WORK ZONES (CLOSED): 0 to report. Hide

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 24 to report. Hide

Expect delays due to work zoneInterstate 29 North - ANDREW COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 22-MAR-2021 to 30-NOV-2021.
Road work begins .83 MILES AFTER US 59 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 29 South - ANDREW COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 22-MAR-2021 to 30-NOV-2021.
Road work begins .52 MILES AFTER RT K N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 229 North - ANDREW COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-OCT-2021 to 22-OCT-2021.
Road work begins .81 MILES AFTER RT K S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 229 South - ANDREW COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-OCT-2021 to 22-OCT-2021.
Road work begins 1.26 MILES BEFORE BK LEWIS AND CLARK TRAIL E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route D North - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins AT US 136 W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route D South - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins AT RT A E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route E West - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins AT MO 111 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route E East - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins AT RT U S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route U North - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins 3.85 MILES BEFORE RT E E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route U South - ATCHISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins AT CST WEST ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route V West - ATCHISON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins .
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route V East - ATCHISON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-OCT-2021 to 27-MAY-2022.
Road work begins .
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 29 South - ATCHISON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2021 to 01-DEC-2021.
Road work begins 8.06 MILES BEFORE RT A E.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneInterstate 29 North - ATCHISON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 10-MAY-2021 to 01-DEC-2021.
Road work begins 6.15 MILES AFTER RT A W.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneST JOSEPH AVE North - BUCHANAN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 27-SEP-2021 to 15-NOV-2021.
Road work begins AT IS 229 N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneST JOSEPH AVE South - BUCHANAN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 27-SEP-2021 to 15-NOV-2021.
Road work begins .09 MILES BEFORE CST ST JOSEPH AVE N.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 169 North - BUCHANAN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-SEP-2021 to 29-OCT-2021.
Road work begins .02 MILES BEFORE RT FF S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 South - BUCHANAN COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-SEP-2021 to 29-OCT-2021.
Road work begins LESS THAN .01 MILES BEFORE RT FF N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route PP West - CLINTON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-AUG-2021 to 09-NOV-2021.
Road work begins .67 MILES AFTER US 69 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route PP East - CLINTON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 16-AUG-2021 to 09-NOV-2021.
Road work begins 1.47 MILES BEFORE US 69 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route E East - GRUNDY COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-OCT-2021 to 26-OCT-2021.
Road work begins .07 MILES AFTER MO 6 E.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route E West - LINN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-OCT-2021 to 26-OCT-2021.
Road work begins .13 MILES AFTER MO 139 N.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 5 North - SULLIVAN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 04-OCT-2021 to 10-NOV-2021.
Road work begins 2.42 MILES AFTER RT MM W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 5 South - SULLIVAN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 04-OCT-2021 to 10-NOV-2021.
Road work begins 3.03 MILES AFTER RT M W.
Work will be done around the clock, on weekdays and Saturdays.

Back to Top

FUTURE WORK ZONES: 60 to report. Hide

Possible delays due to work zoneInterstate 29 North - ANDREW COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 01-OCT-2022.
Road work begins .92 MILES BEFORE US 59 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 29 North - ANDREW COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 01-DEC-2022.
Road work begins .89 MILES AFTER BK LEWIS AND CLARK TRAIL W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route K North - ANDREW COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .5 MILES BEFORE IS 229 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 169 North - ANDREW COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 1.39 MILES AFTER CST NE WOODBINE RD N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 136 East - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins 1.93 MILES BEFORE RT D N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 136 West - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins AT RT M S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 59 North - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins 2 MILES AFTER CRD 120 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 59 South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins AT US 136 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneInterstate 29 South - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 20-NOV-2021.
Road work begins .4 MILES BEFORE CST BELT HWY S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS29N TO LP29 South - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 17-NOV-2021.
Road work begins .01 MILES AFTER US 71 N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp IS29S TO LP29 South - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 17-NOV-2021.
Road work begins LESS THAN .01 MILES AFTER US 71 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp LP29 TO IS29S South - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 17-NOV-2021.
Road work begins LESS THAN .01 MILES AFTER US 169 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneRamp LP29N TO IS29N North - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 17-NOV-2021.
Road work begins LESS THAN .01 MILES AFTER US 169 S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 169 South - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 15-NOV-2021.
Road work begins .04 MILES BEFORE CST BELT HWY N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 169 North - BUCHANAN COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 15-NOV-2021.
Road work begins .02 MILES BEFORE LP 29 S.
Work will be done around the clock, 7 days a week.
Possible delays due to work zoneUS 36 West - BUCHANAN COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins .26 MILES BEFORE US 169 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 13 South - CALDWELL COUNTY - Delays Possible
CORE DRILLING
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins LESS THAN .01 MILES AFTER CST HUGHES ST N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 13 North - CALDWELL COUNTY - Delays Possible
CORE DRILLING
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .08 MILES BEFORE CST WASHINGTON ST N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 65 North - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins .07 MILES AFTER MO 10 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 65 South - CARROLL COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins .02 MILES AFTER RT W W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route W East - CHARITON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins 2.5 MILES BEFORE MO 3 S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y South - CHARITON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins 7.23 MILES BEFORE BK LEWIS AND CLARK TRAIL W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Y North - CHARITON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins AT US 24 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 116 East - CLINTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins .36 MILES BEFORE US 169 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 116 West - CLINTON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins .15 MILES BEFORE US 169 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AA South - DAVIESS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 21-OCT-2021.
Road work begins .05 MILES AFTER RT T E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AA North - DAVIESS COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 19-OCT-2021 to 21-OCT-2021.
Road work begins .01 MILES AFTER RT Z W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route YY North - DAVIESS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 20-OCT-2021.
Road work begins AT RT P E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 69 North - DAVIESS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins 2.89 MILES AFTER RT EE N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 69 South - DAVIESS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins .76 MILES BEFORE RT T E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H South - DEKALB COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 1 MILE BEFORE RT E W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H North - DEKALB COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H North - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins 1.5 MILES AFTER RT A N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route H South - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins 2.99 MILES AFTER RT V W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AF West - GENTRY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 22-OCT-2021.
Road work begins .07 MILES AFTER RT B S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route A North - GRUNDY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .25 MILES AFTER US 65 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route A South - GRUNDY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 1.53 MILES BEFORE US 65 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 29 South - HOLT COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 01-DEC-2022.
Road work begins .74 MILES AFTER BK LEWIS AND CLARK TRAIL E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneInterstate 29 South - HOLT COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 20-OCT-2021 to 01-OCT-2022.
Road work begins .77 MILES AFTER BK LEWIS AND CLARK TRAIL E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route 11 North - LINN COUNTY - Delays Possible
SCRUB SEALING PAVEMENT
Scheduled from 18-OCT-2021 to 29-OCT-2021.
Road work begins AT BU 36 W.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 11 South - LINN COUNTY - Delays Possible
SCRUB SEALING PAVEMENT
Scheduled from 18-OCT-2021 to 29-OCT-2021.
Road work begins .32 MILES AFTER MO 129 N.
Work will be done around the clock, on weekdays and Saturdays.
Possible delays due to work zoneState Route 110 East - LINN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2021 to 21-OCT-2021.
Road work begins 1.55 MILES BEFORE RT F S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneUS 36 East - LINN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 18-OCT-2021 to 22-OCT-2021.
Road work begins AT RT U S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route AF East - NODAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 22-OCT-2021.
Road work begins .02 MILES AFTER CST PENN ST N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H North - NODAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 22-OCT-2021.
Road work begins 2.98 MILES AFTER RT Y S.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route H South - NODAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 22-OCT-2021.
Road work begins AT RT V E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route M West - NODAWAY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins .05 MILES BEFORE CST PLATTE ST E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route M East - NODAWAY COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins AT US 71 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route PP East - SULLIVAN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 22-OCT-2021.
Road work begins LESS THAN .01 MILES AFTER CST RAILWAY ST N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route PP West - SULLIVAN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 22-OCT-2021.
Road work begins LESS THAN .01 MILES AFTER RT E W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W North - SULLIVAN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 22-OCT-2021.
Road work begins .1 MILES AFTER MO 6 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route W South - SULLIVAN COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 22-OCT-2021.
Road work begins .03 MILES AFTER RT E W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route J East - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins 3.46 MILES BEFORE RT Z N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route J West - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins AT RT Z N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route M East - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 21-OCT-2021.
Road work begins AT US 169 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route M West - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 21-OCT-2021.
Road work begins 1.2 MILES AFTER CRD W 220 ST W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route YY North - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins 2.02 MILES BEFORE RT W W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route YY South - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Z South - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins AT MO 46 W.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route Z North - WORTH COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 19-OCT-2021.
Road work begins AT RT W E.
Work will be done around the clock, on weekdays only.

Back to Top

INCIDENTS: 14 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 117 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT