WORK ZONES (CLOSED): 125 to report. Hide

Road Closed due to work zoneState Route MO 46 E East - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .031 MILE(S) AFTER CRD R AVE S.
Scheduled from 12-FEB-2024 to 31-MAY-2024.
Road Closed due to work zoneState Route MO 46 W West - ATCHISON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .194 MILE(S) AFTER RT MM S.
Scheduled from 12-FEB-2024 to 31-MAY-2024.
Road Closed due to work zoneState Route RT W N North - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .005 MILE(S) BEFORE CRD NW 60TH RD E.
Scheduled from 08-FEB-2024 to 26-JUN-2024.
Road Closed due to work zoneState Route RT W S South - BARTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT V E.
Scheduled from 08-FEB-2024 to 26-JUN-2024.
Road Closed due to work zoneLoop LP 49 N North - BATES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .002 MILE(S) AFTER CRD NE 6004 E.
Scheduled from 08-APR-2024 to 25-APR-2024.
Road Closed due to work zoneLoop LP 49 S South - BATES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .002 MILE(S) AFTER CRD NW 6002 E.
Scheduled from 08-APR-2024 to 25-APR-2024.
Road Closed due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .019 MILE(S) BEFORE CST BROADWAY ST E.
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road Closed due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .018 MILE(S) AFTER CRD FAR WEST DR E.
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road Closed due to work zoneState Route RT W E East - CALLAWAY COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .021 MILE(S) BEFORE US 63 S.
Scheduled from 08-APR-2024 to 07-JUN-2024.
Road Closed due to work zoneState Route RT W W West - CALLAWAY COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .018 MILE(S) BEFORE US 54 E.
Scheduled from 08-APR-2024 to 07-JUN-2024.
Road Closed due to work zoneUS US 61 N North - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST WASHINGTON ST E.
Scheduled from 02-OCT-2023 to 01-NOV-2024.
Road Closed due to work zoneUS US 61 S South - CAPE GIRARDEAU COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST PARK VIEW E.
Scheduled from 02-OCT-2023 to 01-NOV-2024.
Road Closed due to work zoneState Route RT B E East - CARTER COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .012 MILE(S) AFTER RT K S.
Scheduled from 04-MAR-2024 to 04-JUL-2024.
Road Closed due to work zoneState Route RT B W West - CARTER COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 60 W.
Scheduled from 04-MAR-2024 to 04-JUL-2024.
Road Closed due to work zoneCRD PECULIAR DR E East - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .011 MILE(S) AFTER CRD 237TH ST E.
Scheduled from 05-FEB-2024 to 15-JUN-2024.
Road Closed due to work zoneCRD PECULIAR DR W West - CASS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .25 MILE(S) BEFORE CRD 237TH ST E.
Scheduled from 05-FEB-2024 to 15-JUN-2024.
Road Closed due to work zoneState Route RT C E East - CHARITON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .017 MILE(S) BEFORE RT F S.
Scheduled from 18-APR-2024 to 24-APR-2024.
Road Closed due to work zoneState Route RT C W West - CHARITON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .006 MILE(S) AFTER CRD SILOAM AVE S.
Scheduled from 18-APR-2024 to 24-APR-2024.
Road Closed due to work zoneState Route RT HH N North - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .17 MILE(S) AFTER CRD WOODSON AVE S.
Scheduled from 08-APR-2024 to 17-JUL-2024.
Road Closed due to work zoneState Route RT HH S South - CHARITON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .02 MILE(S) AFTER CRD WAYLAND AVE S.
Scheduled from 08-APR-2024 to 17-JUL-2024.
Road Closed due to work zoneCRD 194 E East - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .001 MILE(S) AFTER CRD 67 S.
Scheduled from 10-APR-2024 to 26-APR-2024.
Road Closed due to work zoneCRD 194 W West - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins US 60 E.
Scheduled from 10-APR-2024 to 26-APR-2024.
Road Closed due to work zoneCRD ALOE RD N North - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 10-APR-2024 to 26-APR-2024.
Road Closed due to work zoneCRD ALOE RD S South - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins CRD KASTENDIECK RD E.
Scheduled from 10-APR-2024 to 26-APR-2024.
Road Closed due to work zoneCRD KASTENDIECK RD E East - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .001 MILE(S) AFTER CRD LAMBETH RD S.
Scheduled from 24-MAR-2024 to 05-MAY-2024.
Road Closed due to work zoneCRD KASTENDIECK RD W West - CHRISTIAN COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins CRD VERMULE RD S.
Scheduled from 24-MAR-2024 to 05-MAY-2024.
Road Closed due to work zoneRamp RP RICHARDS RD TO US169S S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST HARLEM RD E.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneUS US 169 S South - CLAY COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .065 MILE(S) BEFORE CO US169S TO RICHARD RD S.
Scheduled from 04-MAR-2024 to 26-APR-2024.
Road Closed due to work zoneUS US 169 S South - CLAY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER RP US169S TO RICHARDS RD S.
Scheduled from 06-FEB-2023 to 14-OCT-2024.
Road Closed due to work zoneState Route RT H E East - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .028 MILE(S) AFTER CRD NE ESTEP RD S.
Scheduled from 05-FEB-2024 to 22-AUG-2024.
Road Closed due to work zoneState Route RT H W West - CLINTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .039 MILE(S) AFTER US 69 S.
Scheduled from 05-FEB-2024 to 22-AUG-2024.
Road Closed due to work zoneState Route RT HH E East - COOPER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) AFTER CRD SCHOOL HOUSE RD E.
Scheduled from 19-FEB-2024 to 26-APR-2024.
Road Closed due to work zoneState Route RT HH W West - COOPER COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) AFTER CRD RODEO DR S.
Scheduled from 19-FEB-2024 to 26-APR-2024.
Road Closed due to work zoneState Route RT K E East - DADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) BEFORE CRD 181 S.
Scheduled from 18-MAR-2024 to 15-JUL-2024.
Road Closed due to work zoneState Route RT K W West - DADE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .007 MILE(S) BEFORE CRD 189 S.
Scheduled from 18-MAR-2024 to 15-JUL-2024.
Road Closed due to work zoneState Route RT M E East - DALLAS COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .378 MILE(S) BEFORE CRD JONES CREEK RD E.
Scheduled from 29-JAN-2024 to 26-JUL-2024.
Road Closed due to work zoneState Route RT M W West - DALLAS COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .007 MILE(S) AFTER CRD JONES CREEK RD E.
Scheduled from 29-JAN-2024 to 26-JUL-2024.
Road Closed due to work zoneState Route RT E W West - DAVIESS COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins .001 MILE(S) AFTER US 69 S.
Scheduled from 18-MAR-2024 to 02-AUG-2024.
Road Closed due to work zoneState Route RT E E East - DEKALB COUNTY - Road Closed
MILLING/RESURFACING WORK
Road closure begins US 169 S.
Scheduled from 18-MAR-2024 to 02-AUG-2024.
Road Closed due to work zoneState Route MO 14 E East - DOUGLAS COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .001 MILE(S) AFTER CST LYLE ST S.
Scheduled from 01-APR-2024 to 12-JUL-2024.
Road Closed due to work zoneState Route MO 14 W West - DOUGLAS COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .001 MILE(S) BEFORE CST DEAN AVE E.
Scheduled from 01-APR-2024 to 12-JUL-2024.
Road Closed due to work zoneState Route RT YY N North - GENTRY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .009 MILE(S) AFTER CST OAK ST E.
Scheduled from 04-DEC-2023 to 21-APR-2024.
Road Closed due to work zoneState Route RT YY S South - GENTRY COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .038 MILE(S) AFTER CRD 250 ST E.
Scheduled from 04-DEC-2023 to 21-APR-2024.
Road Closed due to work zoneCRD 205 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 205 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 213 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 219 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 223 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 241 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD HARMONY AVE N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 E.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD HARMONY AVE S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .002 MILE(S) AFTER US 60 W.
Scheduled from 01-MAR-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 N North - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins .001 MILE(S) AFTER US 60 E.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneState Route MO 125 S South - GREENE COUNTY - Road Closed
MEDIAN OR SHOULDER
Road closure begins US 60 W.
Scheduled from 29-FEB-2024 to 31-AUG-2024.
Road Closed due to work zoneCRD 9020 E East - HOWELL COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .025 MILE(S) AFTER US 63 S.
Scheduled from 22-SEP-2023 to 01-JUL-2024.
Road Closed due to work zoneCRD 9020 W West - HOWELL COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .019 MILE(S) AFTER CST ILLINOIS AVE S.
Scheduled from 22-SEP-2023 to 01-JUL-2024.
Road Closed due to work zoneCST WOODSWETHER RD W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CST W 5TH ST W.
Scheduled from 29-JAN-2024 to 31-DEC-2025.
Road Closed due to work zoneRamp RP BEARDSLEY RD TO IS70W W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST BEARDSLEY RD S.
Scheduled from 07-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP CHARLOTTE ST TO IS70E E East - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .004 MILE(S) AFTER CST CHARLOTTE ST S.
Scheduled from 20-MAR-2024 to 15-MAY-2024.
Road Closed due to work zoneRamp RP E 14TH ST TO IS70E E East - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .003 MILE(S) AFTER CST E 14TH ST E.
Scheduled from 20-MAR-2024 to 15-MAY-2024.
Road Closed due to work zoneRamp RP FIFTH ST TO IS70W W West - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 S.
Scheduled from 07-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP IS70E TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins IS 70 E.
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road Closed due to work zoneRamp RP US169N TO IS35S S South - JACKSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins US 169 N.
Scheduled from 03-APR-2023 to 31-DEC-2025.
Road Closed due to work zoneUS US 169 N North - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .139 MILE(S) AFTER RR KC METRO E.
Scheduled from 04-MAR-2024 to 26-APR-2024.
Road Closed due to work zoneCST THIRD ST E East - JEFFERSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST CROMWELL RD S.
Scheduled from 08-APR-2024 to 19-APR-2024.
Road Closed due to work zoneCST THIRD ST W West - JEFFERSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST HOLLY DR S.
Scheduled from 08-APR-2024 to 19-APR-2024.
Road Closed due to work zoneState Route RT WW N North - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .004 MILE(S) AFTER CRD 1101 S.
Scheduled from 17-JAN-2024 to 30-APR-2024.
Road Closed due to work zoneState Route RT WW S South - JOHNSON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 23 S.
Scheduled from 17-JAN-2024 to 30-APR-2024.
Road Closed due to work zoneState Route RT FF E East - LAFAYETTE COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .012 MILE(S) BEFORE MO 131 S.
Scheduled from 15-APR-2024 to 24-APR-2024.
Road Closed due to work zoneState Route RT FF W West - LAFAYETTE COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .016 MILE(S) BEFORE CRD ROCKY RIDGE RD S.
Scheduled from 15-APR-2024 to 24-APR-2024.
Road Closed due to work zoneCRD 1100 N North - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .08 MILE(S) BEFORE IS 44 E.
Scheduled from 19-FEB-2024 to 31-JUL-2024.
Road Closed due to work zoneCRD 1100 S South - LAWRENCE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .096 MILE(S) BEFORE IS 44 W.
Scheduled from 19-FEB-2024 to 31-JUL-2024.
Road Closed due to work zoneState Route MO 39 N North - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .014 MILE(S) AFTER CRD 2100 E.
Scheduled from 18-MAR-2024 to 13-JUL-2024.
Road Closed due to work zoneState Route MO 39 S South - LAWRENCE COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Road closure begins .012 MILE(S) AFTER RT OO E.
Scheduled from 18-MAR-2024 to 13-JUL-2024.
Road Closed due to work zoneState Route RT AA E East - MACON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins CRD NATIONAL AVE S.
Scheduled from 18-APR-2024 to 19-APR-2024.
Road Closed due to work zoneState Route RT AA W West - MACON COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins .001 MILE(S) AFTER CRD NICKEL AVE S.
Scheduled from 18-APR-2024 to 19-APR-2024.
Road Closed due to work zoneState Route RT AA N North - MARIES COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins US 63 S.
Scheduled from 08-APR-2024 to 25-APR-2024.
Road Closed due to work zoneState Route RT C E East - MARIES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .155 MILE(S) AFTER MO 28 E.
Scheduled from 01-APR-2024 to 30-MAY-2024.
Road Closed due to work zoneState Route RT C W West - MARIES COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .21 MILE(S) AFTER RT H S.
Scheduled from 01-APR-2024 to 30-MAY-2024.
Road Closed due to work zoneState Route MO 79 N North - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST MONROE ST E.
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneState Route MO 79 S South - MARION COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER CST LYON ST E.
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road Closed due to work zoneUS US 62 E East - MISSISSIPPI COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .002 MILE(S) AFTER CRD LEVEE RD E.
Scheduled from 31-OCT-2023 to 01-OCT-2024.
Road Closed due to work zoneUS US 62 W West - MISSISSIPPI COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins US 60 E.
Scheduled from 31-OCT-2023 to 01-OCT-2024.
Road Closed due to work zoneWS IS57S CHARLESTON S South - MISSISSIPPI COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins IS 57 S.
Scheduled from 09-APR-2024 to 10-MAY-2024.
Road Closed due to work zoneState Route RT J E East - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .001 MILE(S) AFTER RT OO S.
Scheduled from 18-FEB-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT J W West - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .002 MILE(S) AFTER MO 151 S.
Scheduled from 18-FEB-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT M E East - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .003 MILE(S) AFTER CRD 1039 S.
Scheduled from 03-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT M W West - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .005 MILE(S) AFTER CRD 1059 S.
Scheduled from 03-MAR-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT Z N North - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .77 MILE(S) AFTER CRD 650 E.
Scheduled from 15-APR-2024 to 01-JUL-2024.
Road Closed due to work zoneState Route RT Z S South - MONROE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .846 MILE(S) AFTER CRD 770 SPUR S.
Scheduled from 15-APR-2024 to 01-JUL-2024.
Road Closed due to work zoneCRD HAMMER RD N North - NEWTON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .053 MILE(S) BEFORE MO 86 E.
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road Closed due to work zoneCRD HAMMER RD S South - NEWTON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .001 MILE(S) AFTER MO 86 E.
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road Closed due to work zoneState Route MO 86 E East - NEWTON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins .004 MILE(S) AFTER OR 71 S.
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road Closed due to work zoneState Route RT AA S South - OSAGE COUNTY - Road Closed
CULVERT REPLACEMENT
Road closure begins RT T S.
Scheduled from 08-APR-2024 to 25-APR-2024.
Road Closed due to work zoneState Route MO 92 E East - PLATTE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .023 MILE(S) AFTER CST PRAIRIE VIEW RD S.
Scheduled from 23-JAN-2024 to 30-JUN-2024.
Road Closed due to work zoneState Route MO 92 W West - PLATTE COUNTY - Road Closed
BRIDGE MAINTENANCE
Road closure begins .023 MILE(S) AFTER RP MO92 TO IS29N N.
Scheduled from 23-JAN-2024 to 30-JUN-2024.
Road Closed due to work zoneState Route MO 3 N North - RANDOLPH COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .345 MILE(S) BEFORE CRD 2040 E.
Scheduled from 05-MAR-2024 to 30-NOV-2024.
Road Closed due to work zoneState Route MO 3 S South - RANDOLPH COUNTY - Road Closed
PAVEMENT REPAIR
Road closure begins .225 MILE(S) BEFORE CRD 2040 E.
Scheduled from 05-MAR-2024 to 30-NOV-2024.
Road Closed due to work zoneCRD LEMON TRL N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .022 MILE(S) BEFORE IS 70 E.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneCRD LEMON TRL S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .015 MILE(S) BEFORE IS 70 W.
Scheduled from 14-MAR-2023 to 31-DEC-2037.
Road Closed due to work zoneState Route RT EE N North - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .113 MILE(S) AFTER MO 20 E.
Scheduled from 12-FEB-2024 to 30-JUN-2024.
Road Closed due to work zoneState Route RT EE S South - SALINE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .06 MILE(S) AFTER CRD 220TH RD E.
Scheduled from 12-FEB-2024 to 30-JUN-2024.
Road Closed due to work zoneCST IVY W West - ST. CHARLES COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins MO 94 W.
Scheduled from 18-JUL-2022 to 01-AUG-2030.
Road Closed due to work zoneOuter Road S OR 64 E East - ST. CHARLES COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins CST INTERSTATE DR E.
Scheduled from 21-FEB-2024 to 24-MAY-2024.
Road Closed due to work zoneOuter Road S OR 64 W West - ST. CHARLES COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins .163 MILE(S) AFTER CST QUAIL BLUFF MANOR DR S.
Scheduled from 21-FEB-2024 to 24-MAY-2024.
Road Closed due to work zoneState Route MO 82 E East - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .032 MILE(S) AFTER CRD NE 751 S.
Scheduled from 01-APR-2024 to 05-JUL-2024.
Road Closed due to work zoneState Route MO 82 W West - ST. CLAIR COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .021 MILE(S) AFTER CRD NE 1021 S.
Scheduled from 01-APR-2024 to 05-JUL-2024.
Road Closed due to work zoneRamp RP LAMBERT INTL BLVD TO IS70E E East - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST NATURAL BRIDGE RD E.
Scheduled from 03-APR-2024 to 28-JUN-2024.
Road Closed due to work zoneRamp RP LAMBERT INTL BLVD TO IS70E E East - ST. LOUIS COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST NATURAL BRIDGE RD E.
Scheduled from 03-APR-2024 to 28-JUN-2024.
Road Closed due to work zoneCST CARONDELET BLVD E East - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .007 MILE(S) AFTER RP CARONDELET BLVD TO IS55S S.
Scheduled from 08-APR-2024 to 08-MAY-2024.
Road Closed due to work zoneCST CARONDELET BLVD W West - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CRD RIVER CITY BLVD S.
Scheduled from 08-APR-2024 to 08-MAY-2024.
Road Closed due to work zoneRamp RP CHEROKEE ST TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST CHEROKEE ST E.
Scheduled from 03-MAY-2022 to 01-DEC-2024.
Road Closed due to work zoneRamp RP GERMANIA ST TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST GERMANIA AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP IS55N TO IDAHO AVE N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins IS 55 N.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP IS55S TO BATES ST W West - ST. LOUIS CITY - Road Closed
PAVEMENT REPAIR
Road closure begins IS 55 S.
Scheduled from 15-APR-2024 to 26-APR-2024.
Road Closed due to work zoneRamp RP LOUGHBOROUGH AVE TO IS55N N North - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST IDAHO AVE E.
Scheduled from 09-JAN-2023 to 01-DEC-2024.
Road Closed due to work zoneRamp RP RIVERVIEW DR TO IS270E E East - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins RT H N.
Scheduled from 21-FEB-2023 to 22-FEB-2027.
Road Closed due to work zoneRamp RP TRUMAN PKWY TO IS55S S South - ST. LOUIS CITY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins CST LAFAYETTE AVE E.
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road Closed due to work zoneState Route RT A E East - WASHINGTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins MO 185 S.
Scheduled from 05-FEB-2024 to 28-MAY-2024.
Road Closed due to work zoneState Route RT A W West - WASHINGTON COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins .004 MILE(S) AFTER RT T S.
Scheduled from 05-FEB-2024 to 28-MAY-2024.
Road Closed due to work zoneState Route RT B N North - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE MAINTENANCE
Road closure begins .004 MILE(S) AFTER RP RTB TO IS44E E.
Scheduled from 18-MAR-2024 to 31-JUL-2024.
Road Closed due to work zoneState Route RT B S South - WEBSTER COUNTY - Road Closed
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE MAINTENANCE
Road closure begins .005 MILE(S) AFTER RP IS44W TO RTB N.
Scheduled from 18-MAR-2024 to 31-JUL-2024.

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 524 to report. Hide

Expect delays due to work zoneState Route MO 3 S South - ADAIR COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins MO 11 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 N North - ADAIR COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins .567 MILE(S) AFTER CRD BENTON RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins .177 MILE(S) BEFORE CRD 1382 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Possible delays due to work zoneUS US 71 N North - ANDREW COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins .729 MILE(S) AFTER RP RTT TO US59N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:55 AM and 09:00 PM.
Possible delays due to work zoneInterstate IS 29 N North - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins .043 MILE(S) AFTER RT W S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 02:30 PM.
Possible delays due to work zoneInterstate IS 29 S South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins 1.942 MILE(S) BEFORE CRD C AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 02:30 PM.
Possible delays due to work zoneUS US 59 N North - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins .004 MILE(S) AFTER CRD ATCHISON HOLT RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 02:30 PM.
Possible delays due to work zoneUS US 59 S South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins .838 MILE(S) BEFORE CRD 110 ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 02:30 PM.
Expect delays due to work zoneState Route RT AA S South - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 03-MAY-2024.
Road work begins RT BB E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT BB E East - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins .001 MILE(S) BEFORE US 54 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT FF W West - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 30-APR-2024.
Road work begins CST LIBERTY ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 86 E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-MAY-2024.
Road work begins .042 MILE(S) BEFORE MO 76 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F E East - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-APR-2024.
Road work begins MO 112 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT F W West - BARRY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-APR-2024.
Road work begins MO 86 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - BATES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins .29 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 49 N North - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins .657 MILE(S) AFTER RP RTB TO IS49N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins .311 MILE(S) AFTER RP RTA TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-MAR-2024 to 30-JUL-2024.
Road work begins .309 MILE(S) BEFORE LP 49 S.
Work will be done 7 days a week.
Expect delays due to work zoneLoop LP 49 N North - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins IS 49 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneLoop LP 49 S South - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins .011 MILE(S) BEFORE CST CONKLIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 E East - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins .527 MILE(S) AFTER CRD NW 2001 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 52 W West - BATES COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 14-APR-2024 to 19-APR-2024.
Road work begins .043 MILE(S) BEFORE RR NEVADA SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 51 N North - BOLLINGER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 31-MAY-2024.
Road work begins .022 MILE(S) BEFORE MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A W West - BOLLINGER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins .022 MILE(S) AFTER MO 51 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B N North - BOLLINGER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins .026 MILE(S) BEFORE RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B S South - BOLLINGER COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - BOONE COUNTY - Expect Delays
CORE DRILLING
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins .067 MILE(S) AFTER US 63C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - BOONE COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins .169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT FF E East - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 30-APR-2024.
Road work begins RT Z S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 63 N North - BOONE COUNTY - Expect Delays
CORE DRILLING
Scheduled from 17-APR-2024 to 22-APR-2024.
Road work begins .122 MILE(S) AFTER RP MO740 TO US63N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 63 S South - BOONE COUNTY - Expect Delays
CORE DRILLING
Scheduled from 17-APR-2024 to 22-APR-2024.
Road work begins .264 MILE(S) BEFORE CST CLARK LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 124 E East - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins .01 MILE(S) AFTER CST STERLING BROCK DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 124 W West - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins .011 MILE(S) AFTER RT F S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT H W West - BOONE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins .003 MILE(S) AFTER CRD ENGLEWOOD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT J N North - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins .043 MILE(S) BEFORE CST HARRIS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT J S South - BOONE COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins .012 MILE(S) AFTER MO 124 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 371 S South - BUCHANAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins .343 MILE(S) BEFORE CRD WILLIAMS RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT AC N North - BUCHANAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins .005 MILE(S) AFTER RT YY E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT AC S South - BUCHANAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins .007 MILE(S) AFTER CST FARAON ST E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 169 S South - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .028 MILE(S) AFTER RT FF S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT NN E East - BUCHANAN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins MO 31 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT Z N North - BUCHANAN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins .228 MILE(S) AFTER CRD COOK NE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 13 N North - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .032 MILE(S) AFTER CRD FAR WEST DR E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 13 S South - CALDWELL COUNTY - Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins .032 MILE(S) AFTER BU 36 E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 E East - CALLAWAY COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins 1.819 MILE(S) AFTER RP RTYY TO IS70E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneInterstate IS 70 W West - CALLAWAY COUNTY - Expect Delays
CORE DRILLING
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins .04 MILE(S) BEFORE RP US54W TO IS70W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 94 E East - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-MAR-2024 to 26-APR-2024.
Road work begins .018 MILE(S) BEFORE RP MO94E TO US54E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 94 W West - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-MAR-2024 to 26-APR-2024.
Road work begins .219 MILE(S) AFTER CST COOPER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT H E East - CALLAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2024 to 07-JUL-2024.
Road work begins .023 MILE(S) AFTER BU 54 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT H W West - CALLAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-APR-2024 to 07-JUL-2024.
Road work begins .021 MILE(S) BEFORE US 54 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT OO W West - CALLAWAY COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 19-APR-2024.
Road work begins .078 MILE(S) BEFORE CST SPALDING RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 54 E East - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 12-MAR-2024 to 26-APR-2024.
Road work begins .196 MILE(S) AFTER RR JEFFERSON CITY SUB E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 54 W West - CALLAWAY COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 12-MAR-2024 to 26-APR-2024.
Road work begins .091 MILE(S) AFTER BK KATY TRAIL E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT EE N North - CAMDEN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins CRD GENES POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT EE S South - CAMDEN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 7 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT O N North - CAMDEN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins CRD TEER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT O S South - CAMDEN COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins US 54 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 25 N North - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD 203 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 25 S South - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .008 MILE(S) AFTER CRD 325 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K E East - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins MO 25 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K W West - CAPE GIRARDEAU COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-MAR-2024 to 01-NOV-2024.
Road work begins .004 MILE(S) BEFORE CRD 201 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 34 E East - CAPE GIRARDEAU COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins .001 MILE(S) AFTER CRD 341 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 34 W West - CAPE GIRARDEAU COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 27-FEB-2024 to 28-FEB-2027.
Road work begins MO 72 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 41 N North - CARROLL COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins .187 MILE(S) AFTER RT F E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 41 S South - CARROLL COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
No delays expected due to work zoneCRD PECULIAR DR N North - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins .015 MILE(S) BEFORE CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
No delays expected due to work zoneCRD PECULIAR DR S South - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins CST CUNNINGHAM INDUSTRIAL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 2 W West - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 19-APR-2024.
Road work begins .031 MILE(S) AFTER CST KING AVE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 10:00 AM and 03:00 PM.
No delays expected due to work zoneState Route RT K N North - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins .466 MILE(S) AFTER CRD E 245TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
No delays expected due to work zoneState Route RT P E East - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 19-APR-2024.
Road work begins .119 MILE(S) BEFORE CRD PURVIS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 07:00 PM.
No delays expected due to work zoneState Route RT P W West - CASS COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 19-APR-2024.
Road work begins .104 MILE(S) AFTER CRD PURVIS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 11 N North - CHARITON COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins .358 MILE(S) AFTER US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 129 N North - CHARITON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER CRD MENEFEE RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins .108 MILE(S) AFTER RT KK S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 5 S South - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins .023 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneCRD KASTENDIECK RD E East - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins .006 MILE(S) AFTER CRD ALOE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD KASTENDIECK RD W West - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins CRD VERMULE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD VERMULE RD N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAR-2024 to 05-MAY-2024.
Road work begins CRD KASTENDIECK RD E.
Work will be done 7 days a week.
Expect delays due to work zoneCRD VERMULE RD N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins CRD KASTENDIECK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD VERMULE RD S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-MAR-2024 to 05-MAY-2024.
Road work begins .02 MILE(S) AFTER MO 14 E.
Work will be done 7 days a week.
Expect delays due to work zoneCRD VERMULE RD S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 19-FEB-2024 to 05-MAY-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 14 E East - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 19-FEB-2024 to 03-JUN-2024.
Road work begins .007 MILE(S) BEFORE CST N CHEROKEE TRL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 14 E East - CHRISTIAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-MAY-2024.
Road work begins .01 MILE(S) BEFORE CST MAIN ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-JUN-2022 to 31-MAY-2024.
Road work begins .028 MILE(S) AFTER CRD S 32ND ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zonePVT ENGLISH VILLAGE DR E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD N DEFFER DR S.
Work will be done on weekdays only.
Expect delays due to work zonePVT ENGLISH VILLAGE DR W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER PVT BRISTOL LN S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT AA W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .001 MILE(S) BEFORE US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT CC E East - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2024 to 26-APR-2024.
Road work begins US 160 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT CC W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2024 to 26-APR-2024.
Road work begins .017 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT CC W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .002 MILE(S) AFTER CRD SYCAMORE RD E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT K S South - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 19-FEB-2024 to 03-JUN-2024.
Road work begins .004 MILE(S) AFTER MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT P N North - CHRISTIAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-APR-2024 to 03-MAY-2024.
Road work begins .001 MILE(S) AFTER MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT V W West - CHRISTIAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins US 160 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 160 W West - CHRISTIAN COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins .081 MILE(S) BEFORE CST ALDERSGATE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 E East - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-FEB-2024 to 29-MAY-2024.
Road work begins CST HOWCRAFT AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 27-FEB-2024 to 05-MAY-2024.
Road work begins CRD LAMBETH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-FEB-2024 to 29-MAY-2024.
Road work begins .042 MILE(S) AFTER CST PLYMOUTH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 06-MAR-2024 to 05-MAY-2024.
Road work begins .001 MILE(S) AFTER CRD STAIGER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 27-FEB-2024 to 05-MAY-2024.
Road work begins .001 MILE(S) AFTER MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - CHRISTIAN COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins CRD LAMBETH RD S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .009 MILE(S) AFTER RT F W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 N North - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .023 MILE(S) BEFORE RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 03-MAR-2025.
Road work begins .115 MILE(S) BEFORE RP US65S TO MO14 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 65 S South - CHRISTIAN COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-NOV-2023 to 01-NOV-2025.
Road work begins .011 MILE(S) BEFORE RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 160 W West - CHRISTIAN COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .147 MILE(S) BEFORE RT AA E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT C E East - CLARK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-APR-2024 to 01-JUL-2024.
Road work begins MO 81 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT C W West - CLARK COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 17-APR-2024 to 01-JUL-2024.
Road work begins .01 MILE(S) AFTER MO 27 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT D E East - CLARK COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 31-MAY-2024.
Road work begins .187 MILE(S) AFTER CRD 391 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT D W West - CLARK COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 31-MAY-2024.
Road work begins .236 MILE(S) BEFORE CRD 391 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT D E East - CLARK COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins .533 MILE(S) BEFORE RT W E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT D W West - CLARK COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins .51 MILE(S) AFTER RT W E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins .013 MILE(S) BEFORE CRD CLINTON COUNTY LINE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 169 N North - CLAY COUNTY - Expect Delays
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins .284 MILE(S) BEFORE RR FORT SCOTT SUB S.
Work will be done 7 days a week.
Possible delays due to work zoneCST N OAK TRFY S South - CLAY COUNTY - Delays Possible
Project Name - BLUME
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 30-SEP-2024.
Road work begins .05 MILE(S) BEFORE MO 9 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneCST NW BARRY RD W West - CLAY COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 02-JAN-2023 to 01-AUG-2024.
Road work begins .025 MILE(S) BEFORE RP US169N TO BARRY RD N.
Work will be done 7 days a week.
Possible delays due to work zoneState Route MO 1 N North - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .046 MILE(S) AFTER CST 64TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 1 S South - CLAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 05-APR-2024 to 26-APR-2024.
Road work begins .406 MILE(S) AFTER CST NE 80TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 169 N North - CLAY COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins .049 MILE(S) AFTER CST ROCK CREEK TER E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 169 S South - CLAY COUNTY - Delays Possible
CONCRETE BARRIER WALL
Scheduled from 16-APR-2024 to 07-JUN-2024.
Road work begins .045 MILE(S) BEFORE CST NW BRIARCLIFF PKWY W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 169 S South - CLAY COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 12-JUL-2024.
Road work begins .378 MILE(S) AFTER CST LAKE MEADOWS DR E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 69 N North - CLAY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .079 MILE(S) BEFORE CST PARK AVE E.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 69 S South - CLAY COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .019 MILE(S) BEFORE CST RANDOLPH RD S.
Work will be done on weekdays only.
Possible delays due to work zoneInterstate IS 35 N North - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins .814 MILE(S) BEFORE RT H E.
Work will be done on weekdays and Saturdays.
Possible delays due to work zoneInterstate IS 35 S South - CLINTON COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins .686 MILE(S) BEFORE RT H E.
Work will be done on weekdays and Saturdays.
Expect delays due to work zoneBusiness BU 50 E East - COLE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins .147 MILE(S) BEFORE CST HEISINGER RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneBusiness BU 50 W West - COLE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins .018 MILE(S) BEFORE CST SOUTHWEST BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST MISSOURI BLVD E East - COLE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins .016 MILE(S) BEFORE CST KANSAS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST W EDGEWOOD DR W West - COLE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2024 to 24-MAY-2024.
Road work begins .072 MILE(S) BEFORE MO 179 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT A W West - COLE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 25-APR-2024.
Road work begins .085 MILE(S) AFTER RT FF S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 03:00 PM.
Possible delays due to work zoneState Route RT N W West - COLE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 179 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 02:00 PM.
Expect delays due to work zoneInterstate IS 70 E East - COOPER COUNTY - Expect Delays
Project Name - ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-DEC-2024.
Road work begins .027 MILE(S) AFTER RR RIVER SUB E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 44 E East - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 20-JUL-2024.
Road work begins .393 MILE(S) BEFORE CRD BEAMER LN S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 44 E East - CRAWFORD COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .01 MILE(S) BEFORE CRD FRONTAGE RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT EE N North - CRAWFORD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins .018 MILE(S) AFTER RT F S.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 19 N North - CRAWFORD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .009 MILE(S) BEFORE CRD WINKLEMANN RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 19 N North - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins .001 MILE(S) AFTER CST GRAND DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 19 S South - CRAWFORD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins .002 MILE(S) BEFORE CRD MCCORMICK RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 19 S South - CRAWFORD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .061 MILE(S) AFTER CST OLD CUBA RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 8 E East - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins .01 MILE(S) AFTER CRD BUTTS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 8 W West - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 01-APR-2024 to 25-APR-2024.
Road work begins .034 MILE(S) BEFORE RT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT M N North - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .468 MILE(S) BEFORE CRD WESCO CEMERTRY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT M S South - CRAWFORD COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .268 MILE(S) AFTER MO 8 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT VV N North - CRAWFORD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT VV S South - CRAWFORD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 44 W West - FRANKLIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 20-JUL-2024.
Road work begins .315 MILE(S) AFTER MO 185 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .156 MILE(S) BEFORE CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER MO 47 S.
Work will be done on weekdays only.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road N OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 E East - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 44 W West - FRANKLIN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 100 E East - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .064 MILE(S) AFTER CST BEDFORD CENTER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 100 W West - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .182 MILE(S) BEFORE CST FIFTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 185 N North - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .018 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 185 S South - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .023 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E E East - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 19-APR-2024.
Road work begins .245 MILE(S) BEFORE CRD HORSTMAN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E W West - FRANKLIN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 19-APR-2024.
Road work begins MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT HH N North - FRANKLIN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins MO 30 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT HH S South - FRANKLIN COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 30-APR-2024.
Road work begins RT O E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT WW E East - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT WW W West - FRANKLIN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins MO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 100 W West - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins .015 MILE(S) BEFORE RT N S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 19 N North - GASCONADE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 28-JUN-2024.
Road work begins .017 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 28 E East - GASCONADE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins .013 MILE(S) BEFORE RT EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 28 W West - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 10-MAY-2024.
Road work begins .061 MILE(S) AFTER RT EE S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 28 W West - GASCONADE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins .238 MILE(S) AFTER US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT EE S South - GASCONADE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins .006 MILE(S) AFTER MO 28 E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route RT U W West - GASCONADE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 03:30 PM.
Expect delays due to work zoneCST GLENSTONE AVE N North - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins .002 MILE(S) BEFORE CST REPUBLIC CT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST GLENSTONE AVE S South - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2023 to 28-JUN-2024.
Road work begins .003 MILE(S) AFTER RP IS44E TO LP44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 125 N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .004 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .044 MILE(S) AFTER CRD 170 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 125 S South - GREENE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2024 to 26-APR-2024.
Road work begins .051 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-MAR-2024 to 19-APR-2024.
Road work begins .012 MILE(S) AFTER CRD 157 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .021 MILE(S) BEFORE RP US60W TO MO13S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 13 N North - GREENE COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 01-MAY-2024.
Road work begins .001 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 13 S South - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 11-DEC-2023 to 01-NOV-2024.
Road work begins .229 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneOuter Road S OR 60 E East - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-DEC-2023 to 15-MAY-2024.
Road work begins .005 MILE(S) AFTER CST S NATURE CENTER WAY W.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneOuter Road S OR 60 W West - GREENE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-DEC-2023 to 15-MAY-2024.
Road work begins CST S NATURE CENTER WAY E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN N North - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins .001 MILE(S) BEFORE US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT NN S South - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins .005 MILE(S) BEFORE US 60 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT P S South - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-APR-2024 to 03-MAY-2024.
Road work begins US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT ZZ N North - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .005 MILE(S) AFTER CRD 186 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ S South - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 19-SEP-2023 to 01-NOV-2024.
Road work begins .01 MILE(S) AFTER CST HINES ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .218 MILE(S) BEFORE RP US60E TO KANSAS EXPY S S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 160 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins .023 MILE(S) AFTER CO US160 TO PVT PRIVATE DR W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 160 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2023 to 01-DEC-2024.
Road work begins .087 MILE(S) AFTER US 60 W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .073 MILE(S) BEFORE US 160 E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins .04 MILE(S) AFTER RP US60E TO RTNN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .013 MILE(S) AFTER CRD 205 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 03-APR-2023 to 01-NOV-2024.
Road work begins .012 MILE(S) BEFORE RT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 09-APR-2024 to 23-MAY-2024.
Road work begins .049 MILE(S) BEFORE RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 01-JUN-2024.
Road work begins .04 MILE(S) AFTER RP US60W TO RTJ N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-SEP-2023 to 01-DEC-2024.
Road work begins .086 MILE(S) BEFORE RP BU65 TO US60W W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins .001 MILE(S) AFTER CST ILLINOIS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 65 N North - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2024 to 01-MAY-2024.
Road work begins .111 MILE(S) BEFORE RP IS44W TO US65N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 160 E East - GREENE COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 10-JUL-2023 to 30-DEC-2024.
Road work begins .014 MILE(S) AFTER CRD 182 E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 35 N North - HARRISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .065 MILE(S) BEFORE US 136 E.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 35 S South - HARRISON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .047 MILE(S) BEFORE RT N E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 13 S South - HENRY COUNTY - Expect Delays
PAVEMENT STRIPING
Scheduled from 01-MAR-2024 to 01-MAY-2024.
Road work begins MO 7 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 5 N North - HOWARD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2024 to 26-APR-2024.
Road work begins .023 MILE(S) BEFORE CST HERNDON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 5 S South - HOWARD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 26-MAR-2024 to 26-APR-2024.
Road work begins .024 MILE(S) BEFORE MO 240 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 3 N North - HOWARD COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins .028 MILE(S) BEFORE CST SEMINARY ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 3 S South - HOWARD COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins .138 MILE(S) AFTER CST CENTRAL ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT V E East - HOWARD COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins .014 MILE(S) BEFORE MO 3 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT Z E East - HOWARD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins RT J E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT Z W West - HOWARD COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 25-APR-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 160 E East - HOWELL COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins .019 MILE(S) AFTER US 63 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 160 E East - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins .017 MILE(S) BEFORE RT BB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 160 W West - HOWELL COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-FEB-2024 to 01-OCT-2024.
Road work begins .003 MILE(S) BEFORE CRD 2730 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 N North - HOWELL COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins .052 MILE(S) BEFORE RR THAYER NORTH SUB E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - HOWELL COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-MAY-2023 to 24-OCT-2024.
Road work begins .022 MILE(S) AFTER CRD 9020 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - HOWELL COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 04-MAR-2024 to 28-JUN-2024.
Road work begins .003 MILE(S) BEFORE BU 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 221 N North - IRON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins .006 MILE(S) BEFORE RR DESOTO SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 221 S South - IRON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins .001 MILE(S) AFTER CRD 97 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 49 N North - IRON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins .006 MILE(S) AFTER CRD 68 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 49 S South - IRON COUNTY - Expect Delays
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins .003 MILE(S) BEFORE CRD 3 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 32 E East - IRON COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .009 MILE(S) AFTER RT KK S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 32 W West - IRON COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .154 MILE(S) AFTER RT A S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT KK S South - IRON COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT N S South - IRON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneCST E 6TH ST E East - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 30-APR-2024.
Road work begins CST W 6TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST NE RICE RD N North - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 31-JAN-2024 to 24-APR-2024.
Road work begins CST SE LANGSFORD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneCST NE RICE RD S South - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 31-JAN-2024 to 24-APR-2024.
Road work begins .006 MILE(S) AFTER CST NE COLUMBUS ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 435 N North - JACKSON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins .158 MILE(S) BEFORE RP IS435N TO LANCER LN E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 28-APR-2024.
Road work begins .031 MILE(S) AFTER RP IS435S TO FRONT ST E E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 70 E East - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-MAR-2024 to 15-MAY-2024.
Road work begins .026 MILE(S) AFTER US 71 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 350 E East - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins .046 MILE(S) BEFORE RT V S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 350 W West - JACKSON COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 22-JAN-2024 to 31-MAY-2024.
Road work begins .028 MILE(S) AFTER CST BLUE PKWY E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS435N TO STADIUM DR E East - JACKSON COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins IS 435 N.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneRamp RP IS670E TO IS70W W West - JACKSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 26-JUL-2023 to 31-MAY-2024.
Road work begins IS 670 E.
Work will be done 7 days a week.
No delays expected due to work zoneUS US 24 E East - JACKSON COUNTY - No Expected Delays
PERMIT OR UTILITY WORK
Scheduled from 16-APR-2024 to 24-APR-2024.
Road work begins .228 MILE(S) BEFORE CST ELSEA SMITH RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneCST CLEAVER II BLVD E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins .002 MILE(S) AFTER CST E 46TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST CLEAVER II BLVD W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins .02 MILE(S) AFTER CST OLIVE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST E 22ND ST E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .015 MILE(S) AFTER CST CAMPBELL ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST E 22ND ST W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .006 MILE(S) BEFORE CST TRACY AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST E 39TH ST E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .016 MILE(S) BEFORE CST HIGHLAND AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST E 39TH ST W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .033 MILE(S) AFTER CST BROOKLYN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST MICHIGAN AVE S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) BEFORE RP US71S TO MICHIGAN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST TRUMAN RD E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 01-MAR-2024 to 26-APR-2024.
Road work begins .023 MILE(S) AFTER CST CUNNINGHAM S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.
Possible delays due to work zoneCST TRUMAN RD W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 21-FEB-2024 to 26-APR-2024.
Road work begins .005 MILE(S) AFTER CST CRYSLER AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 78 E East - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins .022 MILE(S) BEFORE CST CRESCENT AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 78 W West - JACKSON COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins .051 MILE(S) AFTER CST RALSTON AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP DR MARTIN LUTHER KING JR BLVD TO US71N N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins .005 MILE(S) AFTER CST DR MARTIN LUTHER KING JR BLVD W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP US71N TO 22ND ST E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins US 71 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP US71N TO E 39TH ST N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .094 MILE(S) AFTER US 71 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP US71S TO DR MARTIN LUTHER KING JR BLVD E E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins .011 MILE(S) BEFORE CST MICHIGAN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP US71S TO EMANUEL CLEAVER II BLVD S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 24-APR-2024.
Road work begins US 71 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneRamp RP US71S TO THE PASEO S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .011 MILE(S) AFTER US 71 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneUS US 24 E East - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins .012 MILE(S) BEFORE CST INDEPENDENCE AVE W.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 24 W West - JACKSON COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 05-SEP-2023 to 30-JUN-2026.
Road work begins OR 291 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT HH E East - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins CST MAIN ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT HH W West - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins .028 MILE(S) AFTER OR 171 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
No delays expected due to work zoneState Route MO 171 N North - JASPER COUNTY - No Expected Delays
SHOULDER WORK
Scheduled from 03-APR-2024 to 30-APR-2024.
Road work begins .017 MILE(S) BEFORE RT HH E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneLoop LP 44 E East - JASPER COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins .053 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneLoop LP 44 W West - JASPER COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) AFTER RT U S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins .208 MILE(S) BEFORE US 61 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-MAR-2024 to 15-APR-2025.
Road work begins .046 MILE(S) AFTER RP SP61E TO IS55S S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 141 N North - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 23-APR-2024.
Road work begins .094 MILE(S) AFTER CRD FIEDLER LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 141 S South - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 04-APR-2024 to 23-APR-2024.
Road work begins .234 MILE(S) BEFORE CRD FIEDLER LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneState Route MO 21 N North - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 01-NOV-2024.
Road work begins .039 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 21 S South - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-SEP-2023 to 28-JUN-2024.
Road work begins .051 MILE(S) AFTER CRD TESSON FERRY RD S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS55N TO US67N N North - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .013 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins .005 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67N TO IS55N N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 N.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP US67S TO IS55S S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work begins US 67 S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 N North - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 67 S South - JEFFERSON COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins .027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 50 E East - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins .019 MILE(S) AFTER RP MO23 TO US50E E.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 50 W West - JOHNSON COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-FEB-2024 to 14-JUN-2024.
Road work begins .456 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 50 W West - JOHNSON COUNTY - Delays Possible
MEDIAN OR SHOULDER
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins .006 MILE(S) BEFORE OR 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT E N North - KNOX COUNTY - Expect Delays
Project Name - 25 bridge rehab
BRIDGE MAINTENANCE
Scheduled from 28-FEB-2024 to 30-AUG-2024.
Road work begins .011 MILE(S) AFTER CRD TRUMAN LP S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT E S South - KNOX COUNTY - Expect Delays
Project Name - 25 bridge rehab
BRIDGE MAINTENANCE
Scheduled from 28-FEB-2024 to 30-AUG-2024.
Road work begins .045 MILE(S) BEFORE CRD TRUMAN LP S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT M N North - KNOX COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 30-APR-2024.
Road work begins .172 MILE(S) AFTER CO RTM TO MCQUIODS MILL PL S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT M S South - KNOX COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 30-APR-2024.
Road work begins .226 MILE(S) BEFORE CO RTM TO MCQUIODS MILL PL S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M N North - KNOX COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins .172 MILE(S) AFTER CO RTM TO MCQUIODS MILL PL S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M S South - KNOX COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins .226 MILE(S) BEFORE CO RTM TO MCQUIODS MILL PL S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - LACLEDE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-SEP-2023 to 30-APR-2024.
Road work begins 1.289 MILE(S) AFTER RP RTN TO IS44E E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT BB N North - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 30-APR-2024.
Road work begins .007 MILE(S) AFTER CRD PRAIRIE CREEK DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT BB S South - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 30-APR-2024.
Road work begins .052 MILE(S) BEFORE CRD PRESLEY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT F N North - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 10-MAY-2024.
Road work begins .474 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT F S South - LACLEDE COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 18-MAR-2024 to 10-MAY-2024.
Road work begins .124 MILE(S) BEFORE CRD RILEY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 213 N North - LAFAYETTE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 22-APR-2024.
Road work begins MO 20 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 213 S South - LAFAYETTE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 18-APR-2024 to 22-APR-2024.
Road work begins .035 MILE(S) AFTER US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneCST ODELL ST E East - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-MAY-2024.
Road work begins .001 MILE(S) AFTER CST ASH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCST ODELL ST W West - LAWRENCE COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-FEB-2024 to 01-MAY-2024.
Road work begins .002 MILE(S) AFTER CST FRISCO ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - LAWRENCE COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins .732 MILE(S) AFTER RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - LAWRENCE COUNTY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 26-NOV-2023 to 21-JUN-2024.
Road work begins .075 MILE(S) AFTER RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 37 N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 01-MAY-2024.
Road work begins .004 MILE(S) AFTER CST MYRTLE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 37 S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 01-MAY-2024.
Road work begins .043 MILE(S) AFTER RR UNKNOWN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 97 N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 03-MAY-2024.
Road work begins .003 MILE(S) AFTER MO 37 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 97 S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 30-OCT-2023 to 03-MAY-2024.
Road work begins .037 MILE(S) BEFORE CST MADISON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H N North - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .031 MILE(S) BEFORE CST 1ST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT H S South - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-JUL-2023 to 01-NOV-2024.
Road work begins .096 MILE(S) BEFORE CST 5TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT ZZ E East - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins CST MISSOURI AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT ZZ W West - LAWRENCE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 10-APR-2024 to 10-MAY-2024.
Road work begins CST CENTRAL AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .027 MILE(S) AFTER BU 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 06-MAR-2024 to 05-MAY-2024.
Road work begins .001 MILE(S) AFTER MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 W West - LAWRENCE COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .006 MILE(S) BEFORE CRD 2210 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT D N North - LIVINGSTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins .112 MILE(S) BEFORE CST MAIN ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT D S South - LIVINGSTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins .015 MILE(S) BEFORE CST MAIN ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT DD E East - LIVINGSTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins .03 MILE(S) BEFORE CST 4TH ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT DD W West - LIVINGSTON COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins .006 MILE(S) AFTER RT D S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 08:00 AM and 06:00 PM.
Possible delays due to work zoneUS US 36 E East - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins .031 MILE(S) AFTER RP US36E TO US65 E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 E East - LIVINGSTON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins .007 MILE(S) AFTER CRD 401 S.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 W West - LIVINGSTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins .07 MILE(S) AFTER BU 36 E.
Work will be done 7 days a week.
Possible delays due to work zoneUS US 36 W West - LIVINGSTON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins .066 MILE(S) BEFORE BU 36 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 129 S South - MACON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .018 MILE(S) AFTER US 36 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT K E East - MADISON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 26-APR-2024.
Road work begins MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K W West - MADISON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 26-APR-2024.
Road work begins RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT A E East - MADISON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 04-MAR-2024 to 30-APR-2024.
Road work begins .028 MILE(S) BEFORE RT M S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 28 E East - MARIES COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 08-APR-2024 to 10-MAY-2024.
Road work begins .05 MILE(S) AFTER US 63 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT BB W West - MARIES COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2024 to 30-APR-2024.
Road work begins MO 133 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 28 E East - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins .455 MILE(S) BEFORE RT W E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AA N North - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT U E East - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .011 MILE(S) AFTER CO RTU TO RTH W.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 03:30 PM.
Expect delays due to work zoneState Route MO 79 N North - MARION COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins CST LYON ST E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 79 S South - MARION COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins .001 MILE(S) AFTER CST GRAND AVE S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT BB E East - MILLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2024 to 30-APR-2024.
Road work begins MO 42 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT F E East - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins CRD PEA RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT F W West - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 17 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT HH N North - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins .05 MILE(S) AFTER CRD BROCKMAN SPRINGS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT HH S South - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT JJ E East - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins CRD PEA RIDGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT JJ W West - MILLER COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneInterstate IS 57 N North - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-FEB-2024 to 01-JUL-2024.
Road work begins .134 MILE(S) BEFORE RT UU S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 57 N North - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 16-APR-2024 to 23-APR-2024.
Road work begins .369 MILE(S) AFTER RA IS57N CHARLESTON N.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 57 S South - MISSISSIPPI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 05-FEB-2024 to 01-JUL-2024.
Road work begins .657 MILE(S) AFTER CRD 218 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 05:00 PM.
Expect delays due to work zoneUS US 62 E East - MISSISSIPPI COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins .003 MILE(S) AFTER CST S GILMORE AVE S.
Work will be done on weekdays only.
Expect delays due to work zoneUS US 62 W West - MISSISSIPPI COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 21-AUG-2023 to 01-AUG-2024.
Road work begins .003 MILE(S) BEFORE OR 57 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 87 N North - MONITEAU COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2024 to 26-APR-2024.
Road work begins .035 MILE(S) AFTER CST LAKE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 87 S South - MONITEAU COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 27-FEB-2024 to 26-APR-2024.
Road work begins .021 MILE(S) BEFORE BU 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Possible delays due to work zoneState Route RT A E East - MONITEAU COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 25-APR-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 03:00 PM.
Possible delays due to work zoneState Route RT N E East - MONITEAU COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 25-APR-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 02:00 PM.
Expect delays due to work zoneState Route MO 19 S South - MONTGOMERY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 28-JUN-2024.
Road work begins .027 MILE(S) AFTER MO 94 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT A E East - MONTGOMERY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 19-APR-2024.
Road work begins MO 19 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT A W West - MONTGOMERY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 19-APR-2024.
Road work begins MO 161 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT AA N North - MONTGOMERY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 03-MAY-2024.
Road work begins MO 19 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT BB W West - MONTGOMERY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2024 to 26-APR-2024.
Road work begins RT AC S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 135 N North - MORGAN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins .006 MILE(S) BEFORE CST FIRST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 135 S South - MORGAN COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins .02 MILE(S) BEFORE MO 52 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 162 E East - NEW MADRID COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 15-APR-2024 to 20-MAY-2024.
Road work begins .013 MILE(S) AFTER CRD 263 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 60 E East - NEW MADRID COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-OCT-2023 to 01-JUL-2024.
Road work begins .011 MILE(S) AFTER US 62 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road work begins .001 MILE(S) AFTER CRD IBEX RD S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 86 E East - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins .006 MILE(S) AFTER CRD IBEX RD S.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins .014 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 22-JAN-2024 to 24-JUN-2024.
Road work begins .004 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 15-JAN-2024 to 24-JUN-2024.
Road work begins .02 MILE(S) AFTER MO 175 S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route MO 86 W West - NEWTON COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 18-MAR-2024 to 24-JUN-2024.
Road work begins MO 175 S.
Work will be done on weekdays only.
No delays expected due to work zoneCRD HAMMER RD N North - NEWTON COUNTY - No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 29-JAN-2024 to 24-JUN-2024.
Road work begins MO 86 E.
Work will be done on weekdays only.
No delays expected due to work zoneCRD HAMMER RD S South - NEWTON COUNTY - No Expected Delays
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2024 to 24-JUN-2024.
Road work begins .071 MILE(S) BEFORE MO 86 E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT NN E East - NODAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins .452 MILE(S) AFTER CRD ORION RD S.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT NN W West - NODAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 24-APR-2024.
Road work begins .002 MILE(S) AFTER CRD PANTHER RD S.
Work will be done on weekdays only.
Possible delays due to work zoneUS US 71 S South - NODAWAY COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins .17 MILE(S) BEFORE RT V E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 05:00 AM and 09:00 PM.
Expect delays due to work zoneUS US 160 W West - OREGON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 09-OCT-2023 to 01-OCT-2024.
Road work begins .019 MILE(S) AFTER MO 99 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 63 N North - OREGON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 04-MAR-2024 to 28-JUN-2024.
Road work begins CRD 366 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneCRD OLD 50 E East - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins CRD N OUTER RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneCRD OLD 50 W West - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins RT A S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 100 E East - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 31-MAY-2024.
Road work begins US 50 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 133 S South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins .029 MILE(S) BEFORE PVT PRIVATE RD E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT A N North - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins .057 MILE(S) AFTER US 50 W.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT A S South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 27-MAR-2024 to 30-APR-2024.
Road work begins CRD MAIN ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT EE N North - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins MO 133 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT EE S South - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins CRD 505 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 28 W West - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins .007 MILE(S) BEFORE CST FIRST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AA S South - OSAGE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 08-APR-2024 to 25-APR-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT E E East - OSAGE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins US 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT E W West - OSAGE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins MO 89 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT U N North - OSAGE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins .629 MILE(S) BEFORE RT DD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT U S South - OSAGE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 08-FEB-2024 to 03-JUN-2024.
Road work begins .032 MILE(S) AFTER US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneInterstate IS 155 N North - PEMISCOT COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins US 412 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route MO 51 S South - PERRY COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 31-MAY-2024.
Road work begins .014 MILE(S) AFTER CRD 704 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - PHELPS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 22-FEB-2023 to 01-OCT-2024.
Road work begins .072 MILE(S) BEFORE US 63 S.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - PHELPS COUNTY - Expect Delays
DIAMOND GRINDING
Scheduled from 11-APR-2024 to 20-APR-2024.
Road work begins 1.981 MILE(S) AFTER RP LP44 TO IS44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneCST JAMES BLVD E East - PHELPS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneCST JAMES BLVD W West - PHELPS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins .004 MILE(S) AFTER MO 8 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT P E East - PHELPS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT P W West - PHELPS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins RT T S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT T N North - PHELPS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins RT M E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT T S South - PHELPS COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 09-APR-2024 to 25-APR-2024.
Road work begins .005 MILE(S) AFTER CST FIRST ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Expect delays due to work zoneCST NW 72ND ST W West - PLATTE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins .011 MILE(S) BEFORE OR 29 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 371 N North - PLATTE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins .03 MILE(S) AFTER MO 273 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 29 N North - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins .088 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 29 S South - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-MAR-2024 to 10-MAY-2024.
Road work begins .098 MILE(S) BEFORE CRD NEW MARKET RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 92 W West - PLATTE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-MAR-2024 to 01-MAY-2024.
Road work begins .082 MILE(S) BEFORE CRD WINDMILL DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-MAR-2024 to 15-MAY-2024.
Road work begins .981 MILE(S) AFTER RP RTJ TO IS44W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 20-SEP-2023 to 30-APR-2024.
Road work begins .122 MILE(S) AFTER LP 44 E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 133 N North - PULASKI COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 10-MAY-2024.
Road work begins .077 MILE(S) BEFORE CRD BLADE LN E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 17 N North - PULASKI COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 22-APR-2024.
Road work begins .281 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 17 S South - PULASKI COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 22-APR-2024.
Road work begins .153 MILE(S) BEFORE CST WHITTLEBURG HEIGHTS E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route MO 3 N North - RANDOLPH COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER US 24 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT O S South - RAY COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-MAR-2024 to 03-MAY-2024.
Road work begins .014 MILE(S) BEFORE CRD PERRY RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT H E East - REYNOLDS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 12-APR-2024 to 03-MAY-2024.
Road work begins MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT H W West - REYNOLDS COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 12-APR-2024 to 03-MAY-2024.
Road work begins PVT PRIVATE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT KK N North - REYNOLDS COUNTY - Delays Possible
GUARD RAIL/CABLE WORK
Scheduled from 22-FEB-2024 to 30-JUL-2024.
Road work begins MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT N N North - REYNOLDS COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins MO 72 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 202 E East - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins .084 MILE(S) BEFORE CRD AGROW AVE E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 202 W West - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins US 136 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 63 S South - SCHUYLER COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 01-NOV-2024.
Road work begins CRD W IA MO ST E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 60 W West - SCOTT COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-OCT-2023 to 01-JUL-2024.
Road work begins .004 MILE(S) BEFORE IS 55 S.
Work will be done on weekdays only.
Expect delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 25-MAR-2024 to 26-APR-2024.
Road work begins .202 MILE(S) AFTER WS IS70W FORISTELL W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneCST CAVE SPRINGS RD N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins .009 MILE(S) BEFORE CST VETERANS MEMORIAL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneCST CAVE SPRINGS RD S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneCST TECHNOLOGY DR N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .029 MILE(S) BEFORE RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneCST ZUMBEHL RD N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins .002 MILE(S) AFTER OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneCST ZUMBEHL RD S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins .002 MILE(S) BEFORE OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins .774 MILE(S) AFTER RP RTDDS TO IS64E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .1 MILE(S) BEFORE RT DD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .053 MILE(S) BEFORE RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .113 MILE(S) AFTER RP IS64W TO RTDDS S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 64 W West - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 01-APR-2024 to 01-MAY-2024.
Road work begins 1.244 MILE(S) BEFORE RP IS64W TO RTDDS S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 70 E East - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 project #2
SURVEYING
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins .031 MILE(S) BEFORE RP IS70E TO DAVID HOEKEL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 PM and 05:00 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneInterstate IS 70 E East - ST. CHARLES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins .249 MILE(S) AFTER CST EXECUTIVE CENTRE PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 70 W West - ST. CHARLES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins .01 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 79 N North - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins .131 MILE(S) AFTER RP SALT RIVER RD TO MO79N N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 79 S South - ST. CHARLES COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 18-APR-2024 to 31-MAY-2024.
Road work begins .169 MILE(S) AFTER CRD OLD MONROE RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT D E East - ST. CHARLES COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins .02 MILE(S) AFTER PVT COUNTRY OAKS E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT DD N North - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .002 MILE(S) BEFORE CST WINGHAVEN BLVD N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT DD S South - ST. CHARLES COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins CST WINGHAVEN BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 32 E East - ST. FRANCOIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 11-APR-2024 to 09-MAY-2024.
Road work begins CST MAPLE VALLEY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 32 W West - ST. FRANCOIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 11-APR-2024 to 09-MAY-2024.
Road work begins CST ST FRANCOIS AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Possible delays due to work zoneState Route RT AA N North - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .003 MILE(S) BEFORE CRD THOMAS RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT AA S South - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins RT H S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B N North - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .004 MILE(S) BEFORE CRD LOUGHBORO RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B S South - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) BEFORE CRD LOUGHBORO RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E N North - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins MO 47 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT E S South - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .006 MILE(S) AFTER PVT RECAR DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT EE N North - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .001 MILE(S) AFTER CRD COLONY CHURCH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT EE S South - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .004 MILE(S) AFTER CRD VALLEY FORGE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT K E East - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .007 MILE(S) BEFORE CRD CLAY ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT K W West - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) AFTER PVT RIVER VIEW LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT N N North - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .017 MILE(S) AFTER RT NN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT N S South - ST. FRANCOIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .005 MILE(S) BEFORE CST AIRPORT DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN E East - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins RT N S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT NN W West - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins MO 221 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT O E East - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .004 MILE(S) AFTER US 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT O W West - ST. FRANCOIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 01-APR-2024 to 26-APR-2024.
Road work begins .138 MILE(S) AFTER RT D S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 05:00 PM.
Expect delays due to work zoneCST LADUE RD E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins .024 MILE(S) BEFORE RP RTAB TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneCST LADUE RD W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins .023 MILE(S) BEFORE RT AB E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 170 E East - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins .03 MILE(S) AFTER RR SAINT LOUIS DISTRICT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 170 W West - ST. LOUIS COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 17-APR-2024 to 19-APR-2024.
Road work begins .106 MILE(S) BEFORE RP IS170W TO AIRPORT RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .008 MILE(S) AFTER CST CLAYTON RD E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .026 MILE(S) AFTER RP MO340E TO IS270W W.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 44 E East - ST. LOUIS COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 18-MAR-2024 to 26-APR-2024.
Road work begins .527 MILE(S) AFTER RT OO S.
Work will be done on weekdays only.
Work will be conducted between the hours of 12:00 AM and 12:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins .024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route MO 100 E East - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins .04 MILE(S) BEFORE CST WEST COUNTY SHOP CTR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 03:00 AM and 01:00 PM.
Expect delays due to work zoneState Route MO 100 W West - ST. LOUIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins US 67 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 03:00 AM and 01:00 PM.
Expect delays due to work zoneState Route MO 340 E East - ST. LOUIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins .036 MILE(S) BEFORE OR 340 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins .018 MILE(S) AFTER IS 270 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 364 E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins .005 MILE(S) BEFORE MO 141 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Expect delays due to work zoneState Route MO 364 W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 31-MAY-2024.
Road work begins .135 MILE(S) AFTER CRD SEVEN PINES DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:00 PM.
Expect delays due to work zoneRamp RP IS270E TO RTAB E East - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins .006 MILE(S) AFTER IS 270 E.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS270W TO RTAB W West - ST. LOUIS COUNTY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2024 to 22-APR-2024.
Road work begins .009 MILE(S) AFTER IS 270 W.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 67 N North - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins .028 MILE(S) AFTER CST CHESTER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
No delays expected due to work zoneInterstate IS 270 E East - ST. LOUIS COUNTY - No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins .142 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done 7 days a week.
Work will be conducted between the hours of 12:00 AM and 12:00 PM.
No delays expected due to work zoneState Route MO 141 S South - ST. LOUIS COUNTY - No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 04-MAR-2024 to 03-MAY-2024.
Road work begins .018 MILE(S) BEFORE CST PRICHARD FARM RD S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 12:00 AM.
Possible delays due to work zoneCST S EATHERTON RD N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST S EATHERTON RD S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCST WILD HORSE CREEK RD W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 100 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-APR-2024 to 19-APR-2024.
Road work begins .03 MILE(S) BEFORE CST ANDREW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 N North - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 141 N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .009 MILE(S) BEFORE PED PO29 ON MO141 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 141 S South - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 08-APR-2024 to 31-MAY-2024.
Road work begins .002 MILE(S) AFTER RP MO364E TO MO141N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 267 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 12-APR-2024 to 26-APR-2024.
Road work begins US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 267 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-APR-2024 to 26-APR-2024.
Road work begins .033 MILE(S) BEFORE CRD NAVAJO DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 340 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) BEFORE CST RIVER VALLEY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP IS55S TO IS270E E East - ST. LOUIS COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins IS 55 S.
Work will be done 7 days a week.
Possible delays due to work zoneRamp RP IS64W TO BRENTWOOD BLVD N North - ST. LOUIS COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins .027 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneState Route RT AC S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins .023 MILE(S) BEFORE CST ESTATES DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT CC E East - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins MO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT CC W West - ST. LOUIS COUNTY - Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins .01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT D E East - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins .049 MILE(S) BEFORE RR TRRA WEST BELT E.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 11-APR-2024 to 22-APR-2024.
Road work begins .002 MILE(S) AFTER CST PURDUE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT D W West - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins .012 MILE(S) AFTER CST PURDUE AVE S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT N S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAR-2024 to 19-APR-2024.
Road work begins .003 MILE(S) BEFORE CST YOUNG AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route RT U N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-APR-2024 to 10-MAY-2024.
Road work begins .01 MILE(S) AFTER MO 115 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 08-JAN-2024 to 24-APR-2024.
Road work begins .007 MILE(S) BEFORE CRD SCHUETZ RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneUS US 67 S South - ST. LOUIS COUNTY - Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-FEB-2024 to 24-APR-2024.
Road work begins .029 MILE(S) BEFORE CST NORTH TEALBROOK DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Expect delays due to work zoneCST COMPTON AVE N North - ST. LOUIS CITY - Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins .003 MILE(S) BEFORE OR 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneCST COMPTON AVE S South - ST. LOUIS CITY - Expect Delays
ROADSIDE WORK
Scheduled from 01-MAR-2024 to 30-APR-2024.
Road work begins .001 MILE(S) AFTER CST FOREST PARK AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 44 E East - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .035 MILE(S) AFTER RP IS44E TO WASHINGTON AVE N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 44 W West - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 17-APR-2024 to 23-APR-2024.
Road work begins .067 MILE(S) BEFORE CST SOUTHWEST AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .034 MILE(S) BEFORE RV 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Expect delays due to work zoneInterstate IS 55 S South - ST. LOUIS CITY - Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins .009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done 7 days a week.
Expect delays due to work zoneRamp RP IS64W TO FOREST PARK AVE W West - ST. LOUIS CITY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2024 to 31-MAY-2024.
Road work begins IS 64 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
No delays expected due to work zoneInterstate IS 270 W West - ST. LOUIS CITY - No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins .053 MILE(S) AFTER RT H S.
Work will be done 7 days a week.
Work will be conducted between the hours of 12:00 AM and 12:00 PM.
Possible delays due to work zoneInterstate IS 55 N North - ST. LOUIS CITY - Delays Possible
MEDIAN OR SHOULDER
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins .049 MILE(S) BEFORE CST UTAH ST E.
Work will be done on weekdays only.
Possible delays due to work zoneState Route MO 100 E East - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .004 MILE(S) AFTER CST VANDEVENTER AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 100 W West - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2024 to 31-MAY-2024.
Road work begins .004 MILE(S) AFTER CST 39TH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP HAMPTON CONCOURSE N TO IS64E E East - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins CST HAMPTON AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP IS64E TO HAMPTON CONCOURSE N North - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-MAR-2024 to 31-MAY-2024.
Road work begins .008 MILE(S) AFTER RP IS64E TO HAMPTON CONCOURSE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 10:00 AM.
Possible delays due to work zoneRamp RP IS64E TO HAMPTON CONCOURSE S South - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins IS 64 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneRamp RP IS64W TO HAMPTON CONCOURSE S South - ST. LOUIS CITY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-MAR-2024 to 31-MAY-2024.
Road work begins IS 64 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT B N North - STE. GENEVIEVE COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins RT F E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B S South - STE. GENEVIEVE COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 15-APR-2024 to 10-MAY-2024.
Road work begins MO 32 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 114 E East - STODDARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 20-MAY-2024.
Road work begins MO 25 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 114 W West - STODDARD COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAR-2024 to 20-MAY-2024.
Road work begins .001 MILE(S) AFTER US 60 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 51 N North - STODDARD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-MAR-2024 to 08-MAY-2024.
Road work begins .004 MILE(S) AFTER CST INDUSTRIAL DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 51 S South - STODDARD COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 04-MAR-2024 to 08-MAY-2024.
Road work begins .002 MILE(S) AFTER CST SCHUMACHER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 114 E East - STODDARD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins CST TROTTER ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Possible delays due to work zoneState Route MO 114 W West - STODDARD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 08-APR-2024 to 29-APR-2024.
Road work begins .002 MILE(S) BEFORE CRD 763 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Possible delays due to work zoneUS US 60 W West - STODDARD COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 15-APR-2024 to 30-APR-2024.
Road work begins .009 MILE(S) AFTER RT AH S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route MO 13 N North - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins CST BLUE EYE BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 13 S South - STONE COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins .128 MILE(S) BEFORE PVT PARADISE LANDING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route RT V E East - STONE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 10-APR-2024 to 26-APR-2024.
Road work begins MO 176 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 376 E East - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins CST SHEPHERD OF THE HILLS EXP E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 376 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 08-APR-2024 to 30-MAY-2024.
Road work begins MO 265 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .163 MILE(S) AFTER CRD LEISURE LN E.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins .488 MILE(S) BEFORE CRD JONES RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 03-APR-2024 to 01-JUL-2024.
Road work begins US 65 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
Project Name - Long Creek Bridge
BRIDGE RECONSTRUCTION
Scheduled from 12-OCT-2022 to 27-DEC-2024.
Road work begins .218 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done 7 days a week.
Project Web Page - https://www.modot.org/long-creek-bridge-project
Expect delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Expect Delays
ROAD MIX OVERLAY
Scheduled from 12-MAR-2024 to 30-MAY-2024.
Road work begins US 65 N.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 E East - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .174 MILE(S) AFTER CRD LEISURE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route MO 86 W West - TANEY COUNTY - Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 29-AUG-2022 to 31-DEC-2025.
Road work begins .194 MILE(S) AFTER PVT BRIDGEVIEW DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT C E East - WASHINGTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 11-MAR-2024 to 25-APR-2024.
Road work begins .049 MILE(S) AFTER RT Z E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Possible delays due to work zoneState Route RT C W West - WASHINGTON COUNTY - Delays Possible
PAVEMENT REPAIR
Scheduled from 11-MAR-2024 to 25-APR-2024.
Road work begins MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 03:30 PM.
Expect delays due to work zoneInterstate IS 44 E East - WEBSTER COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins .228 MILE(S) BEFORE RP IS44E TO RTB E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.
Expect delays due to work zoneInterstate IS 44 W West - WEBSTER COUNTY - Expect Delays
Project Name - I-44 Corridor Bridge bundle design build
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2024 to 03-MAY-2024.
Road work begins .216 MILE(S) BEFORE RP IS44W TO RTB N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 07:00 AM.

Back to Top

FUTURE WORK ZONES: 261 to report. Hide

Expect delays due to work zoneState Route RT V E East - ANDREW COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins .007 MILE(S) AFTER US 169 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT V E East - ANDREW COUNTY - CLOSED
RESURFACING PAVEMENT
Scheduled from 19-APR-2024 to 23-APR-2024.
Road work begins .011 MILE(S) BEFORE CRD 263 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 29 N North - ANDREW COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .069 MILE(S) BEFORE US 59 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneInterstate IS 29 S South - ANDREW COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .066 MILE(S) BEFORE CRD 369 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 71 S South - ANDREW COUNTY - Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .317 MILE(S) BEFORE CO US71N TO US71S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT MM N North - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins CRD 310 ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT MM S South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins MO 46 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT Y N North - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins US 136 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT Y S South - ATCHISON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins RT AA E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 151 N North - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins CRD 116 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 151 S South - AUDRAIN COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins CRD 128 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT D W West - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 31-MAY-2024.
Road work begins .001 MILE(S) AFTER MO 22 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT M S South - AUDRAIN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins RT FF E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneInterstate IS 49 S South - BATES COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .079 MILE(S) BEFORE RT A E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT OO N North - BENTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins CRD FEASTER BRANCH RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT P E East - BENTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins RT E S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneState Route RT P W West - BENTON COUNTY - Expect Delays
CHIP SEAL OVERLAY
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins RT ZZ S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneState Route RT D E East - BOONE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 31-MAY-2024.
Road work begins RT Z S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneCRD TOM BASS RD S South - BOONE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 10-MAY-2024.
Road work begins OR 63 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 163 N North - BOONE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins .001 MILE(S) AFTER RT K E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route MO 163 S South - BOONE COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins CST PROVIDENCE RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT AC E East - BOONE COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins .012 MILE(S) AFTER CST BUTTONWOOD DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:30 PM and 06:30 AM.
Possible delays due to work zoneState Route RT KK E East - BOONE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .031 MILE(S) BEFORE CRD SOUTHERN HILLS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT KK W West - BOONE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins CRD OLD MILLCREEK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT U E East - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins CRD DAY SW E.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT U W West - BUCHANAN COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins .007 MILE(S) AFTER RR UP S.
Work will be done 7 days a week.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneUS US 60 E East - BUTLER COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .489 MILE(S) BEFORE RR DESOTO SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneUS US 67 N North - BUTLER COUNTY - Expect Delays
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .004 MILE(S) BEFORE BU 67 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT M N North - CALLAWAY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 30-APR-2024.
Road work begins .006 MILE(S) AFTER RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT B E East - CALLAWAY COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
No delays expected due to work zoneState Route MO 58 E East - CASS COUNTY - No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .034 MILE(S) BEFORE CRD PECULIAR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:30 PM.
No delays expected due to work zoneState Route RT A W West - CASS COUNTY - No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins .375 MILE(S) BEFORE CRD NELSON RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneCRD 195TH ST E East - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .006 MILE(S) BEFORE IS 49 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 08:30 PM.
Possible delays due to work zoneCRD 195TH ST W West - CASS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .009 MILE(S) AFTER CST CITY OF RAYMORE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 08:30 PM.
Expect delays due to work zoneState Route RT C E East - CHARITON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .004 MILE(S) AFTER CRD SILOAM AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT C W West - CHARITON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .004 MILE(S) BEFORE CRD SAINT JOSEPH AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT PP E East - CHARITON COUNTY - CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .023 MILE(S) BEFORE CRD CEMETERY AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Expect delays due to work zoneState Route RT PP W West - CHARITON COUNTY - CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .518 MILE(S) BEFORE CRD SALT LICK AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 11 N North - CHARITON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins US 24 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 11 S South - CHARITON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins .002 MILE(S) AFTER RT CC S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 5 N North - CHARITON COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins .08 MILE(S) BEFORE CST MISSOURI ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneState Route RT KK N North - CHARITON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins MO 5 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT KK S South - CHARITON COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .598 MILE(S) BEFORE CRD OLD CHARITON RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 14 E East - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins .046 MILE(S) AFTER CST VANILLA BEAN RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route MO 14 W West - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins RT PP S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT PP S South - CHRISTIAN COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 06-JUL-2024.
Road work begins MO 14 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneInterstate IS 435 S South - CLAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .01 MILE(S) BEFORE CST NE BIRMINGHAM RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:00 PM.
Expect delays due to work zoneBusiness BU 50 E East - COLE COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 24-MAY-2024.
Road work begins .131 MILE(S) BEFORE CST STONERIDGE PKWY S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT B N North - COLE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .075 MILE(S) BEFORE PVT VOLMERT LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT B S South - COLE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .08 MILE(S) BEFORE CST BOB WHITE LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Expect delays due to work zoneState Route RT EE N North - DEKALB COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins US 69 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:30 PM.
Expect delays due to work zoneState Route RT EE S South - DEKALB COUNTY - Expect Delays
SCRUB SEALING PAVEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins MO 6 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 02:30 PM.
Possible delays due to work zoneState Route RT K S South - DENT COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .113 MILE(S) BEFORE RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT ZZ E East - DUNKLIN COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .005 MILE(S) BEFORE CRD 721 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT ZZ W West - DUNKLIN COUNTY - CLOSED
PAVEMENT REPAIR
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .007 MILE(S) AFTER RT NN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 AM and 04:00 PM.
Expect delays due to work zoneCST ST LOUIS ST E East - GREENE COUNTY - CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 29-APR-2024.
Road work begins .003 MILE(S) BEFORE BU 65 S.
Work will be done 7 days a week.
Expect delays due to work zoneCST ST LOUIS ST W West - GREENE COUNTY - CLOSED
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 29-APR-2024.
Road work begins BU 65 S.
Work will be done 7 days a week.
Expect delays due to work zoneUS US 60 E East - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins .004 MILE(S) AFTER CRD 194 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins .004 MILE(S) BEFORE CRD 194 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneUS US 60 W West - GREENE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins .245 MILE(S) AFTER CST ILLINOIS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT V S South - GRUNDY COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins .068 MILE(S) AFTER MO 6 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT AA E East - HARRISON COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .274 MILE(S) AFTER CRD W 200 AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 2 W West - HENRY COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins .405 MILE(S) AFTER RT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route MO 7 N North - HENRY COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins .137 MILE(S) BEFORE CST MO7N TO CST GAINES DR N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 7 S South - HENRY COUNTY - Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins .182 MILE(S) AFTER CST WATER ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P N North - HOLT COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .02 MILE(S) BEFORE CST MINTON E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT P S South - HOLT COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .075 MILE(S) BEFORE RR ST JOSEPH SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT AA E East - HOWARD COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT AA W West - HOWARD COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins RT E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E E East - HOWARD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .007 MILE(S) AFTER CRD 317 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E W West - HOWARD COUNTY - Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .006 MILE(S) AFTER MO 87 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneUS US 40 E East - HOWARD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins .035 MILE(S) BEFORE PVT 445 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneUS US 40 W West - HOWARD COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins .016 MILE(S) AFTER CRD 439 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneRamp RP IS35S TO IS35S S South - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins IS 35 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
Expect delays due to work zoneRamp RP US169N TO IS35S S South - JACKSON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .008 MILE(S) AFTER US 169 S.
Work will be done 7 days a week.
Work will be conducted between the hours of 07:00 AM and 03:00 PM.
No delays expected due to work zoneState Route MO 350 W West - JACKSON COUNTY - No Delays Expected
ROADSIDE WORK
Scheduled from 22-APR-2024 to 27-APR-2024.
Road work begins .388 MILE(S) AFTER CST BLUE PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST KELLEY RD N North - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .025 MILE(S) BEFORE OR 150 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneCST KELLEY RD S South - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .155 MILE(S) BEFORE MO 150 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 150 E East - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .181 MILE(S) BEFORE CST KELLEY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 150 W West - JACKSON COUNTY - Delays Possible
Project Name - 230616-C02 VARIOUS STRIPING
PAVEMENT MARKING
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .207 MILE(S) BEFORE CST KELLEY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .064 MILE(S) AFTER RP CIVIL WAR RD TO IS49N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .02 MILE(S) AFTER CST OAK ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .246 MILE(S) AFTER RP CEDAR RD TO IS49N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .165 MILE(S) BEFORE CST ROBERT ELLIS YOUNG DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .119 MILE(S) AFTER RT HH E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .045 MILE(S) BEFORE RP IS49N TO CIVIL WAR RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .353 MILE(S) BEFORE CST JACKPINE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 N North - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins 1.013 MILE(S) AFTER RP RTD TO IS49N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins 1.31 MILE(S) AFTER CST NUTMEG RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .186 MILE(S) BEFORE RP IS49S TO MO96 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .192 MILE(S) BEFORE RT D E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .249 MILE(S) BEFORE CRD JACKPINE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .208 MILE(S) AFTER RP MO96 TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .054 MILE(S) AFTER RP IS49S TO CST W FAIRVIEW AVE W.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .912 MILE(S) AFTER RP RTM TO IS49S S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneInterstate IS 49 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins .943 MILE(S) AFTER MO 571 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 171 S South - JASPER COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 02-MAY-2024.
Road work begins .157 MILE(S) BEFORE OR 171 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneRamp RP IS55S TO US67S S South - JEFFERSON COUNTY - CLOSED
PAVEMENT MARKING
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins IS 55 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT Y N North - JEFFERSON COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .212 MILE(S) AFTER PVT ROUSAN LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneCRD DANBY RD E East - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .008 MILE(S) BEFORE IS 55 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneCRD DANBY RD W West - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .007 MILE(S) BEFORE IS 55 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 55 S South - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 24-APR-2024 to 27-APR-2024.
Road work begins .18 MILE(S) AFTER RT TT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneOuter Road W OR 55 S South - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins .169 MILE(S) AFTER RT TT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT B N North - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .071 MILE(S) AFTER RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT B S South - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .118 MILE(S) AFTER CRD KLONDIKE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 09:00 PM.
Possible delays due to work zoneState Route RT TT N North - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .027 MILE(S) BEFORE IS 55 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneState Route RT TT S South - JEFFERSON COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .013 MILE(S) AFTER OR 55 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Expect delays due to work zoneState Route MO 2 E East - JOHNSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins .217 MILE(S) BEFORE CRD 1931 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y E East - JOHNSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins MO 13 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Y W West - JOHNSON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 19-APR-2024 to 02-MAY-2024.
Road work begins .118 MILE(S) AFTER CRD 475 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 13 N North - JOHNSON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD 850 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneState Route MO 13 S South - JOHNSON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .017 MILE(S) BEFORE CRD 600 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K E East - KNOX COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 24-APR-2024.
Road work begins RT EE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K E East - KNOX COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins CRD ELK RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT K W West - KNOX COUNTY - CLOSED
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 24-APR-2024.
Road work begins .002 MILE(S) AFTER CRD EAGLE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K E East - KNOX COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins .002 MILE(S) AFTER MO 15 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Possible delays due to work zoneState Route MO 6 E East - KNOX COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .062 MILE(S) AFTER CST LAFAYETTE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 6 W West - KNOX COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .389 MILE(S) BEFORE RT T E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT K W West - KNOX COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins CRD ELKHART PL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT A N North - LACLEDE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .01 MILE(S) BEFORE RT W E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT J W West - LACLEDE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .003 MILE(S) AFTER CRD ATHENS RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT O W West - LACLEDE COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .01 MILE(S) AFTER RT AF S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:30 PM.
Expect delays due to work zoneState Route RT T N North - LAFAYETTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .004 MILE(S) BEFORE CRD SHELBY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT T S South - LAFAYETTE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .001 MILE(S) BEFORE PVT MARIES CREEK BLVD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
No delays expected due to work zoneState Route RT M S South - LAFAYETTE COUNTY - No Delays Expected
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins .431 MILE(S) AFTER CRD MOUNT ZION RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT T N North - LAFAYETTE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .207 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:00 PM.
Possible delays due to work zoneState Route RT T N North - LAFAYETTE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .072 MILE(S) BEFORE CST 26TH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT T S South - LAFAYETTE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .073 MILE(S) BEFORE CST EASTWOOD AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT T S South - LAFAYETTE COUNTY - Delays Possible
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .105 MILE(S) BEFORE CRD HAYGOOD RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:00 PM.
Possible delays due to work zoneUS US 24 E East - LAFAYETTE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .002 MILE(S) BEFORE CST PINE ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 24 W West - LAFAYETTE COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .001 MILE(S) BEFORE CST BLUFF ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneUS US 60 E East - LAWRENCE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 17-MAY-2024.
Road work begins .005 MILE(S) AFTER CST WESTERN AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM.
Expect delays due to work zoneState Route RT K W West - LEWIS COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 01-NOV-2024.
Road work begins .001 MILE(S) AFTER MO 6 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT E W West - LINCOLN COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 15-JUN-2024.
Road work begins .015 MILE(S) BEFORE CST WILLIAMS ST S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT Y N North - LINN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .003 MILE(S) BEFORE CRD DART RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT Y S South - LINN COUNTY - CLOSED
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins CRD BASKER RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 5 S South - LINN COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins .011 MILE(S) AFTER RT U S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Possible delays due to work zoneUS US 36 W West - LINN COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .775 MILE(S) AFTER MO 130 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:30 AM and 02:30 PM.
Expect delays due to work zoneState Route RT D N North - LIVINGSTON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins .159 MILE(S) AFTER CRD 420 E.
Work will be done 7 days a week.
Expect delays due to work zoneState Route RT D S South - LIVINGSTON COUNTY - CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins .065 MILE(S) BEFORE CRD 418 S.
Work will be done 7 days a week.
Possible delays due to work zoneState Route RT V N North - LIVINGSTON COUNTY - Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins US 65 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT VV N North - MACON COUNTY - CLOSED
BRIDGE INSPECTION
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .011 MILE(S) BEFORE CRD BISON ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT VV S South - MACON COUNTY - CLOSED
BRIDGE INSPECTION
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .169 MILE(S) BEFORE CRD ARCTIC RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route RT F N North - MACON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .598 MILE(S) BEFORE CRD DESOTO PL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT F S South - MACON COUNTY - Delays Possible
SEAL COAT OVERLAY
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD DESOTO PL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route RT E E East - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins MO 28 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneState Route RT E W West - MARIES COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins CRD 511 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:30 AM and 04:30 PM.
Possible delays due to work zoneUS US 36 W West - MARION COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins RT U S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 43 N North - MCDONALD COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .021 MILE(S) AFTER MO 90 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 43 S South - MCDONALD COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .022 MILE(S) BEFORE RT O E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E E East - MERCER COUNTY - CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins .008 MILE(S) BEFORE CRD KEYSTONE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT U E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins CRD 450 SPUR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT U E East - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD 455 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT U W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 30-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD 436 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT U W West - MONROE COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins CRD 465 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K E East - MONTGOMERY COUNTY - CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .001 MILE(S) AFTER RT P S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT K W West - MONTGOMERY COUNTY - CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins MO 19 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E E East - MONTGOMERY COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 15-JUN-2024.
Road work begins RT Y E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT K E East - NEWTON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .754 MILE(S) BEFORE CRD BLUEBIRD DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT K W West - NEWTON COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .005 MILE(S) AFTER RR CHEROKEE SUB E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT A W West - NODAWAY COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins .274 MILE(S) BEFORE CST ELM ST E.
Work will be done on weekdays only.
Expect delays due to work zoneState Route RT Z E East - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 03-JUN-2024.
Road work begins CRD 274-B E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT Z W West - OSAGE COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 03-JUN-2024.
Road work begins MO 100 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 08:00 PM.
Expect delays due to work zoneState Route RT A E East - PEMISCOT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .013 MILE(S) AFTER US 412 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT A W West - PEMISCOT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .02 MILE(S) AFTER CRD 286 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT J E East - PEMISCOT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins .238 MILE(S) BEFORE CRD 421 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
Expect delays due to work zoneUS US 50 E East - PETTIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 24-APR-2024 to 25-APR-2024.
Road work begins .133 MILE(S) AFTER CO US50W T0 US50E S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Possible delays due to work zoneState Route RT AC N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .3 MILE(S) AFTER CRD 425 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT AC S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .232 MILE(S) AFTER CRD 424 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT H E East - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .936 MILE(S) BEFORE CRD 222 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT H W West - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .066 MILE(S) AFTER RT W S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .327 MILE(S) AFTER CRD 470 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:59 AM and 06:00 PM.
Possible delays due to work zoneState Route RT M S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .275 MILE(S) AFTER RT V E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:59 AM and 06:00 PM.
Possible delays due to work zoneState Route RT V E East - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .23 MILE(S) AFTER CRD 449 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT V W West - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .429 MILE(S) BEFORE CRD 449 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .105 MILE(S) BEFORE CRD 219 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W N North - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .402 MILE(S) BEFORE CRD 295 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .438 MILE(S) AFTER CRD 223 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Possible delays due to work zoneState Route RT W S South - PIKE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 30-AUG-2024.
Road work begins .019 MILE(S) AFTER CRD 219 E.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 06:00 AM and 06:00 PM.
Expect delays due to work zoneRamp RP RTDE TO IS435S S South - PLATTE COUNTY - CLOSED
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins .008 MILE(S) AFTER RT D E.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Expect delays due to work zoneInterstate IS 435 N North - PLATTE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins .179 MILE(S) AFTER RP RTC TO IS435N N.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Expect delays due to work zoneInterstate IS 435 S South - PLATTE COUNTY - Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 21-APR-2024 to 21-APR-2024.
Road work begins .056 MILE(S) AFTER RP IS435S TO RTD S.
Work will be done on weekdays and Sundays.
Work will be conducted between the hours of 07:00 AM and 07:30 AM.
Expect delays due to work zoneState Route RT N E East - POLK COUNTY - CLOSED
CORE DRILLING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .009 MILE(S) BEFORE CRD 7TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route MO 215 N North - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .022 MILE(S) AFTER RT JJ S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 215 S South - POLK COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .031 MILE(S) AFTER CRD 77TH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - PULASKI COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins 1.154 MILE(S) BEFORE CRD TROPHY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - PULASKI COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .131 MILE(S) BEFORE CRD SUPERIOR RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .995 MILE(S) AFTER CRD TROPHY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneInterstate IS 44 W West - PULASKI COUNTY - Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .019 MILE(S) BEFORE CRD SUPERIOR RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Possible delays due to work zoneState Route MO 133 N North - PULASKI COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .012 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneState Route MO 133 S South - PULASKI COUNTY - Delays Possible
BRIDGE MAINTENANCE
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .026 MILE(S) BEFORE CRD CHEYENNE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Possible delays due to work zoneUS US 36 E East - RALLS COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .003 MILE(S) BEFORE RT J S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 06:00 PM.
Expect delays due to work zoneState Route MO 72 E East - REYNOLDS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins .014 MILE(S) BEFORE CRD 354 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 72 W West - REYNOLDS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins .001 MILE(S) AFTER CRD PARKS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT W E East - SCHUYLER COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins CRD HOOT OWL TRL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT W W West - SCHUYLER COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .001 MILE(S) BEFORE CST WABASH ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT A N North - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins CST STATE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT A S South - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins CST ARCADE ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT EE E East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 29-APR-2024.
Road work begins MO 15 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT EE W West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 29-APR-2024.
Road work begins .001 MILE(S) AFTER CRD 817 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H E East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins CRD 470 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H E East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins RT N E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H E East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD 803 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H E East - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 26-APR-2024.
Road work begins MO 15 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H W West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .001 MILE(S) BEFORE CRD 716 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H W West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 24-APR-2024 to 24-APR-2024.
Road work begins CRD 708 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H W West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins CRD 460 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT H W West - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 26-APR-2024 to 26-APR-2024.
Road work begins CRD 819 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT RA N North - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins CRD 116 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT RA S South - SCOTLAND COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .001 MILE(S) AFTER RT U E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT CC N North - SCOTT COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins MO 91 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT CC S South - SCOTT COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins RT W E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 03:00 PM.
Expect delays due to work zoneInterstate IS 55 N North - SCOTT COUNTY - Expect Delays
MICROSURFACING
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins .125 MILE(S) BEFORE RP IS57N TO IS55N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 05:00 AM and 05:00 PM.
Possible delays due to work zoneState Route RT K S South - SHANNON COUNTY - Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins 2.872 MILE(S) BEFORE CRD 359 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 04:30 PM.
No delays expected due to work zoneRamp RP US61S TO US40W W West - ST. CHARLES COUNTY - No Delays Expected
Project Name - Improve I-70 project #2
SURVEYING
Scheduled from 25-APR-2024 to 25-APR-2024.
Road work begins .023 MILE(S) AFTER US 61 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
Project Name - Improve I-70 project #2
SURVEYING
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins .205 MILE(S) BEFORE RP IS64E TO PROSPECT RD W.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 06:00 AM. Project Web Page - https://www.modot.org/improvei70/warrentonwentzville
Possible delays due to work zoneInterstate IS 64 E East - ST. CHARLES COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 22-APR-2024 to 23-APR-2024.
Road work begins .024 MILE(S) BEFORE RP PROSPECT RD TO IS64E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT B E East - ST. CLAIR COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins 1.108 MILE(S) BEFORE CRD NE OLD 13 HWY S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT B W West - ST. CLAIR COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .594 MILE(S) AFTER CRD NE OLD 13 HWY S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:30 PM.
Expect delays due to work zoneState Route RT O E East - ST. FRANCOIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins .024 MILE(S) BEFORE CST JEFFERSON AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT O W West - ST. FRANCOIS COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 22-APR-2024 to 03-MAY-2024.
Road work begins .026 MILE(S) BEFORE CST JEFFERSON AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route MO 231 S South - ST. LOUIS COUNTY - Expect Delays
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 16-MAY-2024.
Road work begins .006 MILE(S) BEFORE CRD OLD TELEGRAPH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneInterstate IS 270 W West - ST. LOUIS COUNTY - Delays Possible
BRIDGE FLUSHING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .001 MILE(S) AFTER RP IS44W TO IS270W W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 02:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .016 MILE(S) BEFORE RP IS44E TO IS270E E.
Work will be done on weekdays only.
Work will be conducted between the hours of 12:00 PM and 03:00 PM.
Possible delays due to work zoneInterstate IS 44 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .949 MILE(S) BEFORE RP IS44E TO MO141N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 44 W West - ST. LOUIS COUNTY - Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .001 MILE(S) BEFORE US 61 N.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 12:00 PM.
Possible delays due to work zoneInterstate IS 44 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .002 MILE(S) BEFORE MO 141 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 06:00 AM.
Possible delays due to work zoneInterstate IS 70 E East - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins .005 MILE(S) AFTER IS 270 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 70 W West - ST. LOUIS COUNTY - Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins .096 MILE(S) BEFORE CST SPRINGDALE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 PM and 05:00 AM.
Possible delays due to work zoneState Route MO 100 E East - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins CST RARITAN DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 100 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins .029 MILE(S) AFTER CST INDUSTRIAL CT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 109 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins .047 MILE(S) AFTER CST MANCHESTER RD E.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 109 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 26-APR-2024.
Road work begins .123 MILE(S) AFTER PVT PRIVATE E.
Work will be done 7 days a week.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 180 W West - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins .025 MILE(S) AFTER CST WELLSTON PL S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneState Route MO 267 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .021 MILE(S) BEFORE CRD TELEGRAPH RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneState Route MO 267 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .011 MILE(S) BEFORE CRD HOFFMEISTER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneUS US 61 N North - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 23-APR-2024.
Road work begins .026 MILE(S) BEFORE MO 21 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Possible delays due to work zoneUS US 61 S South - ST. LOUIS COUNTY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2024 to 19-APR-2024.
Road work begins .019 MILE(S) AFTER CRD CONCORD VILLAGE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:30 PM.
Expect delays due to work zoneRamp RP ARSENAL ST TO IS55S S South - ST. LOUIS CITY - CLOSED
MEDIAN OR SHOULDER
Scheduled from 19-APR-2024 to 03-MAY-2024.
Road work begins CST ARSENAL ST E.
Work will be done 7 days a week.
Expect delays due to work zoneInterstate IS 55 N North - ST. LOUIS CITY - Expect Delays
MEDIAN OR SHOULDER
Scheduled from 19-APR-2024 to 08-MAY-2024.
Road work begins .001 MILE(S) AFTER RP GASCONADE ST TO IS55N N.
Work will be done 7 days a week.
Possible delays due to work zoneInterstate IS 64 E East - ST. LOUIS CITY - Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 25-APR-2024 to 26-APR-2024.
Road work begins .183 MILE(S) BEFORE PED SCIENCE OVERPASS S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 PM and 05:00 AM.
Possible delays due to work zoneInterstate IS 55 N North - STE. GENEVIEVE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 24-APR-2024 to 27-APR-2024.
Road work begins .249 MILE(S) BEFORE RT TT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Possible delays due to work zoneOuter Road W OR 55 N North - STE. GENEVIEVE COUNTY - Delays Possible
BRIDGE DECK SEALING
Scheduled from 23-APR-2024 to 26-APR-2024.
Road work begins .241 MILE(S) BEFORE RT TT S.
Work will be done on weekdays only.
Work will be conducted between the hours of 06:00 PM and 06:00 AM.
Expect delays due to work zoneCRD 589 N North - STODDARD COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins US 60 W.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneCRD 589 S South - STODDARD COUNTY - CLOSED
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .024 MILE(S) AFTER CRD 538 E.
Work will be done on weekdays only.
Work will be conducted between the hours of 09:00 AM and 03:00 PM.
Expect delays due to work zoneState Route RT E E East - STODDARD COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins MO 25 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT E W West - STODDARD COUNTY - Expect Delays
CULVERT REPLACEMENT
Scheduled from 23-APR-2024 to 25-APR-2024.
Road work begins .006 MILE(S) AFTER CRD 527 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT A E East - STONE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .026 MILE(S) BEFORE RT AA S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT A W West - STONE COUNTY - Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .028 MILE(S) BEFORE RT AA S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of 07:00 AM and 07:00 PM.
Expect delays due to work zoneState Route RT E W West - SULLIVAN COUNTY - CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins .001 MILE(S) AFTER CRD AZALEA DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of 10:00 AM and 04:00 PM.
Expect delays due to work zoneState Route RT BB N North - VERNON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .008 MILE(S) AFTER CRD PARADE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT BB S South - VERNON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins .022 MILE(S) AFTER CST SOUTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT DD E East - VERNON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .013 MILE(S) BEFORE CRD 2500 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT DD W West - VERNON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins RT B E.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 06:00 PM.
Expect delays due to work zoneState Route RT E E East - VERNON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .085 MILE(S) AFTER CRD 2625 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Expect delays due to work zoneState Route RT E W West - VERNON COUNTY - Expect Delays
CORE DRILLING
Scheduled from 23-APR-2024 to 23-APR-2024.
Road work begins .908 MILE(S) BEFORE CRD 2625 S.
Work will be done on weekdays only.
Work will be conducted between the hours of 08:00 AM and 05:00 PM.
Possible delays due to work zoneInterstate IS 49 N North - VERNON COUNTY - Delays Possible
ROADSIDE WORK
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins .068 MILE(S) BEFORE RP RTB TO IS49N N.
Work will be done on weekdays only.
Work will be conducted between the hours of 07:00 AM and 05:00 PM.
Expect delays due to work zoneRamp RP IS44E TO RTB E East - WEBSTER COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .019 MILE(S) AFTER IS 44 E.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP IS44W TO RTB N North - WEBSTER COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins .039 MILE(S) AFTER IS 44 W.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP RTB TO IS44E E East - WEBSTER COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins RT B S.
Work will be done on weekdays only.
Expect delays due to work zoneRamp RP RTB TO IS44W W West - WEBSTER COUNTY - Expect Delays
GUARD RAIL/CABLE WORK
Scheduled from 22-APR-2024 to 26-APR-2024.
Road work begins RT B S.
Work will be done on weekdays only.

Back to Top

INCIDENTS: 30 to report. Show

Back to Top

WINTER ROAD CONDITIONS: 996 to report. Show

Back to Top

Winter Road Conditions Note: The odd numbered routes report generally from north to south and the even numbered routes report generally from west to east. The lettered routes are typically specific to a particular county and likely are not continuous from county to county or through the state.