WORK ZONES (CLOSED): 105 to report. Hide

Road Closed due to work zoneState Route MO 11 N North - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.077 MILE(S) AFTER CRD MARCO RD E.
Scheduled from 19-AUG-2024 to 17-NOV-2024.
Road Closed due to work zoneState Route MO 11 S South - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.2 MILE(S) AFTER CRD MONTGOMERY WOODS TRL S.
Scheduled from 19-AUG-2024 to 17-NOV-2024.
Road Closed due to work zoneState Route RT A N North - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .017 MILE(S) AFTER CRD APACHE WAY S.
Scheduled from 12-AUG-2024 to 02-DEC-2024.
Road Closed due to work zoneState Route RT A S South - ADAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .041 MILE(S) AFTER RT J S.
Scheduled from 12-AUG-2024 to 02-DEC-2024.
Road Closed due to work zoneState Route RT N N North - ADAIR COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins RT CC S.
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route RT N S South - ADAIR COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins CRD LINDERVILLE TRL S.
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route RT K E East - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) AFTER CRD NW 150TH LN S.
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT K W West - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) AFTER CRD NW 145TH LN S.
Scheduled from 24-JUN-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT O N North - BOONE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .002 MILE(S) AFTER RT J S.
Scheduled from 15-OCT-2024 to 25-NOV-2024.
Road Closed due to work zoneState Route RT O S South - BOONE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT J S.
Scheduled from 23-OCT-2024 to 25-NOV-2024.
Road Closed due to work zoneUS US 61 N North - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST WASHINGTON ST E.
Scheduled from 02-OCT-2023 to 01-JAN-2025.
Road Closed due to work zoneUS US 61 S South - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .038 MILE(S) BEFORE PVT PRIVATE RD E.
Scheduled from 02-OCT-2023 to 01-JAN-2025.
Road Closed due to work zoneCRD HUBACH HILL RD E East - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins .437 MILE(S) BEFORE MO 58 E.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneCRD HUBACH HILL RD W West - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins MO 58 E.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneState Route MO 291 N North - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins .117 MILE(S) AFTER CRD 191ST ST E.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneState Route MO 291 S South - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins .095 MILE(S) AFTER CRD 181ST ST E.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneState Route MO 58 E East - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins MO 291 S.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneState Route MO 58 W West - CASS COUNTY - Road Closed
Project Name - Route 291 - route 58 south intersection
INTERSECTION IMPROVEMENTS
Road closure begins .082 MILE(S) AFTER CRD GIBBONS RD S.
Scheduled from 16-SEP-2024 to 16-DEC-2024.
Road Closed due to work zoneWS IS49N HARRISONVILLE N North - CASS COUNTY - Road Closed
SHOULDER WORK
Road closure begins IS 49 N.
Scheduled from 26-SEP-2024 to 30-MAY-2025.
Road Closed due to work zoneState Route MO 33 N North - CLAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .087 MILE(S) AFTER RT CC E.
Scheduled from 29-AUG-2024 to 01-APR-2025.
Road Closed due to work zoneState Route MO 33 S South - CLAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .031 MILE(S) AFTER CRD BURRIS RD S.
Scheduled from 29-AUG-2024 to 01-APR-2025.
Road Closed due to work zoneUS US 169 S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER RP US169S TO RICHARDS RD S.
Scheduled from 06-FEB-2023 to 31-OCT-2024.
Road Closed due to work zoneRamp RP BU50 TO US54E E East - COLE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins BU 50 E.
Scheduled from 02-AUG-2024 to 15-NOV-2024.
Road Closed due to work zoneRamp RP US54E TO US50W W West - COLE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .005 MILE(S) AFTER US 54 E.
Scheduled from 16-SEP-2024 to 15-NOV-2024.
Road Closed due to work zoneRamp RP US63S TO MAIN ST S South - COLE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 63 S.
Scheduled from 16-SEP-2024 to 15-NOV-2024.
Road Closed due to work zoneState Route RT D N North - COLE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .008 MILE(S) AFTER PVT HUNTERS HAVEN DR S.
Scheduled from 12-AUG-2024 to 02-DEC-2024.
Road Closed due to work zoneState Route RT D S South - COLE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .01 MILE(S) AFTER CRD KROLL RD S.
Scheduled from 12-AUG-2024 to 02-DEC-2024.
Road Closed due to work zoneState Route RT B E East - DAVIESS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .03 MILE(S) AFTER MO 13 S.
Scheduled from 22-OCT-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route RT B W West - DAVIESS COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .005 MILE(S) BEFORE RT K S.
Scheduled from 22-OCT-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route RT EE N North - DEKALB COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins US 69 S.
Scheduled from 16-OCT-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT EE S South - DEKALB COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .098 MILE(S) BEFORE US 69 S.
Scheduled from 16-OCT-2024 to 26-OCT-2024.
Road Closed due to work zoneState Route RT J E East - DUNKLIN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins CRD 215 S.
Scheduled from 30-SEP-2024 to 15-DEC-2024.
Road Closed due to work zoneState Route RT J W West - DUNKLIN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .013 MILE(S) BEFORE CRD 107 S.
Scheduled from 30-SEP-2024 to 15-DEC-2024.
Road Closed due to work zoneState Route RT Y N North - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .064 MILE(S) AFTER CRD STONE CHURCH RD S.
Scheduled from 03-JUN-2024 to 15-NOV-2024.
Road Closed due to work zoneState Route RT Y S South - FRANKLIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .942 MILE(S) AFTER RT YY E.
Scheduled from 03-JUN-2024 to 15-NOV-2024.
Road Closed due to work zoneCRD 94 E East - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins US 65 S.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCRD 94 W West - GREENE COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER US 65 N.
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road Closed due to work zoneCST WOODSWETHER RD W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST W 5TH ST W.
Scheduled from 29-JAN-2024 to 31-DEC-2025.
Road Closed due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER US 40 E.
Scheduled from 05-SEP-2024 to 31-DEC-2024.
Road Closed due to work zoneRamp RP IS70W TO LITTLE BLUE EXPWY N North - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins IS 70 W.
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneRamp RP US169N TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 N.
Scheduled from 03-APR-2023 to 31-DEC-2025.
Road Closed due to work zoneState Route RT YY E East - JASPER COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .007 MILE(S) BEFORE RR HEAVAENER SUB S.
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route RT YY W West - JASPER COUNTY - Road Closed
RAILROAD MAINTENANCE
Road closure begins .004 MILE(S) BEFORE RR HEAVAENER SUB S.
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneCRD WEST ROCK CREEK RD W West - JEFFERSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) BEFORE MO 21 N.
Scheduled from 14-OCT-2024 to 14-JAN-2025.
Road Closed due to work zoneState Route MO 64 E East - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .401 MILE(S) BEFORE CST ROLLING HILLS RD S.
Scheduled from 10-JUN-2024 to 29-NOV-2024.
Road Closed due to work zoneState Route MO 64 W West - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .325 MILE(S) AFTER CST ROLLING HILLS RD S.
Scheduled from 10-JUN-2024 to 29-NOV-2024.
Road Closed due to work zoneState Route RT B N North - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .237 MILE(S) BEFORE CRD CREEK RD E.
Scheduled from 26-AUG-2024 to 29-NOV-2024.
Road Closed due to work zoneState Route RT B S South - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .081 MILE(S) AFTER CRD CREEK RD E.
Scheduled from 26-AUG-2024 to 29-NOV-2024.
Road Closed due to work zoneState Route RT VV N North - LACLEDE COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .021 MILE(S) AFTER PVT KATRINA LN E.
Scheduled from 21-OCT-2024 to 28-OCT-2024.
Road Closed due to work zoneState Route RT VV S South - LACLEDE COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .023 MILE(S) AFTER CRD LIVINGSTON RD E.
Scheduled from 21-OCT-2024 to 28-OCT-2024.
Road Closed due to work zoneState Route MO 147 N North - LINCOLN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins MO 47 S.
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route MO 147 S South - LINCOLN COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins CRD WALKER RD S.
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneState Route RT CC E East - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .504 MILE(S) AFTER CRD 244 E.
Scheduled from 12-AUG-2024 to 15-NOV-2024.
Road Closed due to work zoneState Route RT CC W West - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .681 MILE(S) AFTER CRD 255 S.
Scheduled from 12-AUG-2024 to 15-NOV-2024.
Road Closed due to work zoneState Route MO 79 N North - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST MONROE ST E.
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route MO 79 S South - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST LYON ST E.
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route RT AA E East - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .261 MILE(S) AFTER CRD 835 S.
Scheduled from 09-SEP-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT AA W West - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .176 MILE(S) BEFORE CRD 857 S.
Scheduled from 09-SEP-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route MO 161 N North - MONTGOMERY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .088 MILE(S) AFTER CRD MEADOWLARK RD E.
Scheduled from 05-AUG-2024 to 31-DEC-2024.
Road Closed due to work zoneState Route MO 161 S South - MONTGOMERY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .046 MILE(S) AFTER CRD RUTHEFORD RD E.
Scheduled from 05-AUG-2024 to 31-DEC-2024.
Road Closed due to work zoneState Route RT D E East - NEW MADRID COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) BEFORE RT W E.
Scheduled from 09-SEP-2024 to 10-JAN-2025.
Road Closed due to work zoneState Route RT D W West - NEW MADRID COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) BEFORE RT E S.
Scheduled from 09-SEP-2024 to 10-JAN-2025.
Road Closed due to work zoneRamp RP MO43 TO IS44W W West - NEWTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 43 N.
Scheduled from 10-OCT-2024 to 22-NOV-2024.
Road Closed due to work zoneRamp RP MO43S TO IS44E E East - NEWTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER MO 86 E.
Scheduled from 10-OCT-2024 to 22-NOV-2024.
Road Closed due to work zoneState Route RT HH E East - PEMISCOT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .013 MILE(S) AFTER CRD 282 E.
Scheduled from 03-SEP-2024 to 13-NOV-2024.
Road Closed due to work zoneState Route RT HH W West - PEMISCOT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT EE E.
Scheduled from 03-SEP-2024 to 13-NOV-2024.
Road Closed due to work zoneState Route RT J E East - PEMISCOT COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins CRD 407 S.
Scheduled from 30-SEP-2024 to 31-OCT-2024.
Road Closed due to work zoneState Route RT J W West - PEMISCOT COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins CRD 405 S.
Scheduled from 30-SEP-2024 to 31-OCT-2024.
Road Closed due to work zoneState Route RT K E East - PEMISCOT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .017 MILE(S) AFTER PVT 255 CONNECTOR S.
Scheduled from 05-AUG-2024 to 11-NOV-2024.
Road Closed due to work zoneState Route RT K W West - PEMISCOT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) BEFORE CRD 261 S.
Scheduled from 05-AUG-2024 to 11-NOV-2024.
Road Closed due to work zoneState Route RT M N North - PETTIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .036 MILE(S) AFTER CRD ECHO RD S.
Scheduled from 14-OCT-2024 to 14-MAR-2025.
Road Closed due to work zoneState Route RT M S South - PETTIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .032 MILE(S) AFTER RT V E.
Scheduled from 14-OCT-2024 to 14-MAR-2025.
Road Closed due to work zoneState Route RT Z E East - PLATTE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .938 MILE(S) BEFORE CRD SHERWOOD FOREST E.
Scheduled from 14-OCT-2024 to 29-MAY-2025.
Road Closed due to work zoneState Route RT Z W West - PLATTE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .439 MILE(S) AFTER CRD SHERWOOD FOREST E.
Scheduled from 14-OCT-2024 to 29-MAY-2025.
Road Closed due to work zoneState Route MO 129 N North - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .081 MILE(S) AFTER CRD 317TH RD S.
Scheduled from 30-SEP-2024 to 06-FEB-2025.
Road Closed due to work zoneState Route MO 129 S South - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .374 MILE(S) BEFORE CRD 317TH RD S.
Scheduled from 30-SEP-2024 to 06-FEB-2025.
Road Closed due to work zoneState Route RT M E East - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .521 MILE(S) BEFORE CRD BAMBOO TRL S.
Scheduled from 09-SEP-2024 to 10-JAN-2025.
Road Closed due to work zoneState Route RT M W West - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .243 MILE(S) AFTER CRD BAMBOO TRL S.
Scheduled from 09-SEP-2024 to 10-JAN-2025.
Road Closed due to work zoneState Route RT U N North - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .322 MILE(S) AFTER CRD 110TH ST E.
Scheduled from 03-SEP-2024 to 12-DEC-2024.
Road Closed due to work zoneState Route RT U S South - PUTNAM COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .323 MILE(S) AFTER CRD GRAND FIR TRL E.
Scheduled from 03-SEP-2024 to 12-DEC-2024.
Road Closed due to work zoneCST RED DEVIL RD E East - RALLS COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 61 S.
Scheduled from 17-OCT-2024 to 01-NOV-2024.
Road Closed due to work zoneCST RED DEVIL RD W West - RALLS COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 61 N.
Scheduled from 17-OCT-2024 to 01-NOV-2024.
Road Closed due to work zoneCRD LEMON TRL N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) BEFORE IS 70 E.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneCRD LEMON TRL S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) BEFORE IS 70 W.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneState Route RT K E East - SHELBY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .381 MILE(S) BEFORE CRD 2060 E.
Scheduled from 26-AUG-2024 to 01-DEC-2024.
Road Closed due to work zoneState Route RT K W West - SHELBY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .327 MILE(S) AFTER CRD 2060 E.
Scheduled from 26-AUG-2024 to 01-DEC-2024.
Road Closed due to work zoneCO NOR 70 TO MO79S S South - ST. CHARLES COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins OR 70 E.
Scheduled from 03-OCT-2024 to 01-DEC-2024.
Road Closed due to work zoneCST IVY W West - ST. CHARLES COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins MO 94 W.
Scheduled from 18-JUL-2022 to 01-AUG-2030.
Road Closed due to work zoneState Route RT TT E East - ST. CLAIR COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins MO 13 S.
Scheduled from 07-OCT-2024 to 22-NOV-2024.
Road Closed due to work zoneState Route RT TT W West - ST. CLAIR COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins RT T E.
Scheduled from 07-OCT-2024 to 22-NOV-2024.
Road Closed due to work zoneState Route MO 221 N North - ST. FRANCOIS COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .006 MILE(S) AFTER CRD HOWELL RD S.
Scheduled from 21-AUG-2024 to 08-NOV-2024.
Road Closed due to work zoneState Route MO 221 S South - ST. FRANCOIS COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .006 MILE(S) BEFORE CRD OLD VANDERGRIFF RD S.
Scheduled from 21-AUG-2024 to 08-NOV-2024.
Road Closed due to work zoneRamp RP MO340E TO US67N N North - ST. LOUIS COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins .003 MILE(S) AFTER RP MO340W TO US67N N.
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneRamp RP US67N TO MO340E E East - ST. LOUIS COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins US 67 N.
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road Closed due to work zoneRamp RP CHEROKEE ST TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST CHEROKEE ST E.
Scheduled from 03-MAY-2022 to 01-DEC-2024.
Road Closed due to work zoneRamp RP GERMANIA ST TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST GERMANIA AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP IS55N TO IDAHO AVE N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins IS 55 N.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP LOUGHBOROUGH AVE TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST IDAHO AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP RIVERVIEW DR TO IS270E E East - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT H N.
Scheduled from 21-FEB-2023 to 22-FEB-2027.
Road Closed due to work zoneRamp RP TRUMAN PKWY TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST LAFAYETTE AVE E.
Scheduled from 06-DEC-2022 to 29-MAY-2025.
Road Closed due to work zoneRA IS55N BLOOMSDALE N North - STE. GENEVIEVE COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins IS 55 N.
Scheduled from 10-OCT-2024 to 01-MAY-2025.
Road Closed due to work zoneState Route RT P N North - STODDARD COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .005 MILE(S) AFTER RT Y E.
Scheduled from 14-OCT-2024 to 13-JAN-2025.
Road Closed due to work zoneState Route RT P S South - STODDARD COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins CRD 518 E.
Scheduled from 14-OCT-2024 to 13-JAN-2025.
Road Closed due to work zoneState Route RT N E East - SULLIVAN COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins RT Y S.
Scheduled from 02-OCT-2024 to 21-NOV-2024.
Road Closed due to work zoneState Route RT N W West - SULLIVAN COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .018 MILE(S) BEFORE RT Y S.
Scheduled from 02-OCT-2024 to 21-NOV-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 550 to report. Hide

Expect delays due to work zoneBusiness BU 71 N North - ANDREW COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-SEP-2024 to 01-NOV-2024.
Road work begins .038 MILE(S) AFTER OR 29 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneBusiness BU 71 S South - ANDREW COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-SEP-2024 to 01-NOV-2024.
Road work begins .103 MILE(S) AFTER CRD 153 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 29 S South - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .007 MILE(S) AFTER RT B E.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 59 S South - ATCHISON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-AUG-2024 to 01-NOV-2024.
Road work begins .209 MILE(S) AFTER CST MAIN ST E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneUS US 54 E East - AUDRAIN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 25-OCT-2024.
Road work begins .108 MILE(S) BEFORE CRD 471 S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - AUDRAIN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 25-OCT-2024.
Road work begins .316 MILE(S) BEFORE CRD 725 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 86 E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 29-NOV-2024.
Road work begins .042 MILE(S) BEFORE MO 76 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F E East - BARRY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 23-OCT-2024 to 01-NOV-2024.
Road work begins MO 112 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT F W West - BARRY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 23-OCT-2024 to 01-NOV-2024.
Road work begins .104 MILE(S) AFTER MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT WW N North - BARRY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 05-NOV-2024.
Road work begins CRD 1170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT WW S South - BARRY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 05-NOV-2024.
Road work begins MO 39 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneBusiness BU 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) BEFORE CST 8TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneBusiness BU 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) AFTER CST 17TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneBusiness BU 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .001 MILE(S) BEFORE CST NORTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST BUSINESS 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) AFTER CST JEFFERSON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST BUSINESS 37 S South - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .014 MILE(S) AFTER CST BRITES CIRCLE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCST CLEVELAND AVE W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .001 MILE(S) BEFORE CST DAVID SIPPY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 37 N North - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .007 MILE(S) AFTER CST W BROADWAY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 86 W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .001 MILE(S) BEFORE RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins .052 MILE(S) BEFORE MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins MO 86 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins MO 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT C W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 29-NOV-2024.
Road work begins CST GABBY GIBBONS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 60 E East - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .003 MILE(S) BEFORE CST S EISENHOWER ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 60 W West - BARRY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .005 MILE(S) AFTER CST MILLER WAY S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - BARTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-AUG-2024 to 01-NOV-2024.
Road work begins .007 MILE(S) AFTER US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneState Route MO 43 N North - BARTON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 23-AUG-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD SW 20TH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 43 S South - BARTON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-SEP-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) AFTER US 160 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 43 S South - BARTON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 23-AUG-2024 to 01-NOV-2024.
Road work begins .008 MILE(S) AFTER US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneOuter Road E OR 49 N North - BARTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-AUG-2024 to 30-OCT-2024.
Road work begins US 160 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneOuter Road E OR 49 S South - BARTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-AUG-2024 to 30-OCT-2024.
Road work begins RT EE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN N North - BARTON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-SEP-2024 to 30-OCT-2024.
Road work begins US 160 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT NN S South - BARTON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-SEP-2024 to 30-OCT-2024.
Road work begins RT K E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT NN N North - BARTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .026 MILE(S) BEFORE CST DARWIN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT NN S South - BARTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .011 MILE(S) BEFORE CST MAPLE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 18 E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins CST ETHEL ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route MO 18 E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins .009 MILE(S) BEFORE CRD NE PAWNEE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT A E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins .529 MILE(S) BEFORE CRD SW 14267 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT A W West - BATES COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT AA E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins MO 18 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT B E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT BB N North - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins .03 MILE(S) AFTER RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT DD N North - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT E E East - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins RT AA E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT FF S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER CRD NW 14512 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT KK S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins CRD NE 15254 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT M S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 01:00 AM.
Possible delays due to work zoneState Route RT PP N North - BATES COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins CRD SW 10508 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT PP S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT T S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins CRD NE 10293 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT U W West - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT V S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT Z S South - BATES COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins CRD NE 15004 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins .018 MILE(S) BEFORE RR COLT S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 70 E East - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-JUL-2025.
Road work begins 1.065 MILE(S) BEFORE RP IS70E TO RTJ E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 15-OCT-2024 to 25-NOV-2024.
Road work begins .03 MILE(S) BEFORE RP IS70W TO RTJ W.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins .169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins .2 MILE(S) BEFORE RP IS70W TO US63C N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 63 N North - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins .056 MILE(S) BEFORE RP US63N TO RTWW N.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneUS US 63 N North - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-OCT-2024.
Road work begins .074 MILE(S) BEFORE RT B S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 N North - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-OCT-2024 to 01-DEC-2024.
Road work begins .031 MILE(S) BEFORE RP US63N TO MO22 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - BOONE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins .076 MILE(S) BEFORE CST CLARK LN E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneUS US 63 S South - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-JUL-2024 to 31-OCT-2024.
Road work begins .197 MILE(S) BEFORE MO 763 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 22 E East - BOONE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2024.
Road work begins .091 MILE(S) BEFORE MO 124 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 22 W West - BOONE COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2024.
Road work begins .034 MILE(S) AFTER CST COLUMBIA ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 740 E East - BOONE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 14-OCT-2024 to 25-OCT-2024.
Road work begins .061 MILE(S) BEFORE MO 163 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 740 W West - BOONE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 14-OCT-2024 to 25-OCT-2024.
Road work begins .064 MILE(S) BEFORE MO 163 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT TT E East - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-SEP-2024 to 02-DEC-2024.
Road work begins RT ZZ S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT TT W West - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-SEP-2024 to 02-DEC-2024.
Road work begins .002 MILE(S) BEFORE CST SILVEY ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT Y S South - BUCHANAN COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 23-OCT-2024 to 21-NOV-2024.
Road work begins RT DD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 70 W West - CALLAWAY COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-JUL-2025.
Road work begins .639 MILE(S) BEFORE RP IS70W TO RTM W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneUS US 54 E East - CALLAWAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-AUG-2024 to 06-NOV-2024.
Road work begins .019 MILE(S) BEFORE CRD S SUMMIT DR S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 54 W West - CALLAWAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-AUG-2024 to 06-NOV-2024.
Road work begins .504 MILE(S) AFTER CRD 220 E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 55 N North - CAPE GIRARDEAU COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 24-OCT-2024 to 30-OCT-2024.
Road work begins .003 MILE(S) BEFORE RP US61S TO IS55N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 55 S South - CAPE GIRARDEAU COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 24-OCT-2024 to 30-OCT-2024.
Road work begins .433 MILE(S) AFTER CST BAINBRIDGE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 34 E East - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 07-OCT-2024 to 29-NOV-2024.
Road work begins .001 MILE(S) BEFORE CRD 341 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 34 W West - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 07-OCT-2024 to 29-NOV-2024.
Road work begins .003 MILE(S) AFTER MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 72 E East - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 18-SEP-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE CRD 345 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 72 W West - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 18-SEP-2024 to 01-NOV-2024.
Road work begins .264 MILE(S) BEFORE CRD 438 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 74 E East - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 30-SEP-2024 to 31-JAN-2025.
Road work begins .07 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 74 W West - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 30-SEP-2024 to 31-JAN-2025.
Road work begins CST MT AUBURN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W N North - CAPE GIRARDEAU COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 22-OCT-2024 to 01-NOV-2024.
Road work begins US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W S South - CAPE GIRARDEAU COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 22-OCT-2024 to 01-NOV-2024.
Road work begins MO 177 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 61 N North - CAPE GIRARDEAU COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road work begins .002 MILE(S) AFTER CST GOOD HOPE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT O N North - CASS COUNTY - Delays Possible
Project Name - Route O JST0073_240216-C04
MILLING/RESURFACING WORK
Scheduled from 21-SEP-2024 to 01-NOV-2024.
Road work begins RT A E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT O S South - CASS COUNTY - Delays Possible
Project Name - Route O JST0073_240216-C04
MILLING/RESURFACING WORK
Scheduled from 21-SEP-2024 to 01-NOV-2024.
Road work begins MO 2 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 24 E East - CHARITON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-SEP-2024 to 01-DEC-2024.
Road work begins .504 MILE(S) AFTER CRD SHELBY AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneCRD S NICHOLAS RD N North - CHRISTIAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-OCT-2024 to 31-DEC-2024.
Road work begins .087 MILE(S) BEFORE CRD RIDGEWAY DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneCRD S NICHOLAS RD S South - CHRISTIAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-OCT-2024 to 31-DEC-2024.
Road work begins .005 MILE(S) AFTER CRD RIDGEWAY DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zonePVT ENGLISH VILLAGE DR E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done on weekdays only.
Expect delays due to work zonePVT ENGLISH VILLAGE DR W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .008 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins CO US160E TO RTAAW S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD LINDBERGH RD E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT MM N North - CHRISTIAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 30-OCT-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT MM S South - CHRISTIAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 30-OCT-2024.
Road work begins CRD ROSE HILL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 160 W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .106 MILE(S) BEFORE RT AA W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .009 MILE(S) AFTER RT F W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .023 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .115 MILE(S) BEFORE RP US65S TO MO14 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .011 MILE(S) BEFORE RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 61 N North - CLARK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-AUG-2024 to 29-NOV-2024.
Road work begins .077 MILE(S) AFTER CST TAYLOR ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 09:00 PM.
Expect delays due to work zoneUS US 61 S South - CLARK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-AUG-2024 to 29-NOV-2024.
Road work begins US 136 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 09:00 PM.
No delays expected due to work zoneInterstate IS 435 N North - CLAY COUNTY - No Expected Delays
MOWING
Scheduled from 01-OCT-2024 to 31-OCT-2024.
Road work begins .089 MILE(S) BEFORE RP MO291 TO IS435N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
No delays expected due to work zoneInterstate IS 435 S South - CLAY COUNTY - No Expected Delays
MOWING
Scheduled from 01-OCT-2024 to 31-OCT-2024.
Road work begins .02 MILE(S) BEFORE CST N WOODLAND AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneCST NW BARRY RD W West - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2025.
Road work begins .025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT EE N North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins .176 MILE(S) AFTER CRD OLD EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT EE S South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins .583 MILE(S) AFTER RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT H E East - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins .108 MILE(S) AFTER CST 124TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 04:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT H W West - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins MO 10 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 04:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT JJ N North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT JJ S South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT N N North - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins .04 MILE(S) AFTER CRD NE 108TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT N S South - CLAY COUNTY - Delays Possible
MOWING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins MO 10 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 169 N North - CLAY COUNTY - Delays Possible
CONCRETE BARRIER WALL
Scheduled from 25-OCT-2024 to 08-NOV-2024.
Road work begins .044 MILE(S) BEFORE RP RICHARDS RD TO US169N N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 35 N North - CLINTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 12-AUG-2024 to 01-DEC-2024.
Road work begins .713 MILE(S) AFTER RP MO116 TO IS35N N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 35 S South - CLINTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 12-AUG-2024 to 01-DEC-2024.
Road work begins .608 MILE(S) BEFORE RP IS35S TO US69 S.
Work will be done 7 days a week.
Expect delays due to work zoneCST W MCCARTY ST E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 15-NOV-2024.
Road work begins .002 MILE(S) AFTER US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneCST W MCCARTY ST W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 15-NOV-2024.
Road work begins .002 MILE(S) AFTER RP MCCARTY ST TO US63N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT B N North - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-SEP-2024 to 26-NOV-2024.
Road work begins .493 MILE(S) AFTER PVT CLOVER HILL LN E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT B S South - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-SEP-2024 to 26-NOV-2024.
Road work begins .693 MILE(S) BEFORE PVT CLOVER HILL LN E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 50 E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2024 to 15-NOV-2024.
Road work begins .066 MILE(S) BEFORE RP US50E TO US54E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 50 W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-JUL-2024 to 15-NOV-2024.
Road work begins .002 MILE(S) AFTER BU 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 54 E East - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 15-NOV-2024.
Road work begins .042 MILE(S) BEFORE RP US54E TO BU50 E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - COLE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-JUL-2024 to 15-NOV-2024.
Road work begins .07 MILE(S) BEFORE RR JEFFERSON CITY SUB E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 E East - COOPER COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins .027 MILE(S) AFTER RR RIVER SUB E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - COOPER COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 01-NOV-2024.
Road work begins .432 MILE(S) AFTER RT Z S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 5 S South - COOPER COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 11-OCT-2024 to 25-OCT-2024.
Road work begins .014 MILE(S) AFTER CRD GLENWOOD LAKE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 70 E East - COOPER COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .296 MILE(S) BEFORE CRD DUNKLES DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 70 W West - COOPER COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .266 MILE(S) BEFORE CRD DUNKLES DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 44 E East - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 01-NOV-2024.
Road work begins .393 MILE(S) BEFORE CRD BEAMER LN S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 44 E East - CRAWFORD COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .01 MILE(S) BEFORE CRD FRONTAGE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT D E East - DALLAS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-OCT-2024 to 07-NOV-2024.
Road work begins US 65 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT D W West - DALLAS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 07-OCT-2024 to 07-NOV-2024.
Road work begins .003 MILE(S) AFTER CST MILL ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT K N North - DALLAS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-OCT-2024 to 31-OCT-2024.
Road work begins MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT EE N North - DEKALB COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2024 to 07-NOV-2024.
Road work begins US 69 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT EE S South - DEKALB COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2024 to 07-NOV-2024.
Road work begins .09 MILE(S) BEFORE CRD ROGERS RD E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 69 N North - DEKALB COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2024 to 07-NOV-2024.
Road work begins .074 MILE(S) AFTER CST PENCE RD E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 69 S South - DEKALB COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-SEP-2024 to 07-NOV-2024.
Road work begins .185 MILE(S) BEFORE CRD ROGERS RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT AM E East - DOUGLAS COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 15-OCT-2024 to 31-OCT-2024.
Road work begins MO 181 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 25 N North - DUNKLIN COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 09-SEP-2024 to 01-NOV-2024.
Road work begins CST WILLIS ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 412 E East - DUNKLIN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .024 MILE(S) BEFORE MO 84 E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 412 W West - DUNKLIN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .008 MILE(S) AFTER CRD 729 S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 44 W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 01-NOV-2024.
Road work begins .315 MILE(S) AFTER MO 185 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .156 MILE(S) BEFORE CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER MO 47 S.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .02 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT MM N North - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM S South - FRANKLIN COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 11-JUL-2024 to 01-NOV-2025.
Road work begins RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT YY E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY E East - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .04 MILE(S) BEFORE RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .051 MILE(S) AFTER CRD SCHOENENBURG RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT YY W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .047 MILE(S) AFTER MO 185 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 50 E East - FRANKLIN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 16-SEP-2024 to 31-DEC-2024.
Road work begins .063 MILE(S) AFTER RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 50 W West - FRANKLIN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 16-SEP-2024 to 31-DEC-2024.
Road work begins .005 MILE(S) BEFORE CST BOURBEUSE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 185 N North - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .018 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 185 S South - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .023 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT N N North - FRANKLIN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-OCT-2024 to 01-NOV-2024.
Road work begins .006 MILE(S) AFTER CRD FRISCO SPUR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 01:00 AM.
Possible delays due to work zoneState Route RT N S South - FRANKLIN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-OCT-2024 to 01-NOV-2024.
Road work begins .021 MILE(S) AFTER RT O E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT WW E East - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT WW W West - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E E East - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins .115 MILE(S) AFTER CRD LONE GROOVE SCHOOL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 19 N North - GASCONADE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .234 MILE(S) AFTER CRD SIMPSON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 19 S South - GASCONADE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .628 MILE(S) BEFORE CRD SIMPSON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 136 E East - GENTRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-AUG-2024 to 02-DEC-2024.
Road work begins .054 MILE(S) BEFORE CST 11TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 136 E East - GENTRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-AUG-2024 to 02-DEC-2024.
Road work begins .424 MILE(S) BEFORE BU 136 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 PM.
Expect delays due to work zoneUS US 136 W West - GENTRY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-AUG-2024 to 02-DEC-2024.
Road work begins .047 MILE(S) AFTER CRD 520 RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST CAMPBELL AVE N North - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE RP US60E TO US160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST CAMPBELL AVE N North - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 15-NOV-2024.
Road work begins .001 MILE(S) AFTER CST E EL CAMINO ALTO E.
Work will be done 7 days a week.
Expect delays due to work zoneCST CAMPBELL AVE S South - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 01-NOV-2024.
Road work begins US 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneCST CAMPBELL AVE S South - GREENE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-MAY-2024 to 15-NOV-2024.
Road work begins .003 MILE(S) AFTER US 160 W.
Work will be done 7 days a week.
Expect delays due to work zoneCST GLENSTONE AVE N North - GREENE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 27-FEB-2023 to 31-OCT-2024.
Road work begins .002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST GLENSTONE AVE S South - GREENE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 27-FEB-2023 to 31-OCT-2024.
Road work begins .003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST REPUBLIC ST E East - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 26-AUG-2024 to 04-NOV-2024.
Road work begins .024 MILE(S) AFTER CST KANSAS CT S.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 AM and 08:00 PM.
Expect delays due to work zoneCST REPUBLIC ST W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 26-AUG-2024 to 04-NOV-2024.
Road work begins .088 MILE(S) AFTER CST PARKCREST AVE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 AM and 08:00 PM.
Expect delays due to work zoneCST WALNUT LAWN ST E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 01-NOV-2024.
Road work begins .007 MILE(S) BEFORE CO CST WALNUT LAWN ST TO MO13S E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneCST WALNUT LAWN ST W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 02-JUL-2024 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER CO CST WALNUT LAWN TO MO13N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneLoop LP 44 E East - GREENE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 30-AUG-2024 to 31-MAR-2025.
Road work begins .065 MILE(S) BEFORE CST SHERMAN AVE S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 125 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .044 MILE(S) AFTER CRD 170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .021 MILE(S) BEFORE RP US60W TO MO13S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 S South - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .229 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 744 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins US 160 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 744 W West - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-JUN-2024 to 31-JUL-2025.
Road work begins .001 MILE(S) AFTER RT OO E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT E E East - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .011 MILE(S) BEFORE CST MAPLE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT ZZ N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .01 MILE(S) AFTER CST HINES ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .014 MILE(S) AFTER CRD 182 E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-OCT-2024 to 15-NOV-2024.
Road work begins .013 MILE(S) AFTER MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .218 MILE(S) BEFORE RP US60E TO KANSAS EXPY S S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 160 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .087 MILE(S) AFTER US 60 W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .073 MILE(S) BEFORE US 160 E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .013 MILE(S) AFTER CRD 205 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .086 MILE(S) BEFORE RP BU65 TO US60W W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .012 MILE(S) BEFORE RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUN-2024 to 04-NOV-2024.
Road work begins .003 MILE(S) BEFORE CRD 94 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 65 S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JUL-2024 to 04-NOV-2024.
Road work begins .003 MILE(S) BEFORE CRD 94 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 160 E East - GREENE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-OCT-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) BEFORE CRD 53 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 136 W West - HARRISON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-AUG-2024 to 02-DEC-2024.
Road work begins .008 MILE(S) BEFORE MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 PM.
Possible delays due to work zoneInterstate IS 35 S South - HARRISON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 26-NOV-2024.
Road work begins 1.778 MILE(S) BEFORE CRD E 280 ST E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 13 N North - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins .063 MILE(S) AFTER MO 52 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 13 S South - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-NOV-2025.
Road work begins .012 MILE(S) BEFORE CRD SW 450TH RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 7 N North - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 15-DEC-2024.
Road work begins .093 MILE(S) AFTER RT O S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 7 S South - HENRY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 15-DEC-2024.
Road work begins .096 MILE(S) AFTER RT DD S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT D W West - HENRY COUNTY - Delays Possible
MOWING
Scheduled from 19-SEP-2024 to 31-OCT-2024.
Road work begins CRD SW-450 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 09:00 PM.
Expect delays due to work zoneUS US 59 N North - HOLT COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-AUG-2024 to 01-NOV-2024.
Road work begins .014 MILE(S) AFTER CRD VENTURA DR S.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneState Route MO 240 E East - HOWARD COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins .032 MILE(S) AFTER MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 240 W West - HOWARD COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 17-OCT-2024 to 25-OCT-2024.
Road work begins US 40 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 5 S South - HOWARD COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 03-SEP-2024 to 25-OCT-2024.
Road work begins .027 MILE(S) AFTER MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT AA E East - HOWARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-OCT-2024 to 08-NOV-2024.
Road work begins MO 87 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT AA W West - HOWARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-OCT-2024 to 08-NOV-2024.
Road work begins RT E E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT AM W West - HOWELL COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 15-OCT-2024 to 31-OCT-2024.
Road work begins US 63 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 N North - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2024 to 08-NOV-2024.
Road work begins CST CREAMERY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Expect delays due to work zoneUS US 63 S South - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 21-OCT-2024 to 08-NOV-2024.
Road work begins CST WAYHAVEN AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Possible delays due to work zoneUS US 160 E East - HOWELL COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 30-SEP-2024 to 12-JAN-2025.
Road work begins .002 MILE(S) AFTER CST INDEPENDENCE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 160 W West - HOWELL COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 30-SEP-2024 to 12-JAN-2025.
Road work begins .004 MILE(S) AFTER CST FREEDOM DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneCST LITTLE BLUE PKWY N North - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 10-JAN-2025.
Road work begins .001 MILE(S) BEFORE CST VALLEY VIEW PKWY W.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:30 AM and 11:59 PM.
Expect delays due to work zoneCST LITTLE BLUE PKWY S South - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-JUL-2024 to 10-JAN-2025.
Road work begins .002 MILE(S) BEFORE CST E JACKSON DR S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:30 AM and 11:59 PM.
Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins .074 MILE(S) BEFORE CST E 83RD ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 12:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 01-DEC-2024.
Road work begins .026 MILE(S) BEFORE RP MO12 TO IS435S S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 02:00 PM.
Expect delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 15-OCT-2024 to 25-OCT-2024.
Road work begins IS 435 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 470 W West - JACKSON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 15-OCT-2024 to 25-OCT-2024.
Road work begins MO 291 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 150 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-OCT-2024 to 25-OCT-2024.
Road work begins .053 MILE(S) AFTER CST GRAND SUMMIT BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 150 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-OCT-2024 to 25-OCT-2024.
Road work begins .262 MILE(S) AFTER CST RAYTOWN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-OCT-2024 to 31-OCT-2024.
Road work begins IS 435 N.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 350 W West - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-OCT-2024 to 31-OCT-2024.
Road work begins .087 MILE(S) AFTER RP MO350W TO COLBERN RD W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS70E TO LITTLE BLUE EXPWY S South - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-JUL-2024 to 10-JAN-2025.
Road work begins IS 70 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP LITTLE BLUE EXPWY TO IS70E E East - JACKSON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 21-AUG-2024 to 10-JAN-2025.
Road work begins CST LITTLE BLUE PKWY S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT FF E East - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-OCT-2024 to 25-OCT-2024.
Road work begins .489 MILE(S) AFTER RT H S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneCST BLUE RIDGE BLVD S South - JACKSON COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-APR-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER RP BLUE RIDGE BLVD TO MO350W W.
Work will be done 7 days a week.
Possible delays due to work zoneCST HOLMES RD N North - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins .046 MILE(S) BEFORE CST E 105TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST HOLMES RD S South - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins .005 MILE(S) BEFORE CST E 101ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST WORNALL RD N North - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins .015 MILE(S) BEFORE RP WORNALL RD TO US50E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST WORNALL RD S South - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 25-OCT-2024 to 29-OCT-2024.
Road work begins .013 MILE(S) AFTER CST W 103RD ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 24-OCT-2024 to 26-OCT-2024.
Road work begins .052 MILE(S) BEFORE RP IS435S TO FRONT ST E E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneState Route MO 12 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-SEP-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) AFTER CST WOODLAND AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 18-SEP-2024 to 30-OCT-2025.
Road work begins CST 55TH ST E.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT BB S South - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-SEP-2024 to 10-DEC-2024.
Road work begins .108 MILE(S) AFTER CRD OAKLAND SCHOOL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT FF W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-SEP-2024 to 10-DEC-2024.
Road work begins .047 MILE(S) AFTER RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 25-OCT-2024 to 27-OCT-2024.
Road work begins .015 MILE(S) BEFORE MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 25-OCT-2024 to 27-OCT-2024.
Road work begins .147 MILE(S) AFTER CST CHARLTON RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins OR 291 S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 40 E East - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 21-OCT-2024 to 26-OCT-2024.
Road work begins .001 MILE(S) BEFORE CST US 40 HWY E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 40 W West - JACKSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 21-OCT-2024 to 26-OCT-2024.
Road work begins .041 MILE(S) AFTER RT BB S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCRD W FOUNTAIN RD E East - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER CST LONE ELM RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD W FOUNTAIN RD W West - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-NOV-2024.
Road work begins MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST E FOUNTAIN RD E East - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-NOV-2024.
Road work begins MO 43 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST E FOUNTAIN RD W West - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER CST PRAIRIE FLOWER RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 43 N North - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-DEC-2024.
Road work begins CST E ZORA ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 43 N North - JASPER COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-SEP-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) AFTER MO 171 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 43 S South - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 14-OCT-2024 to 01-DEC-2024.
Road work begins .001 MILE(S) AFTER MO 171 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT H W West - JASPER COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 19-AUG-2024 to 31-OCT-2024.
Road work begins .012 MILE(S) BEFORE RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K E East - JASPER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-AUG-2024 to 30-OCT-2024.
Road work begins .068 MILE(S) AFTER OR 49 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K W West - JASPER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-AUG-2024 to 30-OCT-2024.
Road work begins MO 37 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT TT E East - JASPER COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 26-AUG-2024 to 31-OCT-2024.
Road work begins LP 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 66 E East - JASPER COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road work begins .001 MILE(S) BEFORE CST BYERS AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 12:00 PM.
Possible delays due to work zoneOuter Road W OR 49 S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP IS49S TO RTHH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins IS 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneRamp RP RTHH TO IS49S S South - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins RT HH E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH E East - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .044 MILE(S) BEFORE OR 49 S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT HH W West - JASPER COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2024 to 28-FEB-2025.
Road work begins .011 MILE(S) AFTER IS 49 S.
Work will be done on weekdays only.
Expect delays due to work zoneCRD OLD HWY 21 S South - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-AUG-2024 to 01-NOV-2024.
Road work begins .03 MILE(S) AFTER PVT ENCHANTED FOREST DR S.
Work will be done 7 days a week.
Expect delays due to work zoneCST HERKY-HORINE RD W West - JEFFERSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-OCT-2024 to 29-NOV-2024.
Road work begins .026 MILE(S) BEFORE IS 55 N.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 28-AUG-2024 to 31-OCT-2024.
Road work begins .046 MILE(S) BEFORE RP US67N TO IS55N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins .208 MILE(S) BEFORE US 61 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 28-AUG-2024 to 31-OCT-2024.
Road work begins .232 MILE(S) BEFORE RR RIVER SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins .315 MILE(S) BEFORE RR RIVER SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 21 N North - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 31-DEC-2024.
Road work begins .039 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS55N TO US67N N North - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .013 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .005 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67N TO IS55N N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 21 S South - JEFFERSON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .224 MILE(S) BEFORE CRD BRITTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT C N North - JEFFERSON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work begins RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C S South - JEFFERSON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work begins RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 21-OCT-2024 to 28-OCT-2024.
Road work begins .12 MILE(S) BEFORE CRD VALLES MINES SCHOOL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 13 N North - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .003 MILE(S) AFTER CRD NW 1400 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 13 S South - JOHNSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .2 MILE(S) BEFORE RT Y E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 50 E East - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 15-NOV-2024.
Road work begins .019 MILE(S) AFTER RP MO23 TO US50E E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 50 W West - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 15-NOV-2024.
Road work begins .456 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT K E East - KNOX COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-AUG-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER MO 15 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route RT AD N North - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins 1.54 MILE(S) AFTER CRD AUDRAIN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT AD S South - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins 1.782 MILE(S) BEFORE CRD AUDRAIN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT O E East - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .368 MILE(S) BEFORE CRD USHER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT O W West - LACLEDE COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .156 MILE(S) AFTER CRD USHER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT D N North - LAFAYETTE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-SEP-2024 to 25-OCT-2024.
Road work begins .008 MILE(S) AFTER OR 70 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT D S South - LAFAYETTE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-SEP-2024 to 25-OCT-2024.
Road work begins MO 224 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT FF W West - LAFAYETTE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-OCT-2024 to 25-OCT-2024.
Road work begins .289 MILE(S) BEFORE RT D S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 70 E East - LAFAYETTE COUNTY - Delays Possible
CORE DRILLING
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins 1.279 MILE(S) AFTER RP RTFN TO IS70E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneBusiness BU 60 E East - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-AUG-2024 to 05-NOV-2024.
Road work begins .005 MILE(S) AFTER CST LEWIS SHAW AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneBusiness BU 60 W West - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-AUG-2024 to 05-NOV-2024.
Road work begins .004 MILE(S) BEFORE CST RINKER ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 15-OCT-2024 to 29-OCT-2024.
Road work begins .353 MILE(S) AFTER CRD 1222 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 39 N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-AUG-2024 to 05-NOV-2024.
Road work begins .006 MILE(S) BEFORE CST HADLEY ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 39 S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-AUG-2024 to 05-NOV-2024.
Road work begins .034 MILE(S) BEFORE CST MADISON ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .031 MILE(S) BEFORE CST 1ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .096 MILE(S) BEFORE CST 5TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P N North - LAWRENCE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 17-JUN-2024 to 25-OCT-2024.
Road work begins BU 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P S South - LAWRENCE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 17-JUN-2024 to 25-OCT-2024.
Road work begins .001 MILE(S) BEFORE CST ADAMS ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT W N North - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 05-NOV-2024.
Road work begins BU 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W S South - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 05-NOV-2024.
Road work begins .059 MILE(S) AFTER CRD 2180 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneCST CLEVELAND AVE E East - LAWRENCE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .002 MILE(S) BEFORE RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 37 S South - LAWRENCE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-JUL-2024 to 02-DEC-2024.
Road work begins .004 MILE(S) BEFORE CST CLEVELAND AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K W West - LEWIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-AUG-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER MO 6 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 47 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins .014 MILE(S) BEFORE CST NORTH LINCOLN DR S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 47 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins .026 MILE(S) AFTER PVT ANNA AVE S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 79 N North - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-AUG-2024 to 31-OCT-2024.
Road work begins .043 MILE(S) BEFORE CRD OLD DAMERON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 79 N North - LINCOLN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-SEP-2024 to 15-NOV-2024.
Road work begins .003 MILE(S) BEFORE CST HURRICANE ST E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 79 S South - LINCOLN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-SEP-2024 to 15-NOV-2024.
Road work begins .164 MILE(S) BEFORE RT P S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneRamp RP MO47 TO US61N N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins MO 47 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP MO47 TO US61S S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins MO 47 S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP US61N TO MO47 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins US 61 N.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP US61S TO MO47 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .012 MILE(S) AFTER US 61 S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 61 N North - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .048 MILE(S) AFTER CST OLD CAP AU GRIS RD E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 61 S South - LINCOLN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins .319 MILE(S) BEFORE CST DUGAN LN E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 72 E East - MADISON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 12-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD 517 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 72 W West - MADISON COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 03-JUN-2024 to 12-NOV-2024.
Road work begins .002 MILE(S) AFTER OR 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 72 E East - MADISON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .003 MILE(S) BEFORE CRD 517 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 72 W West - MADISON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .001 MILE(S) AFTER OR 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 67 N North - MADISON COUNTY - Delays Possible
PAVEMENT STRIPING
Scheduled from 21-OCT-2024 to 28-OCT-2024.
Road work begins .178 MILE(S) BEFORE PVT ROBERTS LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 133 N North - MARIES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) BEFORE CRD 218 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 42 E East - MARIES COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 14-OCT-2024 to 31-OCT-2024.
Road work begins .112 MILE(S) AFTER CST CHESTNUT ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 42 W West - MARIES COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 14-OCT-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER CRD 330 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route RT AA N North - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneUS US 61 S South - MARION COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2024 to 08-NOV-2024.
Road work begins .065 MILE(S) BEFORE CST MARKET ST E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT NN E East - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 08-NOV-2024.
Road work begins MO 59 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN W West - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 15-OCT-2024 to 08-NOV-2024.
Road work begins CRD EAGLE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W N North - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-SEP-2024 to 08-NOV-2024.
Road work begins BU 71 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W S South - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 12-SEP-2024 to 08-NOV-2024.
Road work begins MO 76 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT Y N North - MCDONALD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 57 N North - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAY-2024 to 31-DEC-2024.
Road work begins 1.088 MILE(S) AFTER CRD 202 E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 57 S South - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAY-2024 to 31-DEC-2024.
Road work begins 1.964 MILE(S) BEFORE CRD 202 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 105 N North - MISSISSIPPI COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 03-SEP-2024 to 08-NOV-2024.
Road work begins MO 80 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 105 S South - MISSISSIPPI COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 03-SEP-2024 to 08-NOV-2024.
Road work begins US 62 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K W West - MONROE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2024 to 01-NOV-2024.
Road work begins .006 MILE(S) AFTER MO 151 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 5 N North - MORGAN COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 11-OCT-2024 to 25-OCT-2024.
Road work begins .014 MILE(S) AFTER CRD RAIL ROAD LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - NEW MADRID COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-OCT-2024 to 28-OCT-2024.
Road work begins .724 MILE(S) AFTER RP US61 TO IS55N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 55 S South - NEW MADRID COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-OCT-2024 to 28-OCT-2024.
Road work begins .253 MILE(S) AFTER RP RTP TO IS55S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 62 E East - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 15-NOV-2024.
Road work begins .003 MILE(S) AFTER CST PATTERSON ST E.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 62 W West - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 15-NOV-2024.
Road work begins .339 MILE(S) BEFORE MO 153 S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 22-NOV-2024.
Road work begins .001 MILE(S) BEFORE RP IS44E TO MO43 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2024 to 22-NOV-2024.
Road work begins RP IS44E TO MO43 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins RP IS44E TO MO43 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-JUN-2024 to 30-NOV-2024.
Road work begins .016 MILE(S) AFTER RP LP49S TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 07-OCT-2024 to 22-NOV-2024.
Road work begins RP LP49N TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - NEWTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2024 to 22-NOV-2024.
Road work begins .002 MILE(S) BEFORE RP LP49N TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 N North - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-SEP-2024 to 22-NOV-2024.
Road work begins .001 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 49 S South - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-SEP-2024 to 22-NOV-2024.
Road work begins .004 MILE(S) BEFORE RT V E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 43 N North - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-AUG-2024 to 25-OCT-2024.
Road work begins .003 MILE(S) AFTER CST 41ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 43 S South - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 05-AUG-2024 to 25-OCT-2024.
Road work begins RT FF E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-OCT-2024 to 25-OCT-2024.
Road work begins MO 43 S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 04:00 PM and 02:00 AM.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-OCT-2024 to 25-OCT-2024.
Road work begins .018 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 04:00 PM and 02:00 AM.
Expect delays due to work zoneState Route RT Y S South - NEWTON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 60 E East - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 06-AUG-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER CRD SHETLAND RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 01:30 AM and 01:30 PM.
Expect delays due to work zoneUS US 60 W West - NEWTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 06-AUG-2024 to 01-NOV-2024.
Road work begins CRD VIXEN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 01:30 AM and 01:30 PM.
Possible delays due to work zoneState Route MO 133 S South - OSAGE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .02 MILE(S) BEFORE RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AA S South - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 55 N North - PEMISCOT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 12-AUG-2024 to 08-NOV-2024.
Road work begins .781 MILE(S) BEFORE RP IS55N TO RTBB N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 55 S South - PEMISCOT COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-OCT-2024 to 28-OCT-2024.
Road work begins .163 MILE(S) AFTER RP MO164 TO IS55S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 51 N North - PERRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins .004 MILE(S) BEFORE CRD 946 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 51 N North - PERRY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 03-SEP-2024 to 31-OCT-2024.
Road work begins .02 MILE(S) BEFORE RP IS55N TO MO51 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 51 S South - PERRY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2024 to 31-JUL-2026.
Road work begins .607 MILE(S) BEFORE CRD 946 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 51 S South - PERRY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 03-SEP-2024 to 31-OCT-2024.
Road work begins .013 MILE(S) BEFORE US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 65 N North - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 02-DEC-2024.
Road work begins .035 MILE(S) AFTER CRD SMELSER RD E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 65 S South - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2024 to 02-DEC-2024.
Road work begins .021 MILE(S) AFTER CO US65S TO US65N W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - PHELPS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 07-OCT-2024 to 28-OCT-2024.
Road work begins .037 MILE(S) BEFORE MO 8 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 8 E East - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-SEP-2024 to 31-OCT-2024.
Road work begins .033 MILE(S) BEFORE CST E ELDON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 8 W West - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-SEP-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) AFTER CST JAMES LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT DD E East - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-SEP-2024 to 31-OCT-2024.
Road work begins .068 MILE(S) AFTER CST CHARLES ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT DD W West - PHELPS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 09-SEP-2024 to 31-OCT-2024.
Road work begins .004 MILE(S) AFTER CST FOREST LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 79 S South - PIKE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-AUG-2024 to 31-OCT-2024.
Road work begins .036 MILE(S) AFTER RR KC SOUTHERN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W N North - PIKE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-AUG-2024 to 31-OCT-2024.
Road work begins .363 MILE(S) BEFORE RT H E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT W S South - PIKE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-AUG-2024 to 31-OCT-2024.
Road work begins .078 MILE(S) BEFORE RT H E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 29 S South - PLATTE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2024 to 31-OCT-2024.
Road work begins .114 MILE(S) AFTER RP MO273 TO IS29S S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 45 N North - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road work begins .076 MILE(S) AFTER CRD NW 65TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 45 S South - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road work begins .202 MILE(S) BEFORE CRD NW 65TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-SEP-2024 to 29-NOV-2024.
Road work begins .004 MILE(S) BEFORE CRD RUNNING HORSE RD S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT D W West - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-SEP-2024 to 29-NOV-2024.
Road work begins .003 MILE(S) AFTER RP RTD TO IS435N N.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT D N North - POLK COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 20-AUG-2024 to 29-NOV-2024.
Road work begins .026 MILE(S) AFTER CRD 420TH RD E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT D S South - POLK COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 20-AUG-2024 to 29-NOV-2024.
Road work begins .019 MILE(S) BEFORE CRD 410TH RD E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - PULASKI COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 04-AUG-2024 to 01-DEC-2024.
Road work begins .07 MILE(S) BEFORE LP 44 E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneInterstate IS 44 E East - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 01-DEC-2024.
Road work begins .06 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 PM and 12:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 04-AUG-2024 to 01-DEC-2024.
Road work begins .057 MILE(S) BEFORE LP 44 W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 01-DEC-2024.
Road work begins .039 MILE(S) AFTER RP IS44W TO LP44W W.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 PM and 12:00 AM.
Expect delays due to work zoneLoop LP 44 E East - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 01-DEC-2024.
Road work begins .009 MILE(S) AFTER CST PEGGY AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 11:59 PM.
Expect delays due to work zoneLoop LP 44 W West - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-JUL-2024 to 01-DEC-2024.
Road work begins .052 MILE(S) BEFORE CST PLATTNER AVE S.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneUS US 61 N North - RALLS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-OCT-2024 to 08-NOV-2024.
Road work begins .139 MILE(S) BEFORE CST WARREN BARRETT DR E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 3 N North - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 3 S South - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins CRD 1105 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K E East - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-JUL-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER US 63 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 24 W West - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-SEP-2024 to 01-DEC-2024.
Road work begins .184 MILE(S) BEFORE CRD 2130 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-OCT-2024 to 01-DEC-2024.
Road work begins .056 MILE(S) AFTER US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT KK N North - REYNOLDS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-JUN-2024 to 25-OCT-2024.
Road work begins .004 MILE(S) BEFORE CRD 900 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT KK S South - REYNOLDS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-JUN-2024 to 25-OCT-2024.
Road work begins CRD 906 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - SALINE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 17-JUN-2024 to 01-NOV-2024.
Road work begins 1.052 MILE(S) BEFORE RP IS70E TO US65S S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 240 W West - SALINE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 25-OCT-2024 to 25-OCT-2024.
Road work begins .324 MILE(S) BEFORE MO 41 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 70 W West - SALINE COUNTY - Delays Possible
CORE DRILLING
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .794 MILE(S) AFTER CO NOR70 TO SOR70 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 202 E East - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-AUG-2024 to 01-NOV-2024.
Road work begins .084 MILE(S) BEFORE CRD AGROW AVE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 202 W West - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-AUG-2024 to 01-NOV-2024.
Road work begins US 136 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 91 N North - SCOTT COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 01-NOV-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 55 N North - SCOTT COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 18-OCT-2024 to 25-OCT-2024.
Road work begins .127 MILE(S) BEFORE RR CHESTER SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 55 S South - SCOTT COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 18-OCT-2024 to 25-OCT-2024.
Road work begins .735 MILE(S) AFTER RP RTAB TO IS55S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 364 E East - ST. CHARLES COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road work begins .072 MILE(S) AFTER RP RTKS TO MO364E E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 79 N North - ST. CHARLES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-DEC-2024.
Road work begins .009 MILE(S) BEFORE RP IS70W TO MO79N N.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 79 N North - ST. CHARLES COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-OCT-2024 to 01-DEC-2024.
Road work begins RP MO79 TO IS70E E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 79 S South - ST. CHARLES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-AUG-2024 to 01-DEC-2024.
Road work begins .141 MILE(S) BEFORE RR SAINT LOUIS DISTRICT E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 79 S South - ST. CHARLES COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-OCT-2024 to 01-DEC-2024.
Road work begins .001 MILE(S) AFTER RP IS70W TO MO79S S.
Work will be done 7 days a week.
Possible delays due to work zoneCST WINGHAVEN BLVD N North - ST. CHARLES COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-SEP-2024 to 30-OCT-2024.
Road work begins RT DD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneCST WINGHAVEN BLVD S South - ST. CHARLES COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-SEP-2024 to 30-OCT-2024.
Road work begins .001 MILE(S) AFTER RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 25-JUL-2024 to 29-NOV-2024.
Road work begins .111 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 94 E East - ST. CHARLES COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 25-JUL-2024 to 29-NOV-2024.
Road work begins .014 MILE(S) BEFORE CST VETERANS MEMORIAL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 94 W West - ST. CHARLES COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 25-JUL-2024 to 29-NOV-2024.
Road work begins .008 MILE(S) AFTER CST SUNSET DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT B W West - ST. CLAIR COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) AFTER RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 32 E East - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 24-OCT-2024 to 07-NOV-2024.
Road work begins RT OO S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 32 W West - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 24-OCT-2024 to 07-NOV-2024.
Road work begins .007 MILE(S) AFTER PVT TJ LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneCST BIG BEND BLVD E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-AUG-2024 to 31-OCT-2024.
Road work begins .004 MILE(S) BEFORE RP BIG BEND BLVD TO IS64E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 PM and 05:00 AM.
Expect delays due to work zoneCST BIG BEND BLVD W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 19-AUG-2024 to 31-OCT-2024.
Road work begins .006 MILE(S) BEFORE RP IS64W TO BIG BEND BLVD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 PM and 05:00 AM.
Expect delays due to work zoneCST HANLEY RD N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-AUG-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) BEFORE CST EAGER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 PM and 05:00 AM.
Expect delays due to work zoneCST HANLEY RD S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-AUG-2024 to 31-OCT-2024.
Road work begins .024 MILE(S) BEFORE RP IS64W TO HANLEY RD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 PM and 05:00 AM.
Expect delays due to work zoneCST MCKELVEY RD N North - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 07-OCT-2024 to 31-OCT-2024.
Road work begins .079 MILE(S) BEFORE CST CHAPARRAL DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneCST MCKELVEY RD S South - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 07-OCT-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) AFTER RP IS270E TO IS70E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-AUG-2024 to 31-OCT-2024.
Road work begins .215 MILE(S) BEFORE RP IS270E TO IS64E E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 07-AUG-2024 to 31-OCT-2024.
Road work begins .197 MILE(S) BEFORE RP IS270W TO RTAB W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 29-MAY-2025.
Road work begins .024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270E TO RTAB E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins IS 270 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO IS64E E East - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-OCT-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) AFTER IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO IS64W W West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-OCT-2024 to 31-OCT-2024.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO RTAB W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS64E TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-OCT-2024 to 31-OCT-2024.
Road work begins .017 MILE(S) AFTER RP IS64W TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS64W TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 05-OCT-2024 to 31-OCT-2024.
Road work begins .044 MILE(S) AFTER RP IS64W TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP RTAB TO IS270E E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-APR-2024 to 31-OCT-2024.
Road work begins RT AB E.
Work will be done 7 days a week.
Work will be conducted between the hours of 08:05 AM and 12:00 PM.
Expect delays due to work zoneRamp RP RTAB TO IS270W W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work begins RT AB E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT EE N North - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 26-SEP-2024 to 07-NOV-2024.
Road work begins MO 180 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneState Route RT EE S South - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 26-SEP-2024 to 07-NOV-2024.
Road work begins .005 MILE(S) BEFORE CST CORREGIDOR DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins .016 MILE(S) AFTER RP US67N TO MO180E E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins .028 MILE(S) AFTER CST PROSPECT AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins .047 MILE(S) AFTER RP US67S TO MO180E E.
Work will be done 7 days a week.
No delays expected due to work zoneInterstate IS 55 S South - ST. LOUIS COUNTY - No Expected Delays
ROADSIDE WORK
Scheduled from 21-OCT-2024 to 29-NOV-2024.
Road work begins .009 MILE(S) BEFORE RP BUTLER HILL RD TO IS55S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:30 PM.
Possible delays due to work zoneCST CLARKSON RD N North - ST. LOUIS COUNTY - Delays Possible
Project Name - Safety improvements project db 2
MEDIAN OR SHOULDER
Scheduled from 16-OCT-2024 to 08-NOV-2024.
Road work begins .009 MILE(S) BEFORE CST CLAYTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM. Project Web Page - https://www.modot.org/SLSafetyProject
Possible delays due to work zoneCST CLARKSON RD S South - ST. LOUIS COUNTY - Delays Possible
Project Name - Safety improvements project db 2
MEDIAN OR SHOULDER
Scheduled from 16-OCT-2024 to 08-NOV-2024.
Road work begins OR 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM. Project Web Page - https://www.modot.org/SLSafetyProject
Possible delays due to work zoneCST LINDBERGH BLVD N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-AUG-2024 to 27-NOV-2024.
Road work begins .003 MILE(S) BEFORE OR 61 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneCST LINDBERGH BLVD S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-AUG-2024 to 01-NOV-2024.
Road work begins .003 MILE(S) BEFORE PVT ST LOUIS CO LIBRARY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneCST NATURAL BRIDGE RD E East - ST. LOUIS COUNTY - Delays Possible
MEDIAN OR SHOULDER
Scheduled from 13-SEP-2024 to 31-OCT-2024.
Road work begins .027 MILE(S) AFTER IS 170 W.
Work will be done 7 days a week.
Possible delays due to work zoneCST NATURAL BRIDGE RD W West - ST. LOUIS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 02-SEP-2024 to 31-OCT-2024.
Road work begins .035 MILE(S) AFTER CST NORTH HANLEY RD S.
Work will be done 7 days a week.
Possible delays due to work zoneCST S EATHERTON RD N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST S EATHERTON RD S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Delays Possible
Project Name - Variable scope pavement repairs @ various loc.
PAVEMENT REPAIR
Scheduled from 03-SEP-2024 to 31-OCT-2024.
Road work begins .102 MILE(S) BEFORE RP US67S TO IS270W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 109 N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2024 to 01-NOV-2024.
Road work begins .043 MILE(S) BEFORE CST ROCKWOOD FOREST VALLEY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 21 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .007 MILE(S) AFTER CRD TOWNE SOUTH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 231 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-AUG-2024 to 08-NOV-2024.
Road work begins .036 MILE(S) AFTER CRD SYLVIA DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 267 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-SEP-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) BEFORE CRD LEMAY GARDENS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 267 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-SEP-2024 to 31-OCT-2024.
Road work begins .01 MILE(S) AFTER CRD HOFFMEISTER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 26-AUG-2024 to 31-OCT-2024.
Road work begins .009 MILE(S) AFTER CST COUNTRY RIDGE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road work begins CST PENNSYLVANIA AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 364 E East - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .126 MILE(S) BEFORE RP MO364E TO MO141S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 364 W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .151 MILE(S) AFTER CRD SEVEN PINES DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Possible delays due to work zoneState Route MO 370 E East - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 21-OCT-2024 to 25-OCT-2024.
Road work begins .04 MILE(S) BEFORE CST FERGUSON LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneOuter Road N OR 64 W West - ST. LOUIS COUNTY - Delays Possible
Project Name - Variable scope pavement repairs @ various loc.
PAVEMENT REPAIR
Scheduled from 03-SEP-2024 to 31-OCT-2024.
Road work begins CST S WOODS MILL RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneOuter Road S OR 64 E East - ST. LOUIS COUNTY - Delays Possible
Project Name - Variable scope pavement repairs @ various loc.
PAVEMENT REPAIR
Scheduled from 03-SEP-2024 to 31-OCT-2024.
Road work begins CST SOUTH FORTY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT AB E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-OCT-2024 to 04-NOV-2024.
Road work begins .001 MILE(S) AFTER OR 270 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT CC E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 24-OCT-2024 to 25-OCT-2024.
Road work begins .018 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins .013 MILE(S) AFTER RP RTDE TO IS170W W.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-MAR-2024 to 01-DEC-2025.
Road work begins .001 MILE(S) AFTER CST PAGE BLVD E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT N N North - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 06-DEC-2024.
Road work begins .005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 18-OCT-2024 to 29-NOV-2024.
Road work begins .022 MILE(S) BEFORE CST BERNHARDT AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 06-DEC-2024.
Road work begins .002 MILE(S) BEFORE CST JEAN DR E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 61 S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 14-OCT-2024 to 29-NOV-2024.
Road work begins .002 MILE(S) AFTER CST CLAYTON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins RP IS64E TO US67N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-OCT-2024 to 03-NOV-2024.
Road work begins .006 MILE(S) BEFORE CST CONWAY RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2024 to 31-OCT-2024.
Road work begins CST ELMGROVE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-SEP-2024 to 31-OCT-2024.
Road work begins .006 MILE(S) AFTER RT AC S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-OCT-2024 to 01-NOV-2024.
Road work begins .015 MILE(S) BEFORE CST CONWAY RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-OCT-2024 to 03-NOV-2024.
Road work begins .079 MILE(S) AFTER CST SCHAEFER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneCST KINGSHIGHWAY BLVD N North - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 31-OCT-2024.
Road work begins .01 MILE(S) BEFORE IS 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 PM and 05:30 AM.
Expect delays due to work zoneCST KINGSHIGHWAY BLVD S South - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 31-OCT-2024.
Road work begins .031 MILE(S) AFTER CST CLAYTON AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 PM and 05:30 AM.
Expect delays due to work zoneInterstate IS 55 S South - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 29-MAY-2025.
Road work begins .009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 100 E East - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-SEP-2024 to 31-OCT-2024.
Road work begins .019 MILE(S) BEFORE RR UNKNOWN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 PM and 05:30 AM.
Expect delays due to work zoneState Route MO 100 W West - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-SEP-2024 to 31-OCT-2024.
Road work begins .009 MILE(S) BEFORE CST 39TH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 PM and 05:30 AM.
Possible delays due to work zoneCST CHOUTEAU AVE E East - ST. LOUIS CITY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2024 to 22-NOV-2024.
Road work begins .004 MILE(S) AFTER CST SPRING AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneCST CHOUTEAU AVE W West - ST. LOUIS CITY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 14-OCT-2024 to 22-NOV-2024.
Road work begins .003 MILE(S) AFTER CST GRAND BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneCST COMPTON AVE N North - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-SEP-2024 to 31-OCT-2024.
Road work begins .003 MILE(S) AFTER OR 64 E.
Work will be done on weekdays only.
Possible delays due to work zoneCST COMPTON AVE S South - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-SEP-2024 to 31-OCT-2024.
Road work begins .013 MILE(S) BEFORE RP IS64W TO FOREST PARK AVE W.
Work will be done on weekdays only.
Possible delays due to work zoneCST HAMPTON AVE N North - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) BEFORE CST OAKLAND AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneCST HAMPTON AVE S South - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 04-SEP-2024 to 31-OCT-2024.
Road work begins CST CONCOURSE DR S.
Work will be done on weekdays only.
Possible delays due to work zoneInterstate IS 64 E East - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) AFTER CST 22ND ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 W West - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 16-OCT-2024 to 31-OCT-2024.
Road work begins .033 MILE(S) AFTER CST 1ST ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 70 E East - ST. LOUIS CITY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-OCT-2024 to 25-OCT-2024.
Road work begins .007 MILE(S) AFTER RR TYLER LEAD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 01:00 PM.
Possible delays due to work zoneState Route RT H N North - ST. LOUIS CITY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins .007 MILE(S) AFTER CST CARRIE AVE E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT H S South - ST. LOUIS CITY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-SEP-2024 to 31-DEC-2025.
Road work begins .005 MILE(S) AFTER CST HALL ST N.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT M N North - STE. GENEVIEVE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JUL-2024 to 25-NOV-2024.
Road work begins .004 MILE(S) BEFORE CST VALLE SPRING TRL E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M S South - STE. GENEVIEVE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JUL-2024 to 25-NOV-2024.
Road work begins US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 55 N North - STE. GENEVIEVE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-OCT-2024 to 01-MAY-2025.
Road work begins .011 MILE(S) BEFORE RA IS55N BLOOMSDALE N.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 25 S South - STODDARD COUNTY - Expect Delays
CONCRETE OVERLAY
Scheduled from 09-SEP-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD 672 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 91 S South - STODDARD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-JUL-2024 to 01-NOV-2024.
Road work begins RT P S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C E East - STODDARD COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 24-OCT-2024 to 30-OCT-2024.
Road work begins .035 MILE(S) AFTER RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C W West - STODDARD COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 24-OCT-2024 to 30-OCT-2024.
Road work begins .003 MILE(S) BEFORE CRD 211 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 29-NOV-2024.
Road work begins CST BLUE EYE BLVD S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 29-NOV-2024.
Road work begins .128 MILE(S) BEFORE PVT PARADISE LANDING RD E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 376 E East - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 16-SEP-2024 to 29-NOV-2024.
Road work begins CST SHEPHERD OF THE HILLS EXP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 376 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 16-SEP-2024 to 29-NOV-2024.
Road work begins MO 265 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .164 MILE(S) AFTER CRD LEISURE LN E.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 29-NOV-2024.
Road work begins US 65 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .175 MILE(S) AFTER CRD LEISURE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 17 N North - TEXAS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 31-OCT-2024.
Road work begins .139 MILE(S) AFTER MO 38 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 17 S South - TEXAS COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 29-JUL-2024 to 31-OCT-2024.
Road work begins .085 MILE(S) BEFORE RT AW S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 N North - TEXAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-SEP-2024 to 22-NOV-2024.
Road work begins .013 MILE(S) AFTER MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 S South - TEXAS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-SEP-2024 to 22-NOV-2024.
Road work begins .005 MILE(S) AFTER RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - VERNON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-OCT-2024 to 31-OCT-2024.
Road work begins .798 MILE(S) AFTER RP RTE TO IS49N N.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 S South - VERNON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-AUG-2024 to 01-NOV-2024.
Road work begins .009 MILE(S) AFTER RR CLINTON SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 06:30 PM.
Expect delays due to work zoneInterstate IS 49 S South - VERNON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-OCT-2024 to 31-OCT-2024.
Road work begins .712 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 E East - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 02-DEC-2024.
Road work begins .018 MILE(S) AFTER CRD 1200 S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - VERNON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2024 to 02-DEC-2024.
Road work begins .031 MILE(S) AFTER CRD 1375 S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT C N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT C S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT D E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins 1.207 MILE(S) BEFORE CRD 200 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT D W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT EE E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT EE W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins .02 MILE(S) AFTER RT AA S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT H E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .934 MILE(S) BEFORE CRD 200 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT H W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT M N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins OR 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 01:00 AM.
Possible delays due to work zoneState Route RT O E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT O W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT D E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT OO E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT OO W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Y E East - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Y W West - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins .009 MILE(S) AFTER RT AA S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Z N North - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins CRD LADY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Z S South - VERNON COUNTY - Delays Possible
MOWING
Scheduled from 23-OCT-2024 to 31-OCT-2024.
Road work begins RT D E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 47 N North - WASHINGTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-AUG-2024 to 01-NOV-2024.
Road work begins .105 MILE(S) AFTER CRD OLD 47 LOOP S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 47 S South - WASHINGTON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-AUG-2024 to 01-NOV-2024.
Road work begins .345 MILE(S) BEFORE CRD OLD 47 LOOP S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 21 N North - WASHINGTON COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2024 to 31-OCT-2024.
Road work begins .045 MILE(S) AFTER MO 47 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.

Back to Top

FUTURE WORK ZONES: 173 to report. Hide

Expect delays due to work zoneState Route RT HH E East - ADAIR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins CRD GIFFORD TRL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH W West - ADAIR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .001 MILE(S) AFTER CRD SUMAC TRL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 169 N North - ANDREW COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .204 MILE(S) BEFORE RT D S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 169 S South - ANDREW COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .307 MILE(S) AFTER CRD 3082 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 29 N North - ANDREW COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 04-NOV-2024.
Road work begins .871 MILE(S) AFTER US 59 N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 29 S South - ATCHISON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 01-NOV-2024.
Road work begins .957 MILE(S) BEFORE CRD RED STAR RD E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 136 E East - ATCHISON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .971 MILE(S) BEFORE CRD C AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT A N North - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) AFTER CRD 832 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A S South - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins RT U E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT NN N North - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins MO 22 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT NN S South - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins CRD 316 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT M E East - BUTLER COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins CRD 456 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT M W West - BUTLER COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) AFTER CRD 470 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT M N North - CALLAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .011 MILE(S) BEFORE PVT KIMBERLEY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Possible delays due to work zoneState Route RT M S South - CALLAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .296 MILE(S) BEFORE CRD 254 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Expect delays due to work zoneState Route RT B E East - CARROLL COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .004 MILE(S) BEFORE CRD 303 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT B W West - CARROLL COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .006 MILE(S) BEFORE CRD 318 E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 65 N North - CARROLL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .074 MILE(S) BEFORE RR BROOKFIELD SUB E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 39 N North - CEDAR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .029 MILE(S) BEFORE CRD 951 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 39 S South - CEDAR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH N North - CEDAR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .024 MILE(S) BEFORE CRD QUAIL E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH N North - CEDAR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .108 MILE(S) BEFORE PVT E OVERLAND RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH S South - CEDAR COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .01 MILE(S) BEFORE CRD 550 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .01 MILE(S) AFTER CST VALLEY VIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 5 S South - CHARITON COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .004 MILE(S) AFTER RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K N North - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 01-NOV-2024 to 01-NOV-2024.
Road work begins CRD 49 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT K S South - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 01-NOV-2024 to 01-NOV-2024.
Road work begins CRD 47 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT Y E East - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .004 MILE(S) BEFORE CRD 143 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT Y W West - CLARK COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .002 MILE(S) BEFORE CRD 146 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 210 E East - CLAY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .008 MILE(S) BEFORE OR 210 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Expect delays due to work zoneState Route MO 210 W West - CLAY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .208 MILE(S) BEFORE OR 210 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Possible delays due to work zoneState Route MO 179 N North - COOPER COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .078 MILE(S) AFTER CRD BIG LICK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 179 S South - COOPER COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 98 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 87 S South - COOPER COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .01 MILE(S) AFTER RT D S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
Expect delays due to work zoneState Route MO 8 E East - CRAWFORD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-OCT-2024 to 29-NOV-2024.
Road work begins .034 MILE(S) BEFORE RR LEAD LINE BRANCH S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 8 W West - CRAWFORD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-OCT-2024 to 29-NOV-2024.
Road work begins .058 MILE(S) BEFORE CST HICKORY ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT Y S South - CRAWFORD COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT V E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneOuter Road N OR 44 E East - CRAWFORD COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneOuter Road N OR 44 W West - CRAWFORD COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins CRD ESSMAN DUNN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneOuter Road S OR 44 E East - CRAWFORD COUNTY - Delays Possible
DIAMOND GRINDING
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT UU S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneOuter Road S OR 44 W West - CRAWFORD COUNTY - Delays Possible
DIAMOND GRINDING
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT DD N North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT DD S South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .003 MILE(S) AFTER CRD JAKES PRAIRIE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 245 N North - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .014 MILE(S) AFTER RT U E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 245 S South - DADE COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .204 MILE(S) AFTER CRD 82 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT CC W West - DENT COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT A N North - DUNKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 21-APR-2025.
Road work begins .005 MILE(S) AFTER CRD 526 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT A S South - DUNKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 21-APR-2025.
Road work begins .003 MILE(S) BEFORE CRD 525 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT PP N North - DUNKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins MO 164 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT PP S South - DUNKLIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins CRD 714 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
No delays expected due to work zoneInterstate IS 44 E East - FRANKLIN COUNTY - No Delays Expected
BRIDGE MAINTENANCE
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins 1.557 MILE(S) AFTER RP RTAF TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A N North - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .004 MILE(S) BEFORE CRD 450 ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT A S South - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .01 MILE(S) BEFORE RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT C N North - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .001 MILE(S) AFTER SP C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT C S South - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .007 MILE(S) AFTER RT FF E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP MO744 TO US65N N North - GREENE COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 28-OCT-2024.
Road work begins MO 744 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP MO744 TO US65S S South - GREENE COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 28-OCT-2024.
Road work begins MO 744 E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP US65N TO MO744 E East - GREENE COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 28-OCT-2024.
Road work begins US 65 N.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneRamp RP US65S TO MO744 W West - GREENE COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 27-OCT-2024 to 28-OCT-2024.
