AFTER RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 32 E East
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.055 MILE(S) BEFORE MO 49 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 32 W West
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.017 MILE(S) BEFORE MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 49 N North
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.003 MILE(S) BEFORE CO MO21 TO MO49 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 49 S South
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.174 MILE(S) BEFORE MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 49 S South
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.081 MILE(S) AFTER MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT A S South
-
IRON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 49 N North
-
IRON COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-JUL-2025.
Road work begins
.023 MILE(S) AFTER RT BB E.
Work will be done
7 days a week.
State Route MO 49 S South
-
IRON COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-JUL-2025.
Road work begins
.04 MILE(S) BEFORE RT BB E.
Work will be done
7 days a week.
State Route MO 49 N North
-
IRON COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.045 MILE(S) BEFORE CST OGLE DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
CST E 6TH ST E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 13-FEB-2025 to 11-APR-2025.
Road work begins
CST SUPERIOR ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 350 E East
-
JACKSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-MAR-2025 to 30-JUN-2025.
Road work begins
.147 MILE(S) AFTER CST E 83RD ST E.
Work will be done
7 days a week.
State Route MO 350 W West
-
JACKSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-MAR-2025 to 30-JUN-2025.
Road work begins
.358 MILE(S) AFTER CO US50E TO US50W E.
Work will be done
7 days a week.
State Route MO 7 N North
-
JACKSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 04-APR-2025.
Road work begins
.004 MILE(S) AFTER CST CLARK RD E.
Work will be done
on weekdays only.
US US 40 E East
-
JACKSON COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 19-MAR-2025 to 04-APR-2025.
Road work begins
.117 MILE(S) BEFORE CST BRENTWOOD AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST US 40 HWY E East
-
JACKSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 31-MAR-2025 to 09-APR-2025.
Road work begins
.01 MILE(S) AFTER CST E 31ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
CST US 40 HWY W West
-
JACKSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 31-MAR-2025 to 09-APR-2025.
Road work begins
US 40 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.137 MILE(S) AFTER CST OLDHAM RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.036 MILE(S) AFTER RP GREGORY BLVD TO IS435S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.282 MILE(S) BEFORE RP IS470E TO BLUE RIDGE BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 11-APR-2025.
Road work begins
.037 MILE(S) BEFORE RP IS470E TO VIEW HIGH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.022 MILE(S) BEFORE RP IS470E TO BOWLIN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.1 MILE(S) BEFORE RP NE DOUGLAS ST S TO IS470E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 11-APR-2025.
Road work begins
.176 MILE(S) BEFORE RP IS470W TO VIEW HIGH DR N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.022 MILE(S) BEFORE CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.111 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.073 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.118 MILE(S) BEFORE RP IS49S TO MO150E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 12 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 15-MAY-2025.
Road work begins
.001 MILE(S) BEFORE CST CLAREMONT AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-MAR-2025 to 27-JUN-2025.
Road work begins
.013 MILE(S) AFTER CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 15-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
RP MO150 TO MO291S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 150 W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
.007 MILE(S) AFTER RP MO150 TO US50E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 350 E East
-
JACKSON COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 18-SEP-2024 to 30-OCT-2025.
Road work begins
CST 55TH ST E.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 AM
and
07:00 PM.
Ramp RP BOWLIN RD TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE BOWLIN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470E TO BOWLIN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.01 MILE(S) AFTER IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO BLUE RIDGE BLVD N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO COLBERN RD W West
-
JACKSON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Ramp RP IS470W TO NE DOUGLAS ST S S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.011 MILE(S) AFTER IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST N TO IS470W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST S TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE DOUGLAS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO RAYTOWN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.014 MILE(S) AFTER IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.008 MILE(S) AFTER CST WILLIS ST S.
Work will be done
on weekdays only.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.134 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.059 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT D E East
-
JASPER COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) BEFORE CST ORCHARD ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST MCNUTT ST N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 30-APR-2025.
Road work begins
CST PROVIDENCE WAY E.
Work will be done
7 days a week.
CST MCNUTT ST S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 30-APR-2025.
Road work begins
.013 MILE(S) BEFORE CST HERCULANEUM CROSSING S.
Work will be done
7 days a week.
Interstate IS 55 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins
.208 MILE(S) BEFORE US 61 S.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins
.315 MILE(S) BEFORE RR RIVER SUB S.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-FEB-2025 to 31-DEC-2025.
Road work begins
.143 MILE(S) BEFORE PVT MANLEY QUARRY RD E.
Work will be done
7 days a week.
Ramp RP IS55N TO US67N N North
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 30-APR-2025.
Road work begins
.013 MILE(S) AFTER IS 55 N.
Work will be done
on weekdays only.
Ramp RP IS55S TO US67S S South
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 30-APR-2025.
Road work begins
.005 MILE(S) AFTER IS 55 S.
Work will be done
on weekdays only.
Ramp RP US67N TO IS55N N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 30-APR-2025.
Road work begins
US 67 N.
Work will be done
on weekdays only.
Ramp RP US67S TO IS55S S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 30-APR-2025.
Road work begins
US 67 S.
Work will be done
on weekdays only.
State Route RT O W West
-
JEFFERSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins
RT F S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT Z E East
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-MAR-2025 to 30-APR-2025.
Road work begins
.001 MILE(S) AFTER RP RTZ TO IS55S S.
Work will be done
on weekdays only.
State Route RT Z W West
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-MAR-2025 to 30-APR-2025.
Road work begins
.003 MILE(S) AFTER RP IS55N TO RTZ E.
Work will be done
on weekdays only.
US US 67 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 30-APR-2025.
Road work begins
.091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done
on weekdays only.
US US 67 N North
-
JEFFERSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 28-MAR-2025 to 05-APR-2025.
Road work begins
.148 MILE(S) BEFORE RT CC S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
US US 67 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 30-APR-2025.
Road work begins
.027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done
on weekdays only.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-MAR-2025 to 02-JUN-2025.
Road work begins
.1 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 61 N North
-
JEFFERSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) BEFORE PVT COUNTRY HAVEN DR E.
Work will be done
7 days a week.
US US 61 S South
-
JEFFERSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins
.012 MILE(S) BEFORE PVT RIVER DALE DR E.
Work will be done
7 days a week.
State Route MO 13 S South
-
JOHNSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2025 to 05-MAY-2025.
Road work begins
.036 MILE(S) AFTER CRD 1250 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F N North
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 25-APR-2025.
Road work begins
.005 MILE(S) AFTER MO 2 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT F S South
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 25-APR-2025.
Road work begins
.01 MILE(S) AFTER MO 58 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT D N North
-
LACLEDE COUNTY
- Expect Delays
State Route RT JJ N North
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
RT F S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 PM
and
04:00 PM.
Interstate IS 70 E East
-
LAFAYETTE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.651 MILE(S) BEFORE RP IS70E TO RTY E.
Work will be done
7 days a week.
State Route RT AA E East
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 02-MAY-2025.
Road work begins
.01 MILE(S) AFTER CST LIPPER ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT AA W West
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 02-MAY-2025.
Road work begins
.006 MILE(S) AFTER MO 23 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT DD E East
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
.015 MILE(S) AFTER MO 39 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT H N North
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.015 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT H S South
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
LP 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z N North
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
.041 MILE(S) AFTER CST DOGWOOD DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT Z S South
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD FRENCHMANS BLUFF RD E East
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CRD FRENCHMANS BLUFF RD W West
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
.184 MILE(S) BEFORE CST SARAH ANN BLVD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.014 MILE(S) BEFORE CST NORTH LINCOLN DR S.
Work will be done
7 days a week.
State Route MO 47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.026 MILE(S) AFTER PVT ANNA AVE S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61N N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61S S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP US61N TO MO47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
US 61 N.
Work will be done
7 days a week.
Ramp RP US61S TO MO47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.012 MILE(S) AFTER US 61 S.
Work will be done
7 days a week.
US US 61 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.048 MILE(S) AFTER CST OLD CAP AU GRIS RD E.
Work will be done
7 days a week.
US US 61 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.319 MILE(S) BEFORE CST N LINCOLN DR E.
Work will be done
7 days a week.
State Route RT E E East
-
LINCOLN COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 04-APR-2025.
Road work begins
.097 MILE(S) BEFORE RT UU S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT E W West
-
LINCOLN COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 04-APR-2025.
Road work begins
.108 MILE(S) BEFORE CST HICKORY ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
US US 63 S South
-
MACON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 14-APR-2025.
Road work begins
.045 MILE(S) AFTER CRD KITE PL E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 68 E East
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.008 MILE(S) BEFORE CRD 2480 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
04:30 PM.
US US 36 W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2025 to 20-JUN-2025.
Road work begins
.017 MILE(S) AFTER US 24 W.
Work will be done
on weekdays and Saturdays.
US US 24 E East
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.115 MILE(S) BEFORE RP US24E TO MO6 E.
Work will be done
7 days a week.
US US 24 W West
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.159 MILE(S) BEFORE RP US24W TO MO6 W.
Work will be done
7 days a week.
US US 61 N North
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.1 MILE(S) BEFORE RP US24E TO MO6 E.
Work will be done
7 days a week.
US US 61 S South
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.145 MILE(S) BEFORE RP US24W TO MO6 W.
Work will be done
7 days a week.
State Route RT MM N North
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.011 MILE(S) AFTER CRD BENTON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT MM S South
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
MO 90 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT TT N North
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
MO 90 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT TT S South
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
CRD STONE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST WALNUT ST N North
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.001 MILE(S) AFTER MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST WALNUT ST S South
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.016 MILE(S) BEFORE MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 52 E East
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.03 MILE(S) BEFORE RT E S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 52 W West
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.025 MILE(S) AFTER CST CHERRY ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E N North
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E S South
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.028 MILE(S) BEFORE MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-FEB-2025 to 01-DEC-2025.
Road work begins
.419 MILE(S) BEFORE RP IS70E TO RTE W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
08:00 AM.
State Route MO 52 E East
-
MORGAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 01-NOV-2025.
Road work begins
.025 MILE(S) BEFORE CST BROWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 52 W West
-
MORGAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 01-NOV-2025.
Road work begins
.015 MILE(S) BEFORE CST WEST VIEW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 55 N North
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 15-APR-2025.
Road work begins
.592 MILE(S) BEFORE CRD 704 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 55 S South
-
NEW MADRID COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 16-APR-2025.
Road work begins
.025 MILE(S) BEFORE MO 80 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 55 S South
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 02-APR-2025 to 14-APR-2025.
Road work begins
1.391 MILE(S) AFTER RT AA S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
US US 61 N North
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2025 to 17-MAY-2025.
Road work begins
.013 MILE(S) BEFORE CRD 502 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
US US 61 S South
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2025 to 17-MAY-2025.
Road work begins
.002 MILE(S) AFTER CST HENNINGS DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
CRD DAVID DR E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins
.024 MILE(S) BEFORE IS 49 S.
Work will be done
7 days a week.
CRD DAVID DR W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins
.014 MILE(S) AFTER PVT IVEYRIDGE LN S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins
.02 MILE(S) AFTER MO 43 S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins
.001 MILE(S) AFTER RP IS44E TO MO43 S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.024 MILE(S) AFTER RP IS44E TO US166 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 44 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins
.002 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done
7 days a week.
Interstate IS 44 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins
.013 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done
7 days a week.
State Route MO 86 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins
MO 43 S.
Work will be done
7 days a week.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins
.002 MILE(S) BEFORE MO 43 N.
Work will be done
7 days a week.
US US 60 E East
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins
.299 MILE(S) BEFORE RT Y S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 E East
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins
.348 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done
on weekdays only.
US US 60 W West
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins
.319 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done
on weekdays only.
US US 60 W West
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins
.243 MILE(S) AFTER CRD FINCH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
NEWTON COUNTY
- No Expected Delays
SURVEYING
Scheduled from 24-FEB-2025 to 04-APR-2025.
Road work begins
.169 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 44 W West
-
NEWTON COUNTY
- No Expected Delays
BRIDGE MAINTENANCE
Scheduled from 09-DEC-2024 to 02-JUL-2025.
Road work begins
.001 MILE(S) AFTER RP LP49N TO IS44W W.
Work will be done
7 days a week.
State Route MO 19 N North
-
OREGON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-SEP-2025.
Road work begins
.009 MILE(S) AFTER CRD 430 E.
Work will be done
on weekdays only.
US US 50 E East
-
OSAGE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 13-MAR-2026.
Road work begins
.019 MILE(S) BEFORE CRD 801 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
US US 50 E East
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.161 MILE(S) BEFORE CRD 602 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
Interstate IS 55 S South
-
PEMISCOT COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 28-MAR-2025 to 03-APR-2025.
Road work begins
.393 MILE(S) AFTER RP US412E TO IS55S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 55 N North
-
PEMISCOT COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 28-MAR-2025 to 03-APR-2025.
Road work begins
.014 MILE(S) BEFORE RP IS55S TO IS155S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 51 N North
-
PERRY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins
.004 MILE(S) BEFORE CRD 946 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 51 S South
-
PERRY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins
.607 MILE(S) BEFORE CRD 946 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT O N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 09-MAY-2025.
Road work begins
.001 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT O S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 09-MAY-2025.
Road work begins
.006 MILE(S) AFTER RT N E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road work begins
.003 MILE(S) AFTER RT M S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 18-APR-2025.
Road work begins
.035 MILE(S) AFTER CRD SMELSER RD E.
Work will be done
7 days a week.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.067 MILE(S) AFTER CST REBAR RD E.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 18-APR-2025.
Road work begins
.021 MILE(S) AFTER CO US65S TO US65N W.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.322 MILE(S) BEFORE OR 65 S.
Work will be done
7 days a week.
State Route MO 68 W West
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.008 MILE(S) AFTER CRD SHERWOOD LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
04:30 PM.
State Route RT E N North
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.022 MILE(S) AFTER RT HH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT E S South
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) AFTER CRD 8450 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT Y E East
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.087 MILE(S) BEFORE CRD 8240 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT Y W West
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.082 MILE(S) BEFORE CRD 8120 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT D N North
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 03-NOV-2025.
Road work begins
.005 MILE(S) AFTER RT FF S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT D S South
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 03-NOV-2025.
Road work begins
.022 MILE(S) AFTER RT FF S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 61 N North
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 01-MAY-2025.
Road work begins
.064 MILE(S) BEFORE RP US61N TO RTD N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 61 S South
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 01-MAY-2025.
Road work begins
.027 MILE(S) AFTER RP US61S TO RTD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 152 E East
-
PLATTE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.005 MILE(S) AFTER RP MO152E TO IS29N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 29 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.072 MILE(S) BEFORE IS 435 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.126 MILE(S) BEFORE RT D E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.076 MILE(S) BEFORE CST NW COOKINGHAM DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.034 MILE(S) BEFORE MO 45 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.042 MILE(S) AFTER RP IS435S TO RTD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.129 MILE(S) BEFORE CST NW COOKINGHAM DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.093 MILE(S) BEFORE MO 45 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
State Route RT PP E East
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.284 MILE(S) AFTER CRD 358TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
12:04 PM.
State Route RT PP W West
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.136 MILE(S) AFTER CRD 370TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
12:04 PM.
State Route RT D N North
-
POLK COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.257 MILE(S) BEFORE CRD 390TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT D S South
-
POLK COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.097 MILE(S) AFTER RT NN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
Interstate IS 44 W West
-
PULASKI COUNTY
- No Expected Delays
SURVEYING
Scheduled from 24-FEB-2025 to 04-APR-2025.
Road work begins
.043 MILE(S) AFTER RP IS44W TO MO133 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT BB E East
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 01-NOV-2025.
Road work begins
MO 3 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT BB W West
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 01-NOV-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D N North
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2025 to 01-NOV-2025.
Road work begins
.001 MILE(S) AFTER RT BB E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2025 to 01-NOV-2025.
Road work begins
RT C S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT DD N North
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-NOV-2025.
Road work begins
US 24 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT DD S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-NOV-2025.
Road work begins
CRD 1650 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT T S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
RT B E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 63 N North
-
RANDOLPH COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 20-FEB-2025 to 01-NOV-2025.
Road work begins
.009 MILE(S) BEFORE RT J E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.024 MILE(S) BEFORE RP RTM TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.19 MILE(S) BEFORE RR HANNIBAL DISTRICT E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.176 MILE(S) BEFORE RP US63S TO RTM W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.008 MILE(S) BEFORE RP US24 TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.01 MILE(S) BEFORE RP RTEE TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.037 MILE(S) AFTER RR HANNIBAL DISTRICT E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.008 MILE(S) BEFORE RP US24 TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F E East
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
RT B S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT F W West
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
CRD E 132ND ST E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT T E East
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
MO 210 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT T W West
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
CST CAMDEN ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 10 E East
-
RAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.166 MILE(S) AFTER CRD HILL SCHOOL RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 10 W West
-
RAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.224 MILE(S) BEFORE CRD YOUNG RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 49 N North
-
REYNOLDS COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.125 MILE(S) BEFORE RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT A N North
-
REYNOLDS COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
MO 49 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B N North
-
REYNOLDS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 31-OCT-2025.
Road work begins
.004 MILE(S) BEFORE CRD 785 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT B S South
-
REYNOLDS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 31-OCT-2025.
Road work begins
.003 MILE(S) BEFORE CRD 784 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 70 E East
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.477 MILE(S) AFTER RP US65N TO IS70E E.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.507 MILE(S) BEFORE RP IS70W TO RTVV W.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.013 MILE(S) AFTER RP RTJ TO IS70W W.
Work will be done
7 days a week.
State Route MO 19 S South
-
SHANNON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-SEP-2025.
Road work begins
.024 MILE(S) BEFORE CRD 19A E.
Work will be done
on weekdays only.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.093 MILE(S) AFTER CST RESEARCH PARK CIR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 PM
and
05:00 AM.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-MAR-2025 to 11-APR-2025.
Road work begins
.096 MILE(S) BEFORE RP FAIRGROUNDS RD TO IS70E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-MAR-2025 to 11-APR-2025.
Road work begins
.06 MILE(S) AFTER RP IS70W TO LP70E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Ramp RP FAIRGROUNDS RD TO IS70E E East
-
ST. CHARLES COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 11-APR-2025.
Road work begins
.014 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 12-APR-2025.
Road work begins
.004 MILE(S) AFTER RT DD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:30 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
CORE DRILLING
Scheduled from 30-MAR-2025 to 04-APR-2025.
Road work begins
.025 MILE(S) AFTER IS 70 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 12-APR-2025.
Road work begins
.001 MILE(S) BEFORE RT K S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
CORE DRILLING
Scheduled from 30-MAR-2025 to 04-APR-2025.
Road work begins
.136 MILE(S) AFTER CST LAKE ST LOUIS BLVD E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
SHOULDER WORK
Scheduled from 03-APR-2025 to 05-APR-2025.
Road work begins
.006 MILE(S) AFTER RP RTW TO IS70W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 02-APR-2025 to 04-APR-2025.
Road work begins
.024 MILE(S) AFTER MO 94 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
State Route MO 94 E East
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.004 MILE(S) BEFORE RR HANNIBAL SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 94 W West
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.008 MILE(S) AFTER RT H E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 61 N North
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
CORE DRILLING
Scheduled from 30-MAR-2025 to 04-APR-2025.
Road work begins
.042 MILE(S) AFTER RP IS64E TO IS70E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
US US 61 S South
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
CORE DRILLING
Scheduled from 30-MAR-2025 to 04-APR-2025.
Road work begins
.069 MILE(S) BEFORE RP US61S TO US40W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route MO 221 N North
-
ST. FRANCOIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 17-APR-2025.
Road work begins
.001 MILE(S) BEFORE PVT ST FRANCOIS HILLS DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 221 S South
-
ST. FRANCOIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 17-APR-2025.
Road work begins
.003 MILE(S) BEFORE CRD THIRD ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
US US 67 N North
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-MAR-2025 to 15-APR-2025.
Road work begins
.003 MILE(S) AFTER CRD BLOMEIER RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
US US 67 S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-MAR-2025 to 04-APR-2025.
Road work begins
.151 MILE(S) BEFORE MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 67 S South
-
ST. FRANCOIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-MAR-2025 to 15-APR-2025.
Road work begins
.008 MILE(S) BEFORE CST DOUBET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
CST NORTH HANLEY RD N North
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 24-MAR-2025 to 30-APR-2025.
Road work begins
.028 MILE(S) BEFORE MO 115 S.
Work will be done
7 days a week.
CST NORTH HANLEY RD S South
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 24-MAR-2025 to 30-APR-2025.
Road work begins
.055 MILE(S) BEFORE MO 115 S.
Work will be done
7 days a week.
Interstate IS 170 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
RP AIRPORT RD TO IS170E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.021 MILE(S) AFTER RP IS170W TO MO115S S.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 31-MAR-2025 to 04-APR-2025.
Road work begins
.051 MILE(S) BEFORE CST NYFLOT AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.121 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done
7 days a week.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
.008 MILE(S) BEFORE RP IS270E TO IS64E E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
.028 MILE(S) BEFORE RP MO340E TO IS270W W.
Work will be done
7 days a week.
Interstate IS 55 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins
.19 MILE(S) BEFORE RP IS55N TO REAVIS BARRACKS RD E.
Work will be done
7 days a week.
Interstate IS 64 E East
-
ST. LOUIS COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 24-MAR-2025 to 11-APR-2025.
Road work begins
.371 MILE(S) BEFORE RP IS64E TO CHESTERFIELD AIRPORT RD E.
Work will be done
7 days a week.
Interstate IS 64 W West
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.322 MILE(S) BEFORE CST SPIRIT OF ST LOUIS BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 PM
and
05:00 AM.
Interstate IS 70 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CST AIRFLIGHT DR S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
Interstate IS 70 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.005 MILE(S) AFTER RT N S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
State Route MO 21 N North
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JAN-2025 to 02-MAY-2025.
Road work begins
.019 MILE(S) BEFORE CRD CAROLYNNE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
State Route MO 21 S South
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JAN-2025 to 02-MAY-2025.
Road work begins
.026 MILE(S) AFTER CST GREEN PARK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
State Route MO 366 E East
-
ST. LOUIS COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 17-MAR-2025 to 09-APR-2025.
Road work begins
.051 MILE(S) BEFORE CST WATSON RD W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Ramp RP IS270E TO RTAB E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
IS 270 E.
Work will be done
7 days a week.
Ramp RP IS270W TO IS64E E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS270W TO IS64W W West
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS270W TO RTAB W West
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS64E TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
.03 MILE(S) AFTER RP IS64E TO IS270W W.
Work will be done
7 days a week.
Ramp RP IS64W TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
IS 64 W.
Work will be done
7 days a week.
Ramp RP RTAB TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
RT AB E.
Work will be done
7 days a week.
Ramp RP RTAB TO IS270W W West
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-DEC-2024 to 30-APR-2025.
Road work begins
RT AB E.
Work will be done
7 days a week.
CRD THEISS RD N North
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
OR 270 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CRD THEISS RD S South
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
CRD THEISSCORD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST S EATHERTON RD N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST S EATHERTON RD S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Interstate IS 170 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 07-APR-2025.
Road work begins
.033 MILE(S) AFTER RP MO115N TO IS170E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 07-APR-2025.
Road work begins
.125 MILE(S) BEFORE PED PED OVER IS170 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 03-APR-2025 to 04-APR-2025.
Road work begins
.385 MILE(S) BEFORE RP IS270E TO RTDE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 PM
and
04:00 AM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2025 to 04-APR-2025.
Road work begins
.047 MILE(S) BEFORE CO SOR270E TO NOR270W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 PM
and
04:00 AM.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2025 to 04-APR-2025.
Road work begins
.151 MILE(S) BEFORE CST WASHINGTON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 PM
and
04:00 AM.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.953 MILE(S) BEFORE RP IS44E TO MO141N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Interstate IS 64 W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 31-MAR-2025 to 10-APR-2025.
Road work begins
.08 MILE(S) AFTER RP CHESTERFIELD AIRPORT RD TO IS64W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 115 N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2025 to 30-APR-2025.
Road work begins
.024 MILE(S) AFTER CST MALINE AVE S.
Work will be done
7 days a week.
State Route MO 115 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-MAR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) AFTER CST EAST DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 115 S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2025 to 30-APR-2025.
Road work begins
.011 MILE(S) BEFORE CST ENGLER AVE E.
Work will be done
7 days a week.
State Route MO 115 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.002 MILE(S) AFTER CST LINCOLN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 180 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 08-APR-2025.
Road work begins
.02 MILE(S) AFTER RT EE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-APR-2025.
Road work begins
.004 MILE(S) BEFORE CRD MILITARY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-APR-2025.
Road work begins
.006 MILE(S) AFTER CRD BRILLIANT LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 17-APR-2025.
Road work begins
.003 MILE(S) BEFORE CRD LAREDO AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-MAR-2025 to 30-APR-2025.
Road work begins
.001 MILE(S) AFTER PVT MONARCH FIRE STATION E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 366 E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins
.004 MILE(S) AFTER CST SUNSET OFFICE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 366 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-MAR-2025 to 03-APR-2025.
Road work begins
.021 MILE(S) AFTER CST PEMBROKE DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
Ramp RP IS170E TO IS70E E East
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 170 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Ramp RP IS170W TO IS70W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 170 W.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Ramp RP IS70E TO IS170W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 70 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
State Route RT CC E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT D E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins
.013 MILE(S) AFTER RP RTDE TO IS170W W.
Work will be done
on weekdays only.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins
.001 MILE(S) AFTER CST PAGE BLVD E.
Work will be done
on weekdays only.
State Route RT N N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-MAY-2025.
Road work begins
.005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done
on weekdays only.
State Route RT N S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CST JEAN DR E.
Work will be done
on weekdays only.
State Route RT U S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 04-APR-2025.
Road work begins
.026 MILE(S) BEFORE CST NORMANDY PL E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 50 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-MAY-2025.
Road work begins
.001 MILE(S) AFTER CRD SAPPINGTON ACRES DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 61 N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 28-APR-2025.
Road work begins
.001 MILE(S) AFTER MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
US US 61 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-MAR-2025 to 03-APR-2025.
Road work begins
.002 MILE(S) AFTER CRD UNION RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 61 N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-FEB-2025 to 21-APR-2025.
Road work begins
.005 MILE(S) BEFORE CST SWAN DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-MAR-2025 to 08-APR-2025.
Road work begins
.002 MILE(S) BEFORE CRD FIVE OAKS PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAR-2025 to 18-APR-2025.
Road work begins
.004 MILE(S) BEFORE CST CONWAY RD E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS CITY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.022 MILE(S) BEFORE RP IS270W TO RIVERVIEW DR W.
Work will be done
7 days a week.
Interstate IS 55 S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins
.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done
7 days a week.
State Route RT H N North
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.001 MILE(S) AFTER CST CHAIN OF ROCKS BRG E.
Work will be done
7 days a week.
State Route RT H S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.001 MILE(S) BEFORE CST DUNN RD E.
Work will be done
7 days a week.
State Route MO 366 W West
-
ST. LOUIS CITY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins
.005 MILE(S) BEFORE CST RIVER DES PERES BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT H N North
-
ST. LOUIS CITY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins
.007 MILE(S) AFTER CST CARRIE AVE E.
Work will be done
7 days a week.
State Route RT H S South
-
ST. LOUIS CITY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins
.005 MILE(S) AFTER CST HALL ST N.
Work will be done
7 days a week.
Interstate IS 55 N North
-
STE. GENEVIEVE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-OCT-2024 to 01-MAY-2025.
