WORK ZONES (CLOSED): 17 to report. Hide

Road Closed due to work zoneCST E 23RD ST E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST INDIANA AVE S.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneCST E 23RD ST W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST MONROE AVE S.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneInterstate IS 670 E East - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins .147 MILE(S) BEFORE CST GENESSEE ST S.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneOuter Road N OR 50 E East - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST SE SHENANDOAH DR E.
Scheduled from 26-MAR-2025 to 15-JUN-2025.
Road Closed due to work zoneOuter Road N OR 50 W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .358 MILE(S) AFTER CST MILTON THOMPSON RD S.
Scheduled from 26-MAR-2025 to 15-JUN-2025.
Road Closed due to work zonePVT OVERPASS S South - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .024 MILE(S) BEFORE CST TRUMAN RD E.
Scheduled from 11-APR-2025 to 31-DEC-2032.
Road Closed due to work zoneRamp RP BROADWAY TO IS670E E East - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins .001 MILE(S) AFTER CST TRUMAN RD E.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneRamp RP E 23RD ST TO IS70E E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST E 23RD ST E.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP E 23RD ST TO IS70W W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST E 23RD ST E.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP IS670E TO US71N N North - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins IS 670 E.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneRamp RP IS670E TO US71S S South - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins IS 670 E.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneRamp RP IS670E TO WYOMING ST S South - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins .146 MILE(S) BEFORE CST GENESSEE ST S.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneRamp RP IS70E TO 23RD ST W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER IS 70 E.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP IS70E TO MYRTLE AVE E East - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins IS 70 E.
Scheduled from 20-MAR-2025 to 20-MAR-2031.
Road Closed due to work zoneRamp RP IS70W TO 23RD ST E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins IS 70 W.
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP TRUMAN RD TO IS670E E East - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins CST MCGEE ST S.
Scheduled from 16-MAY-2025 to 17-MAY-2025.
Road Closed due to work zoneRamp RP WYOMING ST TO IS670E E East - JACKSON COUNTY - Road Closed
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Road closure begins CST WYOMING ST N.
Scheduled from 16-MAY-2025 to 17-MAY-2025.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 66 to report. Hide

Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-MAY-2025 to 28-MAY-2025.
Road work begins .006 MILE(S) AFTER US 24 W.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-MAY-2025 to 28-MAY-2025.
Road work begins .097 MILE(S) BEFORE CST N LEVEE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 12-MAY-2025 to 16-MAY-2025.
Road work begins .018 MILE(S) BEFORE CST INDIANA AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 31-JUL-2025.
Road work begins .006 MILE(S) BEFORE CST E 18TH ST E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 W West - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 31-JUL-2025.
Road work begins .014 MILE(S) AFTER CST E 27TH ST E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 150 W West - JACKSON COUNTY - Expect Delays
Project Name - Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins .007 MILE(S) AFTER RP MO150 TO US50E E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneState Route MO 150 W West - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 14-APR-2025 to 23-MAY-2025.
Road work begins .087 MILE(S) AFTER RP BOTTS RD S TO MO150W W.
Work will be done 7 days a week.
No delays expected due to work zoneInterstate IS 70 W West - JACKSON COUNTY - No Expected Delays
SHOULDER WORK
Scheduled from 05-MAY-2025 to 16-MAY-2025.
Road work begins .049 MILE(S) BEFORE RP IS70W TO WOODS CHAPEL RD S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:30 AM and 03:00 PM.
Possible delays due to work zoneCST NE STROTHER RD E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-MAY-2025 to 05-JUN-2025.
Road work begins .007 MILE(S) BEFORE CST NE RALPH POWELL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneCST SW BLUE PKWY W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-APR-2025 to 29-MAY-2025.
Road work begins .003 MILE(S) AFTER CST SW 3RD ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneCST VIEW HIGH DR N North - JACKSON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins .032 MILE(S) AFTER CST NW OLD VIEW HIGH RD E.
Work will be done 7 days a week.
Possible delays due to work zoneCST VIEW HIGH DR S South - JACKSON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins .039 MILE(S) AFTER CST NW VIEW HIGH PKWY N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .064 MILE(S) BEFORE RR PITTSBURG SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .1 MILE(S) BEFORE RP NE DOUGLAS ST S TO IS470E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .022 MILE(S) BEFORE RP IS470E TO BOWLIN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 16-MAY-2025.
Road work begins .037 MILE(S) BEFORE RP IS470E TO VIEW HIGH DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .282 MILE(S) BEFORE RP IS470E TO BLUE RIDGE BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .111 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 16-MAY-2025.
Road work begins .176 MILE(S) BEFORE RP IS470W TO VIEW HIGH DR N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 470 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .022 MILE(S) BEFORE CST NE DOUGLAS ST N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 49 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 16-MAY-2025.
Road work begins .073 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 49 S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 16-MAY-2025.
Road work begins .118 MILE(S) BEFORE RP IS49S TO MO150E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins .001 MILE(S) AFTER MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 12 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2025 to 16-MAY-2025.
Road work begins .054 MILE(S) AFTER CST WOODLAND AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-MAR-2025 to 27-JUN-2025.
Road work begins .013 MILE(S) AFTER CST FOREST AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 13-JUN-2025.
Road work begins .002 MILE(S) BEFORE CST FOREST AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAY-2025 to 31-MAY-2025.
Road work begins .045 MILE(S) AFTER CST RIVER BLVD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2025 to 19-MAY-2025.
Road work begins .011 MILE(S) BEFORE CST NORTHERN BLVD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 150 E East - JACKSON COUNTY - Delays Possible
Project Name - Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins RP MO150 TO MO291S S.
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneState Route MO 291 N North - JACKSON COUNTY - Delays Possible
SWEEPING PAVEMENT
Scheduled from 12-MAY-2025 to 16-MAY-2025.
Road work begins .152 MILE(S) BEFORE RP MO291N TO MO210 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 78 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins .006 MILE(S) BEFORE CST VERMONT AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP BOWLIN RD TO IS470E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins CST NE BOWLIN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP IS470E TO BOWLIN RD E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .01 MILE(S) AFTER IS 470 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP IS470W TO BLUE RIDGE BLVD N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins IS 470 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP IS470W TO NE DOUGLAS ST S S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .011 MILE(S) AFTER IS 470 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP IS670W TO IS35S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 05-MAY-2025 to 03-JUL-2025.
Road work begins IS 670 W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP MO7 TO IS70E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP MO7 TO US24E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP MO7 TO US50E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP MO7N TO US24W W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP NE DOUGLAS ST N TO IS470W W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins CST NE DOUGLAS ST N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP NE DOUGLAS ST S TO IS470E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins CST NE DOUGLAS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP RAYTOWN RD TO US50E E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins CST RAYTOWN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP RAYTOWN RD TO US50W W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins CST RAYTOWN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP US24E TO MO7 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP US24W TO MO7 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins US 24 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP US50E TO MO7 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP US50E TO RAYTOWN RD E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 16-MAY-2025.
Road work begins .014 MILE(S) AFTER IS 470 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP US50W TO RAYTOWN RD W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-APR-2025 to 16-MAY-2025.
Road work begins .069 MILE(S) AFTER IS 470 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT H S South - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-MAY-2025 to 23-MAY-2025.
Road work begins .027 MILE(S) BEFORE RT FF E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins .051 MILE(S) BEFORE RP US24E TO MO7 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins .008 MILE(S) AFTER CST WILLIS ST S.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins .051 MILE(S) BEFORE RP US24W TO MO7 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins OR 291 S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 50 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins .206 MILE(S) BEFORE RP US50E TO MO7 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 50 E East - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .066 MILE(S) AFTER RP CHIPMAN RD TO US50E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 50 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .047 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 50 W West - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2025 to 16-MAY-2025.
Road work begins .067 MILE(S) BEFORE RP US50W TO MO7 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 71 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .069 MILE(S) AFTER RP US71N TO THE PASEO N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 71 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 16-MAY-2025.
Road work begins .07 MILE(S) BEFORE CST LINWOOD BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 71 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 16-MAY-2025 to 16-MAY-2025.
Road work begins .12 MILE(S) AFTER RP US71N TO LINWOOD BLVD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 71 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .03 MILE(S) AFTER CST E 27TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 71 S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2025 to 16-MAY-2025.
Road work begins .035 MILE(S) AFTER CST E 18TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 71 S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 16-MAY-2025.
Road work begins .146 MILE(S) AFTER RP US71S TO DR MARTIN LUTHER KING JR BLVD E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 71 S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 16-MAY-2025 to 16-MAY-2025.
Road work begins .053 MILE(S) AFTER RP US71S TO MICHIGAN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.

