State Route RT B E East
-
ANDREW COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.117 MILE(S) AFTER RT N S.
Scheduled from
28-APR-2025
to
09-JUL-2025.
State Route RT B W West
-
ANDREW COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.062 MILE(S) AFTER CRD 122 S.
Scheduled from
28-APR-2025
to
09-JUL-2025.
CST EUREKA AVE N North
-
BUCHANAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.019 MILE(S) BEFORE US 59 S.
Scheduled from
21-APR-2025
to
18-SEP-2025.
CST LAKE AVE S South
-
BUCHANAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.017 MILE(S) BEFORE CST KENTUCKY ST E.
Scheduled from
21-APR-2025
to
18-SEP-2025.
State Route MO 752 E East
-
BUCHANAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
US 59 S.
Scheduled from
21-APR-2025
to
18-SEP-2025.
State Route MO 752 W West
-
BUCHANAN COUNTY
- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure begins
.001 MILE(S) BEFORE CST SHERMAN ST S.
Scheduled from
21-APR-2025
to
18-SEP-2025.
State Route RT D N North
-
CALDWELL COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.035 MILE(S) AFTER CRD KERR RD E.
Scheduled from
10-MAR-2025
to
12-AUG-2025.
State Route RT D S South
-
CALDWELL COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.015 MILE(S) AFTER CRD JEWELL DR E.
Scheduled from
10-MAR-2025
to
12-AUG-2025.
State Route RT D E East
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.656 MILE(S) AFTER CRD MUSSEL FORK AVE S.
Scheduled from
24-FEB-2025
to
15-JUL-2025.
State Route RT D W West
-
CHARITON COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.994 MILE(S) BEFORE CRD MUSSEL FORK AVE S.
Scheduled from
24-FEB-2025
to
15-JUL-2025.
State Route RT EE N North
-
GENTRY COUNTY
- Road Closed
PATCHING DRIVE SURFACE
Road closure begins
RT T E.
Scheduled from
02-JUN-2025
to
06-JUN-2025.
State Route RT EE S South
-
GENTRY COUNTY
- Road Closed
PATCHING DRIVE SURFACE
Road closure begins
RT P E.
Scheduled from
02-JUN-2025
to
06-JUN-2025.
State Route RT B N North
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.97 MILE(S) BEFORE CRD SQUIRREL RD S.
Scheduled from
12-MAY-2025
to
31-JUL-2025.
State Route RT B S South
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.616 MILE(S) AFTER CRD SQUIRREL RD S.
Scheduled from
12-MAY-2025
to
31-JUL-2025.
State Route RT T E East
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.007 MILE(S) AFTER COE MILL CREEK LEVEE RD S.
Scheduled from
05-MAY-2025
to
14-JUL-2025.
State Route RT T W West
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.013 MILE(S) AFTER PVT FARM RD S.
Scheduled from
05-MAY-2025
to
14-JUL-2025.
US US 59 N North
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.045 MILE(S) AFTER CRD 142 E.
Scheduled from
01-JUN-2025
to
31-AUG-2025.
US US 59 S South
-
HOLT COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.358 MILE(S) BEFORE CRD ADOBE RD E.
Scheduled from
01-JUN-2025
to
31-AUG-2025.
State Route RT NN E East
-
NODAWAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.024 MILE(S) BEFORE CRD ORION RD S.
Scheduled from
06-MAY-2025
to
01-DEC-2025.
State Route RT NN W West
-
NODAWAY COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.02 MILE(S) BEFORE CRD PANTHER RD S.
Scheduled from
06-MAY-2025
to
01-DEC-2025.
State Route RT M E East
-
WORTH COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.011 MILE(S) BEFORE CRD PLUM TRL E.
Scheduled from
28-APR-2025
to
24-JUL-2025.
State Route RT M W West
-
WORTH COUNTY
- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins
.013 MILE(S) AFTER CST MILL ST S.
Scheduled from
28-APR-2025
to
24-JUL-2025.
State Route MO 48 E East
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.286 MILE(S) AFTER RT D S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route MO 48 W West
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.471 MILE(S) AFTER CRD 198 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT DD N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-NOV-2025.
