For immediate assistance, please contact us at 1-888-ASK-MODOT ( 1-888-275-6636 ).

For more information about MoDOT, please visit our home page.

Use the dropdown boxes below to filter the results.

WORK ZONES (CLOSED): 88 to report. Hide

Road Closed due to work zoneState Route O East - ANDREW COUNTY - Road Closed
Project Name - PLATTE RIVER BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Road closure begins .54 MILES BEFORE CST MAIN ST W.
Scheduled from 18-MAR-2019 to 14-NOV-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/ROUTE-O-PLATTE-RIVER-BRIDGE-REPLACEMENT
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7754
Road Closed due to work zoneState Route O West - ANDREW COUNTY - Road Closed
Project Name - PLATTE RIVER BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Road closure begins .47 MILES AFTER CST MAIN ST W.
Scheduled from 18-MAR-2019 to 14-NOV-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/ROUTE-O-PLATTE-RIVER-BRIDGE-REPLACEMENT
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7754
Road Closed due to work zoneState Route 111 South - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 3.73 MILES BEFORE RT W N.
Scheduled from 03-SEP-2019 to 20-DEC-2019.
Road Closed due to work zoneState Route 111 North - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.67 MILES AFTER RT W S.
Scheduled from 03-SEP-2019 to 20-DEC-2019.
Road Closed due to work zoneUS 136 East - ATCHISON COUNTY - Road Closed
Project Name - NORTHWEST MISSOURI FLOODING
PAVEMENT REPAIR
Road closure begins 2.01 MILES BEFORE RT D N.
Scheduled from 12-AUG-2019 to 31-OCT-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/2019-NORTHWEST-MISSOURI-FLOODING
Road Closed due to work zoneUS 136 West - ATCHISON COUNTY - Road Closed
Project Name - NORTHWEST MISSOURI FLOODING
PAVEMENT REPAIR
Road closure begins .2 MILES AFTER IS 29 S.
Scheduled from 12-AUG-2019 to 31-OCT-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/2019-NORTHWEST-MISSOURI-FLOODING
Road Closed due to work zoneState Route FF West - BOLLINGER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.46 MILES BEFORE RT H N.
Scheduled from 11-SEP-2019 to 31-DEC-2019.
Road Closed due to work zoneState Route FF East - BOLLINGER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.42 MILES AFTER RT H N.
Scheduled from 11-SEP-2019 to 31-DEC-2019.
Road Closed due to work zoneASH ST East - BOONE COUNTY - Road Closed
SIDEWALK/ADA IMPROVEMENTS
Road closure begins .03 MILES BEFORE MO 763 S.
Scheduled from 14-OCT-2019 to 19-OCT-2019.
Road Closed due to work zoneASH ST West - BOONE COUNTY - Road Closed
SIDEWALK/ADA IMPROVEMENTS
Road closure begins LESS THAN .01 MILES AFTER MO 763 S.
Scheduled from 14-OCT-2019 to 19-OCT-2019.
Road Closed due to work zoneRamp IS55S TO US61 South - CAPE GIRARDEAU COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins AT IS 55 S.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route M East - CHARITON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 2.02 MILES AFTER MO 11 N.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route M West - CHARITON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 3.02 MILES BEFORE MO 11 S.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneDIX RD North - COLE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .04 MILES BEFORE US 50 E.
Scheduled from 07-OCT-2019 to 25-OCT-2019.
Road Closed due to work zoneDIX RD South - COLE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .02 MILES BEFORE US 50 W.
Scheduled from 07-OCT-2019 to 25-OCT-2019.
Road Closed due to work zoneINDUSTRIAL DR West - COLE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins AT CST W MCCARTY ST W.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneINDUSTRIAL DR East - COLE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .18 MILES BEFORE CST W MCCARTY ST W.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneW MCCARTY ST West - COLE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .1 MILES BEFORE US 63 N.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneW MCCARTY ST East - COLE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .1 MILES BEFORE CST INDUSTRIAL DR E.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneRamp US63S TO W MCCARTY ST West - COLE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins AT US 63 S.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route B West - DAVIESS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER RT N W.
Scheduled from 30-SEP-2019 to 29-NOV-2019.
Road Closed due to work zoneState Route B East - DAVIESS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER RT N E.
Scheduled from 30-SEP-2019 to 29-NOV-2019.
Road Closed due to work zoneState Route DD South - DAVIESS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .05 MILES BEFORE IS 35 S.
Scheduled from 09-SEP-2019 to 29-NOV-2019.
Road Closed due to work zoneState Route DD North - DAVIESS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .04 MILES BEFORE IS 35 N.
Scheduled from 09-SEP-2019 to 29-NOV-2019.
Road Closed due to work zoneState Route H North - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 6.44 MILES BEFORE CST EAST ST N.
Scheduled from 16-SEP-2019 to 20-DEC-2019.
Road Closed due to work zoneState Route H South - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 5.83 MILES AFTER CST EAST ST N.
Scheduled from 16-SEP-2019 to 20-DEC-2019.
Road Closed due to work zoneState Route T North - GASCONADE COUNTY - Road Closed
Project Name - GASCONADE COUNTY ROUTE T
BRIDGE RECONSTRUCTION
Road closure begins 1.54 MILES BEFORE RT V E.
Scheduled from 10-JUL-2019 to 06-DEC-2019.
Road Closed due to work zoneState Route T South - GASCONADE COUNTY - Road Closed
Project Name - GASCONADE COUNTY ROUTE T
BRIDGE RECONSTRUCTION
Road closure begins 1.31 MILES AFTER RT V E.
Scheduled from 10-JUL-2019 to 06-DEC-2019.
Road Closed due to work zone55 North - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 26-AUG-2019 to 25-NOV-2019.
Road Closed due to work zoneState Route TT East - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.49 MILES AFTER RT PP N.
Scheduled from 13-AUG-2019 to 25-NOV-2019.
Road Closed due to work zoneState Route K South - HENRY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .51 MILES AFTER CST SECOND ST E.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route K North - HENRY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .89 MILES AFTER RT MM W.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route 291 North - JACKSON COUNTY - Road Closed
PAVEMENT MARKING
Road closure begins 1.14 MILES AFTER CST COURTNEY RD N.
Scheduled from 16-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneRamp BEARDSLEY RD TO IS70W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT CST BEARDSLEY RD N.
Scheduled from 06-MAR-2018 to 31-DEC-2020.
Road Closed due to work zoneRamp HOLMES RD TO IS435N North - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins AT CST HOLMES RD N.
Scheduled from 12-MAY-2018 to 31-MAY-2020.
Road Closed due to work zoneRamp HOLMES RD TO IS435S South - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins AT CST HOLMES RD N.
Scheduled from 12-MAY-2018 to 31-MAY-2020.
Road Closed due to work zoneRamp IS35N TO IS70W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT IS 35 N.
Scheduled from 07-MAR-2018 to 31-DEC-2020.
Road Closed due to work zoneRamp IS435N TO IS70W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT IS 435 N.
Scheduled from 05-SEP-2019 to 15-MAR-2020.
Road Closed due to work zoneRamp IS435S TO IS70E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT IS 435 S.
Scheduled from 05-SEP-2019 to 15-MAR-2020.
Road Closed due to work zoneRamp IS435S TO IS70W West - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins AT US 24 W.
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneRamp IS70E TO IS435N North - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT IS 70 E.
Scheduled from 18-MAR-2019 to 01-DEC-2020.
Road Closed due to work zoneRamp IS70E TO MANCHESTER TRFY East - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins AT IS 70 E.
Scheduled from 10-MAR-2019 to 01-DEC-2020.
Road Closed due to work zoneRamp IS70W TO IS435S South - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins AT IS 70 W.
Scheduled from 18-MAR-2019 to 01-DEC-2020.
Road Closed due to work zoneRamp MANCHESTER TRFY TO IS70E East - JACKSON COUNTY - Road Closed
PAVEMENT MARKING
Road closure begins AT CST MANCHESTER TRFY S.
Scheduled from 11-MAR-2019 to 01-DEC-2020.
Road Closed due to work zoneRamp MANCHESTER TRFY TO IS70W West - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins AT CST MANCHESTER TRFY S.
Scheduled from 11-MAR-2019 to 01-DEC-2020.
Road Closed due to work zoneRamp RTW TO IS435S South - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .05 MILES AFTER US 71 S.
Scheduled from 12-MAY-2018 to 31-DEC-2019.
Road Closed due to work zoneRamp TENTH ST TO IS70E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT CST TENTH ST E.
Scheduled from 10-SEP-2019 to 31-DEC-2019.
Road Closed due to work zoneRamp TENTH ST TO IS70W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT CST TENTH ST E.
Scheduled from 10-SEP-2019 to 31-DEC-2019.
Road Closed due to work zoneRamp US169S TO IS70W West - JACKSON COUNTY - Road Closed
Project Name - LEWIS AND CLARK BRIADGE REPLACEMENT
PERMIT OR UTILITY WORK
Road closure begins AT CST FIFTH ST W.
Scheduled from 09-SEP-2019 to 31-DEC-2020.
Road Closed due to work zoneUS 24 West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT CST BROADWAY S.
Scheduled from 22-MAY-2018 to 31-DEC-2020.
Road Closed due to work zoneState Route D East - JASPER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .98 MILES AFTER CST MAIN ST S.
Scheduled from 03-APR-2019 to 20-DEC-2019.
Road Closed due to work zoneState Route 23 North - JOHNSON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .01 MILES AFTER RT EE W.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route E East - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.22 MILES BEFORE RT MM S.
Scheduled from 13-SEP-2019 to 01-DEC-2019.
Road Closed due to work zone1147 North - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .37 MILES BEFORE IS 44 E.
Scheduled from 26-AUG-2019 to 15-DEC-2019.
Road Closed due to work zone1147 South - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .03 MILES BEFORE IS 44 W.
Scheduled from 26-AUG-2019 to 15-DEC-2019.
Road Closed due to work zoneInterstate 44 East - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.91 MILES BEFORE CRD LOOP 44 W.
Scheduled from 29-JUL-2019 to 30-NOV-2019.
Road Closed due to work zoneRamp MO39 TO IS44E East - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT LP 44 W.
Scheduled from 19-AUG-2019 to 15-DEC-2019.
Road Closed due to work zoneRamp RTH TO IS44W West - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CRD LOOP 44 E.
Scheduled from 29-JUL-2019 to 15-DEC-2019.
Road Closed due to work zoneSPLITLOG ST West - MCDONALD COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .16 MILES AFTER CST SPLITLOG ST W.
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneSPLITLOG ST East - MCDONALD COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .18 MILES BEFORE CST SPLITLOG ST W.
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneState Route KK South - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT MO 90 E.
Scheduled from 03-SEP-2019 to 02-DEC-2019.
Road Closed due to work zoneState Route KK North - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .09 MILES BEFORE MO 90 E.
Scheduled from 03-SEP-2019 to 02-DEC-2019.
Road Closed due to work zoneMCKINNEY ST East - NEWTON COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .11 MILES BEFORE CST WHITE AVE S.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneMCKINNEY ST West - NEWTON COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .1 MILES AFTER CST WHITE AVE S.
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route FF North - NODAWAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins 2.67 MILES BEFORE CRD 160 ST W.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route FF South - NODAWAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins 2.34 MILES AFTER CRD 160 ST W.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route NN West - NODAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 1 MILE BEFORE RT E N.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route NN East - NODAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .01 MILES AFTER RT E N.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route W South - PETTIS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 1.28 MILES AFTER CST WASHINGTON RD E.
Scheduled from 15-OCT-2019 to 22-OCT-2019.
Road Closed due to work zoneState Route W North - PETTIS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins LESS THAN .01 MILES AFTER RT DD E.
Scheduled from 15-OCT-2019 to 22-OCT-2019.
Road Closed due to work zoneState Route E North - PIKE COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .01 MILES AFTER US 54 W.
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road Closed due to work zoneState Route E South - PIKE COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .07 MILES BEFORE US 54 W.
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road Closed due to work zoneUS 136 East - PUTNAM COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .53 MILES AFTER MO 149 S.
Scheduled from 26-AUG-2019 to 18-OCT-2019.
Road Closed due to work zoneUS 136 West - PUTNAM COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins 1.86 MILES AFTER RT N S.
Scheduled from 26-AUG-2019 to 18-OCT-2019.
Road Closed due to work zoneState Route FF South - RALLS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .04 MILES BEFORE US 61 N.
Scheduled from 15-OCT-2019 to 17-OCT-2019.
News Releases - REPLACING CULVERTS AT VARIOUS LOCATIONS
Road Closed due to work zoneState Route FF North - RALLS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 2.56 MILES BEFORE US 61 S.
Scheduled from 15-OCT-2019 to 17-OCT-2019.
News Releases - REPLACING CULVERTS AT VARIOUS LOCATIONS
Road Closed due to work zoneState Route T East - SCHUYLER COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins AT RT A N.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route T West - SCHUYLER COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .76 MILES BEFORE RT A N.
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road Closed due to work zoneState Route 77 South - SCOTT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 3.41 MILES AFTER RT D E.
Scheduled from 01-JUL-2019 to 18-OCT-2019.
Road Closed due to work zoneState Route 77 North - SCOTT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 4.44 MILES BEFORE RT D W.
Scheduled from 01-JUL-2019 to 18-OCT-2019.
Road Closed due to work zoneOuter Road 55 North - SCOTT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 02-OCT-2019 to 31-OCT-2019.
Road Closed due to work zoneOuter Road 55 South - SCOTT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 02-OCT-2019 to 31-OCT-2019.
Road Closed due to work zoneState Route T North - ST. CHARLES COUNTY - Road Closed
Project Name - ROUTE T - FOLLOW DETOUR
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER RT M W.
Scheduled from 23-SEP-2019 to 10-NOV-2019.
Road Closed due to work zoneRamp IS270E TO IS44W West - ST. LOUIS COUNTY - Road Closed
PAVEMENT MARKING
Road closure begins AT IS 270 E.
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneRamp US67S TO DORSETT RD West - ST. LOUIS COUNTY - Road Closed
SHOULDER WORK
Road closure begins AT CST LINDBERGH BLVD S.
Scheduled from 09-OCT-2019 to 18-OCT-2019.
Road Closed due to work zoneRamp 14TH ST TO IS64W West - ST. LOUIS CITY - Road Closed
BRIDGE MAINTENANCE
Road closure begins AT CST 14TH ST N.
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road Closed due to work zoneRamp CLARK AVE TO IS64W West - ST. LOUIS CITY - Road Closed
BRIDGE MAINTENANCE
Road closure begins LESS THAN .01 MILES AFTER CST CLARK AVE W.
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road Closed due to work zoneRamp VANDEVENTER AVE TO IS44W West - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CST VANDEVENTER AVE S.
Scheduled from 23-MAR-2019 to 15-DEC-2019.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 549 to report. Hide

Possible delays due to work zoneState Route A East - ATCHISON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 1.41 MILES BEFORE RT D N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route O South - ATCHISON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT C W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 136 East - ATCHISON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .02 MILES BEFORE IS 29 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 59 North - ATCHISON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .01 MILES AFTER MO 46 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 59 South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 07-OCT-2019 to 18-OCT-2019.
Road work begins AT CST WALNUT ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneState Route 248 East - BARRY COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-OCT-2019 to 15-DEC-2019.
Road work begins 2.33 MILES AFTER RT C W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 37 North - BARRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-SEP-2019 to 02-DEC-2019.
Road work begins .02 MILES BEFORE US 60 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 37 South - BARRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-SEP-2019 to 02-DEC-2019.
Road work begins .1 MILES AFTER CST MYRTLE E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 39 North - BARRY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 17-OCT-2019.
Road work begins .98 MILES BEFORE RT YY E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 39 South - BARRY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins .09 MILES AFTER RT YY W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 86 East - BARRY COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-OCT-2019 to 16-DEC-2019.
Road work begins 2.7 MILES BEFORE RT E W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route TT East - BARRY COUNTY - Expect Delays
Project Name - J7S3123 RESURFACE PAVEMENT
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 39 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - BARRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2019 to 28-NOV-2019.
Road work begins .14 MILES BEFORE CST KYLER S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 East - BARRY COUNTY - Expect Delays
Project Name - BRIDGE DECK REPLACEMENT
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2019 to 28-NOV-2019.
Road work begins .01 MILES AFTER CST EISENHOWER ST N.
Work will be done around the clock, on weekdays only.
News Releases - ALL ROUTE 60 TRAFFIC WILL BE SWITCHED HEAD TO HEAD ON EASTBOUND BRIDGE
Expect delays due to work zoneState Route T South - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 126 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route V West - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 30-SEP-2019 to 31-OCT-2019.
Road work begins AT IS 49 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route V East - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 30-SEP-2019 to 31-OCT-2019.
Road work begins AT MO 43 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W North - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W South - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .02 MILES AFTER RT V E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 East - BARTON COUNTY - Expect Delays
Project Name - SLIDE REPAIR
GUARD RAIL/CABLE WORK
Scheduled from 14-OCT-2019 to 22-NOV-2019.
Road work begins 2.47 MILES BEFORE RT M S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 49 North - BATES COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .73 MILES BEFORE RT B E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 18 East - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .13 MILES AFTER IS 49 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 18 West - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 3.05 MILES AFTER RT K N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 52 East - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .85 MILES BEFORE CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 52 West - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .21 MILES AFTER US 71 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K South - BATES COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .27 MILES AFTER MO 52 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K North - BATES COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 4.37 MILES BEFORE MO 52 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK South - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 3.22 MILES BEFORE MO 18 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK North - BATES COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .13 MILES AFTER MO 18 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route YY North - BATES COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 2.64 MILES BEFORE MO 52 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route YY South - BATES COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .12 MILES AFTER MO 52 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 North - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-OCT-2019 to 18-OCT-2019.
Road work begins 2.69 MILES AFTER RT M S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 South - BENTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 17-APR-2019 to 01-NOV-2019.
Road work begins .02 MILES BEFORE CST COMMERCIAL ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 South - BENTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT RT AA E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 North - BENTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 17-APR-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER US 65 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 South - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-OCT-2019 to 18-OCT-2019.
Road work begins 1.66 MILES AFTER RT Z E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneCOLLEGE AVE South - BOONE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-SEP-2019 to 20-NOV-2019.
Road work begins .26 MILES AFTER LP 70 W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneCOLLEGE AVE North - BOONE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-SEP-2019 to 20-NOV-2019.
Road work begins .06 MILES AFTER CST COLLEGE AVE S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 371 North - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-SEP-2019 to 21-NOV-2019.
Road work begins 1.35 MILES AFTER RT H N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 371 South - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-SEP-2019 to 21-NOV-2019.
Road work begins AT CST 22ND ST S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 59 North - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-SEP-2019 to 06-NOV-2019.
Road work begins .05 MILES BEFORE MO 273 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 59 South - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-SEP-2019 to 06-NOV-2019.
Road work begins .05 MILES BEFORE CST LAKE AVE N.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneBusiness 67 North - BUTLER COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins .25 MILES AFTER CST WESTWOOD BLVD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 116 West - CALDWELL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins 2.42 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 116 West - CALDWELL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins 1.46 MILES AFTER CST ELM ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 70 East - CALLAWAY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins 1.8 MILES BEFORE US 54 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route B West - CALLAWAY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins .11 MILES BEFORE RT E W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route O East - CALLAWAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .27 MILES AFTER CST BLUFF ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route O West - CALLAWAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .02 MILES AFTER RT D N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 54 East - CALLAWAY COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 25-SEP-2019 to 25-OCT-2019.
Road work begins 2.18 MILES AFTER CRD 436 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 54 West - CALLAWAY COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 25-SEP-2019 to 25-OCT-2019.
Road work begins 2 MILES AFTER CRD 328 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 54 East - CALLAWAY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins 2.11 MILES AFTER RT AA E.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneInterstate 70 West - CALLAWAY COUNTY - No Expected Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-AUG-2019 to 31-OCT-2019.
Road work begins .21 MILES BEFORE RT YY W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 7 North - CAMDEN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT CST WASHINGTON ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N North - CAMDEN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 30-SEP-2019 to 24-OCT-2019.
Road work begins AT US 54 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N South - CAMDEN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 30-SEP-2019 to 24-OCT-2019.
Road work begins 6.24 MILES BEFORE US 54 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route T South - CAMDEN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 7 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route T North - CAMDEN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT CST SECOND ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W West - CAMDEN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 30-SEP-2019 to 24-OCT-2019.
Road work begins AT US 54 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W East - CAMDEN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 30-SEP-2019 to 24-OCT-2019.
Road work begins 5.21 MILES BEFORE US 54 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneLoop 55 North - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 29-JUL-2019 to 01-NOV-2019.
Road work begins .02 MILES AFTER MO 25 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneLoop 55 South - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 29-JUL-2019 to 01-NOV-2019.
Road work begins .05 MILES AFTER IS 55 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 74 West - CAPE GIRARDEAU COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 16-OCT-2019 to 18-OCT-2019.
Road work begins .04 MILES AFTER IS 55 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 10 East - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins 1.99 MILES BEFORE RT D S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 24 East - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-JUN-2019 to 15-NOV-2019.
Road work begins .31 MILES AFTER BU 65 S.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneUS 24 West - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-JUN-2019 to 15-NOV-2019.
Road work begins .6 MILES BEFORE MO 10 E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneUS 65 North - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins .06 MILES AFTER RT J E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 65 South - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 09-SEP-2019 to 17-OCT-2019.
Road work begins .38 MILES AFTER RT W W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 65 South - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 28-OCT-2019.
Road work begins .34 MILES AFTER RT Z S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 65 North - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 28-OCT-2019.
Road work begins .77 MILES BEFORE RT Z S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 49 South - CASS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .29 MILES BEFORE MO 7 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 58 West - CASS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-APR-2019 to 31-OCT-2019.
Road work begins .11 MILES AFTER CST DEAN AVE N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 58 East - CASS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-APR-2019 to 31-OCT-2019.
Road work begins .02 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route A West - CASS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 25-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER RT B E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route A East - CASS COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 18 W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route A West - CASS COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins .07 MILES BEFORE MO 18 W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route A East - CASS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 25-OCT-2019.
Road work begins .01 MILES BEFORE CST HIGH SCHOOL AVE W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route E North - CASS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-SEP-2019 to 19-OCT-2019.
Road work begins .06 MILES AFTER CST STRUZICK RD E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneNORTH AVE East - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-SEP-2019 to 25-OCT-2019.
Road work begins .35 MILES BEFORE CST 171ST ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 32 East - CEDAR COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 01-NOV-2019.
Road work begins 1.96 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 32 West - CEDAR COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 01-NOV-2019.
Road work begins 2.55 MILES BEFORE RT CC W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 24 East - CHARITON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2019 to 26-FEB-2020.
Road work begins 1.09 MILES AFTER MO 129 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 24 West - CHARITON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2019 to 26-FEB-2020.
Road work begins 2.22 MILES BEFORE MO 129 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 24 East - CHARITON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 05-NOV-2019.
Road work begins .57 MILES BEFORE CST JACKSON ST W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 24 West - CHARITON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 05-NOV-2019.
Road work begins .01 MILES BEFORE CST JACKSON ST E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneBusiness 65 South - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 15-APR-2020.
Road work begins .25 MILES BEFORE CST W SOUTH ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneS NICHOLAS RD North - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-OCT-2019 to 16-DEC-2019.
Road work begins .11 MILES AFTER CRD S NICHOLAS RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneSELMORE BLVD North - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 15-APR-2020.
Road work begins .33 MILES BEFORE CST E SOUTH ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 125 South - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-SEP-2019 to 31-OCT-2019.
Road work begins .57 MILES AFTER RT U E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-SEP-2019 to 11-NOV-2019.
Road work begins .26 MILES BEFORE CST MT VERNON ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 South - CHRISTIAN COUNTY - Expect Delays
Project Name - UBAWS / MILL AND FILL SOME DAY WORK MOSTLY NIGHTS
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUL-2019 to 11-NOV-2019.
Road work begins .03 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 14 East - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins .87 MILES AFTER RT N S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 14 East - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins .03 MILES BEFORE CRD JOHNS FORD RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 14 East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 15-APR-2020.
Road work begins .24 MILES BEFORE CST S 3RD ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA East - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins .44 MILES AFTER CRD N NICHOLAS RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route F East - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins 1.69 MILES BEFORE BU 65 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N South - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 26-AUG-2019 to 21-OCT-2019.
Road work begins 2.02 MILES BEFORE RT M W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route U East - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins .8 MILES AFTER MO 125 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W South - CHRISTIAN COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 09-SEP-2019 to 31-OCT-2019.
Road work begins 3.67 MILES AFTER MO 14 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route ZZ South - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 26-AUG-2019 to 21-OCT-2019.
Road work begins 3.2 MILES BEFORE MO 14 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 West - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 06-OCT-2019 to 15-DEC-2019.
Road work begins .02 MILES AFTER MO 14 E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneENGLEWOOD RD East - CLAY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-AUG-2019 to 01-JAN-2020.
Road work begins .1 MILES BEFORE US 169 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneENGLEWOOD RD West - CLAY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-AUG-2019 to 01-JAN-2020.
Road work begins .08 MILES BEFORE US 169 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneKANSAS ST East - CLAY COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 15-NOV-2019.
Road work begins AT MO 152 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneKANSAS ST West - CLAY COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 15-NOV-2019.
Road work begins AT CST CLAYVIEW DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 35 North - CLAY COUNTY - Expect Delays
MOWING
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins .43 MILES BEFORE CST BEDFORD AVE E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 435 South - CLAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins .12 MILES AFTER MO 210 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 110 East - CLAY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 25-APR-2019 to 31-DEC-2019.
Road work begins .01 MILES BEFORE US 69 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 110 West - CLAY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 27-APR-2019 to 31-DEC-2019.
Road work begins .08 MILES BEFORE CST NE COOKINGHAM DR W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneInterstate 435 North - CLAY COUNTY - Delays Possible
MEDIAN OR SHOULDER
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins .04 MILES AFTER MO 210 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 435 South - CLAY COUNTY - Delays Possible
MEDIAN OR SHOULDER
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins .03 MILES AFTER MO 110 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 10 East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .08 MILES AFTER CST JESSE JAMES RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 152 East - CLAY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2019 to 31-DEC-2019.
Road work begins AT CST FLINTLOCK RD S.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 152 West - CLAY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 07-AUG-2019 to 31-DEC-2019.
Road work begins AT CST KANSAS ST W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 33 North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .12 MILES AFTER CST B S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 92 East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .03 MILES BEFORE US 169 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneRamp IS29S TO MO210E East - CLAY COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 09-SEP-2019 to 21-OCT-2019.
Road work begins .08 MILES BEFORE CST ARMOUR RD W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route A North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST N CHURCH RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route C South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .5 MILES BEFORE RT CC E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route C North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .09 MILES AFTER MO 92 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route CC West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 33 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route CC East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT RT C N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route D East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT US 69 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route DD West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins .03 MILES AFTER MO 92 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route DD East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins .9 MILES AFTER CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins 2.85 MILES BEFORE MO 92 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins .02 MILES AFTER MO 92 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins 2.86 MILES BEFORE MO 92 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins .07 MILES AFTER MO 92 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route EE North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 210 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route EE South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT RT H W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .28 MILES BEFORE RT JJ S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .02 MILES AFTER CST H W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route JJ North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .51 MILES BEFORE MO 210 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route JJ South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route MM West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins AT US 69 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route MM East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins 4.86 MILES BEFORE US 69 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route N North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .1 MILES AFTER MO 210 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route N South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST MARIETTA ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route RA North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 92 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route RA South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 31-OCT-2019.
Road work begins .86 MILES BEFORE MO 92 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route W East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT US 169 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route W West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .09 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 South - CLAY COUNTY - Delays Possible
SWEEPING PAVEMENT
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .06 MILES BEFORE MO 9 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 North - CLAY COUNTY - Delays Possible
SWEEPING PAVEMENT
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .37 MILES AFTER CST THIRD ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 69 South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .69 MILES AFTER RT PP W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 69 North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .12 MILES AFTER CST RAINBOW BLVD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 35 South - CLINTON COUNTY - Expect Delays
MOWING
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins .03 MILES BEFORE RT PP E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 110 West - CLINTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .01 MILES BEFORE US 69 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 33 South - CLINTON COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .06 MILES AFTER RT PP E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 South - CLINTON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 20-SEP-2019 to 20-OCT-2019.
Road work begins .75 MILES AFTER CST HALLAR AVE E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 169 North - CLINTON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 20-SEP-2019 to 20-OCT-2019.
Road work begins .03 MILES AFTER MO 116 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneBIG HORN DR North - COLE COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .19 MILES BEFORE US 50 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneBIG HORN DR South - COLE COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .17 MILES BEFORE US 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneHORNER RD West - COLE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneHORNER RD East - COLE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CRD BIG HORN DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneS COUNTRY CLUB DR North - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .19 MILES BEFORE OR 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneS COUNTRY CLUB DR South - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST W TRUMAN BLVD W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneDIX RD North - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST MISSOURI BLVD E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneDIX RD South - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins .02 MILES AFTER CST INDUSTRIAL DR E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneELLIS BLVD West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE OR 54 E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneELLIS BLVD East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneW TRUMAN BLVD West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .08 MILES BEFORE OR 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneW TRUMAN BLVD East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST W TRUMAN BLVD E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST W TRUMAN BLVD E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .13 MILES AFTER CST WILDWOOD DR S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .01 MILES AFTER CRD BUS 50 W W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CRD S COUNTRY CLUB DR S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 50 West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST COUNTRY CLUB DR E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .23 MILES AFTER CST CHRISTY DR N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST CHRISTY DR S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins AT CST JEFFERSON ST E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .57 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneRamp DIX RD TO US50W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST DIX RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp SOUTH COUNTRY CLUB DR TO US50E East - COLE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CRD S COUNTRY CLUB DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp TRUMAN BLVD TO US50W West - COLE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST W TRUMAN BLVD W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp US50E TO DIX RD East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp US50E TO SOUTH COUNTRY CLUB DR North - COLE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp US50W TO DIX RD West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp US50W TO TRUMAN BLVD East - COLE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins .01 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route C East - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST SOUTHWEST BLVD N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 50 East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins .62 MILES BEFORE CST DIX RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 50 West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-SEP-2019 to 01-NOV-2019.
Road work begins .33 MILES AFTER US 63 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 70 East - COOPER COUNTY - Expect Delays
SURVEYING
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins AT MO 179 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AA West - COOPER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AA East - COOPER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins AT RT B N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .62 MILES AFTER CST FRANKLIN ST N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .06 MILES AFTER MO 49 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .04 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .06 MILES BEFORE RT ZZ W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 8 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 24-OCT-2019.
Road work begins .57 MILES BEFORE RT DD S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 24-OCT-2019.
Road work begins .6 MILES BEFORE CST FRANKLIN ST N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .6 MILES BEFORE RT CC W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .62 MILES AFTER OR 44 E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 49 South - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .14 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH North - CRAWFORD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins 4.16 MILES BEFORE MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH South - CRAWFORD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route ZZ East - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 24-OCT-2019.
Road work begins .02 MILES BEFORE CST HISTORIC RT 66 E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route ZZ West - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-OCT-2019 to 24-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST HISTORIC RT 66 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route M South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins AT MO 8 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route M North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins AT RT YY W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route P North - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 4.42 MILES AFTER RT DD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route P South - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 3.54 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route YY West - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins AT RT M S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route ZZ West - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 1.47 MILES AFTER CST WASHINGTON BLVD E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route ZZ East - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 1.03 MILES AFTER RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 West - DADE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 02-OCT-2019 to 24-OCT-2019.
Road work begins .03 MILES AFTER CST GRAND AVE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 East - DADE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 02-OCT-2019 to 24-OCT-2019.
Road work begins .18 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 69 North - DAVIESS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE RT T E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H East - DENT COUNTY - Delays Possible
CONCRETE OVERLAY
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins 2.82 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H West - DENT COUNTY - Delays Possible
CONCRETE OVERLAY
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins 3.31 MILES BEFORE RT C N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 162 East - DUNKLIN COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 25 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneFRANKLIN ST South - FRANKLIN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-OCT-2019 to 29-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE CST THIRD ST E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneFRANKLIN ST North - FRANKLIN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-OCT-2019 to 29-OCT-2019.
Road work begins .08 MILES BEFORE CST BIEKER ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 44 East - FRANKLIN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins 1.49 MILES AFTER MO 100 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 47 North - FRANKLIN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 09-SEP-2016 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST EIGTH ST W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneOuter Road 44 West - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 24-OCT-2019.
Road work begins 2.09 MILES BEFORE RT AF N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-AUG-2019 to 15-NOV-2019.
Road work begins 1.37 MILES BEFORE RT O E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 13 South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-AUG-2019 to 15-NOV-2019.
Road work begins 1.35 MILES BEFORE CRD 60 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 13 North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-AUG-2019 to 15-NOV-2019.
Road work begins .67 MILES BEFORE RT BB W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 13 South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-AUG-2019 to 15-NOV-2019.
Road work begins .64 MILES BEFORE RT BB E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 360 West - GREENE COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins .12 MILES BEFORE CRD 156 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 360 East - GREENE COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins .02 MILES BEFORE CRD 156 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 65 North - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 15-OCT-2019 to 29-OCT-2019.
Road work begins .03 MILES BEFORE CST CATALPA ST E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-JUL-2019 to 01-DEC-2020.
Road work begins .61 MILES AFTER CST JACKSON ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 160 East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 06-OCT-2019 to 15-DEC-2019.
Road work begins .01 MILES AFTER CRD PLAINVIEW RD E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneUS 160 West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-JUL-2019 to 01-DEC-2020.
Road work begins .03 MILES BEFORE CST WEST BYP N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 35 North - HARRISON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 07-AUG-2019 to 01-NOV-2019.
Road work begins .19 MILES BEFORE CST MILLER ST W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneInterstate 35 South - HARRISON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 29-JUL-2019 to 01-NOV-2019.
Road work begins .25 MILES AFTER RT N W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneGAINES DR West - HENRY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 02-SEP-2019 to 12-DEC-2019.
Road work begins .93 MILES BEFORE CST COMMUNITY DR S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneGAINES DR East - HENRY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 02-SEP-2019 to 12-DEC-2019.
Road work begins AT MO 13 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 South - HENRY COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins .04 MILES BEFORE RT Z E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 West - HICKORY COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins .02 MILES AFTER MO 83 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 111 North - HOLT COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-SEP-2019 to 05-NOV-2019.
Road work begins .02 MILES AFTER CST NODAWAY ST E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 111 South - HOLT COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-SEP-2019 to 05-NOV-2019.
Road work begins .01 MILES BEFORE RT T W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 87 North - HOWARD COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 03-JUN-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 5 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 87 South - HOWARD COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 03-JUN-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 5 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route Y North - HOWARD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 124 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - HOWARD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins 7.5 MILES BEFORE MO 124 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 49 North - IRON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-OCT-2019 to 31-OCT-2019.
Road work begins .09 MILES BEFORE MO 32 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 72 East - IRON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 25-JUL-2019 to 15-DEC-2019.
Road work begins 2.04 MILES AFTER MO 21 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 72 West - IRON COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 19-JUN-2019 to 31-DEC-2019.
Road work begins AT MO 49 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneINDEPENDENCE AVE West - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins .07 MILES BEFORE CST LIBERTY ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneINDEPENDENCE AVE East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins .22 MILES BEFORE CST RIVER BLVD N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneINDEPENDENCE AVE West - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins .07 MILES BEFORE CST LIBERTY ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 North - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .16 MILES AFTER CST FRONT ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 435 North - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins .98 MILES BEFORE MO 210 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 435 North - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-SEP-2019 to 10-AUG-2020.
Road work begins LESS THAN .01 MILES AFTER CST RAYTOWN RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 435 South - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-SEP-2019 to 10-AUG-2020.
Road work begins .19 MILES BEFORE US 24 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 70 West - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE CST BLUE RIDGE CUTOFF N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS435N TO IS70E East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins AT IS 435 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS435S TO IS70E East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins LESS THAN .01 MILES AFTER IS 435 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS435S TO US40 East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-AUG-2019 to 01-APR-2020.
Road work begins LESS THAN .01 MILES AFTER US 24 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS70E TO IS435S South - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins AT IS 70 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route BB North - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-AUG-2019 to 25-OCT-2019.
Road work begins .11 MILES AFTER RT AA E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route E South - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-SEP-2019 to 19-OCT-2019.
Road work begins .94 MILES BEFORE RT VV E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route F South - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-AUG-2019 to 23-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER RT H S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route F North - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-AUG-2019 to 23-OCT-2019.
Road work begins .21 MILES AFTER CRD OUTER BELT EXT RD N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route H North - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-AUG-2019 to 27-OCT-2019.
Road work begins .28 MILES AFTER CST BROADWAY ST S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 24 East - JACKSON COUNTY - Expect Delays
Project Name - INDEPENDENCE WATER MAIN BREAK
PERMIT OR UTILITY WORK
Scheduled from 16-OCT-2019 to 25-OCT-2019.
Road work begins .06 MILES BEFORE CST NW NOLAND RD N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 24 West - JACKSON COUNTY - Expect Delays
Project Name - INDEPENDENCE WATER MAIN BREAK
PERMIT OR UTILITY WORK
Scheduled from 16-OCT-2019 to 25-OCT-2019.
Road work begins .02 MILES BEFORE CST NW NOLAND RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 40 East - JACKSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-AUG-2019 to 01-APR-2020.
Road work begins .3 MILES BEFORE US 24 W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneINDEPENDENCE AVE East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-SEP-2019 to 09-NOV-2019.
Road work begins .07 MILES BEFORE CST FOREST AVE S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 435 North - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CRD STATE LINE RD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 435 South - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 470 East - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING, APRIL 7TH TO NOV. 1ST.
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins .3 MILES BEFORE CST RAYTOWN RD S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 470 West - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING, APRIL 7TH TO NOV. 1ST.
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins AT MO 291 S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 210 East - JACKSON COUNTY - Delays Possible
MOWING
Scheduled from 08-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 291 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 291 South - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING TO 39TH ST. APRIL 7TH TO NOV. 1
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins .01 MILES BEFORE CST 39TH ST E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 291 North - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING TO 39TH ST. APRIL 7TH TO NOV. 1
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER IS 470 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneRamp BESS TRUMAN PKWY TO US24 East - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins .17 MILES BEFORE CST INDEPENDENCE AVE E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneRamp DELAWARE ST TO US24 West - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins .18 MILES BEFORE US 24 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneRamp US24 TO BESS TRUMAN PKWY West - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins AT US 24 W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneRamp US24 TO BESS TRUMAN PKWY East - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 30-SEP-2019 to 01-JUN-2020.
Road work begins AT CST INDEPENDENCE AVE E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 40 West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 14-NOV-2019.
Road work begins .11 MILES AFTER CST 39TH ST E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 50 East - JACKSON COUNTY - Delays Possible
Project Name - 50 HWY J-TURNS
INTERSECTION IMPROVEMENTS
Scheduled from 30-SEP-2019 to 01-NOV-2019.
Road work begins .69 MILES AFTER CRD OUTER BELT EXT RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zone100 North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 14-OCT-2019 to 17-OCT-2019.
Road work begins .05 MILES BEFORE IS 44 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zone100 South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 14-OCT-2019 to 17-OCT-2019.
Road work begins .05 MILES BEFORE IS 44 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneE 32ND ST East - JASPER COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-AUG-2019 to 08-JAN-2020.
Road work begins .03 MILES BEFORE CST CONNECTICUT AVE S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneE 32ND ST East - JASPER COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 15-JUL-2019 to 11-NOV-2019.
Road work begins .06 MILES BEFORE CST INDIANA AVE N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneE 32ND ST West - JASPER COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 04-OCT-2019 to 19-OCT-2019.
Road work begins .15 MILES BEFORE IS 49 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneLoop 49 South - JASPER COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-AUG-2019 to 31-DEC-2019.
Road work begins .44 MILES AFTER MO 171 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneLoop 49 South - JASPER COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-SEP-2019 to 24-MAY-2020.
Road work begins .01 MILES BEFORE CST NEWMAN RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneLoop 49 South - JASPER COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 02-OCT-2019 to 01-DEC-2019.
Road work begins AT CST S MADISON ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 43 North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 96 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 43 South - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 96 West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 43 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 96 West - JASPER COUNTY - Expect Delays
CORE DRILLING
Scheduled from 08-OCT-2019 to 17-OCT-2019.
Road work begins 1.85 MILES AFTER RT U S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 96 East - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 171 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA South - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT HH W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT LP 44 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT CST GRAND AVE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH East - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT CST MAIN ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ South - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT Z W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT P E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P East - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 2.14 MILES BEFORE RT JJ N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .06 MILES AFTER CST SCHIFFERDECKER AVE N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route T North - JASPER COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT RT N W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route YY East - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins 1.79 MILES BEFORE RT Z W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route YY West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 96 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 67 North - JEFFERSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-AUG-2019 to 31-OCT-2019.
Road work begins .47 MILES AFTER RT JJ N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 67 South - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 08-JUL-2019 to 31-OCT-2019.
Road work begins .59 MILES BEFORE CRD FLUCOM RD E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 110 West - JEFFERSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .01 MILES BEFORE US 67 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 110 East - JEFFERSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .05 MILES AFTER MO 21 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 141 North - JEFFERSON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2019 to 22-NOV-2019.
Road work begins .01 MILES AFTER IS 55 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 30 East - JEFFERSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 25-OCT-2019.
Road work begins .9 MILES BEFORE RT Y S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y South - JEFFERSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 30 E.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneState Route W North - JOHNSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 30-JUL-2019 to 25-OCT-2019.
Road work begins .08 MILES BEFORE US 50 E.
Work will be done around the clock, on weekdays and Saturdays.
No delays expected due to work zoneUS 50 East - JOHNSON COUNTY - No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 31-JUL-2019 to 29-NOV-2019.
Road work begins 1.51 MILES AFTER CRD OUTER BELT EXT RD N.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneUS 50 West - JOHNSON COUNTY - No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 31-JUL-2019 to 29-NOV-2019.
Road work begins .75 MILES BEFORE RT Z N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneOLIVE ST North - JOHNSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-SEP-2019 to 08-NOV-2019.
Road work begins .01 MILES AFTER CST TENTH ST E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 58 East - JOHNSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-SEP-2019 to 08-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT U S.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneUS 50 West - JOHNSON COUNTY - Delays Possible
Project Name - 50 HWY J-TURNS
INTERSECTION IMPROVEMENTS
Scheduled from 30-SEP-2019 to 01-NOV-2019.
Road work begins .12 MILES AFTER RT Z S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 44 East - LACLEDE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins AT CST COWAN DR S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 44 West - LACLEDE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-NOV-2019.
Road work begins AT RT N N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneOuter Road 44 East - LACLEDE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 30-SEP-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER LP 44 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneOuter Road 44 West - LACLEDE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 30-SEP-2019 to 01-NOV-2019.
Road work begins 1.05 MILES BEFORE RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 East - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUL-2019 to 20-OCT-2019.
Road work begins .06 MILES AFTER MO 39 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 44 West - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 29-JUL-2019 to 15-DEC-2019.
Road work begins .48 MILES BEFORE RT H S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 44 West - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUL-2019 to 20-OCT-2019.
Road work begins .93 MILES AFTER MO 174 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 39 North - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 16-DEC-2019.
Road work begins .22 MILES BEFORE CST CARNATION S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 39 South - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 16-DEC-2019.
Road work begins .2 MILES AFTER CST CARNATION ST N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 39 North - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 27-NOV-2018 to 16-DEC-2019.
Road work begins .26 MILES AFTER CST LINCOLN AVE N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K North - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-OCT-2019 to 17-OCT-2019.
Road work begins .06 MILES AFTER CST OLIVE ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K South - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-OCT-2019 to 17-OCT-2019.
Road work begins .16 MILES BEFORE CST ELLIOTT AVE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 79 North - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins 2.72 MILES AFTER CST MAIN ST N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route KK West - LINCOLN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2019 to 31-OCT-2019.
Road work begins .04 MILES BEFORE US 61 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route KK East - LINCOLN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2019 to 31-OCT-2019.
Road work begins AT US 61 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 61 South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .37 MILES BEFORE RT KK W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 61 North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .05 MILES AFTER CST DUGAN LN W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 65 North - LIVINGSTON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-SEP-2019 to 28-OCT-2019.
Road work begins .46 MILES AFTER RT Z S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 65 South - LIVINGSTON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-SEP-2019 to 28-OCT-2019.
Road work begins 1.43 MILES BEFORE RT Z S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 63 North - MARIES COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2019 to 01-NOV-2019.
Road work begins 1.78 MILES BEFORE MO 28 W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route V South - MARIES COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins AT CST FIFTH ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route V North - MARIES COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins AT RT N W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 110 West - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins AT US 36 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW/MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneState Route 110 East - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins 3.02 MILES AFTER RT K S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneUS 24 East - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 24 West - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins 4.28 MILES BEFORE US 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 North - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 South - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins .89 MILES BEFORE US 24 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Possible delays due to work zone3RD ST North - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins .08 MILES BEFORE CST WARREN BARRETT DR E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zone3RD ST South - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins AT CST WARREN BARRETT DR E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneRESERVOIR ST North - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins AT MO 79 N.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneRESERVOIR ST South - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins .07 MILES BEFORE CST MARK TWAIN AVE E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route A South - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins 1.6 MILES BEFORE RT M W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route A North - MARION COUNTY - Delays Possible
Project Name - BRIDGE PAINTING
BRIDGE MAINTENANCE
Scheduled from 20-AUG-2019 to 01-NOV-2019.
Road work begins 1.54 MILES AFTER RT M E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate 49 North - MCDONALD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .02 MILES AFTER MO 76 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 49 South - MCDONALD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins 1.42 MILES BEFORE MO 76 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 90 West - MCDONALD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 10-OCT-2019 to 18-OCT-2019.
Road work begins 1.51 MILES BEFORE RT MM S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 54 West - MILLER COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins .77 MILES BEFORE CST HORSESHOE BEND PKWY W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 54 East - MILLER COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins .55 MILES AFTER CST BAGNELL DAM BLVD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 57 North - MISSISSIPPI COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 10-SEP-2019 to 15-NOV-2019.
Road work begins AT MO 105 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - MISSISSIPPI COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 08-JUL-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 105 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA East - MONROE COUNTY - Expect Delays
Project Name - J2S3194
BRIDGE RECONSTRUCTION
Scheduled from 20-SEP-2019 to 01-NOV-2019.
Road work begins 2.94 MILES BEFORE RT KK E.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - BRIDGE PAINTING ON RT AA OVER BEE CREEK P0826
Expect delays due to work zoneState Route AA West - MONROE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 01-NOV-2019.
Road work begins 2.9 MILES AFTER MO 15 S.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - BRIDGE REHAB AND PAINTING P0826 BEE CREEK
Expect delays due to work zoneState Route AA East - MONROE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 01-NOV-2019.
Road work begins 2.94 MILES BEFORE RT KK E.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - BRIDGE REHAB AND PAINTING P0826 BEE CREEK
Expect delays due to work zoneInterstate 70 West - MONTGOMERY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins 2.18 MILES AFTER RT J S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 70 West - MONTGOMERY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-JUN-2019 to 31-AUG-2020.
Road work begins 2.21 MILES AFTER MO 161 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route C East - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 52 W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route AA North - NEW MADRID COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 23-SEP-2019 to 16-NOV-2019.
Road work begins AT MO 80 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route FF South - NEW MADRID COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-SEP-2019 to 09-NOV-2019.
Road work begins AT US 60 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route FF North - NEW MADRID COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-SEP-2019 to 09-NOV-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P West - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-SEP-2019 to 26-OCT-2019.
Road work begins .11 MILES BEFORE IS 55 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P East - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-SEP-2019 to 26-OCT-2019.
Road work begins .09 MILES BEFORE IS 55 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 East - NEW MADRID COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 08-JUL-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 61 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 162 West - NEW MADRID COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins .9 MILES BEFORE CST FOURTH ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 162 East - NEW MADRID COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 16-OCT-2019 to 18-OCT-2019.
Road work begins .37 MILES AFTER CST FOURTH ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 162 West - NEW MADRID COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 16-OCT-2019 to 18-OCT-2019.
Road work begins AT RT B S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 60 West - NEW MADRID COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .06 MILES BEFORE RT FF N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 60 East - NEW MADRID COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .05 MILES BEFORE RT FF S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneLoop 49 South - NEWTON COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-OCT-2019 to 25-OCT-2019.
Road work begins .96 MILES BEFORE CRD GATEWAY DR N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneLoop 49 North - NEWTON COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-AUG-2019 to 31-DEC-2019.
Road work begins .02 MILES AFTER CST RANGE LINE RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 43 North - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-JUL-2019 to 02-DEC-2019.
Road work begins .76 MILES AFTER MO 43 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 60 East - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-OCT-2019 to 25-OCT-2019.
Road work begins .13 MILES AFTER US 71 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-OCT-2019 to 25-OCT-2019.
Road work begins .04 MILES BEFORE BU 60 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 142 East - OREGON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2019 to 01-OCT-2020.
Road work begins AT RT EE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route C East - OSAGE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 01-AUG-2019 to 18-OCT-2019.
Road work begins .02 MILES AFTER RT A N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route C West - OSAGE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 01-AUG-2019 to 18-OCT-2019.
Road work begins .01 MILES AFTER MO 100 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route W East - OSAGE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 01-AUG-2019 to 18-OCT-2019.
Road work begins .02 MILES AFTER RT A N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route W West - OSAGE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 01-AUG-2019 to 18-OCT-2019.
Road work begins .02 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 63 South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2019 to 01-NOV-2019.
Road work begins .64 MILES AFTER US 50 E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneKINGSHIGHWAY South - PERRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-SEP-2019 to 29-NOV-2019.
Road work begins AT MO 51 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneKINGSHIGHWAY North - PERRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-SEP-2019 to 29-NOV-2019.
Road work begins .09 MILES BEFORE CST HUBER RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 44 West - PHELPS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT CST KINGSHIGHWAY E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 44 East - PHELPS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 2.25 MILES BEFORE CST OLD WIRE OUTER RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route BB West - PHELPS COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 05-AUG-2019 to 31-OCT-2019.
Road work begins .01 MILES AFTER MO 8 E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route BB East - PHELPS COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 05-AUG-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST TENTH ST E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route Y West - PHELPS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT RT E N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y East - PHELPS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 5.41 MILES BEFORE RT E S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z West - PHELPS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins AT RT J N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 63 South - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-OCT-2019 to 02-DEC-2019.
Road work begins .02 MILES AFTER CST RIDGEVIEW RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-OCT-2019 to 02-DEC-2019.
Road work begins .03 MILES BEFORE CST BISHOP AVE N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route C North - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins AT IS 44 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route C South - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-SEP-2019 to 31-OCT-2019.
Road work begins 7.74 MILES BEFORE RT T S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route K West - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins AT US 63 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route K East - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins 2.35 MILES BEFORE RT J S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route O South - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-SEP-2019 to 17-OCT-2019.
Road work begins AT CST PINE TREE RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route O North - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-SEP-2019 to 17-OCT-2019.
Road work begins 5.3 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T North - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 31-OCT-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T South - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 31-OCT-2019.
Road work begins AT RT P W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route YY East - PHELPS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 68 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 79 South - PIKE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .11 MILES AFTER CST 3RD ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 54 West - PIKE COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins .15 MILES AFTER MO 79 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneInterstate 435 South - PLATTE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 71 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 435 North - PLATTE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .26 MILES AFTER CST NW COOKINGHAM DR W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins 2.91 MILES AFTER RT N W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 06-AUG-2019 to 15-NOV-2019.
Road work begins 1.92 MILES AFTER RT BB E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 13 South - POLK COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 06-AUG-2019 to 15-NOV-2019.
Road work begins .11 MILES BEFORE SP 215 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route H South - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H North - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins 5.42 MILES BEFORE DOD POLLA RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y North - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER SP 44 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins .13 MILES BEFORE LP 44 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z East - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins AT SP 44 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneSpur 44 West - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins AT CST MISSOURI AVE N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneSpur 44 East - PULASKI COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2019 to 01-NOV-2019.
Road work begins AT LP 44 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route N North - PULASKI COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 05-OCT-2019 to 31-OCT-2019.
Road work begins 3.42 MILES BEFORE MO 133 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route N South - PULASKI COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 05-OCT-2019 to 31-OCT-2019.
Road work begins AT MO 133 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route U North - PULASKI COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 133 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route U South - PULASKI COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 15-OCT-2019 to 24-OCT-2019.
Road work begins 1.02 MILES AFTER RT EE W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 24 West - RALLS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER BU 36 E.
Work will be done around the clock, on weekdays only.
News Releases - SHOULDER WORK ZONE. NO INTERFERENCE WTH TRAFFIC. ONE DAY ONLY.
Possible delays due to work zoneUS 24 East - RALLS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .03 MILES AFTER RT Z S.
Work will be done around the clock, on weekdays only.
News Releases - SHOULDER WORK ZONE. NO INTERFERENCE WTH TRAFFIC. ONE DAY ONLY.
Expect delays due to work zoneUS 24 West - RANDOLPH COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE RT JJ E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 24 East - RANDOLPH COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins 1.01 MILES BEFORE RT D S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 10 West - RAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins .02 MILES AFTER RT M N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route A South - RAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 04-OCT-2019 to 18-OCT-2019.
Road work begins 2.03 MILES AFTER RT KK W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route D West - RAY COUNTY - Delays Possible
MOWING
Scheduled from 07-OCT-2019 to 31-OCT-2019.
Road work begins AT RT C S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 72 East - REYNOLDS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 19-JUN-2019 to 31-DEC-2019.
Road work begins .75 MILES AFTER MO 72 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 142 West - RIPLEY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2019 to 01-OCT-2020.
Road work begins AT MO 21 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA South - SCOTT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 23-SEP-2019 to 16-NOV-2019.
Road work begins AT US 62 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 East - SCOTT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 08-JUL-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER IS 55 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneSECOND ST South - SCOTT COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-SEP-2019 to 15-NOV-2019.
Road work begins .04 MILES AFTER CST SECOND ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneSECOND ST North - SCOTT COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 30-SEP-2019 to 15-NOV-2019.
Road work begins .11 MILES BEFORE CST SECOND ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 61 South - SCOTT COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 20-OCT-2019.
Road work begins .04 MILES AFTER RT A E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 61 North - SCOTT COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 20-OCT-2019.
Road work begins .23 MILES BEFORE RT A E.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneInterstate 70 West - ST. CHARLES COUNTY - No Expected Delays
ROADSIDE WORK
Scheduled from 21-MAY-2019 to 18-OCT-2019.
Road work begins .2 MILES BEFORE CRD BELLEAU CREEK RD S.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneInterstate 70 East - ST. CHARLES COUNTY - No Expected Delays
ROADSIDE WORK
Scheduled from 21-MAY-2019 to 18-OCT-2019.
Road work begins .11 MILES AFTER CST WOODLAWN AVE N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneSALT RIVER RD West - ST. CHARLES COUNTY - Delays Possible
CONCRETE OVERLAY
Scheduled from 12-AUG-2019 to 21-OCT-2019.
Road work begins .12 MILES BEFORE MO 79 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneSALT RIVER RD East - ST. CHARLES COUNTY - Delays Possible
CONCRETE OVERLAY
Scheduled from 12-AUG-2019 to 21-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST PEARL DR S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneOuter Road 70 East - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 19-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST SONDEREN ST N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route B West - ST. CHARLES COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 02-OCT-2019 to 28-OCT-2019.
Road work begins AT MO 94 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route B East - ST. CHARLES COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 02-OCT-2019 to 28-OCT-2019.
Road work begins 7.65 MILES BEFORE CST NEW TOWN BLVD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route DD North - ST. CHARLES COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 16-OCT-2019 to 18-OCT-2019.
Road work begins .09 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T North - ST. CHARLES COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-OCT-2019 to 25-OCT-2019.
Road work begins AT RT TT S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T South - ST. CHARLES COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 16-OCT-2019 to 25-OCT-2019.
Road work begins .82 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 North - ST. CLAIR COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 31-OCT-2019.
Road work begins 2.03 MILES BEFORE RT Z W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 East - ST. CLAIR COUNTY - Expect Delays
SEAL COAT OVERLAY
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins 1.59 MILES BEFORE RT J N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 8 East - ST. FRANCOIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUN-2019 to 31-DEC-2019.
Road work begins LESS THAN .01 MILES BEFORE CST DESLOGE DR N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 8 West - ST. FRANCOIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUN-2019 to 31-DEC-2019.
Road work begins AT CST HAWTHORNE ST W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneCLAYTON RD West - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-OCT-2019 to 22-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 109 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneCLAYTON RD East - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 109 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 170 West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-SEP-2019 to 25-OCT-2019.
Road work begins .44 MILES AFTER CST AIRPORT RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 270 West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins .06 MILES BEFORE CST S NEW FLORISSANT RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 West - ST. LOUIS COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins .06 MILES BEFORE US 50 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 64 East - ST. LOUIS COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .04 MILES AFTER CST SPOEDE RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 70 East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .09 MILES BEFORE CST CYPRESS RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 70 East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-OCT-2019 to 17-OCT-2019.
Road work begins .39 MILES AFTER IS 170 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 141 North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins .02 MILES AFTER CST MARYLAND HEIGHTS EXPY S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins .03 MILES BEFORE CRD RIDER TRAIL SOUTH W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS270W TO IS44E East - ST. LOUIS COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 08-OCT-2019 to 18-OCT-2019.
Road work begins AT IS 270 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS44W TO IS270E East - ST. LOUIS COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 16-OCT-2019 to 24-OCT-2019.
Road work begins AT US 50 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-OCT-2018 to 31-OCT-2019.
Road work begins .03 MILES AFTER CST GEYER RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 04-SEP-2019 to 18-OCT-2019.
Road work begins AT IS 270 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins .05 MILES AFTER MO 366 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins AT IS 270 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 50 East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-SEP-2019 to 06-DEC-2019.
Road work begins LESS THAN .01 MILES AFTER CO NO HIGHWAY DR TO MRAZ LN W.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneState Route 141 South - ST. LOUIS COUNTY - No Expected Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins .02 MILES BEFORE CST VALLEY DR W.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneState Route 141 North - ST. LOUIS COUNTY - No Expected Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins .05 MILES BEFORE CST VALLEY DR W.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneState Route 141 South - ST. LOUIS COUNTY - No Expected Delays
PAVEMENT STRIPING
Scheduled from 15-OCT-2019 to 31-DEC-2019.
Road work begins .02 MILES BEFORE CRD BIG BEND RD W.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneState Route 141 North - ST. LOUIS COUNTY - No Expected Delays
PAVEMENT STRIPING
Scheduled from 15-OCT-2019 to 31-DEC-2019.
Road work begins .33 MILES AFTER CRD HAWKINS RD S.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneState Route 141 South - ST. LOUIS COUNTY - No Expected Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 31-DEC-2019.
Road work begins .63 MILES BEFORE CST VANCE RD W.
Work will be done around the clock, on weekdays only.
No delays expected due to work zoneState Route 141 North - ST. LOUIS COUNTY - No Expected Delays
PAVEMENT REPAIR
Scheduled from 15-OCT-2019 to 31-DEC-2019.
Road work begins .38 MILES AFTER CRD HAWKINS RD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneDORSETT RD West - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2019 to 30-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST MIDLAND BLVD E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneDORSETT RD East - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2019 to 30-NOV-2019.
Road work begins .06 MILES BEFORE CST MIDLAND BLVD E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneLINDBERGH BLVD South - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2019 to 31-OCT-2019.
Road work begins .32 MILES BEFORE CST MIDLAND BLVD W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneLINDBERGH BLVD North - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2019 to 31-OCT-2019.
Road work begins .24 MILES BEFORE CST DORSETT RD W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneMANCHESTER RD West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 22-OCT-2019.
Road work begins .35 MILES BEFORE CST S BRENTWOOD BLVD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneMANCHESTER RD East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 22-OCT-2019.
Road work begins .08 MILES BEFORE CST BERRY RD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneMERAMEC STATION RD North - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-DEC-2019.
Road work begins .1 MILES AFTER MO 141 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneMIDLAND BLVD West - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2019 to 29-NOV-2019.
Road work begins .07 MILES BEFORE CST DORSETT RD W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneMIDLAND BLVD East - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 01-OCT-2019 to 29-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST DORSETT RD W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneWATSON RD East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 27-OCT-2019.
Road work begins .11 MILES BEFORE CRD ROCK HILL RD W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneWATSON RD East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2019 to 27-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST GRANT RD N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 55 North - ST. LOUIS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 08-OCT-2019 to 22-OCT-2019.
Road work begins .1 MILES BEFORE CST WEBER RD W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 100 West - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 24-MAY-2020.
Road work begins .68 MILES AFTER CST WESTGLEN FARMS DR W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 100 East - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 06-AUG-2019 to 24-MAY-2020.
Road work begins .66 MILES BEFORE MO 109 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 109 South - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 14-MAY-2019 to 01-MAY-2020.
Road work begins .02 MILES BEFORE CST WINDSOR MEADOW BLVD W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 109 North - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 14-MAY-2019 to 01-MAY-2020.
Road work begins .05 MILES BEFORE MO 100 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 141 North - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-DEC-2019.
Road work begins .04 MILES BEFORE CST VALLEY DR E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2019 to 26-NOV-2019.
Road work begins .02 MILES AFTER MO 30 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 141 North - ST. LOUIS COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 14-OCT-2019 to 18-OCT-2019.
Road work begins .32 MILES AFTER CRD HAWKINS RD S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-DEC-2019.
Road work begins .23 MILES BEFORE CST VANCE RD W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 340 East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST COUNTRY RIDGE DR W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 370 West - ST. LOUIS COUNTY - Delays Possible
Project Name - 370 OVER 94 REHAB
BRIDGE RECONSTRUCTION
Scheduled from 16-MAY-2019 to 31-OCT-2019.
Road work begins .69 MILES AFTER MO 141 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneOuter Road 44 East - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-DEC-2019.
Road work begins AT MO 141 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneRamp IS44E TO MO141N North - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2019 to 01-DEC-2019.
Road work begins .02 MILES BEFORE CST SOUTH HIGHWAY DR E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 61 North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE CRD BIG BEND RD W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 67 South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-OCT-2019 to 31-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE CST MANCHESTER RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 55 South - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2019 to 17-OCT-2019.
Road work begins .2 MILES AFTER CST GASCONADE ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 44 West - ST. LOUIS CITY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 23-MAR-2019 to 15-DEC-2019.
Road work begins .19 MILES AFTER CST JEFFERSON AVE S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 44 East - ST. LOUIS CITY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 07-DEC-2019.
Road work begins .25 MILES BEFORE CST MACKLIND AVE N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneRamp IS55N TO CARONDELET BLVD North - ST. LOUIS CITY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-OCT-2019 to 25-OCT-2019.
Road work begins .02 MILES AFTER IS 55 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route N South - STE. GENEVIEVE COUNTY - Delays Possible
ROAD MIX OVERLAY
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins .08 MILES AFTER RT M N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route N North - STE. GENEVIEVE COUNTY - Delays Possible
ROAD MIX OVERLAY
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins 7.51 MILES BEFORE RT Z E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 25 North - STODDARD COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-SEP-2019 to 01-NOV-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 25 South - STODDARD COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-SEP-2019 to 01-NOV-2019.
Road work begins .56 MILES BEFORE RT Y E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y West - STODDARD COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-SEP-2019 to 01-NOV-2019.
Road work begins 2.38 MILES BEFORE MO 25 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y East - STODDARD COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 09-SEP-2019 to 01-NOV-2019.
Road work begins AT MO 25 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 13 North - STONE COUNTY - Expect Delays
Project Name - UBAWS / MILL AND FILL SOME DAY WORK MOSTLY NIGHTS
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2019 to 28-OCT-2019.
Road work begins 2.58 MILES BEFORE CST JAMES RIVER RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 173 North - STONE COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins .49 MILES AFTER MO 76 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 173 South - STONE COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 17-OCT-2019 to 18-OCT-2019.
Road work begins 1.39 MILES BEFORE MO 76 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D West - STONE COUNTY - Expect Delays
Project Name - J7S3274 RESURFACE ROADWAY
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 265 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y West - STONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins AT MO 76 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y East - STONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 30-SEP-2019 to 18-OCT-2019.
Road work begins 6.74 MILES BEFORE MO 76 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 139 South - SULLIVAN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-OCT-2019 to 05-NOV-2019.
Road work begins .42 MILES BEFORE RT EE W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 139 North - SULLIVAN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-OCT-2019 to 05-NOV-2019.
Road work begins .42 MILES BEFORE RT EE W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 65 South - TANEY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 24-OCT-2019.
Road work begins .01 MILES BEFORE MO 176 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 65 North - TANEY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2019 to 24-OCT-2019.
Road work begins 1.31 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 65 South - TANEY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2019 to 17-OCT-2019.
Road work begins .34 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - TEXAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-AUG-2019 to 01-NOV-2019.
Road work begins AT BU 60 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 60 West - TEXAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-OCT-2019 to 18-OCT-2019.
Road work begins AT BU 60 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 63 North - TEXAS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 19-AUG-2019 to 01-NOV-2019.
Road work begins AT US 60 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 63 South - TEXAS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 09-OCT-2019 to 01-NOV-2019.
Road work begins 2.69 MILES BEFORE RT B E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 63 South - TEXAS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 19-AUG-2019 to 01-NOV-2019.
Road work begins AT RT U W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route BB South - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 03-OCT-2019 to 18-OCT-2019.
Road work begins .07 MILES AFTER US 54 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route BB North - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 03-OCT-2019 to 18-OCT-2019.
Road work begins AT CRD WALDO W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D East - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins 2.51 MILES BEFORE CST SOUTH ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D West - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins .32 MILES AFTER US 71 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK West - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 07-OCT-2019 to 18-OCT-2019.
Road work begins AT MO 43 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK East - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 07-OCT-2019 to 18-OCT-2019.
Road work begins .05 MILES AFTER RT T N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M South - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins .11 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M North - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins .28 MILES AFTER IS 49 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N East - VERNON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .83 MILES AFTER MO 43 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N West - VERNON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-OCT-2019 to 18-OCT-2019.
Road work begins .66 MILES AFTER RT B W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route OO East - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins AT RT M S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route OO West - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 15-OCT-2019 to 25-OCT-2019.
Road work begins AT RT C S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 West - VERNON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 18-JUL-2019 to 18-OCT-2019.
Road work begins .19 MILES BEFORE IS 49 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 East - VERNON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 18-JUL-2019 to 18-OCT-2019.
Road work begins .02 MILES AFTER CST AUSTIN ST E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 47 South - WARREN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 09-SEP-2016 to 01-NOV-2019.
Road work begins .85 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route T South - WASHINGTON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins AT RT A E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T North - WASHINGTON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 15-OCT-2019 to 17-OCT-2019.
Road work begins AT MO 185 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route C North - WEBSTER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-OCT-2019 to 23-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST LOVELAND ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route C South - WEBSTER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-OCT-2019 to 23-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 38 E.
Work will be done around the clock, 7 days a week.

Back to Top

FUTURE WORK ZONES: 106 to report. Hide

Expect delays due to work zoneState Route CC North - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .04 MILES AFTER RT C W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route CC South - BARTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins 4.34 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 18 East - BATES COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 19-OCT-2019 to 19-OCT-2019.
Road work begins .23 MILES BEFORE CST FOURTH ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 63 South - BOONE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2019 to 05-NOV-2019.
Road work begins .25 MILES AFTER CST DISCOVERY PKWY S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 94 East - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 18-OCT-2019 to 22-NOV-2019.
Road work begins 1.09 MILES AFTER RT D N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 94 West - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 18-OCT-2019 to 22-NOV-2019.
Road work begins 2.77 MILES BEFORE RT D N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneJORDON RD West - CHARITON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 24 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneJORDON RD East - CHARITON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER RT J S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 92 West - CLAY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins .2 MILES BEFORE CST LYNN RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 92 East - CLAY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins 1.03 MILES BEFORE CST LYNN RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 92 East - CLAY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins 1.06 MILES BEFORE CST LYNN RD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 92 West - CLAY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 22-OCT-2019.
Road work begins .2 MILES BEFORE CST LYNN RD S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp MO210E TO IS435S South - CLAY COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 210 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp MO210W TO IS435S South - CLAY COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins AT MO 210 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneBROADWAY BLVD South - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2019 to 19-OCT-2019.
Road work begins .39 MILES BEFORE CST WOODSWETHER RD W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneOLD HWY 54 West - COLE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOLD HWY 54 East - COLE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .52 MILES BEFORE MO 17 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 West - CRAWFORD COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins AT RT H E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH North - DENT COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins 2.48 MILES BEFORE CST SOUTH MACARTHUR ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route HH South - DENT COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins AT MO 72 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P North - DENT COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins 3.72 MILES BEFORE MO 32 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P South - DENT COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 32 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 360 West - GREENE COUNTY - CLOSED
BRIDGE DECK SEALING
Scheduled from 21-OCT-2019 to 22-OCT-2019.
Road work begins .05 MILES BEFORE IS 44 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS44W TO MO360E East - GREENE COUNTY - CLOSED
BRIDGE DECK SEALING
Scheduled from 22-OCT-2019 to 23-OCT-2019.
Road work begins .1 MILES BEFORE IS 44 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 125 South - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .12 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 125 North - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .2 MILES BEFORE RT D W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AD West - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins 1.11 MILES BEFORE MO 125 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AD East - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins 1.01 MILES AFTER MO 125 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D East - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .31 MILES BEFORE RT J S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D West - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .29 MILES AFTER RT J S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D East - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .59 MILES BEFORE CRD ROYAL DR S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D West - GREENE COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins .29 MILES AFTER CRD ROYAL DR S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route B North - HENRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .68 MILES AFTER RT K N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 124 West - HOWARD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins 1.74 MILES AFTER CST SEXTON ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 124 East - HOWARD COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins AT MO 240 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 5 North - HOWARD COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 5 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 5 South - HOWARD COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 240 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneBROADWAY BLVD North - JACKSON COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2019 to 21-OCT-2019.
Road work begins .01 MILES AFTER CST FIFTH ST W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneTRUMAN RD East - JACKSON COUNTY - CLOSED
Project Name - KC CONVENTION CENTER HOTEL
PERMIT OR UTILITY WORK
Scheduled from 22-OCT-2019 to 24-OCT-2019.
Road work begins AT CST BROADWAY BLVD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneNW LEES SUMMIT RD North - JACKSON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .15 MILES BEFORE IS 70 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 35 North - JACKSON COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 20-OCT-2019 to 20-OCT-2019.
Road work begins .27 MILES BEFORE CST SOUTHWEST BLVD E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneInterstate 35 South - JACKSON COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 20-OCT-2019 to 20-OCT-2019.
Road work begins .25 MILES BEFORE CST SOUTHWEST BLVD E.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneInterstate 70 East - JACKSON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .26 MILES BEFORE CST NW LEES SUMMIT RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 435 North - JACKSON COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-OCT-2019 to 24-OCT-2019.
Road work begins .12 MILES BEFORE CST OLDHAM RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 435 North - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins AT US 50 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 435 South - JACKSON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins .02 MILES AFTER US 50 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 291 North - JACKSON COUNTY - Delays Possible
PAVEMENT MARKING
Scheduled from 18-OCT-2019 to 18-APR-2020.
Road work begins 1.1 MILES AFTER CST COURTNEY RD N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 44 East - JASPER COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 01-NOV-2019.
Road work begins 1.55 MILES BEFORE RT U S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 West - JASPER COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 01-NOV-2019.
Road work begins .56 MILES BEFORE RT U S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 61 North - JEFFERSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 23-OCT-2019 to 29-OCT-2019.
Road work begins .22 MILES BEFORE CST COMMERCIAL BLVD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 110 West - JEFFERSON COUNTY - Delays Possible
PAVEMENT MARKING
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins .01 MILES BEFORE US 67 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 110 East - JEFFERSON COUNTY - Delays Possible
PAVEMENT MARKING
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins .05 MILES AFTER MO 21 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AA North - JOHNSON COUNTY - CLOSED
Project Name - 50 HWY J-TURNS
INTERSECTION IMPROVEMENTS
Scheduled from 21-OCT-2019 to 04-DEC-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route AA South - JOHNSON COUNTY - CLOSED
Project Name - 50 HWY J-TURNS
INTERSECTION IMPROVEMENTS
Scheduled from 21-OCT-2019 to 04-DEC-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route V North - KNOX COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins .97 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route V South - KNOX COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins .02 MILES AFTER RT M S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 East - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 15-DEC-2019.
Road work begins .07 MILES AFTER MO 265 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 44 West - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 01-NOV-2019.
Road work begins .89 MILES AFTER MO 96 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 East - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 01-NOV-2019.
Road work begins .2 MILES AFTER RT N N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 44 West - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-OCT-2019 to 15-DEC-2019.
Road work begins .93 MILES AFTER MO 174 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 36 West - MACON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CRD MAJOR AVE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneABBOTT RD South - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneABBOTT RD North - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 54 West - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneOuter Road 54 East - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zone290 East - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zone290 West - MILLER COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2019 to 24-OCT-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS55N TO IS57N North - NEW MADRID COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 22-OCT-2019 to 23-OCT-2019.
Road work begins AT IS 55 N.
Work will be done around the clock, on weekdays and Sundays.
Expect delays due to work zoneInterstate 44 East - NEWTON COUNTY - Expect Delays
Project Name - REPAIRING PRE PASS SENSORS IN RIGHT LANE AT 1.2 MM
PERMIT OR UTILITY WORK
Scheduled from 22-OCT-2019 to 23-OCT-2019.
Road work begins .8 MILES AFTER US 400 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 86 East - NEWTON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-OCT-2019 to 31-JAN-2020.
Road work begins .51 MILES BEFORE RT C N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K East - NEWTON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-OCT-2019 to 31-JAN-2020.
Road work begins 2.34 MILES AFTER CST OLIVE ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - NEWTON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-OCT-2019 to 31-JAN-2020.
Road work begins .61 MILES AFTER US 60 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route C South - PERRY COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-OCT-2019 to 15-NOV-2019.
Road work begins .47 MILES BEFORE RT A W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route C North - PERRY COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-OCT-2019 to 15-NOV-2019.
Road work begins AT RT A E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route T South - PHELPS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 31-OCT-2019.
Road work begins AT IS 44 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route T North - PHELPS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 21-OCT-2019 to 31-OCT-2019.
Road work begins AT CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T North - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route T South - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins AT RT C N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-OCT-2019 to 25-OCT-2019.
Road work begins 2.81 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-OCT-2019 to 25-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 154 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins 2.81 MILES BEFORE MO 19 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER MO 154 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins .96 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-OCT-2019 to 23-OCT-2019.
Road work begins 2.81 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route DD East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins 5.05 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route DD West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins 3.78 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M South - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .01 MILES BEFORE RT W W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M North - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins AT RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS55S TO US60E East - SCOTT COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 25-OCT-2019 to 28-OCT-2019.
Road work begins AT IS 55 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneRamp IS57N TO IS55N North - SCOTT COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-OCT-2019 to 25-OCT-2019.
Road work begins AT US 60 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 70 West - ST. CHARLES COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-OCT-2019 to 21-OCT-2019.
Road work begins .06 MILES BEFORE CST MID RIVERS MALL DR S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS70E TO MO141N North - ST. LOUIS COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 19-OCT-2019 to 20-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER IS 70 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS70E TO MO141N North - ST. LOUIS COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 18-OCT-2019 to 21-OCT-2019.
Road work begins AT IS 70 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp MO141S TO IS70E East - ST. LOUIS COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 19-OCT-2019 to 20-OCT-2019.
Road work begins AT CST EARTH CITY EXPY S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp MO141S TO IS70E East - ST. LOUIS COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 18-OCT-2019 to 21-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST MARYLAND HEIGHTS EXPY S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp US67N TO DORSETT RD East - ST. LOUIS COUNTY - CLOSED
SHOULDER WORK
Scheduled from 19-OCT-2019 to 28-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST LINDBERGH BLVD N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneMARYLAND HEIGHTS EXPY North - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 19-OCT-2019 to 20-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST MARYLAND HEIGHTS EXPY S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneMARYLAND HEIGHTS EXPY North - ST. LOUIS COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 18-OCT-2019 to 21-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST MARYLAND HEIGHTS EXPY S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 70 West - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2019 to 31-OCT-2019.
Road work begins .75 MILES BEFORE CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 67 North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-OCT-2019 to 25-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER CST LITZSINGER RD W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 67 South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-OCT-2019 to 25-OCT-2019.
Road work begins .24 MILES BEFORE CST LITZSINGER RD E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 65 North - TANEY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2019 to 18-OCT-2019.
Road work begins .06 MILES AFTER MO 76 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - WEBSTER COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins .29 MILES BEFORE CST MILL ST N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 East - WEBSTER COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins .36 MILES BEFORE CST MAIN ST W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 West - WEBSTER COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 21-OCT-2019 to 21-OCT-2019.
Road work begins .34 MILES AFTER RT Z S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 60 East - WEBSTER COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-OCT-2019 to 22-OCT-2019.
Road work begins .19 MILES BEFORE RT VV S.
Work will be done around the clock, on weekdays only.

Back to Top

INCIDENTS: 29 to report. Show

Back to Top

FLOODS (CLOSED): 44 to report. Show

Back to Top

FLOODS: 2 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 986 to report. Show