WORK ZONES (CLOSED): 28 to report. Hide

Road Closed due to work zoneState Route RT RA N North - ANDREW COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins CRD 405 S.
Scheduled from 29-APR-2024 to 24-MAY-2024.
Road Closed due to work zoneState Route RT RA S South - ANDREW COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins CRD 462 E.
Scheduled from 29-APR-2024 to 24-MAY-2024.
Road Closed due to work zoneState Route RT T E East - ANDREW COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins CRD 458 E.
Scheduled from 29-APR-2024 to 24-MAY-2024.
Road Closed due to work zoneState Route RT T W West - ANDREW COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins .004 MILE(S) BEFORE RT DD S.
Scheduled from 29-APR-2024 to 24-MAY-2024.
Road Closed due to work zoneState Route MO 46 E East - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .031 MILE(S) AFTER CRD R AVE S.
Scheduled from 12-FEB-2024 to 31-MAY-2024.
Road Closed due to work zoneState Route MO 46 W West - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .194 MILE(S) AFTER RT MM S.
Scheduled from 12-FEB-2024 to 31-MAY-2024.
Road Closed due to work zoneState Route RT Z N North - BUCHANAN COUNTY - Road Closed
RESURFACING PAVEMENT
Road closure begins .086 MILE(S) AFTER US 36 W.
Scheduled from 25-APR-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .019 MILE(S) BEFORE CST BROADWAY ST E.
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road Closed due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .018 MILE(S) AFTER CRD FAR WEST DR E.
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road Closed due to work zoneState Route RT HH N North - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .17 MILE(S) AFTER CRD WOODSON AVE S.
Scheduled from 08-APR-2024 to 17-JUL-2024.
Road Closed due to work zoneState Route RT HH S South - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) AFTER CRD WAYLAND AVE S.
Scheduled from 08-APR-2024 to 17-JUL-2024.
Road Closed due to work zoneState Route RT PP E East - CHARITON COUNTY - Road Closed
BRIDGE INSPECTION
Road closure begins .023 MILE(S) BEFORE CRD CEMETERY AVE S.
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT PP W West - CHARITON COUNTY - Road Closed
BRIDGE INSPECTION
Road closure begins .518 MILE(S) BEFORE CRD SALT LICK AVE S.
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT Y N North - CHARITON COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins US 24 E.
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road Closed due to work zoneState Route RT Y S South - CHARITON COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins RT M E.
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road Closed due to work zoneState Route RT H E East - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .028 MILE(S) AFTER CRD NE ESTEP RD S.
Scheduled from 05-FEB-2024 to 22-AUG-2024.
Road Closed due to work zoneState Route RT H W West - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .039 MILE(S) AFTER US 69 S.
Scheduled from 05-FEB-2024 to 22-AUG-2024.
Road Closed due to work zoneState Route RT NN W West - CLINTON COUNTY - Road Closed
RESURFACING PAVEMENT
Road closure begins .375 MILE(S) BEFORE CRD NW BETHANY CHURCH RD S.
Scheduled from 25-APR-2024 to 01-MAY-2024.
Road Closed due to work zoneState Route RT E W West - DAVIESS COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins .001 MILE(S) AFTER US 69 S.
Scheduled from 18-MAR-2024 to 02-AUG-2024.
Road Closed due to work zoneState Route RT E E East - DEKALB COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins US 169 S.
Scheduled from 18-MAR-2024 to 02-AUG-2024.
Road Closed due to work zoneState Route RT D N North - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .159 MILE(S) AFTER CRD 420 E.
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route RT D S South - LIVINGSTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .065 MILE(S) BEFORE CRD 418 S.
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road Closed due to work zoneState Route RT E E East - MERCER COUNTY - Road Closed
SURVEYING
Road closure begins .008 MILE(S) BEFORE CRD KEYSTONE AVE S.
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road Closed due to work zoneState Route RT HH N North - NODAWAY COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins MO 46 E.
Scheduled from 01-MAY-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT HH S South - NODAWAY COUNTY - Road Closed
PATCHING DRIVE SURFACE
Road closure begins CRD 240 ST E.
Scheduled from 01-MAY-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT NN E East - NODAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .058 MILE(S) BEFORE CRD KATYDID RD S.
Scheduled from 01-MAY-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT NN W West - NODAWAY COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .028 MILE(S) BEFORE RT EE S.
Scheduled from 01-MAY-2024 to 02-MAY-2024.
Road Closed due to work zoneState Route RT E W West - SULLIVAN COUNTY - Road Closed
SURVEYING
Road closure begins .001 MILE(S) AFTER CRD AZALEA DR S.
Scheduled from 22-APR-2024 to 06-MAY-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 37 to report. Hide

Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins .177 MILE(S) BEFORE CRD 1382 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins .729 MILE(S) AFTER RP RTT TO US59N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:55 AM and 09:00 PM.
Expect delays due to work zoneState Route MO 31 N North - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 07-MAY-2024.
Road work begins US 169 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 371 S South - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins .343 MILE(S) BEFORE CRD WILLIAMS RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT AC N North - BUCHANAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins .005 MILE(S) AFTER RT YY E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT AC S South - BUCHANAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins .007 MILE(S) AFTER CST FARAON ST E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT U E East - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins CRD DAY SW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT U W West - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins .007 MILE(S) AFTER RR UP S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 169 S South - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .028 MILE(S) AFTER RT FF S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 31 S South - BUCHANAN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 07-MAY-2024.
Road work begins .003 MILE(S) AFTER US 36 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .032 MILE(S) AFTER CRD FAR WEST DR E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .032 MILE(S) AFTER BU 36 E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 41 N North - CARROLL COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 07-MAY-2024.
Road work begins .187 MILE(S) AFTER RT F E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 41 S South - CARROLL COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 07-MAY-2024.
Road work begins US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 129 N North - CHARITON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD MENEFEE RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins .08 MILE(S) BEFORE CST MISSOURI ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins .108 MILE(S) AFTER RT KK S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 5 S South - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins .023 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Possible delays due to work zoneState Route RT KK N North - CHARITON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT KK S South - CHARITON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .598 MILE(S) BEFORE CRD OLD CHARITON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT F S South - CLINTON COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAY-2024 to 01-MAY-2024.
Road work begins US 169 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
Possible delays due to work zoneInterstate IS 35 N North - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins .814 MILE(S) BEFORE RT H E.
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneInterstate IS 35 S South - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins .686 MILE(S) BEFORE RT H E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneUS US 69 N North - DEKALB COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins .001 MILE(S) BEFORE CST PENCE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:30 PM.
Expect delays due to work zoneUS US 69 S South - DEKALB COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins .133 MILE(S) BEFORE CST PENCE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 69 S South - DEKALB COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 01-MAY-2024 to 08-MAY-2024.
Road work begins .123 MILE(S) BEFORE CRD ROGERS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:30 PM.
Possible delays due to work zoneState Route RT V S South - GRUNDY COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-APR-2024 to 14-MAY-2024.
Road work begins .068 MILE(S) AFTER MO 6 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneInterstate IS 35 N North - HARRISON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 01-MAY-2024 to 01-JUN-2024.
Road work begins .076 MILE(S) AFTER US 136 E.
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneInterstate IS 35 S South - HARRISON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 01-MAY-2024 to 01-JUN-2024.
Road work begins .013 MILE(S) BEFORE RT N E.
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneState Route MO 5 S South - LINN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins .011 MILE(S) AFTER RT U S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT V N North - LIVINGSTON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 23-APR-2024 to 14-MAY-2024.
Road work begins US 65 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 36 E East - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins .031 MILE(S) AFTER RP US36E TO US65 E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 E East - LIVINGSTON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins .007 MILE(S) AFTER CRD 401 S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 W West - LIVINGSTON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins .066 MILE(S) BEFORE BU 36 E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 W West - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins .07 MILE(S) AFTER BU 36 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT A W West - NODAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 03-MAY-2024.
Road work begins .274 MILE(S) BEFORE CST ELM ST E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 71 S South - NODAWAY COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins .17 MILE(S) BEFORE RT V E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.

Back to Top

FUTURE WORK ZONES: 9 to report. Hide

Expect delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 07-MAY-2024 to 23-MAY-2024.
Road work begins .054 MILE(S) BEFORE RR KANSAS CITY DISTRICT E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 5 S South - CHARITON COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 07-MAY-2024 to 23-MAY-2024.
Road work begins .006 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done 7 days a week.
Expect delays due to work zoneLoop LP 35 N North - CLINTON COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 09-MAY-2024 to 09-MAY-2024.
Road work begins RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 09:00 PM.
Expect delays due to work zoneCST GRAND AVE E East - DEKALB COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 09-MAY-2024 to 09-MAY-2024.
Road work begins .111 MILE(S) AFTER BU 36 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT W N North - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 03-MAY-2024 to 03-MAY-2024.
Road work begins .011 MILE(S) BEFORE CRD 330 ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT W S South - GENTRY COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 03-MAY-2024 to 03-MAY-2024.
Road work begins .001 MILE(S) BEFORE CRD 327 ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 65 S South - MERCER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 03-MAY-2024 to 04-MAY-2024.
Road work begins .002 MILE(S) AFTER CRD JIGSAW AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 10:00 AM.
Possible delays due to work zoneUS US 65 S South - MERCER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 03-MAY-2024 to 04-MAY-2024.
Road work begins .002 MILE(S) AFTER CRD JIGSAW AVE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 10:00 AM.
Possible delays due to work zoneState Route RT D E East - SULLIVAN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 06-MAY-2024 to 07-MAY-2024.
Road work begins .002 MILE(S) BEFORE CRD LITTLE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.

Back to Top

INCIDENTS: 0 to report. Show

Back to Top

FLOODS (CLOSED): 4 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 116 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT