WORK ZONES (CLOSED): 7 to report. Hide

Road Closed due to work zoneState Route 163 North - BOONE COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins .15 MILES AFTER CST STEWART RD E.
Scheduled from 18-APR-2019 to 19-APR-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneOuter Road 44 West - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.21 MILES BEFORE RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.
Road Closed due to work zoneOuter Road 44 East - LACLEDE COUNTY - Road Closed
Project Name - NEW GASCONADE RIVER BRIDGE ON I-44OR NEAR HAZELGRE
BRIDGE RECONSTRUCTION
Road closure begins 1.9 MILES AFTER RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route E North - MONITEAU COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.3 MILES AFTER RT W W.
Scheduled from 11-MAR-2019 to 07-JUN-2019.
Project Web Page -
News Releases - BRIDGE NUMBER R0435
Road Closed due to work zoneState Route E South - MONITEAU COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.64 MILES BEFORE RT W W.
Scheduled from 11-MAR-2019 to 07-JUN-2019.
Project Web Page -
News Releases - BRIDGE NUMBER R0435
Road Closed due to work zoneState Route 185 South - WASHINGTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 5.4 MILES BEFORE RT AA W.
Scheduled from 08-APR-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 185 North - WASHINGTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 5.1 MILES AFTER RT AA E.
Scheduled from 08-APR-2019 to 28-JUN-2019.
Project Web Page -
News Releases -

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 100 to report. Hide

Expect delays due to work zoneCOLLEGE AVE South - BOONE COUNTY - Expect Delays
Project Name - 181116-D03
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 22-APR-2019.
Road work begins .03 MILES AFTER LP 70 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneCOLLEGE AVE North - BOONE COUNTY - Expect Delays
Project Name - 181116-D03
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 22-APR-2019.
Road work begins .01 MILES AFTER CST COLLEGE AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 124 West - BOONE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 19-JUL-2019.
Road work begins .2 MILES AFTER US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 124 East - BOONE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 19-JUL-2019.
Road work begins .46 MILES BEFORE US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 22 East - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins AT RT F N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp MO22 TO US63N North - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins AT MO 22 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp MO22 TO US63S South - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins AT MO 22 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp US63N TO MO22 East - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins AT US 63 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp US63S TO MO22 East - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins AT US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y East - BOONE COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 02-APR-2019 to 19-APR-2019.
Road work begins .15 MILES AFTER RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - BOONE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 17-APR-2019 to 26-APR-2019.
Road work begins AT MO 763 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zonePROVIDENCE RD South - BOONE COUNTY - Delays Possible
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins .01 MILES BEFORE CST WORLEY ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zonePROVIDENCE RD South - BOONE COUNTY - Delays Possible
Project Name - 181214-D02
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-APR-2019 to 19-APR-2019.
Road work begins .03 MILES BEFORE CST VANDIVER DR E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route K West - BOONE COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins AT CST OLD PLANK RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route K East - BOONE COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins 2.99 MILES BEFORE CST SCOTT BLVD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O North - BOONE COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins 6.45 MILES BEFORE RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O South - BOONE COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins 4.45 MILES AFTER RT J S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route UU West - BOONE COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins .07 MILES AFTER US 40 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route UU East - BOONE COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins LESS THAN .01 MILES AFTER RT O N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneBusiness 54 East - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 03-MAY-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneBusiness 54 West - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 03-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER RT C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 03-MAY-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 03-MAY-2019.
Road work begins 2.08 MILES BEFORE RT H W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O East - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .27 MILES AFTER CST BLUFF ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O West - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .02 MILES AFTER RT D N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y West - CALLAWAY COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 02-APR-2019 to 19-APR-2019.
Road work begins LESS THAN .01 MILES AFTER RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - CAMDEN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2019 to 30-AUG-2019.
Road work begins .07 MILES AFTER MO 7 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - CAMDEN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2019 to 30-AUG-2019.
Road work begins 1.02 MILES AFTER RT KK E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 South - CAMDEN COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2019 to 24-MAY-2019.
Road work begins .35 MILES AFTER CRD SOUTH BUSINESS ROUTE 5 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE OR 54 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins AT CST JEFFERSON ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST CHRISTY DR S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .23 MILES AFTER CST CHRISTY DR N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .57 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST SOUTHWEST BLVD N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 135 North - COOPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 14-MAR-2019 to 25-APR-2019.
Road work begins .05 MILES BEFORE CST COLLEGE AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 South - COOPER COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-APR-2019 to 28-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER RT B N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Delays Possible
Project Name -
CONCRETE OVERLAY
Scheduled from 15-APR-2019 to 02-MAY-2019.
Road work begins .71 MILES AFTER CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Delays Possible
Project Name -
CONCRETE OVERLAY
Scheduled from 15-APR-2019 to 02-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT MARKING
Scheduled from 11-MAR-2019 to 25-APR-2019.
Road work begins .71 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT MARKING
Scheduled from 11-MAR-2019 to 25-APR-2019.
Road work begins AT OR 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 49 South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-APR-2019 to 25-APR-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp RTC TO IS44E East - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 26-MAR-2019 to 19-APR-2019.
Road work begins AT CST PINE ST N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C West - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 26-MAR-2019 to 19-APR-2019.
Road work begins AT CST PINE ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route FF North - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 19-APR-2019.
Road work begins 1.74 MILES BEFORE IS 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route FF South - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 19-APR-2019.
Road work begins .15 MILES AFTER IS 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route ZZ West - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins .05 MILES BEFORE CST HISTORIC RT 66 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route ZZ East - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 26-APR-2019.
Road work begins AT RT F S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 32 West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-MAR-2019 to 19-APR-2019.
Road work begins AT MO 72 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 32 East - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-MAR-2019 to 19-APR-2019.
Road work begins AT RT F N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C North - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins 1.05 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C South - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins LESS THAN .01 MILES AFTER MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route CC West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins .02 MILES AFTER RT H W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route CC East - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins 1.62 MILES AFTER RT C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins AT MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route OO East - DENT COUNTY - Delays Possible
Project Name -
RAILROAD MAINTENANCE
Scheduled from 11-MAR-2019 to 02-MAY-2019.
Road work begins 4.76 MILES BEFORE RT O N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route OO West - DENT COUNTY - Delays Possible
Project Name -
RAILROAD MAINTENANCE
Scheduled from 11-MAR-2019 to 02-MAY-2019.
Road work begins AT RT O N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P South - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-MAR-2019 to 02-MAY-2019.
Road work begins AT MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P North - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-MAR-2019 to 02-MAY-2019.
Road work begins 3.72 MILES BEFORE MO 72 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 North - LACLEDE COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2019 to 24-MAY-2019.
Road work begins .03 MILES AFTER CST 7TH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N North - LACLEDE COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 19-APR-2019.
Road work begins AT MO 32 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N South - LACLEDE COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 19-APR-2019.
Road work begins AT RT T S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - MARIES COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 01-APR-2019 to 24-MAY-2019.
Road work begins 1.9 MILES AFTER RT A N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 28 West - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins AT US 63 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 North - MARIES COUNTY - Delays Possible
Project Name -
RAILROAD MAINTENANCE
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins 1.74 MILES BEFORE MO 28 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 South - MARIES COUNTY - Delays Possible
Project Name -
RAILROAD MAINTENANCE
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins .57 MILES AFTER MO 28 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2019 to 10-MAY-2019.
Road work begins .38 MILES AFTER RT M E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 01-APR-2019 to 23-MAY-2019.
Road work begins 1.39 MILES AFTER RT M W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 01-APR-2019 to 23-MAY-2019.
Road work begins .34 MILES AFTER MO 52 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2019 to 10-MAY-2019.
Road work begins .52 MILES BEFORE BU 54 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 North - MONITEAU COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-APR-2019 to 28-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER CST MAIN ST W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 South - MONITEAU COUNTY - Delays Possible
Project Name -
MICROSURFACING
Scheduled from 18-APR-2019 to 03-MAY-2019.
Road work begins .04 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - MORGAN COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 52 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 North - MORGAN COUNTY - Delays Possible
Project Name -
MICROSURFACING
Scheduled from 18-APR-2019 to 03-MAY-2019.
Road work begins .06 MILES AFTER MO 52 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 18-APR-2019 to 22-APR-2019.
Road work begins 2.43 MILES BEFORE RT T N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 18-APR-2019 to 22-APR-2019.
Road work begins 2.34 MILES AFTER RT T S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins .66 MILES BEFORE CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins .95 MILES BEFORE CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins AT CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 01-APR-2019 to 24-MAY-2019.
Road work begins .96 MILES AFTER CST BISHOP AVE S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - PHELPS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins AT IS 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 8 East - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-APR-2019 to 02-MAY-2019.
Road work begins AT MO 68 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 8 West - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-APR-2019 to 02-MAY-2019.
Road work begins 2.7 MILES BEFORE MO 68 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H East - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 19-APR-2019.
Road work begins 3.45 MILES BEFORE RT C N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J North - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 08-APR-2019 to 26-APR-2019.
Road work begins AT RT K W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J South - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 08-APR-2019 to 26-APR-2019.
Road work begins AT IS 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J North - PHELPS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins .03 MILES AFTER RT K E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J South - PHELPS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins LESS THAN .01 MILES AFTER IS 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 28 East - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins .38 MILES AFTER CST FIFTH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD East - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 08-APR-2019 to 26-APR-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD West - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 08-APR-2019 to 26-APR-2019.
Road work begins 4.07 MILES BEFORE MO 17 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 21 South - WASHINGTON COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 27-MAR-2019 to 30-APR-2019.
Road work begins .15 MILES BEFORE MO 8 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - WASHINGTON COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 27-MAR-2019 to 30-APR-2019.
Road work begins .12 MILES AFTER CST MAIN AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 West - WASHINGTON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 08-APR-2019 to 22-APR-2019.
Road work begins 3.28 MILES BEFORE CST MAIN AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - WASHINGTON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 08-APR-2019 to 22-APR-2019.
Road work begins 2.53 MILES AFTER MO 21 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 21 South - WASHINGTON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins AT MO 8 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 21 North - WASHINGTON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-APR-2019 to 25-APR-2019.
Road work begins AT MO 32 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

FUTURE WORK ZONES: 22 to report. Hide

Expect delays due to work zoneRamp US63C TO IS70E East - BOONE COUNTY - CLOSED
Project Name -
CONCRETE OVERLAY
Scheduled from 24-APR-2019 to 25-APR-2019.
Road work begins AT US 63C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 East - BOONE COUNTY - Delays Possible
Project Name -
CONCRETE OVERLAY
Scheduled from 22-APR-2019 to 23-APR-2019.
Road work begins .21 MILES BEFORE CRD ROBY FARM RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 East - BOONE COUNTY - Delays Possible
Project Name -
CONCRETE OVERLAY
Scheduled from 25-APR-2019 to 26-APR-2019.
Road work begins .11 MILES AFTER CST GARTH AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 East - BOONE COUNTY - Delays Possible
Project Name -
CONCRETE OVERLAY
Scheduled from 25-APR-2019 to 26-APR-2019.
Road work begins .2 MILES BEFORE LP 70 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 South - COOPER COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 22-APR-2019 to 01-MAY-2019.
Road work begins .18 MILES AFTER RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .04 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .06 MILES BEFORE RT ZZ W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N East - CRAWFORD COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 25-APR-2019.
Road work begins 7.93 MILES AFTER CST HICKORY ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y South - HOWARD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 22-APR-2019 to 02-MAY-2019.
Road work begins 7.5 MILES BEFORE MO 124 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y North - HOWARD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 22-APR-2019 to 02-MAY-2019.
Road work begins AT MO 124 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 North - MONITEAU COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 22-APR-2019 to 01-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST MAIN ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route KK South - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 01-MAY-2019.
Road work begins 2.55 MILES BEFORE RT D S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route KK North - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 01-MAY-2019.
Road work begins AT RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 135 South - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 22-APR-2019.
Road work begins 1.11 MILES BEFORE RT DD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MORGAN COUNTY - Delays Possible
Project Name -
MICROSURFACING
Scheduled from 22-APR-2019 to 03-MAY-2019.
Road work begins .03 MILES AFTER CST NEWTON ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-APR-2019 to 25-APR-2019.
Road work begins .57 MILES BEFORE MO 135 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-APR-2019 to 25-APR-2019.
Road work begins .51 MILES AFTER MO 135 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MORGAN COUNTY - Delays Possible
Project Name -
MICROSURFACING
Scheduled from 22-APR-2019 to 03-MAY-2019.
Road work begins 1.14 MILES AFTER RT W S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 17 South - PULASKI COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 22-APR-2019.
Road work begins .2 MILES BEFORE CRD RED OAK RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 17 North - PULASKI COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 22-APR-2019.
Road work begins AT CRD RED OAK RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 21 North - WASHINGTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 23-MAY-2019.
Road work begins .35 MILES BEFORE MO 8 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N West - WASHINGTON COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-APR-2019 to 25-APR-2019.
Road work begins 5.75 MILES AFTER MO 185 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

INCIDENTS: 2 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show

Back to Top

FLOODS: 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 158 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.