WORK ZONES (CLOSED): 9 to report. Hide

Road Closed due to work zoneState Route RT C E East - BARTON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .348 MILE(S) BEFORE CRD NE 20TH LN S.
Scheduled from 02-APR-2025 to 17-APR-2025.
Road Closed due to work zoneOuter Road E OR 65 N North - DALLAS COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins CRD CANDLEWOOD RD E.
Scheduled from 01-APR-2025 to 03-APR-2025.
Road Closed due to work zoneOuter Road E OR 65 S South - DALLAS COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .004 MILE(S) AFTER MO 38 E.
Scheduled from 01-APR-2025 to 03-APR-2025.
Road Closed due to work zoneState Route MO 37 N North - JASPER COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .019 MILE(S) AFTER RT E E.
Scheduled from 17-MAR-2025 to 03-APR-2025.
Road Closed due to work zoneState Route MO 37 S South - JASPER COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .024 MILE(S) AFTER CRD HEMLOCK RD E.
Scheduled from 17-MAR-2025 to 10-APR-2025.
Road Closed due to work zoneState Route MO 90 E East - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER PVT STAGE COACH RD S.
Scheduled from 20-JAN-2025 to 01-DEC-2025.
Road Closed due to work zoneState Route MO 90 W West - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .002 MILE(S) AFTER CRD ROCKWOOD RD S.
Scheduled from 20-JAN-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP MO43 TO IS44W W West - NEWTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 43 N.
Scheduled from 26-MAR-2025 to 02-JUL-2025.
Road Closed due to work zoneRamp RP MO86 TO IS44E E East - NEWTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 86 E.
Scheduled from 26-MAR-2025 to 02-JUL-2025.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 82 to report. Hide

Expect delays due to work zoneState Route MO 39 N North - BARRY COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins .059 MILE(S) BEFORE CRD FISH N FUN RD S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 39 S South - BARRY COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins .06 MILE(S) BEFORE CRD 2205 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 126 E East - BARTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins .005 MILE(S) BEFORE CST VINE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 126 W West - BARTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 18-MAY-2025.
Road work begins .004 MILE(S) BEFORE CST MILL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 08:00 PM.
Expect delays due to work zoneLoop LP 49 N North - BATES COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins .018 MILE(S) BEFORE CST PINE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 05:00 PM.
Expect delays due to work zoneLoop LP 49 S South - BATES COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins .007 MILE(S) AFTER CST ORANGE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 49 N North - BATES COUNTY - Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins .021 MILE(S) AFTER RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Delays Possible
BRIDGE FLUSHING
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins 1.443 MILE(S) AFTER RP RTA TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .023 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .011 MILE(S) BEFORE RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT FF N North - DADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT FF S South - DADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins CRD 132 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 97 N North - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins .073 MILE(S) AFTER CRD 142 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 97 S South - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins .038 MILE(S) BEFORE CRD 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 160 E East - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins .303 MILE(S) BEFORE CRD 81 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 160 W West - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 03-APR-2025.
Road work begins .275 MILE(S) BEFORE CRD 91 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT D E East - DALLAS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT D W West - DALLAS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-MAR-2025 to 04-APR-2025.
Road work begins .001 MILE(S) BEFORE CST MILL ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneCST CHESTNUT EXPY E East - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins .003 MILE(S) BEFORE LP 44 E.
Work will be done on weekdays only.
Expect delays due to work zoneCST CHESTNUT EXPY W West - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins .001 MILE(S) AFTER OR 65 S.
Work will be done on weekdays only.
Expect delays due to work zoneCST JAMES RIVER FRWY W West - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-MAR-2025 to 04-MAY-2025.
Road work begins .005 MILE(S) BEFORE CST GLENSTONE AVE N.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins .054 MILE(S) AFTER RP IS44E TO MO13S S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 21-MAY-2027.
Road work begins .002 MILE(S) AFTER US 65 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneLoop LP 44 E East - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins .009 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Expect delays due to work zoneLoop LP 44 W West - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-DEC-2024 to 30-JUN-2026.
Road work begins .005 MILE(S) BEFORE BU 65 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 125 N North - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins .09 MILE(S) AFTER CST OLD ORCHARD DR S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 22-MAY-2026.
Road work begins .008 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 744 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins US 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 744 W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins .001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneRamp RP MO744 TO US65N N North - GREENE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins MO 744 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 08:00 PM and 06:00 PM.
Expect delays due to work zoneRamp RP MO744 TO US65S S South - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins MO 744 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP US65N TO MO744 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 01-MAY-2025.
Road work begins US 65 N.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP US65S TO MO744 W West - GREENE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 30-OCT-2024 to 01-MAY-2025.
Road work begins .002 MILE(S) AFTER US 65 S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 08:00 AM and 06:00 AM.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 31-MAR-2025 to 11-APR-2025.
Road work begins .003 MILE(S) BEFORE MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins .002 MILE(S) AFTER RP MO360W TO IS44E E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins .062 MILE(S) BEFORE RP IS44W TO RTB W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 13 N North - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins .063 MILE(S) AFTER MO 52 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 13 N North - HENRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2025 to 05-MAY-2025.
Road work begins .009 MILE(S) AFTER MO 7 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 13 S South - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins .012 MILE(S) BEFORE CRD SW 450TH RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT D E East - JASPER COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins .007 MILE(S) BEFORE CST ORCHARD ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT DD E East - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins .015 MILE(S) AFTER MO 39 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT DD W West - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins .015 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT H S South - LAWRENCE COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins LP 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT Z N North - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins .041 MILE(S) AFTER CST DOGWOOD DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT Z S South - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-MAR-2025 to 09-APR-2025.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT MM N North - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins .011 MILE(S) AFTER CRD BENTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM S South - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-APR-2025 to 03-APR-2025.
Road work begins MO 90 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT TT N North - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins MO 90 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT TT S South - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-APR-2025 to 03-APR-2025.
Road work begins CRD STONE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCRD DAVID DR E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins .024 MILE(S) BEFORE IS 49 S.
Work will be done 7 days a week.
Expect delays due to work zoneCRD DAVID DR W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-MAR-2025 to 09-FEB-2026.
Road work begins .014 MILE(S) AFTER PVT IVEYRIDGE LN S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins .02 MILE(S) AFTER MO 43 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins .001 MILE(S) AFTER RP IS44E TO MO43 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-APR-2025 to 11-APR-2025.
Road work begins .024 MILE(S) AFTER RP IS44E TO US166 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 30-MAR-2025 to 02-JUL-2025.
Road work begins .013 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 23-MAR-2025 to 02-JUL-2025.
Road work begins .002 MILE(S) BEFORE RP IS44W TO LP49S S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins MO 43 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-MAR-2025 to 02-JUL-2025.
Road work begins .002 MILE(S) BEFORE MO 43 N.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - NEWTON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins .348 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 60 E East - NEWTON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins .299 MILE(S) BEFORE RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - NEWTON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 01-JUN-2025.
Road work begins .243 MILE(S) AFTER CRD FINCH DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - NEWTON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 17-MAR-2025 to 05-JUN-2025.
Road work begins .319 MILE(S) BEFORE CRD HAMMER RD S.
Work will be done on weekdays only.
No delays expected due to work zoneInterstate IS 44 E East - NEWTON COUNTY - No Expected Delays
SURVEYING
Scheduled from 24-FEB-2025 to 04-APR-2025.
Road work begins .169 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
No delays expected due to work zoneInterstate IS 44 W West - NEWTON COUNTY - No Expected Delays
BRIDGE MAINTENANCE
Scheduled from 09-DEC-2024 to 02-JUL-2025.
Road work begins .001 MILE(S) AFTER RP LP49N TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT PP E East - POLK COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .284 MILE(S) AFTER CRD 358TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:04 PM.
Expect delays due to work zoneState Route RT PP W West - POLK COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .136 MILE(S) AFTER CRD 370TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:04 PM.
Possible delays due to work zoneState Route RT D N North - POLK COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .257 MILE(S) BEFORE CRD 390TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT D S South - POLK COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .097 MILE(S) AFTER RT NN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins .04 MILE(S) BEFORE CRD CASSIE LN E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins .001 MILE(S) AFTER MO 248 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 30-MAR-2025 to 18-APR-2025.
Road work begins .077 MILE(S) AFTER CST KISSEE AVE E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-JAN-2025 to 19-MAY-2025.
Road work begins .028 MILE(S) AFTER PVT SHADY LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins .164 MILE(S) AFTER CRD LEISURE LN E.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 30-MAY-2025.
Road work begins .218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Possible delays due to work zoneState Route MO 248 E East - TANEY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 31-MAY-2025.
Road work begins .008 MILE(S) BEFORE CST CHIEFS CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 248 W West - TANEY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-JAN-2025 to 31-MAY-2025.
Road work begins .003 MILE(S) BEFORE US 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 13-MAR-2025 to 01-MAY-2025.
Road work begins 1.042 MILE(S) BEFORE RR AURORA SUB E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .175 MILE(S) AFTER CRD LEISURE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT E E East - VERNON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .025 MILE(S) BEFORE CRD 2000 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E W West - VERNON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 01-APR-2025 to 03-APR-2025.
Road work begins .018 MILE(S) AFTER CRD 2625 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.

Back to Top

FUTURE WORK ZONES: 36 to report. Hide

Expect delays due to work zoneState Route RT FF N North - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT FF S South - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .001 MILE(S) AFTER CRD NW 90TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K E East - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .034 MILE(S) AFTER CRD NW STATE LINE LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K W West - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .029 MILE(S) AFTER RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V E East - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .04 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V W West - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 7 S South - BENTON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 07-APR-2025 to 10-APR-2025.
Road work begins .685 MILE(S) AFTER RT KK S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins CST W JACKSON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneState Route RT C W West - DALLAS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT DD E East - DALLAS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins MO 73 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT DD W West - DALLAS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins CRD HACKBERRY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST GLENSTONE AVE N North - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins .015 MILE(S) BEFORE US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST GLENSTONE AVE S South - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 28-APR-2025.
Road work begins .019 MILE(S) BEFORE US 60 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins .003 MILE(S) AFTER MO 13 S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins .015 MILE(S) AFTER CST CAMPBELL AVE S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 15-APR-2025.
Road work begins .003 MILE(S) AFTER CRD VALLEY WATER MILL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 7 N North - HENRY COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins .001 MILE(S) AFTER CST GOLDEN DR S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 7 S South - HENRY COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 07-APR-2025 to 22-APR-2025.
Road work begins .231 MILE(S) AFTER CST GERHART DR S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT W N North - HENRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins CRD SE-561 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W S South - HENRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT PP E East - HICKORY COUNTY - CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .001 MILE(S) AFTER CRD NE 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT PP W West - HICKORY COUNTY - CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins MO 83 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 44 W West - JASPER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 06-APR-2025 to 09-APR-2025.
Road work begins .34 MILE(S) BEFORE RP IS44W TO MO37 N.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT V E East - POLK COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins MO 123 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT V W West - POLK COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2025 to 10-APR-2025.
Road work begins .003 MILE(S) AFTER MO 83 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AB N North - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins CRD 222ND RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT AB S South - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins MO 215 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C E East - POLK COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 21-APR-2025.
Road work begins RT D S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT UU E East - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins CRD 510TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT UU W West - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 14-APR-2025.
Road work begins RT U S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT WW N North - ST. CLAIR COUNTY - CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .008 MILE(S) AFTER CRD SE 470 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT WW S South - ST. CLAIR COUNTY - CLOSED
CHIP SEAL OVERLAY
Scheduled from 07-APR-2025 to 17-APR-2025.
Road work begins .012 MILE(S) AFTER RT V S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT A N North - WEBSTER COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins US 60 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT A S South - WEBSTER COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 30-SEP-2025.
Road work begins .243 MILE(S) BEFORE CRD NORMANDY RD E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 60 E East - WEBSTER COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins .032 MILE(S) AFTER PVT HONOR CAMP LN S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 60 W West - WEBSTER COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 07-APR-2025 to 31-DEC-2025.
Road work begins .096 MILE(S) BEFORE CRD WHITE ROSE LN S.
Work will be done 7 days a week.

Back to Top

INCIDENTS: 3 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 222 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.