WORK ZONES (CLOSED): 21 to report. Hide

Road Closed due to work zoneState Route MO 11 N North - ADAIR COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .183 MILE(S) AFTER CRD QUINN WAY S.
Scheduled from 11-APR-2022 to 19-AUG-2022.
News Releases - S0807 S. FORK SOUTH FABIUS RIVER
Road Closed due to work zoneState Route MO 11 N North - ADAIR COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .433 MILE(S) BEFORE CRD CLAY WAY S.
Scheduled from 11-APR-2022 to 19-AUG-2022.
News Releases - S0569 FLOYD CREEK
Road Closed due to work zoneState Route MO 11 S South - ADAIR COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .208 MILE(S) BEFORE CRD QUINN WAY S.
Scheduled from 11-APR-2022 to 19-AUG-2022.
News Releases - S0807 S. FORK SOUTH FABIUS RIVER
Road Closed due to work zoneState Route MO 11 S South - ADAIR COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .405 MILE(S) AFTER CRD CLAY WAY S.
Scheduled from 11-APR-2022 to 19-AUG-2022.
News Releases - S0569 FLOYD CREEK
Road Closed due to work zoneState Route RT J E East - AUDRAIN COUNTY - Road Closed
Project Name - basinger roundabout
INTERSECTION IMPROVEMENTS
Road closure begins .424 MILE(S) BEFORE US 54 E.
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road Closed due to work zoneState Route RT J W West - AUDRAIN COUNTY - Road Closed
Project Name - basinger roundabout
INTERSECTION IMPROVEMENTS
Road closure begins US 54 E.
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road Closed due to work zoneState Route RT E E East - LEWIS COUNTY - Road Closed
Project Name - FARM BRIDGE
BRIDGE RECONSTRUCTION
Road closure begins .259 MILE(S) AFTER CRD 453 (215TH AVE) S.
Scheduled from 28-FEB-2022 to 06-JUL-2022.
News Releases - RT. E P0207 SUGAR CREEK
Road Closed due to work zoneState Route RT E E East - LEWIS COUNTY - Road Closed
Project Name - Farm bridge derrah's branch
BRIDGE RECONSTRUCTION
Road closure begins .228 MILE(S) BEFORE CRD 456 (120TH AVE) E.
Scheduled from 13-JUN-2022 to 20-OCT-2022.
Road Closed due to work zoneState Route RT E W West - LEWIS COUNTY - Road Closed
Project Name - FARM BRIDGE
BRIDGE RECONSTRUCTION
Road closure begins .329 MILE(S) BEFORE CRD 453 (215TH AVE) S.
Scheduled from 28-FEB-2022 to 06-JUL-2022.
News Releases - RT. E P0207 SUGAR CREEK
Road Closed due to work zoneState Route RT E W West - LEWIS COUNTY - Road Closed
Project Name - Farm bridge derrah's branch
BRIDGE RECONSTRUCTION
Road closure begins .205 MILE(S) AFTER CRD 456 (120TH AVE) E.
Scheduled from 13-JUN-2022 to 20-OCT-2022.
Road Closed due to work zoneUS US 24 E East - MARION COUNTY - Road Closed
Project Name - 24- bridge closure
BRIDGE MAINTENANCE
Road closure begins .004 MILE(S) BEFORE OR 24 E.
Scheduled from 18-APR-2022 to 30-JUL-2022.
Road Closed due to work zoneState Route MO 161 N North - PIKE COUNTY - Road Closed
Project Name - bowling green roundabout
INTERSECTION IMPROVEMENTS
Road closure begins .037 MILE(S) BEFORE BU 61 S.
Scheduled from 31-MAY-2022 to 11-JUL-2022.
Road Closed due to work zoneState Route MO 161 S South - PIKE COUNTY - Road Closed
Project Name - bowling green roundabout
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER BU 61 S.
Scheduled from 31-MAY-2022 to 11-JUL-2022.
Road Closed due to work zoneState Route RT A N North - SCHUYLER COUNTY - Road Closed
Project Name - Farm bridge brushy creek
BRIDGE RECONSTRUCTION
Road closure begins .314 MILE(S) AFTER CRD LOG CABIN TRL E.
Scheduled from 02-MAY-2022 to 30-SEP-2022.
Road Closed due to work zoneState Route RT A S South - SCHUYLER COUNTY - Road Closed
Project Name - Farm bridge brushy creek
BRIDGE RECONSTRUCTION
Road closure begins .377 MILE(S) BEFORE CRD LOG CABIN TRL E.
Scheduled from 02-MAY-2022 to 30-SEP-2022.
Road Closed due to work zoneState Route RT C E East - SCHUYLER COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .069 MILE(S) BEFORE CRD HULEN DR S.
Scheduled from 11-APR-2022 to 12-AUG-2022.
News Releases - P0233 NORTH FORK MID FABIUS RIVER
Road Closed due to work zoneState Route RT C W West - SCHUYLER COUNTY - Road Closed
Project Name - FARM BRIDGE PROGRAM
BRIDGE RECONSTRUCTION
Road closure begins .039 MILE(S) AFTER CRD HULEN DR S.
Scheduled from 11-APR-2022 to 12-AUG-2022.
News Releases - P0233 NORTH FORK MID FABIUS RIVER
Road Closed due to work zoneState Route RT M N North - SCHUYLER COUNTY - Road Closed
Project Name - Farm bridge SOUTH FORK NORTH FABIUS RIVER
BRIDGE RECONSTRUCTION
Road closure begins .295 MILE(S) BEFORE CRD ALL SHIRE SCHOOL DR E.
Scheduled from 18-JUN-2022 to 31-OCT-2022.
Road Closed due to work zoneState Route RT M S South - SCHUYLER COUNTY - Road Closed
Project Name - Farm bridge SOUTH FORK NORTH FABIUS RIVER
BRIDGE RECONSTRUCTION
Road closure begins .26 MILE(S) AFTER CRD ALL SHIRE SCHOOL DR E.
Scheduled from 18-JUN-2022 to 31-OCT-2022.
Road Closed due to work zoneState Route RT C E East - SCOTLAND COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .282 MILE(S) BEFORE CRD 861 S.
Scheduled from 27-JUN-2022 to 03-OCT-2022.
Road Closed due to work zoneState Route RT C W West - SCOTLAND COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .176 MILE(S) AFTER CRD 861 S.
Scheduled from 27-JUN-2022 to 03-OCT-2022.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 21 to report. Hide

Possible delays due to work zoneCST BALTIMORE ST N North - ADAIR COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-JUN-2022 to 15-AUG-2022.
Road work begins .003 MILE(S) BEFORE MO 6 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneCST BALTIMORE ST S South - ADAIR COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-JUN-2022 to 15-AUG-2022.
Road work begins .139 MILE(S) BEFORE CST BREWINGTON AVE E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneCST BREWINGTON AVE E East - ADAIR COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-JUN-2022 to 15-AUG-2022.
Road work begins .014 MILE(S) AFTER RT B S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneCST BREWINGTON AVE W West - ADAIR COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-JUN-2022 to 15-AUG-2022.
Road work begins .001 MILE(S) AFTER BU 63 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route MO 19 N North - AUDRAIN COUNTY - Expect Delays
Project Name - Basinger Roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road work begins .227 MILE(S) BEFORE CO US54 TO US54 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route MO 19 S South - AUDRAIN COUNTY - Expect Delays
Project Name - Basinger Roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road work begins .202 MILE(S) BEFORE US 54 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS US 54 E East - AUDRAIN COUNTY - Expect Delays
Project Name - basinger roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road work begins .308 MILE(S) BEFORE CO US54 TO US54 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS US 54 W West - AUDRAIN COUNTY - Expect Delays
Project Name - basinger roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 16-JUN-2022 to 01-DEC-2022.
Road work begins .226 MILE(S) BEFORE CO US54 TO US54 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route RT A S South - CLARK COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 21-JUN-2022 to 30-AUG-2022.
Road work begins US 136 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route RT A N North - LEWIS COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 21-JUN-2022 to 30-AUG-2022.
Road work begins RT E E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route MO 79 N North - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2022 to 01-NOV-2022.
Road work begins .509 MILE(S) BEFORE PVT WEHDE LN E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route MO 79 S South - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2022 to 01-NOV-2022.
Road work begins .006 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS US 61 N North - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUN-2022 to 01-NOV-2022.
Road work begins .066 MILE(S) BEFORE RT V E.
Work will be done around the clock, on weekdays and Saturdays.
No delays expected due to work zoneUS US 24 W West - MARION COUNTY - No Expected Delays
Project Name - 24- bridge closure
BRIDGE MAINTENANCE
Scheduled from 18-APR-2022 to 30-JUL-2022.
Road work begins .618 MILE(S) BEFORE OR 24 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route RT U E East - MONROE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 26-MAY-2022 to 12-AUG-2022.
Road work begins .697 MILE(S) BEFORE MO 107 S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route RT U W West - MONROE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 26-MAY-2022 to 12-AUG-2022.
Road work begins MO 107 S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate IS 70 W West - MONTGOMERY COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 28-JUN-2022 to 08-JUL-2022.
Road work begins .333 MILE(S) AFTER RT N S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneBusiness BU 61 N North - PIKE COUNTY - Expect Delays
Project Name - Bowling Green Roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 26-MAY-2022 to 01-NOV-2022.
Road work begins .045 MILE(S) BEFORE MO 161 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneBusiness BU 61 S South - PIKE COUNTY - Expect Delays
Project Name - Bowling Green Roundabout
INTERSECTION IMPROVEMENTS
Scheduled from 26-MAY-2022 to 01-NOV-2022.
Road work begins .026 MILE(S) BEFORE MO 161 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route MO 79 N North - PIKE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-APR-2022 to 01-NOV-2022.
Road work begins RR KC SOUTHERN S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route MO 79 S South - RALLS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-APR-2022 to 01-NOV-2022.
Road work begins RT N E.
Work will be done around the clock, on weekdays and Saturdays.

Back to Top

FUTURE WORK ZONES: 56 to report. Hide

Expect delays due to work zoneState Route RT K N North - ADAIR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins MO 11 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT K S South - ADAIR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins MO 6 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT O N North - AUDRAIN COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .008 MILE(S) AFTER RT J E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Y N North - AUDRAIN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .02 MILE(S) BEFORE CRD 110 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Y S South - AUDRAIN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .202 MILE(S) BEFORE RR MEXICO SUB E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT ZZ N North - AUDRAIN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 11-JUL-2022.
Road work begins RT Z S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT HH N North - CLARK COUNTY - CLOSED
Project Name - hh- seal coat (cinder/chip)
SEAL COAT OVERLAY
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins CRD 249 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT HH S South - CLARK COUNTY - CLOSED
Project Name - hh- seal coat (cinder/chip)
SEAL COAT OVERLAY
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins RT Y E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT W E East - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT W E East - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT W W West - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins RT D E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT W W West - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins RT D E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z E East - CLARK COUNTY - CLOSED
Project Name - z- resurfacing with cold mix
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins MO 81 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z E East - CLARK COUNTY - CLOSED
Project Name - z- seal coat (cinder/chip)
RESURFACING PAVEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins MO 81 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z E East - CLARK COUNTY - CLOSED
Project Name - z- resurfacing with cold mix
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins MO 81 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z W West - CLARK COUNTY - CLOSED
Project Name - z- resurfacing with cold mix
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .001 MILE(S) AFTER US 61 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z W West - CLARK COUNTY - CLOSED
Project Name - z- resurfacing with cold mix
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .001 MILE(S) AFTER US 61 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT Z W West - CLARK COUNTY - CLOSED
Project Name - z- seal coat (cinder/chip)
RESURFACING PAVEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins .001 MILE(S) AFTER US 61 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route RT U W West - CLARK COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 07-JUL-2022 to 02-AUG-2022.
Road work begins RT A S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route RT E E East - LEWIS COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins RT K E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT E W West - LEWIS COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .01 MILE(S) AFTER RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route MO 47 N North - LINCOLN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .006 MILE(S) BEFORE RT H S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route MO 47 S South - LINCOLN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins MO 79 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT P S South - MACON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .004 MILE(S) AFTER CRD DECOY ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT J E East - MACON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .001 MILE(S) BEFORE MO 3 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT J W West - MACON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins US 63 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT RA N North - MACON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins CRD JARGON PL E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT RA S South - MACON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins RT J E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT D E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .001 MILE(S) BEFORE CRD 689 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT D W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .001 MILE(S) AFTER CRD 699 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT K E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .098 MILE(S) BEFORE CRD 1133 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT K E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins .001 MILE(S) BEFORE CRD 1133 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT K W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins .081 MILE(S) BEFORE CRD 1133 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT K W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .001 MILE(S) AFTER CRD 1133 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT O S South - MONROE COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins RT D E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT ZZ S South - MONROE COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 11-JUL-2022.
Road work begins RT D E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT MM E East - MONTGOMERY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins .008 MILE(S) BEFORE CRD POST OAK SCH RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT MM W West - MONTGOMERY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 06-JUL-2022.
Road work begins .002 MILE(S) AFTER CRD SHOOTING STAR RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate IS 70 E East - MONTGOMERY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-JUL-2022 to 09-JUL-2022.
Road work begins 1.274 MILE(S) AFTER RP MO19 TO IS70E E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate IS 70 W West - MONTGOMERY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .651 MILE(S) BEFORE RP IS70W TO RTE W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route RT E E East - MONTGOMERY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2022 to 14-JUL-2022.
Road work begins RT Y E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneState Route RT E W West - MONTGOMERY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2022 to 14-JUL-2022.
Road work begins .031 MILE(S) BEFORE RT Y E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneState Route RT CC E East - RALLS COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins CRD SYCAMORE TRL E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT CC W West - RALLS COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins RT H S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT AA N North - RANDOLPH COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 08-JUL-2022 to 08-JUL-2022.
Road work begins .19 MILE(S) BEFORE RR MEXICO SUB E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT AA S South - RANDOLPH COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 08-JUL-2022 to 08-JUL-2022.
Road work begins .002 MILE(S) BEFORE RR MEXICO SUB E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT U E East - SCOTLAND COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .003 MILE(S) BEFORE RR MARCELINE SUB E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT U W West - SCOTLAND COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 07-JUL-2022 to 07-JUL-2022.
Road work begins .002 MILE(S) AFTER RT A S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route RT U E East - SCOTLAND COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 07-JUL-2022 to 02-AUG-2022.
Road work begins US 136 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS US 36 W West - SHELBY COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2022 to 06-JUL-2022.
Road work begins .001 MILE(S) AFTER CRD 449 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT N N North - WARREN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .001 MILE(S) BEFORE CRD SMITH CREEK RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT N S South - WARREN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 05-JUL-2022 to 05-JUL-2022.
Road work begins .006 MILE(S) BEFORE CRD KERSTEN RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT U N North - WARREN COUNTY - CLOSED
CORE DRILLING
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins MO 94 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT U S South - WARREN COUNTY - CLOSED
CORE DRILLING
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .032 MILE(S) BEFORE CRD MEREMONTE RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT AA E East - WARREN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .003 MILE(S) BEFORE OR 70 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route RT AA W West - WARREN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 05-JUL-2022 to 07-JUL-2022.
Road work begins .603 MILE(S) BEFORE CRD RANCH RD E.
Work will be done around the clock, on weekdays only.

Back to Top

INCIDENTS: 19 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 59 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT