WORK ZONES (CLOSED): 8 to report. Hide

Road Closed due to work zoneState Route A South - CLARK COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.99 MILES BEFORE CST JEFFERSON ST W.
Scheduled from 14-APR-2019 to 26-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route A North - CLARK COUNTY - Road Closed
Project Name - RT. A CLARK CO. BRIDGE REPLACEMENT S. WYACONDA
BRIDGE RECONSTRUCTION
Road closure begins 1.9 MILES AFTER CST JEFFERSON ST W.
Scheduled from 15-APR-2019 to 27-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route A North - MARION COUNTY - Road Closed
Project Name - ROUTE A BRIDGE REDECK
BRIDGE RECONSTRUCTION
Road closure begins 1.3 MILES BEFORE RT M E.
Scheduled from 13-MAY-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A South - MARION COUNTY - Road Closed
Project Name - ROUTE A BRIDGE REDECK
BRIDGE RECONSTRUCTION
Road closure begins AT RT M W.
Scheduled from 13-MAY-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 63 South - SCHUYLER COUNTY - Road Closed
Project Name - J2P2194
BRIDGE RECONSTRUCTION
Road closure begins 1.62 MILES BEFORE MO 202 W.
Scheduled from 13-MAY-2019 to 21-JUN-2019.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER NORTH FORK MIDDLE FABIUS RIVER 1.6 MILES NORTH OF RT. 136 NEAR LANCASTER
Road Closed due to work zoneUS 63 North - SCHUYLER COUNTY - Road Closed
Project Name - J2P2194
BRIDGE RECONSTRUCTION
Road closure begins 1.59 MILES AFTER MO 202 E.
Scheduled from 13-MAY-2019 to 21-JUN-2019.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER NORTH FORK MIDDLE FABIUS RIVER 1.6 MILES NORTH OF RT. 136 NEAR LANCASTER
Road Closed due to work zoneState Route M South - SCOTLAND COUNTY - Road Closed
Project Name - RT. M SCOTLAND CO. BRIDGE REPLACEMENT INDIAN CREEK
BRIDGE RECONSTRUCTION
Road closure begins 1.07 MILES AFTER RT MM N.
Scheduled from 01-APR-2019 to 03-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route M North - SCOTLAND COUNTY - Road Closed
Project Name - RT. M SCOTLAND CO. BRIDGE REPLACEMENT INDIAN CREEK
BRIDGE RECONSTRUCTION
Road closure begins 1.11 MILES BEFORE RT MM N.
Scheduled from 01-APR-2019 to 03-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 43 to report. Hide

Expect delays due to work zoneState Route 6 West - ADAIR COUNTY - Expect Delays
Project Name - J2P3132
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 20-AUG-2019.
Road work begins .94 MILES BEFORE MO 149 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - RESURFACE FROM CHARITION RIVER BRIDGE NEAR NOVINGER TO RT. 129 SULLIVAN CO. LINE
Expect delays due to work zoneState Route D West - ADAIR COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 17-JUN-2019 to 25-JUN-2019.
Road work begins AT MO 149 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D East - ADAIR COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 17-JUN-2019 to 25-JUN-2019.
Road work begins 5.03 MILES AFTER CST FRONT ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .3 MILES BEFORE US 54 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .3 MILES BEFORE RT BB W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB East - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 09-SEP-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB West - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 09-SEP-2019.
Road work begins .2 MILES BEFORE US 54 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - ROUNDABOUT INTERSECTION IMPROV.-SCOTT'S CORNER
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .41 MILES BEFORE RT BB W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/8052
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneUS 54 West - AUDRAIN COUNTY - Expect Delays
Project Name - ROUNDABOUT INTERSECTION IMPROV.-SCOTT'S CORNER
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .5 MILES BEFORE RT BB E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/8052
Expect delays due to work zoneState Route 81 South - CLARK COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 28-MAY-2019 to 26-JUL-2019.
Road work begins AT US 136 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 81 North - LEWIS COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 28-MAY-2019 to 26-JUL-2019.
Road work begins .02 MILES AFTER MO 16 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 79 North - LINCOLN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins 2.72 MILES AFTER CST MAIN ST N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route E East - LINCOLN COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 17-JUN-2019 to 17-JUL-2019.
Road work begins AT RT UU N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route E West - LINCOLN COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 17-JUN-2019 to 17-JUL-2019.
Road work begins AT RT B E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - LINCOLN COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 17-JUN-2019 to 17-JUL-2019.
Road work begins AT RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - LINCOLN COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 17-JUN-2019 to 17-JUL-2019.
Road work begins AT RT E W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - LINCOLN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .37 MILES BEFORE RT KK W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - LINCOLN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .05 MILES AFTER CST DUGAN LN W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 East - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins 3.02 MILES AFTER RT K S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneState Route 110 West - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins AT US 36 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW/MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneUS 24 East - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 24 West - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins 4.28 MILES BEFORE US 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 North - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 South - MARION COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 23-MAY-2019 to 26-JUL-2019.
Road work begins 1.18 MILES AFTER RT W E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins .89 MILES BEFORE US 24 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneInterstate 70 West - MONTGOMERY COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 05-JUN-2019 to 31-AUG-2020.
Road work begins 2.21 MILES AFTER MO 161 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - MONTGOMERY COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 13-JUN-2019 to 22-JUN-2019.
Road work begins 2.2 MILES AFTER MO 161 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - MONTGOMERY COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 30-JUN-2019.
Road work begins .13 MILES BEFORE US 40 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - MONTGOMERY COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 30-JUN-2019.
Road work begins .12 MILES AFTER IS 70 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K East - MONTGOMERY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-JUN-2019 to 27-JUN-2019.
Road work begins .26 MILES AFTER RT P S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K West - MONTGOMERY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-JUN-2019 to 27-JUN-2019.
Road work begins 2.02 MILES BEFORE RT P N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 94 East - MONTGOMERY COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 17-JUN-2019 to 27-JUN-2019.
Road work begins 5.05 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 94 West - MONTGOMERY COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 17-JUN-2019 to 27-JUN-2019.
Road work begins AT RT P S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 79 South - PIKE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .11 MILES AFTER CST 3RD ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - PIKE COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins .15 MILES AFTER MO 79 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneUS 61 North - RALLS COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 23-MAY-2019 to 26-JUL-2019.
Road work begins AT CST WARREN BARRETT DR E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC West - WARREN COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-JUN-2019 to 26-JUN-2019.
Road work begins 4.21 MILES BEFORE MO 47 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC East - WARREN COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-JUN-2019 to 26-JUN-2019.
Road work begins AT MO 47 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W South - WARREN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 10-JUN-2019 to 15-JUL-2019.
Road work begins AT RT A S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W North - WARREN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 10-JUN-2019 to 15-JUL-2019.
Road work begins LESS THAN .01 MILES BEFORE OR 70 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 47 South - WARREN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 09-SEP-2016 to 01-AUG-2019.
Road work begins .85 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 47 South - WARREN COUNTY - Delays Possible
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-JUN-2019 to 03-JUL-2019.
Road work begins .19 MILES BEFORE CST FRANKLIN ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

