WORK ZONES (CLOSED): 24 to report.
HideCRD PECULIAR DR E East
-
CASS COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.011 MILE(S) AFTER CRD 237TH ST E.
Scheduled from
05-FEB-2024
to
15-JUN-2024.
CRD PECULIAR DR W West
-
CASS COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.25 MILE(S) BEFORE CRD 237TH ST E.
Scheduled from
05-FEB-2024
to
15-JUN-2024.
CST NE 45TH ST W West
-
CLAY COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
.024 MILE(S) BEFORE MO 1 S.
Scheduled from
22-APR-2024
to
30-APR-2024.
CST NE 47TH ST W West
-
CLAY COUNTY
- Road Closed
PERMIT OR UTILITY WORK
Road closure begins
.013 MILE(S) BEFORE MO 1 S.
Scheduled from
22-APR-2024
to
30-APR-2024.
Ramp RP RICHARDS RD TO US169S S South
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
CST HARLEM RD E.
Scheduled from
06-FEB-2023
to
14-OCT-2024.
US US 169 S South
-
CLAY COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.065 MILE(S) BEFORE CO US169S TO RICHARD RD S.
Scheduled from
04-MAR-2024
to
26-APR-2024.
US US 169 S South
-
CLAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.021 MILE(S) AFTER RP US169S TO RICHARDS RD S.
Scheduled from
06-FEB-2023
to
14-OCT-2024.
CST WOODSWETHER RD W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.003 MILE(S) AFTER CST W 5TH ST W.
Scheduled from
29-JAN-2024
to
31-DEC-2025.
Ramp RP BEARDSLEY RD TO IS70W W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
CST BEARDSLEY RD S.
Scheduled from
07-MAR-2024
to
31-MAY-2024.
Ramp RP CHARLOTTE ST TO IS70E E East
-
JACKSON COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.004 MILE(S) AFTER CST CHARLOTTE ST S.
Scheduled from
20-MAR-2024
to
15-MAY-2024.
Ramp RP E 14TH ST TO IS70E E East
-
JACKSON COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.003 MILE(S) AFTER CST E 14TH ST E.
Scheduled from
20-MAR-2024
to
15-MAY-2024.
Ramp RP FIFTH ST TO IS70W W West
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
US 169 S.
Scheduled from
07-MAR-2024
to
31-MAY-2024.
Ramp RP IS70E TO IS35S S South
-
JACKSON COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
IS 70 E.
Scheduled from
18-MAR-2024
to
31-MAY-2024.
Ramp RP US169N TO IS35S S South
-
JACKSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
US 169 N.
Scheduled from
03-APR-2023
to
31-DEC-2025.
US US 169 N North
-
JACKSON COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.139 MILE(S) AFTER RR KC METRO E.
Scheduled from
04-MAR-2024
to
26-APR-2024.
State Route RT WW N North
-
JOHNSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.004 MILE(S) AFTER CRD 1101 S.
Scheduled from
17-JAN-2024
to
30-APR-2024.
State Route RT WW S South
-
JOHNSON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
MO 23 S.
Scheduled from
17-JAN-2024
to
30-APR-2024.
State Route MO 92 E East
-
PLATTE COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.023 MILE(S) AFTER CST PRAIRIE VIEW RD S.
Scheduled from
23-JAN-2024
to
30-JUN-2024.
State Route MO 92 W West
-
PLATTE COUNTY
- Road Closed
BRIDGE MAINTENANCE
Road closure begins
.023 MILE(S) AFTER RP MO92 TO IS29N N.
Scheduled from
23-JAN-2024
to
30-JUN-2024.
State Route RT Z W West
-
PLATTE COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.2 MILE(S) BEFORE RT F S.
Scheduled from
24-APR-2024
to
25-APR-2024.
CRD LEMON TRL N North
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.022 MILE(S) BEFORE IS 70 E.
Scheduled from
14-MAR-2023
to
31-DEC-2037.
CRD LEMON TRL S South
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.015 MILE(S) BEFORE IS 70 W.
Scheduled from
14-MAR-2023
to
31-DEC-2037.
State Route RT EE N North
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.113 MILE(S) AFTER MO 20 E.
Scheduled from
12-FEB-2024
to
30-JUN-2024.
State Route RT EE S South
-
SALINE COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.06 MILE(S) AFTER CRD 220TH RD E.
Scheduled from
12-FEB-2024
to
30-JUN-2024.
Back to Top
WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 54 to report.
HideCRD PECULIAR DR N North
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
.015 MILE(S) BEFORE CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
CRD PECULIAR DR S South
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins
CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT K N North
-
CASS COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins
.466 MILE(S) AFTER CRD E 245TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
CRD 195TH ST E East
-
CASS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.006 MILE(S) BEFORE IS 49 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
08:30 PM.
CRD 195TH ST W West
-
CASS COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins
.009 MILE(S) AFTER CST CITY OF RAYMORE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
08:30 PM.
State Route MO 2 E East
-
CASS COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 21-APR-2024 to 26-APR-2024.
Road work begins
.043 MILE(S) AFTER CRD ORCHARD RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 435 S South
-
CLAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.01 MILE(S) BEFORE CST NE BIRMINGHAM RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 03-MAY-2024.
Road work begins
.022 MILE(S) BEFORE CST NE 44TH TER E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 169 N North
-
CLAY COUNTY
- Expect Delays
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins
.284 MILE(S) BEFORE RR FORT SCOTT SUB S.
Work will be done
7 days a week.
US US 169 N North
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins
.013 MILE(S) BEFORE CRD CLINTON COUNTY LINE RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CST N OAK TRFY S South
-
CLAY COUNTY
- Delays Possible
Project Name -
BLUME
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road work begins
.05 MILE(S) BEFORE MO 9 N.
Work will be done
7 days a week.
Work will be conducted between the hours of
09:00 AM
and
05:00 PM.
CST NW BARRY RD W West
-
CLAY COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2024.
Road work begins
.025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done
7 days a week.
State Route MO 1 N North
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins
.046 MILE(S) AFTER CST 64TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 10-MAY-2024.
Road work begins
.406 MILE(S) AFTER CST NE 80TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins
.004 MILE(S) AFTER CST NE 47TH TER E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
State Route MO 1 S South
-
CLAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins
.001 MILE(S) BEFORE CST NE 46TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
US US 169 N North
-
CLAY COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins
.049 MILE(S) AFTER CST ROCK CREEK TER E.
Work will be done
7 days a week.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins
.378 MILE(S) AFTER CST LAKE MEADOWS DR E.
Work will be done
7 days a week.
US US 169 S South
-
CLAY COUNTY
- Delays Possible
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins
.045 MILE(S) BEFORE CST NW BRIARCLIFF PKWY W.
Work will be done
7 days a week.
US US 69 N North
-
CLAY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.079 MILE(S) BEFORE CST PARK AVE E.
Work will be done
on weekdays only.
US US 69 S South
-
CLAY COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins
.019 MILE(S) BEFORE CST RANDOLPH RD S.
Work will be done
on weekdays only.
CST E 6TH ST E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 30-APR-2024.
Road work begins
CST W 6TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 35 N North
-
JACKSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins
.01 MILE(S) AFTER RP W 12TH ST TO IS35N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 12-MAY-2024.
Road work begins
.031 MILE(S) AFTER RP IS435S TO FRONT ST E E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAR-2024 to 15-MAY-2024.
Road work begins
.026 MILE(S) AFTER US 71 S.
Work will be done
7 days a week.
Interstate IS 70 E East
-
JACKSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.034 MILE(S) AFTER RP IS70E TO IS35S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 70 W West
-
JACKSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.001 MILE(S) AFTER RR UNKNOWN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 150 E East
-
JACKSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.028 MILE(S) BEFORE RP MO291N TO MO150 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 350 E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins
.046 MILE(S) BEFORE RT V S.
Work will be done
7 days a week.
State Route MO 350 W West
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins
.028 MILE(S) AFTER CST BLUE PKWY E.
Work will be done
7 days a week.
Ramp RP IS670E TO IS70W W West
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-JUL-2023 to 31-MAY-2024.
Road work begins
IS 670 E.
Work will be done
7 days a week.
State Route MO 350 E East
-
JACKSON COUNTY
- No Expected Delays
ROADSIDE WORK
Scheduled from 22-APR-2024 to 27-APR-2024.
Road work begins
.043 MILE(S) BEFORE CST HARDY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
03:00 PM
and
01:00 PM.
State Route MO 350 W West
-
JACKSON COUNTY
- No Expected Delays
ROADSIDE WORK
Scheduled from 22-APR-2024 to 27-APR-2024.
Road work begins
.388 MILE(S) AFTER CST BLUE PKWY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST TRUMAN RD E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAR-2024 to 26-APR-2024.
Road work begins
.023 MILE(S) AFTER CST CUNNINGHAM S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
12:00 PM.
CST TRUMAN RD W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-FEB-2024 to 26-APR-2024.
Road work begins
.005 MILE(S) AFTER CST CRYSLER AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 78 E East
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.022 MILE(S) BEFORE CST CRESCENT AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 78 W West
-
JACKSON COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.051 MILE(S) AFTER CST RALSTON AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
US US 24 E East
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
.012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done
7 days a week.
US US 24 W West
-
JACKSON COUNTY
- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins
OR 291 S.
Work will be done
7 days a week.
State Route MO 2 E East
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
.217 MILE(S) BEFORE CRD 1931 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route RT Y E East
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route RT Y W West
-
JOHNSON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins
.118 MILE(S) AFTER CRD 475 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
US US 50 E East
-
JOHNSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins
.019 MILE(S) AFTER RP MO23 TO US50E E.
Work will be done
7 days a week.
US US 50 W West
-
JOHNSON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins
.456 MILE(S) BEFORE RT D S.
Work will be done
7 days a week.
State Route RT M S South
-
LAFAYETTE COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins
.431 MILE(S) AFTER CRD MOUNT ZION RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT T N North
-
LAFAYETTE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.207 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT T S South
-
LAFAYETTE COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins
.105 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
US US 50 E East
-
PETTIS COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 25-APR-2024.
Road work begins
.133 MILE(S) AFTER CO US50W T0 US50E S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:30 PM.
State Route MO 371 N North
-
PLATTE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins
.03 MILE(S) AFTER MO 273 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 45 S South
-
PLATTE COUNTY
- No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins
.035 MILE(S) AFTER PVT PE083045C3454 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
Interstate IS 29 N North
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.088 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Interstate IS 29 S South
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins
.098 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route MO 92 W West
-
PLATTE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 01-MAY-2024.
Road work begins
.082 MILE(S) BEFORE CRD WINDMILL DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT O S South
-
RAY COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2024 to 03-MAY-2024.
Road work begins
.014 MILE(S) BEFORE CRD PERRY RD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
Back to Top
FUTURE WORK ZONES: 42 to report.
HideInterstate IS 49 N North
-
CASS COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road work begins
.128 MILE(S) BEFORE RP IS49N TO W 155TH ST N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 58 E East
-
CASS COUNTY
- No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 29-APR-2024 to 10-MAY-2024.
Road work begins
.036 MILE(S) AFTER CST APPLE VALLEY PKWY S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
State Route RT H E East
-
CLAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 30-APR-2024 to 30-APR-2024.
Road work begins
.049 MILE(S) BEFORE CRD STOCKDALE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
US US 69 N North
-
CLAY COUNTY
- CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-MAY-2024 to 05-MAY-2024.
Road work begins
.016 MILE(S) BEFORE CST PARK AVE E.
Work will be done
7 days a week.
US US 69 S South
-
CLAY COUNTY
- CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-MAY-2024 to 05-MAY-2024.
Road work begins
.006 MILE(S) AFTER CST POE AVE S.
Work will be done
7 days a week.
Interstate IS 29 S South
-
CLAY COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 02-MAY-2024 to 04-MAY-2024.
Road work begins
RP MO210W TO IS29S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
US US 169 S South
-
CLAY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 29-APR-2024 to 02-MAY-2024.
Road work begins
.131 MILE(S) AFTER MO 92 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
CO BLUE RIDGE BLVD TO WOR49S E East
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
CST BLUE RIDGE BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CO EOR49 TO WOR49 S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
OR 49 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CO WOR 49 TO EOR 49 N North
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST 15TH ST N North
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.013 MILE(S) BEFORE OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
CST 15TH ST S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Outer Road W OR 49 S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.007 MILE(S) AFTER CST BLUE RIDGE BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Outer Road W OR 49 S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.009 MILE(S) AFTER CST BLUE RIDGE BLVD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
PVT ACCESS ROAD E East
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.011 MILE(S) BEFORE OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
PVT ACCESS ROAD W West
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP FRONT ST E TO IS435S S South
-
JACKSON COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 28-APR-2024 to 12-MAY-2024.
Road work begins
.016 MILE(S) AFTER CST FRONT ST E.
Work will be done
7 days a week.
Ramp RP FRONT ST W TO IS435S S South
-
JACKSON COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 28-APR-2024 to 12-MAY-2024.
Road work begins
.005 MILE(S) AFTER CST FRONT ST W.
Work will be done
7 days a week.
Ramp RP IS470E TO IS70W W West
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 02-MAY-2024 to 04-MAY-2024.
Road work begins
IS 470 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Ramp RP IS49S TO WOR49 S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.013 MILE(S) AFTER IS 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP IS670E TO IS70W W West
-
JACKSON COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 03-MAY-2024 to 04-MAY-2024.
Road work begins
.011 MILE(S) AFTER IS 670 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
12:00 AM.
Ramp RP MO150E TO IS49S S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road work begins
.001 MILE(S) AFTER MO 150 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP MO150W TO IS49S S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road work begins
MO 150 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Ramp RP WOR49 TO IS49S S South
-
JACKSON COUNTY
- CLOSED
MILLING/RESURFACING WORK
Scheduled from 30-APR-2024 to 02-MAY-2024.
Road work begins
.001 MILE(S) AFTER OR 49 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 27-APR-2024 to 28-APR-2024.
Road work begins
.044 MILE(S) AFTER RP IS435S TO FRONT ST E E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 435 S South
-
JACKSON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 29-APR-2024 to 12-MAY-2024.
Road work begins
.039 MILE(S) AFTER RP IS435S TO FRONT ST E E.
Work will be done
7 days a week.
Interstate IS 470 E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-APR-2024 to 28-APR-2024.
Road work begins
.002 MILE(S) AFTER RP US71S TO IS470E E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
06:30 AM.
Interstate IS 470 W West
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-APR-2024 to 28-APR-2024.
Road work begins
.177 MILE(S) BEFORE RP IS470W TO BLUE RIDGE BLVD N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
06:30 AM.
Interstate IS 49 S South
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 01-MAY-2024 to 03-MAY-2024.
Road work begins
.014 MILE(S) BEFORE RP WOR49 TO IS49S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
JACKSON COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 02-MAY-2024 to 04-MAY-2024.
Road work begins
.003 MILE(S) BEFORE RP IS70W TO LITTLE BLUE EXPWY N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
05:00 AM.
Ramp RP BLUE RIDGE BLVD TO IS470W W West
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-APR-2024 to 28-APR-2024.
Road work begins
CST BLUE RIDGE BLVD S.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
06:30 AM.
Ramp RP RED BRIDGE RD TO IS470E E East
-
JACKSON COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 28-APR-2024 to 28-APR-2024.
Road work begins
.076 MILE(S) AFTER RP RED BRIDGE RD TO IS49N N.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 AM
and
06:30 AM.
State Route RT C N North
-
RAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 01-MAY-2024 to 01-MAY-2024.
Road work begins
.007 MILE(S) BEFORE CO RTC TO W 156TH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT C N North
-
RAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 29-APR-2024 to 29-APR-2024.
Road work begins
CRD W 148TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT C S South
-
RAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 01-MAY-2024 to 01-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD W 164TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT C S South
-
RAY COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 29-APR-2024 to 29-APR-2024.
Road work begins
.006 MILE(S) AFTER CRD W 156TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT C N North
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
.13 MILE(S) AFTER CRD W 164TH ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT C S South
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
CRD FIRST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT D E East
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
.039 MILE(S) AFTER RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT D W West
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
MO 13 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT M N North
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
.06 MILE(S) BEFORE CRD REYNOLDS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT M S South
-
RAY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 29-APR-2024 to 03-MAY-2024.
Road work begins
RT C S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.