Road work begins US 65 S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 10:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT F S South - GREENE COUNTY - CLOSED
CORE DRILLING
Scheduled from 28-OCT-2024 to 07-NOV-2024.
Road work begins .135 MILE(S) AFTER PVT W WILD ROSE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 744 W West - GREENE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .002 MILE(S) BEFORE CST HOMEWOOD AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Expect delays due to work zoneState Route MO 5 N North - HOWARD COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .011 MILE(S) AFTER CST LAFAYETTE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 PM and 02:30 AM.
Expect delays due to work zoneState Route MO 5 S South - HOWARD COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .008 MILE(S) AFTER CST KUEMMEL PARK DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 PM and 02:30 AM.
Expect delays due to work zoneState Route RT A N North - HOWARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-OCT-2024 to 15-NOV-2024.
Road work begins RT EE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT A N North - HOWARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-OCT-2024 to 15-NOV-2024.
Road work begins .039 MILE(S) AFTER MO 124 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT A S South - HOWARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-OCT-2024 to 15-NOV-2024.
Road work begins .035 MILE(S) AFTER CO MO124 TO RTA S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y N North - IRON COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 49 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneOuter Road N OR 50 E East - JACKSON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 29-OCT-2024 to 31-OCT-2024.
Road work begins CST SE SHENANDOAH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneOuter Road N OR 50 W West - JACKSON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 29-OCT-2024 to 31-OCT-2024.
Road work begins .446 MILE(S) BEFORE CST SE SHENANDOAH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 470 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .305 MILE(S) BEFORE CST JAMES A REED RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 50 W West - JACKSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .418 MILE(S) BEFORE CST SE SHENANDOAH DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 02:30 PM.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .034 MILE(S) AFTER RP IS55N TO SP61N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 12:00 AM and 05:00 AM.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .085 MILE(S) AFTER RP IS55S TO RTZ W.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 12:00 AM and 05:00 AM.
Possible delays due to work zoneState Route RT W N North - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .046 MILE(S) AFTER CST HALLMARK DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT W S South - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .029 MILE(S) BEFORE CRD BYRNESVILLE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT V E East - LACLEDE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins PVT ROW CROP LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT V W West - LACLEDE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins CRD SKYLINE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT TT E East - LAFAYETTE COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .013 MILE(S) AFTER CRD OLD CONCORD RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneState Route RT TT W West - LAFAYETTE COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .008 MILE(S) AFTER CRD CONCORD CHURCH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneState Route RT Z N North - LAFAYETTE COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .027 MILE(S) AFTER CRD CONCORD CHURCH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneState Route RT Z S South - LAFAYETTE COUNTY - CLOSED
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .005 MILE(S) BEFORE CRD VINYARD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - LAWRENCE COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 30-OCT-2024 to 13-NOV-2024.
Road work begins 1.107 MILE(S) BEFORE CRD 1222 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT N N North - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins MO 174 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT N S South - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins MO 96 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT OO E East - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins CRD 2082 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT OO W West - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins MO 39 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT T N North - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT T S South - LAWRENCE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins MO 174 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT CC E East - LEWIS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins RT C E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT CC W West - LEWIS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins CRD 542 (250TH ST) E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E E East - LEWIS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .001 MILE(S) BEFORE CRD 394 (130TH AVE) S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E W West - LEWIS COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .001 MILE(S) BEFORE CRD 387 (135TH AVE) S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT J N North - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .001 MILE(S) BEFORE CST SCARLET OAK CT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT J N North - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins CRD ROCK SPRINGS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 03:00 PM.
Expect delays due to work zoneState Route RT J S South - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins CST BOONE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT J S South - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .001 MILE(S) AFTER RT U E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 03:00 PM.
Expect delays due to work zoneState Route RT V E East - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins PVT ETHAN DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT V W West - LINCOLN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins RT JJ E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT E E East - LINCOLN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .061 MILE(S) BEFORE CRD SITTON BRANCH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT E W West - LINCOLN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .008 MILE(S) AFTER CST SECOND ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT J N North - LINCOLN COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 31-OCT-2024 to 01-NOV-2024.
Road work begins CST KENSINGTON PALACE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT J S South - LINCOLN COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 31-OCT-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER CST OAK FOREST DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM E East - LINN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins MO 139 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Expect delays due to work zoneState Route RT MM E East - LINN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .021 MILE(S) BEFORE RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM E East - LINN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 01-NOV-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE CRD CEDAR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM E East - LINN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .388 MILE(S) AFTER CRD CLARK DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM W West - LINN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .001 MILE(S) AFTER CRD BALE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 12:00 PM.
Possible delays due to work zoneState Route RT C E East - MARIES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 28 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT C W West - MARIES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .006 MILE(S) AFTER CRD PETERSON RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT DD N North - MARION COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins CRD 226 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT DD S South - MARION COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins CRD 189 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT P E East - MILLER COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT P W West - MILLER COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 57 N North - MISSISSIPPI COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 08-NOV-2024.
Road work begins 1.359 MILE(S) AFTER RP RTB TO IS57N N.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 57 S South - MISSISSIPPI COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 08-NOV-2024.
Road work begins .015 MILE(S) BEFORE US 62 E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 87 N North - MONITEAU COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .068 MILE(S) AFTER RT U E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
Expect delays due to work zoneState Route RT C N North - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .001 MILE(S) BEFORE SP C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT C S South - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins CRD 870 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT D E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .002 MILE(S) BEFORE CRD 623 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT D W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins CRD 624 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 52 E East - MORGAN COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .011 MILE(S) AFTER MO 135 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 52 W West - MORGAN COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .032 MILE(S) BEFORE CST SPRUCE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Expect delays due to work zoneInterstate IS 55 N North - NEW MADRID COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 31-OCT-2024 to 01-NOV-2024.
Road work begins 1.583 MILE(S) AFTER RP RTP TO IS55N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT M N North - PERRY COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .004 MILE(S) AFTER CRD 934 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT M S South - PERRY COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins RT H E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - PHELPS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-OCT-2024 to 15-NOV-2024.
Road work begins 1.819 MILE(S) BEFORE RP IS44W TO RTV W.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT B N North - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 68 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT B S South - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) AFTER RT EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT HH N North - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .004 MILE(S) AFTER RT E S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT HH S South - PHELPS COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .088 MILE(S) AFTER CRD 8360 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT P E East - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT P W West - PHELPS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 45 S South - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .154 MILE(S) AFTER CRD N BLUFF RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 28 E East - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .008 MILE(S) AFTER PVT CHASITY DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 28 W West - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) AFTER CST A ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT D E East - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) AFTER CRD CORPUS LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT D W West - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins .029 MILE(S) BEFORE CRD COUNCIL LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT O N North - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins CRD CAVE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT O S South - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins MO 28 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT Y N North - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins LP 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT Y S South - PULASKI COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins CRD HOLTZMAN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A S South - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 30-OCT-2024 to 15-NOV-2024.
Road work begins .058 MILE(S) BEFORE RT B E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT J N North - SALINE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 28-OCT-2024 to 30-OCT-2024.
Road work begins .028 MILE(S) AFTER RP RTJ TO IS70W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .373 MILE(S) AFTER RP RTDDS TO IS64E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 12:50 AM.
Expect delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .26 MILE(S) AFTER RP CAVE SPRINGS RD N TO IS70W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneRamp RP IS70E TO RTK S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 14-NOV-2024.
Road work begins IS 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP IS270E TO RTAB E East - ST. LOUIS COUNTY - CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-OCT-2024 to 02-DEC-2024.
Road work begins IS 270 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP US67N TO RTDE E East - ST. LOUIS COUNTY - CLOSED
MILLING/RESURFACING WORK
Scheduled from 26-OCT-2024 to 26-OCT-2024.
Road work begins US 67 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 02:00 AM and 06:00 AM.
Expect delays due to work zoneInterstate IS 64 E East - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 30-OCT-2024 to 31-OCT-2024.
Road work begins .01 MILE(S) AFTER CST LACLEDE STATION RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
No delays expected due to work zoneInterstate IS 44 E East - ST. LOUIS COUNTY - No Delays Expected
BRIDGE MAINTENANCE
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .036 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 367 N North - ST. LOUIS COUNTY - No Delays Expected
BRIDGE MAINTENANCE
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .035 MILE(S) BEFORE CST CHAMBERS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 367 S South - ST. LOUIS COUNTY - No Delays Expected
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 28-OCT-2024.
Road work begins .035 MILE(S) BEFORE CST CHAMBERS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneCRD ANTIRE RD N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .245 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneCRD ANTIRE RD S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins RP IS44W TO ANTIRE RD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .003 MILE(S) AFTER RP IS64W TO IS270E E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 02:00 AM and 06:00 AM.
Possible delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-OCT-2024 to 27-OCT-2024.
Road work begins .226 MILE(S) BEFORE RP IS270W TO RTAB W.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 02:00 AM and 06:00 AM.
Possible delays due to work zoneState Route MO 180 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 28-OCT-2024 to 22-NOV-2024.
Road work begins .004 MILE(S) AFTER CST BANKS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 367 N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .013 MILE(S) AFTER RP MO367N TO CHAMBERS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 367 S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 28-OCT-2024 to 29-OCT-2024.
Road work begins .217 MILE(S) BEFORE CST HAVILAND DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 04:00 PM.
Possible delays due to work zoneRamp RP IS170E TO IS70W W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins IS 170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneRamp RP NOR270 TO IS270W W West - ST. LOUIS COUNTY - Delays Possible
CONCRETE BARRIER WALL
Scheduled from 28-OCT-2024 to 11-NOV-2024.
Road work begins OR 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - ST. LOUIS CITY - Expect Delays
PAVEMENT MARKING
Scheduled from 28-OCT-2024 to 01-NOV-2024.
Road work begins .013 MILE(S) BEFORE CST WEBER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneRamp RP IS64W TO KINGSHIGHWAY BLVD N North - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-OCT-2024 to 31-OCT-2024.
Road work begins IS 64 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - STE. GENEVIEVE COUNTY - Expect Delays
PAVEMENT MARKING
Scheduled from 28-OCT-2024 to 01-NOV-2024.
Road work begins .736 MILE(S) BEFORE CRD CARRON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneState Route RT MM W West - SULLIVAN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 01-NOV-2024 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER RT Z S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM W West - SULLIVAN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .008 MILE(S) BEFORE RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT MM W West - SULLIVAN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 31-OCT-2024 to 31-OCT-2024.
Road work begins .001 MILE(S) BEFORE CRD CEDAR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneUS US 65 N North - TANEY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 29-OCT-2024 to 30-OCT-2024.
Road work begins .374 MILE(S) BEFORE CST WILSHIRE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC E East - TEXAS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 28-OCT-2024 to 31-OCT-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT HH S South - VERNON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .027 MILE(S) AFTER CRD 400 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT HH S South - VERNON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .027 MILE(S) AFTER CRD 400 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT FF N North - WEBSTER COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 30-OCT-2024 to 30-OCT-2024.
Road work begins .889 MILE(S) AFTER CRD BELL FORD RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT P E East - WEBSTER COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 29-OCT-2024 to 29-OCT-2024.
Road work begins .095 MILE(S) BEFORE CRD P RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.

Back to Top

INCIDENTS: 20 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 996 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.