Road work begins
.006 MILE(S) BEFORE CRD 361 E.
Work will be done
on weekdays and Saturdays.
State Route RT DD S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-NOV-2025.
Road work begins
.003 MILE(S) BEFORE CRD 372 E.
Work will be done
on weekdays and Saturdays.
State Route RT H N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.016 MILE(S) BEFORE RT Y S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT H S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.011 MILE(S) AFTER RT Y S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT Y N North
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.225 MILE(S) BEFORE CRD 4 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT Y S South
-
ANDREW COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.27 MILE(S) BEFORE CRD 4 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
Interstate IS 29 N North
-
ANDREW COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 01-JUL-2025.
Road work begins
1.144 MILE(S) AFTER RP US169 TO IS29N N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
12:00 PM.
Interstate IS 29 N North
-
ATCHISON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 28-APR-2025 to 01-SEP-2025.
Road work begins
1.345 MILE(S) BEFORE RT Z E.
Work will be done
7 days a week.
Interstate IS 29 S South
-
ATCHISON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 28-APR-2025 to 01-SEP-2025.
Road work begins
.31 MILE(S) AFTER CRD 280 ST E.
Work will be done
7 days a week.
US US 59 N North
-
ATCHISON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-MAY-2025 to 04-JUN-2025.
Road work begins
.362 MILE(S) AFTER CRD 225 ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
US US 59 S South
-
ATCHISON COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 20-MAY-2025 to 04-JUN-2025.
Road work begins
.489 MILE(S) BEFORE CRD 120 ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
05:00 PM.
State Route MO 116 E East
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.026 MILE(S) AFTER OR 29 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route MO 116 W West
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.033 MILE(S) AFTER CO MO116 TO RTY E.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT DD E East
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
.408 MILE(S) BEFORE CRD 115 SE S.
Work will be done
on weekdays and Saturdays.
State Route RT DD W West
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
.009 MILE(S) BEFORE CRD HORN S.
Work will be done
on weekdays and Saturdays.
State Route RT FF N North
-
BUCHANAN COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 02-JUN-2025 to 02-JUN-2025.
Road work begins
.005 MILE(S) AFTER CRD RIVERSIDE TERRACE SE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route RT H E East
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
.002 MILE(S) BEFORE CRD AUXIER RD SE S.
Work will be done
on weekdays and Saturdays.
State Route RT H W West
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
.008 MILE(S) BEFORE CRD 356 S.
Work will be done
on weekdays and Saturdays.
State Route RT M N North
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
.626 MILE(S) BEFORE CRD NICHOLS SW E.
Work will be done
on weekdays and Saturdays.
State Route RT M S South
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 10-APR-2025 to 28-NOV-2025.
Road work begins
MO 116 E.
Work will be done
on weekdays and Saturdays.
State Route RT P E East
-
BUCHANAN COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-NOV-2025.
Road work begins
.014 MILE(S) BEFORE RT UU S.
Work will be done
on weekdays and Saturdays.
State Route RT YY W West
-
BUCHANAN COUNTY
- Expect Delays
PERMIT OR UTILITY WORK
Scheduled from 27-MAY-2025 to 13-JUN-2025.
Road work begins
.036 MILE(S) AFTER CST 38TH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT H E East
-
BUCHANAN COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 27-MAY-2025 to 05-JUN-2025.
Road work begins
.392 MILE(S) AFTER RT FF S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
09:00 AM
and
04:00 PM.
US US 169 N North
-
BUCHANAN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 26-MAY-2025 to 06-JUN-2025.
Road work begins
.127 MILE(S) AFTER CST PACIFIC ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 169 S South
-
BUCHANAN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 26-MAY-2025 to 06-JUN-2025.
Road work begins
.186 MILE(S) BEFORE CST PACIFIC ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 36 E East
-
CALDWELL COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 27-MAY-2025 to 06-AUG-2025.
Road work begins
.483 MILE(S) AFTER RT P S.
Work will be done
on weekdays only.
US US 65 N North
-
CARROLL COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 28-MAY-2025 to 23-OCT-2025.
Road work begins
.264 MILE(S) BEFORE RT CC E.
Work will be done
on weekdays and Saturdays.
Interstate IS 35 N North
-
CLINTON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 19-JUN-2025.
Road work begins
.109 MILE(S) BEFORE RP IS35N TO MO116 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
Interstate IS 35 S South
-
CLINTON COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 19-JUN-2025.
Road work begins
.029 MILE(S) AFTER RP IS35S TO US69 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT NN E East
-
CLINTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.166 MILE(S) BEFORE CRD NW KELLER RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT NN W West
-
CLINTON COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.276 MILE(S) BEFORE CRD NW KELLER RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route MO 6 W West
-
DAVIESS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-SEP-2025.
Road work begins
US 69 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT Z W West
-
DAVIESS COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 02-JUN-2025 to 12-JUN-2025.
Road work begins
.079 MILE(S) BEFORE CRD 106 ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route MO 6 E East
-
DEKALB COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 14-APR-2025 to 30-SEP-2025.
Road work begins
.004 MILE(S) BEFORE MO 31 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT A N North
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.156 MILE(S) BEFORE CRD STEWART RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT A S South
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.373 MILE(S) BEFORE CRD STEWART RD E.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E E East
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.495 MILE(S) AFTER CRD LAKESITE RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E E East
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.352 MILE(S) AFTER RT H S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E E East
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.348 MILE(S) AFTER CRD WALDO RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E W West
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.292 MILE(S) AFTER CRD GRANT RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E W West
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.228 MILE(S) AFTER CRD RIDGLINE RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT E W West
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.095 MILE(S) AFTER CRD OGLE RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
08:00 PM.
State Route RT H N North
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.457 MILE(S) AFTER CRD GLENWOOD DR E.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
12:08 PM.
State Route RT H S South
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 02-JUN-2025 to 28-NOV-2025.
Road work begins
.058 MILE(S) BEFORE CRD RIDGELINE RD S.
Work will be done
7 days a week.
Work will be conducted between the hours of
05:00 AM
and
12:08 PM.
State Route RT P W West
-
DEKALB COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-APR-2025 to 28-NOV-2025.
Road work begins
.036 MILE(S) BEFORE CRD THORNTON RD S.
Work will be done
on weekdays and Saturdays.
State Route RT Z E East
-
GENTRY COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 02-JUN-2025 to 12-JUN-2025.
Road work begins
.187 MILE(S) AFTER CRD 617 RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
US US 169 S South
-
GENTRY COUNTY
- Delays Possible
BRIDGE INSPECTION
Scheduled from 28-MAY-2025 to 05-JUN-2025.
Road work begins
.027 MILE(S) BEFORE CRD 270 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
Interstate IS 29 N North
-
HOLT COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 28-MAY-2025 to 31-AUG-2025.
Road work begins
.132 MILE(S) BEFORE US 59 S.
Work will be done
7 days a week.
Interstate IS 29 S South
-
HOLT COUNTY
- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 10-MAR-2025 to 01-JUL-2025.
Road work begins
.055 MILE(S) BEFORE US 59 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
12:00 PM.
Interstate IS 29 S South
-
HOLT COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 28-MAY-2025 to 31-AUG-2025.
Road work begins
.382 MILE(S) AFTER CRD BEAGLE RD S.
Work will be done
7 days a week.
US US 36 W West
-
LINN COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 27-MAY-2025 to 06-AUG-2025.
Road work begins
.273 MILE(S) AFTER CRD ATLANTIC LOOP E.
Work will be done
on weekdays only.
US US 65 N North
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 25-JUL-2025.
Road work begins
.003 MILE(S) AFTER BU 36 E.
Work will be done
7 days a week.
US US 65 S South
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 25-JUL-2025.
Road work begins
.001 MILE(S) AFTER MO 190 E.
Work will be done
7 days a week.
US US 65 S South
-
LIVINGSTON COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 28-MAY-2025 to 23-OCT-2025.
Road work begins
.039 MILE(S) AFTER BU 36 W.
Work will be done
on weekdays and Saturdays.
US US 136 E East
-
NODAWAY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 02-JUN-2025 to 06-JUN-2025.
Road work begins
.005 MILE(S) AFTER RT PP S.
Work will be done
on weekdays only.
US US 136 W West
-
NODAWAY COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 02-JUN-2025 to 06-JUN-2025.
Road work begins
.005 MILE(S) AFTER CST MAIN ST E.
Work will be done
on weekdays only.
State Route MO 113 S South
-
NODAWAY COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 02-JUN-2025 to 06-JUN-2025.
Road work begins
.002 MILE(S) BEFORE CST MAPLE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:30 PM.
State Route RT D E East
-
SULLIVAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2025 to 01-NOV-2025.
Road work begins
MO 6 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT C N North
-
ANDREW COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 05-JUN-2025 to 05-JUN-2025.
Road work begins
.244 MILE(S) AFTER RT E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT DD S South
-
ANDREW COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 04-JUN-2025 to 04-JUN-2025.
Road work begins
RT T E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT O W West
-
ANDREW COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 03-JUN-2025 to 03-JUN-2025.
Road work begins
.033 MILE(S) BEFORE CRD 290 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT J N North
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 04-JUN-2025 to 04-JUN-2025.
Road work begins
CRD NAMRASH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT J S South
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 04-JUN-2025 to 04-JUN-2025.
Road work begins
CRD CUTTOFF RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT M E East
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 03-JUN-2025 to 03-JUN-2025.
Road work begins
.24 MILE(S) BEFORE MO 11 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT M W West
-
CHARITON COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 03-JUN-2025 to 03-JUN-2025.
Road work begins
.222 MILE(S) BEFORE CRD SIOUX AVE S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
Interstate IS 35 N North
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.016 MILE(S) AFTER RP IS35N TO MO6 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 35 S South
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.008 MILE(S) AFTER RP IS35S TO MO6 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 6 E East
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.004 MILE(S) AFTER CRD 130 ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 6 E East
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.008 MILE(S) AFTER RP MO6 TO IS35N N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 6 E East
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 19-AUG-2025.
Road work begins
.003 MILE(S) AFTER RP MO6 TO IS35S S.
Work will be done
7 days a week.
State Route MO 6 W West
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.006 MILE(S) AFTER RP MO6 TO IS35S S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route MO 6 W West
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 09-JUN-2025 to 19-AUG-2025.
Road work begins
.005 MILE(S) AFTER RP IS35N TO MO6 N.
Work will be done
7 days a week.
State Route MO 6 W West
-
DAVIESS COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
.068 MILE(S) BEFORE RP IS35N TO MO6 N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT AF W West
-
GENTRY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 04-JUN-2025 to 05-JUN-2025.
Road work begins
.005 MILE(S) BEFORE CRD 420 RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT AF E East
-
NODAWAY COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 04-JUN-2025 to 05-JUN-2025.
Road work begins
.002 MILE(S) BEFORE CRD PANTHER RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT MM N North
-
NODAWAY COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 03-JUN-2025 to 03-JUN-2025.
Road work begins
CRD 290 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT MM S South
-
NODAWAY COUNTY
- CLOSED
PAVEMENT REPAIR
Scheduled from 03-JUN-2025 to 03-JUN-2025.
Road work begins
.028 MILE(S) BEFORE CRD 280 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT VV E East
-
NODAWAY COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 03-JUN-2025 to 12-JUN-2025.
Road work begins
.036 MILE(S) AFTER CRD MERCURY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route RT VV W West
-
NODAWAY COUNTY
- CLOSED
BRIDGE INSPECTION
Scheduled from 03-JUN-2025 to 12-JUN-2025.
Road work begins
.028 MILE(S) AFTER RT AH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:00 PM.
State Route MO 148 E East
-
NODAWAY COUNTY
- Delays Possible
SCRUB SEALING PAVEMENT
Scheduled from 06-JUN-2025 to 12-JUN-2025.
Road work begins
.134 MILE(S) AFTER CRD 180 ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT B E East
-
NODAWAY COUNTY
- Delays Possible
SCRUB SEALING PAVEMENT
Scheduled from 10-JUN-2025 to 13-JUN-2025.
Road work begins
US 71 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.