State Route MO 37 N North
-
BARRY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 01-FEB-2022 to 01-JUL-2022.
Road work begins
.05 MILE(S) BEFORE CST BIRCH ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 37 S South
-
BARRY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 01-FEB-2022 to 01-JUL-2022.
Road work begins
.028 MILE(S) AFTER CRD 2228 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
BARTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 21-DEC-2022.
Road work begins
.383 MILE(S) AFTER RP RTEE TO IS49N N.
Work will be done around the clock,
7 days a week.
State Route MO 126 E East
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
CRD SW STATE LINE RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 126 W West
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.017 MILE(S) BEFORE OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT FF N North
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT V E.
Work will be done around the clock,
on weekdays only.
State Route RT FF S South
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.001 MILE(S) AFTER CRD NW 90TH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT K E East
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.224 MILE(S) AFTER CRD NW STATE LINE RD S.
Work will be done around the clock,
on weekdays only.
State Route RT K W West
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.011 MILE(S) AFTER MO 43 S.
Work will be done around the clock,
on weekdays only.
State Route RT O N North
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 126 E.
Work will be done around the clock,
on weekdays only.
State Route RT O S South
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
State Route RT T N North
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.476 MILE(S) BEFORE CRD SE 60TH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT T S South
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.018 MILE(S) BEFORE CO US160 TO RTTS S.
Work will be done around the clock,
on weekdays only.
State Route RT U E East
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
CRD SE 40TH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT U W West
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
State Route RT V W West
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT C E.
Work will be done around the clock,
on weekdays only.
State Route RT Y S South
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 126 E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.022 MILE(S) BEFORE CST 12TH E.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
BARTON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.001 MILE(S) BEFORE CST CHURCH S.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
BARTON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2022 to 24-MAY-2022.
Road work begins
.331 MILE(S) AFTER MO 126 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
BATES COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-APR-2022 to 31-AUG-2022.
Road work begins
.021 MILE(S) AFTER RT A E.
Work will be done around the clock,
on weekdays and Saturdays.
Interstate IS 49 N North
-
BATES COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 24-MAY-2022 to 27-MAY-2022.
Road work begins
1.28 MILE(S) BEFORE CRD OLD TOWN ACCESS RD E.
Work will be done around the clock,
on weekdays only.
State Route RT A E East
-
BATES COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.529 MILE(S) BEFORE CRD SW 14267 E.
Work will be done around the clock,
on weekdays only.
State Route RT M S South
-
BATES COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT B E.
Work will be done around the clock,
on weekdays only.
State Route RT N N North
-
BATES COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
.35 MILE(S) AFTER RT B E.
Work will be done around the clock,
on weekdays only.
State Route RT N S South
-
BATES COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
MO 52 E.
Work will be done around the clock,
on weekdays only.
State Route RT V S South
-
BATES COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.212 MILE(S) AFTER CRD SW 10508 E.
Work will be done around the clock,
on weekdays only.
State Route MO 7 N North
-
BENTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-MAY-2022 to 03-JUN-2022.
Road work begins
.505 MILE(S) AFTER PVT PRIVATE DR S.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 7 S South
-
BENTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-MAY-2022 to 03-JUN-2022.
Road work begins
.396 MILE(S) AFTER COE OMAHA RD E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route RT E N North
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
CRD SWISHER AVE S.
Work will be done around the clock,
on weekdays only.
State Route RT E S South
-
BENTON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
CRD SCHWEITZER AVE S.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
BENTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-MAY-2022 to 03-JUN-2022.
Road work begins
RT B S.
Work will be done around the clock,
on weekdays only.
State Route RT U N North
-
BENTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2022 to 27-MAY-2022.
Road work begins
.068 MILE(S) BEFORE CRD WHITEMAN RD E.
Work will be done around the clock,
7 days a week.
US US 65 N North
-
BENTON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 28-MAR-2022 to 01-JUL-2022.
Road work begins
.869 MILE(S) BEFORE MO 52 W.
Work will be done around the clock,
7 days a week.
State Route RT E W West
-
CEDAR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 97 S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.012 MILE(S) AFTER BU 65 S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
CST 25TH ST S.
Work will be done around the clock,
on weekdays only.
State Route RT CC W West
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.001 MILE(S) AFTER RT J W.
Work will be done around the clock,
on weekdays only.
State Route RT F E East
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.012 MILE(S) AFTER BU 65 S.
Work will be done around the clock,
on weekdays only.
State Route RT J W West
-
CHRISTIAN COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.003 MILE(S) AFTER RT NN S.
Work will be done around the clock,
on weekdays only.
US US 65 S South
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-NOV-2023.
Road work begins
.007 MILE(S) BEFORE RT EE E.
Work will be done around the clock,
on weekdays only.
State Route MO 39 N North
-
DADE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
.003 MILE(S) BEFORE CO CRD 483 TO MO39 E.
Work will be done around the clock,
on weekdays only.
State Route MO 97 S South
-
DADE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
.18 MILE(S) AFTER CRD 66 E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
DADE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
RT CC S.
Work will be done around the clock,
on weekdays only.
State Route RT O E East
-
DADE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
State Route RT O W West
-
DADE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.244 MILE(S) AFTER CRD 155 S.
Work will be done around the clock,
on weekdays only.
State Route RT O W West
-
DADE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
State Route RT U W West
-
DADE COUNTY
- Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.348 MILE(S) AFTER CRD 237 S.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
DADE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2022 to 24-MAY-2022.
Road work begins
.083 MILE(S) BEFORE CST FOURTH ST E.
Work will be done around the clock,
on weekdays only.
State Route RT C W West
-
DALLAS COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-APR-2022 to 26-MAY-2022.
Road work begins
US 65 S.
Work will be done around the clock,
on weekdays only.
State Route RT TT W West
-
DALLAS COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-APR-2022 to 26-MAY-2022.
Road work begins
US 65 N.
Work will be done around the clock,
on weekdays only.
Business BU 60 E East
-
GREENE COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-APR-2022 to 31-JUL-2022.
Road work begins
.005 MILE(S) AFTER RT B S.
Work will be done around the clock,
on weekdays only.
Business BU 65 N North
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 22-MAY-2022 to 26-MAY-2022.
Road work begins
.032 MILE(S) BEFORE CST E GRAND ST E.
Work will be done around the clock,
on weekdays and Sundays.
Business BU 65 N North
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 01-JUL-2022.
Road work begins
.021 MILE(S) BEFORE CST GLENSTONE AVE N.
Work will be done around the clock,
on weekdays and Saturdays.
Business BU 65 S South
-
GREENE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 22-MAY-2022 to 26-MAY-2022.
Road work begins
.028 MILE(S) BEFORE CST E GRAND ST E.
Work will be done around the clock,
on weekdays and Sundays.
Business BU 65 S South
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-OCT-2021 to 01-JUL-2022.
Road work begins
.042 MILE(S) AFTER RP CST GLENSTONE AVE TO US60E E.
Work will be done around the clock,
7 days a week.
Business BU 65 S South
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 01-JUL-2022.
Road work begins
.006 MILE(S) AFTER CST INDEPENDENCE ST E.
Work will be done around the clock,
on weekdays and Saturdays.
CST REPUBLIC ST E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 01-JUL-2022.
Road work begins
CST BOULDER AVE S.
Work will be done around the clock,
on weekdays and Saturdays.
CST REPUBLIC ST W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2021 to 01-JUL-2022.
Road work begins
.005 MILE(S) AFTER OR 60 E.
Work will be done around the clock,
on weekdays and Saturdays.
Loop LP 44 E East
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 09-MAY-2022 to 09-JUN-2022.
Road work begins
MO 266 E.
Work will be done around the clock,
7 days a week.
Loop LP 44 W West
-
GREENE COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 09-MAY-2022 to 09-JUN-2022.
Road work begins
.055 MILE(S) AFTER RR CHEROKEE SUB E.
Work will be done around the clock,
7 days a week.
State Route MO 125 N North
-
GREENE COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 23-MAY-2022 to 27-MAY-2022.
Road work begins
.089 MILE(S) BEFORE RT DD E.
Work will be done around the clock,
on weekdays only.
State Route MO 125 S South
-
GREENE COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 23-MAY-2022 to 27-MAY-2022.
Road work begins
.002 MILE(S) AFTER CST E KENNEDY ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 744 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.005 MILE(S) BEFORE US 160 E.
Work will be done around the clock,
on weekdays and Sundays.
State Route MO 744 W West
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.005 MILE(S) BEFORE US 160 W.
Work will be done around the clock,
on weekdays and Sundays.
Ramp RP US60E TO KANSAS EXPY S S South
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.006 MILE(S) AFTER US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT FF N North
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.011 MILE(S) AFTER RT M E.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-SEP-2022.
Road work begins
.001 MILE(S) AFTER IS 44 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
BRIDGE DECK SEALING
Scheduled from 24-MAY-2022 to 02-JUN-2022.
Road work begins
.013 MILE(S) AFTER CRD 1 S.
Work will be done around the clock,
on weekdays only.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.01 MILE(S) BEFORE MO 744 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 E East
-
GREENE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 11-APR-2022 to 26-AUG-2022.
Road work begins
.001 MILE(S) AFTER RT FF S.
Work will be done around the clock,
on weekdays only.
US US 160 W West
-
GREENE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-SEP-2022.
Road work begins
US 60 W.
Work will be done around the clock,
on weekdays and Sundays.
US US 160 W West
-
GREENE COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 04-APR-2022 to 01-DEC-2022.
Road work begins
.01 MILE(S) BEFORE MO 744 E.
Work will be done around the clock,
on weekdays and Sundays.
US US 60 E East
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAR-2021 to 01-JUL-2022.
Road work begins
.008 MILE(S) AFTER CST NATIONAL AVE S.
Work will be done around the clock,
on weekdays and Saturdays.
US US 60 W West
-
GREENE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAR-2021 to 01-JUL-2022.
Road work begins
.001 MILE(S) AFTER RP US60E TO US65N N.
Work will be done around the clock,
on weekdays and Saturdays.
State Route RT AF S South
-
GREENE COUNTY
- No Expected Delays
PAVEMENT REPAIR
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.369 MILE(S) AFTER CRD 193 S.
Work will be done around the clock,
on weekdays only.
State Route MO 52 E East
-
HENRY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2022 to 31-MAY-2022.
Road work begins
.42 MILE(S) BEFORE CRD SW-0601 S.
Work will be done around the clock,
on weekdays only.
State Route MO 52 W West
-
HENRY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2022 to 31-MAY-2022.
Road work begins
.068 MILE(S) BEFORE CRD SW-501 S.
Work will be done around the clock,
on weekdays only.
State Route MO 7 N North
-
HENRY COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2022 to 30-JUN-2022.
Road work begins
.174 MILE(S) BEFORE CRD NW-1401 S.
Work will be done around the clock,
7 days a week.
State Route RT PP S South
-
HENRY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.853 MILE(S) AFTER RT C E.
Work will be done around the clock,
on weekdays only.
State Route RT U N North
-
HICKORY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2022 to 24-MAY-2022.
Road work begins
US 54 E.
Work will be done around the clock,
on weekdays only.
State Route RT U S South
-
HICKORY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2022 to 24-MAY-2022.
Road work begins
US 65 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
JASPER COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-MAR-2022 to 31-AUG-2022.
Road work begins
.051 MILE(S) AFTER MO 249 S.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 37 N North
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.226 MILE(S) AFTER CRD ELM RD E.
Work will be done around the clock,
on weekdays only.
State Route MO 43 N North
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.096 MILE(S) AFTER MO 171 N.
Work will be done around the clock,
on weekdays only.
State Route MO 96 E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.133 MILE(S) BEFORE CST WILLOW ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 96 W West
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.034 MILE(S) BEFORE CRD CL 201 S.
Work will be done around the clock,
on weekdays only.
Outer Road E OR 49 N North
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.032 MILE(S) AFTER CRD CEDAR RD E.
Work will be done around the clock,
on weekdays only.
Outer Road E OR 49 S South
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.036 MILE(S) AFTER CRD CEDAR RD E.
Work will be done around the clock,
on weekdays only.
Outer Road N OR 44 E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
OR 49 S.
Work will be done around the clock,
on weekdays only.
Outer Road N OR 44 W West
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
OR 49 S.
Work will be done around the clock,
on weekdays only.
Outer Road S OR 44 E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 59 N.
Work will be done around the clock,
on weekdays only.
Outer Road S OR 44 W West
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 59 N.
Work will be done around the clock,
on weekdays only.
Outer Road W OR 49 S South
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.096 MILE(S) BEFORE CRD W 52ND ST E.
Work will be done around the clock,
on weekdays only.
Outer Road W OR 49 S South
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.01 MILE(S) AFTER RT HH E.
Work will be done around the clock,
on weekdays only.
State Route RT AA S South
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT HH E.
Work will be done around the clock,
on weekdays only.
State Route RT D E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
MO 171 S.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.01 MILE(S) AFTER CST AMBER DR E.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
MO 571 S.
Work will be done around the clock,
on weekdays only.
State Route RT HH E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
CST MAIN ST E.
Work will be done around the clock,
on weekdays only.
State Route RT N E East
-
JASPER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
.026 MILE(S) AFTER OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT V E East
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT D E.
Work will be done around the clock,
on weekdays only.
State Route RT VV W West
-
JASPER COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2022 to 27-MAY-2022.
Road work begins
RT AA S.
Work will be done around the clock,
on weekdays only.
State Route RT Y N North
-
JASPER COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT H E.
Work will be done around the clock,
on weekdays only.
State Route MO 96 E East
-
LAWRENCE COUNTY
- Expect Delays
JOINT/CRACK SEALING
Scheduled from 14-MAR-2022 to 31-MAY-2022.
Road work begins
.028 MILE(S) AFTER RT YY S.
Work will be done around the clock,
on weekdays only.
State Route RT F W West
-
LAWRENCE COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.178 MILE(S) AFTER CRD 2100 E.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
MCDONALD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-MAY-2022 to 01-AUG-2022.
Road work begins
.002 MILE(S) AFTER RT CC E.
Work will be done around the clock,
on weekdays only.
State Route RT EE E East
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-MAY-2022 to 26-MAY-2022.
Road work begins
.084 MILE(S) AFTER RR HEAVAENER SUB S.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 24-MAY-2022 to 26-MAY-2022.
Road work begins
.018 MILE(S) AFTER OR 49 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
MCDONALD COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 24-MAY-2022 to 24-MAY-2022.
Road work begins
.29 MILE(S) BEFORE BU 71 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 E East
-
NEWTON COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-MAR-2022 to 01-JUL-2022.
Road work begins
.176 MILE(S) BEFORE RP IS44E TO US166 E.
Work will be done around the clock,
on weekdays and Saturdays.
State Route MO 175 N North
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 03-JAN-2022 to 11-JUN-2022.
Road work begins
.002 MILE(S) AFTER MO 86 E.
Work will be done around the clock,
7 days a week.
State Route MO 175 S South
-
NEWTON COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 03-JAN-2022 to 11-JUN-2022.
Road work begins
.007 MILE(S) AFTER CRD OAKWOOD TRAIL RD E.
Work will be done around the clock,
7 days a week.
State Route MO 86 E East
-
NEWTON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-JAN-2022 to 11-JUN-2022.
Road work begins
RP IS49N TO MO86 E.
Work will be done around the clock,
7 days a week.
State Route MO 86 W West
-
NEWTON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-JAN-2022 to 11-JUN-2022.
Road work begins
.026 MILE(S) AFTER PVT KIRKWOOD LN S.
Work will be done around the clock,
7 days a week.
State Route RT D E East
-
NEWTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-MAY-2022 to 01-AUG-2022.
Road work begins
.001 MILE(S) BEFORE CRD MINK S.
Work will be done around the clock,
on weekdays only.
US US 166 E East
-
NEWTON COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-MAR-2022 to 01-JUL-2022.
Road work begins
US 400 E.
Work will be done around the clock,
on weekdays and Saturdays.
US US 166 W West
-
NEWTON COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 07-MAR-2022 to 01-JUL-2022.
Road work begins
.02 MILE(S) AFTER IS 44 W.
Work will be done around the clock,
on weekdays and Saturdays.
State Route RT AC W West
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-APR-2022 to 26-MAY-2022.
Road work begins
CRD E 320TH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT HH N North
-
POLK COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-APR-2022 to 26-MAY-2022.
Road work begins
MO 64 E.
Work will be done around the clock,
on weekdays only.
State Route RT B W West
-
ST. CLAIR COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 11-MAY-2022 to 26-MAY-2022.
Road work begins
.038 MILE(S) AFTER RT H S.
Work will be done around the clock,
on weekdays only.
State Route RT H S South
-
ST. CLAIR COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.011 MILE(S) BEFORE CRD SW 150 E.
Work will be done around the clock,
on weekdays only.
State Route RT A W West
-
STONE COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 24-MAY-2022 to 24-MAY-2022.
Road work begins
.076 MILE(S) BEFORE RT U E.
Work will be done around the clock,
on weekdays only.
State Route MO 413 N North
-
STONE COUNTY
- Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 24-MAY-2022 to 24-MAY-2022.
Road work begins
.307 MILE(S) AFTER CST TUNNEL DR E.
Work will be done around the clock,
on weekdays only.
State Route MO 76 E East
-
TANEY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 24-MAY-2022 to 26-MAY-2022.
Road work begins
.044 MILE(S) AFTER CRD HERITAGE ESTATES RD E.
Work will be done around the clock,
on weekdays only.
State Route RT DD E East
-
TANEY COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 18-MAY-2022 to 01-JUN-2022.
Road work begins
.039 MILE(S) AFTER CRD NAGEL SMITH RD E.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
TANEY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 01-NOV-2023.
Road work begins
.108 MILE(S) AFTER MO 76 W.
Work will be done around the clock,
on weekdays only.
US US 65 N North
-
TANEY COUNTY
- Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 04-APR-2022 to 30-JUN-2022.
Road work begins
.02 MILE(S) AFTER US 160 E.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 S South
-
VERNON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2022 to 21-DEC-2022.
Road work begins
.684 MILE(S) AFTER RP RTK TO IS49S S.
Work will be done around the clock,
7 days a week.
State Route RT C N North
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
US 54 E.
Work will be done around the clock,
on weekdays only.
State Route RT C S South
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT M S.
Work will be done around the clock,
on weekdays only.
State Route RT D E East
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.159 MILE(S) BEFORE CRD 250 S.
Work will be done around the clock,
on weekdays only.
State Route RT D W West
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT E E East
-
VERNON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT M N North
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
OR 49 S.
Work will be done around the clock,
on weekdays only.
State Route RT MM E East
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
RT V S.
Work will be done around the clock,
on weekdays only.
State Route RT OO E East
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT M S.
Work will be done around the clock,
on weekdays only.
State Route RT OO W West
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT C S.
Work will be done around the clock,
on weekdays only.
State Route RT V N North
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 23-MAY-2022 to 26-MAY-2022.
Road work begins
RT D E.
Work will be done around the clock,
on weekdays only.
State Route RT WW N North
-
VERNON COUNTY
- Expect Delays
MOWING
Scheduled from 16-MAY-2022 to 26-MAY-2022.
Road work begins
.094 MILE(S) AFTER RT D E.
Work will be done around the clock,
on weekdays only.
Business BU 60 W West
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-APR-2022 to 31-JUL-2022.
Road work begins
.003 MILE(S) AFTER CST W CENTER ST E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 E East
-
WEBSTER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 27-MAY-2022.
Road work begins
.164 MILE(S) AFTER CRD PIN OAK LP E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 E East
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
.002 MILE(S) BEFORE RT DD E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 E East
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
.014 MILE(S) AFTER RP MO38 TO IS44W W.
Work will be done around the clock,
on weekdays only.
State Route MO 38 W West
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
.003 MILE(S) AFTER RT A S.
Work will be done around the clock,
on weekdays only.
State Route MO 38 W West
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
.004 MILE(S) AFTER RT DD E.
Work will be done around the clock,
on weekdays only.
State Route MO 38 W West
-
WEBSTER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 27-MAY-2022.
Road work begins
.04 MILE(S) BEFORE CST BLAIR ST S.
Work will be done around the clock,
on weekdays only.
State Route RT A N North
-
WEBSTER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 27-MAY-2022.
Road work begins
.013 MILE(S) AFTER US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT A S South
-
WEBSTER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 27-MAY-2022.
Road work begins
.004 MILE(S) AFTER MO 38 E.
Work will be done around the clock,
on weekdays only.
State Route RT DD E East
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
MO 38 E.
Work will be done around the clock,
on weekdays only.
State Route RT DD W West
-
WEBSTER COUNTY
- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-APR-2022 to 01-JUL-2022.
Road work begins
.004 MILE(S) AFTER CST E WASHINGTON ST E.
Work will be done around the clock,
on weekdays only.
State Route RT K S South
-
WEBSTER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-APR-2022 to 27-MAY-2022.
Road work begins
.008 MILE(S) AFTER US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT H N North
-
BARRY COUNTY
- Delays Possible
Project Name -
detection installation
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-JUN-2022 to 02-JUN-2022.
Road work begins
US 60 E.
Work will be done around the clock,
on weekdays only.
State Route RT H S South
-
BARRY COUNTY
- Delays Possible
Project Name -
detection installation
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-JUN-2022 to 02-JUN-2022.
Road work begins
.002 MILE(S) AFTER CST JEROME LN E.
Work will be done around the clock,
on weekdays only.
US US 60 E East
-
BARRY COUNTY
- Delays Possible
Project Name -
detection installation
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-JUN-2022 to 02-JUN-2022.
Road work begins
.028 MILE(S) BEFORE RT H S.
Work will be done around the clock,
on weekdays only.
US US 60 W West
-
BARRY COUNTY
- Delays Possible
Project Name -
detection installation
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-JUN-2022 to 02-JUN-2022.
Road work begins
.027 MILE(S) BEFORE RT H S.
Work will be done around the clock,
on weekdays only.
State Route RT DD E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
RT W S.
Work will be done around the clock,
on weekdays only.
State Route RT DD W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
RT EE E.
Work will be done around the clock,
on weekdays only.
State Route RT EE E East
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
RT DD E.
Work will be done around the clock,
on weekdays only.
State Route RT EE W West
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
RT A S.
Work will be done around the clock,
on weekdays only.
State Route RT J S South
-
BARTON COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
US 160 E.
Work will be done around the clock,
on weekdays only.
CST MAIN ST N North
-
CHRISTIAN COUNTY
- CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-JUN-2022 to 15-AUG-2022.
Road work begins
.001 MILE(S) AFTER MO 14 E.
Work will be done around the clock,
7 days a week.
CST MAIN ST S South
-
CHRISTIAN COUNTY
- CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-JUN-2022 to 15-AUG-2022.
Road work begins
.014 MILE(S) BEFORE MO 14 E.
Work will be done around the clock,
7 days a week.
State Route MO 14 E East
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 30-DEC-2022.
Road work begins
.011 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 14 W West
-
CHRISTIAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 30-DEC-2022.
Road work begins
.002 MILE(S) BEFORE CST RIDGECREST RD S.
Work will be done around the clock,
on weekdays only.
State Route RT A W West
-
DADE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-MAY-2022 to 02-JUN-2022.
Road work begins
MO 97 S.
Work will be done around the clock,
on weekdays only.
State Route MO 18 E East
-
HENRY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-MAY-2022 to 02-JUN-2022.
Road work begins
1.367 MILE(S) BEFORE CRD NW-401 S.
Work will be done around the clock,
on weekdays only.
State Route MO 18 W West
-
HENRY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-MAY-2022 to 02-JUN-2022.
Road work begins
.115 MILE(S) BEFORE CRD NW-401 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 49 N North
-
JASPER COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-JUN-2022 to 01-JUN-2022.
Road work begins
.827 MILE(S) AFTER RP RTM TO IS49N N.
Work will be done around the clock,
on weekdays only.
State Route RT FF W West
-
JASPER COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 31-MAY-2022 to 03-JUN-2022.
Road work begins
.008 MILE(S) AFTER CST DAVIS BLVD S.
Work will be done around the clock,
on weekdays only.
State Route RT J N North
-
JASPER COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 30-MAY-2022 to 09-JUN-2022.
Road work begins
RT H E.
Work will be done around the clock,
on weekdays only.
State Route RT A E East
-
JASPER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 25-MAY-2022 to 02-JUN-2022.
Road work begins
MO 37 S.
Work will be done around the clock,
on weekdays only.
Interstate IS 44 W West
-
LAWRENCE COUNTY
- Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 30-MAY-2022 to 31-MAY-2022.
Road work begins
.647 MILE(S) BEFORE RT Z S.
Work will be done around the clock,
on weekdays only.
State Route RT JJ N North
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-MAY-2022 to 01-JUN-2022.
Road work begins
CRD SAWMILL RD E.
Work will be done around the clock,
on weekdays only.
State Route RT JJ S South
-
MCDONALD COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 25-MAY-2022 to 01-JUN-2022.
Road work begins
MO 76 E.
Work will be done around the clock,
on weekdays only.
State Route MO 59 N North
-
NEWTON COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 30-MAY-2022 to 02-JUN-2022.
Road work begins
.106 MILE(S) AFTER CRD SPRUCE DR E.
Work will be done around the clock,
on weekdays only.
State Route MO 59 N North
-
NEWTON COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 31-MAY-2022 to 02-JUN-2022.
Road work begins
.081 MILE(S) BEFORE CST MAIN ST S.
Work will be done around the clock,
on weekdays only.
State Route MO 59 S South
-
NEWTON COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 30-MAY-2022 to 02-JUN-2022.
Road work begins
.008 MILE(S) BEFORE CRD KUDU RD S.
Work will be done around the clock,
on weekdays only.
State Route MO 59 S South
-
NEWTON COUNTY
- Expect Delays
CONCRETE OVERLAY
Scheduled from 31-MAY-2022 to 02-JUN-2022.
Road work begins
.206 MILE(S) BEFORE CRD BEECH RD E.
Work will be done around the clock,
on weekdays only.
State Route RT FF E East
-
NEWTON COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 31-MAY-2022 to 04-JUN-2022.
Road work begins
.003 MILE(S) AFTER LP 49 N.
Work will be done around the clock,
on weekdays only.
State Route RT HH E East
-
NEWTON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 31-MAY-2022 to 01-JUL-2022.
Road work begins
.012 MILE(S) AFTER MO 86 E.
Work will be done around the clock,
on weekdays only.
State Route MO 76 E East
-
STONE COUNTY
- Expect Delays
PAVEMENT MARKING
Scheduled from 30-MAY-2022 to 01-JUN-2022.
Road work begins
.037 MILE(S) BEFORE MO 376 W.
Work will be done around the clock,
on weekdays only.
State Route RT A E East
-
STONE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-JUN-2022 to 06-JUN-2022.
Road work begins
.081 MILE(S) BEFORE CRD MARBLE RD S.
Work will be done around the clock,
on weekdays only.
State Route RT A W West
-
STONE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 01-JUN-2022 to 06-JUN-2022.
Road work begins
.047 MILE(S) AFTER CRD OZARK RD E.
Work will be done around the clock,
on weekdays only.
State Route RT H E East
-
STONE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 25-MAY-2022 to 25-MAY-2022.
Road work begins
.059 MILE(S) AFTER COE BAXTER PARK E.
Work will be done around the clock,
on weekdays only.
State Route RT H W West
-
STONE COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 25-MAY-2022 to 25-MAY-2022.
Road work begins
MO 13 S.
Work will be done around the clock,
on weekdays only.
State Route RT PP E East
-
WEBSTER COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 31-MAY-2022 to 02-JUN-2022.
Road work begins
.089 MILE(S) AFTER RT KK S.
Work will be done around the clock,
on weekdays only.