Back to Top

FUTURE WORK ZONES: 23 to report. Hide

Expect delays due to work zoneRamp RP WYOMING ST TO IS670E E East - JACKSON COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins .002 MILE(S) AFTER CST LIBERTY ST S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 35 N North - JACKSON COUNTY - Expect Delays
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUN-2025.
Road work begins .089 MILE(S) BEFORE RP EATON ST TO IS35N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 35 S South - JACKSON COUNTY - Expect Delays
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUN-2025.
Road work begins .007 MILE(S) BEFORE RP IS35N TO IS70W W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 670 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins .147 MILE(S) BEFORE CST GENESSEE ST S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAY-2025 to 18-MAY-2025.
Road work begins .013 MILE(S) AFTER CST THE PASEO S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 150 E East - JACKSON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins .073 MILE(S) AFTER OR 291 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 150 W West - JACKSON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins .102 MILE(S) AFTER CST COURT DR S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins .013 MILE(S) BEFORE CST ARLINGTON AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2025 to 20-MAY-2025.
Road work begins .035 MILE(S) BEFORE CST WILSON AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneRamp RP BROADWAY TO IS35S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins CST BROADWAY BLVD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP EATON ST TO IS35N N North - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .092 MILE(S) BEFORE IS 35 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35N TO 14TH ST E East - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 35 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35N TO BROADWAY N N North - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .02 MILE(S) BEFORE RP IS35N TO IS670E E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35N TO BROADWAY S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .008 MILE(S) BEFORE RP IS35N TO IS670E E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35N TO IS670E E East - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .033 MILE(S) AFTER IS 35 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35N TO IS670W W West - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 35 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35S TO EATON ST N North - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 35 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35S TO IS670E E East - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 35 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS35S TO PENN VALLEY DR S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 35 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS670E TO IS35S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins IS 670 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS670W TO IS35N N North - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .018 MILE(S) AFTER CST CENTRAL ST N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP PENN VALLEY DR N TO IS35N N North - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins .044 MILE(S) AFTER CST PENN VALLEY DR S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP PENNSYLVANIA AVE TO IS35S S South - JACKSON COUNTY - Delays Possible
Project Name - 241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 03-JUL-2025.
Road work begins CST PENNSYLVANIA AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.

Back to Top

INCIDENTS: 3 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show