WORK ZONES (CLOSED): 20 to report.
Hide
State Route RT K E East
-
BARTON COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.001 MILE(S) BEFORE RT V E.
Scheduled from
19-JUN-2022
to
31-AUG-2022.
State Route RT K W West
-
BARTON COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.008 MILE(S) BEFORE CRD NW 70TH RD E.
Scheduled from
19-JUN-2022
to
31-AUG-2022.
CST MAIN ST N North
-
CHRISTIAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.001 MILE(S) AFTER MO 14 E.
Scheduled from
01-JUN-2022
to
15-AUG-2022.
CST MAIN ST S South
-
CHRISTIAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.014 MILE(S) BEFORE MO 14 E.
Scheduled from
01-JUN-2022
to
15-AUG-2022.
State Route RT KK E East
-
GREENE COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.132 MILE(S) AFTER PVT HIDDEN LAKE LN S.
Scheduled from
02-MAY-2022
to
15-JUL-2022.
State Route MO 96 E East
-
JASPER COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.481 MILE(S) BEFORE CRD 20 S.
Scheduled from
15-JUN-2022
to
04-OCT-2022.
State Route MO 96 W West
-
JASPER COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.011 MILE(S) AFTER CRD 20 S.
Scheduled from
15-JUN-2022
to
04-OCT-2022.
State Route MO 174 E East
-
LAWRENCE COUNTY
- Road Closed
Project Name -
I-44 CORRIDOR BRIDGE BUNDLE DESIN BUILD
BRIDGE RECONSTRUCTION
Road closure begins
.018 MILE(S) AFTER RP MO174 TO IS44W W.
Scheduled from
12-JUN-2022
to
16-SEP-2022.
State Route MO 174 W West
-
LAWRENCE COUNTY
- Road Closed
Project Name -
I-44 CORRIDOR BRIDGE BUNDLE DESIN BUILD
BRIDGE RECONSTRUCTION
Road closure begins
.02 MILE(S) AFTER RP IS44E TO MO174 E.
Scheduled from
12-JUN-2022
to
16-SEP-2022.
State Route MO 37 N North
-
LAWRENCE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.068 MILE(S) BEFORE CST GIBBS AVE S.
Scheduled from
22-MAY-2022
to
19-AUG-2022.
State Route MO 37 S South
-
LAWRENCE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.005 MILE(S) AFTER CST GIBBS AVE S.
Scheduled from
22-MAY-2022
to
19-AUG-2022.
State Route MO 97 N North
-
LAWRENCE COUNTY
- Road Closed
Project Name -
I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins
.493 MILE(S) AFTER CRD 2040 E.
Scheduled from
12-JUN-2022
to
29-JUL-2022.
State Route MO 97 S South
-
LAWRENCE COUNTY
- Road Closed
Project Name -
I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins
.039 MILE(S) AFTER CRD 2030 E.
Scheduled from
12-JUN-2022
to
29-JUL-2022.
State Route RT H E East
-
MCDONALD COUNTY
- Road Closed
CONCRETE BARRIER WALL
Road closure begins
.033 MILE(S) AFTER CST OAK ST E.
Scheduled from
15-JUN-2022
to
01-SEP-2022.
State Route RT H W West
-
MCDONALD COUNTY
- Road Closed
CONCRETE BARRIER WALL
Road closure begins
.041 MILE(S) AFTER CRD MILL CREEK RD S.
Scheduled from
15-JUN-2022
to
01-SEP-2022.
State Route RT E N North
-
NEWTON COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
CST GROVE ST E.
Scheduled from
20-JUN-2022
to
26-SEP-2022.
State Route RT E S South
-
NEWTON COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.001 MILE(S) BEFORE CRD OLD RICHEY RD E.
Scheduled from
20-JUN-2022
to
26-SEP-2022.
Business BU 13 N North
-
POLK COUNTY
- Road Closed
ROADSIDE WORK
Road closure begins
.002 MILE(S) AFTER CST OHIO ST S.
Scheduled from
04-FEB-2022
to
31-OCT-2022.
State Route RT CC N North
-
WEBSTER COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.455 MILE(S) AFTER PVT BROKEN ARROW LN S.
Scheduled from
09-MAY-2022
to
09-SEP-2022.
State Route RT CC S South
-
WEBSTER COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.486 MILE(S) BEFORE PVT BROKEN ARROW LN S.
Scheduled from
09-MAY-2022
to
09-SEP-2022.
Back to Top
WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 66 to report.
Hide
State Route MO 37 N North
-
BARRY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 01-FEB-2022 to 01-AUG-2022.
Road work begins
.051 MILE(S) BEFORE CST BIRCH ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 37 S South
-
BARRY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 01-FEB-2022 to 01-AUG-2022.
Road work begins
.029 MILE(S) AFTER CRD 2228 E.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
BARRY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 29-JUN-2022 to 07-JUL-2022.
Road work begins
MO 86 E.
Work will be done around the clock,
on weekdays only.
State Route RT E W West
-
BARRY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 29-JUN-2022 to 07-JUL-2022.
Road work begins
RT M S.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
BARRY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 21-JUN-2022 to 05-JUL-2022.
Road work begins
MO 76 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
BARTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 21-DEC-2022.
Road work begins
.383 MILE(S) AFTER RP RTEE TO IS49N N.
Work will be done around the clock,
7 days a week.
Interstate IS 49 N North
-
BATES COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-APR-2022 to 31-AUG-2022.
Road work begins
.021 MILE(S) AFTER RT A E.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 49 S South
-
BATES COUNTY
- Expect Delays
MOWING
Scheduled from 23-JUN-2022 to 05-JUL-2022.
Road work begins
1.367 MILE(S) BEFORE RP IS49S TO RTA W.
Work will be done around the clock,
on weekdays only.
State Route RT P N North
-
BATES COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 27-JUN-2022 to 07-JUL-2022.
Road work begins
.085 MILE(S) AFTER CO RTB TO RTP E.
Work will be done around the clock,
on weekdays only.
State Route MO 83 N North
-
BENTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 09-JUN-2022 to 08-JUL-2022.
Road work begins
.965 MILE(S) AFTER RT K S.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
BENTON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 28-MAR-2022 to 31-JUL-2022.
Road work begins
.869 MILE(S) BEFORE MO 52 W.
Work will be done around the clock,
7 days a week.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.012 MILE(S) AFTER BU 65 S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
CST 25TH ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 30-DEC-2022.
Road work begins
.011 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 30-DEC-2022.
Road work begins
.002 MILE(S) BEFORE CST RIDGECREST RD S.
Work will be done around the clock,
on weekdays only.
State Route RT CC W West
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.001 MILE(S) AFTER RT J W.
Work will be done around the clock,
on weekdays only.
State Route RT F E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.012 MILE(S) AFTER BU 65 S.
Work will be done around the clock,
on weekdays only.
State Route RT J W West
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.003 MILE(S) AFTER RT NN S.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-NOV-2023.
Road work begins
.007 MILE(S) BEFORE RT EE E.
Work will be done around the clock,
on weekdays only.
Business BU 60 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-APR-2022 to 31-JUL-2022.
Road work begins
.005 MILE(S) AFTER RT B S.
Work will be done around the clock,
on weekdays only.
Business BU 65 N North
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 15-JUL-2022.
Road work begins
CST GLENSTONE AVE N.
Work will be done around the clock,
on weekdays and Saturdays.
Business BU 65 S South
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 15-JUL-2022.
Road work begins
.005 MILE(S) AFTER CST INDEPENDENCE ST E.
Work will be done around the clock,
on weekdays and Saturdays.
CST MORRIS AVE N North
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JUN-2022 to 27-JUL-2022.
Road work begins
OR 44 E.
Work will be done around the clock,
on weekdays only.
CST MORRIS AVE S South
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JUN-2022 to 27-JUL-2022.
Road work begins
CST SMITH ST E.
Work will be done around the clock,
on weekdays only.
CST REPUBLIC ST E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 15-JUL-2022.
Road work begins
CST BOULDER AVE S.
Work will be done around the clock,
on weekdays and Saturdays.
CST REPUBLIC ST W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 15-JUL-2022.
Road work begins
.005 MILE(S) AFTER OR 60 E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 744 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.005 MILE(S) BEFORE US 160 E.
Work will be done around the clock,
on weekdays and Sundays.
State Route MO 744 W West
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.005 MILE(S) BEFORE US 160 W.
Work will be done around the clock,
on weekdays and Sundays.
Outer Road N OR 44 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JUN-2022 to 27-JUL-2022.
Road work begins
.007 MILE(S) AFTER CST PARK AVE S.
Work will be done around the clock,
on weekdays only.
Outer Road N OR 44 W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JUN-2022 to 27-JUL-2022.
Road work begins
.002 MILE(S) AFTER CST NORTON RD E.
Work will be done around the clock,
on weekdays only.
Ramp RP US60E TO KANSAS EXPY S S South
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.006 MILE(S) AFTER US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT FF N North
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.011 MILE(S) AFTER RT M E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.001 MILE(S) AFTER RT FF S.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-SEP-2022.
Road work begins
.001 MILE(S) AFTER IS 44 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.01 MILE(S) BEFORE MO 744 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 W West
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-SEP-2022.
Road work begins
US 60 W.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 W West
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.01 MILE(S) BEFORE MO 744 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAR-2021 to 15-JUL-2022.
Road work begins
.006 MILE(S) AFTER CST NATIONAL AVE S.
Work will be done around the clock,
on weekdays and Saturdays.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAR-2021 to 15-JUL-2022.
Road work begins
.001 MILE(S) AFTER RP US60E TO US65N N.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 44 W West
-
JASPER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-MAR-2022 to 31-AUG-2022.
Road work begins
.051 MILE(S) AFTER MO 249 S.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 27-JUN-2022 to 08-JUL-2022.
Road work begins
.001 MILE(S) BEFORE RT K E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 27-JUN-2022 to 01-AUG-2022.
Road work begins
.008 MILE(S) AFTER RT H E.
Work will be done around the clock,
on weekdays only.
State Route RT VV E East
-
JASPER COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-JUN-2022 to 26-AUG-2022.
Road work begins
.001 MILE(S) AFTER MO 249 N.
Work will be done around the clock,
on weekdays only.
State Route RT VV W West
-
JASPER COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-JUN-2022 to 26-AUG-2022.
Road work begins
RT AA S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2022 to 29-JUL-2022.
Road work begins
.479 MILE(S) BEFORE RP IS44E TO MO174 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2022 to 29-JUL-2022.
Road work begins
.149 MILE(S) BEFORE RP IS44W TO MO174 W.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-MAY-2022 to 01-AUG-2022.
Road work begins
.002 MILE(S) AFTER RT CC E.
Work will be done around the clock,
on weekdays only.
State Route RT H E East
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2022 to 01-SEP-2022.
Road work begins
MO 90 E.
Work will be done around the clock,
on weekdays only.
State Route RT JJ N North
-
MCDONALD COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 21-JUN-2022 to 05-JUL-2022.
Road work begins
CRD SAWMILL RD E.
Work will be done around the clock,
on weekdays only.
State Route RT D E East
-
NEWTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-MAY-2022 to 01-AUG-2022.
Road work begins
.001 MILE(S) BEFORE CRD MINK S.
Work will be done around the clock,
on weekdays only.
State Route RT FF E East
-
NEWTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-JUN-2022 to 08-JUL-2022.
Road work begins
.006 MILE(S) AFTER LP 49 N.
Work will be done around the clock,
on weekdays only.
State Route RT HH E East
-
NEWTON COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JUN-2022 to 31-JUL-2022.
Road work begins
.009 MILE(S) AFTER CST SOUTH ST E.
Work will be done around the clock,
on weekdays only.
State Route RT HH W West
-
NEWTON COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JUN-2022 to 31-JUL-2022.
Road work begins
.001 MILE(S) AFTER CST SHARTEL RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 13 N North
-
ST. CLAIR COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 27-JUN-2022 to 11-JUL-2022.
Road work begins
.278 MILE(S) AFTER BU 13 S.
Work will be done around the clock,
on weekdays only.
State Route RT P S South
-
ST. CLAIR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 27-JUN-2022 to 07-JUL-2022.
Road work begins
.003 MILE(S) AFTER RR CLINTON SUB S.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
TANEY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-NOV-2023.
Road work begins
.107 MILE(S) AFTER MO 76 W.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 S South
-
VERNON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 21-DEC-2022.
Road work begins
.684 MILE(S) AFTER RP RTK TO IS49S S.
Work will be done around the clock,
7 days a week.
Business BU 60 W West
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-APR-2022 to 31-JUL-2022.
Road work begins
.003 MILE(S) AFTER CST W CENTER ST E.
Work will be done around the clock,
on weekdays only.
State Route RT A N North
-
WEBSTER COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-JUN-2022 to 08-JUL-2022.
Road work begins
.218 MILE(S) AFTER CRD NORMANDY RD E.
Work will be done around the clock,
on weekdays only.
