Interstate IS 44 W West
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 20-JUL-2024.
Road work begins
.315 MILE(S) AFTER MO 185 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Outer Road N OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.156 MILE(S) BEFORE CST WILDWOOD TERRACE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road N OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
on weekdays only.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road N OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.005 MILE(S) AFTER MO 47 S.
Work will be done
on weekdays only.
Outer Road S OR 44 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road S OR 44 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
MO 185 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 100 E East
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.064 MILE(S) AFTER CST BEDFORD CENTER DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 100 W West
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins
.182 MILE(S) BEFORE CST FIFTH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 185 N North
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.018 MILE(S) BEFORE RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 185 S South
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.023 MILE(S) BEFORE RT WW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT HH N North
-
FRANKLIN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins
MO 30 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH S South
-
FRANKLIN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins
RT O E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT WW E East
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
.001 MILE(S) BEFORE RT D S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT WW W West
-
FRANKLIN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins
MO 185 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 55 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins
.208 MILE(S) BEFORE US 61 S.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-MAR-2024 to 15-APR-2025.
Road work begins
.046 MILE(S) AFTER RP SP61E TO IS55S S.
Work will be done
7 days a week.
State Route MO 141 N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.094 MILE(S) AFTER CRD FIEDLER LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 141 S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.234 MILE(S) BEFORE CRD FIEDLER LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 01-NOV-2024.
Road work begins
.039 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done
7 days a week.
State Route MO 21 S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-SEP-2023 to 28-JUN-2024.
Road work begins
.051 MILE(S) AFTER CRD TESSON FERRY RD S.
Work will be done
7 days a week.
Ramp RP IS55N TO US67N N North
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins
.013 MILE(S) AFTER IS 55 N.
Work will be done
on weekdays only.
Ramp RP IS55S TO US67S S South
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins
.005 MILE(S) AFTER IS 55 S.
Work will be done
on weekdays only.
Ramp RP US67N TO IS55N N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins
US 67 N.
Work will be done
on weekdays only.
Ramp RP US67S TO IS55S S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins
US 67 S.
Work will be done
on weekdays only.
Ramp RP US67S TO IS55S S South
-
JEFFERSON COUNTY
- Expect Delays
PAVEMENT STRIPING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
US 67 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 PM
and
05:00 AM.
US US 67 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins
.091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done
on weekdays only.
US US 67 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins
.027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done
on weekdays only.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 24-APR-2024 to 27-APR-2024.
Road work begins
.18 MILE(S) AFTER RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
Outer Road W OR 55 S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.169 MILE(S) AFTER RT TT S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
US US 67 N North
-
JEFFERSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins
.077 MILE(S) BEFORE CRD WOLF HOLLOW RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
.202 MILE(S) AFTER WS IS70W FORISTELL W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP US61S TO US40W W West
-
ST. CHARLES COUNTY
- No Expected Delays
Project Name -
Improve I-70 project #2
SURVEYING
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.023 MILE(S) AFTER US 61 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzvilleCST CAVE SPRINGS RD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.009 MILE(S) BEFORE CST VETERANS MEMORIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST CAVE SPRINGS RD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST TECHNOLOGY DR N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.029 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST ZUMBEHL RD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.002 MILE(S) AFTER OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
CST ZUMBEHL RD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins
.002 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.1 MILE(S) BEFORE RT DD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.053 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
.774 MILE(S) AFTER RP RTDDS TO IS64E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.113 MILE(S) AFTER RP IS64W TO RTDDS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins
1.244 MILE(S) BEFORE RP IS64W TO RTDDS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.249 MILE(S) AFTER CST EXECUTIVE CENTRE PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.01 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 79 N North
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins
.131 MILE(S) AFTER RP SALT RIVER RD TO MO79N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 79 S South
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins
.169 MILE(S) AFTER CRD OLD MONROE RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT D E East
-
ST. CHARLES COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 03-MAY-2024.
Road work begins
.02 MILE(S) AFTER PVT COUNTRY OAKS E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT DD N North
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.002 MILE(S) BEFORE CST WINGHAVEN BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT DD S South
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
CST WINGHAVEN BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.008 MILE(S) AFTER CST CLAYTON RD E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.026 MILE(S) AFTER RP MO340E TO IS270W W.
Work will be done
7 days a week.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 18-MAR-2024 to 26-APR-2024.
Road work begins
.527 MILE(S) AFTER RT OO S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
Interstate IS 55 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done
7 days a week.
State Route MO 100 E East
-
ST. LOUIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins
.04 MILE(S) BEFORE CST WEST COUNTY SHOP CTR DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
03:00 AM
and
01:00 PM.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins
CST SYLVAN PL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
03:00 AM
and
01:00 PM.
State Route MO 141 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 30-APR-2024.
Road work begins
.044 MILE(S) AFTER CST GRAVOIS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 16-MAY-2024.
Road work begins
.006 MILE(S) BEFORE CRD OLD TELEGRAPH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins
.036 MILE(S) BEFORE OR 340 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins
.018 MILE(S) AFTER IS 270 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 364 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins
.005 MILE(S) BEFORE MO 141 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:00 PM.
