WORK ZONES (CLOSED): 17 to report. Hide

Road Closed due to work zoneState Route 48 East - ANDREW COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT RT D S.
Scheduled from 29-MAY-2020 to 10-AUG-2020.
Road Closed due to work zoneState Route 48 West - ANDREW COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins AT RT M S.
Scheduled from 29-MAY-2020 to 10-AUG-2020.
Road Closed due to work zoneState Route C West - CARROLL COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 1.91 MILES BEFORE RT D N.
Scheduled from 30-JUN-2020 to 01-NOV-2020.
Road Closed due to work zoneState Route C East - CARROLL COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins 1.09 MILES AFTER RT KK E.
Scheduled from 30-JUN-2020 to 01-NOV-2020.
Road Closed due to work zoneState Route A South - GENTRY COUNTY - Road Closed
Project Name - DEKALB RTE. A -
BRIDGE RECONSTRUCTION
Road closure begins 1.15 MILES AFTER RT Z W.
Scheduled from 06-APR-2020 to 20-JUL-2020.
Road Closed due to work zoneState Route H East - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .3 MILES AFTER RT B N.
Scheduled from 26-MAY-2020 to 10-JUL-2020.
Road Closed due to work zoneState Route H West - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .59 MILES BEFORE RT B S.
Scheduled from 27-MAY-2020 to 10-JUL-2020.
Road Closed due to work zoneState Route T West - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.34 MILES BEFORE RT O S.
Scheduled from 08-JUN-2020 to 07-AUG-2020.
Road Closed due to work zoneState Route T East - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .77 MILES AFTER RT O S.
Scheduled from 15-JUN-2020 to 07-AUG-2020.
Road Closed due to work zoneState Route T East - HOLT COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .07 MILES AFTER MO 111 S.
Scheduled from 20-MAY-2020 to 01-SEP-2020.
Road Closed due to work zoneState Route T West - HOLT COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins 1.83 MILES BEFORE MO 111 N.
Scheduled from 20-MAY-2020 to 01-SEP-2020.
Road Closed due to work zoneUS 159 South - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.12 MILES AFTER MO 111 S.
Scheduled from 08-JUN-2020 to 22-AUG-2020.
Road Closed due to work zoneUS 159 North - HOLT COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.27 MILES BEFORE MO 111 N.
Scheduled from 08-JUN-2020 to 22-AUG-2020.
Road Closed due to work zoneState Route H North - NODAWAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins 3.94 MILES AFTER RT A E.
Scheduled from 09-JUL-2020 to 18-JUL-2020.
Road Closed due to work zoneState Route H South - NODAWAY COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins 3.94 MILES AFTER RT V W.
Scheduled from 09-JUL-2020 to 18-JUL-2020.
Road Closed due to work zoneState Route PP West - SULLIVAN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .59 MILES BEFORE CST RAILWAY ST S.
Scheduled from 13-MAR-2020 to 30-SEP-2020.
Road Closed due to work zoneState Route PP East - SULLIVAN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .11 MILES AFTER CST RAILWAY ST N.
Scheduled from 13-MAR-2020 to 30-SEP-2020.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 57 to report. Hide

Expect delays due to work zoneInterstate 29 North - ANDREW COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 09-MAR-2020 to 15-DEC-2020.
Road work begins .83 MILES AFTER US 71 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 South - ANDREW COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 09-MAR-2020 to 15-DEC-2020.
Road work begins .52 MILES AFTER RT K N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneBusiness 71 North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 23-JUN-2020 to 13-JUL-2020.
Road work begins .66 MILES AFTER CO BU71S TO BU71N E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AA East - ATCHISON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins AT RT Y S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route B East - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins AT RT A E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route C East - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins AT US 59 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y South - ATCHISON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins AT RT AA W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 29 South - BUCHANAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 02-JUN-2020 to 30-OCT-2020.
Road work begins .16 MILES BEFORE RT O E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 North - BUCHANAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 02-JUN-2020 to 30-OCT-2020.
Road work begins 1.2 MILES AFTER RT H N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 6 West - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 06-APR-2020 to 28-AUG-2020.
Road work begins .04 MILES BEFORE US 71 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route 6 East - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 06-APR-2020 to 28-AUG-2020.
Road work begins .01 MILES AFTER LP 29 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 169 North - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 06-APR-2020 to 28-AUG-2020.
Road work begins LESS THAN .01 MILES AFTER IS 29 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 169 South - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 06-APR-2020 to 28-AUG-2020.
Road work begins .02 MILES AFTER IS 29 S.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneInterstate 229 North - BUCHANAN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 24-JUN-2020 to 10-JUL-2020.
Road work begins .12 MILES BEFORE CRD 40TH ST N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 229 South - BUCHANAN COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 24-JUN-2020 to 10-JUL-2020.
Road work begins LESS THAN .01 MILES BEFORE CST 22ND ST N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route DD East - BUCHANAN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 06-JUL-2020 to 10-JUL-2020.
Road work begins 2.57 MILES BEFORE RT H E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 116 East - CALDWELL COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 10-JUL-2020 to 17-JUL-2020.
Road work begins AT RT D N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 116 West - CALDWELL COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 10-JUL-2020 to 17-JUL-2020.
Road work begins AT CST ELM ST W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 116 West - CALDWELL COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 10-JUL-2020 to 17-JUL-2020.
Road work begins AT RT A S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 116 East - CALDWELL COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 10-JUL-2020 to 17-JUL-2020.
Road work begins AT MO 13 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 13 North - CALDWELL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2020 to 30-JUL-2020.
Road work begins .08 MILES BEFORE BU 36 E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 13 South - CALDWELL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2020 to 30-JUL-2020.
Road work begins .08 MILES BEFORE MO 110 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneUS 36 West - CALDWELL COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 27-MAY-2020 to 30-JUL-2020.
Road work begins .14 MILES BEFORE BU 36 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneUS 24 East - CARROLL COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-JUN-2020 to 17-JUL-2020.
Road work begins .02 MILES AFTER MO 41 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route T East - CHARITON COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins AT MO 5 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route T West - CHARITON COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-JUL-2020 to 17-JUL-2020.
Road work begins 1.7 MILES BEFORE MO 5 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 24 West - CHARITON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-JUN-2020 to 17-JUL-2020.
Road work begins .04 MILES BEFORE CST JACKSON ST W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate 35 North - CLINTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-JUN-2020 to 15-SEP-2020.
Road work begins .05 MILES AFTER US 69 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate 35 North - CLINTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 26-MAR-2020 to 14-SEP-2020.
Road work begins .23 MILES BEFORE RT PP E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 35 South - CLINTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 26-MAR-2020 to 14-SEP-2020.
Road work begins 2.49 MILES BEFORE MO 116 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 33 South - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 06-JUL-2020 to 15-JUL-2020.
Road work begins AT MO 116 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 33 South - CLINTON COUNTY - Expect Delays
MILLING DRIVE SURFACE
Scheduled from 09-JUL-2020 to 10-JUL-2020.
Road work begins .15 MILES AFTER RT PP W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 33 North - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 06-JUL-2020 to 15-JUL-2020.
Road work begins .02 MILES BEFORE CST MAIN ST W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route PP East - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 06-JUL-2020 to 15-JUL-2020.
Road work begins AT MO 33 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route PP West - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 06-JUL-2020 to 15-JUL-2020.
Road work begins AT US 69 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 69 North - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 30-JUN-2020 to 11-JUL-2020.
Road work begins AT MO 116 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 69 South - CLINTON COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 30-JUN-2020 to 11-JUL-2020.
Road work begins AT LP 35 S.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneUS 69 South - CLINTON COUNTY - No Expected Delays
MOWING
Scheduled from 22-JUN-2020 to 24-JUL-2020.
Road work begins .64 MILES AFTER RT PP W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 35 North - DAVIESS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUN-2020 to 23-SEP-2020.
Road work begins AT RT C W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 6 East - DAVIESS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUN-2020 to 29-JUL-2020.
Road work begins AT IS 35 S.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate 35 South - DEKALB COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-JUN-2020 to 15-SEP-2020.
Road work begins LESS THAN .01 MILES AFTER MO 110 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 6 West - GRUNDY COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 16-JUN-2020 to 29-JUL-2020.
Road work begins .15 MILES AFTER CST 7TH ST W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 6 West - GRUNDY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-JUN-2020 to 28-JUL-2020.
Road work begins .18 MILES BEFORE CST 10TH ST E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 6 East - GRUNDY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-JUN-2020 to 28-JUL-2020.
Road work begins .15 MILES BEFORE CST 7TH ST E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneInterstate 35 South - HARRISON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 08-JUN-2020 to 23-SEP-2020.
Road work begins .19 MILES AFTER CST MILLER ST E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneInterstate 29 South - HOLT COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2020 to 04-SEP-2020.
Road work begins .95 MILES AFTER US 159 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 North - HOLT COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-APR-2020 to 02-SEP-2020.
Road work begins .52 MILES BEFORE RT E N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 South - HOLT COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 16-APR-2020 to 02-SEP-2020.
Road work begins .58 MILES BEFORE RT E N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 North - HOLT COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2020 to 04-SEP-2020.
Road work begins 1.24 MILES BEFORE US 159 S.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneState Route E South - HOLT COUNTY - No Expected Delays
Project Name - J1I3009
BRIDGE RECONSTRUCTION
Scheduled from 07-MAY-2020 to 07-NOV-2020.
Road work begins .01 MILES BEFORE IS 29 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 190 West - LIVINGSTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2020 to 26-NOV-2020.
Road work begins 2.38 MILES BEFORE RT A N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 190 East - LIVINGSTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2020 to 26-NOV-2020.
Road work begins 1.01 MILES AFTER RT A N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 65 South - LIVINGSTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 13-APR-2020 to 01-DEC-2020.
Road work begins .51 MILES AFTER BU 36 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 65 North - LIVINGSTON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 13-APR-2020 to 01-DEC-2020.
Road work begins 1.95 MILES AFTER RT Z S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneState Route 110 West - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 14-APR-2020 to 23-JUL-2020.
Road work begins 2.01 MILES BEFORE RT A S.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 46 East - NODAWAY COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-MAY-2020 to 24-JUL-2020.
Road work begins AT US 136 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 46 West - WORTH COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 05-MAY-2020 to 24-JUL-2020.
Road work begins AT US 169 N.
Work will be done around the clock, on weekdays and Saturdays.

Back to Top

FUTURE WORK ZONES: 34 to report. Hide

Possible delays due to work zoneInterstate 229 North - ANDREW COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins .87 MILES BEFORE US 59 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H North - ANDREW COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 14-JUL-2020 to 14-JUL-2020.
Road work begins .9 MILES AFTER US 59 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 116 East - BUCHANAN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins .78 MILES AFTER RT MM S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y South - BUCHANAN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 14-JUL-2020 to 14-JUL-2020.
Road work begins 1.14 MILES BEFORE MO 116 E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 North - BUCHANAN COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins .25 MILES BEFORE CST WOODBINE RD NE N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E East - CHARITON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 16-JUL-2020.
Road work begins AT MO 139 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route TT South - CHARITON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 14-JUL-2020 to 15-JUL-2020.
Road work begins 4.96 MILES BEFORE MO 139 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H West - CLINTON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 16-JUL-2020.
Road work begins AT US 69 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H East - CLINTON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins AT MO 33 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H East - CLINTON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 16-JUL-2020.
Road work begins AT RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H West - CLINTON COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins 1.75 MILES BEFORE MO 33 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M West - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 16-JUL-2020 to 16-JUL-2020.
Road work begins 2.51 MILES AFTER US 169 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route M East - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 16-JUL-2020 to 16-JUL-2020.
Road work begins 3.57 MILES BEFORE US 169 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z East - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins 1.01 MILES BEFORE RT A N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z West - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 13-JUL-2020 to 13-JUL-2020.
Road work begins 1.21 MILES BEFORE RT D N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z East - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 13-JUL-2020 to 13-JUL-2020.
Road work begins .46 MILES AFTER RT D S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route Z West - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins AT RT A S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route C West - LINN COUNTY - Expect Delays
CORE DRILLING
Scheduled from 13-JUL-2020 to 16-JUL-2020.
Road work begins 1.32 MILES AFTER RT M S.
Work will be done around the clock, on weekdays only.
News Releases - PRELIMINARY GEOTECHNICAL WORK FARM BRIDGE PROGRAM
Expect delays due to work zoneState Route C East - LINN COUNTY - Expect Delays
CORE DRILLING
Scheduled from 13-JUL-2020 to 16-JUL-2020.
Road work begins 1.47 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
News Releases - PRELIMINARY GEOTECHNICAL WORK FARM BRIDGE PROGRAM
Expect delays due to work zoneState Route C West - LINN COUNTY - Expect Delays
CORE DRILLING
Scheduled from 14-JUL-2020 to 18-JUL-2020.
Road work begins .66 MILES AFTER RT CC S.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - PRELIMINARY GEOTECHNICAL WORK FARM BRIDGE PROGRAM
Expect delays due to work zoneState Route C East - LINN COUNTY - Expect Delays
CORE DRILLING
Scheduled from 14-JUL-2020 to 18-JUL-2020.
Road work begins .85 MILES BEFORE RT CC S.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - PRELIMINARY GEOTECHNICAL WORK FARM BRIDGE PROGRAM
Possible delays due to work zoneState Route FF North - LINN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 13-JUL-2020.
Road work begins AT MO 5 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route TT South - LINN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins AT MO 110 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 46 West - NODAWAY COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 13-JUL-2020 to 04-SEP-2020.
Road work begins .59 MILES AFTER RT AB N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 46 East - NODAWAY COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 13-JUL-2020 to 04-SEP-2020.
Road work begins 1.6 MILES BEFORE RT AB S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 46 West - NODAWAY COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 13-JUL-2020 to 02-OCT-2020.
Road work begins 2.01 MILES AFTER CST 1ST ST E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 46 East - NODAWAY COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 13-JUL-2020 to 02-OCT-2020.
Road work begins 2.5 MILES AFTER RT AB N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route OO East - NODAWAY COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins 1 MILE BEFORE MO 148 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route OO West - NODAWAY COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins AT MO 148 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y South - NODAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins AT RT A W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route UU South - PUTNAM COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins 1.25 MILES BEFORE MO 5 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route UU North - PUTNAM COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 13-JUL-2020 to 14-JUL-2020.
Road work begins AT MO 5 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route CC South - PUTNAM COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-JUL-2020 to 15-JUL-2020.
Road work begins 4.23 MILES BEFORE MO 129 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route V South - PUTNAM COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-JUL-2020 to 16-JUL-2020.
Road work begins 1.48 MILES BEFORE MO 149 S.
Work will be done around the clock, on weekdays only.

Back to Top

INCIDENTS: 32 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 117 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.