State Route MO 39 N North
-
BARRY COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.059 MILE(S) BEFORE CRD FISH N FUN RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 39 S South
-
BARRY COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.06 MILE(S) BEFORE CRD 2205 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 126 E East
-
BARTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins
.005 MILE(S) BEFORE CST VINE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
08:00 PM.
State Route MO 126 W West
-
BARTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CST MILL S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
08:00 PM.
Loop LP 49 N North
-
BATES COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.018 MILE(S) BEFORE CST PINE ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
05:00 PM.
Loop LP 49 S South
-
BATES COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) AFTER CST ORANGE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
05:00 PM.
Interstate IS 49 N North
-
BATES COUNTY
- Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.021 MILE(S) AFTER RT B E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Interstate IS 49 S South
-
BATES COUNTY
- Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
1.443 MILE(S) AFTER RP RTA TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 65 N North
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.023 MILE(S) BEFORE RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins
.011 MILE(S) BEFORE RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT FF N North
-
DADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
US 160 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT FF S South
-
DADE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
CRD 132 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 97 N North
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.073 MILE(S) AFTER CRD 142 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 97 S South
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.038 MILE(S) BEFORE CRD 72 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 160 E East
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.303 MILE(S) BEFORE CRD 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 160 W West
-
DADE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins
.275 MILE(S) BEFORE CRD 91 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT D E East
-
DALLAS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins
US 65 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D W West
-
DALLAS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins
.001 MILE(S) BEFORE CST MILL ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CST CHESTNUT EXPY E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.003 MILE(S) BEFORE LP 44 E.
Work will be done
on weekdays only.
CST CHESTNUT EXPY W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.001 MILE(S) AFTER OR 65 S.
Work will be done
on weekdays only.
CST JAMES RIVER FRWY W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-MAR-2025 to 04-MAY-2025.
Road work begins
.005 MILE(S) BEFORE CST GLENSTONE AVE N.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins
.054 MILE(S) AFTER RP IS44E TO MO13S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins
.002 MILE(S) AFTER US 65 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Loop LP 44 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.009 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Loop LP 44 W West
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins
.005 MILE(S) BEFORE BU 65 S.
Work will be done
on weekdays only.
State Route MO 125 N North
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins
.09 MILE(S) AFTER CST OLD ORCHARD DR S.
Work will be done
on weekdays only.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins
.008 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
State Route MO 744 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins
US 160 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 744 W West
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins
.001 MILE(S) AFTER RT OO E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Ramp RP MO744 TO US65N N North
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins
MO 744 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 PM.
Ramp RP MO744 TO US65S S South
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins
MO 744 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Ramp RP US65N TO MO744 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins
US 65 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Ramp RP US65S TO MO744 W West
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins
.002 MILE(S) AFTER US 65 S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 AM
and
06:00 AM.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins
.003 MILE(S) BEFORE MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 44 E East
-
GREENE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.002 MILE(S) AFTER RP MO360W TO IS44E E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 44 W West
-
GREENE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.062 MILE(S) BEFORE RP IS44W TO RTB W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 13 N North
-
HENRY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins
.063 MILE(S) AFTER MO 52 E.
Work will be done
7 days a week.
State Route MO 13 N North
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2025 to 05-MAY-2025.
Road work begins
.009 MILE(S) AFTER MO 7 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 S South
-
HENRY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins
.012 MILE(S) BEFORE CRD SW 450TH RD E.
Work will be done
7 days a week.
State Route RT D E East
-
JASPER COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.007 MILE(S) BEFORE CST ORCHARD ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT DD E East
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
.015 MILE(S) AFTER MO 39 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT H N North
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
.015 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT H S South
-
LAWRENCE COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
LP 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z N North
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
.041 MILE(S) AFTER CST DOGWOOD DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT Z S South
-
LAWRENCE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT MM N North
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
.011 MILE(S) AFTER CRD BENTON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT MM S South
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins
MO 90 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT TT N North
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
MO 90 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT TT S South
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins
CRD STONE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CRD DAVID DR E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins
.024 MILE(S) BEFORE IS 49 S.
Work will be done
7 days a week.
CRD DAVID DR W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins
.014 MILE(S) AFTER PVT IVEYRIDGE LN S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins
.02 MILE(S) AFTER MO 43 S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins
.001 MILE(S) AFTER RP IS44E TO MO43 S.
Work will be done
7 days a week.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins
.024 MILE(S) AFTER RP IS44E TO US166 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 44 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins
.013 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done
7 days a week.
Interstate IS 44 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins
.002 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done
7 days a week.
State Route MO 86 E East
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins
MO 43 S.
Work will be done
7 days a week.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins
.002 MILE(S) BEFORE MO 43 N.
Work will be done
7 days a week.
US US 60 E East
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins
.348 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done
on weekdays only.
US US 60 E East
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins
.299 MILE(S) BEFORE RT Y S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins
.243 MILE(S) AFTER CRD FINCH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 60 W West
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins
.319 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done
on weekdays only.
