WORK ZONES (CLOSED): 177 to report. Hide

Road Closed due to work zoneState Route RT A N North - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .017 MILE(S) AFTER CRD APACHE WAY S.
Scheduled from 04-JUN-2024 to 02-DEC-2024.
Road Closed due to work zoneState Route RT A S South - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .041 MILE(S) AFTER RT J S.
Scheduled from 04-JUN-2024 to 02-DEC-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 02-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 N North - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 02-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneUS US 63 S South - ADAIR COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road Closed due to work zoneState Route MO 111 N North - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 28-MAY-2024 to 12-AUG-2024.
Road Closed due to work zoneState Route MO 111 S South - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 28-MAY-2024 to 12-AUG-2024.
Road Closed due to work zoneState Route RT C N North - AUDRAIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .066 MILE(S) AFTER CRD 248 SPUR S.
Scheduled from 29-APR-2024 to 01-AUG-2024.
Road Closed due to work zoneState Route RT C S South - AUDRAIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .045 MILE(S) AFTER CRD 132 E.
Scheduled from 29-APR-2024 to 01-AUG-2024.
Road Closed due to work zoneState Route RT W N North - AUDRAIN COUNTY - Road Closed
ROADSIDE WORK
Road closure begins .001 MILE(S) AFTER CST E STATE ST E.
Scheduled from 17-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT W S South - AUDRAIN COUNTY - Road Closed
ROADSIDE WORK
Road closure begins .001 MILE(S) BEFORE CST E WASHINGTON ST E.
Scheduled from 17-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT WW E East - AUDRAIN COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins CRD 557 S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT WW W West - AUDRAIN COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins CRD 538 E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT K E East - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) AFTER CRD NW 150TH LN S.
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT K W West - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) AFTER CRD NW 145TH LN S.
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT O N North - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .028 MILE(S) AFTER CRD SW 60TH RD E.
Scheduled from 07-JUN-2024 to 17-SEP-2024.
Road Closed due to work zoneState Route RT O S South - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) AFTER CRD SW 15TH RD E.
Scheduled from 07-JUN-2024 to 17-SEP-2024.
Road Closed due to work zoneCST COOK RD E East - BUCHANAN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) BEFORE CST 38TH ST S.
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneCST COOK RD W West - BUCHANAN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .041 MILE(S) BEFORE IS 29 N.
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .
Scheduled from 17-JUN-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .
Scheduled from 17-JUN-2024 to 14-AUG-2024.
Road Closed due to work zoneCST OLD JEFFERSON CITY RD E East - CALLAWAY COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins US 54 W.
Scheduled from 15-JUL-2024 to 06-SEP-2024.
Road Closed due to work zoneCST OLD JEFFERSON CITY RD W West - CALLAWAY COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .007 MILE(S) BEFORE US 54 E.
Scheduled from 15-JUL-2024 to 06-SEP-2024.
Road Closed due to work zoneRamp RP US54W TO MO94E E East - CALLAWAY COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 54 W.
Scheduled from 15-JUL-2024 to 18-SEP-2024.
Road Closed due to work zoneRamp RP US63N TO US54W W West - CALLAWAY COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 63 N.
Scheduled from 15-JUL-2024 to 18-SEP-2024.
Road Closed due to work zoneState Route RT A N North - CALLAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .006 MILE(S) BEFORE RT B E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT A S South - CALLAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .107 MILE(S) AFTER CRD 1064 E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT D N North - CAPE GIRARDEAU COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .009 MILE(S) BEFORE CRD 459 S.
Scheduled from 24-JUN-2024 to 23-OCT-2024.
Road Closed due to work zoneState Route RT D S South - CAPE GIRARDEAU COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .005 MILE(S) BEFORE CRD 460 E.
Scheduled from 24-JUN-2024 to 23-OCT-2024.
Road Closed due to work zoneUS US 61 N North - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .
Scheduled from 02-OCT-2023 to 01-NOV-2024.
Road Closed due to work zoneUS US 61 S South - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .
Scheduled from 02-OCT-2023 to 01-NOV-2024.
Road Closed due to work zoneState Route RT CC E East - CARROLL COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .207 MILE(S) BEFORE CRD 261 S.
Scheduled from 15-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT CC W West - CARROLL COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) AFTER CRD 261 S.
Scheduled from 15-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT M E East - CARROLL COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .091 MILE(S) AFTER CRD 363 S.
Scheduled from 15-JUL-2024 to 01-OCT-2024.
Road Closed due to work zoneCRD PECULIAR DR E East - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .008 MILE(S) AFTER CRD 237TH ST E.
Scheduled from 19-JUN-2024 to 26-JUL-2024.
Road Closed due to work zoneCRD PECULIAR DR W West - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .319 MILE(S) BEFORE CRD 237TH ST E.
Scheduled from 19-JUN-2024 to 26-JUL-2024.
Road Closed due to work zoneState Route RT D E East - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) AFTER CRD HUNT AVE S.
Scheduled from 11-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT D W West - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .05 MILE(S) AFTER CRD CHESTNUT AVE S.
Scheduled from 11-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT F N North - CHARITON COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins .029 MILE(S) AFTER CRD ORDWAY RD E.
Scheduled from 10-JUN-2024 to 18-SEP-2024.
Road Closed due to work zoneState Route RT F S South - CHARITON COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins .042 MILE(S) AFTER CRD JOLIET RD E.
Scheduled from 10-JUN-2024 to 18-SEP-2024.
Road Closed due to work zoneState Route RT JJ N North - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .1 MILE(S) AFTER RT E E.
Scheduled from 08-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT JJ S South - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .447 MILE(S) AFTER CRD JOHN ROTH RD E.
Scheduled from 08-JUL-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT M W West - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .062 MILE(S) AFTER CRD UNNAMED RD S.
Scheduled from 15-JUL-2024 to 01-OCT-2024.
Road Closed due to work zoneState Route RT WW N North - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .193 MILE(S) BEFORE CRD ROCKFORD HILLS AVE S.
Scheduled from 13-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route RT WW S South - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .004 MILE(S) AFTER CRD ROCKFORD HILLS AVE S.
Scheduled from 13-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneCRD ALOE RD N North - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .004 MILE(S) BEFORE RR CHEROKEE SUB E.
Scheduled from 17-JUL-2024 to 31-JUL-2024.
Road Closed due to work zoneCRD ALOE RD S South - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .003 MILE(S) BEFORE RR CHEROKEE SUB E.
Scheduled from 17-JUL-2024 to 31-JUL-2024.
Road Closed due to work zoneState Route MO 14 E East - CHRISTIAN COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .
Scheduled from 24-JUN-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .
Scheduled from 24-JUN-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route RT DD N North - CLARK COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins RT C E.
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road Closed due to work zoneState Route RT DD S South - CLARK COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins CRD 95 E.
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road Closed due to work zoneRamp RP RICHARDS RD TO US169S S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST HARLEM RD E.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneState Route RT A N North - CLAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins CST N CHURCH RD S.
Scheduled from 15-JUL-2024 to 21-AUG-2024.
Road Closed due to work zoneState Route RT A S South - CLAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .001 MILE(S) AFTER CRD CARRIAGE LN E.
Scheduled from 15-JUL-2024 to 21-AUG-2024.
Road Closed due to work zoneUS US 169 S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER RP US169S TO RICHARDS RD S.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneState Route RT H E East - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .028 MILE(S) AFTER CRD NE ESTEP RD S.
Scheduled from 05-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route RT H W West - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .039 MILE(S) AFTER US 69 S.
Scheduled from 05-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route RT O N North - COOPER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .476 MILE(S) AFTER PVT BAINES LN E.
Scheduled from 24-JUN-2024 to 20-SEP-2024.
Road Closed due to work zoneState Route RT O S South - COOPER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .683 MILE(S) AFTER CRD SWAN RD E.
Scheduled from 24-JUN-2024 to 20-SEP-2024.
Road Closed due to work zoneState Route RT H E East - CRAWFORD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER RP RTH TO IS44W W.
Scheduled from 09-JUL-2024 to 01-AUG-2024.
Road Closed due to work zoneState Route RT H W West - CRAWFORD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .019 MILE(S) AFTER RP IS44E TO RTH E.
Scheduled from 09-JUL-2024 to 01-AUG-2024.
Road Closed due to work zoneState Route RT HH N North - CRAWFORD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CRD SIG BASS RD E.
Scheduled from 03-JUN-2024 to 28-AUG-2024.
Road Closed due to work zoneState Route RT HH S South - CRAWFORD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 19 S.
Scheduled from 03-JUN-2024 to 28-AUG-2024.
Road Closed due to work zoneState Route RT H N North - DUNKLIN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .002 MILE(S) BEFORE CRD 206 E.
Scheduled from 08-JUL-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route RT H S South - DUNKLIN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .008 MILE(S) BEFORE CRD 200 E.
Scheduled from 08-JUL-2024 to 25-OCT-2024.
Road Closed due to work zoneRA IS44W ST CLAIR W West - FRANKLIN COUNTY - Road Closed
LIGHTING/SIGNAL/SIGN WORK
Road closure begins IS 44 W.
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road Closed due to work zoneRamp RP IS44W TO MO100 W West - FRANKLIN COUNTY - Road Closed
LIGHTING/SIGNAL/SIGN WORK
Road closure begins IS 44 W.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT Y N North - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .064 MILE(S) AFTER CRD STONE CHURCH RD S.
Scheduled from 03-JUN-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route RT Y S South - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .942 MILE(S) AFTER RT YY E.
Scheduled from 03-JUN-2024 to 16-OCT-2024.
Road Closed due to work zoneState Route MO 19 N North - GASCONADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 03-JUN-2024 to 16-AUG-2024.
Road Closed due to work zoneState Route MO 19 S South - GASCONADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 03-JUN-2024 to 16-AUG-2024.
Road Closed due to work zoneCRD 205 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 205 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 94 E East - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins US 65 S.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCRD 94 W West - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER US 65 N.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCRD HARMONY AVE N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 E.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD HARMONY AVE S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 N North - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .
Scheduled from 28-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route MO 125 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 S South - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .
Scheduled from 28-MAY-2024 to 15-AUG-2024.
Road Closed due to work zoneState Route MO 125 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route RT PP N North - GREENE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER RT K S.
Scheduled from 16-MAY-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT PP S South - GREENE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins RT K S.
Scheduled from 16-MAY-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT V N North - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .437 MILE(S) AFTER CRD 33 S.
Scheduled from 17-JUN-2024 to 09-SEP-2024.
Road Closed due to work zoneState Route RT V S South - GREENE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .445 MILE(S) AFTER PVT 38 E.
Scheduled from 17-JUN-2024 to 09-SEP-2024.
Road Closed due to work zoneState Route RT P E East - HOWARD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .115 MILE(S) AFTER CST EDWARD ST S.
Scheduled from 04-JUN-2024 to 28-AUG-2024.
Road Closed due to work zoneState Route RT P W West - HOWARD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .131 MILE(S) BEFORE CST EDWARD ST S.
Scheduled from 04-JUN-2024 to 28-AUG-2024.
Road Closed due to work zoneCST SE MOORE ST E East - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER CST SE SOUTH AVE E.
