State Route MO 7 N North
-
CASS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2025 to 20-JUN-2025.
Road work begins
.087 MILE(S) BEFORE CST RICHLAND PKWY E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 49 N North
-
CASS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 10-APR-2025.
Road work begins
.043 MILE(S) BEFORE RT A E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:00 PM.
Interstate IS 49 S South
-
CASS COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 31-MAR-2025 to 10-APR-2025.
Road work begins
.028 MILE(S) AFTER RP IS49S TO RTA S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:00 PM.
State Route MO 2 E East
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.005 MILE(S) AFTER CST SE OUTER RD S.
Work will be done
on weekdays and Saturdays.
State Route MO 2 W West
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.002 MILE(S) AFTER CST BIRD AVE S.
Work will be done
on weekdays and Saturdays.
State Route MO 7 N North
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-APR-2025 to 16-MAY-2025.
Road work begins
.04 MILE(S) BEFORE CST ORIOLE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route MO 7 S South
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-APR-2025 to 16-MAY-2025.
Road work begins
.039 MILE(S) BEFORE CST MAVERICK TRL E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.002 MILE(S) AFTER CST NE BIRMINGHAM RD E.
Work will be done
7 days a week.
Interstate IS 435 S South
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.312 MILE(S) AFTER RP US69S TO IS435S S.
Work will be done
7 days a week.
State Route MO 1 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 02-MAY-2025.
Road work begins
.021 MILE(S) BEFORE CST 72ND ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 1 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 02-MAY-2025.
Road work begins
CST N INDIANA AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 152 W West
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.004 MILE(S) AFTER MO 1 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 92 E East
-
CLAY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 05-MAR-2025 to 18-APR-2025.
Road work begins
.003 MILE(S) BEFORE CRD MT OLIVET RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT DD E East
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
.003 MILE(S) BEFORE COE LITTON WAY S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT DD W West
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
MO 92 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CST NW BARRY RD W West
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2025.
Road work begins
.025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done
7 days a week.
Interstate IS 35 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.011 MILE(S) BEFORE RP IS35N TO IS435N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
Interstate IS 35 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.005 MILE(S) BEFORE IS 435 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.053 MILE(S) BEFORE CST NE PLEASANT VALLEY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.031 MILE(S) AFTER RP IS435N TO NE SHOAL CREEK PKWY N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.138 MILE(S) AFTER RP IS435N TO MO152W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.074 MILE(S) BEFORE CST NE PLEASANT VALLEY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.116 MILE(S) BEFORE CST NE SHOAL CREEK PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 10-MAR-2025 to 10-APR-2025.
Road work begins
.245 MILE(S) BEFORE CST BARRY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 92 E East
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.146 MILE(S) BEFORE CRD NORTH WATER S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 92 W West
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 31-MAR-2025 to 30-APR-2025.
Road work begins
.157 MILE(S) AFTER CRD PLATTSBURG RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
CST E 6TH ST E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 13-FEB-2025 to 11-APR-2025.
Road work begins
CST SUPERIOR ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 350 E East
-
JACKSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-MAR-2025 to 30-JUN-2025.
Road work begins
.147 MILE(S) AFTER CST E 83RD ST E.
Work will be done
7 days a week.
State Route MO 350 W West
-
JACKSON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-MAR-2025 to 30-JUN-2025.
Road work begins
.358 MILE(S) AFTER CO US50E TO US50W E.
Work will be done
7 days a week.
US US 71 N North
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2025 to 21-APR-2025.
Road work begins
.035 MILE(S) AFTER CST DR MARTIN LUTHER KING JR BLVD W.
Work will be done
7 days a week.
CST US 40 HWY E East
-
JACKSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 31-MAR-2025 to 09-APR-2025.
Road work begins
.01 MILE(S) AFTER CST E 31ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
CST US 40 HWY W West
-
JACKSON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 31-MAR-2025 to 09-APR-2025.
Road work begins
US 40 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
02:00 PM.
Interstate IS 435 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.137 MILE(S) AFTER CST OLDHAM RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.036 MILE(S) AFTER RP GREGORY BLVD TO IS435S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 11-APR-2025.
Road work begins
.037 MILE(S) BEFORE RP IS470E TO VIEW HIGH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.022 MILE(S) BEFORE RP IS470E TO BOWLIN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.282 MILE(S) BEFORE RP IS470E TO BLUE RIDGE BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.1 MILE(S) BEFORE RP NE DOUGLAS ST S TO IS470E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.022 MILE(S) BEFORE CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.111 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2025 to 11-APR-2025.
Road work begins
.176 MILE(S) BEFORE RP IS470W TO VIEW HIGH DR N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.073 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.118 MILE(S) BEFORE RP IS49S TO MO150E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 12 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 15-MAY-2025.
Road work begins
.001 MILE(S) BEFORE CST CLAREMONT AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-MAR-2025 to 27-JUN-2025.
Road work begins
.013 MILE(S) AFTER CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 15-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
RP MO150 TO MO291S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 150 W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
.007 MILE(S) AFTER RP MO150 TO US50E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 350 E East
-
JACKSON COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 18-SEP-2024 to 30-OCT-2025.
Road work begins
CST 55TH ST E.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 AM
and
07:00 PM.
Ramp RP BOWLIN RD TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE BOWLIN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470E TO BOWLIN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.01 MILE(S) AFTER IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO BLUE RIDGE BLVD N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO NE DOUGLAS ST S S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.011 MILE(S) AFTER IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST N TO IS470W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST S TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST NE DOUGLAS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO RAYTOWN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-MAR-2025 to 11-APR-2025.
Road work begins
.014 MILE(S) AFTER IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-MAR-2025 to 30-MAY-2025.
Road work begins
.008 MILE(S) AFTER CST WILLIS ST S.
Work will be done
on weekdays only.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.134 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 28-MAR-2025 to 11-APR-2025.
Road work begins
.059 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 13 S South
-
JOHNSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2025 to 05-MAY-2025.
Road work begins
.036 MILE(S) AFTER CRD 1250 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT F N North
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 25-APR-2025.
Road work begins
.005 MILE(S) AFTER MO 2 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT F S South
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 25-APR-2025.
Road work begins
.01 MILE(S) AFTER MO 58 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
Interstate IS 70 E East
-
LAFAYETTE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.651 MILE(S) BEFORE RP IS70E TO RTY E.
Work will be done
7 days a week.
State Route RT AA E East
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 02-MAY-2025.
Road work begins
.01 MILE(S) AFTER CST LIPPER ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT AA W West
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 02-MAY-2025.
Road work begins
.006 MILE(S) AFTER MO 23 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT O N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 09-MAY-2025.
Road work begins
.001 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT O S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 09-MAY-2025.
Road work begins
.006 MILE(S) AFTER RT N E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road work begins
.003 MILE(S) AFTER RT M S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 18-APR-2025.
Road work begins
.035 MILE(S) AFTER CRD SMELSER RD E.
Work will be done
7 days a week.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.067 MILE(S) AFTER CST REBAR RD E.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.322 MILE(S) BEFORE OR 65 S.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 18-APR-2025.
Road work begins
.021 MILE(S) AFTER CO US65S TO US65N W.
Work will be done
7 days a week.
State Route MO 152 E East
-
PLATTE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.005 MILE(S) AFTER RP MO152E TO IS29N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 29 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.072 MILE(S) BEFORE IS 435 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.126 MILE(S) BEFORE RT D E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.076 MILE(S) BEFORE CST NW COOKINGHAM DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 N North
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.034 MILE(S) BEFORE MO 45 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.093 MILE(S) BEFORE MO 45 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.129 MILE(S) BEFORE CST NW COOKINGHAM DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
Interstate IS 435 S South
-
PLATTE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 24-MAR-2025 to 17-APR-2025.
Road work begins
.042 MILE(S) AFTER RP IS435S TO RTD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:30 PM.
State Route RT F E East
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
RT B S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT F W West
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
CRD E 132ND ST E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT T E East
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
MO 210 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT T W West
-
RAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 16-APR-2025.
Road work begins
CST CAMDEN ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 70 E East
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.477 MILE(S) AFTER RP US65N TO IS70E E.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.013 MILE(S) AFTER RP RTJ TO IS70W W.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.507 MILE(S) BEFORE RP IS70W TO RTVV W.
Work will be done
7 days a week.
State Route RT C N North
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.012 MILE(S) AFTER RT J S.
Work will be done
7 days a week.
State Route RT C S South
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.002 MILE(S) AFTER RT J S.
Work will be done
7 days a week.
State Route RT F N North
-
CASS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 11-APR-2025.
Road work begins
.011 MILE(S) AFTER CRD 339TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT F S South
-
CASS COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 11-APR-2025.
Road work begins
.01 MILE(S) AFTER CRD 331ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT J N North
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-APR-2025.
Road work begins
.009 MILE(S) AFTER RT C S.
Work will be done
7 days a week.
State Route RT J S South
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-APR-2025.
Road work begins
.011 MILE(S) AFTER CST SCHOOL RD S.
Work will be done
7 days a week.
US US 71 N North
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 24-APR-2025.
Road work begins
.018 MILE(S) AFTER RP IS49N TO RTJ N.
Work will be done
7 days a week.
State Route RT J E East
-
CLAY COUNTY
- CLOSED
ROAD MIX OVERLAY
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
RT W E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT J W West
-
CLAY COUNTY
- CLOSED
ROAD MIX OVERLAY
Scheduled from 07-APR-2025 to 15-APR-2025.
Road work begins
CRD SW 200TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.004 MILE(S) BEFORE CST PLEASANT VALLEY RD W.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.403 MILE(S) AFTER RP 19TH ST E TO IS35S S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.018 MILE(S) AFTER CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
State Route MO 152 E East
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 30-MAY-2025.
Road work begins
.011 MILE(S) BEFORE MO 1 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 152 W West
-
CLAY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 30-MAY-2025.
Road work begins
.002 MILE(S) BEFORE CST KANSAS ST W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
CST TRUMAN RD E East
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.01 MILE(S) AFTER RP IS70E TO TRUMAN RD E.
Work will be done
7 days a week.
CST TRUMAN RD W West
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.002 MILE(S) AFTER CST INDIANA AVE S.
Work will be done
7 days a week.
Interstate IS 670 W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
PVT OVERPASS S South
-
JACKSON COUNTY
- CLOSED
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 31-DEC-2032.
Road work begins
.024 MILE(S) BEFORE CST TRUMAN RD E.
Work will be done
on weekdays only.
Ramp RP IS35N TO US169N N North
-
JACKSON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
IS 35 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Ramp RP IS70W TO 13TH ST E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
IS 670 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP TENTH ST TO IS70E E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
CST E 10TH ST E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP US71N TO IS670W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
.006 MILE(S) AFTER US 71 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Ramp RP US71S TO IS670W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 06-APR-2025 to 06-APR-2025.
Road work begins
US 71 S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
04:00 AM
and
05:00 PM.
Interstate IS 35 N North
-
JACKSON COUNTY
- Expect Delays
ROADSIDE WORK
Scheduled from 07-APR-2025 to 11-APR-2025.
Road work begins
.002 MILE(S) AFTER RP IS35N TO US169N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 11-APR-2025 to 14-APR-2025.
Road work begins
.003 MILE(S) AFTER CST CHESTNUT AVE S.
Work will be done
7 days a week.
US US 40 E East
-
JACKSON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 07-APR-2025 to 08-APR-2025.
Road work begins
.006 MILE(S) BEFORE CST BOWLIN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:30 PM.
CST SW BLUE PKWY W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 09-APR-2025 to 29-MAY-2025.
Road work begins
.003 MILE(S) AFTER CST SW 3RD ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 29 S South
-
PLATTE COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 08-APR-2025 to 09-APR-2025.
Road work begins
.247 MILE(S) BEFORE RP IS29S TO RTH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.