WORK ZONES (CLOSED): 41 to report. Hide

Road Closed due to work zoneState Route RT O N North - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .028 MILE(S) AFTER CRD SW 60TH RD E.
Scheduled from 07-JUN-2024 to 17-SEP-2024.
Road Closed due to work zoneState Route RT O S South - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) AFTER CRD SW 15TH RD E.
Scheduled from 07-JUN-2024 to 17-SEP-2024.
Road Closed due to work zoneLoop LP 49 N North - BATES COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .012 MILE(S) AFTER CRD NE 6004 E.
Scheduled from 29-MAY-2024 to 28-JUN-2024.
Road Closed due to work zoneLoop LP 49 S South - BATES COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .011 MILE(S) AFTER CRD NW 6002 E.
Scheduled from 29-MAY-2024 to 28-JUN-2024.
Road Closed due to work zoneCRD KASTENDIECK RD E East - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .001 MILE(S) AFTER CRD LAMBETH RD S.
Scheduled from 24-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneCRD KASTENDIECK RD W West - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins CRD VERMULE RD S.
Scheduled from 24-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneCRD VERMULE RD N North - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins CRD KASTENDIECK RD E.
Scheduled from 19-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneCRD VERMULE RD S South - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .02 MILE(S) AFTER MO 14 E.
Scheduled from 19-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT K E East - DADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) BEFORE CRD 181 S.
Scheduled from 18-MAR-2024 to 15-JUL-2024.
Road Closed due to work zoneState Route RT K W West - DADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .007 MILE(S) BEFORE CRD 189 S.
Scheduled from 18-MAR-2024 to 15-JUL-2024.
Road Closed due to work zoneCRD 205 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 205 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 94 E East - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins US 65 S.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCRD 94 W West - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER US 65 N.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCRD HARMONY AVE N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 E.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD HARMONY AVE S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 N North - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .027 MILE(S) AFTER CRD 182 E.
Scheduled from 28-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route MO 125 S South - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .006 MILE(S) AFTER CST NW OUTER RD E.
Scheduled from 28-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route MO 125 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route RT PP N North - GREENE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER RT K S.
Scheduled from 16-MAY-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT PP S South - GREENE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins RT K S.
Scheduled from 16-MAY-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT V N North - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .437 MILE(S) AFTER CRD 33 S.
Scheduled from 17-JUN-2024 to 09-SEP-2024.
Road Closed due to work zoneState Route RT V S South - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .445 MILE(S) AFTER PVT 38 E.
Scheduled from 17-JUN-2024 to 09-SEP-2024.
Road Closed due to work zoneState Route MO 39 N North - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER CRD 2160 E.
Scheduled from 06-MAY-2024 to 28-SEP-2024.
Road Closed due to work zoneState Route MO 39 N North - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .014 MILE(S) AFTER CRD 2100 E.
Scheduled from 18-MAR-2024 to 13-JUL-2024.
Road Closed due to work zoneState Route MO 39 S South - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) AFTER RT OO E.
Scheduled from 18-MAR-2024 to 13-JUL-2024.
Road Closed due to work zoneState Route MO 39 S South - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .025 MILE(S) AFTER CRD 2154 E.
Scheduled from 06-MAY-2024 to 28-SEP-2024.
Road Closed due to work zoneState Route RT C W West - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT CC E.
Scheduled from 13-MAY-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 82 E East - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .006 MILE(S) AFTER OR 82 E.
Scheduled from 28-MAY-2024 to 30-AUG-2024.
Road Closed due to work zoneState Route MO 82 W West - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER CRD SE 150 E.
Scheduled from 28-MAY-2024 to 30-AUG-2024.
Road Closed due to work zoneState Route RT W N North - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .027 MILE(S) AFTER RT Y E.
Scheduled from 03-JUN-2024 to 27-SEP-2024.
Road Closed due to work zoneState Route RT W S South - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .033 MILE(S) AFTER RT EE E.
Scheduled from 03-JUN-2024 to 27-SEP-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 149 to report. Hide

Expect delays due to work zoneState Route MO 86 E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work begins .042 MILE(S) BEFORE MO 76 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 90 W West - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 17-JUN-2024 to 20-JUN-2024.
Road work begins .321 MILE(S) AFTER CST 15TH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT F E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work begins MO 112 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F W West - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work begins MO 86 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN N North - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 17-JUN-2024 to 20-JUN-2024.
Road work begins CRD 2295 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT M N North - BARTON COUNTY - Delays Possible
MOWING
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .025 MILE(S) AFTER CRD BARTON CO BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT M S South - BARTON COUNTY - Delays Possible
MOWING
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN N North - BARTON COUNTY - Delays Possible
MOWING
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .375 MILE(S) AFTER CRD SW CENTRAL RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN S South - BARTON COUNTY - Delays Possible
MOWING
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .066 MILE(S) AFTER RT K E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - BATES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins .29 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins .309 MILE(S) BEFORE LP 49 S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT M S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 7 N North - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 28-JUN-2024.
Road work begins .436 MILE(S) AFTER CRD CREE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 7 S South - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 28-JUN-2024.
Road work begins .002 MILE(S) BEFORE CRD LICKINGTELLER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT T N North - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 17-JUN-2024 to 20-JUN-2024.
Road work begins US 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 83 N North - BENTON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .142 MILE(S) BEFORE RT EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 83 S South - BENTON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .129 MILE(S) AFTER RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Expect delays due to work zonePVT ENGLISH VILLAGE DR E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done on weekdays only.
Expect delays due to work zonePVT ENGLISH VILLAGE DR W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .001 MILE(S) BEFORE US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 01-JUL-2024.
Road work begins .001 MILE(S) AFTER CRD STAIGER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 31-AUG-2024.
Road work begins .001 MILE(S) AFTER CRD LAMBETH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .023 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .009 MILE(S) AFTER RT F W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .011 MILE(S) BEFORE RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .115 MILE(S) BEFORE RP US65S TO MO14 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneUS US 160 W West - CHRISTIAN COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .147 MILE(S) BEFORE RT AA E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 73 N North - DALLAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 30-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Possible delays due to work zoneState Route RT M E East - DALLAS COUNTY - Delays Possible
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 03-JUN-2024 to 26-JUL-2024.
Road work begins .378 MILE(S) BEFORE CRD JONES CREEK RD E.
Work will be done on weekdays only.
Expect delays due to work zoneCST CAMPBELL AVE N North - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 07-JUL-2024.
Road work begins .001 MILE(S) AFTER CST E EL CAMINO ALTO E.
Work will be done 7 days a week.
Expect delays due to work zoneCST CAMPBELL AVE S South - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 07-JUL-2024.
Road work begins .003 MILE(S) AFTER CST REPUBLIC ST E.
Work will be done 7 days a week.
Expect delays due to work zoneCST GLENSTONE AVE N North - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins .002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST GLENSTONE AVE S South - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins .003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins 1.021 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins .558 MILE(S) BEFORE RP IS44W TO RTK N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 125 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .044 MILE(S) AFTER CRD 170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .021 MILE(S) BEFORE RP US60W TO MO13S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 S South - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .229 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 174 W West - GREENE COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAY-2024 to 01-JUL-2024.
Road work begins US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 744 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins US 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 744 W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins .001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT B N North - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins RT MM S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT B S South - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins .022 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM N North - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins .067 MILE(S) BEFORE CRD 140 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM S South - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .01 MILE(S) AFTER CST HINES ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .218 MILE(S) BEFORE RP US60E TO KANSAS EXPY S S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 160 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .087 MILE(S) AFTER US 60 W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .013 MILE(S) AFTER CRD 205 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .073 MILE(S) BEFORE US 160 E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 21-JUN-2024.
Road work begins .004 MILE(S) AFTER CRD 194 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 21-JUN-2024.
Road work begins .245 MILE(S) AFTER CST ILLINOIS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .012 MILE(S) BEFORE RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 21-JUN-2024.
Road work begins .004 MILE(S) BEFORE CRD 194 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-JUL-2024.
Road work begins .001 MILE(S) AFTER CST O NEAL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .086 MILE(S) BEFORE RP BU65 TO US60W W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins CST TIMBERCREST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road work begins .003 MILE(S) BEFORE CRD 94 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 65 S South - GREENE COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins .003 MILE(S) BEFORE CRD VALLEY WATER MILL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Delays Possible
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins .034 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Delays Possible
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins .016 MILE(S) AFTER RP IS44W TO RTK N.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 160 E East - GREENE COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .014 MILE(S) AFTER CRD 182 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT M E East - HENRY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 03-JUN-2024 to 20-JUN-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT M W West - HENRY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 03-JUN-2024 to 20-JUN-2024.
Road work begins MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 13 S South - HENRY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 11-JUN-2024 to 01-JUL-2024.
Road work begins .004 MILE(S) AFTER CST ANTIOCH DR S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 18 E East - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .012 MILE(S) AFTER RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 18 W West - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .032 MILE(S) AFTER CRD NW-401 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Possible delays due to work zoneState Route RT PP N North - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .004 MILE(S) BEFORE CRD SE-80 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneState Route RT PP S South - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneState Route RT U N North - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .106 MILE(S) AFTER CRD SE 850 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT U S South - HENRY COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .137 MILE(S) AFTER CRD SE-550 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-JUN-2024 to 22-JUN-2024.
Road work begins .007 MILE(S) BEFORE CRD CIVIL WAR RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-JUN-2024 to 22-JUN-2024.
Road work begins .032 MILE(S) BEFORE RT D E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT HH E East - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUN-2024 to 18-JUL-2024.
Road work begins CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 43 N North - JASPER COUNTY - Delays Possible
MOWING
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .024 MILE(S) BEFORE RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneOuter Road W OR 49 S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP IS49S TO RTHH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins IS 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP RTHH TO IS49S S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH E East - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .044 MILE(S) BEFORE OR 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .011 MILE(S) AFTER IS 49 S.
Work will be done on weekdays only.
Expect delays due to work zoneCST ODELL ST E East - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-JUL-2024.
Road work begins .001 MILE(S) AFTER CST ASH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST ODELL ST W West - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-JUL-2024.
Road work begins .002 MILE(S) AFTER CST FRISCO ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - LAWRENCE COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins .732 MILE(S) AFTER RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - LAWRENCE COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins .075 MILE(S) AFTER RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 14 W West - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 18-JUN-2024 to 19-JUN-2024.
Road work begins .129 MILE(S) AFTER CRD 2152 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .031 MILE(S) BEFORE CST 1ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .096 MILE(S) BEFORE CST 5TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-JUL-2024.
Road work begins CST CENTRAL AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 01-JUL-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 21-JUN-2024.
Road work begins .005 MILE(S) AFTER CST WESTERN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneCST MAIN ST N North - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-MAY-2024 to 21-JUN-2024.
Road work begins .001 MILE(S) AFTER CST 4TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST MAIN ST S South - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-MAY-2024 to 21-JUN-2024.
Road work begins RT W S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 43 N North - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work begins .001 MILE(S) BEFORE RT PP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 43 S South - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work begins PVT BRIDGE J509 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 59 N North - MCDONALD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .255 MILE(S) BEFORE CST ESTER ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 59 S South - MCDONALD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .009 MILE(S) AFTER CST CHRISTNEY ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 90 E East - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-JUL-2024.
Road work begins .001 MILE(S) AFTER CST WATER ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 90 W West - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-JUL-2024.
Road work begins .001 MILE(S) AFTER CST RAILROAD ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W N North - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-MAY-2024 to 21-JUN-2024.
Road work begins .001 MILE(S) AFTER CST FIFTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W S South - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-MAY-2024 to 21-JUN-2024.
Road work begins .002 MILE(S) AFTER CST 8TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins RP IS44E TO MO43 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins .176 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins .016 MILE(S) AFTER RP LP49S TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 N North - NEWTON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 22-JUL-2024.
Road work begins .008 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT HH E East - NEWTON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 05-JUN-2024 to 28-JUN-2024.
Road work begins .014 MILE(S) AFTER CST KENTLAND DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:30 PM.
Expect delays due to work zoneUS US 60 E East - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work begins .001 MILE(S) AFTER CRD KODIAK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 60 W West - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work begins MO 59 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneBusiness BU 60 W West - NEWTON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .048 MILE(S) AFTER CST W HILL ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O N North - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 08-JUL-2024.
Road work begins .012 MILE(S) AFTER RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT O S South - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 08-JUL-2024.
Road work begins .036 MILE(S) BEFORE CST NORTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work begins CST BLUE EYE BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work begins .128 MILE(S) BEFORE PVT PARADISE LANDING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 265 N North - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-MAY-2024 to 28-JUN-2024.
Road work begins .073 MILE(S) BEFORE CRD COMPTON RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 265 S South - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-MAY-2024 to 28-JUN-2024.
Road work begins .004 MILE(S) AFTER MO 76 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 376 E East - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work begins CST SHEPHERD OF THE HILLS EXP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 376 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 08-JUL-2024.
Road work begins MO 265 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 76 E East - TANEY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work begins CRD HARP LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work begins .053 MILE(S) AFTER CRD MANDOLIN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins .488 MILE(S) BEFORE CRD JONES RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .163 MILE(S) AFTER CRD LEISURE LN E.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 08-JUL-2024.
Road work begins US 65 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins US 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 65 N North - TANEY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUN-2024 to 27-JUN-2024.
Road work begins .077 MILE(S) BEFORE PVT BUFFALO RIDGE BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .174 MILE(S) AFTER CRD LEISURE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 54 E East - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins .018 MILE(S) AFTER CRD 1200 S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins .031 MILE(S) AFTER CRD 1375 S.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 49 N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .029 MILE(S) AFTER RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 49 S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .181 MILE(S) AFTER RP RTTT TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E E East - VERNON COUNTY - Delays Possible
ROAD MIX OVERLAY
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .171 MILE(S) AFTER CRD 2400 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E W West - VERNON COUNTY - Delays Possible
ROAD MIX OVERLAY
Scheduled from 18-JUN-2024 to 20-JUN-2024.
Road work begins .01 MILE(S) AFTER RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT H E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .934 MILE(S) BEFORE CRD 200 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT H W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT M N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT OO E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT OO W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 54 E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .753 MILE(S) BEFORE CRD 200 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 54 W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 17-JUN-2024 to 21-JUN-2024.
Road work begins .031 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - WEBSTER COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 17-JUN-2024 to 29-JUN-2024.
Road work begins .09 MILE(S) AFTER CRD PLANK SCHOOL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - WEBSTER COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins 1.59 MILE(S) AFTER RA IS44E STRAFFORD E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT V E East - WEBSTER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .007 MILE(S) AFTER CRD LOVE RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT V W West - WEBSTER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 10-JUN-2024 to 20-JUN-2024.
Road work begins .003 MILE(S) BEFORE CRD FLINT HOLLOW RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.

Back to Top

FUTURE WORK ZONES: 40 to report. Hide

Expect delays due to work zoneState Route RT K E East - BARTON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road work begins .012 MILE(S) AFTER CRD NW 150TH LN S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT K W West - BARTON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road work begins .011 MILE(S) AFTER CRD NW 145TH LN S.
Work will be done 7 days a week.
Expect delays due to work zoneCRD LAMBETH RD N North - CHRISTIAN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins .006 MILE(S) AFTER US 60 E.
Work will be done 7 days a week.
Expect delays due to work zoneCRD LAMBETH RD S South - CHRISTIAN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins CRD KASTENDIECK RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 14 E East - CHRISTIAN COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 24-JUN-2024 to 01-JUL-2024.
Road work begins US 60 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 24-JUN-2024 to 01-JUL-2024.
Road work begins .001 MILE(S) AFTER CST PINE ST S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work begins .044 MILE(S) AFTER PVT HICKMAN LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT AA E East - DALLAS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneCST SUNSET ST E East - GREENE COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 20-JUN-2024 to 21-JUN-2024.
Road work begins .001 MILE(S) BEFORE MO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST SCHOOLCRAFT FWY S South - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins .008 MILE(S) BEFORE BU 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT C E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 02-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneState Route RT C W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 02-JUL-2024.
Road work begins MO 125 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins .012 MILE(S) BEFORE BU 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneState Route MO 7 N North - HENRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 12-JUL-2024.
Road work begins .093 MILE(S) AFTER RT O S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 7 S South - HENRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 12-JUL-2024.
Road work begins .096 MILE(S) AFTER RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins 1.337 MILE(S) BEFORE RP IS49N TO RTH E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins .12 MILE(S) BEFORE RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 171 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-JUN-2024 to 29-JUN-2024.
Road work begins .02 MILE(S) BEFORE PED RUBY JACK TRAIL E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD 2175 E East - LAWRENCE COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins CRD POINSETTA RD S.
Work will be done 7 days a week.
Expect delays due to work zoneCRD 2175 W West - LAWRENCE COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins US 60 E.
Work will be done 7 days a week.
Expect delays due to work zoneCST ODELL ST E East - LAWRENCE COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins CST ASH ST S.
Work will be done 7 days a week.
Expect delays due to work zoneCST ODELL ST W West - LAWRENCE COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 24-JUN-2024 to 08-JUL-2024.
Road work begins .001 MILE(S) AFTER CST FRISCO ST S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 27-JUN-2024.
Road work begins .001 MILE(S) AFTER CRD 2220 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:30 PM.
Expect delays due to work zoneState Route MO 32 E East - POLK COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 20-JUN-2024 to 20-JUN-2024.
Road work begins .242 MILE(S) AFTER CRD 222ND RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 32 W West - POLK COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 20-JUN-2024 to 20-JUN-2024.
Road work begins .306 MILE(S) BEFORE RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT F N North - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins MO 215 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT F S South - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins .007 MILE(S) AFTER RT KK E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT K N North - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins .355 MILE(S) BEFORE CRD 559TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:30 PM.
Expect delays due to work zoneState Route RT K S South - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins MO 215 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:30 PM.
Expect delays due to work zoneState Route RT Y E East - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins .012 MILE(S) BEFORE MO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT Y W West - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUN-2024 to 26-JUN-2024.
Road work begins CRD 480TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT Z E East - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 26-JUN-2024 to 26-JUN-2024.
Road work begins RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:30 PM.
Expect delays due to work zoneState Route RT Z W West - POLK COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 26-JUN-2024 to 26-JUN-2024.
Road work begins CRD 525TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:30 PM.
Expect delays due to work zoneUS US 160 E East - TANEY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2024 to 05-JUL-2024.
Road work begins .148 MILE(S) BEFORE CRD SILVER CREEK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 160 W West - TANEY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2024 to 05-JUL-2024.
Road work begins .066 MILE(S) BEFORE CRD SIOUX LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT AA W West - WEBSTER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-JUN-2024 to 27-JUN-2024.
Road work begins MO 38 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT P E East - WEBSTER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 25-JUN-2024.
Road work begins .213 MILE(S) AFTER CRD ROUGH COUNTRY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT P W West - WEBSTER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2024 to 25-JUN-2024.
Road work begins .01 MILE(S) AFTER RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT Y E East - WEBSTER COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 24-JUN-2024.
Road work begins .88 MILE(S) AFTER CRD ST LUKE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT Y W West - WEBSTER COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 24-JUN-2024.
Road work begins .042 MILE(S) AFTER CRD WILLOW LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.

Back to Top

INCIDENTS: 0 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 222 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT