WORK ZONES (CLOSED): 91 to report. Hide

Road Closed due to work zoneState Route O East - ANDREW COUNTY - Road Closed
Project Name - PLATTE RIVER BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Road closure begins .54 MILES BEFORE CST MAIN ST W.
Scheduled from 18-MAR-2019 to 01-OCT-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/ROUTE-O-PLATTE-RIVER-BRIDGE-REPLACEMENT
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7754
Road Closed due to work zoneState Route O West - ANDREW COUNTY - Road Closed
Project Name - PLATTE RIVER BRIDGE REPLACEMENT
BRIDGE RECONSTRUCTION
Road closure begins .47 MILES AFTER CST MAIN ST W.
Scheduled from 18-MAR-2019 to 01-OCT-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/ROUTE-O-PLATTE-RIVER-BRIDGE-REPLACEMENT
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7754
Road Closed due to work zoneState Route J South - ATCHISON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .44 MILES BEFORE CST MAIN ST W.
Scheduled from 15-APR-2019 to 30-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route J North - ATCHISON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .37 MILES AFTER CST MAIN ST E.
Scheduled from 15-APR-2019 to 30-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B East - BATES COUNTY - Road Closed
Project Name - 190118-G02-ROUTE B, BATES
BRIDGE RECONSTRUCTION
Road closure begins AT RT O N.
Scheduled from 08-APR-2019 to 01-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B West - BATES COUNTY - Road Closed
Project Name - 190118-G02-ROUTE B, BATES
BRIDGE RECONSTRUCTION
Road closure begins AT RT M N.
Scheduled from 08-APR-2019 to 01-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B South - BENTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.3 MILES BEFORE RT W S.
Scheduled from 13-MAY-2019 to 15-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B North - BENTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.02 MILES AFTER RT W S.
Scheduled from 13-MAY-2019 to 15-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp US36W TO MO759N North - BUCHANAN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER US 36 W.
Scheduled from 01-MAY-2019 to 31-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneCAPE WOOD DR West - CAMDEN COUNTY - Road Closed
Project Name -
MEDIAN OR SHOULDER
Road closure begins LESS THAN .01 MILES AFTER US 54 E.
Scheduled from 15-MAY-2019 to 31-DEC-2025.
Project Web Page -
News Releases - CROSSOVER WILL BE CLOSED PERMANENTLY AS PART OF SAFETY IMPROVEMENTS
Road Closed due to work zoneCAPE WOOD DR East - CAMDEN COUNTY - Road Closed
Project Name -
MEDIAN OR SHOULDER
Road closure begins LESS THAN .01 MILES AFTER US 54 W.
Scheduled from 15-MAY-2019 to 31-DEC-2025.
Project Web Page -
News Releases - CROSSOVER WILL BE CLOSED PERMANENTLY AS PART OF SAFETY IMPROVEMENTS
Road Closed due to work zoneBALDWIN ST South - CASS COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins AT CST NORTH AVE E.
Scheduled from 09-MAY-2019 to 23-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneJEFFERSON AVE West - CASS COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins LESS THAN .01 MILES AFTER MO 58 E.
Scheduled from 09-MAY-2019 to 23-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A South - CLARK COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.99 MILES BEFORE CST JEFFERSON ST W.
Scheduled from 14-APR-2019 to 26-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route A North - CLARK COUNTY - Road Closed
Project Name - RT. A CLARK CO. BRIDGE REPLACEMENT S. WYACONDA
BRIDGE RECONSTRUCTION
Road closure begins 1.9 MILES AFTER CST JEFFERSON ST W.
Scheduled from 15-APR-2019 to 27-JUL-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneRamp IS435N TO US69 North - CLAY COUNTY - Road Closed
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Road closure begins AT IS 435 N.
Scheduled from 18-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 69 South - CLINTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .04 MILES BEFORE MO 110 W.
Scheduled from 08-APR-2019 to 03-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 69 North - CLINTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .03 MILES BEFORE MO 110 E.
Scheduled from 08-APR-2019 to 03-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 169 North - DEKALB COUNTY - Road Closed
Project Name - THIRD FORK PLATTE RIVER BRIDGE DEKALB ROUTE 169
BRIDGE RECONSTRUCTION
Road closure begins .16 MILES BEFORE CST WALNUT ST W.
Scheduled from 01-APR-2019 to 15-JUL-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/THIRD-FORK-PLATTE-RIVER-BRIDGE-DEKALB-COUNTY-US-ROUTE-169
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7649
Road Closed due to work zoneUS 169 South - DEKALB COUNTY - Road Closed
Project Name - THIRD FORK PLATTE RIVER BRIDGE DEKALB ROUTE 169
BRIDGE RECONSTRUCTION
Road closure begins .3 MILES BEFORE CST WALNUT ST E.
Scheduled from 01-APR-2019 to 15-JUL-2019.
Project Web Page - HTTPS://WWW.MODOT.ORG/THIRD-FORK-PLATTE-RIVER-BRIDGE-DEKALB-COUNTY-US-ROUTE-169
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7649
Road Closed due to work zoneState Route HH East - DUNKLIN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins AT MO 153 N.
Scheduled from 06-MAY-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route ZZ West - FRANKLIN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 7.2 MILES AFTER RT C S.
Scheduled from 18-FEB-2019 to 05-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route ZZ East - FRANKLIN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 7.29 MILES BEFORE RT C S.
Scheduled from 18-FEB-2019 to 05-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneEVANS RD East - GREENE COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .02 MILES BEFORE US 65 S.
Scheduled from 01-APR-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneEVANS RD West - GREENE COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CST RIVERBLUFF BLVD E.
Scheduled from 01-APR-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneCHESTNUT AVE North - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .06 MILES BEFORE IS 70 E.
Scheduled from 01-MAY-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneCHESTNUT AVE South - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .03 MILES BEFORE US 40 W.
Scheduled from 01-MAY-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneNINTH ST West - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .06 MILES BEFORE US 40 W.
Scheduled from 01-MAY-2019 to 20-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneWORNALL RD South - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .02 MILES BEFORE IS 435 S.
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneWORNALL RD North - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .02 MILES BEFORE US 50 E.
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 12 East - JACKSON COUNTY - Road Closed
Project Name -
PERMIT OR UTILITY WORK
Road closure begins .09 MILES BEFORE CST FOREST AVE S.
Scheduled from 14-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp BEARDSLEY RD TO IS70W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT CST BEARDSLEY RD N.
Scheduled from 06-MAR-2018 to 31-DEC-2020.
Road Closed due to work zoneRamp HOLMES RD TO IS435N North - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins AT CST HOLMES RD N.
Scheduled from 12-MAY-2018 to 31-MAY-2020.
Road Closed due to work zoneRamp HOLMES RD TO IS435S South - JACKSON COUNTY - Road Closed
INTERSECTION IMPROVEMENTS
Road closure begins AT CST HOLMES RD N.
Scheduled from 12-MAY-2018 to 31-MAY-2020.
Road Closed due to work zoneRamp IS35N TO IS70W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT IS 35 N.
Scheduled from 07-MAR-2018 to 31-DEC-2020.
Road Closed due to work zoneRamp IS470W TO STROTHER RD West - JACKSON COUNTY - Road Closed
Project Name -
MILLING/RESURFACING WORK
Road closure begins AT IS 470 W.
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp IS70E TO IS435N North - JACKSON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins AT IS 70 E.
Scheduled from 18-MAR-2019 to 01-DEC-2020.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp IS70E TO MANCHESTER TRFY East - JACKSON COUNTY - Road Closed
Project Name -
NEW PAVEMENT CONSTRUCTION
Road closure begins AT IS 70 E.
Scheduled from 10-MAR-2019 to 01-DEC-2020.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp IS70W TO IS435S South - JACKSON COUNTY - Road Closed
Project Name -
NEW PAVEMENT CONSTRUCTION
Road closure begins AT IS 70 W.
Scheduled from 18-MAR-2019 to 01-DEC-2020.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp MANCHESTER TRFY TO IS70E East - JACKSON COUNTY - Road Closed
Project Name -
PAVEMENT MARKING
Road closure begins AT CST MANCHESTER TRFY S.
Scheduled from 11-MAR-2019 to 01-DEC-2020.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp MANCHESTER TRFY TO IS70W West - JACKSON COUNTY - Road Closed
Project Name -
NEW PAVEMENT CONSTRUCTION
Road closure begins AT CST MANCHESTER TRFY S.
Scheduled from 11-MAR-2019 to 01-DEC-2020.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp RTW TO IS435S South - JACKSON COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .03 MILES AFTER US 71 S.
Scheduled from 12-MAY-2018 to 30-AUG-2019.
Road Closed due to work zoneRamp STROTHER RD TO IS470W West - JACKSON COUNTY - Road Closed
Project Name -
MILLING/RESURFACING WORK
Road closure begins AT CST STROTHER RD W.
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp US169S TO IS70W West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT CST BROADWAY S.
Scheduled from 06-MAR-2018 to 31-DEC-2020.
Road Closed due to work zoneRamp WOODS CHAPEL RD TO IS470W West - JACKSON COUNTY - Road Closed
Project Name -
MILLING/RESURFACING WORK
Road closure begins AT CST WOODS CHAPEL RD W.
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 24 West - JACKSON COUNTY - Road Closed
PERMIT OR UTILITY WORK
Road closure begins AT CST BROADWAY S.
Scheduled from 22-MAY-2018 to 31-DEC-2020.
Road Closed due to work zoneState Route D East - JASPER COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .98 MILES AFTER CST MAIN ST S.
Scheduled from 03-APR-2019 to 01-SEP-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route D West - JASPER COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .08 MILES AFTER CST IVY RD W.
Scheduled from 01-APR-2019 to 01-SEP-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneOuter Road 44 East - LACLEDE COUNTY - Road Closed
Project Name - NEW GASCONADE RIVER BRIDGE ON I-44OR NEAR HAZELGRE
BRIDGE RECONSTRUCTION
Road closure begins 1.9 MILES AFTER RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneOuter Road 44 West - LACLEDE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins 2.21 MILES BEFORE RT N S.
Scheduled from 31-JUL-2018 to 02-AUG-2019.
Road Closed due to work zoneState Route E North - LAFAYETTE COUNTY - Road Closed
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER RT E S.
Scheduled from 12-NOV-2018 to 28-JUN-2019.
Road Closed due to work zoneState Route C South - LIVINGSTON COUNTY - Road Closed
Project Name -
BRIDGE MAINTENANCE
Road closure begins 1.13 MILES BEFORE RT DD E.
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route C North - LIVINGSTON COUNTY - Road Closed
Project Name -
BRIDGE MAINTENANCE
Road closure begins 1.09 MILES AFTER RT DD W.
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route O South - MACON COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins 2.54 MILES BEFORE RT C N.
Scheduled from 17-MAY-2019 to 20-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route O North - MACON COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins 1.29 MILES AFTER RT C S.
Scheduled from 17-MAY-2019 to 20-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A South - MARION COUNTY - Road Closed
Project Name - ROUTE A BRIDGE REDECK
BRIDGE RECONSTRUCTION
Road closure begins AT RT M W.
Scheduled from 13-MAY-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A North - MARION COUNTY - Road Closed
Project Name - ROUTE A BRIDGE REDECK
BRIDGE RECONSTRUCTION
Road closure begins 1.3 MILES BEFORE RT M E.
Scheduled from 13-MAY-2019 to 19-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route E North - MONITEAU COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.3 MILES AFTER RT W W.
Scheduled from 11-MAR-2019 to 21-MAY-2019.
Project Web Page -
News Releases - BRIDGE NUMBER R0435
Road Closed due to work zoneState Route E South - MONITEAU COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.64 MILES BEFORE RT W W.
Scheduled from 11-MAR-2019 to 21-MAY-2019.
Project Web Page -
News Releases - BRIDGE NUMBER R0435
Road Closed due to work zoneState Route AA North - NEW MADRID COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.1 MILES BEFORE IS 55 N.
Scheduled from 29-APR-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route AA South - NEW MADRID COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins .16 MILES BEFORE IS 55 S.
Scheduled from 29-APR-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 43 South - NEWTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER MO 86 E.
Scheduled from 26-MAR-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route A East - NEWTON COUNTY - Road Closed
Project Name -
BRIDGE MAINTENANCE
Road closure begins LESS THAN .01 MILES AFTER RT D W.
Scheduled from 26-MAR-2019 to 30-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route HH West - PEMISCOT COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.02 MILES AFTER RT EE E.
Scheduled from 06-MAY-2019 to 01-AUG-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route B South - PHELPS COUNTY - Road Closed
Project Name - ROUTE B OVER THE BOURBOUS RIVER
BRIDGE RECONSTRUCTION
Road closure begins .8 MILES AFTER RT U E.
Scheduled from 10-MAY-2019 to 09-JUN-2019.
Project Web Page - ROAD CLOSED. PLEASE USE DETOUR. RTE. 68 TO RTE. HH TO RT.E U TO RTE. 68 FOR NB AND REVERSE FOR SB
News Releases - ROAD CLOSED. PLEASE USE DETOUR. RTE. 68 TO RTE. HH TO RT.E U TO RTE. 68 FOR NB AND REVERSE FOR SB
Road Closed due to work zoneState Route PP East - POLK COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.63 MILES AFTER MO 83 N.
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route U East - RAY COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins AT RT M S.
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route U West - RAY COUNTY - Road Closed
Project Name -
CULVERT REPLACEMENT
Road closure begins AT RT C N.
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route V East - RAY COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.47 MILES AFTER MO 13 S.
Scheduled from 25-FEB-2019 to 31-DEC-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route V West - RAY COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.42 MILES BEFORE MO 13 S.
Scheduled from 25-FEB-2019 to 31-DEC-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneUS 63 North - SCHUYLER COUNTY - Road Closed
Project Name - J2P2194
BRIDGE RECONSTRUCTION
Road closure begins 1.59 MILES AFTER MO 202 E.
Scheduled from 13-MAY-2019 to 26-JUN-2019.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER NORTH FORK MIDDLE FABIUS RIVER 1.6 MILES NORTH OF RT. 136 NEAR LANCASTER
Road Closed due to work zoneUS 63 South - SCHUYLER COUNTY - Road Closed
Project Name - J2P2194
BRIDGE RECONSTRUCTION
Road closure begins 1.62 MILES BEFORE MO 202 W.
Scheduled from 13-MAY-2019 to 26-JUN-2019.
Project Web Page -
News Releases - BRIDGE REPLACEMENT OVER NORTH FORK MIDDLE FABIUS RIVER 1.6 MILES NORTH OF RT. 136 NEAR LANCASTER
Road Closed due to work zoneState Route M North - SCOTLAND COUNTY - Road Closed
Project Name - RT. M SCOTLAND CO. BRIDGE REPLACEMENT INDIAN CREEK
BRIDGE RECONSTRUCTION
Road closure begins 1.11 MILES BEFORE RT MM N.
Scheduled from 01-APR-2019 to 19-JUN-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route M South - SCOTLAND COUNTY - Road Closed
Project Name - BRIDGE REPLACEMENT OVER INDIAN CREEK
BRIDGE RECONSTRUCTION
Road closure begins 1.07 MILES AFTER RT MM N.
Scheduled from 01-APR-2019 to 19-JUN-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7674
Road Closed due to work zoneState Route PP East - SCOTT COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .16 MILES BEFORE IS 55 S.
Scheduled from 17-JUL-2017 to 01-JUN-2019.
Road Closed due to work zoneState Route PP West - SCOTT COUNTY - Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins .27 MILES BEFORE IS 55 N.
Scheduled from 17-JUL-2017 to 01-JUN-2019.
Road Closed due to work zoneState Route W East - SCOTT COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.29 MILES AFTER RT P N.
Scheduled from 11-MAR-2019 to 30-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route W West - SCOTT COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.76 MILES AFTER RT CC S.
Scheduled from 11-MAR-2019 to 30-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp SHREWSBURY AVE TO IS44E East - ST. LOUIS COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins AT CST SHREWSBURY AVE N.
Scheduled from 17-JAN-2019 to 31-DEC-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp GRAND BLVD TO IS44W West - ST. LOUIS CITY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CST LAFAYETTE AVE W.
Scheduled from 23-MAR-2019 to 21-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp IS44E TO IS55N North - ST. LOUIS CITY - Road Closed
Project Name -
PAVEMENT REPAIR
Road closure begins AT IS 55 N.
Scheduled from 17-MAY-2019 to 20-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp VANDEVENTER AVE TO IS44W West - ST. LOUIS CITY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins LESS THAN .01 MILES AFTER CST VANDEVENTER AVE S.
Scheduled from 23-MAR-2019 to 15-DEC-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneRamp WEBER RD TO IS55N North - ST. LOUIS CITY - Road Closed
Project Name -
ROADSIDE WORK
Road closure begins AT CST WEBER RD E.
Scheduled from 01-APR-2019 to 22-MAY-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 6 East - SULLIVAN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 3.7 MILES BEFORE MO 5 S.
Scheduled from 13-MAY-2019 to 25-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 6 West - SULLIVAN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 2.95 MILES AFTER MO 5 S.
Scheduled from 13-MAY-2019 to 25-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route BB South - SULLIVAN COUNTY - Road Closed
Project Name - BRIDGE REDECK PROJECT
BRIDGE RECONSTRUCTION
Road closure begins 4.62 MILES BEFORE RT OO S.
Scheduled from 08-APR-2019 to 11-JUN-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7775
Road Closed due to work zoneState Route BB North - SULLIVAN COUNTY - Road Closed
Project Name - BRIDGE REDECK PROJECT
BRIDGE RECONSTRUCTION
Road closure begins 3.19 MILES AFTER RT OO S.
Scheduled from 08-APR-2019 to 11-JUN-2019.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7775
Road Closed due to work zoneState Route ZZ West - SULLIVAN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 1.46 MILES BEFORE RT E E.
Scheduled from 07-MAY-2019 to 17-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route ZZ East - SULLIVAN COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins AT RT E W.
Scheduled from 07-MAY-2019 to 17-JUL-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 185 North - WASHINGTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 5.1 MILES AFTER RT AA E.
Scheduled from 08-APR-2019 to 28-JUN-2019.
Project Web Page -
News Releases -
Road Closed due to work zoneState Route 185 South - WASHINGTON COUNTY - Road Closed
Project Name -
BRIDGE RECONSTRUCTION
Road closure begins 5.4 MILES BEFORE RT AA W.
Scheduled from 08-APR-2019 to 28-JUN-2019.
Project Web Page -
News Releases -

Back to Top

WORK ZONES (EXPECT DELAYS, POSSIBLE DELAYS): 403 to report. Hide

Expect delays due to work zoneState Route 6 West - ADAIR COUNTY - Expect Delays
Project Name - J2P3132
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 20-AUG-2019.
Road work begins .94 MILES BEFORE MO 149 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - RESURFACE FROM CHARITION RIVER BRIDGE NEAR NOVINGER TO RT. 129 SULLIVAN CO. LINE
Expect delays due to work zoneBusiness 71 South - ANDREW COUNTY - Expect Delays
Project Name - BUISNESS U.S. ROUTE 71 RESURFACING
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 04-JUN-2019.
Road work begins LESS THAN .01 MILES BEFORE CST WILLIAM ST W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7752
Expect delays due to work zoneBusiness 71 North - ANDREW COUNTY - Expect Delays
Project Name - BUISNESS U.S. ROUTE 71 RESURFACING
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 04-JUN-2019.
Road work begins AT BU 71 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7752
Expect delays due to work zoneUS 59 South - ANDREW COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 04-JUN-2019.
Road work begins .03 MILES BEFORE BU 71 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 59 North - ANDREW COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 04-JUN-2019.
Road work begins .37 MILES BEFORE BU 71 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .3 MILES BEFORE RT BB W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .3 MILES BEFORE US 54 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB East - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 09-SEP-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route BB West - AUDRAIN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 09-SEP-2019.
Road work begins .2 MILES BEFORE US 54 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - AUDRAIN COUNTY - Expect Delays
Project Name - ROUNDABOUT INTERSECTION IMPROV.-SCOTT'S CORNER
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .5 MILES BEFORE RT BB E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/8052
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 19 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneUS 54 East - AUDRAIN COUNTY - Expect Delays
Project Name - ROUNDABOUT INTERSECTION IMPROV.-SCOTT'S CORNER
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAY-2019 to 13-SEP-2019.
Road work begins .41 MILES BEFORE RT BB W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/8052
Expect delays due to work zoneInterstate 49 North - BATES COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .73 MILES BEFORE RT B E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - BENTON COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 22-APR-2019 to 15-SEP-2019.
Road work begins .02 MILES BEFORE CST COMMERCIAL ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - BENTON COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 17-APR-2019 to 15-SEP-2019.
Road work begins .03 MILES AFTER US 65 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 83 South - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 01-JUN-2019.
Road work begins .05 MILES AFTER MO 7 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM South - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 18-APR-2019 to 01-JUN-2019.
Road work begins 5.95 MILES BEFORE MO 83 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM North - BENTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 18-APR-2019 to 01-JUN-2019.
Road work begins AT US 65 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 124 East - BOONE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 19-JUL-2019.
Road work begins .46 MILES BEFORE US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 124 West - BOONE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 19-JUL-2019.
Road work begins .2 MILES AFTER US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 163 South - BOONE COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 16-MAY-2019 to 07-JUN-2019.
Road work begins .05 MILES AFTER CST OLD PLANK RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 163 North - BOONE COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 16-MAY-2019 to 07-JUN-2019.
Road work begins .03 MILES AFTER OR 63 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 229 South - BUCHANAN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-MAY-2019 to 19-MAY-2019.
Road work begins AT CST 22ND ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 229 North - BUCHANAN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-MAY-2019 to 19-MAY-2019.
Road work begins .15 MILES BEFORE RT A S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 229 South - BUCHANAN COUNTY - Delays Possible
Project Name -
BRIDGE FLUSHING
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins .04 MILES BEFORE US 59 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 60 West - BUTLER COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 08-JUL-2019.
Road work begins AT US 67 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 53 South - BUTLER COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 12-MAR-2019 to 31-JUL-2019.
Road work begins 1.15 MILES BEFORE RT J E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O West - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .02 MILES AFTER RT D N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O East - CALLAWAY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 16-APR-2019 to 01-NOV-2019.
Road work begins .27 MILES AFTER CST BLUFF ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O East - CALLAWAY COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 3.19 MILES BEFORE RT CC S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O West - CALLAWAY COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 3.14 MILES AFTER RT CC N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneEAST OSAGE BEACH PKWY South - CAMDEN COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins .13 MILES AFTER CST OLD HWY 54 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneEAST OSAGE BEACH PKWY North - CAMDEN COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins 1.86 MILES BEFORE MO 42 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 5 South - CAMDEN COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins .35 MILES AFTER MO 7 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route KK West - CAMDEN COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-MAY-2019 to 31-MAY-2019.
Road work begins AT CST WEST OSAGE BEACH PKWY N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route KK East - CAMDEN COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-MAY-2019 to 31-MAY-2019.
Road work begins 2.59 MILES BEFORE CST BURTON DUENKE LN N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM East - CAMDEN COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-MAY-2019 to 31-MAY-2019.
Road work begins .94 MILES BEFORE CST BAGNELL DAM BLVD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM West - CAMDEN COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-MAY-2019 to 31-MAY-2019.
Road work begins AT MO 242 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - CAMDEN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2019 to 30-AUG-2019.
Road work begins 1.02 MILES AFTER RT KK E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - CAMDEN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 11-MAR-2019 to 30-AUG-2019.
Road work begins .07 MILES AFTER MO 7 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneFORT OSAGE LN South - CAMDEN COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins AT CST EAST OSAGE BEACH PKWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOSAGE BEACH PKWY NORTH TURNAROUND East - CAMDEN COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins AT CST EAST OSAGE BEACH PKWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOSAGE BEACH PKWY SOUTH TURNAROUND West - CAMDEN COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins AT CST EAST OSAGE BEACH PKWY N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp US54E TO MO42W West - CAMDEN COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST EAST OSAGE BEACH PKWY N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp US54W TO MO42E East - CAMDEN COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST EAST OSAGE BEACH PKWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K East - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-MAY-2019 to 01-JUL-2019.
Road work begins AT MO 25 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K West - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-MAY-2019 to 01-JUL-2019.
Road work begins 1.68 MILES AFTER CST WILLIAM ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K West - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-MAY-2019 to 01-JUL-2019.
Road work begins AT LP 55 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K East - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-MAY-2019 to 01-JUL-2019.
Road work begins 1.68 MILES BEFORE CST WILLIAM ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 14-JUN-2019.
Road work begins .18 MILES BEFORE CST BLOOMFIELD RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 14-JUN-2019.
Road work begins .16 MILES AFTER CST BLOOMFIELD RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 34 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins .02 MILES AFTER IS 55 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 34 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST HOPE ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins .48 MILES BEFORE LP 55 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - CAPE GIRARDEAU COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 08-APR-2019 to 25-MAY-2019.
Road work begins .06 MILES AFTER LP 55 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 103 North - CARTER COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins AT RT Z W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 103 South - CARTER COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins AT US 60 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 49 South - CASS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .29 MILES BEFORE MO 7 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 58 East - CASS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-APR-2019 to 19-JUL-2019.
Road work begins .02 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 58 West - CASS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-APR-2019 to 19-JUL-2019.
Road work begins .11 MILES AFTER CST DEAN AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 58 West - CASS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 09-MAY-2019 to 23-MAY-2019.
Road work begins .03 MILES BEFORE CST NORTH AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 58 East - CASS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 09-MAY-2019 to 23-MAY-2019.
Road work begins .03 MILES BEFORE CST NORTH AVE W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 49 North - CASS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 08-APR-2019 to 15-JUN-2019.
Road work begins 1.3 MILES BEFORE CST S COMMERCIAL ST N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route J South - CASS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2019 to 05-AUG-2019.
Road work begins .38 MILES BEFORE CST SCHOOL RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - CEDAR COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 16-SEP-2019.
Road work begins 1.96 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 West - CEDAR COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 21-MAR-2019 to 16-SEP-2019.
Road work begins 2.55 MILES BEFORE RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 129 North - CHARITON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 1.13 MILES AFTER RT W W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 24 East - CHARITON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .2 MILES BEFORE CST JACKSON ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 24 East - CHARITON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 2.02 MILES AFTER CST JACKSON ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 24 East - CHARITON COUNTY - Delays Possible
Project Name - BRIDGE REHABILITATION
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2019 to 31-MAY-2019.
Road work begins .29 MILES AFTER CST JACKSON ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7516
Possible delays due to work zoneUS 24 West - CHARITON COUNTY - Delays Possible
Project Name - BRIDGE REHABILITATION
BRIDGE MAINTENANCE
Scheduled from 11-MAR-2019 to 31-MAY-2019.
Road work begins 2.26 MILES AFTER MO 5 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7516
Expect delays due to work zoneBusiness 65 South - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .25 MILES BEFORE CST W SOUTH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneSELMORE BLVD North - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .33 MILES BEFORE CST E SOUTH ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 14 East - CHRISTIAN COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 03-DEC-2018 to 08-NOV-2019.
Road work begins .24 MILES BEFORE CST S 3RD ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneKANSAS ST East - CLAY COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 15-NOV-2019.
Road work begins AT MO 152 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneKANSAS ST West - CLAY COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 15-NOV-2019.
Road work begins AT CST CLAYVIEW DR N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 35 North - CLAY COUNTY - Expect Delays
Project Name -
BRIDGE FLUSHING
Scheduled from 25-APR-2019 to 31-MAY-2019.
Road work begins .41 MILES BEFORE CST BEDFORD AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 35 North - CLAY COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 25-APR-2019 to 31-DEC-2019.
Road work begins .01 MILES BEFORE US 69 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 35 South - CLAY COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 27-APR-2019 to 31-DEC-2019.
Road work begins .08 MILES BEFORE CST NE COOKINGHAM DR W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 152 West - CLAY COUNTY - Expect Delays
Project Name -
BRIDGE FLUSHING
Scheduled from 07-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST SHOAL CREEK PKWY N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 210 West - CLAY COUNTY - Expect Delays
Project Name -
BRIDGE FLUSHING
Scheduled from 17-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE RT N N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 92 West - CLAY COUNTY - Expect Delays
Project Name - CLAY COUNTY ROUTE 92
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2019 to 15-AUG-2019.
Road work begins .34 MILES BEFORE CRD JESSE JAMES FARM RD N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 92 East - CLAY COUNTY - Expect Delays
Project Name - CLAY COUNTY ROUTE 92
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2019 to 15-AUG-2019.
Road work begins .26 MILES AFTER IS 35 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS35S TO MO152W West - CLAY COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2019 to 15-SEP-2019.
Road work begins AT US 69 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins .43 MILES BEFORE CST BEDFORD AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 North - CLAY COUNTY - Delays Possible
Project Name -
MEDIAN OR SHOULDER
Scheduled from 14-MAY-2019 to 24-MAY-2019.
Road work begins .5 MILES BEFORE MO 210 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 North - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 15-DEC-2018 to 31-MAY-2019.
Road work begins .31 MILES BEFORE MO 210 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 South - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 14-DEC-2018 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST PARVIN RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 152 West - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2019 to 31-DEC-2019.
Road work begins AT CST KANSAS ST W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 152 East - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 24-APR-2019 to 31-DEC-2019.
Road work begins AT CST FLINTLOCK RD S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 East - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins .01 MILES AFTER CST ARMOUR RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 West - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 17-DEC-2018 to 31-MAY-2019.
Road work begins .12 MILES BEFORE IS 435 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 East - CLAY COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 17-DEC-2018 to 31-MAY-2019.
Road work begins .41 MILES BEFORE IS 435 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 9 North - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST N OAK TRFY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp ENGLEWOOD RD TO US169S South - CLAY COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 16-MAY-2019 to 06-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER CST ENGLEWOOD RD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp IS35N TO MO152E East - CLAY COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAR-2019 to 15-SEP-2019.
Road work begins AT US 69 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp MO152E TO IS35S South - CLAY COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-APR-2019 to 15-SEP-2019.
Road work begins AT CST BARRY RD W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp MO152W TO IS35N North - CLAY COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 24-APR-2019 to 15-SEP-2019.
Road work begins AT CST KANSAS ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 169 South - CLAY COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 15-APR-2019 to 31-MAY-2019.
Road work begins AT CST ENGLEWOOD RD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 69 South - CLAY COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins .04 MILES AFTER MO 110 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 69 North - CLAY COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins .01 MILES BEFORE CST ANTIOCH RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 35 North - CLINTON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 03-JUN-2019.
Road work begins .22 MILES BEFORE US 69 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 35 South - CLINTON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 03-JUN-2019.
Road work begins .28 MILES BEFORE US 69 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 South - CLINTON COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER RT PP E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE OR 54 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneELLIS BLVD East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT C E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST CHRISTY DR S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .57 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 West - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins AT CST JEFFERSON ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 54 East - COLE COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .23 MILES AFTER CST CHRISTY DR N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER CST SOUTHWEST BLVD N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C West - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - COLE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES BEFORE RT CC N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 54 West - COLE COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins .22 MILES BEFORE CST W MAIN ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 54 East - COLE COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins .36 MILES AFTER RT AA N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 South - COOPER COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-APR-2019 to 28-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER RT B N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .04 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 24-APR-2019 to 01-NOV-2019.
Road work begins .06 MILES BEFORE RT ZZ W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 South - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT MARKING
Scheduled from 11-MAR-2019 to 23-MAY-2019.
Road work begins AT OR 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 19 North - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT MARKING
Scheduled from 11-MAR-2019 to 23-MAY-2019.
Road work begins .71 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 49 South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 06-MAY-2019 to 30-MAY-2019.
Road work begins AT MO 19 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M North - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT RT YY E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M South - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT RT VV N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route TT South - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins 4.86 MILES BEFORE MO 8 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route TT North - CRAWFORD COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT MO 8 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 245 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.7 MILES AFTER CST CATALPA ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 245 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .52 MILES AFTER MO 215 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.92 MILES BEFORE US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .97 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 97 South - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 1.38 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 97 North - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins 3.37 MILES BEFORE RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O East - DADE COUNTY - Expect Delays
Project Name -
ROAD MIX OVERLAY
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .2 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O West - DADE COUNTY - Expect Delays
Project Name -
ROAD MIX OVERLAY
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 2.55 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y East - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .18 MILES BEFORE RT H N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y West - DADE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 06-MAY-2019 to 20-MAY-2019.
Road work begins .86 MILES BEFORE RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - DALLAS COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT CST DALLAS ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins 1.76 MILES AFTER RT P S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 38 East - DALLAS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 22-APR-2019 to 30-MAY-2019.
Road work begins .25 MILES BEFORE RT M W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 64 East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins 1.22 MILES BEFORE PK BEN58 J S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 73 North - DALLAS COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins .64 MILES BEFORE MO 64 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - DALLAS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 22-APR-2019 to 30-MAY-2019.
Road work begins AT MO 38 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - DALLAS COUNTY - Expect Delays
Project Name -
CULVERT REPLACEMENT
Scheduled from 25-MAR-2019 to 30-MAY-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 65 North - DALLAS COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins .13 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 South - DAVIESS COUNTY - Delays Possible
Project Name -
SEAL COAT OVERLAY
Scheduled from 22-APR-2019 to 27-MAY-2019.
Road work begins .18 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - DAVIESS COUNTY - Delays Possible
Project Name -
SEAL COAT OVERLAY
Scheduled from 22-APR-2019 to 27-MAY-2019.
Road work begins .22 MILES BEFORE RT DD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H West - DENT COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 23-MAY-2019.
Road work begins AT RT C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 53 North - DUNKLIN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 01-JUL-2019.
Road work begins AT RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 53 South - DUNKLIN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 01-JUL-2019.
Road work begins .46 MILES BEFORE RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D East - DUNKLIN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 24-APR-2019 to 30-JUN-2019.
Road work begins AT MO 25 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 53 North - DUNKLIN COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 12-MAR-2019 to 31-JUL-2019.
Road work begins .46 MILES AFTER RT J E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 47 North - FRANKLIN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 09-SEP-2016 to 01-AUG-2019.
Road work begins LESS THAN .01 MILES AFTER CST EIGTH ST W.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Road work begins 1.47 MILES BEFORE RT Z S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 65 North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST SUNSHINE ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 65 North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .28 MILES AFTER CST CHESTNUT EXPY W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .06 MILES AFTER MO 266 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route M East - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 27-MAR-2019 to 09-AUG-2019.
Road work begins .06 MILES AFTER RT ZZ S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY East - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST SCHOOLCRAFT FWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z North - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-MAY-2019 to 22-MAY-2019.
Road work begins .04 MILES AFTER US 160 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 65 South - GREENE COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-JAN-2019 to 02-DEC-2019.
Road work begins .1 MILES AFTER CST SCHOOLCRAFT FWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - HARRISON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 31-MAY-2019.
Road work begins .33 MILES BEFORE RT N E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 South - HARRISON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 69 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - HENRY COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 13-MAY-2019 to 02-JUL-2019.
Road work begins .06 MILES AFTER MO 18 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - HENRY COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 13-MAY-2019 to 02-JUL-2019.
Road work begins 2.83 MILES BEFORE BU 13 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW North - HENRY COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 21-MAY-2019.
Road work begins .08 MILES AFTER CST NORTH ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 83 North - HICKORY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 08-APR-2019 to 01-JUN-2019.
Road work begins .04 MILES AFTER US 54 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 29 South - HOLT COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 16-JUN-2019.
Road work begins .21 MILES BEFORE CRD VENTURA DR S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W South - HOWELL COUNTY - Expect Delays
Project Name -
SCRUB SEALING PAVEMENT
Scheduled from 02-MAY-2019 to 31-MAY-2019.
Road work begins AT MO 17 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W North - HOWELL COUNTY - Expect Delays
Project Name -
SCRUB SEALING PAVEMENT
Scheduled from 02-MAY-2019 to 31-MAY-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 60 East - HOWELL COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 09-AUG-2019.
Road work begins AT MO 17 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 60 West - HOWELL COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 09-AUG-2019.
Road work begins 1.54 MILES BEFORE RT RA N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AB West - HOWELL COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins AT US 160 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AB East - HOWELL COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins 6.52 MILES BEFORE US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 49 North - IRON COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 06-MAY-2019 to 30-MAY-2019.
Road work begins AT RT Y S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 435 South - JACKSON COUNTY - Expect Delays
RESURFACING PAVEMENT
Scheduled from 11-MAY-2018 to 31-DEC-2019.
Road work begins .26 MILES BEFORE CST HICKMAN MILLS DR S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneInterstate 435 North - JACKSON COUNTY - Expect Delays
Project Name - MO-210 DIVERGING DIAMOND INTERCHANGE
MEDIAN OR SHOULDER
Scheduled from 16-MAY-2019 to 13-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER CST FRONT ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 470 East - JACKSON COUNTY - Expect Delays
Project Name -
SWEEPING PAVEMENT
Scheduled from 19-MAY-2019 to 20-MAY-2019.
Road work begins AT US 50 E.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 470 West - JACKSON COUNTY - Expect Delays
Project Name -
SWEEPING PAVEMENT
Scheduled from 19-MAY-2019 to 20-MAY-2019.
Road work begins .02 MILES AFTER IS 70 E.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - JACKSON COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 19-MAY-2019 to 23-MAY-2019.
Road work begins .13 MILES AFTER CST STADIUM DR E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - JACKSON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAR-2019 to 14-JUN-2019.
Road work begins .69 MILES BEFORE CST STERLING AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - JACKSON COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 18-MAY-2019 to 19-MAY-2019.
Road work begins .08 MILES AFTER CST CRYSLER ST N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - JACKSON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAR-2019 to 14-JUN-2019.
Road work begins .49 MILES AFTER CST LITTLE BLUE PKWY S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 210 East - JACKSON COUNTY - Expect Delays
Project Name -
BRIDGE FLUSHING
Scheduled from 17-MAY-2019 to 24-MAY-2019.
Road work begins .05 MILES AFTER MO 291 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 291 North - JACKSON COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 17-MAY-2019 to 22-MAY-2019.
Road work begins .02 MILES BEFORE CST 39TH ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 291 South - JACKSON COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 17-MAY-2019 to 20-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 210 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS435N TO IS70E East - JACKSON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins AT IS 435 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS435S TO IS70E East - JACKSON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins LESS THAN .01 MILES AFTER IS 435 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS70E TO IS435S South - JACKSON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 06-APR-2019 to 01-DEC-2020.
Road work begins AT IS 70 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 24 East - JACKSON COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 10-MAY-2019 to 22-MAY-2019.
Road work begins .18 MILES AFTER CST BENNINGTON AVE S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 North - JACKSON COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Road work begins .19 MILES BEFORE CST WORNALL RD N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 470 East - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING, APRIL 7TH TO NOV. 1ST.
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins .3 MILES BEFORE CST RAYTOWN RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 470 West - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING, APRIL 7TH TO NOV. 1ST.
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins AT MO 291 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 12 West - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 14-MAY-2019 to 19-MAY-2019.
Road work begins .11 MILES BEFORE CST FOREST AVE S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 East - JACKSON COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 291 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 West - JACKSON COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 28-JUN-2019.
Road work begins .14 MILES BEFORE MO 291 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 291 North - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING TO 39TH ST. APRIL 7TH TO NOV. 1
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER IS 470 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 291 North - JACKSON COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .98 MILES AFTER CST COURTNEY RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 291 South - JACKSON COUNTY - Delays Possible
Project Name - I-470 RESURFACING TO 39TH ST. APRIL 7TH TO NOV. 1
MILLING/RESURFACING WORK
Scheduled from 07-APR-2019 to 01-NOV-2019.
Road work begins .01 MILES BEFORE CST 39TH ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 7 South - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 16-MAY-2019 to 12-JUN-2019.
Road work begins .57 MILES BEFORE US 50 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 7 North - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 14-MAY-2019 to 28-JUN-2019.
Road work begins .95 MILES AFTER MO 150 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 78 West - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 16-MAY-2019 to 05-JUN-2019.
Road work begins .17 MILES AFTER CST 23RD ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 78 East - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 15-MAY-2019 to 07-JUN-2019.
Road work begins .1 MILES BEFORE CST KINGS HIGHWAY N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 49 South - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 17-MAY-2019 to 29-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST MARTHA TRUMAN RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 50 West - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 7 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 50 East - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 19-APR-2019 to 24-MAY-2019.
Road work begins .57 MILES BEFORE MO 7 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp 104TH ST TO IS435N North - JACKSON COUNTY - Delays Possible
Project Name - I-435 SOUTH LOOP LINK
BRIDGE RECONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT CST 104TH ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp HOLMES RD TO US50E East - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT CST HOLMES RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp STATELINE RD TO IS435N North - JACKSON COUNTY - Delays Possible
Project Name - I-435 SOUTH LOOP LINK
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT CRD STATE LINE RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp US50E TO HOLMES RD East - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT IS 435 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp US50E TO WORNALL RD East - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT US 50 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp WORNALL RD TO US50E East - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins AT CST WORNALL RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 40 East - JACKSON COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Road work begins .1 MILES BEFORE MO 291 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 40 West - JACKSON COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 17-MAY-2019 to 19-MAY-2019.
Road work begins .03 MILES AFTER CST VALLEY VIEW PKWY W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 50 West - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 26-APR-2019 to 31-MAY-2019.
Road work begins 1 MILE AFTER CRD S BUCKNER TARSNEY RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneE 32ND ST West - JASPER COUNTY - Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-JUN-2018 to 31-JUL-2019.
Road work begins .01 MILES AFTER LP 49 S.
Work will be done around the clock, on weekdays only.
Expect delays due to work zoneE 32ND ST East - JASPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JAN-2019 to 31-MAY-2019.
Road work begins .08 MILES AFTER CST DUQUESNE RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneE 32ND ST West - JASPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 16-JAN-2019 to 31-MAY-2019.
Road work begins .2 MILES AFTER IS 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - JASPER COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 25-FEB-2019 to 31-MAY-2019.
Road work begins 1.06 MILES AFTER MO 37 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - JASPER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 23-MAY-2019.
Road work begins .83 MILES AFTER LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - JASPER COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 04-MAR-2019 to 30-SEP-2019.
Road work begins 1.53 MILES BEFORE LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 49 North - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins AT RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 49 South - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins 1 MILE BEFORE RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 East - JEFFERSON COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 08-MAY-2019 to 24-MAY-2019.
Road work begins AT CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 West - JEFFERSON COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 08-MAY-2019 to 24-MAY-2019.
Road work begins AT RT CC S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 West - JEFFERSON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 15-APR-2019 to 24-JUN-2019.
Road work begins .44 MILES AFTER CRD UPPER PLATTIN RD N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 East - JEFFERSON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 15-APR-2019 to 24-JUN-2019.
Road work begins .57 MILES AFTER CRD FOUNTAIN CITY RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 21 South - JEFFERSON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 15-JUN-2019.
Road work begins .92 MILES BEFORE MO 104 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route T East - JEFFERSON COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 25-MAR-2019 to 31-MAY-2019.
Road work begins AT RT JJ N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route T West - JEFFERSON COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 25-MAR-2019 to 31-MAY-2019.
Road work begins AT RT TT N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneState Route 141 North - JEFFERSON COUNTY - No Expected Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2019 to 22-NOV-2019.
Road work begins .01 MILES AFTER IS 55 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 55 South - JEFFERSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 29-APR-2019 to 20-MAY-2019.
Road work begins .02 MILES AFTER RT A W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 55 North - JEFFERSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 29-APR-2019 to 20-MAY-2019.
Road work begins 1.41 MILES AFTER US 61 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 21 South - JEFFERSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 10-MAY-2019 to 20-MAY-2019.
Road work begins .17 MILES BEFORE CST VINELAND SCHOOL RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route BB South - JOHNSON COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 26-MAY-2019.
Road work begins .02 MILES AFTER BU 13 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route BB North - JOHNSON COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 26-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER RT F N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD West - JOHNSON COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 07-JUN-2019.
Road work begins .02 MILES AFTER MO 23 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route DD East - JOHNSON COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 07-JUN-2019.
Road work begins .01 MILES AFTER CST HALE LAKE RD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW South - JOHNSON COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 21-MAY-2019.
Road work begins .01 MILES AFTER MO 23 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 5 North - LACLEDE COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2019 to 14-JUN-2019.
Road work begins .03 MILES AFTER CST 7TH ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 17 North - LACLEDE COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 23-MAY-2019.
Road work begins .7 MILES BEFORE RT U E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - LAFAYETTE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER RT T S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - LAFAYETTE COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 131 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 24 West - LAFAYETTE COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 15-MAY-2019 to 23-MAY-2019.
Road work begins 1.02 MILES AFTER MO 224 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 20 West - LAFAYETTE COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 30-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE RT W N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 20 East - LAFAYETTE COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 30-MAY-2019.
Road work begins .02 MILES AFTER MO 13 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O North - LAFAYETTE COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 01-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER RT M S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route O South - LAFAYETTE COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 01-JUN-2019.
Road work begins .01 MILES AFTER BU 13 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 265 South - LAWRENCE COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 01-MAY-2019 to 23-MAY-2019.
Road work begins .14 MILES BEFORE CST LINCOLN AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 39 North - LAWRENCE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 27-NOV-2018 to 04-JUL-2019.
Road work begins .26 MILES AFTER CST LINCOLN AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 79 North - LINCOLN COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins 2.72 MILES AFTER CST MAIN ST N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - LINCOLN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .37 MILES BEFORE RT KK W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - LINCOLN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2019 to 31-DEC-2020.
Road work begins .05 MILES AFTER CST DUGAN LN W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - MARIES COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 01-APR-2019 to 14-JUN-2019.
Road work begins 1.9 MILES AFTER RT A N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 South - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .26 MILES BEFORE MO 42 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 South - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins .57 MILES AFTER MO 28 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 North - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins 1.74 MILES BEFORE MO 28 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 63 North - MARIES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 42 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 110 East - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins 3.02 MILES AFTER RT K S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneState Route 110 West - MARION COUNTY - Expect Delays
Project Name - RESURFACING FROM MONROE CITY TO MARK TWAIN BRIDGE
RESURFACING PAVEMENT
Scheduled from 04-MAR-2019 to 01-NOV-2019.
Road work begins AT US 36 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW/MODOT.ORG/US-ROUTE-36
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7567
Expect delays due to work zoneUS 24 East - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 24 West - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins 4.28 MILES BEFORE US 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 North - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Expect delays due to work zoneUS 61 South - MARION COUNTY - Expect Delays
Project Name - INTERSECTION IMPROVEMENTS - US 61/24 AND ROUTE F
RESURFACING PAVEMENT
Scheduled from 18-MAR-2019 to 01-NOV-2019.
Road work begins .89 MILES BEFORE US 24 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-24
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7629
Possible delays due to work zoneUS 136 East - MERCER COUNTY - Delays Possible
Project Name -
SCRUB SEALING PAVEMENT
Scheduled from 29-APR-2019 to 30-MAY-2019.
Road work begins .94 MILES BEFORE RT D W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2019 to 24-MAY-2019.
Road work begins .52 MILES BEFORE BU 54 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-MAR-2019 to 24-MAY-2019.
Road work begins .38 MILES AFTER RT M E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 01-APR-2019 to 23-MAY-2019.
Road work begins 1.39 MILES AFTER RT M W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 East - MILLER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 01-APR-2019 to 23-MAY-2019.
Road work begins .34 MILES AFTER MO 52 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 North - MONITEAU COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 15-APR-2019 to 28-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER CST MAIN ST W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 North - MONTGOMERY COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 07-JUN-2019.
Road work begins .13 MILES BEFORE US 40 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - MONTGOMERY COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-APR-2019 to 07-JUN-2019.
Road work begins .12 MILES AFTER IS 70 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 94 West - MONTGOMERY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 20-MAY-2019.
Road work begins .08 MILES AFTER MO 19 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 94 East - MONTGOMERY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 20-MAY-2019.
Road work begins 5.04 MILES AFTER RT D N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 94 West - MONTGOMERY COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins AT RT P S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 94 East - MONTGOMERY COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 30-MAY-2019.
Road work begins 5.05 MILES AFTER RT D N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C East - MORGAN COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 04-FEB-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 52 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D West - NEW MADRID COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 24-APR-2019 to 30-JUN-2019.
Road work begins AT US 62 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U East - NEW MADRID COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 24-APR-2019 to 30-JUN-2019.
Road work begins AT RT D E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U West - NEW MADRID COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 24-APR-2019 to 30-JUN-2019.
Road work begins AT US 62 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - NEWTON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 01-APR-2019 to 01-JUN-2019.
Road work begins AT CST RANGE LINE RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - NEWTON COUNTY - Expect Delays
Project Name - I-44 GUARDRAIL/RESURFACE PROJECT
GUARD RAIL/CABLE WORK
Scheduled from 04-MAR-2019 to 30-SEP-2019.
Road work begins .43 MILES AFTER LP 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route E South - PETTIS COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 26-MAY-2019.
Road work begins .01 MILES AFTER RT B E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route E North - PETTIS COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 26-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 52 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC West - PHELPS COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-MAY-2019 to 24-MAY-2019.
Road work begins .02 MILES AFTER CST LIONS CLUB DR E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC East - PHELPS COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 15-MAY-2019 to 24-MAY-2019.
Road work begins 4.45 MILES BEFORE CST LIONS CLUB DR E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - PHELPS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins AT IS 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 01-APR-2019 to 14-JUN-2019.
Road work begins .96 MILES AFTER CST BISHOP AVE S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins .66 MILES BEFORE CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - PHELPS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins .95 MILES BEFORE CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - PHELPS COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 01-APR-2019 to 01-OCT-2019.
Road work begins AT CST BISHOP AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 8 West - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-APR-2019 to 30-MAY-2019.
Road work begins 2.7 MILES BEFORE MO 68 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 8 East - PHELPS COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 01-APR-2019 to 30-MAY-2019.
Road work begins AT MO 68 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route H East - PHELPS COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 23-MAY-2019.
Road work begins AT US 63 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 79 South - PIKE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins .11 MILES AFTER CST 3RD ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 54 West - PIKE COUNTY - Expect Delays
Project Name - BASSINGER CORNER TO LOUISIANA - 39 MILES
RESURFACING PAVEMENT
Scheduled from 11-MAR-2019 to 01-NOV-2019.
Road work begins .15 MILES AFTER MO 79 S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page - HTTPS://WWW.MODOT.ORG/US-ROUTE-54
News Releases - HTTPS://WWW.MODOT.ORG/NODE/7566
Expect delays due to work zoneInterstate 29 North - PLATTE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 30-MAR-2019 to 30-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 152 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 29 South - PLATTE COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 30-MAR-2019 to 30-MAY-2019.
Road work begins .4 MILES BEFORE CST NW OLD TIFFANY SPRINGS RD W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 South - PLATTE COUNTY - Delays Possible
Project Name -
MEDIAN OR SHOULDER
Scheduled from 14-MAY-2019 to 24-MAY-2019.
Road work begins 2.61 MILES BEFORE MO 45 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 45 North - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST 64TH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 45 South - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER IS 435 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 9 South - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins .02 MILES AFTER CST NW BARRY RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route FF East - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST RIVER RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route FF West - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins .01 MILES AFTER CST MILL ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route K North - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 45 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route K South - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 152 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - POLK COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 04-MAR-2019 to 12-JUN-2019.
Road work begins 1.04 MILES AFTER BU 13 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 04-MAR-2019 to 12-JUN-2019.
Road work begins .8 MILES BEFORE BU 13 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 15-MAY-2019 to 23-MAY-2019.
Road work begins .08 MILES AFTER RT N E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - PULASKI COUNTY - Expect Delays
Project Name - PAINT THE NEW GASCONADE RIVER BRIDGE
BRIDGE MAINTENANCE
Scheduled from 15-MAY-2019 to 03-JUL-2019.
Road work begins 2.34 MILES BEFORE RT P W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 17 South - PULASKI COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 06-MAY-2019 to 23-MAY-2019.
Road work begins AT IS 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 136 West - PUTNAM COUNTY - Delays Possible
Project Name -
SCRUB SEALING PAVEMENT
Scheduled from 29-APR-2019 to 30-MAY-2019.
Road work begins 1.52 MILES AFTER CST 1ST ST N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A East - RALLS COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 13-MAY-2019 to 14-JUN-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A West - RALLS COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 13-MAY-2019 to 14-JUN-2019.
Road work begins AT US 61 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O North - RAY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2019 to 21-MAY-2019.
Road work begins AT RT Z N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route O South - RAY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2019 to 21-MAY-2019.
Road work begins AT MO 10 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 210 West - RAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 16-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 10 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M North - RAY COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 29-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER MO 10 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M South - RAY COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 01-MAY-2019 to 29-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER RT C S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y North - RIPLEY COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins AT MO 21 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route Y South - RIPLEY COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins 10.23 MILES BEFORE MO 142 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 19 South - SHANNON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-NOV-2018 to 31-MAY-2019.
Road work begins .22 MILES BEFORE CST MAIN ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 19 North - SHANNON COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 05-NOV-2018 to 31-MAY-2019.
Road work begins .06 MILES AFTER CST OLD ALTON RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 60 East - SHANNON COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 13-MAY-2019 to 08-JUL-2019.
Road work begins LESS THAN .01 MILES AFTER RT E S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneZUMBEHL RD South - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE IS 70 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneZUMBEHL RD North - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins .01 MILES BEFORE IS 70 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2019 to 20-MAY-2019.
Road work begins .22 MILES BEFORE RT A E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2019 to 20-MAY-2019.
Road work begins .09 MILES AFTER CST SONDEREN ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins .02 MILES BEFORE LP 70 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - ST. CHARLES COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins .02 MILES BEFORE CST S 5TH ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneOuter Road 70 West - ST. CHARLES COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 03-AUG-2018 to 28-SEP-2019.
Road work begins AT CST MAIN ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneOuter Road 70 West - ST. CHARLES COUNTY - Expect Delays
SHOULDER WORK
Scheduled from 03-AUG-2018 to 28-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER CST T R HUGHES BLVD S.
Work will be done around the clock, 7 days a week.
No delays expected due to work zoneState Route DD North - ST. CHARLES COUNTY - No Expected Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins .14 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneState Route DD South - ST. CHARLES COUNTY - No Expected Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 13-MAY-2019 to 31-MAY-2019.
Road work begins .37 MILES AFTER CST WINGHAVEN BLVD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneUS 61 South - ST. CHARLES COUNTY - No Expected Delays
Project Name -
SHOULDER WORK
Scheduled from 15-DEC-2017 to 28-JUN-2019.
Road work begins .27 MILES BEFORE CRD PEINE RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
No delays expected due to work zoneUS 61 North - ST. CHARLES COUNTY - No Expected Delays
Project Name -
SHOULDER WORK
Scheduled from 15-DEC-2017 to 28-JUN-2019.
Road work begins .82 MILES BEFORE RT P E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneE TERRA LN West - ST. CHARLES COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 21-MAR-2019 to 28-JUN-2019.
Road work begins .03 MILES BEFORE CST SONDEREN ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 370 East - ST. CHARLES COUNTY - Delays Possible
Project Name - 370 OVER 94 BRIDGE REHABS
BRIDGE RECONSTRUCTION
Scheduled from 16-MAY-2019 to 31-AUG-2019.
Road work begins .15 MILES AFTER CST MEL WETTER PKWY S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 64 East - ST. CHARLES COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins .13 MILES AFTER RT K N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp IS64W TO RTK North - ST. CHARLES COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins .02 MILES AFTER US 61 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route W South - ST. CHARLES COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins AT US 61 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 South - ST. CLAIR COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins 1 MILE BEFORE RT A E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - ST. CLAIR COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 22-APR-2019 to 31-MAY-2019.
Road work begins 1.93 MILES BEFORE RT C W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A East - ST. CLAIR COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2019 to 01-JUN-2019.
Road work begins AT MO 52 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A West - ST. CLAIR COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 18-MAR-2019 to 01-JUN-2019.
Road work begins .11 MILES AFTER RT C E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 170 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins .06 MILES BEFORE CST FROST AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 170 West - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-APR-2019 to 24-MAY-2019.
Road work begins .16 MILES BEFORE CST FROST AVE W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 170 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-APR-2019 to 07-JUN-2019.
Road work begins .08 MILES BEFORE CST AIRPORT RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 170 West - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-APR-2019 to 07-JUN-2019.
Road work begins .07 MILES BEFORE CST AIRPORT RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 255 North - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 18-MAY-2019 to 19-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 50 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 255 South - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 21-MAY-2019.
Road work begins AT IS 270 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 15-MAY-2019 to 06-SEP-2019.
Road work begins AT IS 270 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 01-JAN-2019 to 31-DEC-2019.
Road work begins .06 MILES BEFORE CST MURDOCH AVE E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2019 to 20-MAY-2019.
Road work begins .61 MILES BEFORE MO 141 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 64 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 21-MAY-2019.
Road work begins .97 MILES AFTER CST BOONES CROSSING RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp BOEING RD TO IS170E East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2019 to 07-JUN-2019.
Road work begins .08 MILES BEFORE IS 170 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-OCT-2018 to 03-JUN-2019.
Road work begins .03 MILES AFTER CST GEYER RD S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneUS 50 West - ST. LOUIS COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-JAN-2019 to 03-JUN-2019.
Road work begins .15 MILES AFTER CST YARNELL RD N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
No delays expected due to work zoneState Route 141 South - ST. LOUIS COUNTY - No Expected Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 06-MAY-2019 to 26-NOV-2019.
Road work begins .02 MILES AFTER MO 30 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneState Route 141 North - ST. LOUIS COUNTY - No Expected Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 15-APR-2019 to 24-MAY-2019.
Road work begins .29 MILES AFTER CRD DUTCH MILL DR W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS67N TO US67S South - ST. LOUIS COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST LINDBERGH BLVD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneMIDLAND BLVD West - ST. LOUIS COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 13-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CRD LINK RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 255 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 16-MAY-2019 to 22-MAY-2019.
Road work begins .68 MILES BEFORE US 50 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 270 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 18-MAY-2019 to 19-MAY-2019.
Road work begins .75 MILES AFTER CST DORSETT RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 270 West - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 18-MAY-2019 to 19-MAY-2019.
Road work begins .66 MILES AFTER CST MCKELVEY RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 64 West - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 03-MAY-2019 to 31-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST MASON RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 64 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-MAR-2019 to 31-MAY-2019.
Road work begins .03 MILES BEFORE CST MARYVILLE CENTRE DR N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 64 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 03-MAY-2019 to 31-MAY-2019.
Road work begins .01 MILES BEFORE CST MASON RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 64 West - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 29-MAR-2019 to 31-MAY-2019.
Road work begins .02 MILES BEFORE CST MARYVILLE CENTRE DR S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 109 North - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 14-MAY-2019 to 01-MAY-2020.
Road work begins .05 MILES BEFORE MO 100 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 109 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 14-MAY-2019 to 01-MAY-2020.
Road work begins .02 MILES BEFORE CST WINDSOR MEADOW BLVD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 15-MAY-2019 to 19-MAY-2019.
Road work begins .2 MILES AFTER CST MARYLAND HEIGHTS EXPY N.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 15-APR-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 61 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 141 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 28-JAN-2019 to 01-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER US 40 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 141 North - ST. LOUIS COUNTY - Delays Possible
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 28-JAN-2019 to 01-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER MO 30 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 141 North - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 26-APR-2019 to 31-MAY-2019.
Road work begins .11 MILES BEFORE CRD RIDER TRAIL SOUTH E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 30 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 26-APR-2019 to 07-JUN-2019.
Road work begins .17 MILES BEFORE CRD MUSICK RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 340 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 13-MAY-2019 to 20-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE CST NORTH & SOUTH RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 370 West - ST. LOUIS COUNTY - Delays Possible
Project Name - 370 OVER 94 REHAB
BRIDGE RECONSTRUCTION
Scheduled from 16-MAY-2019 to 30-SEP-2019.
Road work begins .69 MILES AFTER MO 141 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneOuter Road 367 North - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 08-MAY-2019 to 31-MAY-2019.
Road work begins .12 MILES BEFORE CRD PARKER RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp HANLEY RD TO IS64E East - ST. LOUIS COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 04-FEB-2019 to 20-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST HANLEY RD S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 61 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 23-APR-2019 to 20-MAY-2019.
Road work begins .02 MILES AFTER CST LITZSINGER RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 61 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 23-APR-2019 to 03-JUN-2019.
Road work begins .02 MILES BEFORE CST CLAYTON RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 67 North - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 16-MAY-2019 to 24-MAY-2019.
Road work begins .09 MILES AFTER CST KIRKWOOD AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 67 South - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 16-MAY-2019 to 24-MAY-2019.
Road work begins AT CST CONWAY RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - ST. LOUIS CITY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 01-JAN-2019 to 31-DEC-2019.
Road work begins .19 MILES AFTER CST WELLINGTON CT S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
No delays expected due to work zoneRamp 11TH ST TO IS70E East - ST. LOUIS CITY - No Expected Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 13-DEC-2018 to 01-JUN-2019.
Road work begins AT CST 11TH ST S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 44 West - ST. LOUIS CITY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 23-MAR-2019 to 15-DEC-2019.
Road work begins .19 MILES AFTER CST JEFFERSON AVE S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 44 East - ST. LOUIS CITY - Delays Possible
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 18-MAR-2019 to 07-DEC-2019.
Road work begins .25 MILES BEFORE CST MACKLIND AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 6 East - SULLIVAN COUNTY - Expect Delays
Project Name - J2P3132
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 20-AUG-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 129 S.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases - RESURFACE FROM CHARITION RIVER BRIDGE NEAR NOVINGER TO RT. 129 SULLIVAN CO. LINE
Expect delays due to work zoneState Route 176 West - TANEY COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER US 160 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route EE West - TANEY COUNTY - Expect Delays
Project Name - ROUTES 176 / EE RESURFACE
RESURFACING PAVEMENT
Scheduled from 29-APR-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 176 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route B West - TEXAS COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins 13.98 MILES BEFORE MO 137 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route B East - TEXAS COUNTY - Delays Possible
Project Name -
JOINT/CRACK SEALING
Scheduled from 17-MAY-2019 to 15-JUN-2019.
Road work begins AT US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - WARREN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 21-MAY-2019.
Road work begins .83 MILES BEFORE MO 47 S.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 47 South - WARREN COUNTY - Delays Possible
SHOULDER WORK
Scheduled from 09-SEP-2016 to 01-AUG-2019.
Road work begins .85 MILES BEFORE CST FRANKLIN ST S.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 21 North - WASHINGTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 22-APR-2019 to 15-JUN-2019.
Road work begins .35 MILES BEFORE MO 8 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 67 South - WAYNE COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 25-MAR-2019 to 31-MAY-2019.
Road work begins 5.47 MILES BEFORE MO 172 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 22-MAY-2019.
Road work begins 2.43 MILES AFTER RT B S.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 19-MAY-2019 to 22-MAY-2019.
Road work begins 2.44 MILES AFTER RT B S.
Work will be done around the clock, on weekdays and Sundays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - WEBSTER COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 14-MAY-2019 to 20-MAY-2019.
Road work begins .35 MILES BEFORE RT B N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 5 North - WRIGHT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 06-AUG-2018 to 01-AUG-2019.
Road work begins LESS THAN .01 MILES AFTER BU 60 E.
Work will be done around the clock, 7 days a week.
Expect delays due to work zoneState Route 5 South - WRIGHT COUNTY - Expect Delays
PAVEMENT REPAIR
Scheduled from 06-AUG-2018 to 01-AUG-2019.
Road work begins AT RT H W.
Work will be done around the clock, 7 days a week.

Back to Top

FUTURE WORK ZONES: 245 to report. Hide

Possible delays due to work zoneInterstate 29 North - ANDREW COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .91 MILES AFTER US 59 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C North - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .26 MILES AFTER RT T E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route C South - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .67 MILES BEFORE RT T E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC East - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins .91 MILES AFTER RT C S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC West - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 1.01 MILES BEFORE RT C N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route T East - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins 3.07 MILES BEFORE RT E N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route T West - AUDRAIN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins 2.99 MILES AFTER RT E N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D East - BARRY COUNTY - Expect Delays
Project Name - J7S3274 RESURFACE ROADWAY
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 248 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT East - BARRY COUNTY - Expect Delays
Project Name - J7S3123 RESURFACE PAVEMENT
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins .03 MILES AFTER MO 39 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z East - BARRY COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-OCT-2019.
Road work begins LESS THAN .01 MILES AFTER US 60 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Z West - BARRY COUNTY - Expect Delays
Project Name - RESURFACE
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-OCT-2019.
Road work begins .03 MILES AFTER MO 39 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AA East - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 28-MAY-2019.
Road work begins .04 MILES AFTER MO 18 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AA West - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 28-MAY-2019.
Road work begins AT RT E W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F West - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins .02 MILES AFTER CRD PARK ST N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F East - BATES COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins 2.91 MILES AFTER RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN South - BOONE COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT US 63 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN North - BOONE COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT MO 124 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY South - BOONE COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT MO 124 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY North - BOONE COUNTY - Expect Delays
Project Name -
CHIP SEAL OVERLAY
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins 2.34 MILES BEFORE MO 124 W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 163 South - BOONE COUNTY - Delays Possible
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-MAY-2019 to 07-JUN-2019.
Road work begins LESS THAN .01 MILES BEFORE CST ROLLINS RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 163 North - BOONE COUNTY - Delays Possible
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-MAY-2019 to 07-JUN-2019.
Road work begins .02 MILES BEFORE CST STADIUM BLVD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 763 North - BOONE COUNTY - Delays Possible
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-MAY-2019 to 07-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER MO 740 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 763 South - BOONE COUNTY - Delays Possible
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-MAY-2019 to 07-JUN-2019.
Road work begins LESS THAN .01 MILES BEFORE CST ROLLINS ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS29N TO IS229N North - BUCHANAN COUNTY - CLOSED
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .01 MILES AFTER IS 229 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp US36E TO MO759S South - BUCHANAN COUNTY - CLOSED
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2019 to 20-JUN-2019.
Road work begins AT US 36 E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
No delays expected due to work zoneLoop 29 North - BUCHANAN COUNTY - No Delays Expected
Project Name - SIGNAL CABINET REPLACEMENT: LP-29/BLACKWELL
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins .08 MILES BEFORE CST BLACKWELL RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneLoop 29 South - BUCHANAN COUNTY - No Delays Expected
Project Name - SIGNAL CABINET REPLACEMENT: LP-29/BLACKWELL
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins .11 MILES BEFORE CST BLACKWELL RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route FF North - BUCHANAN COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .48 MILES AFTER RT O W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 169 North - BUCHANAN COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .02 MILES AFTER CST PEAR ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route B South - CALDWELL COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 2.06 MILES BEFORE MO 110 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U East - CALDWELL COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .03 MILES AFTER MO 13 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 36 West - CALDWELL COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins .03 MILES BEFORE RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route BB South - CALLAWAY COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.23 MILES BEFORE RT AA E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route BB North - CALLAWAY COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.19 MILES AFTER RT AA W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J South - CAMDEN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2019 to 31-OCT-2019.
Road work begins 3.65 MILES AFTER MO 7 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J North - CAMDEN COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2019 to 31-OCT-2019.
Road work begins 3.96 MILES BEFORE MO 7 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - CASS COUNTY - CLOSED
Project Name -
MILLING/RESURFACING WORK
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins .01 MILES AFTER CRD 275TH ST W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp MO7S TO IS49N North - CASS COUNTY - CLOSED
Project Name -
MILLING/RESURFACING WORK
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins AT MO 7 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 291 North - CASS COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 71 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - CASS COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins .18 MILES BEFORE CST MECHANIC ST E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - CASS COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins .03 MILES BEFORE CRD 275TH ST W.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route B West - CEDAR COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .37 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route B East - CEDAR COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .16 MILES AFTER RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY South - CHARITON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 1.88 MILES BEFORE MO 139 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route YY North - CHARITON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 1.67 MILES AFTER MO 139 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 South - CHARITON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 20-JUN-2019.
Road work begins .01 MILES AFTER CST MISSOURI ST S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 North - CHARITON COUNTY - Delays Possible
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 20-JUN-2019.
Road work begins LESS THAN .01 MILES BEFORE CST JACKSON ST W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 125 North - CHRISTIAN COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 14 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P South - CHRISTIAN COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 1.37 MILES AFTER CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P North - CHRISTIAN COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 2.2 MILES BEFORE CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS35N TO IS435S South - CLAY COUNTY - CLOSED
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .1 MILES AFTER IS 35 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route JJ North - CLAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .51 MILES BEFORE MO 210 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS435S TO IS35S South - CLAY COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER IS 435 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 North - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins .45 MILES BEFORE MO 210 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 South - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins .02 MILES BEFORE MO 152 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 1 South - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins AT CST INDIANA AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 1 North - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins .02 MILES AFTER PVT PE024210C0027 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 10 East - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 22-MAY-2019 to 24-MAY-2019.
Road work begins AT RT Y N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 152 West - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins LESS THAN .01 MILES AFTER MO 110 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 291 South - CLAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins AT CST NE COOKINGHAM DR E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 169 South - CLAY COUNTY - Delays Possible
Project Name -
PAVEMENT STRIPING
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .17 MILES BEFORE CST ENGLEWOOD RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 169 North - CLAY COUNTY - Delays Possible
Project Name -
PAVEMENT STRIPING
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .1 MILES BEFORE CST 68TH ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 135 North - COOPER COUNTY - Expect Delays
Project Name -
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .11 MILES BEFORE CST ROE ST N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 South - COOPER COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER IS 70 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 North - COOPER COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 South - COOPER COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT CST CHURCH ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route T North - COOPER COUNTY - Delays Possible
Project Name -
ROAD MIX OVERLAY
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins 4.94 MILES BEFORE RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route T South - COOPER COUNTY - Delays Possible
Project Name -
ROAD MIX OVERLAY
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins AT RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route W North - COOPER COUNTY - Delays Possible
Project Name -
ROAD MIX OVERLAY
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 3.6 MILES BEFORE RT J E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route W South - COOPER COUNTY - Delays Possible
Project Name -
ROAD MIX OVERLAY
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOLD ROUTE 66 South - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneOLD ROUTE 66 North - CRAWFORD COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C West - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins AT OR 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route C East - CRAWFORD COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.14 MILES BEFORE CRD FRONTAGE RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K West - DADE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .42 MILES AFTER RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route K East - DADE COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .31 MILES AFTER MO 39 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route EE South - DEKALB COUNTY - Delays Possible
Project Name -
CHIP SEAL OVERLAY
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins .02 MILES AFTER MO 6 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 32 East - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins AT RT F N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 32 West - DENT COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins AT MO 72 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW East - DENT COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.72 MILES BEFORE MO 19 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW West - DENT COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins AT MO 19 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 30 East - FRANKLIN COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2019 to 28-MAY-2019.
Road work begins .03 MILES AFTER CST PARKWAY DR S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 22-MAY-2019 to 29-MAY-2019.
Road work begins .78 MILES BEFORE LP 44 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 21-MAY-2019 to 27-MAY-2019.
Road work begins .36 MILES AFTER CST NATIONAL AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 West - GREENE COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins 1 MILE AFTER US 65 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AB North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .63 MILES BEFORE CST HUGHES RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route AB South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .21 MILES BEFORE CST HUGHES RD E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .79 MILES BEFORE RT CC E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .02 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 2.25 MILES BEFORE RT CC E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - GREENE COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 1.8 MILES AFTER RT CC W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS35N TO US69 North - HARRISON COUNTY - CLOSED
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT IS 35 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 South - HARRISON COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 30-AUG-2019.
Road work begins .22 MILES BEFORE RT A E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - HARRISON COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 30-AUG-2019.
Road work begins .19 MILES BEFORE CST MILLER ST W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - HENRY COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .61 MILES AFTER RT PP S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 North - HENRY COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins 1.23 MILES BEFORE RT B E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - HENRY COUNTY - Expect Delays
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .77 MILES AFTER MO 52 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route U North - HENRY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 3.23 MILES AFTER RT Z E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route U South - HENRY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 3.49 MILES BEFORE RT Z W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 South - HOWARD COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins AT RT E W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 87 North - HOWARD COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins 1.01 MILES BEFORE RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 21 North - IRON COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 20-MAY-2019 to 15-JUN-2019.
Road work begins .12 MILES BEFORE MO 32 E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 East - IRON COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 20-MAY-2019 to 15-JUN-2019.
Road work begins .14 MILES BEFORE MO 21 N.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 291 South - JACKSON COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins .04 MILES BEFORE CST COLBERN RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 7 South - JACKSON COUNTY - Expect Delays
Project Name -
PAVEMENT STRIPING
Scheduled from 20-MAY-2019 to 26-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST WYATT RD E.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS435N TO IS70E East - JACKSON COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER IS 435 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneRamp IS435N TO STADIUM DR East - JACKSON COUNTY - Expect Delays
Project Name -
BRIDGE RECONSTRUCTION
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER IS 435 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 50 East - JACKSON COUNTY - Expect Delays
Project Name -
SWEEPING PAVEMENT
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST PRYOR RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 50 West - JACKSON COUNTY - Expect Delays
Project Name -
SWEEPING PAVEMENT
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .78 MILES BEFORE CRD OUTER BELT RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - JACKSON COUNTY - Delays Possible
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins .25 MILES BEFORE CST SUMMIT ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 35 North - JACKSON COUNTY - Delays Possible
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .02 MILES BEFORE CST SOUTHWEST BLVD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 North - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT CRD STATE LINE RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 435 South - JACKSON COUNTY - Delays Possible
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins AT US 50 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 291 North - JACKSON COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins 1.03 MILES BEFORE MO 210 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 7 North - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .44 MILES AFTER US 50 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 40 East - JACKSON COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 22-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST WOODS CHAPEL RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 96 East - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins .16 MILES BEFORE CRD INCA RD W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 96 West - JASPER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 30-MAY-2019.
Road work begins .07 MILES BEFORE LP 49 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 55 South - JEFFERSON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .63 MILES BEFORE CST CENTRAL AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 55 South - JEFFERSON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins .27 MILES BEFORE RT Z E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 55 North - JEFFERSON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .03 MILES BEFORE CST W MAIN ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 266 East - LAWRENCE COUNTY - Expect Delays
Project Name -
CORE DRILLING
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .4 MILES BEFORE CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 266 West - LAWRENCE COUNTY - Expect Delays
Project Name -
CORE DRILLING
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .03 MILES AFTER CST MAIN ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 81 South - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins 1.68 MILES BEFORE MO 16 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 81 North - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins 1.08 MILES AFTER MO 16 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D North - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins 1.24 MILES BEFORE CST POMEROY N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D South - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .06 MILES BEFORE CST N 4TH ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D North - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins 1.5 MILES BEFORE RT U E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D South - LEWIS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins .5 MILES AFTER RT U W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D North - LEWIS COUNTY - CLOSED
Project Name -
CORE DRILLING
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins AT MO 156 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D South - LEWIS COUNTY - CLOSED
Project Name -
CORE DRILLING
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 1.5 MILES AFTER RT U W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J North - LEWIS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT MO 156 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J South - LEWIS COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT H S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - LEWIS COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .06 MILES AFTER RT B S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - LEWIS COUNTY - Expect Delays
Project Name -
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 16 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N South - LEWIS COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 6 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route N North - LEWIS COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 4.42 MILES BEFORE RT C W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC East - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins AT RT W S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route CC West - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 79 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F East - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 24-MAY-2019 to 28-MAY-2019.
Road work begins AT US 61 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F West - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 24-MAY-2019 to 28-MAY-2019.
Road work begins AT RT W S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN South - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 2.61 MILES BEFORE RT B E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN North - LINCOLN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT B E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M North - LINN COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins .08 MILES AFTER CST PARK ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U North - LINN COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 24-MAY-2019.
Road work begins .01 MILES AFTER MO 110 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route WW East - LINN COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT CST HAUSER ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W South - LIVINGSTON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins 1.58 MILES BEFORE RT A N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route W North - LIVINGSTON COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins .56 MILES AFTER RT A N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 139 North - LIVINGSTON COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.85 MILES BEFORE CRD FIRST ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 36 East - MARION COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT CST CENTRAL AVE N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D East - MERCER COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins 1.81 MILES BEFORE US 65 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 87 North - MONITEAU COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT US 50 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D West - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins 1.99 MILES AFTER RT Z S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D East - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins 2.73 MILES BEFORE RT Z N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J East - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins 1.87 MILES AFTER RT Y W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route J West - MONROE COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins 1.52 MILES AFTER MO 151 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 161 South - MONTGOMERY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins AT CST STURGEON ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 161 North - MONTGOMERY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins AT IS 70 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route WW South - MONTGOMERY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins AT MO 19 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route WW North - MONTGOMERY COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 23-MAY-2019 to 24-MAY-2019.
Road work begins AT CST MAIN ST S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 North - MORGAN COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins 1.39 MILES BEFORE RT TT N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 5 South - MORGAN COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 52 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 West - MORGAN COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins .01 MILES AFTER MO 5 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 52 East - MORGAN COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins .11 MILES BEFORE CST NEWTON ST E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 North - NEW MADRID COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 29-JUN-2019.
Road work begins .1 MILES AFTER IS 55 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 61 South - NEW MADRID COUNTY - Expect Delays
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 29-JUN-2019.
Road work begins .03 MILES AFTER LP 55 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .18 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .04 MILES AFTER RT P W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .69 MILES AFTER CST BROADLAWN BLVD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .21 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P West - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .05 MILES AFTER RT NN N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route P East - NEWTON COUNTY - Expect Delays
Project Name -
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins .04 MILES AFTER MO 86 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneMAHOGANY RD South - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins .05 MILES BEFORE US 136 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneMAHOGANY RD North - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 136 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route JJ West - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins 1.05 MILES BEFORE US 71 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route JJ East - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 24-MAY-2019 to 24-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER US 71 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN East - NODAWAY COUNTY - CLOSED
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins 1.28 MILES BEFORE CST GRAND AVE W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN West - NODAWAY COUNTY - CLOSED
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .37 MILES AFTER CST GRAND AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN East - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 2.58 MILES BEFORE RT E S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route NN West - NODAWAY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 2.53 MILES AFTER RT E N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 46 East - NODAWAY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 30-MAY-2019.
Road work begins .98 MILES BEFORE MO 113 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route E North - NODAWAY COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins .17 MILES BEFORE RT NN E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route V East - NODAWAY COUNTY - Delays Possible
Project Name -
SHOULDER WORK
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins 1.34 MILES BEFORE CST W SOUTH HILLS DR W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 133 North - OSAGE COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 20-MAY-2019 to 30-SEP-2019.
Road work begins .22 MILES BEFORE US 63 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 133 South - OSAGE COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 20-MAY-2019 to 30-SEP-2019.
Road work begins LESS THAN .01 MILES AFTER US 63 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 North - OSAGE COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 20-MAY-2019 to 30-SEP-2019.
Road work begins .35 MILES BEFORE MO 133 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneUS 63 South - OSAGE COUNTY - Expect Delays
Project Name -
INTERSECTION IMPROVEMENTS
Scheduled from 20-MAY-2019 to 30-SEP-2019.
Road work begins .42 MILES BEFORE MO 133 N.
Work will be done around the clock, 7 days a week.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 155 South - PEMISCOT COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 1.77 MILES BEFORE US 412 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 155 North - PEMISCOT COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins .39 MILES AFTER US 412 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 55 South - PEMISCOT COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins .37 MILES AFTER IS 155 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M West - PHELPS COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-MAY-2019 to 30-MAY-2019.
Road work begins AT US 63 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route M East - PHELPS COUNTY - Delays Possible
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-MAY-2019 to 30-MAY-2019.
Road work begins AT RT J S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 152 East - PLATTE COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 20-MAY-2019 to 28-JUN-2019.
Road work begins AT RT N N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 13 North - POLK COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins 1.85 MILES AFTER RT BB E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AB West - PULASKI COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 27-MAY-2019 to 30-MAY-2019.
Road work begins AT MO 17 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route AB East - PULASKI COUNTY - Delays Possible
Project Name -
PAVEMENT REPAIR
Scheduled from 27-MAY-2019 to 30-MAY-2019.
Road work begins AT IS 44 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins 2.81 MILES BEFORE MO 19 S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins 1 MILE BEFORE MO 154 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .97 MILES AFTER MO 19 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 154 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y South - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins 2.77 MILES BEFORE MO 154 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route Y North - RALLS COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 21-MAY-2019 to 21-MAY-2019.
Road work begins 2.02 MILES AFTER MO 154 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 10 West - RAY COUNTY - Expect Delays
Project Name -
GUARD RAIL/CABLE WORK
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins 2.96 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 10 West - RAY COUNTY - Delays Possible
Project Name -
MOWING
Scheduled from 22-MAY-2019 to 24-MAY-2019.
Road work begins 4.51 MILES BEFORE RT J N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A North - SCOTLAND COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT RT M N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route A South - SCOTLAND COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins 1.36 MILES BEFORE RT M S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 15 South - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins AT RT E S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 15 North - SHELBY COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins AT RT J W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - ST. CHARLES COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .75 MILES AFTER RT W S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneE TERRA LN West - ST. CHARLES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins .26 MILES BEFORE CST WOODLAWN AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneE TERRA LN East - ST. CHARLES COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins LESS THAN .01 MILES AFTER CST WOODLAWN AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 32 West - ST. FRANCOIS COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 20-MAY-2019 to 15-JUN-2019.
Road work begins .11 MILES BEFORE CST CEDAR ST S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 270 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .28 MILES BEFORE MO 340 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 44 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
NEW PAVEMENT CONSTRUCTION
Scheduled from 20-MAY-2019 to 22-MAY-2019.
Road work begins AT IS 270 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .31 MILES BEFORE CST AIRFLIGHT DR N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 West - ST. LOUIS COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE MO 115 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
No delays expected due to work zoneState Route 366 East - ST. LOUIS COUNTY - No Delays Expected
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins AT CST GRANT RD N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 14-JUL-2019.
Road work begins .23 MILES AFTER IS 170 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 14-JUL-2019.
Road work begins .23 MILES AFTER IS 170 W.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 30 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 21-MAY-2019 to 04-JUN-2019.
Road work begins .02 MILES BEFORE CST GRAVOIS AVE E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 340 East - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT CST COUNTRY RIDGE DR W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route 340 West - ST. LOUIS COUNTY - Delays Possible
Project Name -
PERMIT OR UTILITY WORK
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins .35 MILES AFTER CST N WOODS MILL RD S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp IS44E TO IS270E East - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .18 MILES BEFORE MO 366 E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneRamp IS44W TO IS270W West - ST. LOUIS COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 24-MAY-2019.
Road work begins .14 MILES AFTER MO 366 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 64 East - ST. LOUIS CITY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins .12 MILES AFTER CST TAYLOR AVE S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 West - ST. LOUIS CITY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 14-JUL-2019.
Road work begins .02 MILES AFTER CST UNION BLVD S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneInterstate 70 West - ST. LOUIS CITY - Delays Possible
Project Name -
MILLING/RESURFACING WORK
Scheduled from 20-MAY-2019 to 14-JUL-2019.
Road work begins .02 MILES AFTER CST UNION BLVD S.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H North - STODDARD COUNTY - CLOSED
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT ZZ S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route H South - STODDARD COUNTY - CLOSED
Project Name -
PAVEMENT REPAIR
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins 1.43 MILES AFTER MO 25 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route D West - STONE COUNTY - Expect Delays
Project Name - J7S3274 RESURFACE ROADWAY
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins LESS THAN .01 MILES AFTER MO 265 N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route TT West - STONE COUNTY - Expect Delays
Project Name - J7S3123 RESURFACE PAVEMENT
RESURFACING PAVEMENT
Scheduled from 20-MAY-2019 to 01-NOV-2019.
Road work begins .04 MILES AFTER RT D W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route PP West - SULLIVAN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins 1.25 MILES BEFORE RT W S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route PP East - SULLIVAN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 22-MAY-2019 to 22-MAY-2019.
Road work begins .01 MILES AFTER RT W N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route VV West - SULLIVAN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins .01 MILES AFTER RT B N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route VV East - SULLIVAN COUNTY - CLOSED
Project Name -
CULVERT REPLACEMENT
Scheduled from 23-MAY-2019 to 23-MAY-2019.
Road work begins 1.26 MILES BEFORE RT B S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 86 East - TANEY COUNTY - Expect Delays
Project Name -
BRIDGE MAINTENANCE
Scheduled from 21-MAY-2019 to 23-MAY-2019.
Road work begins 2.54 MILES AFTER RT UU W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - WARREN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 21-MAY-2019 to 22-MAY-2019.
Road work begins 1.57 MILES BEFORE RT A N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneInterstate 70 East - WARREN COUNTY - Expect Delays
Project Name -
PAVEMENT REPAIR
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins LESS THAN .01 MILES BEFORE RT A N.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route 21 South - WASHINGTON COUNTY - Expect Delays
Project Name -
MICROSURFACING
Scheduled from 20-MAY-2019 to 15-JUN-2019.
Road work begins .22 MILES AFTER CST HIGH ST E.
Work will be done around the clock, on weekdays and Saturdays.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U South - WASHINGTON COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT MO 8 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneState Route U North - WASHINGTON COUNTY - Delays Possible
Project Name -
ROADSIDE WORK
Scheduled from 20-MAY-2019 to 23-MAY-2019.
Road work begins AT RT M E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Possible delays due to work zoneUS 67 South - WAYNE COUNTY - Delays Possible
Project Name -
BRIDGE MAINTENANCE
Scheduled from 20-MAY-2019 to 20-MAY-2019.
Road work begins .74 MILES AFTER MO 34 W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route F East - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 22-MAY-2019 to 23-MAY-2019.
Road work begins AT CST MADISON ST W.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route MM East - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 20-MAY-2019 to 21-MAY-2019.
Road work begins AT RT ZZ S.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -
Expect delays due to work zoneState Route ZZ North - WEBSTER COUNTY - Expect Delays
Project Name -
PATCHING DRIVE SURFACE
Scheduled from 27-MAY-2019 to 29-MAY-2019.
Road work begins AT RT F E.
Work will be done around the clock, on weekdays only.
Project Web Page -
News Releases -

Back to Top