WORK ZONES (CLOSED): 22 to report. Hide

Road Closed due to work zoneState Route MO 185 N North - FRANKLIN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .001 MILE(S) AFTER CRD OLD STATE RD E.
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road Closed due to work zoneState Route MO 185 S South - FRANKLIN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins CRD WEST CASCO RD S.
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road Closed due to work zoneCST ST JOHNS CHURCH RD E East - JEFFERSON COUNTY - Road Closed
LIGHTING/SIGNAL/SIGN WORK
Road closure begins .001 MILE(S) AFTER CST PATRICK PL S.
Scheduled from 14-APR-2025 to 08-MAY-2026.
Road Closed due to work zoneCST ST JOHNS CHURCH RD W West - JEFFERSON COUNTY - Road Closed
LIGHTING/SIGNAL/SIGN WORK
Road closure begins US 67 S.
Scheduled from 14-APR-2025 to 08-MAY-2026.
Road Closed due to work zoneCST THIRD ST E East - JEFFERSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST CROMWELL RD S.
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road Closed due to work zoneCST THIRD ST W West - JEFFERSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) BEFORE IS 55 N.
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road Closed due to work zoneRamp RP IS55N TO US67S S South - JEFFERSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins IS 55 N.
Scheduled from 17-MAY-2025 to 31-DEC-2026.
Road Closed due to work zoneRamp RP IS55S TO US67N N North - JEFFERSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins IS 55 S.
Scheduled from 10-DEC-2024 to 31-DEC-2026.
Road Closed due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins US 67 S.
Scheduled from 28-FEB-2025 to 22-AUG-2025.
Road Closed due to work zoneCST IVY W West - ST. CHARLES COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins MO 94 W.
Scheduled from 18-JUL-2022 to 01-AUG-2030.
Road Closed due to work zoneCST CONWAY RD W West - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) BEFORE IS 270 E.
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road Closed due to work zoneRamp RP RTDE TO US67N N North - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT D E.
Scheduled from 05-MAY-2025 to 06-NOV-2026.
Road Closed due to work zoneRamp RP RTDW TO US67S S South - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT D W.
Scheduled from 05-MAY-2025 to 06-NOV-2026.
Road Closed due to work zoneRamp RP US67N TO RTDW W West - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 67 N.
Scheduled from 05-MAY-2025 to 06-NOV-2026.
Road Closed due to work zoneRamp RP US67S TO RTDE E East - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 67 S.
Scheduled from 05-MAY-2025 to 06-NOV-2026.
Road Closed due to work zoneRamp RP CHEROKEE ST TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST CHEROKEE ST E.
Scheduled from 17-JAN-2025 to 31-DEC-2025.
Road Closed due to work zoneRamp RP GERMANIA ST TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST GERMANIA AVE E.
Scheduled from 17-JAN-2025 to 31-DEC-2025.
Road Closed due to work zoneRamp RP IS270W TO RIVERVIEW DR W West - ST. LOUIS CITY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins IS 270 W.
Scheduled from 13-JAN-2025 to 02-JUN-2025.
Road Closed due to work zoneRamp RP IS55N TO IDAHO AVE N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins IS 55 N.
Scheduled from 17-JAN-2025 to 31-DEC-2025.
Road Closed due to work zoneRamp RP LOUGHBOROUGH AVE TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST IDAHO AVE E.
Scheduled from 17-JAN-2025 to 31-DEC-2025.
Road Closed due to work zoneRamp RP RIVERVIEW DR TO IS270W W West - ST. LOUIS CITY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .005 MILE(S) BEFORE RT H S.
Scheduled from 13-JAN-2025 to 02-JUN-2025.
Road Closed due to work zoneRamp RP TRUMAN PKWY TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST LAFAYETTE AVE E.
Scheduled from 06-DEC-2022 to 31-DEC-2025.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 136 to report. Hide

Expect delays due to work zoneState Route MO 100 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 08-AUG-2025.
Road work begins .038 MILE(S) AFTER CST FIFTH ST E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 100 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 08-AUG-2025.
Road work begins .015 MILE(S) AFTER RT OO S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT KK E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins MO 185 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT KK E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT KK W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins MO 185 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT KK W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins .001 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT M N North - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins RT AT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M S South - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins .072 MILE(S) BEFORE CRD ST LOUIS ROCK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM N North - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT MM S South - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT O E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins RT AT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 50 E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins .009 MILE(S) AFTER CRD COUNTY LINE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 05:00 AM.
Expect delays due to work zoneUS US 50 W West - FRANKLIN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 31-MAR-2025 to 13-MAR-2026.
Road work begins .002 MILE(S) BEFORE CRD COUNTY LINE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 07:00 PM.
Expect delays due to work zoneUS US 50 W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins CRD SHOTWELL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 44 W West - FRANKLIN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins .065 MILE(S) BEFORE US 50 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Possible delays due to work zoneState Route MO 30 E East - FRANKLIN COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins RT WW E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP IS44W TO US50 W West - FRANKLIN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Possible delays due to work zoneState Route RT AH E East - FRANKLIN COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT AH W West - FRANKLIN COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins .007 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 50 E East - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-JUN-2025.
Road work begins .068 MILE(S) BEFORE RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 05:00 AM.
Possible delays due to work zoneUS US 50 W West - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-JUN-2025.
Road work begins .008 MILE(S) AFTER CST MACARTHUR AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 05:00 AM.
Expect delays due to work zoneCST CENTRAL AVE E East - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 30-MAY-2025.
Road work begins .012 MILE(S) AFTER CST HORINE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:30 PM.
Expect delays due to work zoneCST CENTRAL AVE W West - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 30-MAY-2025.
Road work begins .004 MILE(S) AFTER CST HOLLY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:30 PM.
Expect delays due to work zoneCST MCNUTT ST N North - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 31-DEC-2025.
Road work begins CST PROVIDENCE WAY E.
Work will be done 7 days a week.
Expect delays due to work zoneCST MCNUTT ST S South - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 31-DEC-2025.
Road work begins .013 MILE(S) BEFORE CST HERCULANEUM CROSSING S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2025 to 31-DEC-2025.
Road work begins .028 MILE(S) AFTER RP IS55N TO US67N N.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-FEB-2025 to 31-DEC-2025.
Road work begins .143 MILE(S) BEFORE PVT MANLEY QUARRY RD E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2025 to 31-DEC-2025.
Road work begins .269 MILE(S) BEFORE RR RIVER SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 231 N North - JEFFERSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins .008 MILE(S) AFTER US 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP IS55N TO US67N N North - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2025.
Road work begins .013 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2025.
Road work begins .005 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67N TO IS55N N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2025.
Road work begins US 67 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2025.
Road work begins US 67 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT O W West - JEFFERSON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins RT F S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT Z E East - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2025.
Road work begins .001 MILE(S) AFTER RP RTZ TO IS55S S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2025.
Road work begins .142 MILE(S) BEFORE RT CC S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2025.
Road work begins .027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 21 N North - JEFFERSON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-MAR-2025 to 02-JUN-2025.
Road work begins .1 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C S South - JEFFERSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-MAY-2025 to 29-MAY-2025.
Road work begins .014 MILE(S) BEFORE CRD WHITE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 61 N North - JEFFERSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 30-MAY-2025.
Road work begins .083 MILE(S) BEFORE CST GRANDVIEW PARK DR E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 61 N North - JEFFERSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins .002 MILE(S) BEFORE PVT COUNTRY HAVEN DR E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 61 S South - JEFFERSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 30-MAY-2025.
Road work begins .044 MILE(S) AFTER US 67 N.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 61 S South - JEFFERSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins .012 MILE(S) BEFORE PVT RIVER DALE DR E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2025 to 30-NOV-2025.
Road work begins .093 MILE(S) AFTER CST RESEARCH PARK CIR E.
Work will be done 7 days a week.
Work will be conducted between the hours of 12:00 AM and 05:00 AM.
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins .01 MILE(S) AFTER RP IS64E TO RTDDN N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 13-JUN-2025.
Road work begins .013 MILE(S) AFTER MO 364 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:30 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneInterstate IS 64 W West - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins .077 MILE(S) BEFORE RP MO94 TO IS64W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 W West - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 13-JUN-2025.
Road work begins .001 MILE(S) BEFORE RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:30 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAY-2025 to 06-JUN-2025.
Road work begins .011 MILE(S) BEFORE RP RTW TO IS70W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneState Route MO 94 E East - ST. CHARLES COUNTY - Delays Possible
GROOVING DRIVE SURFACE
Scheduled from 01-MAY-2025 to 04-JUN-2025.
Road work begins .1 MILE(S) BEFORE CRD RAILROAD AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 94 W West - ST. CHARLES COUNTY - Delays Possible
GROOVING DRIVE SURFACE
Scheduled from 01-MAY-2025 to 04-JUN-2025.
Road work begins .072 MILE(S) AFTER RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP RTKS TO IS64E E East - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAY-2025 to 23-MAY-2025.
Road work begins RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:30 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneState Route RT Z N North - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins RT D E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT Z S South - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins .002 MILE(S) BEFORE CRD BUCKNER RD E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 61 N North - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins .006 MILE(S) BEFORE IS 64 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneUS US 61 S South - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins .004 MILE(S) AFTER RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Expect delays due to work zoneCST PERSHALL RD E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-APR-2025 to 01-DEC-2025.
Road work begins .002 MILE(S) BEFORE CST HAZELWOOD AVE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 05:00 PM and 02:00 PM.
Expect delays due to work zoneCST PERSHALL RD W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-APR-2025 to 01-DEC-2025.
Road work begins .004 MILE(S) AFTER OR 270 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 05:00 PM and 02:00 PM.
Expect delays due to work zoneInterstate IS 170 E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins RP AIRPORT RD TO IS170E E.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 08:00 AM.
Expect delays due to work zoneInterstate IS 170 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins .021 MILE(S) AFTER RP IS170W TO MO115S S.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 08:00 AM.
Expect delays due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins .043 MILE(S) BEFORE RP IS270E TO IS64E E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins .121 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins .066 MILE(S) AFTER RP MO340W TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - ST. LOUIS COUNTY - Expect Delays
MILLING DRIVE SURFACE
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins .014 MILE(S) BEFORE RP SOR44 TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:30 PM.
Expect delays due to work zoneInterstate IS 55 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins .19 MILE(S) BEFORE RP IS55N TO REAVIS BARRACKS RD E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins .004 MILE(S) BEFORE CST AIRFLIGHT DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 08:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins .005 MILE(S) AFTER RT N S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 08:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins .021 MILE(S) BEFORE RP IS70W TO IS270W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins .178 MILE(S) AFTER PVT PRIVATE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 367 S South - ST. LOUIS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 11-DEC-2024 to 01-JUN-2025.
Road work begins .003 MILE(S) AFTER CST LEWIS & CLARK BLVD N.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270E TO RTAB E East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins IS 270 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO IS64E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO IS64W W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO RTAB W West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS64E TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins .016 MILE(S) BEFORE RP IS64W TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS64W TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins .005 MILE(S) AFTER RP IS64W TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP RTAB TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins RT AB E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP RTAB TO IS270W W West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins .002 MILE(S) AFTER RT AB E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT AC N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2025 to 30-SEP-2025.
Road work begins .03 MILE(S) BEFORE CST DORWOOD DR S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT AC S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2025 to 30-SEP-2025.
Road work begins .111 MILE(S) BEFORE CST LUCAS AND HUNT RD S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 31-JUL-2025.
Road work begins .023 MILE(S) AFTER PVT SUNSWEPT PARK DR E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 31-JUL-2025.
Road work begins .007 MILE(S) AFTER CRD CANDLEWYCK CLUB DR E.
Work will be done 7 days a week.
No delays expected due to work zoneState Route MO 115 S South - ST. LOUIS COUNTY - No Expected Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 14-MAR-2025 to 01-SEP-2026.
Road work begins .005 MILE(S) AFTER RT U S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Possible delays due to work zoneCST S EATHERTON RD N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST S EATHERTON RD S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 115 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAY-2025 to 23-MAY-2025.
Road work begins .011 MILE(S) BEFORE CST FRANCIS ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 141 S South - ST. LOUIS COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins .007 MILE(S) BEFORE CST CONWAY RD E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 231 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-MAY-2025 to 23-MAY-2025.
Road work begins .016 MILE(S) BEFORE CRD JEFFERSON BARRACKS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-MAY-2025.
Road work begins .004 MILE(S) BEFORE CRD MILITARY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-MAY-2025 to 17-JUN-2025.
Road work begins .009 MILE(S) AFTER CRD SHERIDAN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 28-MAY-2025.
Road work begins .02 MILE(S) BEFORE CRD ENGLAND TOWN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-MAY-2025 to 22-MAY-2025.
Road work begins CRD KINGSTON DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 23-MAY-2025.
Road work begins .009 MILE(S) BEFORE CST MARSH AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2025 to 30-MAY-2025.
Road work begins CST COUNTRY RIDGE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2025 to 30-MAY-2025.
Road work begins CST RIVER VALLEY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 23-MAY-2025.
Road work begins .02 MILE(S) BEFORE CST CLAYTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 366 E East - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins .004 MILE(S) AFTER CST SUNSET OFFICE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP IS170E TO IS70E E East - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins IS 170 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 08:00 AM.
Possible delays due to work zoneRamp RP IS170W TO IS70W W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins IS 170 W.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 08:00 AM.
Possible delays due to work zoneRamp RP IS170W TO IS70W W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 31-MAY-2025.
Road work begins .003 MILE(S) AFTER IS 170 W.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 PM and 08:00 AM.
Possible delays due to work zoneRamp RP IS64E TO MO141S S South - ST. LOUIS COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins .009 MILE(S) AFTER IS 64 E.
Work will be done 7 days a week.
Possible delays due to work zoneRamp RP IS64W TO MO141S S South - ST. LOUIS COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins .022 MILE(S) AFTER OR 64 W.
Work will be done 7 days a week.
Possible delays due to work zoneRamp RP IS70E TO IS170W W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins IS 70 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 08:00 AM.
Possible delays due to work zoneRamp RP MO141N TO IS64W W West - ST. LOUIS COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins MO 141 N.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT CC E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 16-JUN-2025.
Road work begins .059 MILE(S) BEFORE RP DRTDE TO US67S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins .013 MILE(S) AFTER RP RTDE TO IS170W W.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 06-JUN-2025.
Road work begins .025 MILE(S) AFTER CST MILFORD AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins .001 MILE(S) AFTER CST PAGE BLVD E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 16-JUN-2025.
Road work begins CST FLOM CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAY-2025 to 30-MAY-2025.
Road work begins .02 MILE(S) BEFORE CST PENNSYLVANIA AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT N N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-APR-2025 to 01-JUL-2026.
Road work begins .007 MILE(S) BEFORE CST FLORISSANT RD S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT N N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 01-AUG-2025.
Road work begins .005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-APR-2025 to 01-JUL-2026.
Road work begins .06 MILE(S) AFTER CST FAIRVIEW LN E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 01-AUG-2025.
Road work begins .002 MILE(S) BEFORE CST JEAN DR E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 50 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-MAY-2025.
Road work begins .001 MILE(S) AFTER CRD SAPPINGTON ACRES DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2025 to 30-MAY-2025.
Road work begins .002 MILE(S) AFTER CST HUNTLEIGH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins .043 MILE(S) BEFORE CST CONWAY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins .543 MILE(S) BEFORE RP US67S TO NATURAL BRIDGE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 01:00 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins .006 MILE(S) BEFORE CST OLD OLIVE STREET RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 27-MAY-2025.
Road work begins .003 MILE(S) BEFORE CST CONWAY RD E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 270 W West - ST. LOUIS CITY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins .022 MILE(S) BEFORE RP IS270W TO RIVERVIEW DR W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins .009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 64 E East - ST. LOUIS CITY - Expect Delays
MICROSURFACING
Scheduled from 21-APR-2025 to 01-AUG-2025.
Road work begins .015 MILE(S) AFTER RP VANDEVENTER AVE TO IS64W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneInterstate IS 64 W West - ST. LOUIS CITY - Expect Delays
MICROSURFACING
Scheduled from 21-APR-2025 to 01-AUG-2025.
Road work begins .018 MILE(S) BEFORE CST 22ND ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 367 N North - ST. LOUIS CITY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 11-DEC-2024 to 01-JUN-2025.
Road work begins OR 70 W.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT H N North - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins .001 MILE(S) AFTER CST CHAIN OF ROCKS BRG E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT H S South - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins .001 MILE(S) BEFORE CST DUNN RD E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 366 W West - ST. LOUIS CITY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins .005 MILE(S) BEFORE CST RIVER DES PERES BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT H N North - ST. LOUIS CITY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins .007 MILE(S) AFTER CST CARRIE AVE E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT H S South - ST. LOUIS CITY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins .005 MILE(S) AFTER CST HALL ST N.
Work will be done 7 days a week.

Back to Top

FUTURE WORK ZONES: 19 to report. Hide

Expect delays due to work zoneState Route RT MM N North - FRANKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 27-MAY-2025 to 10-JUN-2025.
Road work begins .098 MILE(S) BEFORE PVT DANFORTH DR S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT MM S South - FRANKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 27-MAY-2025 to 10-JUN-2025.
Road work begins .001 MILE(S) BEFORE PVT LIVESTOCK DR E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 30 E East - FRANKLIN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2025 to 27-MAY-2025.
Road work begins RT WW E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT C S South - FRANKLIN COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-MAY-2025 to 22-MAY-2025.
Road work begins .241 MILE(S) BEFORE RT KK E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT W E East - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2025 to 22-MAY-2025.
Road work begins RT JJ S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - ST. CHARLES COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 27-MAY-2025 to 22-JUL-2025.
Road work begins .021 MILE(S) BEFORE RP IS70E TO RTK S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 27-MAY-2025 to 22-JUL-2025.
Road work begins .018 MILE(S) BEFORE CST SPENCER RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneState Route RT D E East - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-MAY-2025 to 23-MAY-2025.
Road work begins .001 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT D W West - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-MAY-2025 to 23-MAY-2025.
Road work begins .01 MILE(S) AFTER CRD BENNE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Expect delays due to work zoneCST S EATHERTON RD N North - ST. LOUIS COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-MAY-2025 to 24-JUN-2025.
Road work begins MO 109 S.
Work will be done 7 days a week.
Expect delays due to work zoneCST S EATHERTON RD S South - ST. LOUIS COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-MAY-2025 to 24-JUN-2025.
Road work begins .013 MILE(S) AFTER RR CENTRAL MIDLAND E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 21 S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 27-MAY-2025 to 27-MAY-2026.
Road work begins .163 MILE(S) AFTER CRD TIFFANY SQUARE PKWY E.
Work will be done 7 days a week.
Possible delays due to work zoneCST SHREWSBURY AVE N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2025 to 29-MAY-2025.
Road work begins .008 MILE(S) AFTER RP SHREWSBURY AVE TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:00 PM.
Possible delays due to work zoneCST SHREWSBURY AVE S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2025 to 29-MAY-2025.
Road work begins .01 MILE(S) AFTER RP IS44W TO SHREWSBURY AVE S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:00 PM.
Possible delays due to work zoneInterstate IS 70 W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 27-MAY-2025 to 30-MAY-2025.
Road work begins .272 MILE(S) AFTER RP MO141S TO IS70W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2025 to 06-JUN-2025.
Road work begins .001 MILE(S) AFTER IS 270 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-MAY-2025 to 30-MAY-2025.
Road work begins .012 MILE(S) AFTER CST MISSOURI BOTTOM RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2025 to 29-MAY-2025.
Road work begins .019 MILE(S) AFTER RP NATURAL BRIDGE RD TO US67N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-MAY-2025 to 22-MAY-2025.
Road work begins .05 MILE(S) AFTER RP MO340E TO US67S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 11:00 AM.

Back to Top

INCIDENTS: 28 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show