WORK ZONES (CLOSED): 11 to report. Hide

Road Closed due to work zoneState Route B East - BATES COUNTY - Road Closed
Project Name - 190118-G02-ROUTE B, BATES
BRIDGE RECONSTRUCTION
Road closure begins AT RT O N.
Scheduled from 08-APR-2019 to 01-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B West - BATES COUNTY - Road Closed
Project Name - 190118-G02-ROUTE B, BATES
BRIDGE RECONSTRUCTION
Road closure begins AT RT M N.
Scheduled from 08-APR-2019 to 01-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B South - BENTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.3 MILES BEFORE RT W S.
Scheduled from 13-MAY-2019 to 15-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B North - BENTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.02 MILES AFTER RT W S.
Scheduled from 13-MAY-2019 to 15-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneEVANS RD East - GREENE COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .02 MILES BEFORE US 65 S.
Scheduled from 01-APR-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneEVANS RD West - GREENE COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CST RIVERBLUFF BLVD E.
Scheduled from 01-APR-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route D East - JASPER COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .98 MILES AFTER CST MAIN ST S.
Scheduled from 03-APR-2019 to 01-SEP-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route D West - JASPER COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .08 MILES AFTER CST IVY RD W.
Scheduled from 01-APR-2019 to 01-SEP-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 43 South - NEWTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER MO 86 E.
Scheduled from 26-MAR-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A East - NEWTON COUNTY - Road Closed
Project Name -
BRIDGE MAINTENANCE
Road closure begins LESS THAN .01 MILES AFTER RT D W.
Scheduled from 26-MAR-2019 to 30-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route PP East - POLK COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.63 MILES AFTER MO 83 N.
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Project Web Page -
News Releases -

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 65 to report. Hide

Expect delays due to work zoneInterstate 49 North - BATES COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .73 MILES BEFORE RT B E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - BENTON COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-APR-2019 to 15-SEP-2019.
Road work begins .02 MILES BEFORE CST COMMERCIAL ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - BENTON COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 17-APR-2019 to 15-SEP-2019.
Road work begins .03 MILES AFTER US 65 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 83 South - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 01-JUN-2019.
Road work begins .05 MILES AFTER MO 7 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM South - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 18-APR-2019 to 01-JUN-2019.
Road work begins 5.95 MILES BEFORE MO 83 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM North - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 18-APR-2019 to 01-JUN-2019.
Road work begins AT US 65 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - CEDAR COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 16-SEP-2019.
Road work begins 1.96 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 West - CEDAR COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 16-SEP-2019.
Road work begins 2.55 MILES BEFORE RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneBusiness 65 South - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .25 MILES BEFORE CST W SOUTH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneSELMORE BLVD North - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .33 MILES BEFORE CST E SOUTH ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 14 East - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .24 MILES BEFORE CST S 3RD ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 245 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.7 MILES AFTER CST CATALPA ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 245 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .52 MILES AFTER MO 215 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.92 MILES BEFORE US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .97 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 97 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.38 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 97 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 3.37 MILES BEFORE RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O East - DADE COUNTY - Expect Delays
Project Name -
ROAD MIX OVERLAY
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .2 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O West - DADE COUNTY - Expect Delays
Project Name -
ROAD MIX OVERLAY
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 2.55 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y East - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .18 MILES BEFORE RT H N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y West - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .86 MILES BEFORE RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - DALLAS COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT CST DALLAS ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins 1.76 MILES AFTER RT P S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 38 East - DALLAS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 22-APR-2019 to 30-MAY-2019.
Road work begins .25 MILES BEFORE RT M W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 64 East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins 1.22 MILES BEFORE PK BEN58 J S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 73 North - DALLAS COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins .64 MILES BEFORE MO 64 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - DALLAS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 22-APR-2019 to 30-MAY-2019.
Road work begins AT MO 38 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 65 North - DALLAS COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins .13 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Road work begins 1.47 MILES BEFORE RT Z S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 65 North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST SUNSHINE ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 65 North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .28 MILES AFTER CST CHESTNUT EXPY W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .06 MILES AFTER MO 266 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-MAR-2019 to 09-AUG-2019.
Road work begins .06 MILES AFTER RT ZZ S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY East - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST SCHOOLCRAFT FWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .04 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 65 South - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-JAN-2019 to 02-DEC-2019.
Road work begins .1 MILES AFTER CST SCHOOLCRAFT FWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - HENRY COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 13-MAY-2019 to 02-JUL-2019.
Road work begins .06 MILES AFTER MO 18 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - HENRY COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 13-MAY-2019 to 02-JUL-2019.
Road work begins 2.83 MILES BEFORE BU 13 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW North - HENRY COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 21-MAY-2019.
Road work begins .08 MILES AFTER CST NORTH ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 83 North - HICKORY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 01-JUN-2019.
Road work begins .04 MILES AFTER US 54 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneE 32ND ST West - JASPER COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JUN-2018 to 31-JUL-2019.
Road work begins .01 MILES AFTER LP 49 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneE 32ND ST East - JASPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JAN-2019 to 31-MAY-2019.
Road work begins .08 MILES AFTER CST DUQUESNE RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneE 32ND ST West - JASPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JAN-2019 to 31-MAY-2019.
Road work begins .2 MILES AFTER IS 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - JASPER COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Road work begins 1.06 MILES AFTER MO 37 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - JASPER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 23-MAY-2019.
Road work begins .83 MILES AFTER LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - JASPER COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 04-MAR-2019 to 30-SEP-2019.
Road work begins 1.53 MILES BEFORE LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 49 North - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins AT RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 49 South - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins 1 MILE BEFORE RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 265 South - LAWRENCE COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 01-MAY-2019 to 23-MAY-2019.
Road work begins .14 MILES BEFORE CST LINCOLN AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 North - LAWRENCE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 27-NOV-2018 to 04-JUL-2019.
Road work begins .26 MILES AFTER CST LINCOLN AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - NEWTON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2019 to 01-JUN-2019.
Road work begins AT CST RANGE LINE RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - NEWTON COUNTY - Expect Delays
Project Name - I-44 GUARDRAIL/RESURFACE PROJECT
GUARD RAIL/CABLE WORK
Scheduled from 04-MAR-2019 to 30-SEP-2019.
Road work begins .43 MILES AFTER LP 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - POLK COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 04-MAR-2019 to 12-JUN-2019.
Road work begins 1.04 MILES AFTER BU 13 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 04-MAR-2019 to 12-JUN-2019.
Road work begins .8 MILES BEFORE BU 13 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-MAY-2019 to 23-MAY-2019.
Road work begins .08 MILES AFTER RT N E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - ST. CLAIR COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins 1 MILE BEFORE RT A E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - ST. CLAIR COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins 1.93 MILES BEFORE RT C W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A East - ST. CLAIR COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2019 to 01-JUN-2019.
Road work begins AT MO 52 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A West - ST. CLAIR COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2019 to 01-JUN-2019.
Road work begins .11 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 176 West - TANEY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route EE West - TANEY COUNTY - Expect Delays
Project Name - ROUTES 176 / EE RESURFACE
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 176 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 22-MAY-2019.
Road work begins 2.43 MILES AFTER RT B S.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 22-MAY-2019.
Road work begins 2.44 MILES AFTER RT B S.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 14-MAY-2019 to 20-MAY-2019.
Road work begins .35 MILES BEFORE RT B N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

FUTURE WORK ZONES: 46 to report. Hide

Expect delays due to work zoneState Route D East - BARRY COUNTY - Expect Delays
Project Name - J7S3274 RESURFACE ROADWAY
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 248 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT East - BARRY COUNTY - Expect Delays
Project Name - J7S3123 RESURFACE PAVEMENT
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 39 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z East - BARRY COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 60 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z West - BARRY COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-OCT-2019.
Road work begins .03 MILES AFTER MO 39 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AA East - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 28-MAY-2019.
Road work begins .04 MILES AFTER MO 18 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AA West - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 28-MAY-2019.
Road work begins AT RT E W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F West - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins .02 MILES AFTER CRD PARK ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F East - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins 2.91 MILES AFTER RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route B West - CEDAR COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .37 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route B East - CEDAR COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .16 MILES AFTER RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 125 North - CHRISTIAN COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 14 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P South - CHRISTIAN COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 1.37 MILES AFTER CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P North - CHRISTIAN COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 2.2 MILES BEFORE CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K West - DADE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .42 MILES AFTER RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K East - DADE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .31 MILES AFTER MO 39 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 22-MAY-2019 to 29-MAY-2019.
Road work begins .78 MILES BEFORE LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 21-MAY-2019 to 27-MAY-2019.
Road work begins .36 MILES AFTER CST NATIONAL AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins 1 MILE AFTER US 65 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AB North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .63 MILES BEFORE CST HUGHES RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AB South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .21 MILES BEFORE CST HUGHES RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .79 MILES BEFORE RT CC E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .02 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 2.25 MILES BEFORE RT CC E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 1.8 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - HENRY COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .61 MILES AFTER RT PP S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - HENRY COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins 1.23 MILES BEFORE RT B E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - HENRY COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .77 MILES AFTER MO 52 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route U North - HENRY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 3.23 MILES AFTER RT Z E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route U South - HENRY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 3.49 MILES BEFORE RT Z W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 96 East - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins .16 MILES BEFORE CRD INCA RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 96 West - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins .07 MILES BEFORE LP 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 266 East - LAWRENCE COUNTY - Expect Delays
Project Name -
CORE DRILLING
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .4 MILES BEFORE CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 266 West - LAWRENCE COUNTY - Expect Delays
Project Name -
CORE DRILLING
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .03 MILES AFTER CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .18 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .04 MILES AFTER RT P W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .69 MILES AFTER CST BROADLAWN BLVD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .21 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .05 MILES AFTER RT NN N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .04 MILES AFTER MO 86 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins 1.85 MILES AFTER RT BB E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D West - STONE COUNTY - Expect Delays
Project Name - J7S3274 RESURFACE ROADWAY
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 265 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT West - STONE COUNTY - Expect Delays
Project Name - J7S3123 RESURFACE PAVEMENT
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins .04 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - TANEY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 2.54 MILES AFTER RT UU W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F East - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT CST MADISON ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM East - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT ZZ S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route ZZ North - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-MAY-2019 to 29-MAY-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

INCIDENTS: 2 to report. Show

Back to Top

FLOODS (CLOSED): 2 to report. Show

Back to Top

FLOODS: 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 219 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT