State Route MO 100 E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 08-AUG-2025.
Road work begins
.038 MILE(S) AFTER CST FIFTH ST E.
Work will be done
on weekdays only.
State Route MO 100 W West
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-FEB-2025 to 08-AUG-2025.
Road work begins
.015 MILE(S) AFTER RT OO S.
Work will be done
on weekdays only.
State Route RT KK E East
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins
MO 185 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT KK E East
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins
RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT KK W West
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins
MO 185 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT KK W West
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-MAY-2025 to 01-OCT-2025.
Road work begins
.001 MILE(S) AFTER MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT M N North
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins
RT AT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT M S South
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins
.072 MILE(S) BEFORE CRD ST LOUIS ROCK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT MM N North
-
FRANKLIN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins
MO 100 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT MM S South
-
FRANKLIN COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins
RT T E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O E East
-
FRANKLIN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins
RT AT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
US US 50 E East
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
.009 MILE(S) AFTER CRD COUNTY LINE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
US US 50 W West
-
FRANKLIN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 31-MAR-2025 to 13-MAR-2026.
Road work begins
.002 MILE(S) BEFORE CRD COUNTY LINE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
US US 50 W West
-
FRANKLIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
CRD SHOTWELL RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
Interstate IS 44 W West
-
FRANKLIN COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins
.065 MILE(S) BEFORE US 50 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
State Route MO 30 E East
-
FRANKLIN COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
RT WW E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
Ramp RP IS44W TO US50 W West
-
FRANKLIN COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins
IS 44 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
State Route RT AH E East
-
FRANKLIN COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT AH W West
-
FRANKLIN COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
.007 MILE(S) AFTER OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 50 E East
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-JUN-2025.
Road work begins
.068 MILE(S) BEFORE RT BB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
US US 50 W West
-
FRANKLIN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-JUN-2025.
Road work begins
.008 MILE(S) AFTER CST MACARTHUR AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
CST CENTRAL AVE E East
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 30-MAY-2025.
Road work begins
.012 MILE(S) AFTER CST HORINE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
CST CENTRAL AVE W West
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 30-MAY-2025.
Road work begins
.004 MILE(S) AFTER CST HOLLY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
CST MCNUTT ST N North
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 31-DEC-2025.
Road work begins
CST PROVIDENCE WAY E.
Work will be done
7 days a week.
CST MCNUTT ST S South
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2024 to 31-DEC-2025.
Road work begins
.013 MILE(S) BEFORE CST HERCULANEUM CROSSING S.
Work will be done
7 days a week.
Interstate IS 55 N North
-
JEFFERSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2025 to 31-DEC-2025.
Road work begins
.028 MILE(S) AFTER RP IS55N TO US67N N.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-FEB-2025 to 31-DEC-2025.
Road work begins
.143 MILE(S) BEFORE PVT MANLEY QUARRY RD E.
Work will be done
7 days a week.
Interstate IS 55 S South
-
JEFFERSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2025 to 31-DEC-2025.
Road work begins
.269 MILE(S) BEFORE RR RIVER SUB S.
Work will be done
7 days a week.
State Route MO 231 N North
-
JEFFERSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins
.008 MILE(S) AFTER US 67 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
Ramp RP IS55N TO US67N N North
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2025.
Road work begins
.013 MILE(S) AFTER IS 55 N.
Work will be done
on weekdays only.
Ramp RP IS55S TO US67S S South
-
JEFFERSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2025.
Road work begins
.005 MILE(S) AFTER IS 55 S.
Work will be done
on weekdays only.
Ramp RP US67N TO IS55N N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2025.
Road work begins
US 67 N.
Work will be done
on weekdays only.
Ramp RP US67S TO IS55S S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2025.
Road work begins
US 67 S.
Work will be done
on weekdays only.
State Route RT O W West
-
JEFFERSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 31-MAR-2025 to 30-APR-2026.
Road work begins
RT F S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT Z E East
-
JEFFERSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2025.
Road work begins
.001 MILE(S) AFTER RP RTZ TO IS55S S.
Work will be done
on weekdays only.
US US 67 N North
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2025.
Road work begins
.142 MILE(S) BEFORE RT CC S.
Work will be done
on weekdays only.
US US 67 S South
-
JEFFERSON COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2025.
Road work begins
.027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done
on weekdays only.
State Route MO 21 N North
-
JEFFERSON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-MAR-2025 to 02-JUN-2025.
Road work begins
.1 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT C S South
-
JEFFERSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-MAY-2025 to 29-MAY-2025.
Road work begins
.014 MILE(S) BEFORE CRD WHITE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 61 N North
-
JEFFERSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 30-MAY-2025.
Road work begins
.083 MILE(S) BEFORE CST GRANDVIEW PARK DR E.
Work will be done
7 days a week.
US US 61 N North
-
JEFFERSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) BEFORE PVT COUNTRY HAVEN DR E.
Work will be done
7 days a week.
US US 61 S South
-
JEFFERSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 08-APR-2025 to 30-MAY-2025.
Road work begins
.044 MILE(S) AFTER US 67 N.
Work will be done
7 days a week.
US US 61 S South
-
JEFFERSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 03-MAR-2025 to 30-MAY-2025.
Road work begins
.012 MILE(S) BEFORE PVT RIVER DALE DR E.
Work will be done
7 days a week.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2025 to 30-NOV-2025.
Road work begins
.093 MILE(S) AFTER CST RESEARCH PARK CIR E.
Work will be done
7 days a week.
Work will be conducted between the hours of
12:00 AM
and
05:00 AM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins
.01 MILE(S) AFTER RP IS64E TO RTDDN N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 13-JUN-2025.
Road work begins
.013 MILE(S) AFTER MO 364 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:30 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2025 to 21-MAY-2025.
Road work begins
.077 MILE(S) BEFORE RP MO94 TO IS64W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 64 W West
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 17-MAR-2025 to 13-JUN-2025.
Road work begins
.001 MILE(S) BEFORE RT K S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:30 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 70 W West
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAY-2025 to 06-JUN-2025.
Road work begins
.011 MILE(S) BEFORE RP RTW TO IS70W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route MO 94 E East
-
ST. CHARLES COUNTY
- Delays Possible
GROOVING DRIVE SURFACE
Scheduled from 01-MAY-2025 to 04-JUN-2025.
Road work begins
.1 MILE(S) BEFORE CRD RAILROAD AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 94 W West
-
ST. CHARLES COUNTY
- Delays Possible
GROOVING DRIVE SURFACE
Scheduled from 01-MAY-2025 to 04-JUN-2025.
Road work begins
.072 MILE(S) AFTER RT H E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Ramp RP RTKS TO IS64E E East
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve i-70 project 2
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAY-2025 to 23-MAY-2025.
Road work begins
RT K S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:30 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route RT Z N North
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
RT D E.
Work will be done
on weekdays only.
State Route RT Z S South
-
ST. CHARLES COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
.002 MILE(S) BEFORE CRD BUCKNER RD E.
Work will be done
on weekdays only.
US US 61 N North
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins
.006 MILE(S) BEFORE IS 64 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
US US 61 S South
-
ST. CHARLES COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
ROADSIDE WORK
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins
.004 MILE(S) AFTER RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
CST PERSHALL RD E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-APR-2025 to 01-DEC-2025.
Road work begins
.002 MILE(S) BEFORE CST HAZELWOOD AVE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 PM
and
02:00 PM.
CST PERSHALL RD W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-APR-2025 to 01-DEC-2025.
Road work begins
.004 MILE(S) AFTER OR 270 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 PM
and
02:00 PM.
Interstate IS 170 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
RP AIRPORT RD TO IS170E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Interstate IS 170 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.021 MILE(S) AFTER RP IS170W TO MO115S S.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
.043 MILE(S) BEFORE RP IS270E TO IS64E E.
Work will be done
7 days a week.
Interstate IS 270 E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.121 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
.066 MILE(S) AFTER RP MO340W TO IS270W W.
Work will be done
7 days a week.
Interstate IS 44 E East
-
ST. LOUIS COUNTY
- Expect Delays
MILLING DRIVE SURFACE
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
.014 MILE(S) BEFORE RP SOR44 TO IS44E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:30 PM.
Interstate IS 55 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins
.19 MILE(S) BEFORE RP IS55N TO REAVIS BARRACKS RD E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CST AIRFLIGHT DR S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
Interstate IS 70 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.005 MILE(S) AFTER RT N S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
Interstate IS 70 W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins
.021 MILE(S) BEFORE RP IS70W TO IS270W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 02-JUN-2025.
Road work begins
.178 MILE(S) AFTER PVT PRIVATE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
03:00 PM.
State Route MO 367 S South
-
ST. LOUIS COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 11-DEC-2024 to 01-JUN-2025.
Road work begins
.003 MILE(S) AFTER CST LEWIS & CLARK BLVD N.
Work will be done
7 days a week.
Ramp RP IS270E TO RTAB E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
IS 270 E.
Work will be done
7 days a week.
Ramp RP IS270W TO IS64E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS270W TO IS64W W West
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS270W TO RTAB W West
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
IS 270 W.
Work will be done
7 days a week.
Ramp RP IS64E TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
.016 MILE(S) BEFORE RP IS64W TO IS270W W.
Work will be done
7 days a week.
Ramp RP IS64W TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
.005 MILE(S) AFTER RP IS64W TO IS270W W.
Work will be done
7 days a week.
Ramp RP RTAB TO IS270E E East
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
RT AB E.
Work will be done
7 days a week.
Ramp RP RTAB TO IS270W W West
-
ST. LOUIS COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 30-JUN-2025.
Road work begins
.002 MILE(S) AFTER RT AB E.
Work will be done
7 days a week.
State Route RT AC N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2025 to 30-SEP-2025.
Road work begins
.03 MILE(S) BEFORE CST DORWOOD DR S.
Work will be done
7 days a week.
State Route RT AC S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2025 to 30-SEP-2025.
Road work begins
.111 MILE(S) BEFORE CST LUCAS AND HUNT RD S.
Work will be done
7 days a week.
US US 67 N North
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 31-JUL-2025.
Road work begins
.023 MILE(S) AFTER PVT SUNSWEPT PARK DR E.
Work will be done
7 days a week.
US US 67 S South
-
ST. LOUIS COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 31-JUL-2025.
Road work begins
.007 MILE(S) AFTER CRD CANDLEWYCK CLUB DR E.
Work will be done
7 days a week.
State Route MO 115 S South
-
ST. LOUIS COUNTY
- No Expected Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 14-MAR-2025 to 01-SEP-2026.
Road work begins
.005 MILE(S) AFTER RT U S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:30 PM.
CST S EATHERTON RD N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST S EATHERTON RD S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
CST WILD HORSE CREEK RD W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 N North
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 109 S South
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 115 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAY-2025 to 23-MAY-2025.
Road work begins
.011 MILE(S) BEFORE CST FRANCIS ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 141 S South
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins
.007 MILE(S) BEFORE CST CONWAY RD E.
Work will be done
7 days a week.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-MAY-2025 to 23-MAY-2025.
Road work begins
.016 MILE(S) BEFORE CRD JEFFERSON BARRACKS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CRD MILITARY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-MAY-2025 to 17-JUN-2025.
Road work begins
.009 MILE(S) AFTER CRD SHERIDAN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route MO 231 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 28-MAY-2025.
Road work begins
.02 MILE(S) BEFORE CRD ENGLAND TOWN DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 231 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-MAY-2025 to 22-MAY-2025.
Road work begins
CRD KINGSTON DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 23-MAY-2025.
Road work begins
.009 MILE(S) BEFORE CST MARSH AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 340 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2025 to 30-MAY-2025.
Road work begins
CST COUNTRY RIDGE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2025 to 30-MAY-2025.
Road work begins
CST RIVER VALLEY DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 340 W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 23-MAY-2025.
Road work begins
.02 MILE(S) BEFORE CST CLAYTON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 366 E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins
.004 MILE(S) AFTER CST SUNSET OFFICE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Ramp RP IS170E TO IS70E E East
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 170 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Ramp RP IS170W TO IS70W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 170 W.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Ramp RP IS170W TO IS70W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2025 to 31-MAY-2025.
Road work begins
.003 MILE(S) AFTER IS 170 W.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 PM
and
08:00 AM.
Ramp RP IS64E TO MO141S S South
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins
.009 MILE(S) AFTER IS 64 E.
Work will be done
7 days a week.
Ramp RP IS64W TO MO141S S South
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins
.022 MILE(S) AFTER OR 64 W.
Work will be done
7 days a week.
Ramp RP IS70E TO IS170W W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-APR-2025 to 31-MAY-2025.
Road work begins
IS 70 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
08:00 AM.
Ramp RP MO141N TO IS64W W West
-
ST. LOUIS COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-APR-2025 to 18-JUL-2025.
Road work begins
MO 141 N.
Work will be done
7 days a week.
State Route RT CC E East
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
MO 109 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT CC W West
-
ST. LOUIS COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins
.01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT D E East
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 16-JUN-2025.
Road work begins
.059 MILE(S) BEFORE RP DRTDE TO US67S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route RT D E East
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins
.013 MILE(S) AFTER RP RTDE TO IS170W W.
Work will be done
on weekdays only.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 06-JUN-2025.
Road work begins
.025 MILE(S) AFTER CST MILFORD AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins
.001 MILE(S) AFTER CST PAGE BLVD E.
Work will be done
on weekdays only.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 16-JUN-2025.
Road work begins
CST FLOM CT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route RT D W West
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAY-2025 to 30-MAY-2025.
Road work begins
.02 MILE(S) BEFORE CST PENNSYLVANIA AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route RT N N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-APR-2025 to 01-JUL-2026.
Road work begins
.007 MILE(S) BEFORE CST FLORISSANT RD S.
Work will be done
7 days a week.
State Route RT N N North
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 01-AUG-2025.
Road work begins
.005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done
on weekdays only.
State Route RT N S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-APR-2025 to 01-JUL-2026.
Road work begins
.06 MILE(S) AFTER CST FAIRVIEW LN E.
Work will be done
7 days a week.
State Route RT N S South
-
ST. LOUIS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 01-AUG-2025.
Road work begins
.002 MILE(S) BEFORE CST JEAN DR E.
Work will be done
on weekdays only.
US US 50 E East
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-APR-2025 to 30-MAY-2025.
Road work begins
.001 MILE(S) AFTER CRD SAPPINGTON ACRES DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) AFTER CST HUNTLEIGH DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
US US 67 N North
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 23-MAY-2025.
Road work begins
.043 MILE(S) BEFORE CST CONWAY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
.543 MILE(S) BEFORE RP US67S TO NATURAL BRIDGE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
01:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2025 to 21-MAY-2025.
Road work begins
.006 MILE(S) BEFORE CST OLD OLIVE STREET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
12:00 PM.
US US 67 S South
-
ST. LOUIS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 27-MAY-2025.
Road work begins
.003 MILE(S) BEFORE CST CONWAY RD E.
Work will be done
7 days a week.
Interstate IS 270 W West
-
ST. LOUIS CITY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.022 MILE(S) BEFORE RP IS270W TO RIVERVIEW DR W.
Work will be done
7 days a week.
Interstate IS 55 S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2025.
Road work begins
.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done
7 days a week.
Interstate IS 64 E East
-
ST. LOUIS CITY
- Expect Delays
MICROSURFACING
Scheduled from 21-APR-2025 to 01-AUG-2025.
Road work begins
.015 MILE(S) AFTER RP VANDEVENTER AVE TO IS64W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 64 W West
-
ST. LOUIS CITY
- Expect Delays
MICROSURFACING
Scheduled from 21-APR-2025 to 01-AUG-2025.
Road work begins
.018 MILE(S) BEFORE CST 22ND ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route MO 367 N North
-
ST. LOUIS CITY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 11-DEC-2024 to 01-JUN-2025.
Road work begins
OR 70 W.
Work will be done
7 days a week.
State Route RT H N North
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.001 MILE(S) AFTER CST CHAIN OF ROCKS BRG E.
Work will be done
7 days a week.
State Route RT H S South
-
ST. LOUIS CITY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAR-2025 to 31-DEC-2026.
Road work begins
.001 MILE(S) BEFORE CST DUNN RD E.
Work will be done
7 days a week.
State Route MO 366 W West
-
ST. LOUIS CITY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-JAN-2025 to 31-DEC-2025.
Road work begins
.005 MILE(S) BEFORE CST RIVER DES PERES BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT H N North
-
ST. LOUIS CITY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins
.007 MILE(S) AFTER CST CARRIE AVE E.
Work will be done
7 days a week.
State Route RT H S South
-
ST. LOUIS CITY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins
.005 MILE(S) AFTER CST HALL ST N.
Work will be done
7 days a week.