State Route RT T E East
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2025 to 01-NOV-2025.
Road work begins
.013 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT T W West
-
ADAIR COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2025 to 01-NOV-2025.
Road work begins
CRD OLIVE HILL WAY E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 W West
-
CLARK COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-MAY-2025 to 01-NOV-2025.
Road work begins
.103 MILE(S) AFTER CRD 138 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 11 N North
-
KNOX COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-MAY-2025 to 01-NOV-2025.
Road work begins
.072 MILE(S) AFTER CRD BOBCAT AVE S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 156 W West
-
KNOX COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 08-MAY-2025 to 01-NOV-2025.
Road work begins
.062 MILE(S) AFTER MO 151 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
CRD FRENCHMANS BLUFF RD E East
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CRD FRENCHMANS BLUFF RD W West
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 18-NOV-2024 to 30-JUN-2026.
Road work begins
.184 MILE(S) BEFORE CST SARAH ANN BLVD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.014 MILE(S) BEFORE CST NORTH LINCOLN DR S.
Work will be done
7 days a week.
State Route MO 47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-JUN-2024 to 30-JUN-2026.
Road work begins
.026 MILE(S) AFTER PVT ANNA AVE S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61N N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP MO47 TO US61S S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
MO 47 S.
Work will be done
7 days a week.
Ramp RP US61N TO MO47 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
US 61 N.
Work will be done
7 days a week.
Ramp RP US61S TO MO47 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.012 MILE(S) AFTER US 61 S.
Work will be done
7 days a week.
State Route RT K E East
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-MAY-2025 to 02-JUN-2025.
Road work begins
.016 MILE(S) BEFORE CRD CHERRY ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
State Route RT K W West
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-MAY-2025 to 02-JUN-2025.
Road work begins
US 61 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
State Route RT V E East
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-MAY-2025 to 02-JUN-2025.
Road work begins
.027 MILE(S) AFTER US 61 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
State Route RT V W West
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 05-MAY-2025 to 02-JUN-2025.
Road work begins
.02 MILE(S) AFTER RT JJ E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
US US 61 N North
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.048 MILE(S) AFTER CST OLD CAP AU GRIS RD E.
Work will be done
7 days a week.
US US 61 S South
-
LINCOLN COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 11-JUL-2024 to 30-JUN-2026.
Road work begins
.319 MILE(S) BEFORE CST N LINCOLN DR E.
Work will be done
7 days a week.
US US 36 E East
-
MARION COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 05-MAY-2025 to 30-MAY-2025.
Road work begins
.305 MILE(S) AFTER RT H S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
09:00 PM.
US US 36 W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-APR-2025 to 01-NOV-2025.
Road work begins
.27 MILE(S) AFTER RP US24W TO US36W W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 36 W West
-
MARION COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 26-MAR-2025 to 20-JUN-2025.
Road work begins
.017 MILE(S) AFTER US 24 W.
Work will be done
on weekdays and Saturdays.
US US 24 E East
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.115 MILE(S) BEFORE RP US24E TO MO6 E.
Work will be done
7 days a week.
US US 24 W West
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.159 MILE(S) BEFORE RP US24W TO MO6 W.
Work will be done
7 days a week.
US US 61 N North
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.1 MILE(S) BEFORE RP US24E TO MO6 E.
Work will be done
7 days a week.
US US 61 S South
-
MARION COUNTY
- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 24-FEB-2025 to 16-MAY-2025.
Road work begins
.145 MILE(S) BEFORE RP US24W TO MO6 W.
Work will be done
7 days a week.
US US 61 N North
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 20-MAY-2025.
Road work begins
.064 MILE(S) BEFORE RP US61N TO RTD N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 61 S South
-
PIKE COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-APR-2025 to 20-MAY-2025.
Road work begins
.027 MILE(S) AFTER RP US61S TO RTD S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT BB E East
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-APR-2025 to 01-NOV-2025.
Road work begins
MO 3 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT D S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 28-MAR-2025 to 01-NOV-2025.
Road work begins
RT C S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT DD S South
-
RANDOLPH COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-NOV-2025.
Road work begins
CRD 1650 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 N North
-
RANDOLPH COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 20-FEB-2025 to 01-NOV-2025.
Road work begins
.009 MILE(S) BEFORE RT J E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 63 S South
-
RANDOLPH COUNTY
- Expect Delays
DIAMOND GRINDING
Scheduled from 01-APR-2025 to 01-SEP-2025.
Road work begins
.008 MILE(S) BEFORE RP US24 TO US63S S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT H S South
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2025 to 01-NOV-2025.
Road work begins
US 136 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT W W West
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 22-APR-2025 to 01-NOV-2025.
Road work begins
.022 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 E East
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-MAY-2025 to 01-NOV-2025.
Road work begins
.002 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
US US 136 W West
-
SCHUYLER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 01-MAY-2025 to 01-NOV-2025.
Road work begins
.002 MILE(S) AFTER US 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
CST OLD U S HWY 36 E East
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.028 MILE(S) BEFORE RP US36E TO BU36 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
CST OLD U S HWY 36 W West
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.001 MILE(S) BEFORE MO 151 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
State Route MO 151 S South
-
SHELBY COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.3 MILE(S) BEFORE RP US36W TO MO151 N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
Interstate IS 70 E East
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
SURVEYING
Scheduled from 05-MAY-2025 to 15-MAY-2025.
Road work begins
.3 MILE(S) BEFORE RA IS70E WRIGHT CITY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 PM
and
06:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
Interstate IS 70 E East
-
WARREN COUNTY
- Delays Possible
PAVEMENT STRIPING
Scheduled from 27-APR-2025 to 18-MAY-2025.
Road work begins
.729 MILE(S) BEFORE RP IS70E TO RTT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
05:00 AM.
Interstate IS 70 E East
-
WARREN COUNTY
- Delays Possible
Project Name -
Improve I-70 Project #2
NEW PAVEMENT CONSTRUCTION
Scheduled from 28-APR-2025 to 23-MAY-2025.
Road work begins
.204 MILE(S) BEFORE RP IS70E TO W WARRENTON BLVD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Project Web Page -
https://www.modot.org/improvei70/warrentonwentzville
State Route RT DD N North
-
AUDRAIN COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.004 MILE(S) AFTER CRD 980 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT HH E East
-
AUDRAIN COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
RT D E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT M N North
-
AUDRAIN COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.001 MILE(S) AFTER CRD 2000 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route MO 15 N North
-
AUDRAIN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins
.089 MILE(S) AFTER CST WADE ST S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
09:00 PM.
State Route RT HH N North
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
CRD 252 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT HH S South
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
RT Y E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT V E East
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
2.021 MILE(S) BEFORE CRD 6 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT V E East
-
CLARK COUNTY
- CLOSED
RESURFACING PAVEMENT
Scheduled from 14-MAY-2025 to 15-MAY-2025.
Road work begins
2.021 MILE(S) BEFORE CRD 6 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT V W West
-
CLARK COUNTY
- CLOSED
RESURFACING PAVEMENT
Scheduled from 14-MAY-2025 to 15-MAY-2025.
Road work begins
MO 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT V W West
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
MO 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y E East
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 14-MAY-2025 to 15-MAY-2025.
Road work begins
CRD 161 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y E East
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
.002 MILE(S) AFTER RT HH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y W West
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 14-MAY-2025 to 15-MAY-2025.
Road work begins
MO 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y W West
-
CLARK COUNTY
- CLOSED
SEAL COAT OVERLAY
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
MO 81 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT E N North
-
KNOX COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 20-MAY-2025.
Road work begins
MO 156 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT E N North
-
KNOX COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 16-MAY-2025.
Road work begins
MO 156 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT E S South
-
KNOX COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 20-MAY-2025.
Road work begins
MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT E S South
-
KNOX COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 16-MAY-2025.
Road work begins
MO 6 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT U E East
-
KNOX COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT T E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT U W West
-
LEWIS COUNTY
- CLOSED
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT PP E East
-
LINCOLN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-MAY-2025 to 13-MAY-2025.
Road work begins
CRD LIBERTY CHURCH RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT PP W West
-
LINCOLN COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-MAY-2025 to 13-MAY-2025.
Road work begins
.001 MILE(S) AFTER CRD CORSO RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT Y E East
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-MAY-2025 to 13-JUN-2025.
Road work begins
RT W S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
State Route RT Y W West
-
LINCOLN COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 15-MAY-2025 to 13-JUN-2025.
Road work begins
.01 MILE(S) AFTER MO 79 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
06:30 PM.
State Route MO 79 N North
-
LINCOLN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
PVT PIN OAK CT E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 79 S South
-
LINCOLN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.003 MILE(S) AFTER RT JJ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route MO 79 S South
-
LINCOLN COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 13-MAY-2025.
Road work begins
.001 MILE(S) AFTER RT Y E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
03:00 PM.
State Route RT B E East
-
LINCOLN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-MAY-2025 to 16-MAY-2025.
Road work begins
CRD LILLEY LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
09:00 AM.
State Route RT B W West
-
LINCOLN COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 14-MAY-2025 to 16-MAY-2025.
Road work begins
CRD HARTLEY LN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
09:00 AM.
State Route RT O N North
-
LINCOLN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O N North
-
LINCOLN COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.023 MILE(S) AFTER PVT LINCOLN ACRES DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT O N North
-
LINCOLN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT TT N North
-
LINCOLN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
RT D S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT TT S South
-
LINCOLN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
CRD QUARRY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT K N North
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 22-MAY-2025.
Road work begins
US 36 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT K N North
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
US 36 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT K S South
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 22-MAY-2025.
Road work begins
RT DD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT K S South
-
MACON COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
RT DD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
Interstate IS 72 E East
-
MARION COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 28-MAY-2025.
Road work begins
.128 MILE(S) BEFORE MO 79 S.
Work will be done
7 days a week.
Interstate IS 72 W West
-
MARION COUNTY
- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 28-MAY-2025.
Road work begins
US 36 W.
Work will be done
7 days a week.
State Route MO 15 S South
-
MONROE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 19-MAY-2025 to 30-JUN-2025.
Road work begins
.005 MILE(S) AFTER RT D E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
09:00 PM.
State Route MO 15 N North
-
MONROE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT MM S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route MO 15 S South
-
MONROE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.001 MILE(S) BEFORE RT CC E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT CC E East
-
MONROE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
CRD 311 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT CC W West
-
MONROE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
CRD 317 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
04:00 PM.
State Route RT K E East
-
MONTGOMERY COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2025 to 13-MAY-2025.
Road work begins
.001 MILE(S) AFTER RT HH E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route RT K W West
-
MONTGOMERY COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 13-MAY-2025 to 13-MAY-2025.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
Interstate IS 70 E East
-
MONTGOMERY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.034 MILE(S) BEFORE RP IS70E TO RTE W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Interstate IS 70 W West
-
MONTGOMERY COUNTY
- Expect Delays
SHOULDER WORK
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.031 MILE(S) BEFORE RP IS70W TO RTE W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT PP E East
-
PIKE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
CRD 323 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT PP W West
-
PIKE COUNTY
- CLOSED
CULVERT REPLACEMENT
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
CRD 338 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O S South
-
PIKE COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.365 MILE(S) AFTER CO CRD 338 TO RTO S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
03:00 PM.
State Route RT O S South
-
PIKE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
MO 161 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O S South
-
PIKE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
MO 161 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 3 N North
-
RANDOLPH COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 22-MAY-2025.
Road work begins
.993 MILE(S) BEFORE CRD 2075 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 3 N North
-
RANDOLPH COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2025 to 29-MAY-2025.
Road work begins
.891 MILE(S) BEFORE CRD 2040 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
State Route MO 3 S South
-
RANDOLPH COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 12-MAY-2025 to 22-MAY-2025.
Road work begins
.042 MILE(S) BEFORE CRD 2075 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
02:00 PM.
State Route MO 3 S South
-
RANDOLPH COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 19-MAY-2025 to 29-MAY-2025.
Road work begins
.139 MILE(S) BEFORE CRD 2040 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
12:00 PM.
State Route RT A N North
-
RANDOLPH COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.016 MILE(S) AFTER CRD 2905 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT A S South
-
RANDOLPH COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.17 MILE(S) AFTER CRD 2561 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B E East
-
RANDOLPH COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT B W West
-
RANDOLPH COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B W West
-
RANDOLPH COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
RT H S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B W West
-
RANDOLPH COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 14-MAY-2025 to 14-MAY-2025.
Road work begins
CRD 2480 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B W West
-
RANDOLPH COUNTY
- Delays Possible
SEAL COAT OVERLAY
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
.007 MILE(S) BEFORE US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT B W West
-
RANDOLPH COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 13-MAY-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 E East
-
RANDOLPH COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 14-MAY-2025 to 14-MAY-2025.
Road work begins
.047 MILE(S) AFTER RR MOBERLY STUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 E East
-
RANDOLPH COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.049 MILE(S) AFTER RR MOBERLY STUB S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 W West
-
RANDOLPH COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
.033 MILE(S) AFTER CST CRETE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
US US 24 W West
-
RANDOLPH COUNTY
- Delays Possible
CORE DRILLING
Scheduled from 14-MAY-2025 to 14-MAY-2025.
Road work begins
.033 MILE(S) AFTER CST CRETE ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
CRD W VETERANS MEMORIAL PKWY E East
-
WARREN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.32 MILE(S) BEFORE RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
CRD W VETERANS MEMORIAL PKWY W West
-
WARREN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.256 MILE(S) BEFORE RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP IS70E TO RTA S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.002 MILE(S) AFTER IS 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP IS70W TO RTA W West
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
IS 70 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT A N North
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT A S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.076 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT B N North
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
.053 MILE(S) BEFORE OR 70 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT B S South
-
WARREN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP RTA TO IS70E E East
-
WARREN COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
Ramp RP RTA TO IS70W W West
-
WARREN COUNTY
- Delays Possible
NEW PAVEMENT CONSTRUCTION
Scheduled from 12-MAY-2025 to 03-OCT-2025.
Road work begins
RT B S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
06:00 PM.
State Route RT W N North
-
WARREN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
OR 70 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT W S South
-
WARREN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.