Road work begins
.011 MILE(S) BEFORE RA IS55N BLOOMSDALE N.
Work will be done
7 days a week.
State Route MO 51 S South
-
STODDARD COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 31-MAR-2025 to 04-APR-2025.
Road work begins
.002 MILE(S) BEFORE CRD 490 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F N North
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT F S South
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.007 MILE(S) AFTER CRD 468 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 13 N North
-
STONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins
.001 MILE(S) AFTER MO 248 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 N North
-
STONE COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.04 MILE(S) BEFORE CRD CASSIE LN E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 13 S South
-
STONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins
.028 MILE(S) AFTER PVT SHADY LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 S South
-
STONE COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.077 MILE(S) AFTER CST KISSEE AVE E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 86 E East
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins
.164 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins
.218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route MO 248 E East
-
TANEY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 30-APR-2025.
Road work begins
.008 MILE(S) BEFORE CST CHIEFS CT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 248 W West
-
TANEY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 30-APR-2025.
Road work begins
.003 MILE(S) BEFORE US 65 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 76 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 13-MAR-2025 to 01-MAY-2025.
Road work begins
1.042 MILE(S) BEFORE RR AURORA SUB E.
Work will be done
on weekdays only.
State Route MO 86 E East
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.175 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 86 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT E E East
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.025 MILE(S) BEFORE CRD 2000 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E W West
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.018 MILE(S) AFTER CRD 2625 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 70 W West
-
WARREN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-FEB-2025 to 01-DEC-2025.
Road work begins
.03 MILE(S) BEFORE RP IS70W TO W WARRENTON BLVD W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
08:00 AM.
Interstate IS 70 E East
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
SHOULDER WORK
Scheduled from 03-APR-2025 to 05-APR-2025.
Road work begins
.215 MILE(S) BEFORE RP IS70E TO W WARRENTON BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route MO 8 E East
-
WASHINGTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-DEC-2025.
Road work begins
.009 MILE(S) BEFORE CRD OLD HWY 8 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
11:59 PM.
State Route MO 8 W West
-
WASHINGTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-DEC-2025.
Road work begins
.024 MILE(S) BEFORE CRD RAILROAD RD 606 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
11:59 PM.
US US 60 W West
-
WRIGHT COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 31-MAR-2025 to 21-APR-2025.
Road work begins
.002 MILE(S) BEFORE CO US60 TO SOR60 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 60 E East
-
BARRY COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
.157 MILE(S) BEFORE CST S EISENHOWER ST S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route RT FF N North
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
RT V E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT FF S South
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.001 MILE(S) AFTER CRD NW 90TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.034 MILE(S) AFTER CRD NW STATE LINE LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.029 MILE(S) AFTER RT V E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT V E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.04 MILE(S) AFTER MO 43 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT V W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
RT C E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 7 S South
-
BENTON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.685 MILE(S) AFTER RT KK S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 51 S South
-
BOLLINGER COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 05-APR-2025 to 19-APR-2025.
Road work begins
.051 MILE(S) BEFORE MO 91 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 151 N North
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.009 MILE(S) AFTER CST SWITZLER ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
Ramp RP US54W TO US63N N North
-
CALLAWAY COUNTY
- CLOSED
GUARD RAIL/CABLE WORK
Scheduled from 08-APR-2025 to 09-APR-2025.
Road work begins
US 54 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT Z E East
-
CALLAWAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 07-APR-2025.
Road work begins
.016 MILE(S) AFTER RT JJ S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z W West
-
CALLAWAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 07-APR-2025.
Road work begins
.042 MILE(S) AFTER CRD 140 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Interstate IS 70 E East
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2025 to 05-APR-2025.
Road work begins
.356 MILE(S) BEFORE RR FULTON BRANCH S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2025 to 05-APR-2025.
Road work begins
.088 MILE(S) BEFORE US 54 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route RT C N North
-
CAMDEN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT E E East
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT E W West
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT C N North
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.012 MILE(S) AFTER RT J S.
Work will be done
7 days a week.
State Route RT C S South
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.002 MILE(S) AFTER RT J S.
Work will be done
7 days a week.
State Route RT F N North
-
CASS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 11-APR-2025.
Road work begins
.011 MILE(S) AFTER CRD 339TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT F S South
-
CASS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 11-APR-2025.
Road work begins
.01 MILE(S) AFTER CRD 331ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 71 N North
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.018 MILE(S) AFTER RP IS49N TO RTJ N.
Work will be done
7 days a week.
State Route RT W E East
-
CHARITON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-APR-2025 to 17-APR-2025.
Road work begins
.029 MILE(S) AFTER CRD UNKNOWN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
CST W JACKSON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route RT J E East
-
CLAY COUNTY
- CLOSED
ROAD MIX OVERLAY
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
RT W E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT J W West
-
CLAY COUNTY
- CLOSED
ROAD MIX OVERLAY
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
CRD SW 200TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.004 MILE(S) BEFORE CST PLEASANT VALLEY RD W.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.403 MILE(S) AFTER RP 19TH ST E TO IS35S S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.018 MILE(S) AFTER CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
State Route MO 152 E East
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 30-MAY-2025.
Road work begins
.011 MILE(S) BEFORE MO 1 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 152 W West
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CST KANSAS ST W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
Outer Road S OR 44 E East
-
CRAWFORD COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 01-DEC-2025.
Road work begins
.23 MILE(S) BEFORE CRD OLD ROUTE 66 E.
Work will be done
7 days a week.
Outer Road S OR 44 W West
-
CRAWFORD COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 01-DEC-2025.
Road work begins
.127 MILE(S) AFTER CRD OLD ROUTE 66 E.
