WORK ZONES (CLOSED): 23 to report. Hide

Road Closed due to work zoneCRD PECULIAR DR E East - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) AFTER CRD 237TH ST E.
Scheduled from 05-FEB-2024 to 15-JUN-2024.
Road Closed due to work zoneCRD PECULIAR DR W West - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .25 MILE(S) BEFORE CRD 237TH ST E.
Scheduled from 05-FEB-2024 to 15-JUN-2024.
Road Closed due to work zoneCST N KELSEY RD N North - CLAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST N ANTIOCH RD S.
Scheduled from 07-MAY-2024 to 31-MAY-2024.
Road Closed due to work zoneCST NE 43RD ST W West - CLAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .018 MILE(S) BEFORE MO 1 S.
Scheduled from 06-MAY-2024 to 31-MAY-2024.
Road Closed due to work zoneCST NW 188TH ST E East - CLAY COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .011 MILE(S) AFTER CRD H&H LAKE RD S.
Scheduled from 06-MAY-2024 to 28-MAY-2024.
Road Closed due to work zoneCST NW 188TH ST W West - CLAY COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .008 MILE(S) AFTER US 169 S.
Scheduled from 06-MAY-2024 to 28-MAY-2024.
Road Closed due to work zoneRamp RP RICHARDS RD TO US169S S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST HARLEM RD E.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneUS US 169 S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER RP US169S TO RICHARDS RD S.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneCST W 25TH ST E East - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST SUMMIT ST S.
Scheduled from 29-APR-2024 to 14-JUN-2024.
Road Closed due to work zoneCST W 25TH ST W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST WEST PENNWAY DR S.
Scheduled from 29-APR-2024 to 14-JUN-2024.
Road Closed due to work zoneCST WOODSWETHER RD W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST W 5TH ST W.
Scheduled from 29-JAN-2024 to 31-DEC-2025.
Road Closed due to work zoneRamp RP BEARDSLEY RD TO IS70W W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST BEARDSLEY RD S.
Scheduled from 07-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP FIFTH ST TO IS70W W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 S.
Scheduled from 07-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP IS70E TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins IS 70 E.
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP US169N TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 N.
Scheduled from 03-APR-2023 to 31-DEC-2025.
Road Closed due to work zoneState Route RT WW N North - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .063 MILE(S) AFTER CRD 1101 S.
Scheduled from 07-MAY-2024 to 30-MAY-2024.
Road Closed due to work zoneState Route RT WW S South - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .555 MILE(S) AFTER MO 23 S.
Scheduled from 07-MAY-2024 to 30-MAY-2024.
Road Closed due to work zoneState Route MO 92 E East - PLATTE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .023 MILE(S) AFTER CST PRAIRIE VIEW RD S.
Scheduled from 23-JAN-2024 to 30-JUN-2024.
Road Closed due to work zoneState Route MO 92 W West - PLATTE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .023 MILE(S) AFTER RP MO92 TO IS29N N.
Scheduled from 23-JAN-2024 to 30-JUN-2024.
Road Closed due to work zoneCRD LEMON TRL N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) BEFORE IS 70 E.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneCRD LEMON TRL S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) BEFORE IS 70 W.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneState Route RT EE N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .113 MILE(S) AFTER MO 20 E.
Scheduled from 12-FEB-2024 to 30-JUN-2024.
Road Closed due to work zoneState Route RT EE S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .06 MILE(S) AFTER CRD 220TH RD E.
Scheduled from 12-FEB-2024 to 30-JUN-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 57 to report. Hide

Expect delays due to work zoneInterstate IS 49 S South - CASS COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 06-MAY-2024 to 07-JUN-2024.
Road work begins .013 MILE(S) AFTER RP IS49S TO RTA S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - Expect Delays
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins .284 MILE(S) BEFORE RR FORT SCOTT SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .013 MILE(S) BEFORE CRD CLINTON COUNTY LINE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneCST N OAK TRFY S South - CLAY COUNTY - Delays Possible
Project Name - BLUME
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road work begins .05 MILE(S) BEFORE MO 9 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneCST N OAK TRFY S South - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2024 to 29-MAY-2024.
Road work begins .053 MILE(S) BEFORE IS 29 N.
Work will be done 7 days a week.
Possible delays due to work zoneCST NW BARRY RD W West - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2024.
Road work begins .025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 29 N North - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2024 to 29-MAY-2024.
Road work begins .02 MILE(S) BEFORE CST N OAK TRFY N.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 1 N North - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 31-MAY-2024.
Road work begins .046 MILE(S) AFTER CST 64TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 1 S South - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 31-MAY-2024.
Road work begins .406 MILE(S) AFTER CST NE 80TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 1 S South - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-APR-2024 to 31-MAY-2024.
Road work begins .006 MILE(S) BEFORE RP MO1 TO IS35N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 169 N North - CLAY COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins .049 MILE(S) AFTER CST ROCK CREEK TER E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 169 S South - CLAY COUNTY - Delays Possible
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins .045 MILE(S) BEFORE CST NW BRIARCLIFF PKWY W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 169 S South - CLAY COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins .378 MILE(S) AFTER CST LAKE MEADOWS DR E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 69 N North - CLAY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .079 MILE(S) BEFORE CST PARK AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 69 S South - CLAY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .019 MILE(S) BEFORE CST RANDOLPH RD S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 11-AUG-2025.
Road work begins .012 MILE(S) AFTER RP MO350W TO IS435N N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 05:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 22-APR-2024 to 01-DEC-2024.
Road work begins .026 MILE(S) BEFORE RP MO12 TO IS435S S.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins .046 MILE(S) BEFORE RT V S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 350 W West - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins .028 MILE(S) AFTER CST BLUE PKWY E.
Work will be done 7 days a week.
No delays expected due to work zoneCST W 5TH ST W West - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2024 to 31-MAY-2024.
Road work begins .004 MILE(S) BEFORE CST WOODSWETHER RD W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 7 S South - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .072 MILE(S) BEFORE CST BUNDSCHU RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneState Route MO 7 S South - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .013 MILE(S) BEFORE CST JOHNSON RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneRamp RP US40W TO IS70W W West - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 27-SEP-2024.
Road work begins US 40 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
No delays expected due to work zoneState Route RT H N North - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 03-MAY-2024 to 29-JUL-2024.
Road work begins .008 MILE(S) AFTER CST NE 3RD ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
No delays expected due to work zoneUS US 24 W West - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .011 MILE(S) BEFORE CST FIRE PRAIRIE SCHOOL ENT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneCST BLUE RIDGE BLVD S South - JACKSON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-APR-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER RP BLUE RIDGE BLVD TO MO350W W.
Work will be done 7 days a week.
Possible delays due to work zoneCST FRONT ST E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins .018 MILE(S) AFTER CST BERKLEY PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneCST FRONT ST W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins .092 MILE(S) BEFORE PVT EAST ISLE OF CAPRI ENTRANCE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneCST HAWTHORNE RD W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-MAY-2024 to 28-JUN-2024.
Road work begins .029 MILE(S) BEFORE IS 435 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 78 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-MAY-2024 to 31-MAY-2024.
Road work begins .005 MILE(S) AFTER CST ENGLEWOOD CT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zonePVT EAST ISLE OF CAPRI ENTRANCE N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins CST FRONT ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zonePVT EAST ISLE OF CAPRI ENTRANCE S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins .039 MILE(S) BEFORE CST FRONT ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP FRONT ST E TO IS29N N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins CST FRONT ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP FRONT ST E TO IS29S S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins CST FRONT ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP FRONT ST W TO IS29N N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins CST FRONT ST W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneRamp RP FRONT ST W TO IS29S S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins CST FRONT ST W.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP IS29N TO FRONT ST E E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins IS 35 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP IS29N TO FRONT ST W W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins IS 29 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP IS29S TO FRONT ST E E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins IS 35 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneRamp RP IS29S TO FRONT ST W W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 21-MAY-2024 to 31-MAY-2024.
Road work begins IS 29 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins OR 291 S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 71 N North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 29-APR-2024 to 27-MAY-2024.
Road work begins .097 MILE(S) AFTER RP IS435N TO US71N N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 71 S South - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 29-APR-2024 to 27-MAY-2024.
Road work begins .005 MILE(S) BEFORE IS 70 W.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 2 E East - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins .054 MILE(S) AFTER CRD S ROGERS LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 2 W West - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins .003 MILE(S) BEFORE CRD NE 1400 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT O N North - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins .004 MILE(S) AFTER MO 2 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT O S South - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins MO 58 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y E East - JOHNSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y W West - JOHNSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 31-MAY-2024.
Road work begins .004 MILE(S) AFTER MO 23 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneUS US 50 E East - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins .019 MILE(S) AFTER RP MO23 TO US50E E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 50 W West - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins .456 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 N North - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 30-SEP-2024.
Road work begins .035 MILE(S) AFTER CRD SMELSER RD E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 S South - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 30-SEP-2024.
Road work begins .021 MILE(S) AFTER CO US65S TO US65N W.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 371 N North - PLATTE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins .03 MILE(S) AFTER MO 273 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
No delays expected due to work zoneState Route MO 45 S South - PLATTE COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 08-MAY-2024 to 28-MAY-2024.
Road work begins .104 MILE(S) AFTER CRD N BLUFF RD S.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT H N North - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2024 to 03-JUN-2024.
Road work begins .161 MILE(S) AFTER CRD COUNTRYSIDE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.

Back to Top

FUTURE WORK ZONES: 36 to report. Hide

Expect delays due to work zoneState Route MO 7 N North - CASS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 11-OCT-2024.
Road work begins .014 MILE(S) AFTER CST BIRD AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT O N North - CASS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .038 MILE(S) AFTER CRD 327TH ST E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT O S South - CASS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .1 MILE(S) BEFORE CRD 319TH ST E.
Work will be done on weekdays only.
Expect delays due to work zoneCST NW 188TH ST E East - CLAY COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-MAY-2024 to 12-JUL-2024.
Road work begins .013 MILE(S) AFTER CRD H&H LAKE RD S.
Work will be done 7 days a week.
Expect delays due to work zoneCST NW 188TH ST W West - CLAY COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-MAY-2024 to 12-JUL-2024.
Road work begins .011 MILE(S) AFTER CST MAIN ST S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-MAY-2024 to 12-JUL-2024.
Road work begins .086 MILE(S) AFTER CST ROCK CREEK TER E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 169 S South - CLAY COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-MAY-2024 to 12-JUL-2024.
Road work begins .423 MILE(S) AFTER CST LAKE MEADOWS DR E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 69 N North - CLAY COUNTY - CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 31-MAY-2024 to 03-JUN-2024.
Road work begins .016 MILE(S) BEFORE CST PARK AVE E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 69 S South - CLAY COUNTY - CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 31-MAY-2024 to 03-JUN-2024.
Road work begins .006 MILE(S) AFTER CST POE AVE S.
Work will be done 7 days a week.
Expect delays due to work zoneCST NW 108TH ST E East - CLAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAY-2024 to 28-MAY-2024.
Road work begins .025 MILE(S) BEFORE CST N SUMMIT ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneCST NW TIFFANY SPRINGS PKWY E East - CLAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-MAY-2024 to 29-MAY-2024.
Road work begins .356 MILE(S) BEFORE CST N SUMMIT ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 210 E East - CLAY COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .005 MILE(S) BEFORE RP MO210E TO IS435S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 210 W West - CLAY COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .026 MILE(S) BEFORE CO MO210W TO RANDOLPH RD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneState Route MO 9 N North - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 30-MAY-2024.
Road work begins .063 MILE(S) BEFORE CST 16TH AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 9 S South - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 30-MAY-2024.
Road work begins .07 MILE(S) AFTER CST 18TH AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 70 W West - JACKSON COUNTY - CLOSED
CONCRETE BARRIER WALL
Scheduled from 31-MAY-2024 to 31-MAY-2024.
Road work begins .067 MILE(S) BEFORE IS 670 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 7 S South - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 11-OCT-2024.
Road work begins .162 MILE(S) AFTER CRD COLBERN RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Possible delays due to work zoneCST HOLMES ST N North - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 07-JUN-2024.
Road work begins .001 MILE(S) BEFORE CST TRUMAN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 28-MAY-2024 to 30-MAY-2024.
Road work begins .139 MILE(S) AFTER RP E 104TH ST TO IS435N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 28-MAY-2024 to 30-MAY-2024.
Road work begins .211 MILE(S) BEFORE RP IS435S TO 104TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-MAY-2024 to 31-MAY-2024.
Road work begins .054 MILE(S) AFTER CST HARDY AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:07 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 350 W West - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-MAY-2024 to 31-MAY-2024.
Road work begins .144 MILE(S) BEFORE CST WESTRIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT BB N North - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 05-JUN-2024.
Road work begins .14 MILE(S) AFTER CRD PERRY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT BB S South - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 05-JUN-2024.
Road work begins .098 MILE(S) BEFORE CRD PERRY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 2 E East - JOHNSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 03-JUN-2024 to 25-AUG-2024.
Road work begins .095 MILE(S) BEFORE CRD 251 S.
Work will be done 7 days a week.
Expect delays due to work zoneCST HOLDEN ST S South - JOHNSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .062 MILE(S) BEFORE CRD NW 125TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K N North - PLATTE COUNTY - CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-MAY-2024 to 30-MAY-2024.
Road work begins .002 MILE(S) AFTER CRD NW CUSTER DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT K S South - PLATTE COUNTY - CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-MAY-2024 to 30-MAY-2024.
Road work begins .002 MILE(S) AFTER CRD NW 79TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT Z E East - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 27-MAY-2024 to 29-MAY-2024.
Road work begins .012 MILE(S) BEFORE RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z E East - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-MAY-2024 to 30-MAY-2024.
Road work begins .025 MILE(S) AFTER CST JUNE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z E East - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-MAY-2024 to 01-JUN-2024.
Road work begins .013 MILE(S) AFTER CRD CAMP PAWNEE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z W West - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-MAY-2024 to 31-MAY-2024.
Road work begins .494 MILE(S) AFTER CRD CAMP PAWNEE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z W West - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 27-MAY-2024 to 29-MAY-2024.
Road work begins CST MAPLE LEAF RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCRD OLD PIKE RD E East - PLATTE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAY-2024 to 29-MAY-2024.
Road work begins .18 MILE(S) AFTER MO 371 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
No delays expected due to work zoneState Route MO 92 W West - PLATTE COUNTY - No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 28-MAY-2024 to 04-JUN-2024.
Road work begins .001 MILE(S) AFTER CST PRAIRIE VIEW RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 9 S South - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-MAY-2024 to 29-MAY-2024.
Road work begins .008 MILE(S) AFTER CST NW 83RD TER S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.

Back to Top

INCIDENTS: 6 to report. Show