WORK ZONES (CLOSED): 10 to report.
Hide
State Route RT E E East
-
ADAIR COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.178 MILE(S) BEFORE CRD PEARL LN S.
Scheduled from
18-JUN-2025
to
01-DEC-2025.
State Route RT E W West
-
ADAIR COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.028 MILE(S) AFTER CRD PEARL LN S.
Scheduled from
18-JUN-2025
to
01-DEC-2025.
State Route RT V N North
-
ADAIR COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.178 MILE(S) AFTER CRD TWIN OAKS LN E.
Scheduled from
09-APR-2025
to
01-AUG-2025.
State Route RT V S South
-
ADAIR COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.484 MILE(S) BEFORE CRD TWIN OAKS LN E.
Scheduled from
09-APR-2025
to
01-AUG-2025.
State Route RT J E East
-
MACON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.006 MILE(S) AFTER CRD ALPINE AVE S.
Scheduled from
01-JUL-2025
to
01-OCT-2025.
State Route RT J W West
-
MACON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.1 MILE(S) BEFORE CRD ALPINE AVE S.
Scheduled from
01-JUL-2025
to
01-OCT-2025.
State Route RT RA E East
-
MONTGOMERY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.492 MILE(S) BEFORE RT ZZ S.
Scheduled from
09-JUN-2025
to
28-JUL-2025.
State Route RT RA W West
-
MONTGOMERY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.423 MILE(S) AFTER RT ZZ S.
Scheduled from
09-JUN-2025
to
28-JUL-2025.
CRD W VETERANS MEMORIAL PKWY E East
-
WARREN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.001 MILE(S) AFTER RT B S.
Scheduled from
21-JUN-2025
to
21-JUL-2025.
CRD W VETERANS MEMORIAL PKWY W West
-
WARREN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.257 MILE(S) BEFORE RT B S.
Scheduled from
21-JUN-2025
to
21-JUL-2025.
Back to Top
WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 51 to report.
Hide
State Route MO 6 E East
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-JUN-2025 to 01-NOV-2025.
Road work begins
.039 MILE(S) AFTER OR 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 6 W West
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-JUN-2025 to 01-NOV-2025.
Road work begins
.002 MILE(S) AFTER BU 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT V N North
-
ADAIR COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JUN-2025 to 07-JUL-2025.
Road work begins
CRD REDTAIL HAWK LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT V S South
-
ADAIR COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JUN-2025 to 07-JUL-2025.
Road work begins
CST CLINTON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 W West
-
CLARK COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUN-2025 to 01-NOV-2025.
Road work begins
.103 MILE(S) AFTER CRD 138 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 6 W West
-
KNOX COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-JUN-2025 to 01-NOV-2025.
Road work begins
.006 MILE(S) AFTER MO 15 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 15 N North
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-JUN-2025 to 10-JUL-2025.
Road work begins
.29 MILE(S) BEFORE MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 15 S South
-
KNOX COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-JUN-2025 to 10-JUL-2025.
Road work begins
.039 MILE(S) AFTER CST MORGAN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CRD FRENCHMANS BLUFF RD E East
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CRD FRENCHMANS BLUFF RD W West
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
.184 MILE(S) BEFORE CST SARAH ANN BLVD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.014 MILE(S) BEFORE CST NORTH LINCOLN DR S.
Work will be done
7 days a week.
State Route MO 47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.026 MILE(S) AFTER PVT ANNA AVE S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61N N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61S S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP US61N TO MO47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
US 61 N.
Work will be done
7 days a week.
Ramp RP US61S TO MO47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.012 MILE(S) AFTER US 61 S.
Work will be done
7 days a week.
US US 61 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.048 MILE(S) AFTER CST OLD CAP AU GRIS RD E.
Work will be done
7 days a week.
US US 61 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.319 MILE(S) BEFORE CST N LINCOLN DR E.
Work will be done
7 days a week.
US US 63 S South
-
MACON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.039 MILE(S) AFTER CRD KITE PL E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 36 E East
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2025 to 11-JUL-2025.
Road work begins
.44 MILE(S) BEFORE CRD 269 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 36 W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-APR-2025 to 01-NOV-2025.
Road work begins
.27 MILE(S) AFTER RP US24W TO US36W W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 36 W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-JUN-2025 to 11-JUL-2025.
Road work begins
.087 MILE(S) AFTER IS 72 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.034 MILE(S) BEFORE RP IS70E TO RTE W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.031 MILE(S) BEFORE RP IS70W TO RTE W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 94 E East
-
MONTGOMERY COUNTY
- Expect Delays
SEAL COAT OVERLAY
Scheduled from 02-JUN-2025 to 29-AUG-2025.
Road work begins
.009 MILE(S) AFTER MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 63 N North
-
RANDOLPH COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.009 MILE(S) BEFORE RT J E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.008 MILE(S) BEFORE RP US24 TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT H N North
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 01-NOV-2025.
Road work begins
RT W E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT H S South
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 01-NOV-2025.
Road work begins
US 136 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT K E East
-
SCHUYLER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2025 to 07-JUL-2025.
Road work begins
.001 MILE(S) BEFORE CST SIXTH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT K W West
-
SCHUYLER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2025 to 07-JUL-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W E East
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.296 MILE(S) AFTER PVT UNKNOWN S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W E East
-
SCHUYLER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2025 to 07-JUL-2025.
Road work begins
.001 MILE(S) BEFORE CST SECOND ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W W West
-
SCHUYLER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-JUN-2025 to 07-JUL-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W W West
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.022 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 E East
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUN-2025 to 01-NOV-2025.
Road work begins
.002 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 W West
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUN-2025 to 01-NOV-2025.
Road work begins
.002 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CST OLD U S HWY 36 E East
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.028 MILE(S) BEFORE RP US36E TO BU36 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
CST OLD U S HWY 36 W West
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.001 MILE(S) BEFORE MO 151 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
State Route MO 151 S South
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.3 MILE(S) BEFORE RP US36W TO MO151 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
CRD W VETERANS MEMORIAL PKWY E East
-
WARREN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.32 MILE(S) BEFORE RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
CRD W VETERANS MEMORIAL PKWY W West
-
WARREN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.256 MILE(S) BEFORE RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 94 W West
-
WARREN COUNTY
- Expect Delays
SEAL COAT OVERLAY
Scheduled from 02-JUN-2025 to 29-AUG-2025.
Road work begins
.694 MILE(S) BEFORE PVT POLO DOWNS PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP IS70E TO RTA S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.002 MILE(S) AFTER IS 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP IS70W TO RTA W West
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT A N North
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT A S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.076 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT B N North
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.053 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT B S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP RTA TO IS70E E East
-
WARREN COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP RTA TO IS70W W West
-
WARREN COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Back to Top
FUTURE WORK ZONES: 50 to report.
Hide
State Route RT BB W West
-
ADAIR COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 09-JUL-2025 to 10-JUL-2025.
Road work begins
MO 149 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Y N North
-
ADAIR COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 08-JUL-2025.
Road work begins
MO 11 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Y S South
-
ADAIR COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 08-JUL-2025.
Road work begins
RT BB E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 81 N North
-
CLARK COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CST SHERIDEN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 81 S South
-
CLARK COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CST MEDILL RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT E E East
-
LEWIS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
.005 MILE(S) BEFORE CRD 359 (170TH AVE) S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT E W West
-
LEWIS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
.001 MILE(S) AFTER CRD 453 (215TH AVE) S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Z N North
-
LEWIS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CRD 550 (NAPA ST) E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Z S South
-
LEWIS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
RT C E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Y E East
-
LEWIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
RT K E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT Y W West
-
LEWIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
MO 16 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT M E East
-
LINCOLN COUNTY
- CLOSED
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 09-JUL-2025.
Road work begins
MO 79 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT M W West
-
LINCOLN COUNTY
- CLOSED
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 09-JUL-2025.
Road work begins
CRD STERLING HARBOR RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 79 N North
-
LINCOLN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 09-JUL-2025.
Road work begins
.001 MILE(S) BEFORE RT JJ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT M E East
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
US 63 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT M W West
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
RT K S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT VV N North
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
RT Z E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT VV S South
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CRD BISON ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT WW E East
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 10-JUL-2025.
Road work begins
.542 MILE(S) BEFORE CRD ALMOND AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT WW W West
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 10-JUL-2025.
Road work begins
MO 129 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z E East
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2025 to 10-JUL-2025.
Road work begins
CRD ARCHER ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z W West
-
MACON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2025 to 10-JUL-2025.
Road work begins
MO 149 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST MAIN ST N North
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
MO 168 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST MAIN ST N North
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 09-JUL-2025 to 09-JUL-2025.
Road work begins
BU 61 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST MAIN ST S South
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 09-JUL-2025 to 09-JUL-2025.
Road work begins
MO 168 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST MAIN ST S South
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
MO 168 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Outer Road N OR 24 E East
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
CRD 308 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Outer Road N OR 24 W West
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
US 24 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT B E East
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
RT JJ S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT B W West
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CRD 413 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT J W West
-
MARION COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2025 to 10-JUL-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT F E East
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
RT E S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT F W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
.12 MILE(S) AFTER PVT PRIVATE DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT P E East
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
.199 MILE(S) BEFORE CRD 129 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT P W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-JUL-2025 to 30-SEP-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
Outer Road S OR 24 E East
-
MARION COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Outer Road S OR 24 W West
-
MARION COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
.828 MILE(S) BEFORE MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
US US 24 E East
-
MONROE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
.5 MILE(S) AFTER SP 15 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 E East
-
MONROE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
.016 MILE(S) BEFORE CRD 179 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 W West
-
MONROE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 08-JUL-2025 to 08-JUL-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT N N North
-
MONTGOMERY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 08-JUL-2025.
Road work begins
RT J S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
State Route RT N S South
-
MONTGOMERY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 08-JUL-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
State Route RT F N North
-
MONTGOMERY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2025 to 10-JUL-2025.
Road work begins
OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT F S South
-
MONTGOMERY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2025 to 10-JUL-2025.
Road work begins
RT JJ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT J N North
-
MONTGOMERY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-JUL-2025 to 10-JUL-2025.
Road work begins
RT N S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT J S South
-
MONTGOMERY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-JUL-2025 to 10-JUL-2025.
Road work begins
MO 161 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 79 S South
-
PIKE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-JUL-2025 to 09-JUL-2025.
Road work begins
RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT J E East
-
SCHUYLER COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT J W West
-
SCHUYLER COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 07-JUL-2025 to 07-JUL-2025.
Road work begins
CRD SLAUGHTER DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT J E East
-
SHELBY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2025 to 10-JUL-2025.
Road work begins
.001 MILE(S) BEFORE SP J E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Back to Top