State Route RT D N North
-
CASS COUNTY
- Road Closed
Project Name -
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins
.1 MILE(S) AFTER CRD 323RD ST E.
Scheduled from
19-MAY-2025
to
24-AUG-2025.
State Route RT D S South
-
CASS COUNTY
- Road Closed
Project Name -
241213-C02 J4s3453
BRIDGE RECONSTRUCTION
Road closure begins
.028 MILE(S) AFTER CRD E 319TH ST E.
Scheduled from
19-MAY-2025
to
24-AUG-2025.
State Route MO 33 N North
-
CLAY COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.087 MILE(S) AFTER RT CC E.
Scheduled from
29-AUG-2024
to
17-SEP-2025.
State Route MO 33 N North
-
CLAY COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
.062 MILE(S) AFTER CRD DIANA DR E.
Scheduled from
04-JUN-2025
to
27-JUN-2025.
State Route MO 33 S South
-
CLAY COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.031 MILE(S) AFTER CRD BURRIS RD S.
Scheduled from
29-AUG-2024
to
17-SEP-2025.
State Route MO 33 S South
-
CLAY COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
.085 MILE(S) BEFORE RT CC E.
Scheduled from
04-JUN-2025
to
27-JUN-2025.
State Route MO 9 N North
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.024 MILE(S) AFTER RP MO9N TO US169N N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP MO9 TO NW BRIARCLIFF PKWY W W West
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
MO 9 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP MO9S TO NW BRIARCLIFF PKWY E E East
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
MO 9 S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP NW BRIARCLIFF PKWY E TO MO9N N North
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.002 MILE(S) AFTER CST NW PLATTE RD E.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP US169N TO MO9N N North
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.005 MILE(S) AFTER US 169 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
US US 69 N North
-
CLAY COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
CST N BRIGHTON AVE S.
Scheduled from
20-JUN-2025
to
24-JUN-2025.
CST BENTON BLVD N North
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.008 MILE(S) AFTER CST TRUMAN RD E.
Scheduled from
06-JUN-2025
to
15-AUG-2027.
CST BENTON BLVD S South
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.007 MILE(S) AFTER RP BENTON BLVD TO IS70W W.
Scheduled from
06-JUN-2025
to
15-AUG-2027.
CST E 23RD ST E East
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.003 MILE(S) AFTER CST INDIANA AVE S.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
CST E 23RD ST W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.003 MILE(S) AFTER CST MONROE AVE S.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
CST JACKSON AVE N North
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.009 MILE(S) AFTER CST E 29TH ST E.
Scheduled from
27-MAY-2025
to
26-AUG-2025.
CST JACKSON AVE S South
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.006 MILE(S) AFTER OR 70 E.
Scheduled from
27-MAY-2025
to
26-AUG-2025.
Interstate IS 35 S South
-
JACKSON COUNTY
- Road Closed
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
MILLING/RESURFACING WORK
Road closure begins
.001 MILE(S) BEFORE IS 70 W.
Scheduled from
20-JUN-2025
to
22-JUN-2025.
Interstate IS 35 S South
-
JACKSON COUNTY
- Road Closed
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
MILLING/RESURFACING WORK
Road closure begins
.003 MILE(S) AFTER RP IS70E TO IS35S S.
Scheduled from
20-JUN-2025
to
22-JUN-2025.
Outer Road N OR 50 E East
-
JACKSON COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
CST SE SHENANDOAH DR E.
Scheduled from
18-JUN-2025
to
21-JUL-2025.
Outer Road N OR 50 W West
-
JACKSON COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
.12 MILE(S) AFTER CST MILTON THOMPSON RD S.
Scheduled from
18-JUN-2025
to
21-JUL-2025.
PVT OVERPASS S South
-
JACKSON COUNTY
- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins
.024 MILE(S) BEFORE CST TRUMAN RD E.
Scheduled from
11-APR-2025
to
31-DEC-2032.
Ramp RP E 23RD ST TO IS70E E East
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
CST E 23RD ST E.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
Ramp RP E 23RD ST TO IS70W W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
CST E 23RD ST E.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
Ramp RP IS70E TO 23RD ST W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.001 MILE(S) AFTER IS 70 E.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
Ramp RP IS70E TO IS35S S South
-
JACKSON COUNTY
- Road Closed
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
MILLING/RESURFACING WORK
Road closure begins
IS 70 E.
Scheduled from
20-JUN-2025
to
22-JUN-2025.
Ramp RP IS70E TO MYRTLE AVE E East
-
JACKSON COUNTY
- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins
IS 70 E.
Scheduled from
20-MAR-2025
to
20-MAR-2031.
Ramp RP IS70W TO 23RD ST E East
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
IS 70 W.
Scheduled from
05-MAY-2025
to
01-DEC-2025.
Ramp RP IS70W TO IS35S S South
-
JACKSON COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
IS 29 N.
Scheduled from
19-JUN-2025
to
21-JUN-2025.
Business BU 50 E East
-
JOHNSON COUNTY
- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins
US 50 W.
Scheduled from
09-JUN-2025
to
31-OCT-2025.
Business BU 50 W West
-
JOHNSON COUNTY
- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins
.043 MILE(S) AFTER CST W YOUNG AVE E.
Scheduled from
09-JUN-2025
to
31-OCT-2025.
CO US50E TO BU50 E East
-
JOHNSON COUNTY
- Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins
US 50 E.
Scheduled from
09-JUN-2025
to
31-OCT-2025.
State Route RT Y N North
-
LAFAYETTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.005 MILE(S) AFTER RT VV S.
Scheduled from
21-APR-2025
to
01-DEC-2025.
State Route RT Y S South
-
LAFAYETTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.003 MILE(S) AFTER RT VV S.
Scheduled from
21-APR-2025
to
01-DEC-2025.
CO RIVERWAY BLVD TO US69 W West
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.001 MILE(S) AFTER US 69 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
State Route MO 9 S South
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.013 MILE(S) AFTER RP MO9S TO IS635S S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
RA IS29N DEARBORN N North
-
PLATTE COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
IS 29 N.
Scheduled from
17-JAN-2025
to
31-OCT-2025.
Ramp RP IS635N TO US69N N North
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.012 MILE(S) AFTER IS 635 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP IS635S TO MO9S S South
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.004 MILE(S) AFTER IS 635 S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP MO9N TO IS635N N North
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
MO 9 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP MO9S TO IS635N N North
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
MO 9 S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP MO9S TO RIVERWAY BLVD S South
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
US 69 N.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP RIVERWAY BLVD TO US69S S South
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.007 MILE(S) AFTER US 69 S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
Ramp RP US69S TO IS635S S South
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
US 69 S.
Scheduled from
05-MAY-2025
to
02-OCT-2025.
State Route RT Z E East
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.938 MILE(S) BEFORE CRD SHERWOOD FOREST E.
Scheduled from
14-OCT-2024
to
08-AUG-2025.
State Route RT Z W West
-
PLATTE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.439 MILE(S) AFTER CRD SHERWOOD FOREST E.
Scheduled from
14-OCT-2024
to
08-AUG-2025.
State Route RT T E East
-
RAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.014 MILE(S) AFTER PVT FARM RD S.
Scheduled from
05-MAY-2025
to
14-JUL-2025.
State Route RT T W West
-
RAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.082 MILE(S) BEFORE CRD TRIPLE SPRINGS RD S.
Scheduled from
05-MAY-2025
to
14-JUL-2025.
CRD LEMON TRL N North
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.022 MILE(S) BEFORE IS 70 E.
Scheduled from
14-MAR-2023
to
31-DEC-2037.
CRD LEMON TRL S South
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.015 MILE(S) BEFORE IS 70 W.
Scheduled from
14-MAR-2023
to
31-DEC-2037.
State Route MO 7 N North
-
CASS COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-JUN-2025 to 30-JUN-2025.
Road work begins
.068 MILE(S) AFTER CST MYRTLE ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 7 S South
-
CASS COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-APR-2025 to 18-JUL-2025.
Road work begins
.148 MILE(S) AFTER CRD COUNTY LINE RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 7 S South
-
CASS COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-JUN-2025 to 30-JUN-2025.
Road work begins
.011 MILE(S) AFTER CST CEMETERY ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 2 E East
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.005 MILE(S) AFTER CST SE OUTER RD S.
Work will be done
on weekdays and Saturdays.
State Route MO 2 W West
-
CASS COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2025 to 27-AUG-2025.
Road work begins
.002 MILE(S) AFTER CST BIRD AVE S.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 35 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.004 MILE(S) BEFORE CST PLEASANT VALLEY RD W.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.018 MILE(S) AFTER CST LIGHTBURNE ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
10:00 AM.
Interstate IS 35 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.403 MILE(S) AFTER RP 19TH ST E TO IS35S S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
11:00 AM.
Interstate IS 435 N North
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.002 MILE(S) AFTER CST NE BIRMINGHAM RD E.
Work will be done
7 days a week.
Interstate IS 435 S South
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAR-2025 to 01-DEC-2025.
Road work begins
.312 MILE(S) AFTER RP US69N TO IS435S S.
Work will be done
7 days a week.
State Route MO 152 W West
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.004 MILE(S) AFTER MO 1 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST NW BARRY RD W West
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2025.
Road work begins
.025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done
7 days a week.
State Route MO 291 S South
-
CLAY COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 02-MAY-2025 to 31-JUL-2025.
Road work begins
.017 MILE(S) BEFORE CST STEWART RD S.
Work will be done
7 days a week.
Interstate IS 35 N North
-
JACKSON COUNTY
- Expect Delays
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.089 MILE(S) BEFORE RP EATON ST TO IS35N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 35 S South
-
JACKSON COUNTY
- Expect Delays
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.022 MILE(S) BEFORE RP IS35N TO IS670W W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 31-JUL-2025.
Road work begins
.006 MILE(S) BEFORE CST E 18TH ST E.
Work will be done
7 days a week.
Interstate IS 70 W West
-
JACKSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-MAY-2025 to 31-JUL-2025.
Road work begins
.014 MILE(S) AFTER CST E 27TH ST E.
Work will be done
7 days a week.
State Route MO 150 W West
-
JACKSON COUNTY
- Expect Delays
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
.007 MILE(S) AFTER RP US50E TO MO150 E.
Work will be done
on weekdays and Saturdays.
State Route RT V N North
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 02-JUN-2025 to 29-AUG-2025.
Road work begins
.022 MILE(S) BEFORE CST NW LITTLE BLUE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.123 MILE(S) BEFORE CST W KATIE TRL E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
US US 40 E East
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 26-SEP-2025.
Road work begins
.001 MILE(S) BEFORE CST STERLING AVE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 40 W West
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 26-SEP-2025.
Road work begins
.039 MILE(S) BEFORE CST OOIDA DR S.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
CST NE STROTHER RD E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-MAY-2025 to 27-JUN-2025.
Road work begins
.007 MILE(S) BEFORE CST NE RALPH POWELL RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CST VIEW HIGH DR N North
-
JACKSON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
.032 MILE(S) AFTER CST NW OLD VIEW HIGH RD E.
Work will be done
7 days a week.
CST VIEW HIGH DR S South
-
JACKSON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-JUN-2025.
Road work begins
.039 MILE(S) AFTER CST NW VIEW HIGH PKWY N.
Work will be done
7 days a week.
Interstate IS 435 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.039 MILE(S) BEFORE RR PITTSBURG SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.042 MILE(S) BEFORE RP IS470E TO VIEW HIGH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.106 MILE(S) BEFORE RP IS470E TO BLUE RIDGE BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.058 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.072 MILE(S) BEFORE RP IS470W TO VIEW HIGH DR N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.008 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.085 MILE(S) AFTER RP IS49S TO MO150E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 670 E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - RUMBLE STRIPS
SHOULDER WORK
Scheduled from 20-JUN-2025 to 21-JUN-2025.
Road work begins
.012 MILE(S) AFTER RP WYOMING ST TO IS670E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 670 W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - RUMBLE STRIPS
SHOULDER WORK
Scheduled from 20-JUN-2025 to 21-JUN-2025.
Road work begins
.001 MILE(S) BEFORE RP IS670W TO TRUMAN RD W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
State Route MO 12 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JUN-2025 to 30-JUN-2025.
Road work begins
.018 MILE(S) BEFORE CST CRYSLER AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins
.011 MILE(S) BEFORE CST NORTHERN BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 30-JUN-2025.
Road work begins
.002 MILE(S) BEFORE CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-MAR-2025 to 27-JUN-2025.
Road work begins
.013 MILE(S) AFTER CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:30 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 01-JUL-2025.
Road work begins
.044 MILE(S) AFTER RR SEDALIA SUB E.
Work will be done
on weekdays and Saturdays.
State Route MO 210 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUN-2025 to 21-JUN-2025.
Road work begins
.141 MILE(S) BEFORE RP MO291S TO MO210 S.
Work will be done
7 days a week.
State Route MO 210 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 11-JUN-2025 to 30-JUN-2025.
Road work begins
.217 MILE(S) BEFORE RP MO291S TO MO210 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 210 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 11-JUN-2025 to 30-JUN-2025.
Road work begins
.014 MILE(S) BEFORE CST COBBLER RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP BROADWAY TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
CST BROADWAY BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP EATON ST TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.092 MILE(S) BEFORE IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO BROADWAY N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.02 MILE(S) BEFORE RP IS35N TO IS670E E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO BROADWAY S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.008 MILE(S) BEFORE RP IS35N TO IS670E E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO IS670E E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.033 MILE(S) AFTER IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO IS670W W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO EATON ST N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO IS670E E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO PENN VALLEY DR S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS470E TO STROTHER RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO BLUE RIDGE BLVD N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO NE DOUGLAS ST S S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO STROTHER RD W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.011 MILE(S) AFTER IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS670W TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.018 MILE(S) AFTER CST CENTRAL ST N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS670W TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 670 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP MO7 TO IS70E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7 TO US24E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7 TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7N TO US24W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST N TO IS470W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST S TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
CST NE DOUGLAS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP PENN VALLEY DR N TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.044 MILE(S) AFTER CST PENN VALLEY DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP PENNSYLVANIA AVE TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
CST PENNSYLVANIA AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP RAYTOWN RD TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP STROTHER RD TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
CST NE STROTHER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US24E TO MO7 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US24W TO MO7 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
US 24 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO MO7 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO RAYTOWN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50W TO RAYTOWN RD W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.163 MILE(S) BEFORE CRD BURNLEY RD S.
Work will be done
7 days a week.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.015 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.006 MILE(S) AFTER CST CENTRAL ST S.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
US US 40 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JUN-2025 to 19-JUL-2025.
Road work begins
.035 MILE(S) BEFORE CST HARDY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.116 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.193 MILE(S) BEFORE RP US50E TO MO7 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.017 MILE(S) AFTER RP US50W TO MO7 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.156 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.032 MILE(S) AFTER CST E 27TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.119 MILE(S) BEFORE CST LINWOOD BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.069 MILE(S) AFTER RP US71N TO THE PASEO N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.019 MILE(S) BEFORE CST E 19TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.039 MILE(S) AFTER RP US71S TO MICHIGAN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 30-JUN-2025.
Road work begins
.098 MILE(S) AFTER RP US71S TO DR MARTIN LUTHER KING JR BLVD E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 23 N North
-
JOHNSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 25-JUL-2025.
Road work begins
.001 MILE(S) AFTER RT DD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 23 S South
-
JOHNSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 25-JUL-2025.
Road work begins
RT MM S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT F N North
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.005 MILE(S) AFTER MO 2 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT F S South
-
JOHNSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.01 MILE(S) AFTER MO 58 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 50 E East
-
JOHNSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road work begins
.179 MILE(S) AFTER MO 58 E.
Work will be done
7 days a week.
US US 50 W West
-
JOHNSON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-MAY-2025 to 01-DEC-2025.
Road work begins
.249 MILE(S) BEFORE CRD 121 S.
Work will be done
7 days a week.
State Route MO 131 N North
-
JOHNSON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 09-JUN-2025 to 27-JUN-2025.
Road work begins
.009 MILE(S) AFTER MO 2 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route MO 131 S South
-
JOHNSON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 09-JUN-2025 to 27-JUN-2025.
Road work begins
.117 MILE(S) AFTER CST 20TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
Interstate IS 70 E East
-
LAFAYETTE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.651 MILE(S) BEFORE RP IS70E TO RTY E.
Work will be done
7 days a week.
State Route RT AA E East
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 27-JUN-2025.
Road work begins
.01 MILE(S) AFTER CST LIPPER ST S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT AA W West
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 27-JUN-2025.
Road work begins
.006 MILE(S) AFTER MO 23 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 24 E East
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.158 MILE(S) AFTER MO 224 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
09:00 PM.
US US 24 W West
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.006 MILE(S) BEFORE CRD E WALNUT ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
09:00 PM.
US US 24 W West
-
LAFAYETTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.169 MILE(S) AFTER CRD HICKLIN RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
Outer Road N OR 70 W West
-
LAFAYETTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 20-JUN-2025 to 24-JUN-2025.
Road work begins
.02 MILE(S) AFTER MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 127 N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-APR-2025 to 27-JUN-2025.
Road work begins
.006 MILE(S) AFTER OR 50 E.
Work will be done
7 days a week.
State Route RT O N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.001 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT O S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.006 MILE(S) AFTER RT N E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W N North
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.003 MILE(S) AFTER RT M S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
State Route RT W S South
-
PETTIS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAR-2025 to 27-JUN-2025.
Road work begins
.002 MILE(S) AFTER US 50 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
08:00 PM.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.067 MILE(S) AFTER CST REBAR RD E.
Work will be done
7 days a week.
US US 65 N North
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 27-JUN-2025.
Road work begins
.035 MILE(S) AFTER CRD SMELSER RD E.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 15-DEC-2025.
Road work begins
.322 MILE(S) BEFORE OR 65 S.
Work will be done
7 days a week.
US US 65 S South
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 27-JUN-2025.
Road work begins
.021 MILE(S) AFTER CO US65S TO US65N W.
Work will be done
7 days a week.
State Route MO 152 E East
-
PLATTE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-MAR-2025 to 07-OCT-2025.
Road work begins
.005 MILE(S) AFTER RP MO152E TO IS29N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT DD N North
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT DD S South
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
RT Z E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT E E East
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
RT U E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT E W West
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT EE N North
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT HH E East
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
OR 29 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT HH W West
-
PLATTE COUNTY
- Expect Delays
MOWING
Scheduled from 16-JUN-2025 to 27-JUN-2025.
Road work begins
CRD INTERURBAN RD SOUTH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 29 N North
-
PLATTE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-APR-2025 to 07-NOV-2025.
Road work begins
.026 MILE(S) AFTER RP RTD TO IS29N N.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
Interstate IS 29 S South
-
PLATTE COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 14-APR-2025 to 07-NOV-2025.
Road work begins
.006 MILE(S) BEFORE RP IS29S TO MO273 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
State Route RT Z E East
-
PLATTE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-JUN-2025 to 10-JUL-2025.
Road work begins
.135 MILE(S) AFTER CST HACKETT RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z E East
-
PLATTE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-JUN-2025 to 10-JUL-2025.
Road work begins
.43 MILE(S) BEFORE CRD SHERWOOD FOREST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z W West
-
PLATTE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-JUN-2025 to 10-JUL-2025.
Road work begins
.002 MILE(S) AFTER CRD COUNTY LINE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT Z W West
-
PLATTE COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 10-JUN-2025 to 10-JUL-2025.
Road work begins
.942 MILE(S) AFTER CRD SHERWOOD FOREST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Interstate IS 70 E East
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.477 MILE(S) AFTER RP US65N TO IS70E E.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2025 to 01-DEC-2025.
Road work begins
.507 MILE(S) BEFORE RP IS70W TO RTVV W.
Work will be done
7 days a week.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-DEC-2024 to 01-AUG-2025.
Road work begins
1.013 MILE(S) AFTER RP RTJ TO IS70W W.
Work will be done
7 days a week.
State Route MO 127 S South
-
SALINE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-APR-2025 to 27-JUN-2025.
Road work begins
.005 MILE(S) AFTER IS 70 E.
Work will be done
7 days a week.
State Route RT EE N North
-
SALINE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-APR-2025 to 30-JUN-2025.
Road work begins
.003 MILE(S) AFTER RT K S.
Work will be done
7 days a week.
State Route RT EE S South
-
SALINE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-APR-2025 to 30-JUN-2025.
Road work begins
.02 MILE(S) AFTER MO 20 E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
SALINE COUNTY
- Delays Possible
PAVEMENT MARKING
Scheduled from 11-JUN-2025 to 25-JUN-2025.
Road work begins
.812 MILE(S) BEFORE RT Z S.
Work will be done
7 days a week.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT A E East
-
CASS COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 25-JUN-2025 to 03-JUL-2025.
Road work begins
.005 MILE(S) AFTER RT B E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT E N North
-
CASS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 23-JUN-2025 to 26-JUN-2025.
Road work begins
MO 58 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT E S South
-
CASS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 23-JUN-2025 to 26-JUN-2025.
Road work begins
.013 MILE(S) BEFORE CRD 171ST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-JUN-2025 to 27-JUN-2025.
Road work begins
.035 MILE(S) BEFORE CST NE 56TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 92 W West
-
CLAY COUNTY
- Delays Possible
PAVEMENT STRIPING
Scheduled from 21-JUN-2025 to 21-JUN-2025.
Road work begins
.002 MILE(S) AFTER US 169 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
.001 MILE(S) BEFORE RP MO150E TO IS49S S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
State Route MO 150 W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
.001 MILE(S) BEFORE CST WHITE AVE S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP IS49N TO MO150E E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
.001 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP IS49N TO MO150W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
IS 49 N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP IS49S TO MO150E E East
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
IS 49 S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP IS49S TO MO150W W West
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
.001 MILE(S) BEFORE RP IS49S TO MO150E E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP MO150E TO IS49N N North
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
MO 150 E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP MO150W TO IS49N N North
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
MO 150 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP MO150W TO IS49S S South
-
JACKSON COUNTY
- CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-JUN-2025 to 22-JUN-2025.
Road work begins
MO 150 W.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
05:00 PM.
Ramp RP US50E TO JEFFERSON ST N North
-
JACKSON COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 24-JUN-2025 to 24-JUN-2025.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:30 PM.
US US 50 E East
-
JACKSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 24-JUN-2025 to 24-JUN-2025.
Road work begins
.002 MILE(S) BEFORE RP US50E TO THIRD ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:30 PM.
Interstate IS 70 E East
-
LAFAYETTE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 22-JUN-2025 to 23-JUN-2025.
Road work begins
.129 MILE(S) AFTER RP IS70E TO RTD E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 70 W West
-
LAFAYETTE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 24-JUN-2025 to 25-JUN-2025.
Road work begins
.077 MILE(S) AFTER RP IS70W TO RTD W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
Interstate IS 70 W West
-
LAFAYETTE COUNTY
- Expect Delays
CORE DRILLING
Scheduled from 23-JUN-2025 to 24-JUN-2025.
Road work begins
.055 MILE(S) AFTER RP IS70W TO RTE W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
05:00 AM.
State Route MO 45 N North
-
PLATTE COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUN-2025 to 24-JUN-2025.
Road work begins
.015 MILE(S) BEFORE CST LEWIS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 45 S South
-
PLATTE COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUN-2025 to 24-JUN-2025.
Road work begins
.029 MILE(S) BEFORE CST BELL RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 92 E East
-
PLATTE COUNTY
- Delays Possible
PAVEMENT STRIPING
Scheduled from 21-JUN-2025 to 21-JUN-2025.
Road work begins
.616 MILE(S) BEFORE CO MO92 TO SP45 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y N North
-
RAY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 23-JUN-2025 to 07-JUL-2025.
Road work begins
.18 MILE(S) BEFORE CST CRYSTAL DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT Y S South
-
RAY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 23-JUN-2025 to 07-JUL-2025.
Road work begins
.062 MILE(S) BEFORE CST CRYSTAL DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 E East
-
SALINE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 23-JUN-2025 to 24-JUN-2025.
Road work begins
.084 MILE(S) BEFORE RP US40E TO OUTER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
11:00 PM
and
12:00 PM.
Interstate IS 70 W West
-
SALINE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 24-JUN-2025 to 26-JUN-2025.
Road work begins
.468 MILE(S) BEFORE RP IS70W TO MO127 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
11:00 PM
and
12:00 PM.