State Route RT A S South
-
WEBSTER COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-JUN-2022 to 08-JUL-2022.
Road work begins
MO 38 E.
Work will be done around the clock,
on weekdays only.
State Route RT DD E East
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 29-JUN-2022 to 07-JUL-2022.
Road work begins
.002 MILE(S) AFTER CST E WASHINGTON ST E.
Work will be done around the clock,
on weekdays only.
State Route RT DD W West
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 29-JUN-2022 to 07-JUL-2022.
Road work begins
.014 MILE(S) AFTER CRD SWALLOW TAIL RD E.
Work will be done around the clock,
on weekdays only.
State Route RT K N North
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2022 to 12-AUG-2022.
Road work begins
.004 MILE(S) AFTER RT BB S.
Work will be done around the clock,
on weekdays only.
State Route RT K S South
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2022 to 12-AUG-2022.
Road work begins
.005 MILE(S) AFTER CST CORDIE ST S.
Work will be done around the clock,
on weekdays only.
State Route RT M E East
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 30-JUN-2022 to 07-JUL-2022.
Road work begins
RT CC S.
Work will be done around the clock,
on weekdays only.
State Route RT M W West
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 30-JUN-2022 to 07-JUL-2022.
Road work begins
.007 MILE(S) BEFORE RT AC S.
Work will be done around the clock,
on weekdays only.
Back to Top
FUTURE WORK ZONES: 51 to report.
Hide
Outer Road E OR 49 N North
-
BARTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.027 MILE(S) AFTER CRD NE 5TH RD E.
Work will be done around the clock,
on weekdays only.
Outer Road E OR 49 S South
-
BARTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
RT EE E.
Work will be done around the clock,
on weekdays only.
Outer Road W OR 49 N North
-
BARTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.002 MILE(S) BEFORE RT DD E.
Work will be done around the clock,
on weekdays only.
Outer Road W OR 49 S South
-
BARTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.009 MILE(S) BEFORE PVT PRIVATE RD E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
BARTON COUNTY
- Expect Delays
MILLING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
.266 MILE(S) AFTER PVT PRIVATE RD E.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
BARTON COUNTY
- Expect Delays
MILLING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
.194 MILE(S) AFTER RT O S.
Work will be done around the clock,
on weekdays only.
State Route RT B E East
-
BATES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 05-JUL-2022 to 14-JUL-2022.
Road work begins
.643 MILE(S) BEFORE CRD SE 4265 S.
Work will be done around the clock,
on weekdays only.
State Route RT AB E East
-
BENTON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-JUL-2022 to 12-JUL-2022.
Road work begins
RT B S.
Work will be done around the clock,
on weekdays only.
State Route RT AB W West
-
BENTON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-JUL-2022 to 12-JUL-2022.
Road work begins
CRD COONEY CREEK RD E.
Work will be done around the clock,
on weekdays only.
State Route RT W N North
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
CRD BETHLEHEM RD E.
Work will be done around the clock,
on weekdays only.
State Route RT W N North
-
BENTON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-JUL-2022 to 11-JUL-2022.
Road work begins
.294 MILE(S) AFTER PVT COUGAR WAY E.
Work will be done around the clock,
on weekdays only.
State Route RT W S South
-
BENTON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-JUL-2022 to 11-JUL-2022.
Road work begins
MO 52 E.
Work will be done around the clock,
on weekdays only.
State Route RT W S South
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
MO 52 E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 N North
-
CEDAR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
.017 MILE(S) AFTER CST MILL S.
Work will be done around the clock,
on weekdays only.
State Route MO 97 S South
-
CEDAR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins
.002 MILE(S) BEFORE CRD 1662 E.
Work will be done around the clock,
on weekdays only.
State Route RT E W West
-
CEDAR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins
MO 97 S.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
CEDAR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
MO 82 E.
Work will be done around the clock,
on weekdays only.
State Route RT U E East
-
DADE COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 06-JUL-2022 to 11-JUL-2022.
Road work begins
.254 MILE(S) BEFORE CRD 237 S.
Work will be done around the clock,
on weekdays only.
State Route RT W E East
-
DADE COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.016 MILE(S) BEFORE RT OO S.
Work will be done around the clock,
on weekdays only.
CST CHESTNUT EXPY E East
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.115 MILE(S) AFTER CST BELCREST AVE S.
Work will be done around the clock,
on weekdays only.
