Interstate IS 35 N North
-
JACKSON COUNTY
- Expect Delays
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.089 MILE(S) BEFORE RP EATON ST TO IS35N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 35 S South
-
JACKSON COUNTY
- Expect Delays
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.022 MILE(S) BEFORE RP IS35N TO IS670W W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 150 E East
-
JACKSON COUNTY
- Expect Delays
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 09-JUL-2025.
Road work begins
MO 291 N.
Work will be done
on weekdays and Saturdays.
State Route MO 150 W West
-
JACKSON COUNTY
- Expect Delays
Project Name -
Rte 150 Pavement rehabilitation/overlay
RESURFACING PAVEMENT
Scheduled from 17-MAR-2025 to 09-JUL-2025.
Road work begins
.028 MILE(S) BEFORE MO 7 S.
Work will be done
on weekdays and Saturdays.
State Route RT V N North
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 02-JUN-2025 to 29-AUG-2025.
Road work begins
.022 MILE(S) BEFORE CST NW LITTLE BLUE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 02-JUN-2025 to 01-NOV-2025.
Road work begins
.123 MILE(S) BEFORE CST W KATIE TRL E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
US US 40 E East
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 26-SEP-2025.
Road work begins
.001 MILE(S) BEFORE CST STERLING AVE S.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
US US 40 W West
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 26-SEP-2025.
Road work begins
.039 MILE(S) BEFORE CST OOIDA DR S.
Work will be done
7 days a week.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Interstate IS 435 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.039 MILE(S) BEFORE RR PITTSBURG SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.106 MILE(S) BEFORE RP IS470E TO BLUE RIDGE BLVD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.042 MILE(S) BEFORE RP IS470E TO VIEW HIGH DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.058 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.072 MILE(S) BEFORE RP IS470W TO VIEW HIGH DR N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.008 MILE(S) BEFORE RP IS49N TO MO150W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 49 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.085 MILE(S) AFTER RP IS49S TO MO150E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 12 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-JUN-2025 to 11-JUL-2025.
Road work begins
.001 MILE(S) BEFORE CST HARRIS AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2025 to 11-JUL-2025.
Road work begins
.002 MILE(S) BEFORE CST FOREST AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 27-JUN-2025 to 11-JUL-2025.
Road work begins
.001 MILE(S) BEFORE CST CRISP AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 12 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 11-JUL-2025.
Road work begins
.011 MILE(S) BEFORE CST NORTHERN BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 210 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 11-JUN-2025 to 11-JUL-2025.
Road work begins
.217 MILE(S) BEFORE RP MO291S TO MO210 S.
Work will be done
on weekdays only.
State Route MO 210 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 11-JUN-2025 to 11-JUL-2025.
Road work begins
.014 MILE(S) BEFORE CST COBBLER RD S.
Work will be done
on weekdays only.
State Route MO 7 N North
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-JUN-2025 to 08-AUG-2025.
Road work begins
.168 MILE(S) AFTER CST HERRING RD E.
Work will be done
7 days a week.
Ramp RP BROADWAY TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
CST BROADWAY BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP EATON ST TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.092 MILE(S) BEFORE IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO IS670E E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.033 MILE(S) AFTER IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35N TO IS670W W West
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO EATON ST N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO IS670E E East
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS35S TO PENN VALLEY DR S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 35 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS470E TO STROTHER RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO BLUE RIDGE BLVD N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO NE DOUGLAS ST S S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS470W TO STROTHER RD W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.011 MILE(S) AFTER IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP IS670W TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.018 MILE(S) AFTER CST CENTRAL ST N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS670W TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
IS 670 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP MO7 TO IS70E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7 TO US24E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7 TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP MO7N TO US24W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
MO 7 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST N TO IS470W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
CST NE DOUGLAS ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP NE DOUGLAS ST S TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
CST NE DOUGLAS ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP PENN VALLEY DR N TO IS35N N North
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
.044 MILE(S) AFTER CST PENN VALLEY DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP PENNSYLVANIA AVE TO IS35S S South
-
JACKSON COUNTY
- Delays Possible
Project Name -
241018-C05 JKU0018 JKU0029 - Asphalt Paving
RESURFACING PAVEMENT
Scheduled from 13-JUN-2025 to 26-JUL-2025.
Road work begins
CST PENNSYLVANIA AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP RAYTOWN RD TO US50E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP RAYTOWN RD TO US50W W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
CST RAYTOWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP STROTHER RD TO IS470E E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
CST NE STROTHER RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US24E TO MO7 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US24W TO MO7 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
US 24 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO MO7 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
US 50 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50E TO RAYTOWN RD E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Ramp RP US50W TO RAYTOWN RD W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
IS 470 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.163 MILE(S) BEFORE CRD BURNLEY RD S.
Work will be done
7 days a week.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.015 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 01-NOV-2025.
Road work begins
.006 MILE(S) AFTER CST CENTRAL ST S.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
US US 40 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-JUN-2025 to 19-JUL-2025.
Road work begins
.035 MILE(S) BEFORE CST HARDY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.116 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 E East
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.193 MILE(S) BEFORE RP US50E TO MO7 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.156 MILE(S) BEFORE CST NW O BRIEN RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.017 MILE(S) AFTER RP US50W TO MO7 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.069 MILE(S) AFTER RP US71N TO THE PASEO N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.119 MILE(S) BEFORE CST LINWOOD BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 N North
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.032 MILE(S) AFTER CST E 27TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.039 MILE(S) AFTER RP US71S TO MICHIGAN AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.098 MILE(S) AFTER RP US71S TO DR MARTIN LUTHER KING JR BLVD E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 71 S South
-
JACKSON COUNTY
- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 10-JUN-2025 to 31-JUL-2025.
Road work begins
.019 MILE(S) BEFORE CST E 19TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.