State Route RT C S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.371 MILE(S) BEFORE CRD 164 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 29 N North
-
ATCHISON COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 02-DEC-2022 to 06-MAR-2023.
Road work begins
.178 MILE(S) BEFORE CRD C AVE S.
Work will be done around the clock,
7 days a week.
Interstate IS 29 S South
-
ATCHISON COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 02-DEC-2022 to 06-MAR-2023.
Road work begins
1.006 MILE(S) BEFORE CRD C AVE S.
Work will be done around the clock,
7 days a week.
US US 136 E East
-
ATCHISON COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 22-AUG-2022 to 30-NOV-2023.
Road work begins
.725 MILE(S) BEFORE CRD C AVE S.
Work will be done around the clock,
7 days a week.
US US 136 W West
-
ATCHISON COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 22-AUG-2022 to 30-NOV-2023.
Road work begins
.238 MILE(S) AFTER CRD G AVE S.
Work will be done around the clock,
7 days a week.
Interstate IS 29 S South
-
ATCHISON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
1.942 MILE(S) BEFORE CRD C AVE S.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
ATCHISON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 06-FEB-2023 to 15-FEB-2023.
Road work begins
RT U S.
Work will be done around the clock,
on weekdays only.
State Route MO 22 E East
-
AUDRAIN COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
CRD 945 S.
Work will be done around the clock,
on weekdays only.
State Route MO 22 W West
-
AUDRAIN COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
.412 MILE(S) AFTER CST W MONROE ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 N North
-
BARRY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
MO 86 E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 S South
-
BARRY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.007 MILE(S) AFTER RT B E.
Work will be done around the clock,
on weekdays only.
State Route RT KK N North
-
BARTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.184 MILE(S) BEFORE CRD SE 20TH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT KK S South
-
BARTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.003 MILE(S) AFTER CST 21ST ST E.
Work will be done around the clock,
on weekdays only.
State Route RT BB N North
-
BATES COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 07-FEB-2023 to 09-FEB-2023.
Road work begins
.044 MILE(S) BEFORE RT MM E.
Work will be done around the clock,
on weekdays only.
State Route RT BB S South
-
BATES COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 07-FEB-2023 to 09-FEB-2023.
Road work begins
.162 MILE(S) AFTER CRD NE 14004 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins
.169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done around the clock,
on weekdays only.
US US 36 W West
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 31-JAN-2022 to 30-JUN-2023.
Road work begins
.006 MILE(S) BEFORE RP US36W TO IS229S S.
Work will be done around the clock,
7 days a week.
News Releases -
https://www.modot.org/node/27516
Business BU 60 E East
-
BUTLER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-SEP-2022 to 25-SEP-2023.
Road work begins
.001 MILE(S) BEFORE CST BROADWAY ST S.
Work will be done around the clock,
on weekdays only.
Business BU 60 W West
-
BUTLER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-SEP-2022 to 25-SEP-2023.
Road work begins
.001 MILE(S) AFTER CST GUM ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 158 E East
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-OCT-2022 to 01-NOV-2023.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
State Route MO 158 W West
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-OCT-2022 to 01-NOV-2023.
Road work begins
.302 MILE(S) AFTER CRD 343 S.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-OCT-2022 to 01-NOV-2023.
Road work begins
.036 MILE(S) BEFORE RT V E.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-OCT-2022 to 01-NOV-2023.
Road work begins
MO 158 E.
Work will be done around the clock,
on weekdays only.
US US 67 N North
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-AUG-2022 to 01-NOV-2023.
Road work begins
.009 MILE(S) AFTER RP US67N TO US160 E.
Work will be done around the clock,
on weekdays only.
US US 67 S South
-
BUTLER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-AUG-2022 to 01-NOV-2023.
Road work begins
RP US67S TO US160 W.
Work will be done around the clock,
on weekdays only.
State Route MO 2 W West
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 04-DEC-2022 to 01-MAR-2023.
Road work begins
.021 MILE(S) AFTER RT D S.
Work will be done around the clock,
on weekdays only.
State Route MO 58 E East
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 06-JAN-2023 to 03-APR-2023.
Road work begins
.005 MILE(S) AFTER CO MO58 TO MO7 E.
Work will be done around the clock,
7 days a week.
State Route RT D S South
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 04-DEC-2022 to 01-MAR-2023.
Road work begins
.023 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock,
on weekdays only.
State Route RT W E East
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 04-DEC-2022 to 01-MAR-2023.
Road work begins
RT D S.
Work will be done around the clock,
on weekdays only.
State Route MO 97 N North
-
CEDAR COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.065 MILE(S) AFTER RT C E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 S South
-
CEDAR COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.283 MILE(S) BEFORE CRD 1450 E.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 13-FEB-2023.
Road work begins
.322 MILE(S) BEFORE CRD W GHAN RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-JUL-2023.
Road work begins
.011 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-JUL-2023.
Road work begins
.003 MILE(S) BEFORE CST RIDGECREST RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 13-FEB-2023.
Road work begins
.073 MILE(S) BEFORE CST MT VERNON ST E.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
CHRISTIAN COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 06-FEB-2023 to 31-MAY-2023.
Road work begins
.022 MILE(S) BEFORE CRD WOODS FORK RD S.
Work will be done around the clock,
on weekdays only.
Interstate IS 435 N North
-
CLAY COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.025 MILE(S) AFTER MO 291 S.
Work will be done around the clock,
on weekdays only.
Ramp RP IS29S TO US169S S South
-
CLAY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road work begins
IS 29 S.
Work will be done around the clock,
7 days a week.
Interstate IS 35 N North
-
CLAY COUNTY
- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 10-JUN-2022 to 01-JUN-2023.
Road work begins
1.152 MILE(S) AFTER CRD NE 128TH ST E.
Work will be done around the clock,
7 days a week.
Interstate IS 35 S South
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.122 MILE(S) BEFORE MO 291 N.
Work will be done around the clock,
on weekdays only.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.034 MILE(S) AFTER CST NE BIRMINGHAM RD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.078 MILE(S) AFTER MO 291 S.
Work will be done around the clock,
on weekdays only.
State Route MO 1 N North
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.003 MILE(S) BEFORE RP IS35S TO MO1 S.
Work will be done around the clock,
on weekdays only.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.031 MILE(S) BEFORE CST NE 82ND TER E.
Work will be done around the clock,
on weekdays only.
State Route MO 152 W West
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
CST KANSAS ST W.
Work will be done around the clock,
on weekdays only.
State Route MO 210 E East
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
CST ARMOUR RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 210 W West
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.005 MILE(S) AFTER PVT FARM RD S.
Work will be done around the clock,
on weekdays only.
US US 169 N North
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.271 MILE(S) BEFORE CST NW 132ND ST E.
Work will be done around the clock,
on weekdays only.
US US 169 N North
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
.089 MILE(S) BEFORE RP MO152E TO US169N N.
Work will be done around the clock,
on weekdays only.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.171 MILE(S) AFTER CST NW 132ND ST E.
Work will be done around the clock,
on weekdays only.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
.011 MILE(S) AFTER CRD SW 200TH ST E.
Work will be done around the clock,
on weekdays only.
Interstate IS 35 N North
-
CLINTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.458 MILE(S) BEFORE CRD NE 272ND ST E.
Work will be done around the clock,
on weekdays only.
Interstate IS 35 S South
-
CLINTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 30-JAN-2023 to 10-FEB-2023.
Road work begins
1.019 MILE(S) AFTER RP US69 TO IS35S S.
Work will be done around the clock,
on weekdays only.
State Route RT N W West
-
COLE COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 16-JAN-2023 to 17-FEB-2023.
Road work begins
RT NN S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
COOPER COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins
.027 MILE(S) AFTER RR RIVER SUB E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
CRAWFORD COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 30-JAN-2023 to 10-FEB-2023.
Road work begins
.011 MILE(S) BEFORE RP IS44W TO STATE HWY H W.
Work will be done around the clock,
on weekdays only.
State Route MO 8 E East
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-NOV-2022 to 24-FEB-2023.
Road work begins
.259 MILE(S) BEFORE MO 19 S.
Work will be done around the clock,
on weekdays only.
State Route MO 8 W West
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-NOV-2022 to 24-FEB-2023.
Road work begins
.003 MILE(S) AFTER RT BB S.
Work will be done around the clock,
on weekdays only.
State Route RT H E East
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.007 MILE(S) BEFORE RT MM S.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
CRD CAVE RD S.
Work will be done around the clock,
on weekdays only.
State Route RT N E East
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
RT J S.
Work will be done around the clock,
on weekdays only.
State Route RT N W West
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.548 MILE(S) AFTER RT W S.
Work will be done around the clock,
on weekdays only.
State Route RT V E East
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-NOV-2022 to 24-FEB-2023.
Road work begins
MO 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT V W West
-
CRAWFORD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-NOV-2022 to 24-FEB-2023.
Road work begins
RT Y S.
Work will be done around the clock,
on weekdays only.
State Route MO 39 N North
-
DADE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.04 MILE(S) AFTER CST RUSSELL E.
Work will be done around the clock,
on weekdays only.
State Route MO 39 S South
-
DADE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.46 MILE(S) BEFORE CRD 42 E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
DADE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 17-FEB-2023.
Road work begins
.285 MILE(S) AFTER RT H S.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
DALLAS COUNTY
- Expect Delays
MILLING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.208 MILE(S) BEFORE CRD NEW HOPE RD E.
Work will be done around the clock,
on weekdays only.
State Route RT P E East
-
DAVIESS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.004 MILE(S) AFTER RT K S.
Work will be done around the clock,
on weekdays only.
State Route RT P W West
-
DAVIESS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.021 MILE(S) BEFORE RT YY S.
Work will be done around the clock,
on weekdays only.
State Route RT HH N North
-
DENT COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JAN-2023 to 24-FEB-2023.
Road work begins
CRD 6190 S.
Work will be done around the clock,
on weekdays only.
State Route RT HH S South
-
DENT COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JAN-2023 to 24-FEB-2023.
Road work begins
MO 32 E.
Work will be done around the clock,
on weekdays only.
State Route MO 25 N North
-
DUNKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-JAN-2023 to 31-OCT-2023.
Road work begins
US 412 E.
Work will be done around the clock,
on weekdays only.
State Route MO 25 S South
-
DUNKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-JAN-2023 to 31-OCT-2023.
Road work begins
CRD 218 E.
Work will be done around the clock,
on weekdays only.
State Route RT B S South
-
GASCONADE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 30-JAN-2023 to 17-FEB-2023.
Road work begins
.023 MILE(S) BEFORE CRD RED BIRD RD E.
Work will be done around the clock,
on weekdays only.
State Route RT ZZ N North
-
GENTRY COUNTY
- No Expected Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-DEC-2022 to 01-MAR-2023.
Road work begins
RT T E.
Work will be done around the clock,
on weekdays only.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 17-JAN-2023 to 31-MAR-2023.
Road work begins
.002 MILE(S) AFTER RP S NATIONAL AVE TO US60W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
GREENE COUNTY
- No Expected Delays
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.73 MILE(S) BEFORE RP IS44W TO MO125 W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
GREENE COUNTY
- No Expected Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-FEB-2023 to 08-FEB-2023.
Road work begins
.638 MILE(S) AFTER RP MO125 TO IS44W W.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
GREENE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 17-FEB-2023.
Road work begins
.192 MILE(S) AFTER CST FRAZIER AVE S.
Work will be done around the clock,
on weekdays only.
State Route MO 146 E East
-
GRUNDY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.093 MILE(S) AFTER CST BOONE ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 146 W West
-
GRUNDY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.229 MILE(S) BEFORE CST BOONE ST S.
Work will be done around the clock,
on weekdays only.
State Route RT EE S South
-
HARRISON COUNTY
- No Expected Delays
RESURFACING PAVEMENT
Scheduled from 07-NOV-2022 to 31-MAR-2023.
Road work begins
RT M E.
Work will be done around the clock,
on weekdays only.
State Route RT ZZ S South
-
HARRISON COUNTY
- No Expected Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-DEC-2022 to 01-MAR-2023.
Road work begins
US 136 E.
Work will be done around the clock,
on weekdays only.
State Route RT F S South
-
HENRY COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
MO 52 E.
Work will be done around the clock,
on weekdays only.
State Route MO 13 S South
-
HENRY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 19-JAN-2023 to 17-FEB-2023.
Road work begins
.477 MILE(S) BEFORE RT Z E.
Work will be done around the clock,
on weekdays only.
Interstate IS 29 N North
-
HOLT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-FEB-2023 to 08-FEB-2023.
Road work begins
.797 MILE(S) BEFORE CRD ELMWOOD RD S.
Work will be done around the clock,
on weekdays only.
Interstate IS 29 S South
-
HOLT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
.105 MILE(S) BEFORE US 59 S.
Work will be done around the clock,
on weekdays only.
State Route MO 87 N North
-
HOWARD COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.002 MILE(S) AFTER RT E E.
Work will be done around the clock,
on weekdays only.
State Route MO 87 S South
-
HOWARD COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.025 MILE(S) AFTER MO 240 E.
Work will be done around the clock,
on weekdays only.
State Route RT AA E East
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 24-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT AA W West
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 24-FEB-2023.
Road work begins
RT E E.
Work will be done around the clock,
on weekdays only.
State Route MO 17 N North
-
HOWELL COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JAN-2023 to 01-MAR-2023.
Road work begins
.038 MILE(S) BEFORE CST FIFTH ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 17 S South
-
HOWELL COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 13-JAN-2023 to 01-MAR-2023.
Road work begins
.006 MILE(S) AFTER US 60 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 435 N North
-
JACKSON COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 03-DEC-2022 to 15-FEB-2023.
Road work begins
.009 MILE(S) BEFORE RR UNKNOWN STUB S.
Work will be done around the clock,
on weekdays and Saturdays.
Ramp RP IS470E TO VIEW HIGH DR S South
-
JACKSON COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 02-JAN-2023 to 27-MAR-2023.
Road work begins
.026 MILE(S) AFTER IS 470 E.
Work will be done around the clock,
on weekdays and Saturdays.
Ramp RP VIEW HIGH DR TO IS470E E East
-
JACKSON COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 02-JAN-2023 to 27-MAR-2023.
Road work begins
CST VIEW HIGH DR S.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 35 N North
-
JACKSON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.02 MILE(S) AFTER RR NEFF YD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 670 E East
-
JACKSON COUNTY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.147 MILE(S) BEFORE CST GENESSEE ST S.
Work will be done around the clock,
on weekdays only.
Interstate IS 670 W West
-
JACKSON COUNTY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.009 MILE(S) AFTER CST WYANDOTTE ST S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.045 MILE(S) BEFORE RP IS70W TO VAN BRUNT BLVD S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.023 MILE(S) BEFORE US 40 E.
Work will be done around the clock,
on weekdays only.
State Route MO 78 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-FEB-2023 to 08-FEB-2023.
Road work begins
.024 MILE(S) AFTER CST WOODLAND AVE S.
Work will be done around the clock,
on weekdays only.
Ramp RP IS29N TO FRONT ST E E East
-
JACKSON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 09-FEB-2023.
Road work begins
IS 35 N.
Work will be done around the clock,
on weekdays only.
Ramp RP US40 TO IS70W W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
US 40 E.
Work will be done around the clock,
on weekdays only.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.012 MILE(S) BEFORE CST LYNN ST S.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 16-JAN-2023 to 16-FEB-2023.
Road work begins
.006 MILE(S) BEFORE CST OAK ST E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 S South
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 16-JAN-2023 to 16-FEB-2023.
Road work begins
.528 MILE(S) BEFORE RP IS49S TO RTD W.
Work will be done around the clock,
on weekdays only.
State Route MO 37 N North
-
JASPER COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.133 MILE(S) BEFORE RR AURORA SUB E.
Work will be done around the clock,
on weekdays only.
State Route MO 571 S South
-
JASPER COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-DEC-2022 to 17-FEB-2023.
Road work begins
.053 MILE(S) BEFORE RT HH E.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
JASPER COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.129 MILE(S) BEFORE CRD JASCO DR S.
Work will be done around the clock,
on weekdays only.
State Route RT HH E East
-
JASPER COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-DEC-2022 to 17-FEB-2023.
Road work begins
.055 MILE(S) BEFORE MO 571 S.
Work will be done around the clock,
on weekdays only.
State Route RT K E East
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 16-JAN-2023 to 16-FEB-2023.
Road work begins
RT H E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
JASPER COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.127 MILE(S) BEFORE RP RTU TO IS44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
JASPER COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.536 MILE(S) AFTER CRD 40 S.
Work will be done around the clock,
on weekdays only.
State Route MO 66 E East
-
JASPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 30-JAN-2023 to 10-FEB-2023.
Road work begins
.028 MILE(S) BEFORE CRD CENTRAL CITY RD S.
Work will be done around the clock,
on weekdays only.
State Route RT AA E East
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-DEC-2022 to 10-MAR-2023.
Road work begins
.068 MILE(S) AFTER CRD BURLEY RD E.
Work will be done around the clock,
on weekdays only.
State Route RT AA W West
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-DEC-2022 to 10-MAR-2023.
Road work begins
.037 MILE(S) AFTER PVT MYRTLE LN S.
Work will be done around the clock,
on weekdays only.
State Route MO 30 W West
-
JEFFERSON COUNTY
- No Expected Delays
BRIDGE MAINTENANCE
Scheduled from 06-FEB-2023 to 02-MAR-2023.
Road work begins
.067 MILE(S) AFTER PVT INDUSTRIAL DR E.
Work will be done around the clock,
on weekdays only.
BK LEWIS AND CLARK TRAIL E East
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 07-FEB-2023 to 08-FEB-2023.
Road work begins
.195 MILE(S) AFTER CST WALL ST E.
Work will be done around the clock,
on weekdays only.
State Route RT M E East
-
JEFFERSON COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-JAN-2023 to 28-FEB-2023.
Road work begins
.145 MILE(S) BEFORE PVT ST LUKES CHURCH RD E.
Work will be done around the clock,
7 days a week.
State Route RT M W West
-
JEFFERSON COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-JAN-2023 to 28-FEB-2023.
Road work begins
.485 MILE(S) BEFORE CRD MOSS HOLLOW RD S.
Work will be done around the clock,
7 days a week.
State Route RT W N North
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.074 MILE(S) AFTER CRD BURGANS GROVE RD E.
Work will be done around the clock,
on weekdays only.
US US 67 N North
-
JEFFERSON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-NOV-2022 to 28-FEB-2023.
Road work begins
.039 MILE(S) BEFORE CST HICKORY-SQUARE PKWY E.
Work will be done around the clock,
on weekdays only.
US US 67 S South
-
JEFFERSON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-NOV-2022 to 28-FEB-2023.
Road work begins
.019 MILE(S) BEFORE CRD LEMAY FERRY RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 13 N North
-
LAFAYETTE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.013 MILE(S) AFTER RP US24 TO MO13N N.
Work will be done around the clock,
on weekdays only.
State Route MO 20 E East
-
LAFAYETTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-FEB-2023 to 17-FEB-2023.
Road work begins
MO 13 S.
Work will be done around the clock,
on weekdays only.
State Route MO 23 N North
-
LAFAYETTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 05-FEB-2023 to 10-FEB-2023.
Road work begins
.255 MILE(S) BEFORE CRD BETHEL CHURCH RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 23 S South
-
LAFAYETTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 05-FEB-2023 to 10-FEB-2023.
Road work begins
.296 MILE(S) AFTER RT UU E.
Work will be done around the clock,
on weekdays only.
State Route RT UU N North
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
MO 96 E.
Work will be done around the clock,
on weekdays only.
State Route RT UU S South
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.217 MILE(S) BEFORE CRD 2022 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
LAWRENCE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.473 MILE(S) AFTER RP CRD 1010 TO IS44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
LAWRENCE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
.865 MILE(S) BEFORE RP IS44W TO CRD 1010 N.
Work will be done around the clock,
on weekdays only.
State Route MO 5 N North
-
LINN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 08-FEB-2023.
Road work begins
.112 MILE(S) AFTER US 36 W.
Work will be done around the clock,
on weekdays only.
State Route MO 5 S South
-
LINN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 08-FEB-2023.
Road work begins
CST LINE ST E.
Work will be done around the clock,
on weekdays only.
US US 63 N North
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.03 MILE(S) AFTER MO 68 E.
Work will be done around the clock,
on weekdays only.
US US 63 N North
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-JAN-2023 to 10-FEB-2023.
Road work begins
.009 MILE(S) BEFORE CRD 341 S.
Work will be done around the clock,
on weekdays only.
US US 63 S South
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.033 MILE(S) BEFORE RT A S.
Work will be done around the clock,
on weekdays only.
US US 63 S South
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-JAN-2023 to 10-FEB-2023.
Road work begins
.013 MILE(S) BEFORE CRD 329 E.
Work will be done around the clock,
on weekdays only.
Business BU 71 N North
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.04 MILE(S) AFTER CRD PINEY POINT RD E.
Work will be done around the clock,
on weekdays only.
Business BU 71 S South
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.335 MILE(S) AFTER RT EE E.
Work will be done around the clock,
on weekdays only.
State Route MO 59 N North
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
1.001 MILE(S) BEFORE CRD DEER CREEK RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 59 N North
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 03-JAN-2023 to 15-MAR-2023.
Road work begins
.24 MILE(S) AFTER CST REDWOOD LN E.
Work will be done around the clock,
7 days a week.
State Route MO 59 S South
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.264 MILE(S) BEFORE CRD PACK RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 59 S South
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 03-JAN-2023 to 15-MAR-2023.
Road work begins
CST N CLIFFSIDE DR E.
Work will be done around the clock,
7 days a week.
State Route MO 90 E East
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.015 MILE(S) BEFORE CST S LONGVIEW ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 90 E East
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 03-JAN-2023 to 15-MAR-2023.
Road work begins
.002 MILE(S) AFTER RT TT S.
Work will be done around the clock,
7 days a week.
State Route MO 90 W West
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 03-JAN-2023 to 15-MAR-2023.
Road work begins
.009 MILE(S) AFTER CST DAVIS AVE E.
Work will be done around the clock,
7 days a week.
State Route MO 90 W West
-
MCDONALD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-FEB-2023 to 10-FEB-2023.
Road work begins
.398 MILE(S) AFTER CRD OLD PINE TRL S.
Work will be done around the clock,
on weekdays only.
Interstate IS 57 S South
-
MISSISSIPPI COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 18-JAN-2023 to 08-FEB-2023.
Road work begins
.001 MILE(S) AFTER RP IS57S TO MO105S S.
Work will be done around the clock,
on weekdays only.
State Route MO 87 N North
-
MONITEAU COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 09-JAN-2023 to 17-FEB-2023.
Road work begins
CRD BRUSH CREEK RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 87 S South
-
MONITEAU COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 09-JAN-2023 to 17-FEB-2023.
Road work begins
MO 179 S.
Work will be done around the clock,
on weekdays only.
State Route RT N E East
-
MONITEAU COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 16-JAN-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-FEB-2023 to 17-FEB-2023.
Road work begins
1.627 MILE(S) BEFORE RP IS70E TO MO19 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 09-JAN-2023 to 31-MAY-2023.
Road work begins
1.279 MILE(S) BEFORE RP IS70E TO MO19 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 09-JAN-2023 to 31-MAY-2023.
Road work begins
1.848 MILE(S) BEFORE RP IS70W TO MO19 W.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-FEB-2023 to 17-FEB-2023.
Road work begins
2.209 MILE(S) BEFORE RP IS70W TO MO19 W.
Work will be done around the clock,
on weekdays only.
State Route MO 19 N North
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-FEB-2023 to 17-FEB-2023.
Road work begins
.454 MILE(S) AFTER CRD STRUBE RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 19 N North
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-OCT-2022 to 01-DEC-2024.
Road work begins
.114 MILE(S) AFTER CRD STRUBE RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 19 S South
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-FEB-2023 to 17-FEB-2023.
Road work begins
.159 MILE(S) BEFORE CST PICNIC ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 19 S South
-
MONTGOMERY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-OCT-2022 to 01-DEC-2024.
Road work begins
.28 MILE(S) BEFORE CST PICNIC ST E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 03-OCT-2022 to 01-DEC-2024.
Road work begins
1.422 MILE(S) BEFORE RP IS70E TO MO19 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 03-OCT-2022 to 01-DEC-2024.
Road work begins
1.974 MILE(S) BEFORE RP IS70W TO MO19 W.
Work will be done around the clock,
on weekdays only.
State Route MO 52 E East
-
MORGAN COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 09-JAN-2023 to 24-FEB-2023.
Road work begins
.008 MILE(S) BEFORE RT FF S.
Work will be done around the clock,
on weekdays only.
State Route MO 52 W West
-
MORGAN COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 09-JAN-2023 to 24-FEB-2023.
Road work begins
MO 5 S.
Work will be done around the clock,
on weekdays only.
State Route MO 135 N North
-
MORGAN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-DEC-2022 to 24-FEB-2023.
Road work begins
MO 5 S.
Work will be done around the clock,
on weekdays only.
State Route MO 135 S South
-
MORGAN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-DEC-2022 to 24-FEB-2023.
Road work begins
.007 MILE(S) BEFORE CRD WEBB RD E.
Work will be done around the clock,
on weekdays only.
US US 61 N North
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-OCT-2022 to 03-APR-2023.
Road work begins
.003 MILE(S) AFTER CRD 824 E.
Work will be done around the clock,
on weekdays only.
US US 61 S South
-
NEW MADRID COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 17-OCT-2022 to 03-APR-2023.
Road work begins
.008 MILE(S) BEFORE CST RAIDER WAY E.
Work will be done around the clock,
on weekdays only.
US US 61 N North
-
NEW MADRID COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 03-JAN-2023 to 10-FEB-2023.
Road work begins
.002 MILE(S) AFTER CST RAIDER WAY E.
Work will be done around the clock,
on weekdays only.
US US 61 S South
-
NEW MADRID COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 03-JAN-2023 to 10-FEB-2023.
Road work begins
.001 MILE(S) AFTER RP US61 TO US60W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-FEB-2023 to 24-FEB-2023.
Road work begins
.09 MILE(S) BEFORE MO 43 N.
Work will be done around the clock,
on weekdays only.
State Route MO 86 E East
-
NEWTON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.206 MILE(S) AFTER CRD SHETLAND RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 86 W West
-
NEWTON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.58 MILE(S) AFTER CRD WALLEYE RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 86 W West
-
NEWTON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-FEB-2023 to 17-FEB-2023.
Road work begins
.019 MILE(S) BEFORE CST MCCORD ST E.
Work will be done around the clock,
on weekdays only.
State Route RT C E East
-
NODAWAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
CRD NODAWAY ATCHISON RD S.
Work will be done around the clock,
on weekdays only.
State Route RT C W West
-
NODAWAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
US 71 S.
Work will be done around the clock,
on weekdays only.
US US 71 S South
-
NODAWAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 15-FEB-2023.
Road work begins
.021 MILE(S) BEFORE RT D E.
Work will be done around the clock,
on weekdays only.
State Route RT W E East
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-NOV-2022 to 10-FEB-2023.
Road work begins
RT A S.
Work will be done around the clock,
on weekdays only.
State Route RT W W West
-
OSAGE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 07-NOV-2022 to 10-FEB-2023.
Road work begins
US 50 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 155 S South
-
PEMISCOT COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 17-OCT-2022 to 31-JUL-2023.
Road work begins
.043 MILE(S) AFTER US 412 E.
Work will be done around the clock,
on weekdays only.
US US 412 W West
-
PEMISCOT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 09-JAN-2023 to 31-MAR-2023.
Road work begins
.004 MILE(S) AFTER IS 155 N.
Work will be done around the clock,
on weekdays only.
State Route RT EE E East
-
PEMISCOT COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 19-JAN-2023 to 01-APR-2023.
Road work begins
.011 MILE(S) AFTER MO 153 S.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
PEMISCOT COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 19-JAN-2023 to 01-APR-2023.
Road work begins
RT A E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
PHELPS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 30-JAN-2023 to 10-FEB-2023.
Road work begins
.55 MILE(S) AFTER RT U S.
Work will be done around the clock,
on weekdays only.
State Route RT B N North
-
PHELPS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 30-JAN-2023 to 17-FEB-2023.
Road work begins
MO 68 E.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
PHELPS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 23-JAN-2023 to 10-FEB-2023.
Road work begins
CRD 7570 S.
Work will be done around the clock,
on weekdays only.
State Route RT J N North
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-DEC-2022 to 17-FEB-2023.
Road work begins
RT K E.
Work will be done around the clock,
on weekdays only.
State Route RT J S South
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-DEC-2022 to 17-FEB-2023.
Road work begins
RP RTJ TO IS44W W.
Work will be done around the clock,
on weekdays only.
State Route RT T N North
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-DEC-2022 to 17-FEB-2023.
Road work begins
RT M E.
Work will be done around the clock,
on weekdays only.
State Route RT T S South
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-DEC-2022 to 17-FEB-2023.
Road work begins
RT C S.
Work will be done around the clock,
on weekdays only.
Interstate IS 29 N North
-
PLATTE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
.054 MILE(S) AFTER RP IS29N TO 72ND ST N.
Work will be done around the clock,
on weekdays only.
Interstate IS 29 S South
-
PLATTE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
.009 MILE(S) AFTER MO 92 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 435 S South
-
PLATTE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.405 MILE(S) AFTER IS 29 N.
Work will be done around the clock,
on weekdays only.
State Route RT AA N North
-
PLATTE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAR-2022 to 01-JUN-2023.
Road work begins
.003 MILE(S) AFTER CST 51ST TER E.
Work will be done around the clock,
7 days a week.
State Route RT AA S South
-
PLATTE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAR-2022 to 01-JUN-2023.
Road work begins
CST NW WAUKOMIS DR S.
Work will be done around the clock,
7 days a week.
State Route MO 152 E East
-
PLATTE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
.059 MILE(S) BEFORE CST N PLATTE PURCHASE DR N.
Work will be done around the clock,
on weekdays only.
State Route MO 133 N North
-
PULASKI COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.006 MILE(S) AFTER CST YORK ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 133 S South
-
PULASKI COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.068 MILE(S) BEFORE RT C E.
Work will be done around the clock,
on weekdays only.
State Route RT D E East
-
PULASKI COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 23-JAN-2023 to 10-FEB-2023.
Road work begins
MO 28 E.
Work will be done around the clock,
on weekdays only.
State Route RT H N North
-
RALLS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
RT A E.
Work will be done around the clock,
on weekdays only.
State Route RT H S South
-
RALLS COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
RT HH E.
Work will be done around the clock,
on weekdays only.
State Route MO 3 N North
-
RANDOLPH COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 08-SEP-2022 to 15-MAR-2023.
Road work begins
.012 MILE(S) AFTER RT BB E.
Work will be done around the clock,
on weekdays only.
State Route MO 3 S South
-
RANDOLPH COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 08-SEP-2022 to 15-MAR-2023.
Road work begins
.337 MILE(S) AFTER CRD 2040 E.
Work will be done around the clock,
on weekdays only.
State Route MO 13 S South
-
RAY COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.608 MILE(S) AFTER CST WALMART AVE E.
Work will be done around the clock,
on weekdays only.
State Route MO 127 N North
-
SALINE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.064 MILE(S) AFTER RT ZZ S.
Work will be done around the clock,
on weekdays only.
State Route MO 20 W West
-
SALINE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-FEB-2023 to 10-FEB-2023.
Road work begins
.105 MILE(S) BEFORE CRD COUGAR AVE S.
Work will be done around the clock,
on weekdays only.
US US 63 N North
-
SCHUYLER COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.003 MILE(S) BEFORE RT O E.
Work will be done around the clock,
on weekdays only.
US US 63 S South
-
SCHUYLER COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.069 MILE(S) AFTER CRD PRAIRIE SCHOOL RD E.
Work will be done around the clock,
on weekdays only.
CST MALONE AVE E East
-
SCOTT COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 05-JAN-2023 to 31-OCT-2023.
Road work begins
.021 MILE(S) BEFORE US 62 E.
Work will be done around the clock,
on weekdays only.
CST MALONE AVE W West
-
SCOTT COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 05-JAN-2023 to 31-OCT-2023.
Road work begins
.019 MILE(S) BEFORE US 62 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 55 N North
-
SCOTT COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAY-2022 to 01-MAY-2023.
Road work begins
.039 MILE(S) AFTER RP IS57S TO IS55N N.
Work will be done around the clock,
on weekdays only.
Interstate IS 55 S South
-
SCOTT COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAY-2022 to 01-MAY-2023.
Road work begins
.022 MILE(S) BEFORE RP RTHH TO IS55S S.
Work will be done around the clock,
on weekdays only.
US US 61 N North
-
SCOTT COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 05-JAN-2023 to 31-OCT-2023.
Road work begins
.011 MILE(S) BEFORE US 62 E.
Work will be done around the clock,
on weekdays only.
US US 61 S South
-
SCOTT COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 05-JAN-2023 to 31-OCT-2023.
Road work begins
.014 MILE(S) BEFORE US 62 E.
Work will be done around the clock,
on weekdays only.
State Route MO 19 N North
-
SHANNON COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 01-MAR-2023.
Road work begins
.001 MILE(S) AFTER CST PERKINS ST E.
Work will be done around the clock,
7 days a week.
State Route MO 19 S South
-
SHANNON COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 01-MAR-2023.
Road work begins
.002 MILE(S) BEFORE CST SECOND ST E.
Work will be done around the clock,
7 days a week.
US US 36 E East
-
SHELBY COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
RT PP S.
Work will be done around the clock,
on weekdays only.
US US 67 S South
-
ST. CHARLES COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-OCT-2022 to 26-APR-2023.
Road work begins
.221 MILE(S) BEFORE PVT MACHENS CLUB DR S.
Work will be done around the clock,
7 days a week.
State Route MO 94 W West
-
ST. CHARLES COUNTY
- No Expected Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-MAR-2022 to 01-NOV-2023.
Road work begins
.004 MILE(S) AFTER CST SHERMAN DR E.
Work will be done around the clock,
on weekdays only.
Ramp RP MO364W TO HENKE RD N North
-
ST. CHARLES COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 06-FEB-2023 to 16-FEB-2023.
Road work begins
.046 MILE(S) AFTER MO 364 W.
Work will be done around the clock,
on weekdays only.
Ramp RP MO364W TO MO94E E East
-
ST. CHARLES COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-MAR-2022 to 01-NOV-2023.
Road work begins
MO 364 W.
Work will be done around the clock,
on weekdays only.
Ramp RP MO364W TO MUEGGE RD N North
-
ST. CHARLES COUNTY
- No Expected Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-MAR-2022 to 01-SEP-2023.
Road work begins
.042 MILE(S) BEFORE RP MO364W TO MO94E E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.043 MILE(S) BEFORE CO RP IS70E TO RTK TO RP RTK TO IS70W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-FEB-2023 to 20-FEB-2023.
Road work begins
.046 MILE(S) BEFORE MO 370 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.249 MILE(S) AFTER CST EXECUTIVE CENTRE PKWY E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-FEB-2023 to 20-FEB-2023.
Road work begins
.66 MILE(S) BEFORE RP IS70W TO CAVE SPRINGS DR N.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins
.01 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done around the clock,
on weekdays only.
State Route MO 94 E East
-
ST. CHARLES COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-MAR-2022 to 01-NOV-2023.
Road work begins
CST OLD MO 94 E.
Work will be done around the clock,
on weekdays only.
State Route RT F N North
-
ST. CLAIR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 06-FEB-2023 to 17-FEB-2023.
Road work begins
.228 MILE(S) AFTER RT A E.
Work will be done around the clock,
on weekdays only.
Interstate IS 170 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE INSPECTION
Scheduled from 12-DEC-2022 to 30-JUN-2023.
Road work begins
.024 MILE(S) AFTER RP MO180E TO IS170E E.
Work will be done around the clock,
7 days a week.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-NOV-2022 to 30-JUN-2023.
Road work begins
.245 MILE(S) BEFORE CST MIDLAND BLVD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 255 N North
-
ST. LOUIS COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 26-JAN-2023 to 17-FEB-2023.
Road work begins
US 50 W.
Work will be done around the clock,
on weekdays only.
Interstate IS 255 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 09-JAN-2023 to 31-MAR-2023.
Road work begins
US 50 W.
Work will be done around the clock,
on weekdays only.
Interstate IS 255 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-JAN-2023 to 31-MAR-2023.
Road work begins
.003 MILE(S) AFTER RP MO231 TO IS255S S.
Work will be done around the clock,
7 days a week.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-FEB-2023 to 21-FEB-2023.
Road work begins
.174 MILE(S) AFTER RP IS270E TO SOR270E E.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-FEB-2023 to 21-FEB-2023.
Road work begins
.04 MILE(S) BEFORE PED DUNN RD OVERPASS S.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-FEB-2023 to 24-FEB-2023.
Road work begins
.884 MILE(S) AFTER RP LEWIS RD TO IS44E E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-FEB-2023 to 24-FEB-2023.
Road work begins
.06 MILE(S) AFTER RP ANTIRE RD TO IS44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 55 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.021 MILE(S) AFTER RP UNION TO IS55N N.
Work will be done around the clock,
7 days a week.
State Route MO 100 E East
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-AUG-2022 to 25-DEC-2023.
Road work begins
.048 MILE(S) AFTER RP IS270E TO MO100E E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-AUG-2022 to 25-DEC-2023.
Road work begins
.001 MILE(S) AFTER US 61 S.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 100 W West
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-JUN-2022 to 01-DEC-2023.
Road work begins
.012 MILE(S) AFTER CST MANCHESTER RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 01-JUN-2024.
Road work begins
.036 MILE(S) BEFORE OR 340 E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Expect Delays
JOINT/CRACK SEALING
Scheduled from 08-FEB-2023 to 24-FEB-2023.
Road work begins
MO 100 E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 01-SEP-2023.
Road work begins
.036 MILE(S) BEFORE OR 340 E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Expect Delays
JOINT/CRACK SEALING
Scheduled from 08-FEB-2023 to 24-FEB-2023.
Road work begins
.01 MILE(S) AFTER OR 340 E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 01-SEP-2023.
Road work begins
.012 MILE(S) BEFORE CST RIVER VALLEY DR S.
Work will be done around the clock,
on weekdays only.
State Route RT AC N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-FEB-2023 to 06-APR-2023.
Road work begins
RP IS270E TO RTAC E.
Work will be done around the clock,
7 days a week.
State Route RT AC S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-FEB-2023 to 06-APR-2023.
Road work begins
.001 MILE(S) BEFORE OR 270 W.
Work will be done around the clock,
7 days a week.
US US 67 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.005 MILE(S) AFTER CST LONE EAGLE DR E.
Work will be done around the clock,
on weekdays only.
CRD KOCH RD N North
-
ST. LOUIS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 08-FEB-2023 to 03-MAR-2023.
Road work begins
.013 MILE(S) AFTER RP US50W TO KOCH RD N.
Work will be done around the clock,
on weekdays only.
CRD KOCH RD S South
-
ST. LOUIS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 08-FEB-2023 to 03-MAR-2023.
Road work begins
.022 MILE(S) AFTER PVT WEST GATE DR S.
Work will be done around the clock,
on weekdays only.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2020 to 31-DEC-2023.
Road work begins
.011 MILE(S) AFTER RR SAINT LOUIS DISTRICT E.
Work will be done around the clock,
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2020 to 31-DEC-2023.
Road work begins
.056 MILE(S) AFTER RP RIVERVIEW DR TO IS270W W.
Work will be done around the clock,
7 days a week.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-JAN-2023 to 28-FEB-2023.
Road work begins
.001 MILE(S) BEFORE CRD BIG BEND RD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.004 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
CST TURKEY TRACK RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 180 E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUL-2021 to 01-SEP-2023.
Road work begins
CST BOENKER LN E.
Work will be done around the clock,
on weekdays only.
State Route MO 180 W West
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUL-2021 to 01-SEP-2023.
Road work begins
CST MASTERSON PL E.
Work will be done around the clock,
on weekdays only.
State Route MO 30 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 15-FEB-2023.
Road work begins
.051 MILE(S) BEFORE CRD WEBER RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
CST COUNTRY RIDGE DR E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
CST PEACH HILL LN S.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-JAN-2023 to 10-FEB-2023.
Road work begins
.057 MILE(S) AFTER CST DOLORES AVE S.
Work will be done around the clock,
on weekdays only.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JAN-2023 to 09-FEB-2023.
Road work begins
.037 MILE(S) AFTER CST COLISEUM DR E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.005 MILE(S) AFTER CST MCKNIGHT RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JAN-2023 to 09-FEB-2023.
Road work begins
.068 MILE(S) BEFORE CST N WOODS MILL RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-FEB-2023 to 09-FEB-2023.
Road work begins
CST RIVER VALLEY DR S.
Work will be done around the clock,
on weekdays only.
State Route MO 366 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JAN-2023 to 31-MAY-2023.
Road work begins
PVT WATSON INDUSTRIAL RD E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 366 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-JAN-2023 to 09-FEB-2023.
Road work begins
.02 MILE(S) BEFORE CST GIRARD DR S.
Work will be done around the clock,
on weekdays only.
Outer Road S OR 270 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-JAN-2023 to 03-MAR-2023.
Road work begins
.003 MILE(S) AFTER CST FORD LN E.
Work will be done around the clock,
on weekdays only.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-JAN-2023 to 10-FEB-2023.
Road work begins
.001 MILE(S) BEFORE PVT RONNIES PLAZA S.
Work will be done around the clock,
on weekdays only.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-FEB-2023 to 10-FEB-2023.
Road work begins
.02 MILE(S) BEFORE CST SWAN DR E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-DEC-2022 to 28-JUL-2023.
Road work begins
CST NORTH TEALBROOK DR E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-JAN-2023 to 30-JUL-2023.
Road work begins
.052 MILE(S) BEFORE RP US67S TO QUAILWAYS DR W.
Work will be done around the clock,
7 days a week.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-FEB-2023 to 10-FEB-2023.
Road work begins
CST MAPLE AVE E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-JAN-2023 to 28-JUL-2023.
Road work begins
.026 MILE(S) BEFORE CST SUNSWEPT DR E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2022 to 26-MAY-2023.
Road work begins
.047 MILE(S) BEFORE CO RP IS44E TO WASHINGTON AVE TO NOR44 W.
Work will be done around the clock,
7 days a week.
Interstate IS 55 S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins
.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done around the clock,
7 days a week.
Ramp RP BROADWAY TO IS44E E East
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-JAN-2023 to 31-MAY-2023.
Road work begins
CST BROADWAY N.
Work will be done around the clock,
7 days a week.
Ramp RP LUMIERE PLACE BLVD TO IS44E E East
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2022 to 31-MAY-2023.
Road work begins
.053 MILE(S) AFTER CST LUMIERE PLACE BLVD N.
Work will be done around the clock,
7 days a week.
Ramp RP RV70E TO BROADWAY S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2022 to 31-MAY-2023.
Road work begins
RV 70 E.
Work will be done around the clock,
7 days a week.
Interstate IS 44 E East
-
ST. LOUIS CITY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.032 MILE(S) AFTER CST LAFAYETTE AVE E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
ST. LOUIS CITY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
IS 70 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
ST. LOUIS CITY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.096 MILE(S) BEFORE RP IS70E TO CARRIE AVE E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
ST. LOUIS CITY
- Delays Possible
SWEEPING PAVEMENT
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.038 MILE(S) BEFORE CST BROADWAY S.
Work will be done around the clock,
on weekdays only.
State Route RT M N North
-
STE. GENEVIEVE COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-FEB-2023 to 15-MAY-2023.
Road work begins
RT N S.
Work will be done around the clock,
on weekdays only.
State Route RT M S South
-
STE. GENEVIEVE COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-FEB-2023 to 15-MAY-2023.
Road work begins
US 61 S.
Work will be done around the clock,
on weekdays only.
Business BU 60 E East
-
STODDARD COUNTY
- No Expected Delays
SHOULDER WORK
Scheduled from 06-FEB-2023 to 08-FEB-2023.
Road work begins
RT AD S.
Work will be done around the clock,
on weekdays only.
State Route MO 176 W West
-
TANEY COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 07-FEB-2023 to 17-FEB-2023.
Road work begins
.384 MILE(S) AFTER US 160 E.
Work will be done around the clock,
on weekdays only.
State Route MO 86 E East
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 29-DEC-2023.
Road work begins
.163 MILE(S) AFTER CRD LEISURE LN E.
Work will be done around the clock,
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 29-DEC-2023.
Road work begins
.218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done around the clock,
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route RT K E East
-
TANEY COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 07-FEB-2023 to 17-FEB-2023.
Road work begins
MO 76 E.
Work will be done around the clock,
on weekdays only.
State Route MO 86 E East
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.174 MILE(S) AFTER CRD LEISURE LN E.
Work will be done around the clock,
on weekdays only.
State Route MO 86 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done around the clock,
on weekdays only.
US US 60 E East
-
TEXAS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-JAN-2023 to 09-FEB-2023.
Road work begins
.005 MILE(S) AFTER MO 181 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
VERNON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 10-FEB-2023.
Road work begins
.807 MILE(S) AFTER RP RTE TO IS49N N.
Work will be done around the clock,
7 days a week.
Interstate IS 49 S South
-
VERNON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 10-FEB-2023.
Road work begins
.684 MILE(S) AFTER RP RTK TO IS49S S.
Work will be done around the clock,
7 days a week.
State Route RT BB N North
-
VERNON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-OCT-2022 to 15-MAR-2023.
Road work begins
.004 MILE(S) BEFORE CST EWING E.
Work will be done around the clock,
on weekdays only.
State Route RT BB S South
-
VERNON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-OCT-2022 to 15-MAR-2023.
Road work begins
US 54 E.
Work will be done around the clock,
on weekdays only.
State Route RT K E East
-
VERNON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
LP 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT K W West
-
VERNON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
US 54 E.
Work will be done around the clock,
on weekdays only.
State Route RT O E East
-
VERNON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 08-FEB-2023 to 10-FEB-2023.
Road work begins
.536 MILE(S) BEFORE CRD 900 S.
Work will be done around the clock,
on weekdays only.
State Route RT W N North
-
VERNON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-OCT-2022 to 15-MAR-2023.
Road work begins
US 54 E.
Work will be done around the clock,
on weekdays only.
State Route RT W S South
-
VERNON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-OCT-2022 to 15-MAR-2023.
Road work begins
CST ATLANTIC AVE E.
Work will be done around the clock,
on weekdays only.
State Route RT M E East
-
WASHINGTON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
MO 21 S.
Work will be done around the clock,
on weekdays only.
State Route RT M W West
-
WASHINGTON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 06-FEB-2023 to 10-FEB-2023.
Road work begins
.053 MILE(S) BEFORE RT U S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
WEBSTER COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 16-JAN-2023 to 31-MAR-2023.
Road work begins
1.245 MILE(S) BEFORE RP IS44E TO SAMPSON RD E.
Work will be done around the clock,
on weekdays and Sundays.
Interstate IS 44 E East
-
WEBSTER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-JAN-2023 to 30-NOV-2023.
Road work begins
.399 MILE(S) AFTER CRD PLANK SCHOOL RD E.
Work will be done around the clock,
7 days a week.
Interstate IS 44 E East
-
WEBSTER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-JAN-2023 to 31-DEC-2023.
Road work begins
.147 MILE(S) BEFORE CRD SPARKLE BROOK RD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
WEBSTER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-JAN-2023 to 29-DEC-2023.
Road work begins
.379 MILE(S) AFTER RP SAMPSON RD TO IS44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
WEBSTER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-JAN-2023 to 31-DEC-2023.
Road work begins
.396 MILE(S) AFTER RA IS44W CONWAY W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
WEBSTER COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-JAN-2023 to 30-NOV-2023.
Road work begins
.74 MILE(S) BEFORE RP IS44W TO SAMPSON RD W.
Work will be done around the clock,
7 days a week.
Interstate IS 44 W West
-
WEBSTER COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 16-JAN-2023 to 31-MAR-2023.
Road work begins
.97 MILE(S) AFTER RP SAMPSON RD TO IS44W W.
Work will be done around the clock,
on weekdays and Sundays.
Interstate IS 44 W West
-
WEBSTER COUNTY
- No Expected Delays
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
2.182 MILE(S) AFTER RP RTB TO IS44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
WEBSTER COUNTY
- No Expected Delays
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.035 MILE(S) BEFORE MO 38 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
WEBSTER COUNTY
- No Expected Delays
GUARD RAIL/CABLE WORK
Scheduled from 08-FEB-2023 to 08-FEB-2023.
Road work begins
.205 MILE(S) AFTER RP RTCC TO IS44W W.
Work will be done around the clock,
on weekdays only.
State Route RT N S South
-
WORTH COUNTY
- No Expected Delays
RESURFACING PAVEMENT
Scheduled from 22-NOV-2022 to 31-MAR-2023.
Road work begins
RT M E.
Work will be done around the clock,
on weekdays only.
Business BU 60 E East
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 31-JAN-2023 to 01-MAR-2023.
Road work begins
.001 MILE(S) AFTER CST NEWTON ST E.
Work will be done around the clock,
on weekdays only.
Business BU 60 W West
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 31-JAN-2023 to 01-MAR-2023.
Road work begins
.002 MILE(S) BEFORE CST TRIPP ST E.
Work will be done around the clock,
on weekdays only.
State Route RT C N North
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 15-FEB-2023.
Road work begins
.002 MILE(S) BEFORE CST VANNOY ST E.
Work will be done around the clock,
7 days a week.
State Route RT C S South
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 15-FEB-2023.
Road work begins
.003 MILE(S) BEFORE OR 60 E.
Work will be done around the clock,
7 days a week.
State Route RT PP N North
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 15-FEB-2023.
Road work begins
.003 MILE(S) AFTER CST HAWK ST S.
Work will be done around the clock,
7 days a week.
State Route RT PP S South
-
WRIGHT COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JAN-2023 to 15-FEB-2023.
Road work begins
RT C S.
Work will be done around the clock,
7 days a week.
Interstate IS 29 S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 14-FEB-2023 to 15-FEB-2023.
Road work begins
.86 MILE(S) BEFORE RP IS29S TO RTA S.
Work will be done around the clock,
on weekdays only.
State Route RT K E East
-
BARTON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.045 MILE(S) AFTER CRD NW 145TH LN S.
Work will be done around the clock,
on weekdays only.
State Route RT P W West
-
BARTON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.015 MILE(S) AFTER CRD NW 150TH LN S.
Work will be done around the clock,
on weekdays only.
State Route RT V W West
-
BARTON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.008 MILE(S) AFTER OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT AA E East
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.188 MILE(S) AFTER CRD PALMER RD E.
Work will be done around the clock,
on weekdays only.
State Route RT AA W West
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.205 MILE(S) AFTER CRD STONE PILLER AVE S.
Work will be done around the clock,
on weekdays only.
State Route MO 53 N North
-
BUTLER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 10-FEB-2023 to 31-MAR-2023.
Road work begins
CST FAIR ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 53 S South
-
BUTLER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 10-FEB-2023 to 31-MAR-2023.
Road work begins
.001 MILE(S) AFTER BU 67 S.
Work will be done around the clock,
on weekdays only.
State Route RT PP E East
-
CALLAWAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
RT BB S.
Work will be done around the clock,
on weekdays only.
State Route RT PP W West
-
CALLAWAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
MO 94 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 55 N North
-
CAPE GIRARDEAU COUNTY
- Expect Delays
BRIDGE INSPECTION
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.019 MILE(S) AFTER US 61 N.
Work will be done around the clock,
on weekdays only.
Interstate IS 55 S South
-
CAPE GIRARDEAU COUNTY
- Expect Delays
BRIDGE INSPECTION
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.483 MILE(S) BEFORE MO 74 W.
Work will be done around the clock,
on weekdays only.
State Route MO 7 S South
-
CASS COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.031 MILE(S) AFTER RP IS49N TO MO7 S.
Work will be done around the clock,
on weekdays only.
State Route RT O N North
-
CASS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.009 MILE(S) BEFORE CRD 327TH ST E.
Work will be done around the clock,
on weekdays only.
CST MARKET ST N North
-
CHRISTIAN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 10-FEB-2023 to 14-FEB-2023.
Road work begins
.006 MILE(S) AFTER MO 14 E.
Work will be done around the clock,
on weekdays only.
CST MARKET ST S South
-
CHRISTIAN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 10-FEB-2023 to 14-FEB-2023.
Road work begins
.009 MILE(S) BEFORE MO 14 E.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
CHRISTIAN COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.135 MILE(S) BEFORE RP US65N TO RTJ E E.
Work will be done around the clock,
on weekdays only.
CST RICHARDS RD N North
-
CLAY COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 09-FEB-2023 to 22-SEP-2023.
Road work begins
CST HARLEM RD E.
Work will be done around the clock,
7 days a week.
CST RICHARDS RD S South
-
CLAY COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 09-FEB-2023 to 22-SEP-2023.
Road work begins
.118 MILE(S) AFTER CO RICHARD RD TO US169S S.
Work will be done around the clock,
7 days a week.
State Route MO 152 W West
-
CLAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.257 MILE(S) BEFORE RP MO152W TO OAK TRFY N.
Work will be done around the clock,
on weekdays only.
State Route MO 9 S South
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.209 MILE(S) BEFORE CST GRAND BLVD S.
Work will be done around the clock,
on weekdays only.
Business BU 50 E East
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.008 MILE(S) BEFORE CST RAX CT S.
Work will be done around the clock,
on weekdays and Saturdays.
Business BU 50 W West
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.005 MILE(S) BEFORE US 50 E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 179 N North
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
RT B N.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 179 S South
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.147 MILE(S) BEFORE CST W MAIN ST E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 50 E East
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.011 MILE(S) AFTER RP SOUTH COUNTRY CLUB DR TO US50E E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 50 E East
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.253 MILE(S) AFTER CST VETTER LN S.
Work will be done around the clock,
on weekdays and Saturdays.
US US 50 W West
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.184 MILE(S) AFTER CST N SHAMROCK RD S.
Work will be done around the clock,
on weekdays and Saturdays.
US US 50 W West
-
COLE COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 13-FEB-2023 to 01-NOV-2023.
Road work begins
.272 MILE(S) AFTER RP DIX RD TO US50W W.
Work will be done around the clock,
on weekdays and Saturdays.
State Route RT B S South
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.05 MILE(S) AFTER RT J E.
Work will be done around the clock,
on weekdays only.
State Route RT EE E East
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT V N North
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
CRD BIG LICK RD E.
Work will be done around the clock,
on weekdays only.
State Route RT V S South
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
MO 179 S.
Work will be done around the clock,
on weekdays only.
State Route RT Y E East
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT Y W West
-
COOPER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
CRD BOONVILLE RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 100 E East
-
FRANKLIN COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.094 MILE(S) AFTER RT M S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.847 MILE(S) BEFORE RP IS44E TO RTN E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
2.293 MILE(S) BEFORE RP IS44W TO RTK N.
Work will be done around the clock,
on weekdays only.
State Route RT CC W West
-
GREENE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 14-FEB-2023 to 14-FEB-2023.
Road work begins
.402 MILE(S) BEFORE CRD 185 S.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.072 MILE(S) BEFORE BU 65 N.
Work will be done around the clock,
on weekdays only.
Business BU 65 S South
-
GREENE COUNTY
- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.032 MILE(S) AFTER CST CHEROKEE ST E.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
GREENE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.965 MILE(S) BEFORE RP IS44E TO LP44W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
GREENE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.038 MILE(S) BEFORE MO 266 E.
Work will be done around the clock,
on weekdays only.
State Route RT V S South
-
GREENE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 14-FEB-2023 to 15-FEB-2023.
Road work begins
.241 MILE(S) BEFORE PVT W CHELSEA LN E.
Work will be done around the clock,
on weekdays only.
US US 60 E East
-
GREENE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.072 MILE(S) AFTER US 160 E.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
GREENE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 10-FEB-2023 to 10-FEB-2023.
Road work begins
.031 MILE(S) AFTER RP RTYY TO US65S S.
Work will be done around the clock,
on weekdays only.
State Route RT N E East
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 14-FEB-2023 to 14-FEB-2023.
Road work begins
.231 MILE(S) BEFORE CRD NW-1671 S.
Work will be done around the clock,
on weekdays only.
State Route RT N W West
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 14-FEB-2023 to 14-FEB-2023.
Road work begins
.127 MILE(S) BEFORE CRD NW-1531 S.
Work will be done around the clock,
on weekdays only.
State Route RT O N North
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.206 MILE(S) AFTER RT N E.
Work will be done around the clock,
on weekdays only.
State Route RT O N North
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.489 MILE(S) BEFORE CRD NW-500 E.
Work will be done around the clock,
on weekdays only.
State Route RT O S South
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.41 MILE(S) BEFORE CRD NW-500 E.
Work will be done around the clock,
on weekdays only.
State Route RT T E East
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.052 MILE(S) AFTER CRD SW 601 S.
Work will be done around the clock,
on weekdays only.
State Route RT T W West
-
HENRY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 16-FEB-2023 to 16-FEB-2023.
Road work begins
.197 MILE(S) AFTER CRD 501ST RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 7 N North
-
HENRY COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.082 MILE(S) BEFORE RP MO7N TO LUTHERAN DR N.
Work will be done around the clock,
on weekdays only.
State Route MO 240 E East
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.092 MILE(S) BEFORE CST GIVENS RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 240 W West
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
US 40 E.
Work will be done around the clock,
on weekdays only.
State Route MO 5 N North
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.017 MILE(S) AFTER US 40 E.
Work will be done around the clock,
on weekdays only.
State Route MO 5 S South
-
HOWARD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.006 MILE(S) AFTER MO 3 S.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
HOWARD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
CRD 317 S.
Work will be done around the clock,
on weekdays only.
State Route RT E W West
-
HOWARD COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT E W West
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
MO 5 S.
Work will be done around the clock,
on weekdays only.
State Route RT O E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 24-FEB-2023.
Road work begins
RT H S.
Work will be done around the clock,
on weekdays only.
State Route RT O W West
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 24-FEB-2023.
Road work begins
RT A S.
Work will be done around the clock,
on weekdays only.
CRD S BUCKNER TARSNEY RD N North
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 14-FEB-2023.
Road work begins
.324 MILE(S) AFTER CRD PINK HILL RD E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-FEB-2023 to 16-FEB-2023.
Road work begins
.045 MILE(S) BEFORE CST JACKSON AVE S.
Work will be done around the clock,
on weekdays only.
State Route RT AA W West
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 11-FEB-2023.
Road work begins
.057 MILE(S) BEFORE CST ADAMS DAIRY PKWY S.
Work will be done around the clock,
on weekdays and Saturdays.
CST BLUE RIDGE CUTOFF N North
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.032 MILE(S) BEFORE US 40 E.
Work will be done around the clock,
on weekdays only.
CST BLUE RIDGE CUTOFF S South
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.027 MILE(S) BEFORE US 40 E.
Work will be done around the clock,
on weekdays only.
CST RIVER BLVD N North
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-FEB-2023 to 24-FEB-2023.
Road work begins
.017 MILE(S) BEFORE US 24 E.
Work will be done around the clock,
on weekdays only.
CST RIVER BLVD S South
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-FEB-2023 to 24-FEB-2023.
Road work begins
.032 MILE(S) BEFORE US 24 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.014 MILE(S) BEFORE CST BROOKLYN AVE S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.038 MILE(S) BEFORE RP ASKEW AVE TO IS70W W.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-FEB-2023 to 10-FEB-2023.
Road work begins
.006 MILE(S) BEFORE CST VAN BRUNT BLVD N.
Work will be done around the clock,
on weekdays only.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.117 MILE(S) AFTER CST DODGION ST S.
Work will be done around the clock,
on weekdays only.
US US 40 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.037 MILE(S) BEFORE CST 35TH ST E.
Work will be done around the clock,
on weekdays only.
US US 40 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.042 MILE(S) BEFORE CST 35TH ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 110 E East
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-FEB-2023 to 16-FEB-2023.
Road work begins
.023 MILE(S) AFTER CRD FOUNTAIN CITY RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 13-FEB-2023.
Road work begins
.119 MILE(S) BEFORE RT BB S.
Work will be done around the clock,
on weekdays only.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-FEB-2023 to 15-FEB-2023.
Road work begins
.045 MILE(S) BEFORE CRD KLABLE RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 21 S South
-
JEFFERSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-FEB-2023 to 15-FEB-2023.
Road work begins
.032 MILE(S) BEFORE CRD KLABLE RD E.
Work will be done around the clock,
on weekdays only.
State Route RT O S South
-
JOHNSON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.247 MILE(S) AFTER CRD 1100 E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 N North
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.056 MILE(S) AFTER RR AURORA SUB E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 S South
-
LAWRENCE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 17-FEB-2023.
Road work begins
.307 MILE(S) BEFORE RR AURORA SUB E.
Work will be done around the clock,
on weekdays only.
State Route RT U N North
-
MARION COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 17-FEB-2023.
Road work begins
CRD 283 S.
Work will be done around the clock,
on weekdays only.
State Route RT U S South
-
MARION COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 17-FEB-2023.
Road work begins
RT C E.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
MCDONALD COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 14-FEB-2023 to 16-FEB-2023.
Road work begins
.022 MILE(S) AFTER BU 71 S.
Work will be done around the clock,
on weekdays only.
State Route RT B N North
-
MISSISSIPPI COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
.001 MILE(S) BEFORE OR 57 S.
Work will be done around the clock,
7 days a week.
State Route RT B S South
-
MISSISSIPPI COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
US 62 E.
Work will be done around the clock,
7 days a week.
State Route RT A E East
-
MONITEAU COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
MO 87 S.
Work will be done around the clock,
on weekdays only.
State Route RT A W West
-
MONITEAU COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
.182 MILE(S) BEFORE CRD ELM FORD RD E.
Work will be done around the clock,
on weekdays only.
State Route RT B N North
-
MONITEAU COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
US 50 E.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
MONITEAU COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-FEB-2023 to 17-FEB-2023.
Road work begins
MO 179 S.
Work will be done around the clock,
on weekdays only.
State Route RT FF E East
-
MONROE COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 17-FEB-2023.
Road work begins
RT CC E.
Work will be done around the clock,
on weekdays only.
State Route RT FF W West
-
MONROE COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 17-FEB-2023.
Road work begins
RT V S.
Work will be done around the clock,
on weekdays only.
State Route RT PP N North
-
MONROE COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 14-FEB-2023.
Road work begins
RT FF E.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
.491 MILE(S) BEFORE RT N S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
.491 MILE(S) BEFORE RT N S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
.002 MILE(S) BEFORE CRD FLEAHMAN RD S.
Work will be done around the clock,
on weekdays only.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 13-FEB-2023 to 30-JUN-2023.
Road work begins
.002 MILE(S) BEFORE CRD FLEAHMAN RD S.
Work will be done around the clock,
on weekdays only.
State Route RT F N North
-
NEW MADRID COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.001 MILE(S) BEFORE CRD 311 S.
Work will be done around the clock,
on weekdays only.
State Route RT F S South
-
NEW MADRID COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
US 61 S.
Work will be done around the clock,
on weekdays only.
State Route RT DD E East
-
NODAWAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 13-FEB-2023 to 22-FEB-2023.
Road work begins
.282 MILE(S) AFTER CRD CATALINA RD S.
Work will be done around the clock,
on weekdays only.
US US 136 E East
-
NODAWAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 13-FEB-2023 to 22-FEB-2023.
Road work begins
.174 MILE(S) AFTER CRD CARAVAN RD S.
Work will be done around the clock,
on weekdays only.
Interstate IS 155 N North
-
PEMISCOT COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 13-FEB-2023 to 06-MAR-2023.
Road work begins
.242 MILE(S) AFTER US 412 W.
Work will be done around the clock,
on weekdays only.
State Route MO 152 E East
-
PLATTE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 09-FEB-2023 to 10-FEB-2023.
Road work begins
.01 MILE(S) BEFORE RP RTNS TO IS435N N.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
RALLS COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 16-FEB-2023.
Road work begins
SP N S.
Work will be done around the clock,
on weekdays only.
State Route RT E W West
-
RALLS COUNTY
- CLOSED
ROADSIDE WORK
Scheduled from 15-FEB-2023 to 16-FEB-2023.
Road work begins
CRD RIVERVIEW DR S.
Work will be done around the clock,
on weekdays only.
US US 136 E East
-
SCHUYLER COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-FEB-2023 to 16-FEB-2023.
Road work begins
.63 MILE(S) AFTER CST E WASHINGTON ST E.
Work will be done around the clock,
on weekdays only.
State Route RT PP S South
-
SHELBY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-FEB-2023 to 14-FEB-2023.
Road work begins
.002 MILE(S) BEFORE US 36 E.
Work will be done around the clock,
on weekdays only.
State Route RT H E East
-
ST. CHARLES COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.003 MILE(S) BEFORE CRD ISLAND RD S.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
ST. CHARLES COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.002 MILE(S) AFTER CRD BARWISE RD S.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
ST. CHARLES COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.002 MILE(S) AFTER CRD BARWISE RD S.
Work will be done around the clock,
on weekdays only.
Ramp RP HENKE RD TO MO364E E East
-
ST. CHARLES COUNTY
- No Delays Expected
SHOULDER WORK
Scheduled from 13-FEB-2023 to 24-FEB-2023.
Road work begins
.011 MILE(S) AFTER CST HENKE RD S.
Work will be done around the clock,
on weekdays only.
Ramp RP US50E TO KOCH RD S South
-
ST. LOUIS COUNTY
- CLOSED
GUARD RAIL/CABLE WORK
Scheduled from 13-FEB-2023 to 15-FEB-2023.
Road work begins
IS 255 S.
Work will be done around the clock,
on weekdays only.
Ramp RP US50W TO KOCH RD N North
-
ST. LOUIS COUNTY
- CLOSED
GUARD RAIL/CABLE WORK
Scheduled from 14-FEB-2023 to 16-FEB-2023.
Road work begins
IS 255 N.
Work will be done around the clock,
on weekdays only.
US US 67 S South
-
ST. LOUIS COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-FEB-2023 to 11-FEB-2023.
Road work begins
.002 MILE(S) AFTER CST MISSOURI BOTTOM RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-FEB-2023 to 16-FEB-2023.
Road work begins
CST COLISEUM DR E.
Work will be done around the clock,
on weekdays only.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.09 MILE(S) AFTER CST NATURAL BRIDGE RD E.
Work will be done around the clock,
on weekdays only.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.64 MILE(S) BEFORE RP US67S TO NATURAL BRIDGE RD E.
Work will be done around the clock,
on weekdays only.
Ramp RP MEMORIAL DR TO IS44W W West
-
ST. LOUIS CITY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 14-FEB-2023 to 14-FEB-2023.
Road work begins
OR 44 W.
Work will be done around the clock,
on weekdays only.
State Route MO 153 N North
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 10-FEB-2023 to 10-FEB-2023.
Road work begins
MO 114 E.
Work will be done around the clock,
on weekdays only.
State Route MO 153 S South
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 10-FEB-2023 to 10-FEB-2023.
Road work begins
.002 MILE(S) BEFORE US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT AH N North
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 13-FEB-2023 to 13-FEB-2023.
Road work begins
MO 114 E.
Work will be done around the clock,
on weekdays only.
State Route RT AH S South
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 13-FEB-2023 to 13-FEB-2023.
Road work begins
.005 MILE(S) BEFORE US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT FF N North
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
CST MAIN ST E.
Work will be done around the clock,
on weekdays only.
State Route RT FF S South
-
STODDARD COUNTY
- CLOSED
RAILROAD MAINTENANCE
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.002 MILE(S) BEFORE CST MAIN ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 25 N North
-
STODDARD COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-FEB-2023 to 14-FEB-2023.
Road work begins
.004 MILE(S) BEFORE CRD LIGHTHOUSE DR E.
Work will be done around the clock,
on weekdays only.
State Route RT AB E East
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.003 MILE(S) AFTER MO 25 S.
Work will be done around the clock,
on weekdays only.
State Route RT AB W West
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.003 MILE(S) BEFORE CRD 503 S.
Work will be done around the clock,
on weekdays only.
State Route RT WW N North
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.011 MILE(S) BEFORE CRD 470 E.
Work will be done around the clock,
on weekdays only.
State Route RT WW S South
-
STODDARD COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 09-FEB-2023 to 09-FEB-2023.
Road work begins
.003 MILE(S) BEFORE CRD 442 E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 E East
-
WEBSTER COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-FEB-2023 to 15-FEB-2023.
Road work begins
.069 MILE(S) BEFORE CRD CHICKEN HOUSE RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 W West
-
WEBSTER COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-FEB-2023 to 15-FEB-2023.
Road work begins
.348 MILE(S) BEFORE CRD PLEASANT CHURCH RD S.
Work will be done around the clock,
on weekdays only.
State Route RT AD W West
-
WEBSTER COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 13-FEB-2023 to 22-FEB-2023.
Road work begins
RT B S.
Work will be done around the clock,
on weekdays only.
State Route RT OO E East
-
WEBSTER COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.061 MILE(S) AFTER CST POMME DE TERRE DR S.
Work will be done around the clock,
on weekdays only.
State Route RT OO W West
-
WEBSTER COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 15-FEB-2023 to 15-FEB-2023.
Road work begins
.013 MILE(S) AFTER CST PRAIRIE LN S.
Work will be done around the clock,
on weekdays only.