Scheduled from 03-JUN-2024 to 03-JUN-2025.
Road Closed due to work zoneCST SE MOORE ST W West - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .002 MILE(S) AFTER US 40 E.
Scheduled from 03-JUN-2024 to 03-JUN-2025.
Road Closed due to work zoneCST WOODSWETHER RD W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST W 5TH ST W.
Scheduled from 29-JAN-2024 to 31-DEC-2025.
Road Closed due to work zoneRamp RP BLUE RIDGE BLVD TO MO350W W West - JACKSON COUNTY - Road Closed
ROADSIDE WORK
Road closure begins CST BLUE RIDGE BLVD S.
Scheduled from 18-JUL-2024 to 12-AUG-2024.
Road Closed due to work zoneRamp RP IS70E TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins IS 70 E.
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road Closed due to work zoneRamp RP US169N TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 N.
Scheduled from 03-APR-2023 to 31-DEC-2025.
Road Closed due to work zoneCRD OLD HWY 21 N North - JEFFERSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .02 MILE(S) BEFORE RP OLD HWY 21 TO MO21S S.
Scheduled from 08-JUL-2024 to 30-SEP-2024.
Road Closed due to work zoneCRD OLD HWY 21 S South - JEFFERSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .014 MILE(S) BEFORE RP MO21N TO CRD OLD HWY 21 N.
Scheduled from 08-JUL-2024 to 30-SEP-2024.
Road Closed due to work zoneState Route MO 2 E East - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .095 MILE(S) BEFORE CRD 251 S.
Scheduled from 03-JUN-2024 to 25-AUG-2024.
Road Closed due to work zoneState Route MO 64 E East - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .401 MILE(S) BEFORE CST ROLLING HILLS RD S.
Scheduled from 10-JUN-2024 to 29-NOV-2024.
Road Closed due to work zoneState Route MO 64 W West - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .325 MILE(S) AFTER CST ROLLING HILLS RD S.
Scheduled from 10-JUN-2024 to 29-NOV-2024.
Road Closed due to work zoneRamp RP IS44E TO RTN E East - LACLEDE COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins IS 44 E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneCRD 2175 E East - LAWRENCE COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .002 MILE(S) BEFORE RR CHEROKEE SUB E.
Scheduled from 17-JUL-2024 to 31-OCT-2024.
Road Closed due to work zoneCRD 2175 W West - LAWRENCE COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .001 MILE(S) BEFORE RR CHEROKEE SUB E.
Scheduled from 17-JUL-2024 to 31-OCT-2024.
Road Closed due to work zoneState Route MO 39 N North - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER CRD 2160 E.
Scheduled from 06-MAY-2024 to 28-SEP-2024.
Road Closed due to work zoneState Route MO 39 S South - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .025 MILE(S) AFTER CRD 2154 E.
Scheduled from 06-MAY-2024 to 28-SEP-2024.
Road Closed due to work zoneState Route RT D S South - LEWIS COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins .086 MILE(S) BEFORE MO 156 E.
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road Closed due to work zoneState Route RT D N North - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .159 MILE(S) AFTER CRD 420 E.
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route RT D S South - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .065 MILE(S) BEFORE CRD 418 S.
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route MO 79 N North - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route MO 79 S South - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route RT D N North - MARION COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins MO 168 E.
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road Closed due to work zoneState Route RT C W West - MCDONALD COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT CC E.
Scheduled from 13-MAY-2024 to 31-AUG-2024.
Road Closed due to work zoneRamp RP IS57S TO US60 W West - MISSISSIPPI COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins IS 57 S.
Scheduled from 03-JUN-2024 to 26-JUL-2024.
Road Closed due to work zoneRamp RP US60E TO IS57N N North - MISSISSIPPI COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins US 60 E.
Scheduled from 03-JUN-2024 to 26-JUL-2024.
Road Closed due to work zoneUS US 62 E East - MISSISSIPPI COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 31-OCT-2023 to 01-OCT-2024.
Road Closed due to work zoneUS US 62 W West - MISSISSIPPI COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .
Scheduled from 31-OCT-2023 to 01-OCT-2024.
Road Closed due to work zoneState Route RT J E East - MONROE COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins .011 MILE(S) AFTER CRD 1870 S.
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneState Route RT J W West - MONROE COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins MO 15 S.
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneState Route RT DD E East - MORGAN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .026 MILE(S) AFTER RT KK S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT DD W West - MORGAN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .027 MILE(S) AFTER CRD EHLERS RD S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneLoop LP 49 N North - NEWTON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .086 MILE(S) AFTER PVT DUANE LN E.
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road Closed due to work zoneState Route RT HH W West - NEWTON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .027 MILE(S) AFTER CST CHERRY ST E.
Scheduled from 10-JUL-2024 to 09-OCT-2024.
Road Closed due to work zoneRamp RP IS44E TO MO8 E East - PHELPS COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins IS 44 E.
Scheduled from 18-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneRamp RP IS44E TO RTV E East - PHELPS COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .013 MILE(S) AFTER IS 44 E.
Scheduled from 18-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneRamp RP RTV TO IS44E E East - PHELPS COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins RT V E.
Scheduled from 18-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneRamp RP US63 TO IS44E E East - PHELPS COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 63 S.
Scheduled from 18-JUL-2024 to 24-JUL-2024.
Road Closed due to work zoneState Route MO 79 N North - PIKE COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .
Scheduled from 15-JUL-2024 to 15-SEP-2024.
Road Closed due to work zoneState Route MO 79 S South - PIKE COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .
Scheduled from 15-JUL-2024 to 15-SEP-2024.
Road Closed due to work zoneState Route MO 92 E East - PLATTE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .016 MILE(S) AFTER RP IS29S TO MO92 S.
Scheduled from 10-JUN-2024 to 16-AUG-2024.
Road Closed due to work zoneState Route MO 92 W West - PLATTE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER RP MO92 TO IS29N N.
Scheduled from 10-JUN-2024 to 16-AUG-2024.
Road Closed due to work zoneState Route MO 3 N North - RANDOLPH COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .345 MILE(S) BEFORE CRD 2040 E.
Scheduled from 05-MAR-2024 to 30-NOV-2024.
Road Closed due to work zoneState Route MO 3 S South - RANDOLPH COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .225 MILE(S) BEFORE CRD 2040 E.
Scheduled from 05-MAR-2024 to 30-NOV-2024.
Road Closed due to work zoneCRD LEMON TRL N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) BEFORE IS 70 E.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneCRD LEMON TRL S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) BEFORE IS 70 W.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneState Route RT Y E East - SCHUYLER COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins CRD RANCH AVE S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT Y W West - SCHUYLER COUNTY - Road Closed
SEAL COAT OVERLAY
Road closure begins US 63 S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT A N North - SCOTLAND COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .018 MILE(S) BEFORE RR BNSF RAILWAY MARCELINE SUB E.
Scheduled from 01-JUL-2024 to 01-AUG-2024.
Road Closed due to work zoneState Route RT A S South - SCOTLAND COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .013 MILE(S) BEFORE RR BNSF RAILWAY MARCELINE SUB E.
Scheduled from 01-JUL-2024 to 01-AUG-2024.
Road Closed due to work zoneCST BRYAN RD N North - ST. CHARLES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .014 MILE(S) BEFORE IS 70 E.
Scheduled from 17-JUN-2024 to 26-AUG-2024.
Road Closed due to work zoneCST BRYAN RD S South - ST. CHARLES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) BEFORE IS 70 W.
Scheduled from 17-JUN-2024 to 26-AUG-2024.
Road Closed due to work zoneCST IVY W West - ST. CHARLES COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins MO 94 W.
Scheduled from 18-JUL-2022 to 01-AUG-2030.
Road Closed due to work zoneState Route MO 82 E East - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .006 MILE(S) AFTER OR 82 E.
Scheduled from 28-MAY-2024 to 30-AUG-2024.
Road Closed due to work zoneState Route MO 82 W West - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER CRD SE 150 E.
Scheduled from 28-MAY-2024 to 30-AUG-2024.
Road Closed due to work zoneState Route RT WW N North - ST. CLAIR COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins CRD SE 470 E.
Scheduled from 09-JUL-2024 to 25-JUL-2024.
Road Closed due to work zoneState Route RT WW S South - ST. CLAIR COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .043 MILE(S) AFTER RT V S.
Scheduled from 09-JUL-2024 to 25-JUL-2024.
Road Closed due to work zoneRamp RP LAMBERT INTL BLVD TO IS70E E East - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST NATURAL BRIDGE RD E.
Scheduled from 03-APR-2024 to 01-AUG-2024.
Road Closed due to work zoneRamp RP LAMBERT INTL BLVD TO IS70E E East - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST NATURAL BRIDGE RD E.
Scheduled from 03-APR-2024 to 01-AUG-2024.
Road Closed due to work zoneRamp RP CHEROKEE ST TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST CHEROKEE ST E.
Scheduled from 03-MAY-2022 to 01-DEC-2024.
Road Closed due to work zoneRamp RP GERMANIA ST TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST GERMANIA AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP IS55N TO IDAHO AVE N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins IS 55 N.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP LOUGHBOROUGH AVE TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST IDAHO AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP RIVERVIEW DR TO IS270E E East - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT H N.
Scheduled from 21-FEB-2023 to 22-FEB-2027.
Road Closed due to work zoneRamp RP TRUMAN PKWY TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST LAFAYETTE AVE E.
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road Closed due to work zoneState Route RT AC W West - STODDARD COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .003 MILE(S) AFTER CRD 227 S.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT B N North - SULLIVAN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .005 MILE(S) BEFORE CRD KENTUCKY RD E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT B S South - SULLIVAN COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .022 MILE(S) BEFORE RT M E.
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road Closed due to work zoneState Route RT A E East - WASHINGTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .032 MILE(S) AFTER RT T S.
Scheduled from 28-MAY-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route RT A W West - WASHINGTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) AFTER MO 47 S.
Scheduled from 28-MAY-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route RT W N North - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .027 MILE(S) AFTER RT Y E.
Scheduled from 03-JUN-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route RT W S South - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .033 MILE(S) AFTER RT EE E.
Scheduled from 03-JUN-2024 to 31-AUG-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 710 to report. Hide

Expect delays due to work zoneState Route MO 3 S South - ADAIR COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins MO 11 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 N North - ADAIR COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins .029 MILE(S) AFTER CRD 143 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:55 AM and 09:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2024 to 31-JUL-2024.
Road work begins CO US71N TO US71S S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 26-JUL-2024.
Road work begins .298 MILE(S) BEFORE CRD 143 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Possible delays due to work zoneUS US 71 S South - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 15-JUL-2024 to 31-JUL-2024.