CST CHESTNUT EXPY W West
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.004 MILE(S) AFTER CST INGRAM MILL AVE S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
2.017 MILE(S) AFTER RP RTPP TO IS44E E.
Work will be done around the clock,
on weekdays only.
State Route MO 125 N North
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.118 MILE(S) BEFORE CRD 156 E.
Work will be done around the clock,
on weekdays only.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.019 MILE(S) AFTER CRD E FARM RD 154 E.
Work will be done around the clock,
on weekdays only.
State Route RT D E East
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.383 MILE(S) AFTER CRD 219 E.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.083 MILE(S) AFTER MO 125 S.
Work will be done around the clock,
on weekdays only.
State Route RT H N North
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.004 MILE(S) AFTER LP 44 E.
Work will be done around the clock,
on weekdays only.
State Route RT H S South
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.015 MILE(S) AFTER CST GLENSTONE AVE N.
Work will be done around the clock,
on weekdays only.
State Route RT J N North
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.113 MILE(S) AFTER CRD 168 E.
Work will be done around the clock,
on weekdays only.
State Route RT J S South
-
GREENE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.012 MILE(S) BEFORE CRD 199 S.
Work will be done around the clock,
on weekdays only.
State Route RT U W West
-
GREENE COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 06-JUL-2022 to 11-JUL-2022.
Road work begins
RT V S.
Work will be done around the clock,
on weekdays only.
State Route RT Z N North
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-JUL-2022 to 21-JUL-2022.
Road work begins
.004 MILE(S) BEFORE BK FRISCO HIGHLINE TRL S.
Work will be done around the clock,
on weekdays only.
State Route RT Z S South
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-JUL-2022 to 21-JUL-2022.
Road work begins
.004 MILE(S) BEFORE BK FRISCO HIGHLINE TRL S.
Work will be done around the clock,
on weekdays only.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.048 MILE(S) BEFORE CST GOLDEN AVE S.
Work will be done around the clock,
on weekdays only.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.084 MILE(S) BEFORE RP US60E TO RTFF S.
Work will be done around the clock,
on weekdays only.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.18 MILE(S) BEFORE CST GOLDEN AVE S.
Work will be done around the clock,
on weekdays only.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.014 MILE(S) BEFORE RP US160W TO US60W W.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 05-JUL-2022 to 08-JUL-2022.
Road work begins
.035 MILE(S) BEFORE RP IS44W TO US65S S.
Work will be done around the clock,
on weekdays only.
State Route RT AF S South
-
GREENE COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins
1.062 MILE(S) AFTER CRD 193 S.
Work will be done around the clock,
on weekdays only.
State Route RT PP S South
-
GREENE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins
RT K S.
Work will be done around the clock,
on weekdays only.
State Route RT W W West
-
POLK COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
MO 123 S.
Work will be done around the clock,
on weekdays only.
State Route RT AB N North
-
POLK COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins
CRD 222ND RD S.
Work will be done around the clock,
on weekdays only.
State Route RT P N North
-
ST. CLAIR COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.053 MILE(S) BEFORE RR CLINTON SUB S.
Work will be done around the clock,
on weekdays only.
State Route RT P S South
-
ST. CLAIR COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins
.057 MILE(S) BEFORE RR CLINTON SUB S.
Work will be done around the clock,
on weekdays only.
State Route MO 13 S South
-
ST. CLAIR COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-JUL-2022 to 26-JUL-2022.
Road work begins
.202 MILE(S) AFTER RT B E.
Work will be done around the clock,
on weekdays only.
State Route RT B E East
-
ST. CLAIR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 21-JUL-2022.
Road work begins
.14 MILE(S) AFTER RT H S.
Work will be done around the clock,
on weekdays only.
State Route RT B W West
-
ST. CLAIR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 21-JUL-2022.
Road work begins
MO 13 N.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins
.154 MILE(S) AFTER CRD 622 S.
Work will be done around the clock,
on weekdays only.
State Route RT EE E East
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 07-JUL-2022.
Road work begins
.043 MILE(S) AFTER RT AA S.
Work will be done around the clock,
on weekdays only.
State Route RT AC N North
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 14-JUL-2022.
Road work begins
.039 MILE(S) AFTER CRD CASS RD E.
Work will be done around the clock,
on weekdays only.
State Route RT AC S South
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 14-JUL-2022.
Road work begins
RT M E.
Work will be done around the clock,
on weekdays only.
Back to Top