Interstate IS 44 E East
-
NEWTON COUNTY
- No Expected Delays
SURVEYING
Scheduled from 24-FEB-2025 to 04-APR-2025.
Road work begins
.169 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
Interstate IS 44 W West
-
NEWTON COUNTY
- No Expected Delays
BRIDGE MAINTENANCE
Scheduled from 09-DEC-2024 to 02-JUL-2025.
Road work begins
.001 MILE(S) AFTER RP LP49N TO IS44W W.
Work will be done
7 days a week.
State Route RT PP E East
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.284 MILE(S) AFTER CRD 358TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
12:04 PM.
State Route RT PP W West
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.136 MILE(S) AFTER CRD 370TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
12:04 PM.
State Route RT D N North
-
POLK COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.257 MILE(S) BEFORE CRD 390TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT D S South
-
POLK COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.097 MILE(S) AFTER RT NN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route MO 13 N North
-
STONE COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.04 MILE(S) BEFORE CRD CASSIE LN E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 13 N North
-
STONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins
.001 MILE(S) AFTER MO 248 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 S South
-
STONE COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins
.077 MILE(S) AFTER CST KISSEE AVE E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route MO 13 S South
-
STONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins
.028 MILE(S) AFTER PVT SHADY LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 86 E East
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins
.164 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route MO 86 W West
-
TANEY COUNTY
- Expect Delays
Project Name -
Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins
.218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
7 days a week.
Project Web Page -
https://www.modot.org/long-creek-bridge-project
State Route MO 248 E East
-
TANEY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 31-MAY-2025.
Road work begins
.008 MILE(S) BEFORE CST CHIEFS CT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 248 W West
-
TANEY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 31-MAY-2025.
Road work begins
.003 MILE(S) BEFORE US 65 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 76 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 13-MAR-2025 to 01-MAY-2025.
Road work begins
1.042 MILE(S) BEFORE RR AURORA SUB E.
Work will be done
on weekdays only.
State Route MO 86 E East
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.175 MILE(S) AFTER CRD LEISURE LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route MO 86 W West
-
TANEY COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins
.194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT E E East
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.025 MILE(S) BEFORE CRD 2000 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E W West
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins
.018 MILE(S) AFTER CRD 2625 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT FF N North
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
RT V E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT FF S South
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.001 MILE(S) AFTER CRD NW 90TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.034 MILE(S) AFTER CRD NW STATE LINE LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT K W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.029 MILE(S) AFTER RT V E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT V E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.04 MILE(S) AFTER MO 43 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT V W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
RT C E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 7 S South
-
BENTON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins
.685 MILE(S) AFTER RT KK S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
CST W JACKSON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
State Route RT C W West
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
US 65 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD E East
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
MO 73 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
DALLAS COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
CRD HACKBERRY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CST GLENSTONE AVE N North
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins
.015 MILE(S) BEFORE US 60 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
CST GLENSTONE AVE S South
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins
.019 MILE(S) BEFORE US 60 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.003 MILE(S) AFTER MO 13 S.
Work will be done
on weekdays only.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.015 MILE(S) AFTER CST CAMPBELL AVE S.
Work will be done
on weekdays only.
US US 65 N North
-
GREENE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 15-APR-2025.
Road work begins
.003 MILE(S) AFTER CRD VALLEY WATER MILL RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 7 N North
-
HENRY COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins
.001 MILE(S) AFTER CST GOLDEN DR S.
Work will be done
7 days a week.
State Route MO 7 S South
-
HENRY COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins
.231 MILE(S) AFTER CST GERHART DR S.
Work will be done
7 days a week.
State Route RT W N North
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD SE-561 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W S South
-
HENRY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT PP E East
-
HICKORY COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.001 MILE(S) AFTER CRD NE 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT PP W West
-
HICKORY COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
MO 83 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
Interstate IS 44 W West
-
JASPER COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 06-APR-2025 to 09-APR-2025.
Road work begins
.34 MILE(S) BEFORE RP IS44W TO MO37 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT V E East
-
POLK COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
MO 123 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT V W West
-
POLK COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins
.003 MILE(S) AFTER MO 83 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:30 PM.
State Route RT AB N North
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD 222ND RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT AB S South
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
MO 215 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT C E East
-
POLK COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT UU E East
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
CRD 510TH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT UU W West
-
POLK COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins
RT U S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT WW N North
-
ST. CLAIR COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.008 MILE(S) AFTER CRD SE 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT WW S South
-
ST. CLAIR COUNTY
- CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins
.012 MILE(S) AFTER RT V S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route RT A N North
-
WEBSTER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins
US 60 E.
Work will be done
7 days a week.
State Route RT A S South
-
WEBSTER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins
.243 MILE(S) BEFORE CRD NORMANDY RD E.
Work will be done
7 days a week.
US US 60 E East
-
WEBSTER COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins
.032 MILE(S) AFTER PVT HONOR CAMP LN S.
Work will be done
7 days a week.
US US 60 W West
-
WEBSTER COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins
.096 MILE(S) BEFORE CRD WHITE ROSE LN S.
Work will be done
7 days a week.