Work will be done
7 days a week.
State Route RT C W West
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
US 65 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD E East
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
MO 73 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
CRD HACKBERRY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT H W West
-
DENT COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.832 MILE(S) AFTER CRD 2160 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 14 E East
-
DOUGLAS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.016 MILE(S) BEFORE MO 181 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route RT H N North
-
DUNKLIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-APR-2025 to 10-APR-2025.
Road work begins
.006 MILE(S) AFTER RT J E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT H S South
-
DUNKLIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-APR-2025 to 10-APR-2025.
Road work begins
.01 MILE(S) BEFORE CRD 108 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT WW N North
-
DUNKLIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 08-APR-2025.
Road work begins
US 62 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT WW S South
-
DUNKLIN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 08-APR-2025.
Road work begins
RT J E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT KK E East
-
FRANKLIN COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 30-APR-2025.
Road work begins
RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT KK W West
-
FRANKLIN COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 30-APR-2025.
Road work begins
.003 MILE(S) AFTER MO 185 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST GLENSTONE AVE N North
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins
.015 MILE(S) BEFORE US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
CST GLENSTONE AVE S South
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins
.019 MILE(S) BEFORE US 60 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.003 MILE(S) AFTER MO 13 S.
Work will be done
on weekdays only.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.015 MILE(S) AFTER CST CAMPBELL AVE S.
Work will be done
on weekdays only.
US US 65 N North
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 15-APR-2025.
Road work begins
.003 MILE(S) AFTER CRD VALLEY WATER MILL RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 7 N North
-
HENRY COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins
.001 MILE(S) AFTER CST GOLDEN DR S.
Work will be done
7 days a week.
State Route MO 7 S South
-
HENRY COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins
.231 MILE(S) AFTER CST GERHART DR S.
Work will be done
7 days a week.
State Route RT W N North
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD SE-561 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W S South
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT PP E East
-
HICKORY COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.001 MILE(S) AFTER CRD NE 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT PP W West
-
HICKORY COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
MO 83 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT T E East
-
HOLT COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 07-APR-2025 to 09-JUL-2025.
Road work begins
.007 MILE(S) AFTER COE MILL CREEK LEVEE RD S.
Work will be done
7 days a week.
State Route RT T W West
-
HOLT COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 07-APR-2025 to 09-JUL-2025.
Road work begins
.013 MILE(S) AFTER PVT FARM RD S.
Work will be done
7 days a week.
State Route MO 14 W West
-
HOWELL COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.013 MILE(S) AFTER CO RTT TO MO14 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 72 E East
-
IRON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-OCT-2025.
Road work begins
.004 MILE(S) AFTER MO 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
CST ADAMS DAIRY PKWY N North
-
JACKSON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 04-APR-2025 to 05-APR-2025.
Road work begins
.017 MILE(S) AFTER RP IS70E TO ADAMS DAIRY PKWY E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST TRUMAN RD E East
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.01 MILE(S) AFTER RP IS70E TO TRUMAN RD E.
Work will be done
7 days a week.
CST TRUMAN RD W West
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.002 MILE(S) AFTER CST INDIANA AVE S.
Work will be done
7 days a week.
Interstate IS 670 W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
PVT OVERPASS S South
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 31-DEC-2032.
Road work begins
.024 MILE(S) BEFORE CST TRUMAN RD E.
Work will be done
on weekdays only.
Ramp RP IS35N TO US169N N North
-
JACKSON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
IS 35 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS70W TO 13TH ST E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
IS 670 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP IS70W TO ADAMS DAIRY PKWY W West
-
JACKSON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 04-APR-2025 to 05-APR-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP TENTH ST TO IS70E E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
CST E 10TH ST E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP US71N TO IS670W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
.006 MILE(S) AFTER US 71 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP US71S TO IS670W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
US 71 S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Interstate IS 35 N North
-
JACKSON COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.002 MILE(S) AFTER RP IS35N TO US169N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.003 MILE(S) AFTER CST CHESTNUT AVE S.
Work will be done
7 days a week.
US US 40 E East
-
JACKSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-APR-2025 to 08-APR-2025.
Road work begins
.006 MILE(S) BEFORE CST BOWLIN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:30 PM.
US US 169 N North
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2025 to 04-APR-2025.
Road work begins
RR UNKNOWN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
01:00 PM.
Interstate IS 44 W West
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-APR-2025 to 09-APR-2025.
Road work begins
.34 MILE(S) BEFORE RP IS44W TO MO37 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS55S TO RTAW W West
-
JEFFERSON COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 07-APR-2025 to 12-APR-2025.
Road work begins
.009 MILE(S) AFTER IS 55 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 PM
and
05:00 AM.
State Route MO 231 N North
-
JEFFERSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins
.008 MILE(S) AFTER US 67 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
State Route RT C E East
-
LACLEDE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT C W West
-
LACLEDE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
MO 5 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT V E East
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-APR-2025 to 10-APR-2025.
Road work begins
MO 5 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT V W West
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-APR-2025 to 10-APR-2025.
Road work begins
.03 MILE(S) AFTER CRD SKYLINE DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT Y N North
-
LAFAYETTE COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 07-APR-2025 to 01-DEC-2025.
Road work begins
.005 MILE(S) AFTER RT VV S.
Work will be done
7 days a week.
State Route RT Y S South
-
LAFAYETTE COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 07-APR-2025 to 01-DEC-2025.
Road work begins
.003 MILE(S) AFTER RT VV S.
Work will be done
7 days a week.
State Route RT YY E East
-
MACON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 04-APR-2025 to 04-APR-2025.
Road work begins
CRD LOWLAND RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT YY E East
-
MACON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-APR-2025 to 11-APR-2025.
Road work begins
.001 MILE(S) BEFORE CRD LOWLAND RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT YY W West
-
MACON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 04-APR-2025 to 04-APR-2025.
Road work begins
.001 MILE(S) AFTER CRD MARIGOLD AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT YY W West
-
MACON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-APR-2025 to 11-APR-2025.
Road work begins
CRD MARIGOLD AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 72 W West
-
MADISON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-OCT-2025.
Road work begins
.005 MILE(S) BEFORE BU 67 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
US US 67 N North
-
MADISON COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 04-APR-2025 to 10-APR-2025.
Road work begins
.257 MILE(S) BEFORE CO US67N TO US67S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT C S South
-
MILLER COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
MO 17 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 52 E East
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
.006 MILE(S) AFTER RT HH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 52 W West
-
MILLER COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
.001 MILE(S) BEFORE CST HUMPHREY ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT A E East
-
MILLER COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
MO 17 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT A W West
-
MILLER COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
MO 42 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
US US 50 W West
-
MONITEAU COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 08-APR-2025 to 09-APR-2025.
Road work begins
.005 MILE(S) BEFORE CRD COUNTY LINE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route MO 89 N North
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.008 MILE(S) AFTER RT Y S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 89 S South
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
CST LINNWOOD DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
US US 50 W West
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.14 MILE(S) BEFORE CRD 602 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT EE N North
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT EE S South
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
CRD 1280 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT H E East
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT M E East
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.022 MILE(S) AFTER RT J S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT M W West
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
Interstate IS 29 S South
-
PLATTE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 09-APR-2025.
Road work begins
.247 MILE(S) BEFORE RP IS29S TO RTH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT AB N North
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD 222ND RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT AB S South
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
MO 215 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT C E East
-
POLK COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT UU E East
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD 510TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT UU W West
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
RT U S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT W W West
-
RANDOLPH COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-APR-2025 to 17-APR-2025.
Road work begins
MO 3 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
CST OLD U S HWY 36 E East
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.028 MILE(S) BEFORE RP US36E TO BU36 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
CST OLD U S HWY 36 W West
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.001 MILE(S) BEFORE MO 151 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
State Route MO 151 S South
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.3 MILE(S) BEFORE RP US36W TO MO151 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2025 to 07-APR-2025.
Road work begins
.081 MILE(S) BEFORE RP FAIRGROUNDS RD TO IS70E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route RT Z N North
-
ST. CHARLES COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 07-APR-2025 to 09-MAY-2025.
Road work begins
RT D E.
Work will be done
on weekdays only.
State Route RT Z S South
-
ST. CHARLES COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 07-APR-2025 to 09-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CRD BUCKNER RD E.
Work will be done
on weekdays only.
State Route RT WW N North
-
ST. CLAIR COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.008 MILE(S) AFTER CRD SE 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT WW S South
-
ST. CLAIR COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.012 MILE(S) AFTER RT V S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins
.178 MILE(S) AFTER PVT PRIVATE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
State Route RT AB E East
-
ST. LOUIS COUNTY
- No Delays Expected
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 07-APR-2025.
Road work begins
CST LADUE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST MISSOURI BOTTOM RD E East
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
.025 MILE(S) AFTER CST HERITAGE HEIGHTS CIR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
CST MISSOURI BOTTOM RD W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
.133 MILE(S) BEFORE RP MO370E TO MISSOURI BOTTOM RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
Ramp RP IS170W TO IS70W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 31-MAY-2025.
Road work begins
.003 MILE(S) AFTER IS 170 W.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
.003 MILE(S) AFTER CST BAUR BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 11-APR-2025 to 12-APR-2025.
Road work begins
.061 MILE(S) AFTER RP IS55N TO CARONDELET BLVD N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
09:00 AM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 04-APR-2025 to 05-APR-2025.
Road work begins
.061 MILE(S) AFTER RP IS55N TO CARONDELET BLVD N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 PM
and
09:00 AM.
Ramp RP WEBER RD TO IS55N N North
-
ST. LOUIS CITY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 04-APR-2025 to 05-APR-2025.
Road work begins
.004 MILE(S) AFTER CST WEBER RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 PM
and
09:00 AM.
Ramp RP WEBER RD TO IS55N N North
-
ST. LOUIS CITY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 11-APR-2025 to 12-APR-2025.
Road work begins
.008 MILE(S) AFTER CST WEBER RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
09:00 AM.
State Route MO 51 N North
-
STODDARD COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 05-APR-2025 to 19-APR-2025.
Road work begins
.106 MILE(S) AFTER OR 60 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CRD N W SERVICE RD E East
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
SURVEYING
Scheduled from 07-APR-2025 to 07-APR-2025.
Road work begins
.001 MILE(S) BEFORE RT W S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
CRD N W SERVICE RD W West
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
SURVEYING
Scheduled from 07-APR-2025 to 07-APR-2025.
Road work begins
.001 MILE(S) AFTER MO 47 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 70 E East
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.201 MILE(S) BEFORE RP IS70E TO W WARRENTON BLVD E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route RT A N North
-
WEBSTER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins
US 60 E.
Work will be done
7 days a week.
State Route RT A S South
-
WEBSTER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins
.243 MILE(S) BEFORE CRD NORMANDY RD E.
Work will be done
7 days a week.
US US 60 E East
-
WEBSTER COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins
.032 MILE(S) AFTER PVT HONOR CAMP LN S.
Work will be done
7 days a week.
US US 60 W West
-
WEBSTER COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins
.096 MILE(S) BEFORE CRD WHITE ROSE LN S.
Work will be done
7 days a week.