State Route RT RA N North
-
ANDREW COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
CRD 405 S.
Scheduled from
29-APR-2024
to
24-MAY-2024.
State Route RT RA S South
-
ANDREW COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
CRD 462 E.
Scheduled from
29-APR-2024
to
24-MAY-2024.
State Route RT T E East
-
ANDREW COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
CRD 458 E.
Scheduled from
29-APR-2024
to
24-MAY-2024.
State Route RT T W West
-
ANDREW COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
.004 MILE(S) BEFORE RT DD S.
Scheduled from
29-APR-2024
to
24-MAY-2024.
State Route MO 46 E East
-
ATCHISON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.031 MILE(S) AFTER CRD R AVE S.
Scheduled from
12-FEB-2024
to
31-MAY-2024.
State Route MO 46 W West
-
ATCHISON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.194 MILE(S) AFTER RT MM S.
Scheduled from
12-FEB-2024
to
31-MAY-2024.
State Route MO 13 N North
-
CALDWELL COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.019 MILE(S) BEFORE CST BROADWAY ST E.
Scheduled from
01-APR-2024
to
01-SEP-2024.
State Route MO 13 S South
-
CALDWELL COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.018 MILE(S) AFTER CRD FAR WEST DR E.
Scheduled from
01-APR-2024
to
01-SEP-2024.
State Route RT HH N North
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.17 MILE(S) AFTER CRD WOODSON AVE S.
Scheduled from
08-APR-2024
to
17-JUL-2024.
State Route RT HH S South
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.02 MILE(S) AFTER CRD WAYLAND AVE S.
Scheduled from
08-APR-2024
to
17-JUL-2024.
State Route RT H E East
-
CLINTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.028 MILE(S) AFTER CRD NE ESTEP RD S.
Scheduled from
05-FEB-2024
to
22-AUG-2024.
State Route RT H W West
-
CLINTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.039 MILE(S) AFTER US 69 S.
Scheduled from
05-FEB-2024
to
22-AUG-2024.
State Route RT E W West
-
DAVIESS COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
.001 MILE(S) AFTER US 69 S.
Scheduled from
18-MAR-2024
to
02-AUG-2024.
State Route RT E E East
-
DEKALB COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
US 169 S.
Scheduled from
18-MAR-2024
to
02-AUG-2024.
State Route RT D N North
-
LIVINGSTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.159 MILE(S) AFTER CRD 420 E.
Scheduled from
22-APR-2024
to
14-AUG-2024.
State Route RT D S South
-
LIVINGSTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.065 MILE(S) BEFORE CRD 418 S.
Scheduled from
22-APR-2024
to
14-AUG-2024.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins
.729 MILE(S) AFTER RP RTT TO US59N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:55 AM
and
09:00 PM.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.177 MILE(S) BEFORE CRD 1382 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
State Route MO 31 N North
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 07-MAY-2024.
Road work begins
US 169 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 371 S South
-
BUCHANAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins
.343 MILE(S) BEFORE CRD WILLIAMS RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT AC N North
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.005 MILE(S) AFTER RT YY E.
Work will be done
7 days a week.
State Route RT AC S South
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.007 MILE(S) AFTER CST FARAON ST E.
Work will be done
7 days a week.
State Route RT U E East
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
CRD DAY SW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT U W West
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
.007 MILE(S) AFTER RR UP S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 169 S South
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins
.028 MILE(S) AFTER RT FF S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 31 S South
-
BUCHANAN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 07-MAY-2024.
Road work begins
.003 MILE(S) AFTER US 36 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 N North
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER CRD FAR WEST DR E.
Work will be done
7 days a week.
State Route MO 13 S South
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
State Route MO 41 N North
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 07-MAY-2024.
Road work begins
.187 MILE(S) AFTER RT F E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 41 S South
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 07-MAY-2024.
Road work begins
US 24 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 129 N North
-
CHARITON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
.002 MILE(S) AFTER CRD MENEFEE RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.108 MILE(S) AFTER RT KK S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.08 MILE(S) BEFORE CST MISSOURI ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 5 S South
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.023 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
Interstate IS 35 N North
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.814 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 S South
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.686 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
US US 69 N North
-
DEKALB COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins
.001 MILE(S) BEFORE CST PENCE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:30 PM.
US US 69 S South
-
DEKALB COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins
.123 MILE(S) BEFORE CRD ROGERS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:30 PM.
US US 69 S South
-
DEKALB COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins
.133 MILE(S) BEFORE CST PENCE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
06:00 PM.
State Route RT V S South
-
GRUNDY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-APR-2024 to 14-MAY-2024.
Road work begins
.068 MILE(S) AFTER MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Interstate IS 35 N North
-
HARRISON COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 01-MAY-2024 to 01-JUN-2024.
Road work begins
.076 MILE(S) AFTER US 136 E.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 S South
-
HARRISON COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 01-MAY-2024 to 01-JUN-2024.
Road work begins
.013 MILE(S) BEFORE RT N E.
Work will be done
on weekdays and Saturdays.
State Route MO 5 S South
-
LINN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.011 MILE(S) AFTER RT U S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT V N North
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-APR-2024 to 14-MAY-2024.
Road work begins
US 65 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.031 MILE(S) AFTER RP US36E TO US65 E.
Work will be done
7 days a week.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.007 MILE(S) AFTER CRD 401 S.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.066 MILE(S) BEFORE BU 36 E.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.07 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
US US 65 S South
-
MERCER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 03-MAY-2024 to 04-MAY-2024.
Road work begins
.002 MILE(S) AFTER CRD JIGSAW AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
10:00 AM.
US US 65 S South
-
MERCER COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 03-MAY-2024 to 04-MAY-2024.
Road work begins
.002 MILE(S) AFTER CRD JIGSAW AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
10:00 AM.
State Route RT A W West
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 10-MAY-2024.
Road work begins
.274 MILE(S) BEFORE CST ELM ST E.
Work will be done
on weekdays only.
US US 71 S South
-
NODAWAY COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.17 MILE(S) BEFORE RT V E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
Interstate IS 229 S South
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 09-MAY-2024.
Road work begins
.043 MILE(S) BEFORE CST POULIN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:30 PM.
Interstate IS 29 N North
-
BUCHANAN COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 06-MAY-2024 to 06-MAY-2024.
Road work begins
.074 MILE(S) BEFORE RP IS229S TO IS29N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
01:00 PM
and
02:30 PM.
Interstate IS 29 S South
-
BUCHANAN COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 06-MAY-2024 to 06-MAY-2024.
Road work begins
.623 MILE(S) BEFORE RT O E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
Loop LP 29 N North
-
BUCHANAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-MAY-2024 to 14-JUN-2024.
Road work begins
US 169 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Loop LP 29 S South
-
BUCHANAN COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 10-MAY-2024 to 14-JUN-2024.
Road work begins
.046 MILE(S) BEFORE CST EASTON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 07-MAY-2024 to 23-MAY-2024.
Road work begins
.054 MILE(S) BEFORE RR KANSAS CITY DISTRICT E.
Work will be done
7 days a week.
State Route MO 5 S South
-
CHARITON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 07-MAY-2024 to 23-MAY-2024.
Road work begins
.006 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done
7 days a week.
State Route RT FF N North
-
CHARITON COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 10-MAY-2024 to 10-MAY-2024.
Road work begins
US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT FF S South
-
CHARITON COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 10-MAY-2024 to 10-MAY-2024.
Road work begins
CRD RAPHAEL RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Loop LP 35 N North
-
CLINTON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 09-MAY-2024 to 09-MAY-2024.
Road work begins
RT BB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
09:00 PM.
CST GRAND AVE E East
-
DEKALB COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 09-MAY-2024 to 09-MAY-2024.
Road work begins
.111 MILE(S) AFTER BU 36 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
06:00 PM.
US US 36 W West
-
DEKALB COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 06-MAY-2024 to 09-MAY-2024.
Road work begins
.005 MILE(S) BEFORE CST BOB F GRIFFIN RD S.
Work will be done
on weekdays only.
State Route RT FF N North
-
LINN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 06-MAY-2024 to 06-MAY-2024.
Road work begins
.019 MILE(S) BEFORE CRD GOLD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route RT FF S South
-
LINN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 06-MAY-2024 to 06-MAY-2024.
Road work begins
CRD GAS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route MO 190 W West
-
LIVINGSTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 10-MAY-2024.
Road work begins
.036 MILE(S) BEFORE PVT GRAND OAKS E.
Work will be done
on weekdays only.
State Route RT HH N North
-
NODAWAY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 06-MAY-2024 to 09-MAY-2024.
Road work begins
MO 46 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT HH S South
-
NODAWAY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 06-MAY-2024 to 09-MAY-2024.
Road work begins
CRD 240 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT D E East
-
SULLIVAN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-MAY-2024 to 07-MAY-2024.
Road work begins
.002 MILE(S) BEFORE CRD LITTLE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 169 N North
-
WORTH COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 06-MAY-2024 to 17-MAY-2024.
Road work begins
.018 MILE(S) AFTER CRD 135TH RD E.
Work will be done
7 days a week.
US US 169 S South
-
WORTH COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 06-MAY-2024 to 17-MAY-2024.
Road work begins
.003 MILE(S) BEFORE CRD 128TH TRL E.
Work will be done
7 days a week.