Road work begins .102 MILE(S) BEFORE CRD 143 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Expect delays due to work zoneState Route RT B N North - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .28 MILE(S) AFTER RT J E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT B N North - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 31-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT D E East - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .093 MILE(S) AFTER CRD 919 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT D W West - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .112 MILE(S) BEFORE CRD 919 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT FF E East - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .484 MILE(S) AFTER CRD 965 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT FF W West - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .486 MILE(S) BEFORE CRD 965 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y N North - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .095 MILE(S) BEFORE CRD 154 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y S South - AUDRAIN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .118 MILE(S) BEFORE CRD 154 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneBusiness BU 37 N North - BARRY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road work begins .003 MILE(S) AFTER MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneBusiness BU 37 S South - BARRY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road work begins MO 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 76 W West - BARRY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road work begins .004 MILE(S) BEFORE BU 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 86 E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 02-AUG-2024.
Road work begins MO 112 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F W West - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 02-AUG-2024.
Road work begins MO 86 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneBusiness BU 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) BEFORE CST 8TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneBusiness BU 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .001 MILE(S) BEFORE CST NORTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneBusiness BU 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) AFTER CST 17TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST BUSINESS 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) AFTER CST JEFFERSON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST BUSINESS 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .014 MILE(S) AFTER CST BRITES CIRCLE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST CLEVELAND AVE W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .001 MILE(S) BEFORE CST DAVID SIPPY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .007 MILE(S) AFTER CST W BROADWAY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 86 W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .052 MILE(S) BEFORE MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins MO 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins CST GABBY GIBBONS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 60 E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 60 W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 126 E East - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD SW STATE LINE LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 126 W West - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .035 MILE(S) BEFORE OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road E OR 49 N North - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD SE 1 LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road E OR 49 S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .002 MILE(S) AFTER CRD SE 60TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road W OR 49 N North - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD SW 1 LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road W OR 49 N North - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .008 MILE(S) BEFORE CRD NW 50TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road W OR 49 S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD NW 80TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road W OR 49 S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .01 MILE(S) AFTER CRD SW 60TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT FF N North - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT FF S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .001 MILE(S) AFTER CRD NW 90TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT J S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K E East - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD NW STATE LINE LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K W West - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .005 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O N North - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 126 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .035 MILE(S) BEFORE CRD SW 60TH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V E East - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .012 MILE(S) AFTER RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V W West - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Y S South - BARTON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 126 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 43 N North - BARTON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .002 MILE(S) BEFORE RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 160 E East - BARTON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .209 MILE(S) AFTER CRD SW 40TH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 160 W West - BARTON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .389 MILE(S) AFTER CRD SW 10TH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 E East - BATES COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .127 MILE(S) AFTER CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 W West - BATES COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2024 to 01-AUG-2024.
Road work begins .309 MILE(S) AFTER CRD NW 591 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT CC N North - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT CC S South - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .05 MILE(S) AFTER MO 18 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT J N North - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT J S South - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins 1.04 MILE(S) BEFORE CST HIGH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O N North - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins CRD SE 9606 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O S South - BATES COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 49 N North - BATES COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .328 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 02:00 PM and 10:00 PM.
Possible delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .425 MILE(S) AFTER RP RTD TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 02:00 PM and 10:00 PM.
Expect delays due to work zoneState Route MO 52 E East - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 02-AUG-2024.
Road work begins .021 MILE(S) AFTER CRD DILLON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 7 S South - BENTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 31-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT A N North - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins CRD BRAUERSVILLE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 12:00 PM and 03:29 PM.
Expect delays due to work zoneState Route RT A S South - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins PVT MIESNER LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 12:00 PM and 03:29 PM.
Expect delays due to work zoneState Route RT AD E East - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins CRD BRAUERSVILLE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneState Route RT AD W West - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins CRD TOBACCO AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .064 MILE(S) AFTER RP IS70W TO LP70 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 PM and 06:00 AM.
Expect delays due to work zoneUS US 63 N North - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-OCT-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 S South - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-OCT-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 124 E East - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-APR-2024 to 31-JUL-2024.
Road work begins .249 MILE(S) BEFORE CST BROWN AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 124 W West - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-APR-2024 to 31-JUL-2024.
Road work begins .001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 163 N North - BOONE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2024 to 14-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 163 S South - BOONE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2024 to 14-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT B N North - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-APR-2024 to 31-JUL-2024.
Road work begins .083 MILE(S) BEFORE CST KATHRYN DURK DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B S South - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-APR-2024 to 31-JUL-2024.
Road work begins MO 124 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT M E East - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-JUL-2024 to 30-JUL-2024.
Road work begins .001 MILE(S) BEFORE CST CHICO DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT M W West - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-JUL-2024 to 30-JUL-2024.
Road work begins CST BASS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT A S South - BUCHANAN COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 15-AUG-2024.
Road work begins .489 MILE(S) AFTER CRD MCQUEEN SE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Expect delays due to work zoneState Route RT U E East - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins CRD DAY SW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT U W West - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins .007 MILE(S) AFTER RR UP S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 169 S South - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .028 MILE(S) AFTER RT FF S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneInterstate IS 29 N North - BUCHANAN COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road work begins .172 MILE(S) BEFORE CST COOK RD E.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 29 S South - BUCHANAN COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-JUN-2024 to 01-DEC-2024.
Road work begins .018 MILE(S) BEFORE RP US169 TO IS29S S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 W West - BUTLER COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 67 N North - BUTLER COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUN-2024 to 26-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 67 N North - BUTLER COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-JUL-2024 to 31-JUL-2024.
Road work begins .117 MILE(S) AFTER RT O S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 W West - CALLAWAY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 94 E East - CALLAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 18-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 94 W West - CALLAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 18-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 54 E East - CALLAWAY COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 17-JUL-2024 to 06-SEP-2024.
Road work begins .33 MILE(S) BEFORE CST OLD JEFFERSON CITY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 54 W West - CALLAWAY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 02-AUG-2024.
Road work begins .327 MILE(S) BEFORE CRD S SUMMIT DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 54 W West - CALLAWAY COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 17-JUL-2024 to 06-SEP-2024.
Road work begins .314 MILE(S) BEFORE CST OLD JEFFERSON CITY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 54 E East - CALLAWAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-JUL-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 54 W West - CALLAWAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-JUL-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 7 N North - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 31-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 73 S South - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 30-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneState Route RT BB S South - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 02-AUG-2024.
Road work begins .129 MILE(S) AFTER MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT T S South - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT Z N North - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUN-2024 to 31-JUL-2024.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT Z S South - CAMDEN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUN-2024 to 31-JUL-2024.
Road work begins CRD CABLE RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 25 N North - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 25 S South - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT B N North - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-JUL-2024 to 02-AUG-2024.
Road work begins .058 MILE(S) AFTER RT KK E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K E East - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins MO 25 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K W West - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .004 MILE(S) BEFORE CRD 201 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneInterstate IS 55 S South - CAPE GIRARDEAU COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-JUL-2024 to 31-JUL-2024.
Road work begins .015 MILE(S) AFTER RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 34 E East - CAPE GIRARDEAU COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins .001 MILE(S) AFTER CRD 341 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 34 W West - CAPE GIRARDEAU COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins MO 72 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 61 N North - CAPE GIRARDEAU COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 19-JUL-2024 to 26-JUL-2024.
Road work begins .05 MILE(S) AFTER CST MERRIWETHER ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneState Route RT NN N North - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 139 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT NN S South - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT UU E East - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT UU W West - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 60 E East - CARTER COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 7 N North - CASS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 11-OCT-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
No delays expected due to work zoneSpur SP K E East - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 28-JUN-2024 to 26-JUL-2024.
Road work begins .003 MILE(S) AFTER CST MONROE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
No delays expected due to work zoneSpur SP K W West - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 28-JUN-2024 to 26-JUL-2024.
Road work begins RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneCRD HUBACH HILL RD E East - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JUN-2024 to 30-JUL-2024.
Road work begins .388 MILE(S) BEFORE MO 58 E.
Work will be done on weekdays only.
Possible delays due to work zoneCRD HUBACH HILL RD W West - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JUN-2024 to 30-JUL-2024.
Road work begins MO 58 E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 291 N North - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 30-JUL-2024.
Road work begins .057 MILE(S) AFTER CRD 191ST ST E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 291 S South - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-JUN-2024 to 30-JUL-2024.
Road work begins .299 MILE(S) AFTER CRD 181ST ST E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 58 E East - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JUN-2024 to 30-JUL-2024.
Road work begins .011 MILE(S) AFTER MO 291 S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 58 W West - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-JUN-2024 to 30-JUL-2024.
Road work begins .057 MILE(S) AFTER CRD GIBBONS RD S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CEDAR COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .019 MILE(S) AFTER MO 97 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT CC W West - CEDAR COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .239 MILE(S) BEFORE CRD 725 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT B W West - CEDAR COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .012 MILE(S) AFTER MO 97 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .026 MILE(S) BEFORE CST UNION ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Expect delays due to work zoneState Route MO 5 S South - CHARITON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins CST MISSOURI ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Possible delays due to work zoneState Route MO 129 N North - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 24-JUL-2024.
Road work begins .424 MILE(S) AFTER RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 129 S South - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 24-JUL-2024.
Road work begins .087 MILE(S) AFTER RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT NN N North - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 24-JUL-2024.
Road work begins CRD RASCAL FLATS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT NN S South - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 24-JUL-2024.
Road work begins MO 129 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT T E East - CHARITON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zonePVT ENGLISH VILLAGE DR E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done on weekdays only.
Expect delays due to work zonePVT ENGLISH VILLAGE DR W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .001 MILE(S) BEFORE US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 31-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 31-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
No delays expected due to work zoneState Route RT UU N North - CHRISTIAN COUNTY - No Expected Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins MO 125 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneUS US 160 W West - CHRISTIAN COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 92 E East - CLAY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-JUN-2024 to 01-NOV-2024.
Road work begins .014 MILE(S) BEFORE CRD NATION RD S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 92 W West - CLAY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-JUN-2024 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER MO 33 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT N N North - CLAY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 18-JUL-2024 to 01-NOV-2024.
Road work begins .022 MILE(S) AFTER MO 210 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT N S South - CLAY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 18-JUL-2024 to 01-NOV-2024.
Road work begins .044 MILE(S) AFTER CST MARIETTA ST S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .013 MILE(S) BEFORE CRD CLINTON COUNTY LINE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 69 N North - CLAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-JUL-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 69 S South - CLAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-JUL-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
No delays expected due to work zoneState Route MO 291 N North - CLAY COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 31-JUL-2024.
Road work begins CRD N STARK AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
No delays expected due to work zoneState Route RT KK W West - CLAY COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 22-AUG-2024.
Road work begins US 169 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST N OAK TRFY S South - CLAY COUNTY - Delays Possible
Project Name - BLUME
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road work begins .05 MILE(S) BEFORE MO 9 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneCST NW BARRY RD W West - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2025.
Road work begins .025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 10 E East - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .065 MILE(S) AFTER US 69 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:30 AM and 11:31 AM.
Possible delays due to work zoneInterstate IS 35 N North - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneInterstate IS 35 S South - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneCST W MCCARTY ST E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 08-OCT-2024.
Road work begins .002 MILE(S) AFTER US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneCST W MCCARTY ST W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 08-OCT-2024.
Road work begins .002 MILE(S) AFTER RP MCCARTY ST TO US63N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 50 E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2024 to 08-OCT-2024.
Road work begins .066 MILE(S) BEFORE RP US50E TO US54E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 50 W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2024 to 08-OCT-2024.
Road work begins .002 MILE(S) AFTER BU 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 54 E East - COLE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 02-AUG-2024.
Road work begins .016 MILE(S) AFTER RR JEFFERSON CITY SUB E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 54 E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 12-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 12-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 E East - COOPER COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - COOPER COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 30-SEP-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 01-NOV-2024.
Road work begins .393 MILE(S) BEFORE CRD BEAMER LN S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 19 N North - CRAWFORD COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-JUL-2024 to 15-SEP-2024.
Road work begins .003 MILE(S) AFTER RP MO19 TO IS44E E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 19 S South - CRAWFORD COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-JUL-2024 to 15-SEP-2024.
Road work begins .021 MILE(S) BEFORE RP MO19 TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneOuter Road N OR 44 E East - CRAWFORD COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .01 MILE(S) BEFORE CRD FRONTAGE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 19 N North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .014 MILE(S) AFTER CRD SEVEN CEDARS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 19 S South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CST MILL SPRINGS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT D N North - CRAWFORD COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .04 MILE(S) AFTER CST GENEVIEVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D S South - CRAWFORD COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .014 MILE(S) BEFORE CST CHRISTLAND DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT JJ N North - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .083 MILE(S) BEFORE CST S RAILROAD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT JJ S South - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .035 MILE(S) AFTER CST HILLCREST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT M N North - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT YY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT M S South - CRAWFORD COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 8 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT O N North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD RIVERSIDE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT O S South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT P N North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT P S South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT U E East - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD MERAMEC FARMS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT U W West - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT VV N North - CRAWFORD COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT VV S South - CRAWFORD COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT YY W West - CRAWFORD COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 73 N North - DALLAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUN-2024 to 30-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Possible delays due to work zoneState Route RT EE W West - DALLAS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .677 MILE(S) AFTER CRD FOOSE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 5 N North - DOUGLAS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 26-JUL-2024.
Road work begins .202 MILE(S) BEFORE CRD 5-104 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 5 S South - DOUGLAS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 26-JUL-2024.
Road work begins .109 MILE(S) AFTER CRD 5-104 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT UU E East - DUNKLIN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD 725 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT UU W West - DUNKLIN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 01-NOV-2024.
Road work begins .315 MILE(S) AFTER MO 185 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER MO 47 S.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT CC N North - FRANKLIN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 15-NOV-2024.
Road work begins .143 MILE(S) AFTER CRD HAGG RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT CC S South - FRANKLIN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 24-JUN-2024 to 15-NOV-2024.
Road work begins .402 MILE(S) AFTER CST BROADWAY ST E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT E W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .02 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM N North - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM S South - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT YY E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .04 MILE(S) BEFORE RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .051 MILE(S) AFTER CRD SCHOENENBURG RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .047 MILE(S) AFTER MO 185 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 185 N North - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 185 S South - FRANKLIN COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .159 MILE(S) BEFORE CRD FOX CREEK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 185 S South - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 17-JUL-2024 to 24-JUL-2024.
Road work begins .419 MILE(S) BEFORE CRD DINKY RD E.
Work will be done 7 days a week.
Possible delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 17-JUL-2024 to 24-JUL-2024.
Road work begins .383 MILE(S) AFTER CRD DINKY RD E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT WW E East - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT WW W West - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 100 W West - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 28 W West - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-MAY-2024 to 31-JUL-2024.
Road work begins .009 MILE(S) AFTER RT Y E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT E E East - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .115 MILE(S) AFTER CRD LONE GROOVE SCHOOL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK W West - GASCONADE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD MUD CREEK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT OO W West - GASCONADE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD PERSHING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneCST CAMPBELL AVE N North - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 31-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneCST GLENSTONE AVE N North - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-FEB-2023 to 28-AUG-2024.
Road work begins .002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST GLENSTONE AVE S South - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-FEB-2023 to 28-AUG-2024.
Road work begins .003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST SUNSET ST E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 12-AUG-2024.
Road work begins .023 MILE(S) BEFORE MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneCST SUNSET ST W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 12-AUG-2024.
Road work begins .03 MILE(S) BEFORE MO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneCST WALNUT LAWN ST E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 12-AUG-2024.
Road work begins .031 MILE(S) BEFORE MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneCST WALNUT LAWN ST W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 12-AUG-2024.
Road work begins .005 MILE(S) AFTER CST WALNUT LAWN TO MO13N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-JUL-2024 to 26-JUL-2024.
Road work begins .03 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins 1.021 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 30-JUN-2024 to 25-JUL-2024.
Road work begins .206 MILE(S) AFTER CST GRANT AVE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 30-JUN-2024 to 25-JUL-2024.
Road work begins .562 MILE(S) BEFORE CST GRANT AVE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-JUL-2024 to 26-JUL-2024.
Road work begins .026 MILE(S) BEFORE RP IS44W TO RTK N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAY-2024 to 30-AUG-2024.
Road work begins .558 MILE(S) BEFORE RP IS44W TO RTK N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 123 N North - GREENE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 16-JUL-2024 to 22-JUL-2024.
Road work begins .167 MILE(S) AFTER CRD 79 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 125 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 S South - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 174 W West - GREENE COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAY-2024 to 01-SEP-2024.
Road work begins US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 744 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins US 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 744 W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins .001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneRamp RP IS44E TO RTPP S South - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 26-JUL-2024.
Road work begins .001 MILE(S) AFTER IS 44 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP RTPP TO IS44E E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 26-JUL-2024.
Road work begins RT K S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT B N North - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins RT MM S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT B S South - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins .022 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT C E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 24-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneState Route RT C W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUN-2024 to 24-JUL-2024.
Road work begins MO 125 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneState Route RT MM N North - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins .067 MILE(S) BEFORE CRD 140 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM S South - GREENE COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 03-JUN-2024 to 15-AUG-2024.
Road work begins RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 160 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-JUL-2024 to 27-JUL-2024.
Road work begins .408 MILE(S) AFTER US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-JUL-2024 to 27-JUL-2024.
Road work begins .106 MILE(S) AFTER CST GOLDEN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - GREENE COUNTY - Delays Possible
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins .034 MILE(S) BEFORE RP IS44E TO RTPP S.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 44 W West - GREENE COUNTY - Delays Possible
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 27-SEP-2024.
Road work begins .016 MILE(S) AFTER RP IS44W TO RTK N.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 160 E East - GREENE COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 7 N North - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 15-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 7 S South - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 15-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT N E East - HENRY COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins .026 MILE(S) AFTER RT O S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT N W West - HENRY COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins .108 MILE(S) AFTER RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - HENRY COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2024 to 25-JUL-2024.
Road work begins RT Z E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT A E East - HOLT COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-JUL-2024 to 01-AUG-2024.
Road work begins .122 MILE(S) AFTER MO 113 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:16 PM.
Possible delays due to work zoneState Route MO 240 E East - HOWARD COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 09-AUG-2024.
Road work begins .022 MILE(S) AFTER CST COLLEGE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 240 W West - HOWARD COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 09-AUG-2024.
Road work begins .039 MILE(S) BEFORE CST DEPOT ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 87 N North - HOWARD COUNTY - Delays Possible
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .018 MILE(S) AFTER US 40 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 87 S South - HOWARD COUNTY - Delays Possible
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .158 MILE(S) BEFORE MO 240 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT AA E East - HOWARD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT AA W West - HOWARD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT T W West - HOWARD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 129 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 160 E East - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 160 E East - HOWELL COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 160 W West - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 N North - HOWELL COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - HOWELL COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - HOWELL COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 04-MAR-2024 to 31-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT E E East - IRON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins .025 MILE(S) AFTER MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E W West - IRON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins .006 MILE(S) AFTER CRD 134 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK N North - IRON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins .002 MILE(S) BEFORE CRD 93 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK S South - IRON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT N S South - IRON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK S South - IRON COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneCST LITTLE BLUE PKWY N North - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 10-JAN-2025.
Road work begins .001 MILE(S) BEFORE CST VALLEY VIEW PKWY W.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:30 AM and 11:59 PM.
Expect delays due to work zoneCST LITTLE BLUE PKWY S South - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 10-JAN-2025.
Road work begins .002 MILE(S) BEFORE CST E JACKSON DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:30 AM and 11:59 PM.
Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 22-APR-2024 to 01-DEC-2024.
Road work begins .012 MILE(S) AFTER RP MO350W TO IS435N N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .097 MILE(S) BEFORE MO 12 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-JUN-2024 to 07-AUG-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 22-APR-2024 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 269 N North - JACKSON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 01-NOV-2024.
Road work begins .023 MILE(S) AFTER CST FRONT ST W.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 269 S South - JACKSON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE CST CHOUTEAU TRFY N.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 7 S South - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAY-2024 to 11-OCT-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneRamp RP US50E TO BLACKWELL RD N North - JACKSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
No delays expected due to work zoneInterstate IS 29 N North - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 09-AUG-2024.
Road work begins .02 MILE(S) AFTER RP INDEPENDENCE AVE TO IS29N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
No delays expected due to work zoneInterstate IS 29 S South - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 09-AUG-2024.
Road work begins .041 MILE(S) BEFORE RR UNKNOWN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
No delays expected due to work zoneState Route MO 7 S South - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneState Route MO 7 S South - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneRamp RP US40W TO IS70W W West - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 27-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
No delays expected due to work zoneState Route RT H N North - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 03-MAY-2024 to 29-JUL-2024.
Road work begins .008 MILE(S) AFTER CST NE 3RD ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
No delays expected due to work zoneUS US 24 W West - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneCST BLUE RIDGE BLVD S South - JACKSON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-APR-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER RP BLUE RIDGE BLVD TO MO350W W.
Work will be done 7 days a week.
Possible delays due to work zoneCST E 63RD ST E East - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 12-JUL-2024 to 12-AUG-2024.
Road work begins .021 MILE(S) BEFORE RP 63RD ST E TO IS435S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 03:00 PM and 12:00 PM.
Possible delays due to work zoneCST SE BLACKWELL RD S South - JACKSON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins .012 MILE(S) AFTER CST SE SHENANDOAH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-JUL-2024 to 12-AUG-2024.
Road work begins .02 MILE(S) BEFORE CST MAPLE AVE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .119 MILE(S) BEFORE CST HUNTER AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .119 MILE(S) BEFORE CST HUNTER AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 78 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JUL-2024 to 16-AUG-2024.
Road work begins .009 MILE(S) AFTER CST HARDY AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT F N North - JACKSON COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 18-JUL-2024 to 23-JUL-2024.
Road work begins .006 MILE(S) AFTER CST 11TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT F S South - JACKSON COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 18-JUL-2024 to 23-JUL-2024.
Road work begins .018 MILE(S) BEFORE CST SE 4TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-JUL-2024 to 12-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneCRD BURR OAK RD E East - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .082 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 23-AUG-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 43 N North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .05 MILE(S) AFTER MO 96 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 59 N North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .044 MILE(S) AFTER RT FF E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 W West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H W West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .057 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT HH E East - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 21-JUL-2024 to 15-AUG-2024.
