WORK ZONES (CLOSED): 12 to report. Hide

Road Closed due to work zoneState Route 11 North - ADAIR COUNTY - Road Closed
Project Name - BRIDGE REPLACEMENT OVER STEER CREEK
BRIDGE RECONSTRUCTION
Road closure begins 4.66 MILES AFTER MO 6 W.
Scheduled from 26-JUL-2021 to 27-OCT-2021.
Road Closed due to work zoneState Route 11 South - ADAIR COUNTY - Road Closed
Project Name - BRIDGE REPLACEMENT OVER STEER CREEK
BRIDGE RECONSTRUCTION
Road closure begins 4.69 MILES BEFORE US 63 N.
Scheduled from 26-JUL-2021 to 27-OCT-2021.
Road Closed due to work zoneState Route J East - AUDRAIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.29 MILES BEFORE MO 19 S.
Scheduled from 26-AUG-2021 to 15-NOV-2021.
Road Closed due to work zoneState Route J West - AUDRAIN COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.2 MILES AFTER US 54 W.
Scheduled from 26-AUG-2021 to 15-NOV-2021.
Road Closed due to work zoneState Route C West - LEWIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.45 MILES AFTER BU 61 S.
Scheduled from 09-AUG-2021 to 01-DEC-2021.
Road Closed due to work zoneState Route C East - LEWIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.45 MILES BEFORE BU 61 N.
Scheduled from 09-AUG-2021 to 01-DEC-2021.
Road Closed due to work zoneState Route K West - LEWIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.96 MILES BEFORE RT Y E.
Scheduled from 19-JUL-2021 to 01-DEC-2021.
Road Closed due to work zoneState Route K East - LEWIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 1.95 MILES AFTER RT Y W.
Scheduled from 19-JUL-2021 to 01-DEC-2021.
Road Closed due to work zoneState Route N South - MONTGOMERY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .03 MILES BEFORE IS 70 W.
Scheduled from 21-JUN-2021 to 31-OCT-2021.
Road Closed due to work zoneState Route N North - MONTGOMERY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILES BEFORE IS 70 E.
Scheduled from 21-JUN-2021 to 31-OCT-2021.
Road Closed due to work zoneState Route 15 South - SCOTLAND COUNTY - Road Closed
Project Name - BRIDGE REPLACEMENT OVER SOUTH WYACONDA RIVER
BRIDGE RECONSTRUCTION
Road closure begins 1.99 MILES AFTER RT C W.
Scheduled from 16-AUG-2021 to 01-DEC-2021.
Road Closed due to work zoneState Route 15 North - SCOTLAND COUNTY - Road Closed
Project Name - BRIDGE REPLACEMENT OVER SOUTH WYACONDA RIVER
BRIDGE RECONSTRUCTION
Road closure begins 2.48 MILES BEFORE RT C E.
Scheduled from 16-AUG-2021 to 01-DEC-2021.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 22 to report. Hide

Expect delays due to work zoneBALTIMORE ST South - ADAIR COUNTY - Expect Delays
Project Name - RESURFACE AND ADA FROM RTE. 6 SOUTH TO PATTERSON
RESURFACING PAVEMENT
Scheduled from 05-APR-2021 to 15-NOV-2021.
Road work begins LESS THAN .01 MILES AFTER CST ILLINOIS ST W.
Work will be done around the clock, on weekdays only.
News Releases - HTTPS://WWW.MODOT.ORG/NODE/21924
Expect delays due to work zoneBALTIMORE ST North - ADAIR COUNTY - Expect Delays
Project Name - RESURFACE AND ADA FROM RTE. 6 SOUTH TO PATTERSON
RESURFACING PAVEMENT
Scheduled from 05-APR-2021 to 15-NOV-2021.
Road work begins LESS THAN .01 MILES AFTER CST PATTERSON ST W.
Work will be done around the clock, on weekdays only.
News Releases - HTTPS://WWW.MODOT.ORG/NODE/21924
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 12-JUL-2021 to 31-OCT-2021.
Road work begins .76 MILES AFTER RT B S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 54 West - AUDRAIN COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 12-JUL-2021 to 31-OCT-2021.
Road work begins 1.09 MILES BEFORE RT B N.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route B South - LEWIS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 16-AUG-2021 to 01-NOV-2021.
Road work begins AT US 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route B North - LEWIS COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 16-AUG-2021 to 01-NOV-2021.
Road work begins AT BU 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneBusiness 36 East - MACON COUNTY - Expect Delays
Project Name - RESURFACE FROM RTE. 63 TO RTE. 36 IN MACON
RESURFACING PAVEMENT
Scheduled from 30-AUG-2021 to 15-NOV-2021.
Road work begins .01 MILES AFTER CST W BRIGGS DR W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneBusiness 36 West - MACON COUNTY - Expect Delays
Project Name - RESURFACE FROM RTE. 63 TO RTE. 36 IN MACON
RESURFACING PAVEMENT
Scheduled from 30-AUG-2021 to 15-NOV-2021.
Road work begins .03 MILES AFTER US 36 E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route M East - MACON COUNTY - Expect Delays
Project Name - ADA IMPROVEMENTS FROM AARON ST. TO ORCHARD ST.
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-AUG-2021 to 17-DEC-2021.
Road work begins .04 MILES AFTER CRD U S HWY 63 OLD N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route M West - MACON COUNTY - Expect Delays
Project Name - ADA IMPROVEMENTS FROM AARON ST. TO ORCHARD ST.
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 02-AUG-2021 to 17-DEC-2021.
Road work begins .12 MILES AFTER CST MAIN ST W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneUS 63 North - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUL-2021 to 15-NOV-2021.
Road work begins 1.79 MILES BEFORE CST S MISSOURI AVE S.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - RESURFACE AND ADA IMPROVEMENTS FROM 0.4 MILE SOUTH OF RTE. DD TO 0.6 MILE SOUTH OF RTE. YY
Expect delays due to work zoneUS 63 South - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-JUL-2021 to 15-NOV-2021.
Road work begins 1.82 MILES AFTER CRD AXTELL RD E.
Work will be done around the clock, on weekdays and Saturdays.
News Releases - RESURFACE AND ADA IMPROVEMENTS FROM 0.4 MILE SOUTH OF RTE. DD TO 0.6 MILE SOUTH OF RTE. YY
Expect delays due to work zoneUS 24 West - MARION COUNTY - Expect Delays
Project Name - REBUILD ILLINOIS
BRIDGE MAINTENANCE
Scheduled from 12-APR-2021 to 30-NOV-2021.
Road work begins 5.32 MILES BEFORE BK GREAT RIVER ROAD TRAIL N.
Work will be done around the clock, 7 days a week.
Project Web Page - GETTINGAROUNDILLINOIS.COM
News Releases - NORTHEAST.NEWS@MODOT.MO.GOV
Expect delays due to work zoneUS 24 East - MARION COUNTY - Expect Delays
Project Name - REBUILD ILLINOIS
BRIDGE MAINTENANCE
Scheduled from 12-APR-2021 to 30-NOV-2021.
Road work begins 2.84 MILES AFTER BK GREAT RIVER ROAD TRAIL N.
Work will be done around the clock, 7 days a week.
Project Web Page - GETTINGAROUNDILLINOIS.COM
News Releases - NORTHEAST.NEWS@MODOT.MO.GOV
Expect delays due to work zoneInterstate 70 West - MONTGOMERY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-JUN-2021 to 31-OCT-2021.
Road work begins 4.34 MILES BEFORE RT D S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 70 East - MONTGOMERY COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-JUN-2021 to 31-OCT-2021.
Road work begins 3.61 MILES AFTER RT YY E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route EE West - RANDOLPH COUNTY - Expect Delays
Project Name - RESURFACE FROM RTE. 63 TO STATE END MAINTENANCE
RESURFACING PAVEMENT
Scheduled from 27-SEP-2021 to 27-OCT-2021.
Road work begins .03 MILES AFTER CRD ROLLINS ST E.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route EE East - RANDOLPH COUNTY - Expect Delays
Project Name - RESURFACE FROM RTE. 63 TO STATE END MAINTENANCE
RESURFACING PAVEMENT
Scheduled from 27-SEP-2021 to 27-OCT-2021.
Road work begins .02 MILES AFTER US 63 N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneW WASHINGTON ST East - SCHUYLER COUNTY - Expect Delays
Project Name - ADA IMPROVEMENTS 5TH ST TO PERRY ST
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-SEP-2021 to 15-NOV-2021.
Road work begins .35 MILES BEFORE RT U N.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneW WASHINGTON ST West - SCHUYLER COUNTY - Expect Delays
Project Name - ADA IMPROVEMENTS 5TH ST TO PERRY ST
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-SEP-2021 to 15-NOV-2021.
Road work begins .21 MILES AFTER CST W WASHINGTON ST W.
Work will be done around the clock, on weekdays and Saturdays.
Expect delays due to work zoneState Route O North - WARREN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-MAR-2021 to 30-NOV-2021.
Road work begins AT MO 47 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route O South - WARREN COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-MAR-2021 to 30-NOV-2021.
Road work begins AT RT M W.
Work will be done around the clock, on weekdays only.

Back to Top

FUTURE WORK ZONES: 37 to report. Hide

Expect delays due to work zoneState Route N South - AUDRAIN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 19-OCT-2021 to 20-OCT-2021.
Road work begins AT MO 19 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route N North - AUDRAIN COUNTY - CLOSED
RAILROAD MAINTENANCE
Scheduled from 19-OCT-2021 to 20-OCT-2021.
Road work begins .04 MILES BEFORE CST FOURTH ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneBusiness 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - BU 54- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins AT MO 15 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneBusiness 54 West - AUDRAIN COUNTY - Expect Delays
Project Name - BU 54- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2021 to 22-OCT-2021.
Road work begins LESS THAN .01 MILES BEFORE CST GREEN BLVD N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 North - AUDRAIN COUNTY - Expect Delays
Project Name - 54/19- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins .16 MILES BEFORE CST PINE ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 19 North - AUDRAIN COUNTY - Expect Delays
Project Name - 54/19- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins AT RT BB W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 54 West - AUDRAIN COUNTY - Expect Delays
Project Name - 54/19- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins .95 MILES BEFORE MO 19 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 36 West - MARION COUNTY - Expect Delays
Project Name - 36- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins AT CST CENTRAL AVE S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 61 South - MARION COUNTY - Expect Delays
Project Name - 61- PATCHING
PATCHING DRIVE SURFACE
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins .26 MILES AFTER CST WEST ELY RD W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 15 North - MONROE COUNTY - Expect Delays
Project Name - 15- BRIDGE MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .6 MILES BEFORE RT CC W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneGREAT RIVER ROAD TRAIL North - PIKE COUNTY - CLOSED
Project Name - 79- RAILROAD MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .14 MILES BEFORE CST 3RD ST N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneGREAT RIVER ROAD TRAIL South - PIKE COUNTY - CLOSED
Project Name - 79- RAILROAD MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .06 MILES BEFORE CST 3RD ST S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AB West - PIKE COUNTY - CLOSED
Project Name - AB- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins 1.87 MILES BEFORE RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AB West - PIKE COUNTY - CLOSED
Project Name - AB- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins 1.87 MILES BEFORE RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AB East - RALLS COUNTY - CLOSED
Project Name - AB- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins AT RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route AB East - RALLS COUNTY - CLOSED
Project Name - AB- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins AT RT F S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ West - RALLS COUNTY - CLOSED
Project Name - JJ- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 1.92 MILES BEFORE RT P N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ East - RALLS COUNTY - CLOSED
Project Name - JJ- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins LESS THAN .01 MILES AFTER RT P N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ West - RALLS COUNTY - CLOSED
Project Name - JJ- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins 1.91 MILES BEFORE RT P N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route JJ East - RALLS COUNTY - CLOSED
Project Name - JJ- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins AT RT P S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K East - RALLS COUNTY - CLOSED
Project Name - K- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .75 MILES BEFORE RT P N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route K West - RALLS COUNTY - CLOSED
Project Name - K- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins AT RT P S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 36 West - RALLS COUNTY - Expect Delays
Project Name - 36- BRIDGE MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins .05 MILES BEFORE US 24 W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D South - RANDOLPH COUNTY - CLOSED
Project Name - D- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins .55 MILES AFTER RT C N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route D North - RANDOLPH COUNTY - CLOSED
Project Name - D- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 21-OCT-2021 to 21-OCT-2021.
Road work begins 1.34 MILES AFTER RT BB E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route NN East - RANDOLPH COUNTY - CLOSED
Project Name - NN- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins .9 MILES AFTER BU 63 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route NN West - RANDOLPH COUNTY - CLOSED
Project Name - NN- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins 2.46 MILES BEFORE US 63 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P South - RANDOLPH COUNTY - CLOSED
Project Name - P- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 4.88 MILES BEFORE US 63 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P North - RANDOLPH COUNTY - CLOSED
Project Name - P- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins 3.9 MILES AFTER US 63 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P South - RANDOLPH COUNTY - CLOSED
Project Name - P- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins 2.64 MILES BEFORE US 63 N.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route P North - RANDOLPH COUNTY - CLOSED
Project Name - P- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 20-OCT-2021 to 20-OCT-2021.
Road work begins .87 MILES AFTER US 63 N.
Work will be done around the clock, on weekdays only.
Possible delays due to work zoneState Route W West - RANDOLPH COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins AT MO 3 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 63 South - SCHUYLER COUNTY - Expect Delays
Project Name - 63- GRINDING HIGH JOINTS
DIAMOND GRINDING
Scheduled from 18-OCT-2021 to 21-OCT-2021.
Road work begins 5.16 MILES BEFORE MO 202 E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK West - SHELBY COUNTY - CLOSED
Project Name - KK- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .49 MILES AFTER CRD STATE RT KK E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route KK East - SHELBY COUNTY - CLOSED
Project Name - KK- CULVERT REPLACEMENT
CULVERT REPLACEMENT
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .37 MILES AFTER CRD STATE RT KK E.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneState Route 15 South - SHELBY COUNTY - Expect Delays
Project Name - 15- BRIDGE MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 19-OCT-2021 to 19-OCT-2021.
Road work begins .02 MILES AFTER CRD STATE RT J W.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneUS 36 East - SHELBY COUNTY - Expect Delays
Project Name - 36- BRIDGE MAINTENANCE
BRIDGE MAINTENANCE
Scheduled from 18-OCT-2021 to 18-OCT-2021.
Road work begins .25 MILES AFTER MO 151 N.
Work will be done around the clock, on weekdays only.

Back to Top

INCIDENTS: 17 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 59 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.

END OF REPORT