Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-DEC-2025.
Road work begins
1.065 MILE(S) BEFORE RP IS70E TO RTJ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins
.018 MILE(S) BEFORE RR COLT S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
Interstate IS 70 E East
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 01-MAY-2025 to 31-JUL-2025.
Road work begins
1.069 MILE(S) BEFORE RP IS70E TO RTJ E.
Work will be done
7 days a week.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins
.169 MILE(S) BEFORE RP IS70W TO RTBB W.
Work will be done
on weekdays only.
Interstate IS 70 W West
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 13-OCT-2024 to 01-JAN-2027.
Road work begins
.2 MILE(S) BEFORE RP IS70W TO US63C N.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:00 PM
and
07:00 AM.
State Route MO 151 N North
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 07-APR-2025 to 01-NOV-2025.
Road work begins
.009 MILE(S) AFTER CST SWITZLER ST E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
06:30 AM
and
08:30 PM.
Outer Road W OR 63 N North
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
.009 MILE(S) AFTER RT VV S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
Outer Road W OR 63 S South
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
.463 MILE(S) BEFORE CRD EAST CIRCLE DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E N North
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
.102 MILE(S) AFTER CST INDUSTRIAL DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E S South
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
MO 124 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT E S South
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
MO 124 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT PP N North
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
.059 MILE(S) BEFORE CST TANZANITE DR S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT PP N North
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2027.
Road work begins
.011 MILE(S) BEFORE CST GOLDEN BEAR DR E.
Work will be done
on weekdays only.
State Route RT PP S South
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-MAR-2025 to 31-DEC-2027.
Road work begins
.021 MILE(S) AFTER CST OLYMPIC BLVD S.
Work will be done
on weekdays only.
State Route RT PP S South
-
BOONE COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
CRD DUSTY RHODES LN E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT VV N North
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
.034 MILE(S) AFTER OR 63 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT VV S South
-
BOONE COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 23-APR-2025 to 06-JUN-2025.
Road work begins
CRD W DRIPPING SPRINGS RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
US US 63 N North
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins
.056 MILE(S) BEFORE RP US63N TO RTWW N.
Work will be done
7 days a week.
US US 63 S South
-
BOONE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-OCT-2024 to 01-JAN-2026.
Road work begins
.076 MILE(S) BEFORE CST CLARK LN E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-FEB-2025 to 31-DEC-2027.
Road work begins
.441 MILE(S) BEFORE RR FULTON BRANCH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 26-FEB-2025 to 31-DEC-2027.
Road work begins
.265 MILE(S) BEFORE RP IS70W TO US54E E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
Interstate IS 70 W West
-
CALLAWAY COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 08-JUL-2024 to 31-DEC-2025.
Road work begins
.639 MILE(S) BEFORE RP IS70W TO RTM W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
07:00 AM.
US US 54 E East
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-MAR-2025 to 31-MAR-2026.
Road work begins
.05 MILE(S) AFTER OR 70 E.
Work will be done
on weekdays only.
US US 54 W West
-
CALLAWAY COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 24-MAR-2025 to 31-MAR-2026.
Road work begins
.016 MILE(S) AFTER CST DUNN DR E.
Work will be done
on weekdays only.
US US 54 E East
-
CALLAWAY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-JUL-2025.
Road work begins
.253 MILE(S) BEFORE CST MOKANE RD E.
Work will be done
on weekdays only.
US US 54 W West
-
CALLAWAY COUNTY
- Delays Possible
RESURFACING PAVEMENT
Scheduled from 24-MAR-2025 to 01-JUL-2025.
Road work begins
.249 MILE(S) AFTER OR 54 E.
Work will be done
on weekdays only.
State Route RT D S South
-
CAMDEN COUNTY
- Expect Delays
CST WEST OSAGE BEACH PKWY N North
-
CAMDEN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-APR-2025 to 22-MAY-2025.
Road work begins
.016 MILE(S) BEFORE PVT CHATEAU LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST WEST OSAGE BEACH PKWY N North
-
CAMDEN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-APR-2025 to 22-MAY-2025.
Road work begins
.015 MILE(S) AFTER CST OAK LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST WEST OSAGE BEACH PKWY S South
-
CAMDEN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-APR-2025 to 22-MAY-2025.
Road work begins
.003 MILE(S) AFTER CST BROADWATER LN S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
CST WEST OSAGE BEACH PKWY S South
-
CAMDEN COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 28-APR-2025 to 22-MAY-2025.
