WORK ZONES (CLOSED): 4 to report. Hide

Road Closed due to work zoneState Route M North - CALLAWAY COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.23 MILES BEFORE RT E W.
Scheduled from 22-JAN-2019 to 29-MAR-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route M South - CALLAWAY COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .96 MILES AFTER RT E E.
Scheduled from 22-JAN-2019 to 29-MAR-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneOuter Road 44 East - LACLEDE COUNTY - Road Closed
Project Name - NEW GASCONADE RIVER BRIDGE ON I-44OR NEAR HAZELGRE
BRIDGE RECONSTRUCTION
Road closure begins 1.9 MILES AFTER RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneOuter Road 44 West - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.21 MILES BEFORE RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 74 to report. Hide

Expect delays due to work zoneInterstate 70 East - BOONE COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 18-FEB-2019 to 19-FEB-2019.
Road work begins .17 MILES BEFORE US 40 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - BOONE COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 18-FEB-2019 to 19-FEB-2019.
Road work begins .5 MILES AFTER CRD ST CHARLES RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - BOONE COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 18-FEB-2019 to 19-FEB-2019.
Road work begins .01 MILES AFTER MO 740 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneBusiness 54 West - CALLAWAY COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-DEC-2018 to 01-MAR-2019.
Road work begins .19 MILES AFTER CST WESTMINSTER AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneBusiness 54 East - CALLAWAY COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-DEC-2018 to 01-MAR-2019.
Road work begins .02 MILES BEFORE CST TENNYSON RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AA East - CALLAWAY COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-FEB-2019 to 28-FEB-2019.
Road work begins AT RT OO E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - CAMDEN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-NOV-2018 to 30-AUG-2019.
Road work begins 1.02 MILES AFTER RT KK E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 East - CAMDEN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-NOV-2018 to 30-AUG-2019.
Road work begins .07 MILES AFTER MO 7 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneS COUNTRY CLUB DR South - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT CST W TRUMAN BLVD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneS COUNTRY CLUB DR North - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins .19 MILES BEFORE OR 50 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE OR 54 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneW TRUMAN BLVD East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneW TRUMAN BLVD West - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins .03 MILES BEFORE OR 50 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins .69 MILES BEFORE CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins LESS THAN .01 MILES AFTER CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins LESS THAN .01 MILES AFTER CRD BUSINESS 50 WEST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins LESS THAN .01 MILES AFTER CST W TRUMAN BLVD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins LESS THAN .01 MILES AFTER CST MISSOURI BLVD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 09-JAN-2019 to 31-MAR-2019.
Road work begins .33 MILES BEFORE CST MISSOURI BLVD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .57 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .23 MILES AFTER CST CHRISTY DR N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins AT CST JEFFERSON ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST CHRISTY DR S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp SOUTH COUNTRY CLUB DR TO US50E East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp TRUMAN BLVD TO US50W West - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT CST W TRUMAN BLVD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp US50E TO SOUTH COUNTRY CLUB DR North - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT US 50 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp US50W TO TRUMAN BLVD East - COLE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 29-OCT-2018 to 31-MAR-2019.
Road work begins AT US 50 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST SOUTHWEST BLVD N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U South - COOPER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-JAN-2019 to 01-MAR-2019.
Road work begins AT RT B S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U North - COOPER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-JAN-2019 to 01-MAR-2019.
Road work begins AT RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneFRONTAGE RD West - CRAWFORD COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins .59 MILES BEFORE RT H W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneFRONTAGE RD East - CRAWFORD COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins .59 MILES AFTER RT H W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins AT MO 8 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins .05 MILES BEFORE RT VV S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 49 South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J North - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins 2.73 MILES AFTER CST PINE ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins 2.65 MILES AFTER RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N East - CRAWFORD COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT CST WALNUT ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P North - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT CRD FRONTAGE RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route V East - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins AT MO 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route V West - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins AT RT Y S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 28-JAN-2019 to 22-FEB-2019.
Road work begins AT RT V W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route EE West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-FEB-2019 to 01-MAR-2019.
Road work begins 4.28 MILES BEFORE MO 72 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route EE East - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-FEB-2019 to 01-MAR-2019.
Road work begins AT MO 72 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route OO West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-FEB-2019 to 01-MAR-2019.
Road work begins AT RT O N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route OO East - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 31-DEC-2018 to 22-FEB-2019.
Road work begins 4.76 MILES BEFORE RT O N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P North - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-FEB-2019 to 01-MAR-2019.
Road work begins 3.72 MILES BEFORE MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route P South - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-FEB-2019 to 01-MAR-2019.
Road work begins AT MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 124 West - HOWARD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-JAN-2019 to 01-MAR-2019.
Road work begins 1.75 MILES AFTER CST SEXTON ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 124 East - HOWARD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 14-JAN-2019 to 01-MAR-2019.
Road work begins AT MO 240 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 68 West - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins AT RT P E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 68 East - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins 1.31 MILES BEFORE RT P E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H East - MILLER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-FEB-2019 to 01-MAR-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H West - MILLER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 11-FEB-2019 to 01-MAR-2019.
Road work begins 2.61 MILES BEFORE MO 17 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Z South - MILLER COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 13-FEB-2019 to 28-FEB-2019.
Road work begins 1.45 MILES BEFORE RT W N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Z North - MILLER COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 13-FEB-2019 to 28-FEB-2019.
Road work begins AT RT W S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 179 South - MONITEAU COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 01-MAR-2019.
Road work begins .51 MILES AFTER CST ROW ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 179 North - MONITEAU COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 01-MAR-2019.
Road work begins 3.63 MILES BEFORE CST ROW ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - MORGAN COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 52 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD West - OSAGE COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 11-FEB-2019 to 28-FEB-2019.
Road work begins AT RT U S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD East - OSAGE COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 11-FEB-2019 to 28-FEB-2019.
Road work begins 3.19 MILES BEFORE RT U N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 14-JAN-2019 to 22-FEB-2019.
Road work begins 1.42 MILES BEFORE US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 14-JAN-2019 to 22-FEB-2019.
Road work begins 2.92 MILES BEFORE RT C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route T South - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins 4.52 MILES BEFORE MO 17 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route T North - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT MO 17 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 21 North - WASHINGTON COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 21 South - WASHINGTON COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT MO 8 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AA West - WASHINGTON COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins 2.77 MILES AFTER MO 185 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AA East - WASHINGTON COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 11-FEB-2019 to 22-FEB-2019.
Road work begins 4.82 MILES BEFORE MO 185 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N West - WASHINGTON COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 04-FEB-2019 to 22-FEB-2019.
Road work begins AT MO 185 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

FUTURE WORK ZONES: 22 to report. Hide

Expect delays due to work zoneInterstate 70 East - CALLAWAY COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 19-FEB-2019 to 19-FEB-2019.
Road work begins 1.44 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - COOPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2019 to 28-FEB-2019.
Road work begins 1.03 MILES AFTER RT K S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - COOPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2019 to 28-FEB-2019.
Road work begins .21 MILES AFTER RT M N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 41 North - COOPER COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-FEB-2019 to 21-FEB-2019.
Road work begins 1.23 MILES AFTER MO 135 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M North - COOPER COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-FEB-2019 to 21-FEB-2019.
Road work begins 1.45 MILES AFTER US 40 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 3 North - HOWARD COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-FEB-2019 to 26-FEB-2019.
Road work begins 1 MILE BEFORE RT B E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U West - HOWARD COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-FEB-2019 to 26-FEB-2019.
Road work begins 1.44 MILES AFTER RT H N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U East - HOWARD COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 26-FEB-2019 to 26-FEB-2019.
Road work begins 3.29 MILES BEFORE RT H N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 42 West - MARIES COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-FEB-2019 to 01-MAR-2019.
Road work begins 1.79 MILES AFTER RT V N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 42 East - MARIES COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-FEB-2019 to 01-MAR-2019.
Road work begins 1.83 MILES BEFORE RT V S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MILLER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 21-FEB-2019.
Road work begins 2.71 MILES AFTER BU 54 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MILLER COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 21-FEB-2019.
Road work begins 4.02 MILES BEFORE BU 54 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C East - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-FEB-2019 to 20-FEB-2019.
Road work begins .45 MILES BEFORE RT CC S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C East - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 19-FEB-2019 to 19-FEB-2019.
Road work begins .87 MILES BEFORE RT CC S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C West - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 19-FEB-2019 to 19-FEB-2019.
Road work begins .7 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C West - MONITEAU COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-FEB-2019 to 20-FEB-2019.
Road work begins .51 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-FEB-2019 to 21-FEB-2019.
Road work begins .47 MILES AFTER MO 135 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MORGAN COUNTY - Delays Possible
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-FEB-2019 to 21-FEB-2019.
Road work begins .55 MILES BEFORE MO 135 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M East - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 22-FEB-2019.
Road work begins AT RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M West - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 22-FEB-2019.
Road work begins AT RT T N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y North - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 22-FEB-2019.
Road work begins .14 MILES AFTER SP 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y South - PULASKI COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 19-FEB-2019 to 22-FEB-2019.
Road work begins 6.56 MILES BEFORE LP 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top

INCIDENTS: 2 to report. Show

Back to Top

FLOODS (CLOSED): 0 to report. Show

Back to Top

FLOODS: 0 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 158 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.