Road work begins CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT J N North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .106 MILE(S) AFTER RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M W West - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Y N North - JASPER COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneOuter Road W OR 49 S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP IS49S TO RTHH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins IS 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP RTHH TO IS49S S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH E East - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .044 MILE(S) BEFORE OR 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .011 MILE(S) AFTER IS 49 S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins .208 MILE(S) BEFORE US 61 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-MAR-2024 to 15-APR-2025.
Road work begins .415 MILE(S) BEFORE CST HERKY-HORINE RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 21 N North - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS55N TO US67N N North - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .013 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .005 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67N TO IS55N N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT C N North - JEFFERSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JUN-2024 to 31-JUL-2024.
Road work begins RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT P N North - JEFFERSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 15-AUG-2024.
Road work begins MO 110 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT P N North - JEFFERSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 15-AUG-2024.
Road work begins MO 110 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT P S South - JEFFERSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 15-AUG-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT P S South - JEFFERSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 15-AUG-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 67 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-JUN-2024 to 31-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .
Work will be done on weekdays only.
Possible delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 24-JUN-2024 to 31-JUL-2024.
Road work begins .031 MILE(S) AFTER RP MO141S TO IS55N N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT C N North - JEFFERSON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work begins RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C S South - JEFFERSON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work begins RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT F N North - JEFFERSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .16 MILE(S) BEFORE CRD OPEECHEE BEACH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 50 E East - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 13-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 50 W West - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 13-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT K E East - KNOX COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER MO 15 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - LACLEDE COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 23-AUG-2024.
Road work begins .527 MILE(S) BEFORE RA IS44W CONWAY W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT BB N North - LACLEDE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 02-AUG-2024.
Road work begins MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F N North - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 17-JUN-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F S South - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 17-JUN-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT T N North - LACLEDE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins .012 MILE(S) AFTER RT N S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-JUL-2024 to 23-JUL-2024.
Road work begins 1.972 MILE(S) AFTER RP RTN TO IS44E E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 06:30 PM and 05:30 AM.
Possible delays due to work zoneCRD OLD HIGHWAY 40 E East - LAFAYETTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-JUN-2024 to 23-AUG-2024.
Road work begins .281 MILE(S) BEFORE CRD MCDANIEL DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 13 N North - LAFAYETTE COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 17-JUL-2024 to 23-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 13 S South - LAFAYETTE COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 17-JUL-2024 to 23-SEP-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 20 E East - LAFAYETTE COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-JUL-2024.
Road work begins .003 MILE(S) AFTER BU 13 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 AM.
Possible delays due to work zoneState Route MO 20 W West - LAFAYETTE COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-JUL-2024.
Road work begins .002 MILE(S) AFTER CRD BARNETT RD S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 AM.
Possible delays due to work zoneRamp RP IS70E TO MO13 E East - LAFAYETTE COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 17-JUL-2024 to 23-SEP-2024.
Road work begins IS 70 E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT Z N North - LAFAYETTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-JUN-2024 to 23-AUG-2024.
Road work begins .019 MILE(S) AFTER CRD BAINBRIDGE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST ODELL ST E East - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST ODELL ST W West - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .031 MILE(S) BEFORE CST 1ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .096 MILE(S) BEFORE CST 5TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-JUN-2024 to 16-AUG-2024.
Road work begins BU 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-JUN-2024 to 16-AUG-2024.
Road work begins .001 MILE(S) BEFORE CST ADAMS ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-JUN-2024 to 31-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 01-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneCST CLEVELAND AVE E East - LAWRENCE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .002 MILE(S) BEFORE RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 37 S South - LAWRENCE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .004 MILE(S) BEFORE CST CLEVELAND AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K W West - LEWIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER MO 6 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 47 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 47 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP MO47 TO US61N N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins MO 47 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP MO47 TO US61S S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins MO 47 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP US61N TO MO47 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins US 61 N.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP US61S TO MO47 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .012 MILE(S) AFTER US 61 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT V E East - LINCOLN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .397 MILE(S) AFTER CRD HENRY HARRIS LN S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT V W West - LINCOLN COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .373 MILE(S) AFTER PVT WHIPPOORWILL TRL S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneUS US 61 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 61 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT V E East - LINCOLN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT V W West - LINCOLN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins RT JJ E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 36 W West - LINN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins .004 MILE(S) BEFORE CRD NOBLE DR S.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 36 E East - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 31-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 W West - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 31-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT C S South - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2024 to 01-NOV-2024.
Road work begins RT O S.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneState Route RT T E East - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUL-2024 to 30-AUG-2024.
Road work begins .521 MILE(S) AFTER CRD GALAXY AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT T W West - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUL-2024 to 30-AUG-2024.
Road work begins .328 MILE(S) AFTER RR THOMAS HILL BRANCH S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT KK E East - MACON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 72 E East - MADISON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 30-AUG-2024.
Road work begins .002 MILE(S) AFTER CRD 517 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 72 W West - MADISON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 30-AUG-2024.
Road work begins .002 MILE(S) AFTER OR 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 28 E East - MARIES COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-MAY-2024 to 31-JUL-2024.
Road work begins .003 MILE(S) BEFORE MO 89 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 42 E East - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .003 MILE(S) BEFORE CRD COTTONWOOD RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 42 W West - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 28 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AA N North - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT H N North - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 68 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT H S South - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 72 E East - MARION COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2024 to 31-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 72 W West - MARION COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2024 to 31-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT D N North - MARION COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .711 MILE(S) BEFORE RT M E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT D S South - MARION COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .683 MILE(S) AFTER RT M E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneUS US 36 W West - MARION COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 22-JUL-2024 to 30-SEP-2024.
Road work begins .066 MILE(S) BEFORE RP US24W TO US36W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 N North - MCDONALD COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 08-JUL-2024 to 22-AUG-2024.
Road work begins 1.957 MILE(S) BEFORE RP IS49N TO MO90 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 43 N North - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work begins .001 MILE(S) BEFORE RT PP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 43 S South - MCDONALD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-JUN-2024 to 08-AUG-2024.
Road work begins PVT BRIDGE J509 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 59 N North - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUL-2024 to 22-JUL-2024.
Road work begins .066 MILE(S) AFTER CST HILLCREST DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 59 S South - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUL-2024 to 22-JUL-2024.
Road work begins .038 MILE(S) BEFORE RT EE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 76 E East - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 01-SEP-2024.
Road work begins .033 MILE(S) AFTER RT U S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT CC E East - MCDONALD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .332 MILE(S) AFTER MO 76 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT CC W West - MCDONALD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .09 MILE(S) BEFORE CRD ATKINS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 136 E East - MERCER COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 25-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 136 W West - MERCER COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 25-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT OO W West - MILLER COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins RT CC S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 57 N North - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAY-2024 to 01-AUG-2024.
Road work begins 1.088 MILE(S) AFTER CRD 202 E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 57 S South - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAY-2024 to 01-AUG-2024.
Road work begins 1.964 MILE(S) BEFORE CRD 202 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AB E East - MISSISSIPPI COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 15-JUL-2024 to 24-JUL-2024.
Road work begins RT N S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT AB W West - MISSISSIPPI COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 15-JUL-2024 to 24-JUL-2024.
Road work begins RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneUS US 62 E East - MISSISSIPPI COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Expect delays due to work zoneUS US 62 W West - MISSISSIPPI COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT C W West - MONITEAU COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .114 MILE(S) BEFORE RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT AA N North - MONTGOMERY COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .245 MILE(S) BEFORE CRD COON VALLEY RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT AA S South - MONTGOMERY COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .266 MILE(S) AFTER RT PP E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 52 W West - MORGAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 02-AUG-2024.
Road work begins .184 MILE(S) BEFORE CRD WEST BLACKBERRY PATCH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT AA N North - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins .014 MILE(S) AFTER RT W S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT AA S South - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins .003 MILE(S) AFTER RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT D N North - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-JUN-2024 to 24-JUL-2024.
Road work begins .018 MILE(S) AFTER MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT D S South - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 24-JUN-2024 to 24-JUL-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT MM N North - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins CRD RITCHIE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT MM S South - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT OO E East - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins RT AA S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT T N North - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins CRD FERRY LANDING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT T S South - MORGAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 06-JUN-2024 to 31-JUL-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT WW N North - MORGAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 26-JUL-2024.
Road work begins CRD LITTLE BUFFALO RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT WW S South - MORGAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-JUN-2024 to 26-JUL-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 50 E East - MORGAN COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .009 MILE(S) BEFORE CRD LIPTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 08:00 PM.
Expect delays due to work zoneUS US 50 E East - MORGAN COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .834 MILE(S) AFTER CRD QUAIL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.
Expect delays due to work zoneUS US 50 W West - MORGAN COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins 1.078 MILE(S) BEFORE CRD QUAIL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.
Expect delays due to work zoneUS US 50 W West - MORGAN COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .004 MILE(S) BEFORE CRD LEWIS DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 08:00 PM.
Possible delays due to work zoneState Route RT C E East - MORGAN COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 62 E East - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-JUN-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 62 W West - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-JUN-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 22-JUL-2024 to 02-AUG-2024.
Road work begins .06 MILE(S) BEFORE US 400 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins RP IS44E TO MO43 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 23-AUG-2024.
Road work begins .176 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 22-JUL-2024 to 02-AUG-2024.
Road work begins .043 MILE(S) AFTER US 400 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins .016 MILE(S) AFTER RP LP49S TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 N North - NEWTON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 28-MAY-2024 to 23-AUG-2024.
Road work begins .008 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 49 S South - NEWTON COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 08-JUL-2024 to 22-AUG-2024.
Road work begins MO 175 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneLoop LP 49 N North - NEWTON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 21-JUL-2024 to 01-AUG-2024.
Road work begins .309 MILE(S) AFTER CRD CEDAR DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneLoop LP 49 S South - NEWTON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 21-JUL-2024 to 01-AUG-2024.
Road work begins .255 MILE(S) AFTER CST REDDINGS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-JUL-2024 to 01-AUG-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-JUL-2024 to 01-AUG-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-JUL-2024 to 01-AUG-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-JUL-2024 to 01-AUG-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT J E East - NEWTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 21-JUL-2024 to 27-JUL-2024.
Road work begins MO 59 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT J W West - NEWTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 21-JUL-2024 to 27-JUL-2024.
Road work begins MO 37 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V E East - NEWTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 20-JUL-2024 to 23-JUL-2024.
Road work begins .028 MILE(S) BEFORE RP IS49N TO RTV E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT V W West - NEWTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 20-JUL-2024 to 23-JUL-2024.
Road work begins MO 59 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 60 E East - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 60 W West - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-JUN-2024 to 01-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneUS US 71 S South - NODAWAY COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 26-JUL-2024.
Road work begins .105 MILE(S) BEFORE CRD 355 ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Expect delays due to work zoneUS US 160 W West - OREGON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins .
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 100 E East - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT K N North - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins CRD 318 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT K S South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins MO 89 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route RT AA S South - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT B N North - OSAGE COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins MO 133 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT B S South - OSAGE COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .054 MILE(S) BEFORE CST 4TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT KK E East - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT N S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT OO E East - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT J E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT B S South - PERRY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-JUL-2024 to 02-AUG-2024.
Road work begins .161 MILE(S) AFTER CST MAIN ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 51 N North - PERRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins .004 MILE(S) BEFORE CRD 946 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 51 S South - PERRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins .607 MILE(S) BEFORE CRD 946 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 50 E East - PETTIS COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .005 MILE(S) AFTER RT FF S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 65 N North - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 02-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 S South - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 02-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - PHELPS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 22-FEB-2023 to 01-OCT-2024.
Road work begins .072 MILE(S) BEFORE US 63 S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT YY E East - PHELPS COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 68 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AC N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .3 MILE(S) AFTER CRD 425 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT AC S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .232 MILE(S) AFTER CRD 424 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT H E East - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .936 MILE(S) BEFORE CRD 222 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT H W West - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .066 MILE(S) AFTER RT W S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .327 MILE(S) AFTER CRD 470 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:59 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .275 MILE(S) AFTER RT V E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:59 AM and 06:00 PM.
Possible delays due to work zoneState Route RT V E East - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .23 MILE(S) AFTER CRD 449 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT V W West - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .429 MILE(S) BEFORE CRD 449 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .402 MILE(S) BEFORE CRD 295 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .105 MILE(S) BEFORE CRD 219 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .438 MILE(S) AFTER CRD 223 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .019 MILE(S) AFTER CRD 219 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT D E East - PLATTE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .028 MILE(S) BEFORE OR 29 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 45 S South - PLATTE COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 14-JUN-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
No delays expected due to work zoneState Route RT KK E East - PLATTE COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 22-AUG-2024.
Road work begins .266 MILE(S) BEFORE CRD PHILLIP DR S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST MEXICO CITY AVE N North - PLATTE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 30-AUG-2024.
Road work begins .009 MILE(S) BEFORE CST N LISBON AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneCST MEXICO CITY AVE S South - PLATTE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 30-AUG-2024.
Road work begins .006 MILE(S) AFTER OR 29 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneCST NW AMBASSADOR DR N North - PLATTE COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .043 MILE(S) BEFORE RP AMBASSADOR DR S TO MO152E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneCST NW AMBASSADOR DR S South - PLATTE COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .049 MILE(S) BEFORE RP MO152W TO AMBASSADOR DR S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 29 N North - PLATTE COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 17-JUN-2024 to 16-AUG-2024.
Road work begins .027 MILE(S) AFTER RP IS435S TO IS29N N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 29 S South - PLATTE COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2024 to 16-AUG-2024.
Road work begins .223 MILE(S) AFTER RP RTHH TO IS29S S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 92 E East - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 03-JUL-2024 to 03-SEP-2024.
Road work begins .09 MILE(S) AFTER RT B S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Possible delays due to work zoneRamp RP AMBASSADOR DR S TO MO152E E East - PLATTE COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CST NW AMBASSADOR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneRamp RP IS29N TO MEXICO CITY AVE S South - PLATTE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 06-JUN-2024 to 16-AUG-2024.
Road work begins .069 MILE(S) AFTER IS 435 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneRamp RP MEXICO CITY AVE TO IS29N N North - PLATTE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 06-JUN-2024 to 16-AUG-2024.
Road work begins CST MEXICO CITY AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneRamp RP MO152W TO AMBASSADOR DR S S South - PLATTE COUNTY - Delays Possible
Project Name - VARIOUS STRIPING 230616-C02_JKU0232
PAVEMENT MARKING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 152 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT BB E East - POLK COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 20-JUN-2024 to 01-AUG-2024.
Road work begins .033 MILE(S) BEFORE CRD 62ND RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT BB W West - POLK COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 20-JUN-2024 to 01-AUG-2024.
Road work begins MO 13 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT O N North - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 05-AUG-2024.
Road work begins .012 MILE(S) AFTER RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT O S South - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-MAY-2024 to 05-AUG-2024.
Road work begins .036 MILE(S) BEFORE CST NORTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT EE E East - POLK COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .097 MILE(S) AFTER CRD 235TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT FF N North - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT EE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT FF S South - POLK COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .252 MILE(S) BEFORE CRD 237TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneLoop LP 44 E East - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 01-DEC-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 11:59 PM.
Expect delays due to work zoneLoop LP 44 W West - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 01-DEC-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneState Route RT Y N North - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUL-2024 to 30-JUL-2024.
Road work begins US 136 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT Y N North - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 24-JUL-2024.
Road work begins US 136 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT Y S South - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUL-2024 to 30-JUL-2024.
Road work begins MO 129 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT Y S South - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 24-JUL-2024.
Road work begins MO 129 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT YY N North - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUL-2024 to 30-JUL-2024.
Road work begins .007 MILE(S) AFTER US 136 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT YY S South - PUTNAM COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 17-JUL-2024 to 30-JUL-2024.
Road work begins .018 MILE(S) AFTER RT Y S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT B S South - RALLS COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .275 MILE(S) AFTER RT D E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT P N North - RALLS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .677 MILE(S) AFTER RT JJ E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route RT P S South - RALLS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 30-AUG-2024.
Road work begins .687 MILE(S) BEFORE RT JJ E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 3 N North - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT C N North - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2024 to 01-NOV-2024.
Road work begins .008 MILE(S) AFTER RT JJ E.
Work will be done on weekdays and Saturdays.
No delays expected due to work zoneState Route RT T E East - RAY COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 06-JUN-2024 to 17-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneState Route RT T W West - RAY COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 06-JUN-2024 to 17-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 13 N North - RAY COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 03-JUN-2024 to 31-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 13 S South - RAY COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 03-JUN-2024 to 31-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K E East - REYNOLDS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 08-JUL-2024 to 08-AUG-2024.
Road work begins MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K W West - REYNOLDS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 08-JUL-2024 to 08-AUG-2024.
Road work begins .014 MILE(S) AFTER RT O E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK N North - REYNOLDS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-JUN-2024 to 30-AUG-2024.
Road work begins .004 MILE(S) BEFORE CRD 900 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK S South - REYNOLDS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-JUN-2024 to 30-AUG-2024.
Road work begins CRD 906 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT N N North - REYNOLDS COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 09-JUL-2024 to 02-AUG-2024.
Road work begins 4.307 MILE(S) AFTER CRD 214 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK N North - REYNOLDS COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - SALINE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 12:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - SALINE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 30-SEP-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 127 N North - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .004 MILE(S) AFTER MO 20 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT EE N North - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .018 MILE(S) AFTER MO 20 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN W West - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .016 MILE(S) AFTER CRD KLONDIKE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT Z S South - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins CRD 225TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 01-NOV-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT KK W West - SHELBY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins MO 151 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - ST. CHARLES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAY-2024 to 24-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAY-2024 to 24-JUL-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 61 N North - ST. CHARLES COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneUS US 61 S South - ST. CHARLES COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 70 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-MAY-2024 to 24-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Possible delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-MAY-2024 to 24-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 94 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 26-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route MO 94 E East - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-JUN-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 94 W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 26-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route MO 94 W West - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-JUN-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneOuter Road S OR 70 E East - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-JUL-2024 to 26-JUL-2024.
Road work begins .001 MILE(S) AFTER CST RICHMOND CENTER BLVD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneOuter Road S OR 70 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 18-JUL-2024 to 22-AUG-2024.
Road work begins OR 70 E.
Work will be done 7 days a week.
Possible delays due to work zoneOuter Road S OR 70 W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 18-JUL-2024 to 22-AUG-2024.
Road work begins .022 MILE(S) BEFORE CST SPENCER LOOP SOUTH E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT F E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-JUL-2024 to 30-AUG-2024.
Road work begins .44 MILE(S) AFTER PVT BUCKSTONE PASS E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT F E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-JUL-2024 to 30-AUG-2024.
Road work begins .058 MILE(S) BEFORE CRD CALLAWAY FORK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT F W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-JUL-2024 to 30-AUG-2024.
Road work begins .024 MILE(S) AFTER CRD CALLAWAY FORK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT F W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 03-JUL-2024 to 30-AUG-2024.
Road work begins .483 MILE(S) BEFORE PVT BUCKSTONE PASS E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT M N North - ST. CHARLES COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 19-JUL-2024 to 23-JUL-2024.
Road work begins .001 MILE(S) AFTER RT P E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT V N North - ST. CHARLES COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 15-JUL-2024 to 16-AUG-2024.
Road work begins .013 MILE(S) AFTER CRD ORCHARD FARM RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT V S South - ST. CHARLES COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-JUL-2024 to 23-AUG-2024.
Road work begins CRD CANVAS BACK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Z N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 30-AUG-2024.
Road work begins .184 MILE(S) AFTER PVT OAK LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT Z S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 30-AUG-2024.
Road work begins .183 MILE(S) AFTER CRD S POINT PRAIRIE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 12:00 PM.
Possible delays due to work zoneUS US 67 S South - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-JUL-2024 to 08-AUG-2024.
Road work begins .007 MILE(S) AFTER OR 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT HH N North - ST. CLAIR COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 18-JUL-2024 to 23-JUL-2024.
Road work begins .098 MILE(S) BEFORE COE TALLEY BEND E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH S South - ST. CLAIR COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 18-JUL-2024 to 23-JUL-2024.
Road work begins .311 MILE(S) BEFORE CRD NE 866 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT ZZ N North - ST. CLAIR COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 10-JUL-2024 to 25-JUL-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 32 E East - ST. FRANCOIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-JUN-2024 to 31-JUL-2024.
Road work begins .007 MILE(S) AFTER CRD GREEN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 32 E East - ST. FRANCOIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-JUL-2024 to 16-AUG-2024.
Road work begins .002 MILE(S) BEFORE CST MAPLE VALLEY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 32 W West - ST. FRANCOIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-JUL-2024 to 16-AUG-2024.
Road work begins .007 MILE(S) BEFORE CRD GREEN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 67 S South - ST. FRANCOIS COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 15-JUL-2024 to 24-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 67 N North - ST. FRANCOIS COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-JUL-2024 to 31-JUL-2024.
Road work begins .104 MILE(S) AFTER CO US67N TO US67S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins .024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 100 E East - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 13-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 100 W West - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 13-SEP-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins .036 MILE(S) BEFORE OR 340 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUL-2024 to 15-OCT-2024.
Road work begins .036 MILE(S) BEFORE PVT MONARCH FIRE STATION E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUL-2024 to 15-OCT-2024.
Road work begins .004 MILE(S) AFTER RP MO340E TO IS270W W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:30 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins .018 MILE(S) AFTER IS 270 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP IS270E TO RTAB E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins IS 270 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO RTAB W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP RTAB TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-APR-2024 to 31-OCT-2024.
Road work begins RT AB E.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:05 AM and 12:00 PM.
Expect delays due to work zoneRamp RP RTAB TO IS270W W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins RT AB E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneCST S EATHERTON RD N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST S EATHERTON RD S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 55 S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 24-JUN-2024 to 31-JUL-2024.
Road work begins .026 MILE(S) AFTER RP MERAMEC BOTTOM RD TO IS55S S.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 109 N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 115 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-JUL-2024 to 24-JUL-2024.
Road work begins IS 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-JUL-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 31-JUL-2024.
Road work begins .018 MILE(S) BEFORE CRD CRESTLINE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins .024 MILE(S) BEFORE CRD VIEHL AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-JUN-2024 to 16-AUG-2024.
Road work begins .009 MILE(S) AFTER CST COUNTRY RIDGE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 02-AUG-2024.
Road work begins .028 MILE(S) BEFORE RP MO340W TO IS270E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-JUL-2024 to 02-AUG-2024.
Road work begins .018 MILE(S) BEFORE CST RUE DE LA BANQUE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT CC E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-JUL-2024 to 02-AUG-2024.
Road work begins .04 MILE(S) AFTER CST WALTON RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-JUL-2024 to 16-AUG-2024.
Road work begins .01 MILE(S) BEFORE CST ATHERTON DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 08-JUL-2024 to 02-AUG-2024.
Road work begins .01 MILE(S) BEFORE CST CRYSTAL CT S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT N N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-SEP-2024.
Road work begins .005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-SEP-2024.
Road work begins .002 MILE(S) BEFORE CST JEAN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 07-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-JUL-2024 to 08-AUG-2024.
Road work begins .008 MILE(S) BEFORE MO 367 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-FEB-2024 to 07-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JUL-2024 to 22-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Expect delays due to work zoneInterstate IS 55 S South - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 64 W West - ST. LOUIS CITY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins .133 MILE(S) AFTER RP GRAND BLVD TO IS64W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 32 W West - STE. GENEVIEVE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-JUN-2024 to 31-JUL-2024.
Road work begins CST FOURTH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT M N North - STE. GENEVIEVE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JUL-2024 to 25-NOV-2024.
Road work begins .004 MILE(S) BEFORE CST VALLE SPRING TRL E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M S South - STE. GENEVIEVE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JUL-2024 to 25-NOV-2024.
Road work begins US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 61 N North - STE. GENEVIEVE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 61 S South - STE. GENEVIEVE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT B S South - STE. GENEVIEVE COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-JUL-2024 to 31-JUL-2024.
Road work begins .843 MILE(S) BEFORE CRD MADDEN CREEK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT BB N North - STODDARD COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT BB S South - STODDARD COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT M E East - STODDARD COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 08-JUL-2024 to 26-JUL-2024.
Road work begins RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M W West - STODDARD COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 08-JUL-2024 to 26-JUL-2024.
Road work begins MO 25 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 86 E East - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 86 W West - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-JUL-2024 to 30-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 176 E East - TANEY COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 176 W West - TANEY COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-JUL-2024 to 24-JUL-2024.
Road work begins .022 MILE(S) AFTER US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 76 E East - TANEY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work begins CRD HARP LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 76 E East - TANEY COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .002 MILE(S) AFTER CST KNOX AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins .015 MILE(S) AFTER CRD LAKE SHORE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Expect delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 20-SEP-2024.
Road work begins .053 MILE(S) AFTER CRD MANDOLIN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 23-JUL-2024.
Road work begins .024 MILE(S) AFTER CRD CANDLESTICK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
No delays expected due to work zoneState Route RT M S South - TANEY COUNTY - No Expected Delays
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 26-JUL-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - VERNON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 31-JUL-2024.
Road work begins .062 MILE(S) BEFORE LP 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road W OR 49 N North - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins CRD NW 100TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road W OR 49 S South - VERNON COUNTY - Expect Delays
MOWING
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 54 E East - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 01-NOV-2024.
Road work begins .
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 49 N North - VERNON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUL-2024 to 31-JUL-2024.
Road work begins .037 MILE(S) AFTER RR NEVADA SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 43 S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins US 54 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .005 MILE(S) BEFORE IS 49 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT BB N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT DD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT BB S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT DD E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins IS 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT DD W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E E East - VERNON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .134 MILE(S) AFTER CRD 2025 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E W West - VERNON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-JUL-2024 to 22-JUL-2024.
Road work begins .337 MILE(S) AFTER CRD 2400 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .034 MILE(S) AFTER RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT F E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .002 MILE(S) AFTER RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT F W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT FF E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins CRD 100 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT FF W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT K E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins LP 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT K W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .023 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT N E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .016 MILE(S) AFTER CRD ZEBULON E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT N W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins IS 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT T N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins RT FF E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT T S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 54 E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .023 MILE(S) BEFORE CST SPRING ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 54 E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .795 MILE(S) BEFORE CRD 200 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Possible delays due to work zoneUS US 54 W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .029 MILE(S) AFTER MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Possible delays due to work zoneUS US 54 W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 15-JUL-2024 to 25-JUL-2024.
Road work begins .013 MILE(S) BEFORE RT AA S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 94 E East - WARREN COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C E East - WASHINGTON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 15-JUL-2024 to 26-JUL-2024.
Road work begins .063 MILE(S) AFTER RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT C W West - WASHINGTON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 15-JUL-2024 to 26-JUL-2024.
Road work begins .273 MILE(S) AFTER MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 34 E East - WAYNE COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 15-JUL-2024 to 24-JUL-2024.
Road work begins .002 MILE(S) BEFORE MO 143 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 67 N North - WAYNE COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 15-JUL-2024 to 24-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 67 S South - WAYNE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-JUN-2024 to 26-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - WEBSTER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-JUL-2024 to 26-JUL-2024.
Road work begins .009 MILE(S) BEFORE RP IS44E TO SAMPSON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - WEBSTER COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 17-JUN-2024 to 30-AUG-2024.
Road work begins .09 MILE(S) AFTER CRD PLANK SCHOOL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneState Route RT F E East - WEBSTER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT F W West - WEBSTER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-JUL-2024 to 25-JUL-2024.
Road work begins RT MM E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.

Back to Top

FUTURE WORK ZONES: 162 to report. Hide

Expect delays due to work zoneState Route RT B N North - ADAIR COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .004 MILE(S) BEFORE CST BREWINGTON AVE W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 46 E East - ATCHISON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .005 MILE(S) AFTER RT EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 46 W West - ATCHISON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .008 MILE(S) BEFORE CRD Y AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT W N North - AUDRAIN COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins RT BB E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W N North - AUDRAIN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins .006 MILE(S) BEFORE RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W N North - AUDRAIN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins RT BB E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W S South - AUDRAIN COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W S South - AUDRAIN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W S South - AUDRAIN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins RT WW E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT WW E East - AUDRAIN COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins CRD 557 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT WW W West - AUDRAIN COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins CRD 538 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT KK N North - BATES COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .012 MILE(S) AFTER CRD NE 14004 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK S South - BATES COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins CRD NE 15254 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 18 E East - BATES COUNTY - Expect Delays
MOWING
Scheduled from 29-JUL-2024 to 08-AUG-2024.
Road work begins CST ETHEL ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 E East - BATES COUNTY - Expect Delays
MOWING
Scheduled from 23-JUL-2024 to 01-AUG-2024.
Road work begins .029 MILE(S) BEFORE RT O S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT JJ E East - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins .558 MILE(S) AFTER CRD BOHLING AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT JJ W West - BENTON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins RT A S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 169 N North - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 29-JUL-2024 to 30-SEP-2024.
Road work begins .001 MILE(S) AFTER IS 29 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 139 N North - CARROLL COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 7 N North - CASS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .058 MILE(S) BEFORE CRD E 197TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 7 S South - CASS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .029 MILE(S) AFTER CST RICHLAND PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT J N North - CHARITON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 26-JUL-2024.
Road work begins CRD NAMRASH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT J S South - CHARITON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 26-JUL-2024.
Road work begins .019 MILE(S) BEFORE RT MM E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K S South - CHARITON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT FF N North - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 31-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT FF S South - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 31-JUL-2024.
Road work begins CRD RAPHAEL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT Y N North - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 31-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT Y S South - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 31-JUL-2024.
Road work begins RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT DD N North - CHRISTIAN COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-JUL-2024 to 06-AUG-2024.
Road work begins .019 MILE(S) AFTER RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT PP S South - CHRISTIAN COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT DD N North - CLARK COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT DD S South - CLARK COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins CRD 95 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneCST 19TH ST E East - CLAY COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 31-JUL-2024.
Road work begins RP IS35N TO 19TH ST E E.
Work will be done on weekdays only.
Expect delays due to work zoneCST 19TH ST W West - CLAY COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 31-JUL-2024.
Road work begins .006 MILE(S) AFTER CST WATSON DR S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 9 N North - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-JUL-2024 to 27-JUL-2024.
Road work begins .021 MILE(S) BEFORE CST 14TH AVE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 35 N North - CLINTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-JUL-2024 to 01-DEC-2024.
Road work begins .713 MILE(S) AFTER RP MO116 TO IS35N N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 35 S South - CLINTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-JUL-2024 to 01-DEC-2024.
Road work begins .608 MILE(S) BEFORE RP IS35S TO US69 S.
Work will be done 7 days a week.
Expect delays due to work zoneCST STATE ST N North - DADE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .004 MILE(S) AFTER CST BARBER E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneCST STATE ST S South - DADE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .006 MILE(S) AFTER US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 169 S South - DEKALB COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 29-JUL-2024 to 30-SEP-2024.
Road work begins .01 MILE(S) AFTER MO 31 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneRA IS44E ST CLAIR E East - FRANKLIN COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins IS 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 01:00 AM and 03:00 AM.
Expect delays due to work zoneState Route RT VV N North - FRANKLIN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .029 MILE(S) AFTER CRD GRANT SCHOOL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT VV S South - FRANKLIN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .432 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT H N North - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins .048 MILE(S) BEFORE CRD JAKES PRAIRIE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT H S South - FRANKLIN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins .165 MILE(S) BEFORE CRD WILSON BEND RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT Z E East - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUL-2024 to 06-SEP-2024.
Road work begins MO 19 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Z W West - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUL-2024 to 06-SEP-2024.
Road work begins .263 MILE(S) BEFORE CRD HORSTMAN RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 266 E East - GREENE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-JUL-2024 to 25-JUL-2024.
Road work begins .178 MILE(S) AFTER RT AB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 18 W West - HENRY COUNTY - Expect Delays
MOWING
Scheduled from 29-JUL-2024 to 08-AUG-2024.
Road work begins .462 MILE(S) AFTER RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 W West - HENRY COUNTY - Expect Delays
MOWING
Scheduled from 23-JUL-2024 to 01-AUG-2024.
Road work begins .011 MILE(S) AFTER RT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 111 S South - HOLT COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneCO BEARDSLEY RD TO SIXTH ST E East - JACKSON COUNTY - CLOSED
MILLING/RESURFACING WORK
Scheduled from 26-JUL-2024 to 30-JUL-2024.
Road work begins CST BEARDSLEY RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST WASHINGTON ST N North - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 26-JUL-2024 to 30-JUL-2024.
Road work begins .001 MILE(S) AFTER CST SEVENTH ST W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST WASHINGTON ST S South - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 26-JUL-2024 to 30-JUL-2024.
Road work begins US 169 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP IS35N TO US169N N North - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 26-JUL-2024 to 30-JUL-2024.
Road work begins IS 35 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 06:00 AM.
Expect delays due to work zoneRamp RP IS70E TO US169N N North - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 26-JUL-2024 to 30-JUL-2024.
Road work begins IS 70 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 470 W West - JACKSON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .168 MILE(S) AFTER CST NW PRYOR RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 29 N North - JACKSON COUNTY - Delays Possible
SWEEPING PAVEMENT
Scheduled from 23-JUL-2024 to 26-JUL-2024.
Road work begins .121 MILE(S) AFTER CST INDEPENDENCE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins .139 MILE(S) AFTER RP E 104TH ST TO IS435N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins .211 MILE(S) BEFORE RP IS435S TO 104TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP US71N TO TRUMAN RD E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-JUL-2024 to 31-JUL-2024.
Road work begins .031 MILE(S) AFTER US 71 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 71 S South - JACKSON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .034 MILE(S) BEFORE RT W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:09 PM.
Possible delays due to work zoneState Route MO 66 E East - JASPER COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-JUL-2024 to 02-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneCRD OLD HWY 21 S South - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 30-SEP-2024.
Road work begins .03 MILE(S) AFTER PVT ENCHANTED FOREST DR S.
Work will be done 7 days a week.
Expect delays due to work zoneCRD WEST FOUR RIDGE RD S South - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 29-JUL-2024 to 30-SEP-2024.
Road work begins .009 MILE(S) BEFORE MO 21 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS55N TO US67S S South - JEFFERSON COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins IS 55 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - Expect Delays
CONCRETE BARRIER WALL
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins .042 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins US 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneUS US 67 N North - JEFFERSON COUNTY - Expect Delays
CONCRETE BARRIER WALL
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins .076 MILE(S) BEFORE RP IS55S TO US67N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneRamp RP IS44W TO RTT W West - LACLEDE COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .908 MILE(S) BEFORE RP IS44E TO RTN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 PM and 05:30 AM.
Possible delays due to work zoneInterstate IS 44 W West - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-JUL-2024 to 24-JUL-2024.
Road work begins 1.767 MILE(S) AFTER RP MO133 TO IS44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 PM and 05:30 AM.
Possible delays due to work zoneState Route RT PP N North - LAWRENCE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 23-JUL-2024 to 29-JUL-2024.
Road work begins MO 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT D S South - LEWIS COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins MO 156 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT J S South - LINCOLN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins MO 47 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 36 W West - LINN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .028 MILE(S) BEFORE CRD MONACO DR S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 36 W West - LINN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins .01 MILE(S) AFTER MO 5 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 36 E East - MACON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 23-JUL-2024 to 24-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT MM N North - MACON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins CRD NIGHTENGALE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT MM S South - MACON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT D N North - MARION COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins MO 168 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A N North - MONROE COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A N North - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A S South - MONROE COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins CST W CEMETERY SY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A S South - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 30-JUL-2024 to 31-JUL-2024.
Road work begins RT J E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT F E East - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins RT A S.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT F E East - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 25-JUL-2024 to 29-JUL-2024.
Road work begins RT A S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT F W West - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 25-JUL-2024 to 29-JUL-2024.
Road work begins MO 15 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT F W West - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins CRD 227 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT J W West - MONROE COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins MO 151 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 135 N North - MORGAN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .017 MILE(S) AFTER CRD ARTIST DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 135 S South - MORGAN COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .017 MILE(S) AFTER CRD COTTONWOOD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT M N North - NEWTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 23-JUL-2024 to 25-JUL-2024.
Road work begins MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT Y S South - NODAWAY COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .314 MILE(S) BEFORE CRD 1 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneUS US 136 E East - NODAWAY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .022 MILE(S) BEFORE RT PP S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 136 W West - NODAWAY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .012 MILE(S) AFTER RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT FF N North - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 30-AUG-2024.
Road work begins CRD 263 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT FF S South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-JUL-2024 to 30-AUG-2024.
Road work begins MO 89 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT T E East - PERRY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 02-AUG-2024.
Road work begins .208 MILE(S) AFTER RT CC S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT T W West - PERRY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 02-AUG-2024.
Road work begins .739 MILE(S) BEFORE RT CC S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT P E East - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT P W West - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT W W West - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .079 MILE(S) BEFORE CRD 7220 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Expect delays due to work zoneState Route RT DD N North - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .017 MILE(S) BEFORE RT Z E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z W West - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .034 MILE(S) BEFORE RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z W West - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-JUL-2024 to 25-JUL-2024.
Road work begins .01 MILE(S) AFTER CRD CAMP PAWNEE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT Z W West - PLATTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-JUL-2024 to 26-JUL-2024.
Road work begins .053 MILE(S) AFTER RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 152 E East - PLATTE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-JUL-2024 to 28-JUL-2024.
Road work begins .232 MILE(S) BEFORE RP MO152E TO N CONGRESS AVE S S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Expect delays due to work zoneState Route MO 152 W West - PLATTE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-JUL-2024 to 28-JUL-2024.
Road work begins .01 MILE(S) BEFORE RP MO152W TO IS29N N.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Possible delays due to work zoneInterstate IS 29 S South - PLATTE COUNTY - Delays Possible
SWEEPING PAVEMENT
Scheduled from 23-JUL-2024 to 26-JUL-2024.
Road work begins .073 MILE(S) AFTER RP RTDW TO IS29S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT NN E East - POLK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins CRD 120TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT NN W West - POLK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins .003 MILE(S) AFTER RT D S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT RB N North - POLK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins .004 MILE(S) AFTER RT PP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT RB S South - POLK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins PK POMME DE TERRE LAKE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT J E East - RANDOLPH COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 29-JUL-2024 to 29-JUL-2024.
Road work begins .009 MILE(S) AFTER CRD 1870 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT UU E East - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W E East - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins CRD 185TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - SALINE COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins CRD DRIFT AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT B S South - SCHUYLER COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT J E East - SCHUYLER COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 23-JUL-2024 to 24-JUL-2024.
Road work begins US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT J W West - SCHUYLER COUNTY - CLOSED
SEAL COAT OVERLAY
Scheduled from 23-JUL-2024 to 24-JUL-2024.
Road work begins .009 MILE(S) BEFORE CRD QUAIL AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT DD N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 30-AUG-2024.
Road work begins .029 MILE(S) BEFORE IS 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneState Route RT DD S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 30-AUG-2024.
Road work begins .026 MILE(S) BEFORE IS 64 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneState Route RT N E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-JUL-2024 to 30-AUG-2024.
Road work begins .033 MILE(S) BEFORE IS 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT N W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-JUL-2024 to 30-AUG-2024.
Road work begins OR 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP MO370W TO MO141 E East - ST. LOUIS COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins MO 370 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 10:00 PM.
Expect delays due to work zoneState Route MO 141 N North - ST. LOUIS COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 29-JUL-2024 to 02-AUG-2024.
Road work begins .003 MILE(S) BEFORE CST ST LUKES HOSPITAL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Expect delays due to work zoneUS US 61 N North - ST. LOUIS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 24-JUL-2024 to 13-SEP-2024.
Road work begins .002 MILE(S) BEFORE CST MAPLE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneUS US 61 S South - ST. LOUIS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 24-JUL-2024 to 13-SEP-2024.
Road work begins .004 MILE(S) BEFORE CST HUNTLEIGH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneCST CHESTERFIELD PKWY WEST N North - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .056 MILE(S) BEFORE OR 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 11:30 AM and 12:00 PM.
Possible delays due to work zoneCST CHESTERFIELD PKWY WEST S South - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .023 MILE(S) BEFORE IS 64 W.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 10:30 AM and 11:00 AM.
Possible delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .095 MILE(S) AFTER PED PO A6413 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 01:00 PM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 29-JUL-2024 to 01-AUG-2024.
Road work begins .009 MILE(S) AFTER CST BALD HILL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 141 N North - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .004 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:30 AM and 10:00 AM.
Possible delays due to work zoneState Route MO 141 S South - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins .022 MILE(S) AFTER OR 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 09:30 AM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-JUL-2024 to 26-JUL-2024.
Road work begins .033 MILE(S) BEFORE CRD BUTLER HILL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP IS44E TO HAMPTON AVE S South - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins IS 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 PM and 12:00 AM.
Expect delays due to work zoneRamp RP IS44E TO JEFFERSON AVE S South - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins IS 44 E.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS44E TO LAFAYETTE AVE E East - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 25-JUL-2024 to 25-JUL-2024.
Road work begins IS 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 02:00 AM and 04:00 AM.
Expect delays due to work zoneRamp RP IS44W TO ARSENAL ST W West - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 10:00 PM.
Expect delays due to work zoneRamp RP IS44W TO HAMPTON AVE N North - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 04:00 AM and 06:00 AM.
Expect delays due to work zoneRamp RP IS44W TO JEFFERSON AVE W West - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 12:00 AM and 02:00 AM.
Expect delays due to work zoneRamp RP IS44W TO LAFAYETTE AVE W West - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 24-JUL-2024 to 24-JUL-2024.
Road work begins IS 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 02:00 AM and 04:00 AM.
Expect delays due to work zoneRamp RP IS70E TO WEST FLORISSANT AVE S South - ST. LOUIS CITY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-JUL-2024 to 23-JUL-2024.
Road work begins .016 MILE(S) AFTER IS 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 PM and 12:00 AM.
Expect delays due to work zoneState Route MO 91 S South - STODDARD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 01-OCT-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUL-2024 to 16-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-JUL-2024 to 16-AUG-2024.
Road work begins .
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 76 E East - TANEY COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-JUL-2024 to 29-JUL-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 76 W West - TANEY COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-JUL-2024 to 29-JUL-2024.
Road work begins .
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 17 N North - TEXAS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 31-OCT-2024.
Road work begins .139 MILE(S) AFTER MO 38 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 17 S South - TEXAS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 31-OCT-2024.
Road work begins .085 MILE(S) BEFORE RT AW S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - VERNON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 01-OCT-2024.
Road work begins .798 MILE(S) AFTER RP RTE TO IS49N N.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 S South - VERNON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-JUL-2024 to 01-OCT-2024.
Road work begins .712 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done 7 days a week.
Possible delays due to work zoneCST N SERVICE RD W E East - WARREN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-JUL-2024 to 02-AUG-2024.
Road work begins .246 MILE(S) AFTER RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST VETERANS MEMORIAL PKWY W West - WARREN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-JUL-2024 to 02-AUG-2024.
Road work begins .403 MILE(S) BEFORE OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT F N North - WARREN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins .022 MILE(S) AFTER CRD HWY F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT F S South - WARREN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 29-JUL-2024 to 30-JUL-2024.
Road work begins RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT J N North - WARREN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-JUL-2024 to 25-JUL-2024.
Road work begins .001 MILE(S) AFTER OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT W N North - WASHINGTON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-JUL-2024 to 25-JUL-2024.
Road work begins CRD FLOYD TOWER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT W S South - WASHINGTON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-JUL-2024 to 25-JUL-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.

Back to Top

INCIDENTS: 34 to report. Show

Back to Top

FLOODS (CLOSED): 10 to report. Show

Back to Top

FLOODS: 2 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 996 to report. Show