Road work begins
PVT GLAIZE BRIDGE HTS S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
05:00 PM.
State Route RT J N North
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
US 54 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT J S South
-
CAMDEN COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.023 MILE(S) AFTER CO MO7 TO RTJ S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
US US 54 E East
-
COLE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2025 to 25-JUN-2025.
Road work begins
.016 MILE(S) BEFORE CST STADIUM BLVD E.
Work will be done
7 days a week.
US US 54 W West
-
COLE COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2025 to 25-JUN-2025.
Road work begins
.055 MILE(S) BEFORE CST LINDEN DR E.
Work will be done
7 days a week.
Interstate IS 70 E East
-
COOPER COUNTY
- Expect Delays
Project Name -
ROCHEPORT DESIGN BUILD
BRIDGE RECONSTRUCTION
Scheduled from 14-SEP-2021 to 30-JUN-2025.
Road work begins
.027 MILE(S) AFTER RR RIVER SUB E.
Work will be done
on weekdays only.
State Route RT BB N North
-
COOPER COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
RT A S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT BB S South
-
COOPER COUNTY
- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
MO 135 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT CC N North
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
MO 41 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT CC S South
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD ARROW ROCK RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD SCHOOL HOUSE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT HH W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT NN E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
CRD SHACKELFORD BRIDGE DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT NN W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT N E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT OO E East
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT OO W West
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 25-MAR-2025 to 30-MAY-2025.
Road work begins
MO 135 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT PP N North
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
.007 MILE(S) AFTER MO 5 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT PP S South
-
COOPER COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
.004 MILE(S) AFTER CRD DOWNEY RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 70 E East
-
COOPER COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 11-MAY-2025 to 12-MAY-2025.
Road work begins
1.849 MILE(S) BEFORE RT M S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT F N North
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2025 to 16-MAY-2025.
Road work begins
.015 MILE(S) BEFORE IS 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT F S South
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2025 to 16-MAY-2025.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT KK E East
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2025 to 16-MAY-2025.
Road work begins
OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT KK W West
-
CRAWFORD COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 29-APR-2025 to 16-MAY-2025.
Road work begins
RT ZZ E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route MO 19 N North
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.001 MILE(S) BEFORE CRD EDGAR RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route MO 19 S South
-
CRAWFORD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.011 MILE(S) AFTER RT HH S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route RT AA N North
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CRD CHERRYVILLE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT AA S South
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 19 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M N North
-
CRAWFORD COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.009 MILE(S) AFTER RT VV S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT M S South
-
CRAWFORD COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.027 MILE(S) BEFORE RT U E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT TT N North
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 8 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT TT S South
-
CRAWFORD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CRD LIBERTY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 19 N North
-
DENT COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 12-MAY-2025 to 16-MAY-2025.
Road work begins
1.283 MILE(S) AFTER CRD 6240 E.
Work will be done
7 days a week.
State Route MO 19 S South
-
DENT COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 12-MAY-2025 to 16-MAY-2025.
Road work begins
1.123 MILE(S) AFTER CRD 6230 E.
Work will be done
7 days a week.
State Route MO 5 N North
-
HOWARD COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 19-SEP-2025.
Road work begins
.01 MILE(S) BEFORE CST LOCUST ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route MO 5 S South
-
HOWARD COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 14-APR-2025 to 19-SEP-2025.
Road work begins
.016 MILE(S) BEFORE CST VIEW DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
06:00 PM.
State Route RT P E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.119 MILE(S) AFTER CST EDWARD ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT P W West
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 240 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT D N North
-
LACLEDE COUNTY
- Expect Delays
Interstate IS 44 E East
-
LACLEDE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-MAY-2025 to 22-MAY-2025.
Road work begins
.832 MILE(S) BEFORE RP IS44E TO RTN E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
Interstate IS 44 W West
-
LACLEDE COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-MAY-2025 to 22-MAY-2025.
Road work begins
2.197 MILE(S) AFTER RP MO133 TO IS44W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT AD N North
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT O E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT AD S South
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 12-MAY-2025.
Road work begins
RT Z S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT C E East
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.012 MILE(S) AFTER RT H S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT C W West
-
MARIES COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.014 MILE(S) AFTER CRD 424 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
04:00 PM.
State Route RT C N North
-
MILLER COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.38 MILE(S) AFTER PVT WINDES RIDGE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route RT C S South
-
MILLER COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 17 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
02:30 PM.
State Route RT H E East
-
MILLER COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 17 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT H W West
-
MILLER COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CRD OLD TEN MILE RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:30 AM
and
03:30 PM.
State Route RT P E East
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
MO 87 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route RT P W West
-
MILLER COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CST MAIN ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:30 PM.
State Route MO 5 N North
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
.022 MILE(S) AFTER CST DEKALB ST E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 5 S South
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 52 E East
-
MORGAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 01-NOV-2025.
Road work begins
.025 MILE(S) BEFORE CST BROWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 52 E East
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
.019 MILE(S) BEFORE CST BROWN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 52 W West
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
.129 MILE(S) BEFORE CST VIEW DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 52 W West
-
MORGAN COUNTY
- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 27-JAN-2025 to 01-NOV-2025.
Road work begins
.015 MILE(S) BEFORE CST WEST VIEW DR S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT PP E East
-
MORGAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
.009 MILE(S) AFTER RT D S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT PP W West
-
MORGAN COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 14-MAY-2025.
Road work begins
.002 MILE(S) AFTER CRD SCHMIDT RD E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT W N North
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
.001 MILE(S) AFTER CST WALNUT ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT W S South
-
MORGAN COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 05-MAY-2025 to 06-JUN-2025.
Road work begins
MO 52 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
US US 50 E East
-
OSAGE COUNTY
- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 31-MAR-2025 to 13-MAR-2026.
Road work begins
.201 MILE(S) AFTER CRD LOOSE CREEK HIGHWAY E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:30 AM
and
07:00 PM.
State Route MO 89 N North
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.014 MILE(S) BEFORE CST LINNWOOD DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 89 S South
-
OSAGE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.016 MILE(S) BEFORE CST RAILROAD AVE E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
US US 50 E East
-
OSAGE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-MAY-2025 to 24-MAY-2025.
Road work begins
.01 MILE(S) BEFORE CST TENTH ST S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
US US 50 W West
-
OSAGE COUNTY
- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 05-MAY-2025 to 24-MAY-2025.
Road work begins
.001 MILE(S) AFTER CST LINNWOOD DR E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
Interstate IS 44 E East
-
PHELPS COUNTY
- Expect Delays
PAVEMENT REPAIR
Scheduled from 07-MAY-2025 to 22-MAY-2025.
Road work begins
.004 MILE(S) AFTER RP RTV TO IS44E E.
Work will be done
on weekdays only.
State Route RT M E East
-
PHELPS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 30-MAY-2025.
Road work begins
RT J S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route RT M W West
-
PHELPS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 21-APR-2025 to 30-MAY-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
07:00 PM.
State Route MO 68 E East
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.456 MILE(S) BEFORE CRD 4400 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 68 W West
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.398 MILE(S) AFTER RT F E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT C N North
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.009 MILE(S) BEFORE OR 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT C S South
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.001 MILE(S) BEFORE CRD 8220 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT CC E East
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CRD 7360 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT CC W West
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT J N North
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.045 MILE(S) BEFORE CRD 6410 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT J S South
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.326 MILE(S) AFTER RR DOD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT T N North
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.075 MILE(S) AFTER RT M E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT T S South
-
PHELPS COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.017 MILE(S) AFTER IS 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:30 AM
and
03:30 PM.
State Route RT U N North
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.347 MILE(S) BEFORE CRD 1210 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT U S South
-
PHELPS COUNTY
- Delays Possible
CULVERT REPLACEMENT
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.332 MILE(S) AFTER CRD 1220 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT W E East
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.1 MILE(S) AFTER CRD 7220 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT W W West
-
PHELPS COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
US 63 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT H N North
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-MAY-2025 to 22-MAY-2025.
Road work begins
.01 MILE(S) AFTER LP 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT H S South
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-MAY-2025 to 22-MAY-2025.
Road work begins
.002 MILE(S) AFTER RP IS44W TO RTH N.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT Y N North
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 05-MAY-2025 to 04-JUN-2025.
Road work begins
LP 44 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route RT Y S South
-
PULASKI COUNTY
- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 05-MAY-2025 to 04-JUN-2025.
Road work begins
.022 MILE(S) BEFORE IS 44 W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:00 PM.
State Route MO 8 E East
-
WASHINGTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-DEC-2025.
Road work begins
.009 MILE(S) BEFORE CRD OLD HWY 8 E.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
11:59 PM.
State Route MO 8 W West
-
WASHINGTON COUNTY
- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 03-MAR-2025 to 01-DEC-2025.
Road work begins
.024 MILE(S) BEFORE CRD RAILROAD RD 606 S.
Work will be done
7 days a week.
Work will be conducted between the hours of
06:00 AM
and
11:59 PM.
State Route MO 8 E East
-
WASHINGTON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.132 MILE(S) BEFORE PVT DUNROVIN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route MO 8 W West
-
WASHINGTON COUNTY
- Delays Possible
SHOULDER WORK
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
.123 MILE(S) BEFORE PVT RIDGEWAY RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT JJ N North
-
WASHINGTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
CRD BRINLEY RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT JJ S South
-
WASHINGTON COUNTY
- Delays Possible
PAVEMENT REPAIR
Scheduled from 12-MAY-2025 to 15-MAY-2025.
Road work begins
RT C E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT BB N North
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
RT AA E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT BB S South
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
US 54 W.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT FF E East
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
CRD 225 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT FF W West
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
.571 MILE(S) BEFORE CRD 240 E.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT MM E East
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
CRD 389 S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT MM W West
-
CALLAWAY COUNTY
- Expect Delays
CHIP SEAL OVERLAY
Scheduled from 19-MAY-2025 to 09-JUN-2025.
Road work begins
RT J S.
Work will be done
on weekdays and Saturdays.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT C E East
-
COLE COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 18-MAY-2025 to 22-MAY-2025.
Road work begins
.003 MILE(S) AFTER CST ELLIS BLVD E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route RT C W West
-
COLE COUNTY
- CLOSED
BRIDGE MAINTENANCE
Scheduled from 18-MAY-2025 to 22-MAY-2025.
Road work begins
CST ELLIS BLVD E.
Work will be done
on weekdays and Sundays.
Work will be conducted between the hours of
06:00 PM
and
06:00 AM.
State Route MO 19 N North
-
GASCONADE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 30-MAY-2025.
Road work begins
.005 MILE(S) AFTER CRD BRINKMAN RD S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 19 S South
-
GASCONADE COUNTY
- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 19-MAY-2025 to 30-MAY-2025.
Road work begins
.018 MILE(S) BEFORE CRD AUFDERHEIDE RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
08:00 AM
and
05:00 PM.
State Route MO 5 N North
-
HOWARD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.034 MILE(S) BEFORE CRD 430 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route MO 5 S South
-
HOWARD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.004 MILE(S) BEFORE CRD 423 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
MO 3 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT B E East
-
HOWARD COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 19-MAY-2025 to 19-MAY-2025.
Road work begins
MO 3 S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O E East
-
HOWARD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.016 MILE(S) BEFORE CRD 130 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
State Route RT O W West
-
HOWARD COUNTY
- Delays Possible
ROADSIDE WORK
Scheduled from 13-MAY-2025 to 15-MAY-2025.
Road work begins
.016 MILE(S) AFTER RT A S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
04:00 PM.
CRD ROUTE 66 E East
-
LACLEDE COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 19-MAY-2025 to 10-OCT-2025.
Road work begins
.002 MILE(S) AFTER OR 44 E.
Work will be done
7 days a week.
CRD ROUTE 66 W West
-
LACLEDE COUNTY
- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 19-MAY-2025 to 10-OCT-2025.
Road work begins
.003 MILE(S) AFTER CRD RUSTIC DR S.
Work will be done
7 days a week.
State Route RT AC E East
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
RT N S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT AC W West
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 15-MAY-2025 to 15-MAY-2025.
Road work begins
RT K S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT K N North
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
MO 32 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
State Route RT K S South
-
LACLEDE COUNTY
- Delays Possible
PATCHING DRIVE SURFACE
Scheduled from 13-MAY-2025 to 14-MAY-2025.
Road work begins
2.749 MILE(S) AFTER CRD STEVENS RD E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
06:00 AM
and
04:30 PM.
Interstate IS 44 W West
-
PHELPS COUNTY
- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 14-MAY-2025 to 16-MAY-2025.
Road work begins
.023 MILE(S) BEFORE RP MO8 TO IS44W W.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 PM
and
06:00 AM.
State Route RT EE N North
-
PHELPS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-MAY-2025 to 28-MAY-2025.
Road work begins
RT B S.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.
State Route RT EE S South
-
PHELPS COUNTY
- Expect Delays
RESURFACING PAVEMENT
Scheduled from 16-MAY-2025 to 28-MAY-2025.
Road work begins
CRD 1280 E.
Work will be done
on weekdays only.
Work will be conducted between the hours of
07:00 AM
and
07:00 PM.