FUTURE WORK ZONES: 60 to report. Hide

Expect delays due to work zoneState Route K North - ADAIR COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins AT MO 11 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K South - ADAIR COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins AT MO 149 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y North - AUDRAIN COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins AT MO 22 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y North - AUDRAIN COUNTY - Expect Delays
Project Name -
CINDER SEAL OVERLAY
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins AT MO 22 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K North - CLARK COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT US 136 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K North - CLARK COUNTY - CLOSED
Project Name -
CINDER SEAL OVERLAY
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins AT RT N W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K South - CLARK COUNTY - CLOSED
Project Name -
CINDER SEAL OVERLAY
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins 7.94 MILES BEFORE RT N W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K South - CLARK COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT RT N W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route N West - CLARK COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins AT RT K N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB South - KNOX COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT MO 15 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 81 South - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 26-JUN-2019.
Road work begins 3.38 MILES AFTER RT E W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 81 North - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 26-JUN-2019.
Road work begins 2.7 MILES AFTER MO 16 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J North - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-JUN-2019 to 24-JUN-2019.
Road work begins 2.87 MILES AFTER MO 156 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J South - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-JUN-2019 to 24-JUN-2019.
Road work begins .5 MILES AFTER MO 6 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - LEWIS COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-JUN-2019 to 25-JUN-2019.
Road work begins 1 MILE BEFORE MO 16 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - LEWIS COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT MO 16 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - LINCOLN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins .06 MILES BEFORE RT KK E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 3 South - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 25-JUN-2019.
Road work begins 3.02 MILES BEFORE CST CHESTNUT ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 3 North - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 25-JUN-2019.
Road work begins 1.52 MILES AFTER CST CHESTNUT ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F South - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins .75 MILES AFTER RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F North - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins 1.73 MILES BEFORE RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J East - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT RT F N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J West - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins .02 MILES AFTER CST MISSOURI AVE W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route KK East - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins AT RT K S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route KK West - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins 2.51 MILES BEFORE RT K N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM South - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM North - MACON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route PP West - MACON COUNTY - CLOSED
Project Name - J2S3070
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2019 to 22-SEP-2019.
Road work begins 1.06 MILES AFTER RT V N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER WINN BRANCH 1 MILES WEST OF RT. V NEAR MACON. LENGTH OF IMPROVEMENT 0.09 MI.
Expect delays due to work zoneState Route PP East - MACON COUNTY - CLOSED
Project Name - J2S3070
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2019 to 22-SEP-2019.
Road work begins 1.09 MILES BEFORE RT V S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER WINN BRANCH 1 MILES WEST OF RT. V NEAR MACON. LENGTH OF IMPROVEMENT 0.09 MI.
Expect delays due to work zoneState Route KK East - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins .58 MILES AFTER MO 15 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route KK West - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins 1.28 MILES BEFORE MO 15 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route V North - MONROE COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 25-JUN-2019 to 27-JUN-2019.
Road work begins AT RT FF E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y South - MONROE COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins 3.93 MILES AFTER RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y South - MONROE COUNTY - Expect Delays
Project Name -
CINDER SEAL OVERLAY
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins 3.93 MILES AFTER RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route E North - PIKE COUNTY - CLOSED
Project Name - BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2019 to 01-OCT-2019.
Road work begins 1 MILE AFTER RT M S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route E South - PIKE COUNTY - CLOSED
Project Name - BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2019 to 01-OCT-2019.
Road work begins 2.49 MILES BEFORE RT M S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 61 South - RALLS COUNTY - CLOSED
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-JUN-2019 to 01-JUL-2019.
Road work begins AT MO 19 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 61 North - RALLS COUNTY - CLOSED
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-JUN-2019 to 01-JUL-2019.
Road work begins 1.58 MILES BEFORE MO 19 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A West - RALLS COUNTY - CLOSED
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A East - RALLS COUNTY - CLOSED
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins AT RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC North - RANDOLPH COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins AT RT K W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC South - RANDOLPH COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 26-JUN-2019 to 27-JUN-2019.
Road work begins AT RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J East - RANDOLPH COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2019 to 25-JUN-2019.
Road work begins AT US 63 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J West - RANDOLPH COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 24-JUN-2019 to 25-JUN-2019.
Road work begins 1.71 MILES BEFORE RT Y W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 North - SCHUYLER COUNTY - Delays Possible
Project Name - J2P2194 RT. 63 SCHUYLER CO.
BRIDGE RECONSTRUCTION
Scheduled from 22-JUN-2019 to 12-JUL-2019.
Road work begins 1.59 MILES AFTER MO 202 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER N. FORK MIDDLE FABIUS RIVER 1.6 MILES N. OF RT. 136 NEAR LANCASTER
Possible delays due to work zoneUS 63 South - SCHUYLER COUNTY - Delays Possible
Project Name - J2P2194 RT. 63 SCHUYLER CO.
BRIDGE RECONSTRUCTION
Scheduled from 22-JUN-2019 to 12-JUL-2019.
Road work begins 1.62 MILES BEFORE MO 202 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER N. FORK MIDDLE FABIUS RIVER 1.6 MILES N. OF RT. 136 NEAR LANCASTER
Expect delays due to work zonePROVIDENCE ST North - SCOTLAND COUNTY - CLOSED
Project Name -
RAILROAD MAINTENANCE
Scheduled from 22-JUN-2019 to 01-JUL-2019.
Road work begins AT RT U W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zonePROVIDENCE ST South - SCOTLAND COUNTY - CLOSED
Project Name -
RAILROAD MAINTENANCE
Scheduled from 22-JUN-2019 to 01-JUL-2019.
Road work begins .02 MILES BEFORE RT U E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route N East - SCOTLAND COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 24-JUN-2019 to 26-JUN-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB North - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-JUN-2019 to 26-JUN-2019.
Road work begins AT RT M W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P East - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins 3.93 MILES BEFORE MO 15 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P West - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 27-JUN-2019 to 27-JUN-2019.
Road work begins AT MO 15 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT North - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 25-JUN-2019.
Road work begins AT RT DD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT South - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-JUN-2019 to 25-JUN-2019.
Road work begins AT MO 110 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route V South - SHELBY COUNTY - CLOSED
Project Name -
ROAD MIX OVERLAY
Scheduled from 25-JUN-2019 to 27-JUN-2019.
Road work begins AT US 36 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z North - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-JUN-2019 to 24-JUN-2019.
Road work begins AT US 36 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z South - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-JUN-2019 to 24-JUN-2019.
Road work begins AT RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O South - WARREN COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-JUN-2019 to 01-JUL-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O North - WARREN COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-JUN-2019 to 01-JUL-2019.
Road work begins AT MO 47 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route T South - WARREN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-JUN-2019 to 28-JUN-2019.
Road work begins 1.25 MILES AFTER RT M W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

INCIDENTS: 10 to report. Show

Back to Top

FLOODS (CLOSED): 28 to report. Show

Back to Top

FLOODS: 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 59 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT