State Route MO 46 E East
-
ATCHISON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.031 MILE(S) AFTER CRD R AVE S.
Scheduled from
12-FEB-2024
to
31-MAY-2024.
State Route MO 46 W West
-
ATCHISON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.194 MILE(S) AFTER RT MM S.
Scheduled from
12-FEB-2024
to
31-MAY-2024.
State Route MO 13 N North
-
CALDWELL COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.019 MILE(S) BEFORE CST BROADWAY ST E.
Scheduled from
01-APR-2024
to
01-SEP-2024.
State Route MO 13 S South
-
CALDWELL COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.018 MILE(S) AFTER CRD FAR WEST DR E.
Scheduled from
01-APR-2024
to
01-SEP-2024.
State Route RT C E East
-
CHARITON COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.017 MILE(S) BEFORE RT F S.
Scheduled from
18-APR-2024
to
18-APR-2024.
State Route RT C W West
-
CHARITON COUNTY
- Road Closed
CULVERT REPLACEMENT
Road closure begins
.006 MILE(S) AFTER CRD SILOAM AVE S.
Scheduled from
18-APR-2024
to
18-APR-2024.
State Route RT HH N North
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.17 MILE(S) AFTER CRD WOODSON AVE S.
Scheduled from
08-APR-2024
to
17-JUL-2024.
State Route RT HH S South
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.02 MILE(S) AFTER CRD WAYLAND AVE S.
Scheduled from
08-APR-2024
to
17-JUL-2024.
State Route RT H E East
-
CLINTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.028 MILE(S) AFTER CRD NE ESTEP RD S.
Scheduled from
05-FEB-2024
to
22-AUG-2024.
State Route RT H W West
-
CLINTON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.039 MILE(S) AFTER US 69 S.
Scheduled from
05-FEB-2024
to
22-AUG-2024.
State Route RT E W West
-
DAVIESS COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
.001 MILE(S) AFTER US 69 S.
Scheduled from
18-MAR-2024
to
02-AUG-2024.
State Route RT E E East
-
DEKALB COUNTY
- Road Closed
MILLING/RESURFACING WORK
Road closure begins
US 169 S.
Scheduled from
18-MAR-2024
to
02-AUG-2024.
State Route RT YY N North
-
GENTRY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.009 MILE(S) AFTER CST OAK ST E.
Scheduled from
04-DEC-2023
to
21-APR-2024.
State Route RT YY S South
-
GENTRY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.038 MILE(S) AFTER CRD 250 ST E.
Scheduled from
04-DEC-2023
to
21-APR-2024.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.177 MILE(S) BEFORE CRD 1382 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
US US 71 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 02-APR-2024 to 30-AUG-2024.
Road work begins
.729 MILE(S) AFTER RP RTT TO US59N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:55 AM
and
09:00 PM.
Interstate IS 29 N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.043 MILE(S) AFTER RT W S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
Interstate IS 29 S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
1.942 MILE(S) BEFORE CRD C AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 136 E East
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 18-APR-2024.
Road work begins
.971 MILE(S) BEFORE CRD C AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 136 W West
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 18-APR-2024.
Road work begins
.007 MILE(S) AFTER CRD 200 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 59 N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins
.004 MILE(S) AFTER CRD ATCHISON HOLT RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
US US 59 S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 16-APR-2024 to 19-APR-2024.
Road work begins
.838 MILE(S) BEFORE CRD 110 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route MO 371 S South
-
BUCHANAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2024 to 04-JUN-2024.
Road work begins
.343 MILE(S) BEFORE CRD WILLIAMS RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT AC N North
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.005 MILE(S) AFTER RT YY E.
Work will be done
7 days a week.
State Route RT AC S South
-
BUCHANAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 07-MAR-2024 to 15-MAY-2024.
Road work begins
.007 MILE(S) AFTER CST FARAON ST E.
Work will be done
7 days a week.
US US 169 S South
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 03-APR-2024 to 15-AUG-2024.
Road work begins
.028 MILE(S) AFTER RT FF S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT NN E East
-
BUCHANAN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
MO 31 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT Z N North
-
BUCHANAN COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
.228 MILE(S) AFTER CRD COOK NE E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 13 N North
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER CRD FAR WEST DR E.
Work will be done
7 days a week.
State Route MO 13 S South
-
CALDWELL COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-APR-2024 to 01-SEP-2024.
Road work begins
.032 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
State Route MO 41 N North
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
.187 MILE(S) AFTER RT F E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 41 S South
-
CARROLL COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 17-APR-2024 to 03-MAY-2024.
Road work begins
US 24 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 11 N North
-
CHARITON COUNTY
- Expect Delays
PATCHING DRIVE SURFACE
Scheduled from 15-APR-2024 to 19-APR-2024.
Road work begins
.358 MILE(S) AFTER US 24 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 129 N North
-
CHARITON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2024 to 01-NOV-2024.
Road work begins
.002 MILE(S) AFTER CRD MENEFEE RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.108 MILE(S) AFTER RT KK S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
State Route MO 5 S South
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-APR-2024 to 07-MAY-2024.
Road work begins
.023 MILE(S) BEFORE CO US24 TO MO5 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
08:00 PM.
Interstate IS 35 N North
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.814 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 S South
-
CLINTON COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 20-FEB-2024 to 31-MAY-2024.
Road work begins
.686 MILE(S) BEFORE RT H E.
Work will be done
on weekdays and Saturdays.
US US 36 E East
-
DEKALB COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 16-APR-2024 to 18-APR-2024.
Road work begins
.391 MILE(S) BEFORE CRD RESERVOIR RD S.
Work will be done
on weekdays only.
US US 36 W West
-
DEKALB COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 16-APR-2024 to 18-APR-2024.
Road work begins
.265 MILE(S) AFTER CST MC ELWAIN DR S.
Work will be done
on weekdays only.
State Route RT V W West
-
DEKALB COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 18-APR-2024 to 23-APR-2024.
Road work begins
MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 35 N North
-
HARRISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.065 MILE(S) BEFORE US 136 E.
Work will be done
on weekdays only.
Interstate IS 35 S South
-
HARRISON COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 15-APR-2024 to 26-APR-2024.
Road work begins
.047 MILE(S) BEFORE RT N E.
Work will be done
on weekdays only.
US US 36 W West
-
LINN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 15-APR-2024 to 18-APR-2024.
Road work begins
.037 MILE(S) BEFORE MO 130 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:30 PM.
State Route RT D N North
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.112 MILE(S) BEFORE CST MAIN ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT D S South
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.015 MILE(S) BEFORE CST MAIN ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT DD E East
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.03 MILE(S) BEFORE CST 4TH ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
State Route RT DD W West
-
LIVINGSTON COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 11-MAR-2024 to 16-MAY-2024.
Road work begins
.006 MILE(S) AFTER RT D S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
08:00 AM
and
06:00 PM.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.007 MILE(S) AFTER CRD 401 S.
Work will be done
7 days a week.
US US 36 E East
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.031 MILE(S) AFTER RP US36E TO US65 E.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 11-MAR-2024 to 25-JUN-2024.
Road work begins
.066 MILE(S) BEFORE BU 36 E.
Work will be done
7 days a week.
US US 36 W West
-
LIVINGSTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 20-MAR-2024 to 25-JUN-2024.
Road work begins
.07 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
State Route RT NN E East
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 19-APR-2024.
Road work begins
.452 MILE(S) AFTER CRD ORION RD S.
Work will be done
on weekdays only.
State Route RT NN W West
-
NODAWAY COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2024 to 19-APR-2024.
Road work begins
.002 MILE(S) AFTER CRD PANTHER RD S.
Work will be done
on weekdays only.
US US 71 S South
-
NODAWAY COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 04-APR-2024 to 30-AUG-2024.
Road work begins
.17 MILE(S) BEFORE RT V E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
05:00 AM
and
09:00 PM.
Interstate IS 29 N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.069 MILE(S) BEFORE US 59 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 29 S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.066 MILE(S) BEFORE CRD 369 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 71 S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE FLUSHING
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.317 MILE(S) BEFORE CO US71N TO US71S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT MM N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
CRD 310 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT MM S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
MO 46 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Y N North
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
US 136 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT Y S South
-
ATCHISON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 24-APR-2024 to 26-APR-2024.
Road work begins
RT AA E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT U E East
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
CRD DAY SW E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT U W West
-
BUCHANAN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 15-AUG-2024.
Road work begins
.007 MILE(S) AFTER RR UP S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT PP E East
-
CHARITON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.023 MILE(S) BEFORE CRD CEMETERY AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route RT PP W West
-
CHARITON COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.518 MILE(S) BEFORE CRD SALT LICK AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route MO 5 N North
-
CHARITON COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.08 MILE(S) BEFORE CST MISSOURI ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT KK N North
-
CHARITON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
MO 5 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT KK S South
-
CHARITON COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-APR-2024 to 02-MAY-2024.
Road work begins
.598 MILE(S) BEFORE CRD OLD CHARITON RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
03:00 PM.
State Route RT V S South
-
GRUNDY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins
.068 MILE(S) AFTER MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT AA E East
-
HARRISON COUNTY
- Expect Delays
CULVERT REPLACEMENT
Scheduled from 22-APR-2024 to 22-APR-2024.
Road work begins
.274 MILE(S) AFTER CRD W 200 AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT P N North
-
HOLT COUNTY
- CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.02 MILE(S) BEFORE CST MINTON E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT P S South
-
HOLT COUNTY
- CLOSED
PERMIT OR UTILITY WORK
Scheduled from 22-APR-2024 to 24-APR-2024.
Road work begins
.075 MILE(S) BEFORE RR ST JOSEPH SUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route MO 5 S South
-
LINN COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 19-APR-2024 to 27-MAY-2024.
Road work begins
.011 MILE(S) AFTER RT U S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 36 W West
-
LINN COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 22-APR-2024 to 25-APR-2024.
Road work begins
.775 MILE(S) AFTER MO 130 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
02:30 PM.
State Route RT D N North
-
LIVINGSTON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins
.159 MILE(S) AFTER CRD 420 E.
Work will be done
7 days a week.
State Route RT D S South
-
LIVINGSTON COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 22-APR-2024 to 14-AUG-2024.
Road work begins
.065 MILE(S) BEFORE CRD 418 S.
Work will be done
7 days a week.
State Route RT V N North
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 22-APR-2024 to 14-MAY-2024.
Road work begins
US 65 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT E E East
-
MERCER COUNTY
- CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.008 MILE(S) BEFORE CRD KEYSTONE AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
04:00 PM.
State Route RT E W West
-
SULLIVAN COUNTY
- CLOSED
SURVEYING
Scheduled from 22-APR-2024 to 06-MAY-2024.
Road work begins
.001 MILE(S) AFTER CRD AZALEA DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
10:00 AM
and
04:00 PM.