State Route MO 364 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins
.135 MILE(S) AFTER CRD SEVEN PINES DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
02:00 PM.
Ramp RP RTAB TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-APR-2024 to 31-OCT-2024.
Road work begins
RT AB E.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:05 AM
and
12:00 PM.
US US 67 N North
-
ST. LOUIS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins
.028 MILE(S) AFTER CST CHESTER AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins
.142 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
CST S EATHERTON RD N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST S EATHERTON RD S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Interstate IS 255 N North
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-APR-2024 to 10-MAY-2024.
Road work begins
US 50 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 255 S South
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-APR-2024 to 10-MAY-2024.
Road work begins
.004 MILE(S) BEFORE CRD KOCH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.949 MILE(S) BEFORE RP IS44E TO MO141N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.002 MILE(S) BEFORE MO 141 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 70 E East
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins
.005 MILE(S) AFTER IS 270 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 70 W West
-
ST. LOUIS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins
.096 MILE(S) BEFORE CST SPRINGDALE AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route MO 100 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-APR-2024 to 29-APR-2024.
Road work begins
.028 MILE(S) BEFORE CST DUNKIRK DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins
.016 MILE(S) BEFORE CST BALLWIN MANOR DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins
.047 MILE(S) AFTER CST MANCHESTER RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins
.123 MILE(S) AFTER PVT PRIVATE E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 141 N North
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.009 MILE(S) BEFORE PED PO29 ON MO141 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 141 S South
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins
.002 MILE(S) AFTER RP MO364E TO MO141N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-APR-2024 to 25-APR-2024.
Road work begins
.008 MILE(S) BEFORE CRD BETTYJEAN DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 AM.
State Route MO 267 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 267 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.021 MILE(S) BEFORE CRD TELEGRAPH RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 267 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins
.033 MILE(S) BEFORE CRD NAVAJO DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 267 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.011 MILE(S) BEFORE CRD HOFFMEISTER AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins
.002 MILE(S) BEFORE CST RIVER VALLEY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 367 N North
-
ST. LOUIS COUNTY
- Delays Possible
DIAMOND GRINDING
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.004 MILE(S) AFTER CST LONGRIDGE DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:00 PM.
State Route MO 367 S South
-
ST. LOUIS COUNTY
- Delays Possible
DIAMOND GRINDING
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins
.018 MILE(S) AFTER RP MO367N TO IS270W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:00 PM.
Ramp RP IS55S TO IS270E E East
-
ST. LOUIS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
IS 55 S.
Work will be done
7 days a week.
Ramp RP IS64W TO BRENTWOOD BLVD N North
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
.027 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route RT CC E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT D E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins
.049 MILE(S) BEFORE RR TRRA WEST BELT E.
Work will be done
7 days a week.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins
.012 MILE(S) AFTER CST PURDUE AVE S.
Work will be done
7 days a week.
State Route RT U N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 10-MAY-2024.
Road work begins
.01 MILE(S) AFTER MO 115 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JAN-2024 to 01-MAY-2024.
Road work begins
.007 MILE(S) BEFORE CRD SCHUETZ RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-FEB-2024 to 01-MAY-2024.
Road work begins
.029 MILE(S) BEFORE CST NORTH TEALBROOK DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.006 MILE(S) AFTER CST WHITEHALL MANOR DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
CST COMPTON AVE N North
-
ST. LOUIS CITY
- Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins
.003 MILE(S) BEFORE OR 64 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST COMPTON AVE S South
-
ST. LOUIS CITY
- Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins
.001 MILE(S) AFTER CST FOREST PARK AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 44 E East
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.035 MILE(S) AFTER RP IS44E TO WASHINGTON AVE N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 44 W West
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.034 MILE(S) BEFORE RV 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 19-APR-2024 to 08-MAY-2024.
Road work begins
.001 MILE(S) AFTER RP GASCONADE ST TO IS55N N.
Work will be done
7 days a week.
Interstate IS 55 S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done
7 days a week.
Ramp RP IS64W TO FOREST PARK AVE W West
-
ST. LOUIS CITY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 270 W West
-
ST. LOUIS CITY
- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins
.053 MILE(S) AFTER RT H S.
Work will be done
7 days a week.
Work will be conducted between the hours of
12:00 AM
and
12:00 PM.
Interstate IS 55 N North
-
ST. LOUIS CITY
- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins
.049 MILE(S) BEFORE CST UTAH ST E.
Work will be done
on weekdays only.
Interstate IS 64 E East
-
ST. LOUIS CITY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins
.183 MILE(S) BEFORE PED SCIENCE OVERPASS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 100 E East
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST VANDEVENTER AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 100 W West
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.004 MILE(S) AFTER CST 39TH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP HAMPTON CONCOURSE N TO IS64E E East
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
CST HAMPTON AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS64E TO HAMPTON CONCOURSE N North
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-MAR-2024 to 31-MAY-2024.
Road work begins
.008 MILE(S) AFTER RP IS64E TO HAMPTON CONCOURSE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
10:00 AM.
Ramp RP IS64E TO HAMPTON CONCOURSE S South
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS64W TO HAMPTON CONCOURSE S South
-
ST. LOUIS CITY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins
IS 64 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.